NEER-ꯅꯥ ꯁꯦꯝꯈꯤꯕ ꯗ꯭ꯔꯥꯐꯠ ꯚꯔꯁꯟ 1.0꯫ ꯃꯅꯤꯄꯨꯔ ꯂꯩꯉꯥꯛ, ꯗꯤꯁꯇ꯭ꯔꯤꯛ ꯀꯥꯎꯟꯁꯤꯜ, ꯑꯣꯊꯣꯔꯤꯇꯤ ꯅꯠꯔꯒꯥ ꯂꯣꯀꯜ ꯕꯣꯗꯤ ꯑꯃꯠꯇꯅꯥ ꯂꯧꯁꯤꯟꯈꯤꯗꯦ, ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯑꯥꯏꯟꯒꯤ ꯁꯛꯇꯤ ꯂꯩꯇꯦ꯫ ꯗ꯭ꯔꯥꯐꯠ ꯑꯁꯤꯒꯤ ꯃꯇꯥꯡꯗ

ꯁꯔꯨꯛ 3ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯊꯧꯑꯣꯡꯁꯤꯡ


3.1 ꯄꯥꯟꯗꯝ ꯑꯃꯁꯨꯡ ꯁ꯭ꯀꯣꯞ

3.1.1 ꯁꯔꯨꯛ ꯑꯁꯤꯅꯥ ꯁꯔꯨꯛ 2-ꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯅꯣꯡ ꯆꯨꯕ ꯑꯗꯨ ꯃꯈꯥꯗ ꯄꯤꯔꯤꯕ ꯊꯕꯛꯁꯤꯡꯒꯤꯗꯃꯛ ꯔꯟꯑꯣꯐ (runoff)-ꯀꯤ ꯄꯤꯛ, ꯚꯣꯂꯨꯝ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ (hydrograph)-ꯁꯤꯡꯗ ꯀꯔꯝꯅꯥ ꯑꯣꯟꯊꯣꯀꯄꯒꯦ ꯍꯥꯌꯕ ꯇꯥꯀꯏ:

  • (a) ꯈꯣꯡꯕꯥꯟ (drain), ꯏꯟꯂꯦꯠ ꯑꯃꯁꯨꯡ ꯀꯜꯚꯔꯠ (culvert)-ꯀꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯄ (ꯁꯔꯨꯛ 6);
  • (b) ꯔꯤꯇꯦꯟꯁꯟ (retention) ꯑꯃꯁꯨꯡ ꯗꯤꯇꯦꯟꯁꯟ (detention)-ꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯄ, ꯑꯃꯁꯨꯡ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕ (pre- vs post-development comparison) (ꯁꯔꯨꯛ 4);
  • (c) ꯃꯈꯥ ꯊꯡꯕ ꯃꯐꯝ ꯑꯃꯁꯨꯡ ꯇꯦꯜꯋꯥꯇꯔ (tailwater)-ꯒꯤ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁ (ꯁꯔꯨꯛ 5); ꯑꯃꯁꯨꯡ
  • (d) ꯏꯁꯤꯡ ꯂꯩꯐꯝ, ꯄꯨꯈ꯭ꯔꯤ (tank; pukhri) ꯑꯃꯁꯨꯡ ꯔꯤꯖꯅꯦꯜ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡꯒꯤ ꯁ꯭ꯇꯗꯤꯁꯤꯡ (ꯁꯔꯨꯛ 7)꯫

3.1.2 ꯃꯁꯤꯅꯥ ꯃꯈꯥꯒꯤꯁꯤꯡ ꯂꯦꯞꯊꯣꯀꯏ:

  • (a) ꯀꯔꯤ ꯄꯥꯟꯗꯝꯒꯤꯗꯃꯛ ꯑꯃꯁꯨꯡ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯀꯔꯤ ꯁꯥꯏꯖꯒꯤꯗꯃꯛ ꯀꯔꯤ ꯊꯧꯑꯣꯡ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯒꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.4);
  • (b) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯂꯩꯃꯥꯏ ꯀꯔꯝꯅꯥ ꯂꯦꯞꯊꯣꯀꯄꯒꯦ (ꯀ꯭ꯂꯣꯖ 3.3);
  • (c) ꯊꯧꯑꯣꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ: ꯔꯟꯑꯣꯐ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯁꯤꯡ, ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ, ꯂꯩꯃꯥꯏꯁꯤꯡ, ꯀꯔꯚ ꯅꯝꯕꯔꯁꯤꯡ, ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯔꯥꯎꯇꯤꯡ (ꯀ꯭ꯂꯣꯖ 3.5–3.12);
  • (d) ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯃꯣꯗꯦꯜ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯀꯗꯥꯏꯗ ꯃꯊꯧ ꯇꯥꯕꯒꯦ (ꯀ꯭ꯂꯣꯖ 3.13 ꯑꯃꯁꯨꯡ 3.15);
  • (e) ꯈꯣꯡꯊꯥꯡ ꯑꯃꯗꯒꯤ ꯈꯣꯡꯊꯥꯡ ꯑꯃꯗ ꯆꯠꯄ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕ (ꯀ꯭ꯂꯣꯖ 3.14); ꯑꯃꯁꯨꯡ
  • (f) ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ ꯌꯥꯕ ꯑꯃꯁꯨꯡ ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯇꯦꯁꯟ (ꯀ꯭ꯂꯣꯖ 3.16 ꯑꯃꯁꯨꯡ 3.17)꯫

3.1.3 ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯏꯟꯄꯨꯠꯁꯤꯡ (ꯗꯦꯞꯊ, ꯗ꯭ꯌꯨꯔꯦꯁꯟ, ꯑꯦꯔꯤꯌꯦꯜ ꯔꯤꯗꯛꯁꯟ, ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔ, ꯇꯦꯝꯄꯣꯔꯦꯜ ꯄꯦꯇꯔꯟ ꯑꯃꯁꯨꯡ ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯃꯣꯏꯁꯆꯔ) ꯁꯔꯨꯛ 2-ꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ, ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ ꯑꯁꯤꯗ ꯃꯈꯣꯌꯕꯨ ꯍꯣꯡꯗꯣꯛꯔꯣꯏꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. CPHEEO (2019)-ꯒꯤ Manual on Storm Water Drainage Systems-ꯅꯥ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ (Rational Method)-ꯀꯤ ꯃꯄꯨꯡ ꯐꯥꯕ ꯄ꯭ꯔꯣꯁꯤꯖꯔ ꯑꯃꯥ ꯄꯤꯔꯤ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤ ꯊꯕꯛꯀꯤꯗꯃꯛ SWMM-ꯒꯤ ꯃꯃꯤꯡ ꯂꯧꯔꯤ, ꯑꯗꯨꯕꯨ ꯃꯁꯤ ꯈꯣꯡꯕꯥꯟꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯅꯕ ꯒꯥꯏꯗ ꯑꯃꯅꯤ꯫ ꯔꯦꯒꯨꯂꯦꯇꯔ ꯑꯃꯅꯥ "ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ" ("pre-development") ꯀꯔꯝꯅꯥ ꯂꯦꯞꯊꯣꯛꯀꯗꯒꯦ, ꯅꯠꯔꯒꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ ꯑꯃꯕꯨ ꯃꯗꯨꯒꯥ ꯆꯥꯡꯗꯝꯅꯗꯨꯅꯥ ꯇꯦꯁ꯭ꯠ ꯇꯧꯅꯕ ꯀꯔꯤ ꯊꯧꯑꯣꯡ ꯁꯤꯖꯤꯟꯅꯒꯗꯒꯦ ꯍꯥꯌꯕ ꯃꯁꯤꯅꯥ ꯍꯥꯏꯗꯦ (CPHEEO Part A §4.4, §8.5.1)꯫ APWA Section 5600-ꯅꯥ ꯑꯅꯤꯃꯛ ꯇꯧꯏ: ꯃꯁꯤꯅꯥ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯊꯤꯡꯏ, ꯕꯦꯖꯂꯥꯏꯟ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡꯁꯤꯡꯒꯤ ꯃꯃꯤꯡ ꯂꯧꯏ, ꯑꯃꯁꯨꯡ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯑꯃꯁꯨꯡ ꯄ꯭ꯔꯄꯣꯖ ꯇꯧꯔꯕ ꯐꯤꯚꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯂꯝ ꯁꯤꯖꯤꯟꯅꯕꯒꯤ ꯑꯦꯁꯨꯝꯄꯁꯟꯁꯤꯡ ꯐꯤꯛꯁ ꯇꯧꯏ (KC Metro APWA 5600, 2011, §5602.2–5602.3; Version 2025.01, §5603.4)꯫ ꯁꯔꯨꯛ ꯑꯁꯤꯅꯥ ꯃꯣꯗꯦꯜ ꯑꯗꯨ ꯇꯨꯡ ꯏꯟꯅꯩ꯫


3.2 ꯗꯦꯐꯤꯅꯤꯁꯟꯁꯤꯡ

ꯋꯥꯍꯩ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯗ ꯑꯔꯊ
ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯐꯤꯚꯝ (pre-development condition) ꯀ꯭ꯂꯣꯖ 3.3.2-ꯗ ꯂꯦꯞꯊꯣꯛꯈꯤꯕ ꯔꯦꯐꯔꯦꯟꯁ ꯂꯩꯃꯥꯏ; ꯃꯁꯤꯒꯥ ꯆꯥꯡꯗꯝꯅꯗꯨꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯔꯟꯑꯣꯐ ꯇꯦꯁ꯭ꯠ ꯇꯧꯏ꯫ ꯃꯁꯤ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯐꯤꯚꯝ ꯅꯠꯇꯦ꯫
ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝ (post-development condition) ꯄ꯭ꯔꯄꯣꯖ ꯇꯧꯔꯕ ꯊꯕꯛꯁꯤꯡ ꯂꯣꯏꯔꯕ ꯃꯇꯨꯡꯒꯤ ꯂꯩꯃꯥꯏ, ꯀ꯭ꯂꯣꯖ 3.3.3-ꯗ ꯂꯦꯞꯊꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ꯫
ꯄꯣꯏꯟꯠ ꯑꯣꯐ ꯀꯝꯄꯦꯔꯤꯁꯟ (point of comparison, POC) ꯁꯥꯏꯠꯀꯤ ꯔꯟꯑꯣꯐꯅꯥ ꯁꯥꯏꯠ ꯊꯥꯗꯣꯛꯄ ꯃꯐꯝ; ꯃꯐꯝ ꯑꯗꯨꯗ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯐ꯭ꯂꯣꯁꯤꯡ ꯆꯥꯡꯗꯝꯅꯩ (ꯀ꯭ꯂꯣꯖ 3.14)꯫
ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ (time of concentration, Tc) ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯑꯣꯏꯅꯥ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯂꯥꯞꯄ ꯄꯣꯏꯟꯠꯇꯒꯤ ꯄꯣꯏꯟꯠ ꯑꯣꯐ ꯏꯟꯇꯔꯦꯁ꯭ꯠ ꯐꯥꯎꯕ ꯔꯟꯑꯣꯐꯅꯥ ꯆꯦꯟꯅꯕ ꯃꯇꯝ꯫
ꯂꯦꯒ (lag, tL) ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯑꯦꯛꯁꯦꯁ (rainfall excess)-ꯀꯤ ꯁꯦꯟꯇ꯭ꯔꯣꯏꯗꯇꯒꯤ ꯔꯟꯑꯣꯐ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤ ꯄꯤꯛ ꯐꯥꯎꯕꯒꯤ ꯃꯇꯝ꯫
ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯛ ꯁꯣꯏꯜ ꯒ꯭ꯔꯨꯞ (hydrologic soil group, HSG) ꯂꯩꯃꯥꯏ ꯑꯃꯕꯨ ꯏꯁꯤꯡ ꯌꯥꯝꯂꯕ ꯃꯇꯝꯗ ꯃꯁꯤꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯔꯦꯠ ꯃꯇꯨꯡ ꯏꯟꯅ NRCS-ꯅꯥ ꯇꯧꯕ ꯀ꯭ꯂꯥꯁꯤꯐꯤꯀꯦꯁꯟ (A, B, C, D) (USDA NRCS, NEH Part 630, Ch. 7)꯫
ꯀꯔꯚ ꯅꯝꯕꯔ (curve number, CN) ꯂꯩꯃꯥꯏꯒꯤ ꯒ꯭ꯔꯨꯞ, ꯂꯝꯒꯤ ꯀꯚꯔ ꯑꯃꯁꯨꯡ ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯃꯣꯏꯁꯆꯔ ꯄꯨꯟꯁꯤꯟꯗꯨꯅꯥ ꯔꯟꯑꯣꯐ ꯄꯣꯇꯦꯟꯁꯤꯌꯦꯜꯒꯤ ꯏꯟꯗꯦꯛꯁ ꯑꯃꯈꯛꯇꯗ ꯁꯦꯝꯕ NRCS-ꯒꯤ ꯄꯦꯔꯥꯃꯤꯇꯔ (USDA NRCS, NEH Part 630, Ch. 9–10)꯫
ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯃꯣꯏꯁꯆꯔ ꯀꯟꯗꯤꯁꯟ (antecedent moisture condition, AMC) ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯃꯥ ꯍꯧꯕ ꯃꯇꯝꯗ ꯂꯩꯃꯥꯏꯗ ꯂꯩꯕ ꯏꯁꯤꯡꯒꯤ ꯐꯤꯚꯝ: AMC I (ꯀꯡꯕ), II (ꯃꯌꯥꯏ ꯑꯣꯏꯕ), III (ꯏꯁꯤꯡ ꯌꯥꯝꯕ)꯫
ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯦꯔꯤꯌꯥ (directly connected impervious area, DCIA) ꯄꯔꯚꯤꯌꯁ (pervious) ꯂꯩꯃꯥꯏ ꯑꯃꯒꯤ ꯃꯊꯛꯇ ꯑꯍꯥꯅꯕꯗ ꯆꯦꯟꯗꯅꯥ ꯈꯣꯡꯕꯥꯟ, ꯄꯥꯏꯞ ꯅꯠꯔꯒꯥ ꯆꯦꯅꯦꯜ ꯑꯃꯗ ꯆꯦꯟꯊꯔꯛꯄ ꯏꯝꯄꯔꯚꯤꯌꯁ (impervious) ꯂꯩꯃꯥꯏ꯫
ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯦꯔꯤꯌꯥ (disconnected impervious area) ꯃꯁꯤꯒꯤ ꯔꯟꯑꯣꯐꯅꯥ ꯏꯔꯝꯒꯤ ꯁꯤꯁ꯭ꯇꯦꯝꯗ ꯌꯧꯗ꯭ꯔꯤꯉꯩꯗ ꯄꯔꯚꯤꯌꯁ ꯂꯩꯃꯥꯏ ꯑꯃꯒꯤ ꯃꯊꯛꯇ ꯁꯤꯠ ꯐ꯭ꯂꯣ ꯑꯣꯏꯅꯥ ꯆꯦꯟꯕ, ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 3.9.3 ꯃꯄꯨꯡ ꯐꯥꯍꯜꯂꯤꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯩꯃꯥꯏ꯫
ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ (peak rate factor, PRF) ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤ ꯄꯤꯛ ꯏꯀ꯭ꯋꯦꯁꯟꯗ ꯂꯩꯕ ꯀꯟꯁ꯭ꯇꯦꯟꯠ (US ꯀꯁ꯭ꯇꯃꯔꯤ ꯌꯨꯅꯤꯠꯁꯤꯡꯗ 484; ꯀ꯭ꯂꯣꯖ 3.11.2-ꯒꯤ SI ꯃꯑꯣꯡꯗ 0.208)꯫
ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ (continuous simulation) ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯁꯥꯡꯂꯕ ꯔꯦꯀꯣꯔꯗ (ꯆꯍꯤ ꯀꯌꯥ) ꯑꯃꯒꯤ ꯃꯊꯛꯇ ꯆꯂꯥꯏꯕ ꯃꯣꯗꯦꯜ ꯔꯟ; ꯃꯁꯤꯗ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯣꯏꯁꯆꯔ, ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯁꯨꯡ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜꯁꯤꯡ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯃꯗꯒꯤ ꯃꯊꯡꯒꯤ ꯊꯧꯗꯣꯛꯇ ꯄꯨꯊꯣꯀꯏ꯫
ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯀꯦꯁ꯭ꯀꯦꯗ (tank cascade) ꯄꯨꯈ꯭ꯔꯤ (pukhri) ꯑꯃꯒꯤ ꯁꯔꯞꯂꯁ ꯏꯁꯤꯡꯅꯥ ꯃꯊꯡꯒꯤ ꯄꯨꯈ꯭ꯔꯤꯗ ꯆꯦꯟꯊꯔꯛꯄ ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡꯒꯤ ꯆꯦꯟ ꯑꯃꯥ꯫

3.3 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯂꯩꯃꯥꯏ

3.3.1 ꯁꯥꯏꯠ ꯑꯗꯨꯃꯛ, ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯗꯨꯃꯛ. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯔꯟꯁꯤꯡꯅꯥ POC ꯈꯨꯗꯤꯡꯗ ꯆꯦꯟꯊꯔꯛꯄ ꯂꯝ ꯑꯗꯨꯃꯛ ꯌꯥꯎꯍꯅꯒꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ (design storm)-ꯁꯤꯡ ꯑꯗꯨꯃꯛ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 2.11.1)꯫ ꯃꯈꯣꯌ ꯀ꯭ꯂꯣꯖ ꯑꯁꯤꯒꯤ ꯂꯩꯃꯥꯏꯒꯤ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ, ꯃꯗꯨꯒꯤ ꯃꯍꯩ ꯑꯣꯏꯅꯥ ꯊꯣꯀꯄ Tc, ꯑꯃꯁꯨꯡ ꯅꯣꯡꯒꯤ ꯏꯁꯤꯡꯒꯤ ꯀꯟꯇ꯭ꯔꯣꯜꯁꯤꯡꯗ ꯈꯛꯇꯃꯛ ꯈꯦꯠꯅꯒꯗꯕꯅꯤ꯫

3.3.2 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯐꯤꯚꯝ. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯂꯩꯃꯥꯏ ꯑꯁꯤ ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ (greenfield): ꯃꯦꯞꯇ ꯌꯥꯑꯣꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯛ ꯁꯣꯏꯜ ꯒ꯭ꯔꯨꯞꯀꯤꯗꯃꯛ ꯐꯕ ꯐꯤꯚꯝꯗ ꯂꯩꯕ ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ ꯑꯣꯏꯒꯗꯕꯅꯤ, ꯃꯈꯥꯗ ꯄꯤꯔꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ:

  • (a) ꯁꯥꯏꯠꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯂꯝ ꯄꯨꯝꯅꯃꯛ, ꯍꯧꯖꯤꯛ ꯌꯨꯝ ꯁꯥꯔꯕ, ꯄꯦꯚ ꯇꯧꯔꯕ, ꯀꯝꯄꯦꯛꯠ ꯇꯧꯔꯕ ꯅꯠꯔꯒꯥ ꯂꯧꯎ-ꯁꯤꯡꯎ ꯇꯧꯔꯕ ꯂꯝ ꯌꯥꯑꯣꯅꯥ, ꯐꯕ ꯐꯤꯚꯝꯗ ꯂꯩꯕ ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ (ꯒ꯭ꯔꯥꯁ ꯀꯚꯔ > 75%) ꯑꯣꯏꯅꯥ ꯂꯧꯏ꯫ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯀꯚꯔ ꯃꯁꯤꯡ ꯊꯤꯔꯣꯏꯗꯕꯅꯤ꯫
  • (b) ꯀꯔꯚ ꯅꯝꯕꯔ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 3.7-ꯒꯤ HSG-ꯒꯤꯗꯃꯛ "ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ, ꯐꯕ ꯐꯤꯚꯝ" ("open space, good condition")-ꯒꯤ TR-55 ꯚꯦꯜꯌꯨꯅꯤ: AMC II-ꯗ CN 39 (A), 61 (B), 74 (C), 80 (D) (ꯇꯦꯕꯜ 3.5)꯫
  • (c) HSG ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 3.7-ꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ HSG-ꯅꯤ, ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜꯒꯤꯗꯃꯛ ꯒ꯭ꯔꯨꯞ ꯑꯅꯤꯒꯤ ꯔꯨꯜ (ꯀ꯭ꯂꯣꯖ 3.10.1) ꯌꯥꯑꯣꯅꯥ꯫ ꯏꯔꯝꯒꯤ ꯊꯕꯛꯁꯤꯡꯒꯤꯗꯃꯛ HSG ꯐꯒꯠꯍꯅꯕ ꯌꯥꯔꯣꯏ꯫
  • (d) Tc ꯑꯁꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯊꯛꯇ, ꯆꯦꯅꯦꯜ ꯂꯩꯇꯕ ꯑꯣꯚꯔꯂꯦꯟꯗ ꯐ꯭ꯂꯣ ꯑꯃꯁꯨꯡ ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ ꯐ꯭ꯂꯣ (shallow concentrated flow) ꯑꯃꯁꯨꯡ ꯃꯍꯧꯁꯥꯒꯤ ꯆꯦꯅꯦꯜꯁꯤꯡ ꯈꯛꯇꯃꯛ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯏ (ꯀ꯭ꯂꯣꯖ 3.6)꯫ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯄꯥꯏꯞ, ꯂꯥꯏꯟ ꯇꯧꯔꯕ ꯈꯣꯡꯕꯥꯟ ꯑꯃꯁꯨꯡ ꯀꯔꯕꯁꯤꯡ ꯊꯤꯡꯗꯦ꯫
  • (e) ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯏꯁꯤꯡ ꯂꯩꯐꯝꯁꯤꯡ, ꯐꯨꯜ ꯇꯦꯉ꯭ꯛ ꯂꯦꯚꯦꯜ (full tank level, FTL) ꯐꯥꯎꯕ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯋꯥꯇꯔꯁ꯭ꯞꯔꯦꯗ (waterspread), ꯃꯍꯧꯁꯥꯒꯤ ꯆꯦꯅꯦꯜꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯁꯞꯂꯥꯏ ꯅꯠꯔꯒꯥ ꯁꯔꯞꯂꯁ ꯆꯦꯅꯦꯜꯁꯤꯡ ꯂꯩꯔꯤꯕ ꯃꯑꯣꯡ ꯑꯗꯨꯃꯛ ꯊꯝꯃꯤ, ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯕꯨ ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ ꯑꯣꯏꯅꯥ ꯅꯠꯇꯅꯥ, ꯏꯁꯤꯡꯒꯤ ꯃꯊꯛ ꯅꯠꯔꯒꯥ ꯆꯦꯅꯦꯜ ꯑꯣꯏꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯏ꯫

3.3.3 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝ. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯂꯩꯃꯥꯏꯅꯥ ꯄ꯭ꯔꯄꯣꯖ ꯇꯧꯔꯕ ꯊꯕꯛꯁꯤꯡ ꯃꯄꯨꯡ ꯐꯥꯅꯥ ꯁꯥꯒꯠꯂꯕ (full build-out) ꯃꯇꯝꯒꯤ ꯐꯤꯚꯝ ꯎꯠꯀꯗꯕꯅꯤ:

  • (a) ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡ ꯁꯥꯏꯠ ꯄ꯭ꯂꯥꯟꯗꯒꯤ ꯃꯦꯖꯔ ꯇꯧꯒꯗꯕꯅꯤ, ꯌꯨꯝꯊꯛ, ꯄꯦꯚ ꯇꯧꯔꯕ ꯃꯐꯝ, ꯂꯝꯕꯤ ꯑꯃꯁꯨꯡ ꯑꯇꯣꯞꯄ ꯁꯤꯜ ꯇꯧꯔꯕ ꯃꯐꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯇꯣꯉꯥꯟꯅꯥ, ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯕꯨ ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯅꯠꯔꯒꯥ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯑꯣꯏꯅꯥ ꯈꯥꯌꯗꯣꯛꯀꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.9)꯫ TR-55-ꯒꯤ ꯂꯣꯠ-ꯁꯥꯏꯖ ꯔꯦꯁꯤꯗꯦꯟꯁꯤꯌꯦꯜ ꯔꯣꯁꯤꯡ ꯁꯥꯏꯠ ꯃꯁꯥꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫
  • (b) ꯀꯟꯁ꯭ꯇ꯭ꯔꯛꯁꯟꯅꯥ ꯁꯣꯛꯍꯜꯂꯕ (ꯒ꯭ꯔꯦꯗ ꯇꯧꯔꯕ, ꯐꯤꯜ ꯇꯧꯔꯕ ꯅꯠꯔꯒꯥ ꯒꯥꯔꯤ ꯆꯠꯂꯕ) ꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡꯗ ꯃꯍꯧꯁꯥꯒꯤ HSG-ꯗꯒꯤ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯀꯦꯄꯦꯁꯤꯇꯤꯗ ꯊꯥꯛ ꯑꯃꯥ ꯅꯦꯝꯕ HSG (A-ꯗꯒꯤ B, B-ꯗꯒꯤ C, C-ꯗꯒꯤ D) ꯄꯤꯒꯗꯕꯅꯤ, ꯀꯟꯁ꯭ꯇ꯭ꯔꯛꯁꯟꯒꯤ ꯃꯇꯨꯡꯒꯤ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯇꯦꯁ꯭ꯠꯁꯤꯡꯅꯥ (ꯀ꯭ꯂꯣꯖ 3.7.3) ꯑꯇꯣꯞꯄ ꯃꯑꯣꯡ ꯎꯠꯂꯕꯗꯤ ꯅꯠꯇꯦ꯫ ꯀꯟꯁ꯭ꯇ꯭ꯔꯛꯁꯟꯅꯥ ꯁꯣꯛꯍꯜꯂꯕ ꯂꯩꯃꯥꯏ ꯀꯩꯗꯧꯉꯩꯗꯁꯨ HSG A ꯑꯣꯏꯅꯥ ꯈꯥꯌꯗꯣꯛꯔꯣꯏꯗꯕꯅꯤ꯫
  • (c) ꯅꯣꯡꯒꯤ ꯏꯁꯤꯡ ꯈꯣꯃꯖꯤꯟꯕ (RWH)-ꯒꯤ ꯁꯝꯞꯁꯤꯡ ꯄꯨꯡ 12 ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯁꯥꯡꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯍꯧꯕ ꯃꯇꯝꯗ ꯃꯄꯨꯡ ꯊꯟꯂꯦ ꯍꯥꯌꯅꯥ ꯂꯧꯒꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯗ ꯆꯦꯟꯊꯔꯛꯄ ꯌꯨꯝꯊꯛꯀꯤ ꯂꯝ ꯑꯗꯨ ꯊꯧꯗꯣꯛ ꯑꯗꯨꯁꯤꯡꯒꯤꯗꯃꯛ ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯑꯣꯏꯅꯥ ꯂꯧꯒꯗꯕꯅꯤ (ꯁꯔꯨꯛ 4)꯫
  • (d) ꯔꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯗꯤꯇꯦꯟꯁꯟ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡ CN ꯍꯟꯊꯍꯟꯗꯨꯅꯥ ꯅꯠꯇꯅꯥ, ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯣꯏꯅꯥ ꯃꯌꯦꯛ ꯁꯦꯡꯅꯥ ꯎꯠꯀꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.12)꯫

3.3.4 ꯔꯤꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ. ꯀ꯭ꯂꯣꯖ 3.3.2-ꯒꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯐꯤꯚꯝ ꯑꯁꯤ ꯔꯤꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯇꯁꯨ ꯆꯠꯂꯤ꯫ ꯍꯧꯖꯤꯛ ꯃꯄꯨꯡ ꯐꯥꯅꯥ ꯄꯦꯚ ꯇꯧꯔꯕ ꯁꯥꯏꯠ ꯑꯃꯕꯨ ꯃꯁꯤꯒꯤ ꯍꯧꯖꯤꯛꯀꯤ ꯐꯤꯚꯝꯒꯥ ꯅꯠꯇꯅꯥ, ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗꯀꯥ ꯆꯥꯡꯗꯝꯅꯗꯨꯅꯥ ꯇꯦꯁ꯭ꯠ ꯇꯧꯏ꯫ ꯀ꯭ꯂꯣꯖ 4.5.6-ꯒꯤ ꯀꯟꯁ꯭ꯇ꯭ꯔꯦꯟꯗ-ꯔꯤꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ ꯔꯨꯠꯀꯤꯗꯃꯛ, 50%-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯆꯥꯡ ꯑꯗꯨ ꯆꯦꯛ ꯇꯧꯕ ꯉꯝꯅꯕ, ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯐꯤꯚꯝ ꯑꯗꯨꯁꯨ ꯁꯔꯚꯦ ꯇꯧꯔꯕ ꯃꯇꯨꯡ ꯏꯟꯅ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.3.5 ꯁꯥꯏꯠꯀꯤ ꯃꯄꯥꯟꯒꯤ ꯂꯝꯁꯤꯡ.

  • (a) ꯀꯟꯚꯦꯌꯦꯟꯁ ꯗꯤꯖꯥꯏꯟꯒꯤꯗꯃꯛ (ꯁꯔꯨꯛ 6), ꯁꯥꯏꯠꯀꯤ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯂꯝꯁꯤꯡ ꯑꯦꯞꯔꯨꯚ ꯇꯧꯔꯕ ꯃꯥꯁ꯭ꯇꯔ ꯄ꯭ꯂꯥꯟ ꯅꯠꯔꯒꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ ꯄ꯭ꯂꯥꯟꯒꯤ ꯃꯈꯥꯗ ꯃꯈꯣꯌꯒꯤ ꯑꯔꯣꯏꯕ ꯂꯝ ꯁꯤꯖꯤꯟꯅꯕꯗ ꯂꯧꯒꯗꯕꯅꯤ꯫ ꯄ꯭ꯂꯥꯟ ꯑꯃꯠꯇ ꯂꯩꯇꯕ ꯃꯐꯝꯗ, ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯗꯦꯚꯦꯂꯞ ꯇꯧꯗꯕ ꯂꯝ ꯑꯁꯤ ꯌꯥꯝꯗ꯭ꯔꯕꯗ 35% ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯣꯏꯔꯦ ꯍꯥꯌꯅꯥ ꯂꯧꯒꯗꯕꯅꯤ꯫
  • (b) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕꯒꯤꯗꯃꯛ, ꯁꯥꯏꯠꯀꯤ ꯃꯄꯥꯟꯗꯒꯤ ꯂꯥꯀꯄ ꯔꯟ-ꯑꯣꯟ (run-on) ꯑꯁꯤ ꯔꯟ ꯑꯅꯤꯃꯛꯇ ꯃꯍꯧꯖꯤꯛꯀꯤ ꯐꯤꯚꯝꯗ ꯃꯑꯣꯡ ꯑꯃꯈꯛꯇꯗ ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.14.2)꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ ꯔꯦꯐꯔꯦꯟꯁꯅꯥ ꯔꯤꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ ꯈꯨꯗꯤꯡꯃꯛ ꯍꯥꯟꯅꯅꯥ ꯐꯠꯇꯕꯥ ꯑꯣꯏꯔꯕ ꯕꯦꯖꯂꯥꯏꯟ ꯑꯃꯒꯥ ꯆꯥꯡꯗꯝꯅꯗꯨꯅꯥ ꯋꯥꯌꯦꯜ ꯇꯧꯕꯗꯒꯤ ꯊꯤꯡꯏ꯫ UK-ꯒꯤ ꯑꯥꯏꯟꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯇꯕ ꯁ꯭ꯇꯦꯟꯗꯔꯗꯁꯤꯡ (non-statutory standards) ꯑꯃꯁꯨꯡ KC APWA-ꯅꯥ ꯃꯑꯣꯡ ꯇꯣꯉꯥꯟꯅꯥ ꯑꯦꯞꯔꯣꯆ ꯑꯗꯨꯃꯛ ꯂꯧꯏ: APWA-ꯅꯥ HSG C-ꯒꯤꯗꯃꯛ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯂꯧꯎ-ꯁꯤꯡꯎꯒꯤ ꯂꯝ ꯑꯁꯤ "ꯐꯕ ꯐꯤꯚꯝꯒꯤ ꯄꯥꯁꯆꯔ, ꯒ꯭ꯔꯥꯁꯂꯦꯟꯗ ꯅꯠꯔꯒꯥ ꯔꯦꯟꯖ (C = 0.30, CN = 74)" ("good condition pasture, grassland or range (C = 0.30, CN = 74)")-ꯗꯒꯤ ꯍꯦꯟꯗꯅꯕ ꯊꯤꯡꯏ, ꯑꯃꯁꯨꯡ ꯁꯣꯛꯍꯜꯂꯕ ꯂꯩꯃꯥꯏꯁꯤꯡ HSG A ꯅꯠꯔꯒꯥ B ꯑꯣꯏꯅꯥ ꯈꯥꯌꯗꯣꯀꯄ ꯊꯤꯡꯏ (KC Metro APWA 5600, 2011, §5602.3A ꯑꯃꯁꯨꯡ E)꯫ (b)-ꯗ ꯁꯤꯖꯤꯟꯅꯔꯤꯕ TR-55-ꯒꯤ "ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ, ꯐꯕ ꯐꯤꯚꯝ" ꯚꯦꯜꯌꯨꯁꯤꯡ ꯑꯁꯤ TR-55-ꯒꯤ "ꯄꯥꯁꯆꯔ, ꯒ꯭ꯔꯥꯁꯂꯦꯟꯗ ꯅꯠꯔꯒꯥ ꯔꯦꯟꯖ, ꯐꯕ" ("pasture, grassland or range, good") ꯚꯦꯜꯌꯨꯁꯤꯡꯒꯥ ꯃꯥꯟꯅꯩ (USDA SCS TR-55, 1986, Tables 2-2a ꯑꯃꯁꯨꯡ 2-2c), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ CN ꯑꯁꯤ HSG C ꯂꯩꯃꯥꯏꯁꯤꯡꯗ APWA-ꯒꯤ ꯊꯤꯡꯕ ꯑꯗꯨꯒꯥ ꯃꯥꯟꯅꯩ꯫ 3.3.3(b)-ꯗ ꯂꯩꯕ ꯁꯣꯛꯍꯜꯂꯕ ꯂꯩꯃꯥꯏꯁꯤꯡꯒꯤꯗꯃꯛ ꯀ꯭ꯂꯥꯁ ꯑꯃꯥ ꯍꯟꯊꯍꯅꯕ ꯑꯁꯤ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ APWA-ꯒꯤ ꯔꯨꯜꯒꯤ ꯍꯦꯟꯅꯥ ꯂꯥꯏꯕ, ꯍꯦꯟꯅꯥ ꯀꯟꯊꯔꯛꯇꯕ ꯃꯑꯣꯡ ꯑꯃꯥ ꯑꯣꯏꯅꯥ ꯊꯝꯕꯅꯤ, ꯃꯁꯤ ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ (valley floor)-ꯒꯤ ꯂꯦꯀꯨꯁ꯭ꯇ꯭ꯔꯥꯏꯟ (lacustrine) ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ, ꯂꯩꯃꯨ ꯑꯃꯁꯨꯡ ꯄꯤꯠ (peat), ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯕ ꯐꯨꯠꯍꯤꯜ ꯐꯦꯟ (foothill fans)-ꯁꯤꯡꯒꯤ ꯂꯩꯉꯣꯏ ꯑꯃꯁꯨꯡ ꯅꯨꯡꯀꯨꯞ, ꯆꯤꯡꯁꯤꯡꯒꯤ ꯗꯤꯁꯥꯡ ꯁꯦꯜ (Disang shale)-ꯒꯤ ꯃꯊꯛꯇ ꯂꯩꯕ ꯄꯥꯛꯄ ꯂꯩꯃꯥꯏꯁꯤꯡ, ꯕꯔꯦꯜ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟ (Barail sandstone)-ꯒꯤ ꯀꯦꯄꯤꯡꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟ (Jiribam plain)-ꯒꯤ ꯕꯔꯥꯛ ꯑꯃꯁꯨꯡ ꯖꯤꯔꯤ (Jiri)-ꯒꯤ ꯑꯦꯂꯨꯚꯤꯌꯝ (alluvium)-ꯒꯥ ꯌꯥꯅꯩ, ꯃꯐꯝ ꯑꯗꯨꯁꯤꯡꯗ HSG A-ꯗꯒꯤ C-ꯗ ꯆꯣꯡꯕ ꯑꯁꯤ ꯌꯥꯝꯅꯥ ꯍꯦꯟꯒꯅꯤ꯫ 3.3.5(a)-ꯗ ꯄ꯭ꯂꯥꯟ ꯂꯩꯇꯕ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯂꯝꯒꯤꯗꯃꯛ 35%-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯏꯝꯄꯔꯚꯤꯌꯁꯅꯦꯁ ꯑꯁꯤ APWA-ꯒꯤ ꯚꯦꯜꯌꯨꯅꯤ (2011, §5602.3E.2)꯫ ꯀꯟꯚꯦꯌꯦꯟꯁꯀꯤꯗꯃꯛ ꯃꯥꯁ꯭ꯇꯔ ꯄ꯭ꯂꯥꯟꯒꯤ ꯂꯝ ꯁꯤꯖꯤꯟꯅꯕ ꯂꯧꯕ ꯑꯁꯤ CPHEEO-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ, CPHEEO-ꯅꯥ C-ꯅꯥ "ꯃꯥꯁ꯭ꯇꯔ ꯄ꯭ꯂꯥꯟ ꯃꯇꯨꯡ ꯏꯟꯅ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯑꯔꯣꯏꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ" ("ultimate development of the catchment as per the master plan") ꯎꯠꯀꯗꯕꯅꯤ ꯍꯥꯌꯅꯥ ꯍꯥꯏ (CPHEEO 2019, Part A §4.4.1.5)꯫


3.4 ꯊꯧꯑꯣꯡ ꯈꯟꯕ

3.4.1 ꯊꯧꯑꯣꯡ ꯑꯁꯤ ꯄꯥꯟꯗꯝ ꯑꯃꯁꯨꯡ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯁꯥꯏꯖ ꯃꯇꯨꯡ ꯏꯟꯅ ꯇꯦꯕꯜ 3.1-ꯗꯒꯤ ꯈꯟꯒꯗꯕꯅꯤ꯫ ꯃꯃꯤ 3.1-ꯅꯥ ꯔꯨꯜ ꯑꯗꯨꯁꯤꯡꯃꯛ ꯐ꯭ꯂꯣꯆꯥꯔꯠ ꯑꯃꯥ ꯑꯣꯏꯅꯥ ꯎꯠꯂꯤ꯫

ꯇꯦꯕꯜ 3.1 — ꯌꯥꯍꯜꯂꯤꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯊꯧꯑꯣꯡꯁꯤꯡ

ꯄꯥꯟꯗꯝ ꯀꯦꯆꯃꯦꯟꯠ / ꯐꯤꯚꯝ ꯌꯥꯍꯜꯂꯤꯕ ꯊꯧꯑꯣꯡ ꯀ꯭ꯂꯣꯖ
ꯀꯟꯚꯦꯌꯦꯟꯁ ꯑꯦꯂꯤꯃꯦꯟꯠ ꯑꯃꯒꯤ (ꯏꯟꯂꯦꯠ, ꯄꯥꯏꯞꯀꯤ ꯔꯤꯆ, ꯈꯣꯡꯕꯥꯟꯒꯤ ꯔꯤꯆ, ꯀꯜꯚꯔꯠ) ꯄꯤꯛ ꯐ꯭ꯂꯣ ꯏꯁꯤꯡ ꯄꯤꯔꯤꯕ ꯂꯝ ≤ 16 ha, ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯗ ꯁ꯭ꯇꯣꯔꯦꯖ ꯂꯩꯇꯕ, ꯕꯦꯛꯋꯥꯇꯔ ꯂꯩꯇꯕ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ 3.5
ꯀꯟꯚꯦꯌꯦꯟꯁꯀꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣ > 16 ha, ꯅꯠꯔꯒꯥ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯗ ꯁ꯭ꯇꯣꯔꯦꯖ, ꯄꯨꯈ꯭ꯔꯤ ꯅꯠꯔꯒꯥ ꯄꯣꯟꯗ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯂꯩꯔꯕꯗꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ (SCS ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯒꯥ ꯂꯣꯌꯅꯅꯥ SCS-CN, SWMM ꯅꯠꯔꯒꯥ HEC-HMS) 3.8–3.12
ꯔꯤꯇꯦꯟꯁꯟ, ꯗꯤꯇꯦꯟꯁꯟ, ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯍꯦꯛꯇꯗꯤ; ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕ ꯁꯥꯏꯖ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ; ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯌꯥꯍꯜꯂꯣꯏ 3.8–3.12, 3.14
ꯕꯦꯛꯋꯥꯇꯔ, ꯇꯥꯏꯗꯦꯜ ꯅꯠꯔꯒꯥ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯇꯦꯜꯋꯥꯇꯔ ꯂꯩꯕ ꯄꯥꯏꯞ ꯅꯠꯔꯒꯥ ꯈꯣꯡꯕꯥꯟꯒꯤ ꯅꯦꯠꯋꯥꯔꯛ ꯁꯥꯏꯖ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯔꯥꯎꯇꯤꯡꯒꯥ ꯂꯣꯌꯅꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ 3.12.4; ꯁꯔꯨꯛ 5
ꯀꯦꯆꯃꯦꯟꯠ ꯃꯊꯧꯒꯤ ꯐ꯭ꯂꯣꯁꯤꯡ CWC ꯁꯕꯖꯣꯟ 2(c) (Barak and others)-ꯗ 25–5,000 km², CWC-ꯅꯥ ꯐꯣꯡꯗꯣꯛꯇꯔꯤꯕ 2(c)-ꯒꯤ ꯔꯤꯄꯣꯔꯠꯀꯤ ꯃꯍꯨꯠꯇ ꯁꯕꯖꯣꯟ 2(b) (South Brahmaputra)-ꯒꯤ ꯔꯤꯄꯣꯔꯠ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ HEC-HMS ꯅꯠꯔꯒꯥ SWMM, CWC-ꯒꯤ ꯁꯤꯟꯊꯦꯇꯤꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ (SUH)-ꯒꯥ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯇꯧꯗꯨꯅꯥ 3.11.4
ꯔꯤꯖꯅꯦꯜ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡ > 25 km² ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯄ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ 3.13
ꯄꯨꯈ꯭ꯔꯤ (pukhri) ꯀꯦꯁ꯭ꯀꯦꯗꯁꯤꯡ ꯁꯥꯏꯖ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ 3.13
ꯇꯤꯌꯔ B: ꯁꯔꯨꯛ 1-ꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯑꯄꯤꯛꯄ ꯁꯥꯏꯠꯁꯤꯡ ꯗꯤꯖꯥꯏꯟ ꯑꯦꯗꯀꯤ ꯂꯤꯃꯤꯠꯀꯤ ꯃꯅꯨꯡꯗ ꯁꯔꯨꯛ 4-ꯒꯤ ꯃꯈꯥꯗ ꯄꯤꯊꯣꯛꯈꯤꯕ ꯗꯤꯖꯥꯏꯟ ꯑꯦꯗꯁꯤꯡ, ꯃꯈꯣꯌ ꯃꯁꯥꯃꯛ ꯁꯔꯨꯛ ꯑꯁꯤꯒꯤ ꯊꯧꯑꯣꯡꯁꯤꯡꯅꯥ ꯁꯦꯝꯕꯅꯤ 3.4.4
ꯑꯄꯤꯛꯄ ꯁꯥꯏꯠꯁꯤꯡ, ꯑꯣꯊꯣꯔꯤꯇꯤ ꯑꯃꯍꯦꯛꯇꯗꯤ ≤ 1 ha, ꯀ꯭ꯂꯣꯖ 4.14.3-ꯒꯤ ꯂꯤꯃꯤꯠꯀꯤ ꯃꯅꯨꯡꯗ ꯁꯔꯨꯛ 4-ꯒꯤ ꯐꯤꯛꯁ ꯇꯧꯔꯕ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯀꯤ ꯔꯨꯠ (ꯐꯤꯛꯁ ꯇꯧꯔꯕ ꯔꯤꯂꯤꯖ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯁꯤꯡ, ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯃꯥꯁ ꯁ꯭ꯇꯣꯔꯦꯖ) 3.4.4; 4.14.3

ꯃꯃꯤ 3.1 — ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯊꯧꯑꯣꯡ ꯈꯟꯕ ꯍꯧꯕ: ꯀꯦꯜꯀꯨꯂꯦꯁꯟꯒꯤ ꯄꯥꯟꯗꯝ ꯇꯥꯛꯄ ꯁ꯭ꯇꯣꯔꯦꯖ, ꯔꯤꯇꯦꯟꯁꯟ, ꯗꯤꯇꯦꯟꯁꯟ, ꯅꯠꯔꯒꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕꯔꯥ? ꯍꯣꯌ ꯅꯠꯇꯦ (ꯀꯟꯚꯦꯌꯦꯟꯁ ꯄꯤꯛ) ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ ꯃꯊꯧ ꯇꯥꯏ (ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯌꯥꯗꯦ, ꯀ꯭ꯂꯣꯖ 3.4) ꯏꯁꯤꯡ ꯄꯤꯔꯤꯕ ꯑꯦꯔꯤꯌꯥ ≤ 16 ha, ꯀꯟꯚꯦꯌꯦꯟꯁ ꯑꯦꯂꯤꯃꯦꯟꯠ ꯑꯃꯈꯛꯇꯥ, ꯑꯃꯁꯨꯡ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯗ ꯁ꯭ꯇꯣꯔꯦꯖ ꯂꯩꯇꯕꯔꯥ? ꯅꯠꯇꯦ ꯍꯣꯌ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ (ꯀ꯭ꯂꯣꯖ 3.5) Tc ≥ 10 min; ꯐ꯭ꯔꯤꯀ꯭ꯋꯦꯟꯁꯤ ꯐꯦꯛꯇꯔ Cf; ꯃꯐꯝ ꯈꯔꯒꯤ ꯆꯦꯛ (ꯀ꯭ꯂꯣꯖ 3.5.6) ꯀꯦꯆꯃꯦꯟꯠ ꯑꯦꯔꯤꯌꯥ? < 25 km² 25–5,000 km² ꯏꯚꯦꯟꯠ ꯃꯣꯗꯦꯜ SCS ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯒꯥ ꯂꯣꯌꯅꯕ SCS-CN ꯂꯣꯁꯁꯤꯡ, ꯅꯠꯔꯒꯥ SWMM / HEC-HMS (ꯀ꯭ꯂꯣꯖ 3.8–3.12) ꯀꯦꯆꯃꯦꯟꯠ ꯃꯣꯗꯦꯜ HEC-HMS / SWMM, CWC ꯁꯕꯖꯣꯟ SUH-ꯒꯥ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯇꯧꯔꯕ (ꯀ꯭ꯂꯣꯖ 3.11.4) ꯔꯤꯖꯅꯦꯜ ꯐꯦꯁꯤꯂꯤꯇꯤ > 25 km², ꯅꯠꯔꯒꯥ ꯁꯤꯁ꯭ꯇꯦꯝꯗ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯀꯦꯁ꯭ꯀꯦꯗ ꯂꯩꯕꯔꯥ? ꯍꯣꯌ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯍꯥꯞꯆꯤꯟꯕ (ꯀ꯭ꯂꯣꯖ 3.13), ꯗꯤꯖꯥꯏꯟ ꯅꯣꯡ ꯆꯨꯕꯁꯤꯡꯒꯤ ꯃꯊꯛꯇ ꯇꯥꯏꯗꯦꯜ ꯅꯠꯔꯒꯥ ꯕꯦꯛꯋꯥꯇꯔ ꯑꯥꯎꯠꯐꯣꯜ: ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜ ꯑꯃꯅꯥ ꯔꯥꯎꯠ ꯇꯧꯕ (ꯁꯔꯨꯛ 5)꯫

ꯃꯃꯤ 3.1 — ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯊꯧꯑꯣꯡ ꯈꯟꯕ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯑꯅꯧꯅꯥ ꯁꯦꯝꯕ ꯗ꯭ꯔꯣꯏꯡ, KC Metro APWA, Section 5600 Storm Drainage Systems and Facilities, 2011 (§5602.2) ꯑꯃꯁꯨꯡ Version 2025.01 (§5603.4, Policy Supplement, 2025)-ꯗꯒꯤ ꯍꯣꯡꯗꯣꯛꯂꯒꯥ ꯂꯧꯈꯤꯕ꯫

3.4.2 ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗꯀꯤ ꯂꯤꯃꯤꯠꯁꯤꯡ. ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯑꯁꯤ 16 ha ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯑꯄꯤꯛꯄ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ ꯈꯛꯇꯗ ꯑꯃꯁꯨꯡ ꯀꯟꯚꯦꯌꯦꯟꯁ ꯑꯦꯂꯤꯃꯦꯟꯠ ꯑꯃꯈꯛꯇꯒꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯅꯕ ꯈꯛꯇꯗ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯃꯁꯤ ꯔꯤꯇꯦꯟꯁꯟ, ꯗꯤꯇꯦꯟꯁꯟ ꯅꯠꯔꯒꯥ ꯑꯇꯣꯞꯄ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯍꯦꯛꯇꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯅꯕ, ꯅꯠꯔꯒꯥ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯅꯠꯔꯒꯥ ꯔꯟꯑꯣꯐ ꯚꯣꯂꯨꯝ ꯊꯣꯛꯍꯟꯅꯕ ꯀꯩꯗꯧꯉꯩꯗꯁꯨ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫

3.4.3 ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡꯁꯤꯡ. 16 ha-ꯗꯒꯤ ꯍꯦꯟꯕꯗ, ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯀꯦꯜꯀꯨꯂꯦꯁꯟ ꯈꯨꯗꯤꯡꯃꯛꯇ, ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ ꯑꯃꯥ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ: SCS (NRCS) ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯒꯥ ꯂꯣꯌꯅꯕ SCS-CN ꯂꯣꯁꯁꯤꯡ, EPA SWMM, ꯅꯠꯔꯒꯥ HEC-HMS꯫ 25–5,000 km²-ꯒꯤꯗꯃꯛ CWC-ꯒꯤ ꯁꯤꯟꯊꯦꯇꯤꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯨ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯑꯣꯏꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.11.4)꯫

3.4.4 ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯔꯨꯠꯁꯤꯡ. ꯇꯤꯌꯔ B ꯂꯝꯁꯤꯡꯗ (ꯁꯔꯨꯛ 1), ꯁꯔꯨꯛ 4-ꯒꯤ ꯃꯈꯥꯗ ꯄꯤꯊꯣꯛꯈꯤꯕ ꯗꯤꯖꯥꯏꯟ ꯑꯦꯗ ꯑꯃꯗ ꯇꯥꯀꯄ ꯂꯤꯃꯤꯠꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯁꯥꯏꯠꯁꯤꯡꯅꯥ ꯁꯥꯏꯠ ꯑꯗꯨꯒꯤ ꯈꯛꯇꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯃꯣꯗꯦꯜ ꯑꯃꯒꯤ ꯃꯍꯨꯠꯇ ꯗꯤꯖꯥꯏꯟ ꯑꯦꯗ ꯑꯗꯨ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ꯫ ꯂꯝ ꯑꯃꯍꯦꯛꯇꯗꯤ, 1 ha ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯑꯄꯤꯛꯄ ꯁꯥꯏꯠꯁꯤꯡꯅꯥ ꯀ꯭ꯂꯣꯖ 4.14.3-ꯒꯤ ꯐꯤꯛꯁ ꯇꯧꯔꯕ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯀꯤ ꯔꯨꯠ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ; ꯃꯁꯤ ꯅꯣꯡ ꯆꯨꯕꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯄꯤꯛ ꯊꯧꯑꯣꯡꯁꯤꯡ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ ꯍꯥꯌꯕ 3.4.2-ꯒꯤ ꯔꯨꯜꯒꯤ ꯑꯃꯈꯛꯇꯒꯤ ꯑꯦꯛꯁꯦꯞꯁꯟꯅꯤ꯫ 3.4.2-ꯒꯤ ꯃꯈꯥꯗ ꯀꯟꯚꯦꯌꯦꯟꯁꯀꯤꯗꯃꯛ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯔꯤꯕꯅꯤ꯫

3.4.5 5,000 km²-ꯗꯒꯤ ꯍꯦꯟꯕ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡ. ꯃꯈꯣꯌ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤ ꯁ꯭ꯀꯣꯞꯀꯤ ꯃꯄꯥꯟꯗ ꯂꯩ ꯑꯃꯁꯨꯡ ꯋꯥꯇꯔ ꯔꯤꯁꯣꯔꯁꯦꯁ ꯗꯤꯄꯥꯔꯠꯃꯦꯟꯠ (Water Resources Department, WRD)-ꯅꯥ ꯑꯦꯞꯔꯨꯚ ꯇꯧꯔꯕ ꯕꯦꯁꯤꯟ ꯁ꯭ꯇꯗꯤ ꯑꯃꯥ ꯃꯊꯧ ꯇꯥꯏ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. 16 ha-ꯒꯤ ꯂꯤꯃꯤꯠ ꯑꯃꯁꯨꯡ ꯑꯦꯂꯤꯃꯦꯟꯠ ꯑꯃꯈꯛꯇꯒꯤ ꯔꯨꯜ ꯑꯁꯤ APWA 5600 Version 2025.01-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ, ꯃꯁꯤꯅꯥ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ 200 ac-ꯗꯒꯤ 40 ac-ꯗ ꯍꯟꯊꯍꯅꯈꯤ ꯑꯃꯁꯨꯡ ꯃꯁꯤ "ꯄꯥꯏꯞ ꯁꯦꯒꯃꯦꯟꯠ ꯑꯃꯈꯛꯇ" ("a single pipe segment")-ꯇ ꯊꯤꯡꯈꯤ꯫ MARC-ꯒꯤ Policy Supplement-ꯅꯥ ꯃꯁꯤ "ꯔꯟꯑꯣꯐ ꯍꯟꯊꯍꯅꯕꯒꯤ ꯄ꯭ꯔꯦꯛꯇꯤꯁꯁꯤꯡꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯅꯕ ꯅꯠꯔꯒꯥ ꯔꯤꯇꯦꯟꯁꯟ ꯚꯣꯂꯨꯝ ꯑꯃꯁꯨꯡ ꯗꯤꯇꯦꯟꯁꯟ ꯚꯣꯂꯨꯝ ꯂꯦꯞꯅꯕ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯔꯣꯏ" ("cannot be used to size runoff reduction practices or determine retention volumes and detention volumes") ꯍꯥꯌꯅꯥ ꯍꯥꯄꯆꯤꯜꯂꯤ (MARC, APWA Stormwater Standards Supplement, 2025)꯫ CPHEEO-ꯅꯥ (2019, Part A §4.4.1.3) ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ 8–10 km² ꯐꯥꯎꯕ ꯌꯥꯍꯜꯂꯤ, ꯃꯁꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯄꯨꯝꯅꯃꯛꯇ Tc ꯄꯨꯝꯅꯃꯛꯀꯤ ꯃꯅꯨꯡꯗ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯏꯟꯇꯦꯟꯁꯤꯇꯤ ꯃꯥꯟꯅꯩ ꯍꯥꯌꯅꯥ ꯂꯧꯕ ꯑꯃꯁꯨꯡ ꯚꯣꯂꯨꯝ ꯄꯤꯗꯕ ꯊꯧꯑꯣꯡ ꯑꯃꯒꯤꯗꯃꯛ ꯌꯥꯝꯅꯥ ꯆꯥꯎꯏ꯫ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗꯅꯥ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯅꯠꯇꯅꯥ ꯄꯤꯛ ꯈꯛꯇꯃꯛ ꯄꯤꯕꯅꯥ, ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯁꯤ ꯚꯣꯂꯨꯝ ꯑꯃꯁꯨꯡ ꯃꯇꯝ ꯐꯥꯎꯗꯨꯅꯥ ꯂꯩꯕꯅꯥ ꯃꯔꯝ ꯑꯣꯏꯗꯨꯅꯥ ꯃꯁꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯗꯤꯖꯥꯏꯟꯗꯒꯤ ꯂꯧꯊꯣꯀꯏ꯫


3.5 ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ

3.5.1 ꯏꯀ꯭ꯋꯦꯁꯟ. ꯄꯤꯛ ꯐ꯭ꯂꯣ ꯑꯁꯤ ꯃꯈꯥꯒꯤ ꯃꯑꯣꯡꯗ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ:

Q = C · Cf · i · A / 360

ꯃꯐꯝ ꯑꯁꯤꯗ Q ꯑꯁꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣꯅꯤ (m³/s); C ꯑꯁꯤ ꯔꯟꯑꯣꯐ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯅꯤ (ꯇꯦꯕꯜ 3.2); Cf ꯑꯁꯤ ꯐ꯭ꯔꯤꯀ꯭ꯋꯦꯟꯁꯤ ꯐꯦꯛꯇꯔꯅꯤ (ꯇꯦꯕꯜ 3.3), C · Cf ≤ 1.0 ꯑꯣꯏꯅꯥ; i ꯑꯁꯤ Tc-ꯒꯥ ꯃꯥꯟꯅꯕ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯏꯟꯇꯦꯟꯁꯤꯇꯤꯅꯤ (mm/h), ꯁꯔꯨꯛ 2-ꯗꯒꯤ ꯂꯧꯕ (ꯀ꯭ꯂꯣꯖ 2.8-ꯒꯤ ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔꯒꯥ ꯂꯣꯌꯅꯅꯥ); ꯑꯃꯁꯨꯡ A ꯑꯁꯤ ꯏꯁꯤꯡ ꯄꯤꯔꯤꯕ ꯑꯦꯔꯤꯌꯥꯅꯤ (ha)꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯃꯁꯤ CPHEEO-ꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟ Qp = 10 C I A-ꯅꯤ, Qp ꯑꯁꯤ m³/h-ꯗ ꯂꯩ (CPHEEO 2019, Part A §4.4.1.1–4.4.1.3), ꯃꯁꯤꯕꯨ m³/s-ꯗ ꯍꯣꯡꯗꯣꯛꯂꯦ꯫

3.5.2 ꯔꯟꯑꯣꯐ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯁꯤꯡ. C ꯑꯁꯤ ꯇꯦꯕꯜ 3.2-ꯗꯒꯤ ꯂꯧꯒꯗꯕꯅꯤ꯫ ꯔꯦꯟꯖ ꯑꯃꯒꯤ ꯃꯅꯨꯡꯗ, ꯁꯥꯏꯠꯀꯤ ꯗꯦꯇꯥꯅꯥ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯚꯦꯜꯌꯨ ꯑꯃꯥ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯂꯕꯗꯤ ꯅꯠꯇꯅꯥ, ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯔꯦꯟꯖ ꯑꯗꯨꯒꯤ ꯃꯊꯛꯀꯤ ꯇꯉꯥꯏꯐꯗꯕ ꯑꯗꯨ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫

ꯇꯦꯕꯜ 3.2 — ꯔꯟꯑꯣꯐ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠ C (AEP 10% ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯅꯥ ꯊꯣꯀꯄꯒꯤꯗꯃꯛ)

ꯂꯩꯃꯥꯏ ꯅꯠꯔꯒꯥ ꯂꯝ ꯁꯤꯖꯤꯟꯅꯕ C ꯍꯧꯔꯛꯐꯝ
ꯀꯃꯔꯁꯤꯌꯦꯜ 0.70–0.95 CPHEEO 2019, Table 4.2
ꯏꯟꯗꯁ꯭ꯇ꯭ꯔꯤꯌꯦꯜ 0.60–0.90 CPHEEO 2019, Table 4.2
ꯏꯟꯁ꯭ꯇꯤꯇ꯭ꯌꯨꯁꯅꯦꯜ 0.70–0.95 CPHEEO 2019, Table 4.2
ꯔꯦꯁꯤꯗꯦꯟꯁꯤꯌꯦꯜ, ꯍꯥꯏ ꯗꯦꯟꯁꯤꯇꯤ 0.60–0.75 CPHEEO 2019, Table 4.2
ꯔꯦꯁꯤꯗꯦꯟꯁꯤꯌꯦꯜ, ꯂꯣ ꯗꯦꯟꯁꯤꯇꯤ 0.40–0.60 CPHEEO 2019, Table 4.2
ꯔꯤꯀ꯭ꯔꯤꯌꯦꯁꯅꯦꯜ 0.10–0.25 CPHEEO 2019, Table 4.2
ꯑꯦꯁꯐꯥꯜꯠ 0.70–0.95 CPHEEO 2019, Table 4.2
ꯀꯟꯀ꯭ꯔꯤꯠ 0.80–0.95 CPHEEO 2019, Table 4.2
ꯕ꯭ꯔꯤꯛ ꯄꯦꯚꯤꯡ 0.70–0.85 CPHEEO 2019, Table 4.2
ꯌꯨꯝꯊꯛ: ꯇꯥꯏꯜ 0.80–0.90 CPHEEO 2019, Table 4.2
ꯌꯨꯝꯊꯛ: ꯃꯦꯇꯦꯜ 0.70–0.90 CPHEEO 2019, Table 4.2
ꯌꯨꯝꯊꯛ: ꯀꯟꯀ꯭ꯔꯤꯠ 0.70–0.90 CPHEEO 2019, Table 4.2
ꯂꯣꯟ, ꯂꯩꯉꯣꯏ ꯌꯥꯝꯕ ꯂꯩꯃꯥꯏ, ꯐ꯭ꯂꯦꯠ (≤ 2%) 0.05–0.10 ASCE/WPCF 1969
ꯂꯣꯟ, ꯂꯩꯉꯣꯏ ꯌꯥꯝꯕ ꯂꯩꯃꯥꯏ, ꯃꯌꯥꯏ ꯑꯣꯏꯕ (2–7%) 0.10–0.15 ASCE/WPCF 1969
ꯂꯣꯟ, ꯂꯩꯉꯣꯏ ꯌꯥꯝꯕ ꯂꯩꯃꯥꯏ, ꯑꯉꯃꯕ ꯅꯥꯄꯣꯝ (> 7%) 0.15–0.20 ASCE/WPCF 1969
ꯂꯣꯟ, ꯍꯦꯚꯤ (ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ) ꯂꯩꯃꯥꯏ, ꯐ꯭ꯂꯦꯠ (≤ 2%) 0.13–0.17 ASCE/WPCF 1969
ꯂꯣꯟ, ꯍꯦꯚꯤ ꯂꯩꯃꯥꯏ, ꯃꯌꯥꯏ ꯑꯣꯏꯕ (2–7%) 0.18–0.22 ASCE/WPCF 1969
ꯂꯣꯟ, ꯍꯦꯚꯤ ꯂꯩꯃꯥꯏ, ꯑꯉꯃꯕ ꯅꯥꯄꯣꯝ (> 7%) 0.25–0.35 ASCE/WPCF 1969
ꯗꯦꯚꯦꯂꯞ ꯇꯧꯗꯕ ꯂꯝ (ꯐꯤꯚꯝ ꯑꯃꯍꯦꯛꯇꯒꯤꯗꯃꯛ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯍꯦꯟꯕ) 0.30 KC APWA 5600 (2011), §5602.3E

3.5.3 ꯐ꯭ꯔꯤꯀ꯭ꯋꯦꯟꯁꯤ ꯐꯦꯛꯇꯔ. 10%-ꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯗꯅꯥ ꯊꯣꯀꯄ ꯗꯤꯖꯥꯏꯟ AEP-ꯁꯤꯡꯒꯤꯗꯃꯛ, C ꯑꯁꯤ ꯇꯦꯕꯜ 3.3-ꯒꯤ Cf-ꯅꯥ ꯃꯅꯥꯎꯒꯗꯕꯅꯤ꯫ C · Cf ꯄ꯭ꯔꯣꯗꯛꯠ ꯑꯁꯤ 1.0-ꯗꯒꯤ ꯍꯦꯟꯔꯣꯏꯗꯕꯅꯤ꯫

ꯇꯦꯕꯜ 3.3 — ꯐ꯭ꯔꯤꯀ꯭ꯋꯦꯟꯁꯤ ꯐꯦꯛꯇꯔ Cf

ꯗꯤꯖꯥꯏꯟ AEP (ꯔꯤꯇꯔꯟ ꯄꯤꯔꯤꯌꯗ) Cf
10% (10-yr) ꯑꯃꯁꯨꯡ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯅꯥ ꯊꯣꯀꯄ 1.00
4% (25-yr) 1.10
2% (50-yr) 1.20
1% (100-yr) 1.25

3.5.4 ꯀꯝꯄꯣꯖꯤꯠ C. ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯗ ꯂꯩꯃꯥꯏ ꯃꯈꯜ ꯑꯃꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯌꯥꯎꯔꯕꯗꯤ, C ꯑꯁꯤ ꯑꯦꯔꯤꯌꯥ-ꯋꯦꯇꯦꯗ ꯚꯦꯜꯌꯨ C = Σ(Cj · Aj) / ΣAj ꯑꯣꯏꯒꯗꯕꯅꯤ, ꯂꯩꯃꯥꯏ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯂꯝꯁꯤꯡꯗꯒꯤ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯗꯨꯅꯥ꯫ Cf ꯑꯁꯤ ꯀꯝꯄꯣꯖꯤꯠ C-ꯗ ꯁꯤꯖꯤꯟꯅꯩ꯫

3.5.5 ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯅꯦꯠꯋꯥꯔꯛꯁꯤꯡ.

  • (a) Tc ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 3.6 ꯃꯇꯨꯡ ꯏꯟꯅ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ ꯃꯤꯅꯠ 10-ꯗꯒꯤ ꯅꯦꯝꯔꯣꯏꯗꯕꯅꯤ꯫
  • (b) 16 ha-ꯒꯤ ꯂꯤꯃꯤꯠꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯅꯦꯠꯋꯥꯔꯛ ꯑꯃꯒꯤ ꯔꯤꯆ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ, ꯄꯤꯛ ꯑꯁꯤ ꯔꯤꯆ ꯑꯗꯨꯒꯤ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯀ꯭ꯌꯨꯃꯨꯂꯦꯇꯤꯚ Σ(C · A) ꯑꯃꯁꯨꯡ ꯔꯤꯆ ꯑꯗꯨ ꯐꯥꯎꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ Tc ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯔꯤꯆꯁꯤꯡꯒꯤ ꯄꯤꯛꯁꯤꯡ ꯄꯨꯟꯁꯤꯟꯔꯣꯏꯗꯕꯅꯤ꯫

3.5.6 ꯃꯐꯝ ꯈꯔꯒꯤ ꯆꯦꯛ (partial-area check). ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯀꯝꯄꯦꯛꯠ ꯑꯣꯏꯕ, ꯌꯥꯝꯅꯥ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯣꯏꯕ ꯃꯐꯝ ꯑꯃꯒꯤ Tc ꯑꯁꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯄꯨꯝꯅꯃꯛꯀꯤ ꯑꯗꯨꯗꯒꯤ ꯌꯥꯝꯅꯥ ꯅꯦꯝꯂꯕꯗꯤ, ꯄꯤꯛ ꯑꯁꯤ ꯃꯐꯝ ꯑꯗꯨ ꯈꯛꯇꯒꯤꯗꯃꯛꯁꯨ, ꯃꯁꯥꯒꯤ ꯂꯝ, C ꯑꯃꯁꯨꯡ Tc ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯍꯦꯟꯅꯥ ꯆꯥꯎꯕ ꯄꯤꯛ ꯑꯗꯨꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯇꯦꯕꯜ 3.2-ꯗ ꯂꯩꯕ ꯗꯦꯚꯦꯂꯞ ꯇꯧꯔꯕ ꯂꯩꯃꯥꯏꯒꯤ ꯀꯣꯑꯦꯐꯤꯁꯤꯌꯦꯟꯠꯁꯤꯡ ꯑꯁꯤ CPHEEO-ꯒꯤ Table 4.2-ꯅꯤ, CPHEEO-ꯅꯥ ꯃꯁꯤ ASCE/WPCF (1969)-ꯗꯒꯤ ꯍꯣꯡꯗꯣꯛꯂꯒꯥ ꯂꯧꯈꯤꯕꯅꯤ꯫ CPHEEO-ꯅꯥ ꯔꯤꯇꯔꯟ ꯄꯤꯔꯤꯌꯗ ꯄꯨꯝꯅꯃꯛꯀꯤꯗꯃꯛ C ꯃꯥꯟꯅꯅꯥ ꯊꯝꯃꯤ꯫ ꯇꯦꯕꯜ 3.3-ꯅꯥ ꯃꯗꯨꯒꯤ ꯃꯍꯨꯠꯇ APWA-ꯒꯤ ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ-ꯄ꯭ꯔꯤꯁꯤꯄꯤꯇꯦꯁꯟ ꯐꯦꯛꯇꯔꯁꯤꯡ ꯂꯧꯏ (KC Metro APWA 5600, 2011, §5602.2A: 4%, 2% ꯑꯃꯁꯨꯡ 1%-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯒꯤꯗꯃꯛ K = 1.1, 1.2 ꯑꯃꯁꯨꯡ 1.25, C·K ≤ 1.0 ꯑꯣꯏꯅꯥ)꯫ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯌꯥꯝꯗꯅꯥ ꯊꯣꯀꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯏꯁꯤꯡ ꯌꯥꯝꯕ ꯂꯝꯗ ꯍꯧꯕꯅꯥ (ꯀ꯭ꯂꯣꯖ 2.11.4) ꯐꯦꯛꯇꯔ ꯑꯁꯤꯁꯤꯡ ꯃꯐꯝ ꯑꯁꯤꯗ ꯃꯔꯨꯑꯣꯏ꯫ ꯃꯤꯅꯠ 10-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ Tc ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.5.1-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯗꯤꯖꯥꯏꯟ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯒꯥ ꯃꯥꯟꯅꯩ꯫ APWA 2011-ꯅꯥ ꯏꯟꯂꯦꯠ ꯇꯥꯏꯝ ꯃꯤꯅꯠ 5 ꯑꯃꯁꯨꯡ 15-ꯒꯤ ꯃꯔꯛꯇ ꯊꯤꯡꯏ (§5602.7A)꯫ ꯃꯐꯝ ꯈꯔꯒꯤ ꯆꯦꯛ ꯑꯁꯤ CPHEEO-ꯅꯥ "ꯃꯐꯝ ꯈꯔꯒꯤ ꯏꯐꯦꯛꯠ" ("partial area effect") ꯂꯧꯕ ꯃꯑꯣꯡꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ (CPHEEO 2019, Part A §4.4.1.7)꯫ ꯏꯟꯗꯤꯌꯥꯒꯤ ꯁꯍꯔꯒꯤ ꯄ꯭ꯂꯣꯠꯁꯤꯡ ASCE ꯔꯦꯟꯖꯁꯤꯡꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ US-ꯒꯤ ꯂꯝ ꯁꯤꯖꯤꯟꯅꯕꯁꯤꯡꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯀꯨꯞꯅꯥ ꯀꯚꯔ ꯇꯧꯕꯅꯥ ꯃꯔꯝ ꯑꯣꯏꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ 3.5.2-ꯗ ꯔꯦꯟꯖ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯃꯊꯛꯀꯤ ꯇꯉꯥꯏꯐꯗꯕ ꯑꯗꯨ ꯃꯊꯧ ꯇꯥꯍꯜꯂꯤ꯫


3.6 ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ

3.6.1 ꯑꯐꯝꯕ ꯋꯥꯐꯝꯁꯤꯡ. Tc ꯑꯁꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯇꯣꯉꯥꯟꯅꯥ, ꯄꯣꯏꯟꯠ ꯑꯣꯐ ꯏꯟꯇꯔꯦꯁ꯭ꯠ ꯐꯥꯎꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ ꯆꯠꯄꯒꯤ ꯃꯇꯝ ꯄꯤꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊ ꯑꯗꯨꯒꯤ ꯃꯊꯛꯇ, ꯐ꯭ꯂꯣ ꯁꯦꯒꯃꯦꯟꯠ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯆꯠꯄꯒꯤ ꯃꯇꯝꯁꯤꯡ ꯄꯨꯟꯁꯤꯟꯗꯨꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯐꯤꯚꯝ ꯑꯅꯤꯃꯛꯇ Tc ꯑꯁꯤ ꯃꯤꯅꯠ 10-ꯗꯒꯤ ꯅꯦꯝꯔꯣꯏꯗꯕꯅꯤ꯫

3.6.2 NRCS ꯚꯦꯂꯣꯁꯤꯇꯤ (ꯁꯦꯒꯃꯦꯟꯠ) ꯊꯧꯑꯣꯡ. NRCS ꯁꯦꯒꯃꯦꯟꯠ ꯊꯧꯑꯣꯡ ꯑꯁꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯄꯨꯝꯅꯃꯛꯀꯤ ꯗꯤꯐꯣꯜꯠ ꯊꯧꯑꯣꯡꯅꯤ꯫ Tc = Tt(sheet) + Tt(shallow) + Tt(channel), ꯃꯐꯝ ꯑꯁꯤꯗ:

  • (a) ꯁꯤꯠ ꯐ꯭ꯂꯣ (sheet flow):

    Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4)

    ꯃꯐꯝ ꯑꯁꯤꯗ Tt ꯑꯁꯤ ꯄꯨꯡꯗ ꯂꯩ; n ꯑꯁꯤ ꯇꯦꯕꯜ 3.4-ꯒꯤ ꯁꯤꯠ-ꯐ꯭ꯂꯣ ꯔꯐꯅꯦꯁꯅꯤ; L ꯑꯁꯤ ꯁꯤꯠ-ꯐ꯭ꯂꯣꯒꯤ ꯁꯥꯡꯕꯅꯤ (m); P2 ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.3-ꯗꯒꯤ ꯂꯧꯕ, ꯍꯧꯖꯤꯛꯀꯤ 50% AEP (2-yr)-ꯒꯤ ꯄꯨꯡ 24-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯅꯤ (mm), ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔ ꯌꯥꯑꯣꯗꯅꯥ; ꯑꯃꯁꯨꯡ S ꯑꯁꯤ ꯂꯝꯒꯤ ꯅꯥꯄꯣꯝꯅꯤ (m/m)꯫

  • (b) ꯁꯤꯠ-ꯐ꯭ꯂꯣꯒꯤ ꯁꯥꯡꯕ. ꯁꯍꯔꯒꯤ ꯂꯝꯁꯤꯡꯗ, ꯑꯃꯁꯨꯡ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝ ꯄꯨꯝꯅꯃꯛꯇ, ꯁꯤꯠ-ꯐ꯭ꯂꯣꯒꯤ ꯁꯥꯡꯕ ꯑꯁꯤ 30 m-ꯗꯒꯤ ꯍꯦꯟꯔꯣꯏꯗꯕꯅꯤ꯫ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ ꯂꯩꯃꯥꯏꯁꯤꯡꯗ, ꯁꯔꯚꯦꯅꯥ ꯆꯦꯅꯦꯜ ꯂꯩꯇꯕ ꯄ꯭ꯂꯦꯅꯥꯔ ꯂꯝ ꯎꯠꯂꯕ ꯃꯐꯝꯗ ꯈꯛꯇꯃꯛ 90 m ꯐꯥꯎꯕ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ; ꯅꯠꯇꯕꯗꯤ 30 m ꯆꯠꯂꯤ꯫

  • (c) ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ ꯐ꯭ꯂꯣ: Tt = L / (3,600 V), V = 4.918 S^0.5 (ꯄꯦꯚ ꯇꯧꯗꯕ) ꯅꯠꯔꯒꯥ V = 6.196 S^0.5 (ꯄꯦꯚ ꯇꯧꯔꯕ) ꯑꯣꯏꯅꯥ, V ꯑꯁꯤ m/s-ꯗ, L ꯑꯁꯤ m-ꯗ ꯑꯃꯁꯨꯡ S ꯑꯁꯤ m/m-ꯗ꯫

  • (d) ꯆꯦꯅꯦꯜ ꯑꯃꯁꯨꯡ ꯄꯥꯏꯞ ꯐ꯭ꯂꯣ: Tt = L / (3,600 V), V ꯑꯁꯤ ꯕꯦꯉ꯭ꯛ-ꯐꯨꯜ ꯅꯠꯔꯒꯥ ꯄꯥꯏꯞ-ꯐꯨꯜ ꯐ꯭ꯂꯣꯗ ꯃꯦꯅꯤꯡꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟ (Manning's equation)-ꯗꯒꯤ ꯂꯧꯕ꯫

ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ: ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊꯀꯤ ꯃꯊꯛꯇ ꯂꯩꯕ ꯐ꯭ꯂꯣ ꯁꯦꯒꯃꯦꯟꯠꯁꯤꯡ (ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯁ꯭ꯀꯦꯜ ꯃꯇꯨꯡ ꯏꯟꯅ ꯅꯠꯇꯦ) ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ: ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊꯀꯤ ꯃꯊꯛꯇ ꯂꯩꯕ ꯐ꯭ꯂꯣ ꯁꯦꯒꯃꯦꯟꯠꯁꯤꯡ (ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯁ꯭ꯀꯦꯜ ꯃꯇꯨꯡ ꯏꯟꯅ ꯅꯠꯇꯦ) ꯂꯩꯃꯥꯏ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯑꯣꯏꯅꯥ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯂꯥꯞꯄ ꯄꯣꯏꯟꯠ ꯄꯣꯏꯟꯠ ꯑꯣꯐ ꯏꯟꯇꯔꯦꯁ꯭ꯠ (ꯏꯟꯂꯦꯠ, ꯔꯤꯆ ꯅꯠꯔꯒꯥ POC) ꯁꯤꯠ ꯐ꯭ꯂꯣ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯊꯛꯇ ꯏꯁꯤꯡ ꯈꯔꯥ ꯁꯟꯗꯣꯛꯅꯥ ꯆꯦꯟꯕ ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ ꯐ꯭ꯂꯣ ꯔꯤꯜꯁꯤꯡ, ꯒꯇꯔꯁꯤꯡ, ꯁ꯭ꯋꯦꯜꯁꯤꯡ ꯆꯦꯅꯦꯜ ꯑꯃꯁꯨꯡ ꯄꯥꯏꯞ ꯐ꯭ꯂꯣ ꯈꯣꯡꯕꯥꯟꯁꯤꯡ, ꯄꯥꯏꯞꯁꯤꯡ, ꯃꯍꯧꯁꯥꯒꯤ ꯆꯦꯅꯦꯜꯁꯤꯡ L ≤ 30 m (ꯁꯍꯔ; ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯄꯨꯝꯅꯃꯛ) ≤ 90 m, ꯁꯔꯚꯦ ꯇꯧꯔꯕ ꯄ꯭ꯂꯦꯅꯥꯔ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯂꯩꯃꯥꯏꯗ ꯈꯛꯇ ꯁꯤꯠ ꯐ꯭ꯂꯣ — ꯀ꯭ꯂꯣꯖ 3.6.2(a), (b) Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4) [h] ꯇꯦꯕꯜ 3.4-ꯗꯒꯤ n; ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ n = 0.15 P2: 2-yr 24 h ꯅꯣꯡ ꯆꯨꯕ, ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔ ꯂꯩꯇꯅꯥ ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ — ꯀ꯭ꯂꯣꯖ 3.6.2(c) Tt = L / (3,600 V) V = 4.918 S^0.5 (ꯄꯦꯚ ꯇꯧꯗꯕ) V = 6.196 S^0.5 (ꯄꯦꯚ ꯇꯧꯔꯕ) ꯆꯦꯅꯦꯜ ꯑꯃꯁꯨꯡ ꯄꯥꯏꯞ — ꯀ꯭ꯂꯣꯖ 3.6.2(d) Tt = L / (3,600 V) ꯕꯦꯉ꯭ꯛ-ꯐꯨꯜ ꯅꯠꯔꯒꯥ ꯄꯥꯏꯞ-ꯐꯨꯜ ꯐ꯭ꯂꯣꯗ ꯃꯦꯅꯤꯡꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟꯗꯒꯤ V Tc = Tt(sheet) + Tt(shallow) + Tt(channel) ≥ 10 min (ꯀ꯭ꯂꯣꯖ 3.6.1) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤꯗꯃꯛ ꯇꯣꯉꯥꯟꯅꯥ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯏ; ꯂꯦꯒ tL = 0.6 Tc (ꯀ꯭ꯂꯣꯖ 3.6.5)

ꯃꯃꯤ 3.2 — NRCS ꯁꯦꯒꯃꯦꯟꯠ ꯊꯧꯑꯣꯡꯅꯥ ꯇꯥꯏꯝ ꯑꯣꯐ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯁꯟ: ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊꯀꯤ ꯃꯊꯛꯇ ꯁꯤꯠ ꯐ꯭ꯂꯣ, ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ ꯐ꯭ꯂꯣ ꯑꯃꯁꯨꯡ ꯆꯦꯅꯦꯜ ꯅꯠꯔꯒꯥ ꯄꯥꯏꯞ ꯐ꯭ꯂꯣ, ꯀ꯭ꯂꯣꯖ 3.6-ꯒꯤ ꯆꯠꯄꯒꯤ ꯃꯇꯝꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯂꯤꯃꯤꯠꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ꯫ ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯁ꯭ꯀꯦꯜ ꯃꯇꯨꯡ ꯏꯟꯅ ꯅꯠꯇꯦ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯑꯅꯧꯅꯥ ꯁꯦꯝꯕ ꯗ꯭ꯔꯣꯏꯡ, USDA SCS TR-55 (1986), Ch. 3, ꯑꯃꯁꯨꯡ USDA NRCS, NEH Part 630, Ch. 15 (2010)-ꯗꯒꯤ ꯍꯣꯡꯗꯣꯛꯂꯒꯥ ꯂꯧꯈꯤꯕ꯫

ꯇꯦꯕꯜ 3.4 — ꯁꯤꯠ ꯐ꯭ꯂꯣꯒꯤꯗꯃꯛ ꯃꯦꯅꯤꯡꯒꯤ n (USDA SCS TR-55, 1986, Table 3-1)

ꯂꯩꯃꯥꯏ n
ꯆꯦꯟꯕ ꯂꯩꯃꯥꯏꯁꯤꯡ (ꯀꯟꯀ꯭ꯔꯤꯠ, ꯑꯦꯁꯐꯥꯜꯠ, ꯅꯨꯡꯀꯨꯞ, ꯃꯄꯥꯟ ꯊꯣꯛꯂꯕ ꯂꯩꯃꯥꯏ) 0.011
ꯐꯦꯂꯣ (ꯔꯦꯁꯤꯗ꯭ꯌꯨ ꯂꯩꯇꯕ) 0.05
ꯂꯧꯎ-ꯁꯤꯡꯎ ꯇꯧꯔꯕ, ꯔꯦꯁꯤꯗ꯭ꯌꯨ ꯀꯚꯔ ≤ 20% 0.06
ꯂꯧꯎ-ꯁꯤꯡꯎ ꯇꯧꯔꯕ, ꯔꯦꯁꯤꯗ꯭ꯌꯨ ꯀꯚꯔ > 20% 0.17
ꯒ꯭ꯔꯥꯁ: ꯁꯣꯔꯠ-ꯒ꯭ꯔꯥꯁ ꯄ꯭ꯔꯦꯌꯔꯤ 0.15
ꯒ꯭ꯔꯥꯁ: ꯀꯨꯞꯄ ꯒ꯭ꯔꯥꯁꯁꯤꯡ 0.24
ꯔꯦꯟꯖ (ꯃꯍꯧꯁꯥꯒꯤ) 0.13
ꯎꯃꯡ: ꯑꯄꯤꯛꯄ ꯑꯟꯗꯔꯕ꯭ꯔꯁ 0.40
ꯎꯃꯡ: ꯀꯨꯞꯄ ꯑꯟꯗꯔꯕ꯭ꯔꯁ 0.80

3.6.3 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯔꯐꯅꯦꯁ. ꯀ꯭ꯂꯣꯖ 3.3.2-ꯒꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ ꯂꯩꯃꯥꯏꯒꯤꯗꯃꯛ, ꯁꯤꯠ-ꯐ꯭ꯂꯣꯒꯤ n ꯑꯁꯤ 0.15 ꯑꯣꯏꯒꯗꯕꯅꯤ, ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯂꯝ ꯑꯗꯨꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯄꯥꯝꯕꯤꯁꯤꯡꯗꯒꯤ ꯇꯦꯕꯜ 3.4-ꯒꯤ ꯑꯇꯣꯞꯄ ꯚꯦꯜꯌꯨ ꯑꯃꯥ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯂꯕꯗꯤ ꯅꯠꯇꯦ꯫

3.6.4 ꯀꯔꯄꯤꯆ ꯐꯣꯔꯃꯨꯂꯥ. ꯀꯔꯄꯤꯆ ꯐꯣꯔꯃꯨꯂꯥ (Kirpich formula) ꯑꯁꯤ ꯀ꯭ꯔꯣꯁ-ꯆꯦꯛ ꯑꯃꯥ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯃꯛ, ꯅꯠꯔꯒꯥ ꯃꯔꯨꯑꯣꯏꯕ ꯆꯦꯅꯦꯜ ꯑꯃꯥ ꯂꯩꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯂꯃꯗꯝꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ ꯈꯛꯇꯃꯛ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ:

tc = 0.0195 L^0.77 S^−0.385

ꯃꯐꯝ ꯑꯁꯤꯗ tc ꯑꯁꯤ ꯃꯤꯅꯠꯇ ꯂꯩ, L ꯑꯁꯤ ꯃꯔꯨꯑꯣꯏꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊꯀꯤ ꯁꯥꯡꯕꯅꯤ (m) ꯑꯃꯁꯨꯡ S ꯑꯁꯤ ꯃꯁꯤꯒꯤ ꯑꯦꯚꯔꯦꯖ ꯅꯥꯄꯣꯝꯅꯤ (m/m)꯫ ꯃꯁꯤ ꯁꯍꯔꯒꯤ ꯅꯠꯔꯒꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫

3.6.5 ꯂꯦꯒ. ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡ ꯑꯃꯅꯥ ꯂꯦꯒ ꯃꯊꯧ ꯇꯥꯔꯕꯗꯤ, tL = 0.6 Tc꯫

3.6.6 ꯆꯦꯛ. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ Tc ꯑꯁꯤ ꯃꯍꯧꯁꯥꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ Tc-ꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯒꯗꯕꯅꯤ꯫ ꯃꯁꯤ ꯍꯦꯟꯅꯥ ꯁꯥꯡꯂꯕꯗꯤ, ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯁꯕꯃꯤꯇꯦꯜꯗ ꯃꯔꯝ ꯑꯗꯨ ꯇꯥꯀꯄꯤꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯁꯦꯒꯃꯦꯟꯠ ꯊꯧꯑꯣꯡ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡ ꯑꯁꯤ TR-55 (USDA SCS, 1986, Ch. 3) ꯑꯃꯁꯨꯡ NEH Part 630, Ch. 15 (USDA NRCS, 2010)-ꯗꯒꯤ ꯂꯥꯛꯄꯅꯤ꯫ SI ꯀꯟꯁ꯭ꯇꯦꯟꯠꯁꯤꯡ ꯑꯁꯤ US ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡꯒꯤ ꯍꯛꯊꯦꯡꯅꯅꯥ ꯍꯣꯡꯗꯣꯛꯂꯕꯁꯤꯡꯅꯤ: L m-ꯗ ꯑꯃꯁꯨꯡ P2 mm-ꯗ ꯂꯩꯔꯕꯗꯤ 0.007 ꯑꯁꯤ 0.091 ꯑꯣꯏꯔꯛꯏ, ꯑꯃꯁꯨꯡ 16.1345 ꯑꯃꯁꯨꯡ 20.3282 ft/s ꯑꯁꯤ 4.918 ꯑꯃꯁꯨꯡ 6.196 m/s ꯑꯣꯏꯔꯛꯏ꯫ TR-55 (1986)-ꯅꯥ ꯁꯤꯠ ꯐ꯭ꯂꯣ 300 ft (≈ 90 m) ꯐꯥꯎꯕ ꯌꯥꯍꯜꯂꯝꯃꯤ꯫ NEH 630 Ch. 15-ꯅꯥ ꯁꯤꯠ ꯐ꯭ꯂꯣ ꯑꯁꯤ ꯃꯍꯧꯁꯥꯅꯥ ꯁꯦꯂꯣ ꯀꯟꯁꯦꯟꯇ꯭ꯔꯦꯇꯦꯗ ꯐ꯭ꯂꯣ ꯑꯣꯏꯔꯛꯠꯔꯤꯉꯩꯗ 100 ft (≈ 30 m)-ꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯆꯠꯇꯦ ꯍꯥꯌꯅꯥ ꯍꯥꯏ (Merkel, 2001 ꯀꯣꯠ ꯇꯧꯗꯨꯅꯥ), ꯑꯃꯁꯨꯡ US-ꯒꯤ ꯑꯦꯖꯦꯟꯁꯤ ꯀꯌꯥꯅꯥ ꯍꯧꯖꯤꯛ ꯃꯐꯝ ꯑꯗꯨꯗ ꯊꯤꯡꯏ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯁꯤꯒꯤ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯅꯥ 3.6.2(b)-ꯗ ꯁꯍꯔꯒꯤ 30 m-ꯒꯤ ꯂꯤꯃꯤꯠ ꯊꯝꯃꯤ: ꯏꯟꯗꯤꯌꯥꯒꯤ ꯁꯍꯔꯒꯤ ꯄ꯭ꯂꯣꯠꯁꯤꯡꯗ ꯐ꯭ꯂꯣꯅꯥ ꯃꯤꯇꯔ ꯈꯔꯒꯤ ꯃꯅꯨꯡꯗ ꯈꯣꯡꯕꯥꯟ, ꯀꯔꯕ ꯅꯠꯔꯒꯥ ꯀꯝꯄꯥꯎꯟꯗ ꯋꯣꯜꯒꯤ ꯋꯤꯞ ꯍꯣꯜ ꯑꯃꯗ ꯌꯧꯏ꯫ ꯁꯤꯠ-ꯐ꯭ꯂꯣ ꯏꯀ꯭ꯋꯦꯁꯟꯗ ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔ ꯌꯥꯑꯣꯗꯕ P2 ꯁꯤꯖꯤꯟꯅꯕꯒꯤ ꯃꯔꯝ ꯑꯁꯤ P2 ꯑꯁꯤ ꯆꯠꯄꯒꯤ ꯃꯇꯝꯒꯤ ꯃꯔꯤꯒꯤ ꯄꯦꯔꯥꯃꯤꯇꯔꯅꯤ, ꯗꯤꯖꯥꯏꯟ ꯂꯣꯗ ꯅꯠꯇꯦ꯫ ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗꯀꯤꯗꯃꯛ ꯗꯤꯐꯣꯜꯠ n = 0.15 ꯑꯁꯤ TR-55-ꯒꯤ ꯁꯣꯔꯠ-ꯒ꯭ꯔꯥꯁꯀꯤ ꯚꯦꯜꯌꯨꯅꯤ; ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ Q_pre ꯑꯁꯤ ꯑꯁꯦꯡꯕ ꯅꯠꯇꯅꯥ ꯅꯦꯝꯍꯅꯒꯅꯤ ꯍꯥꯌꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯁꯥꯡꯕ Tc ꯚꯦꯜꯌꯨꯁꯤꯡ ꯂꯥꯟꯊꯣꯛꯅꯕ ꯃꯁꯤ ꯂꯧꯏ꯫ ꯀꯔꯄꯤꯆ ꯐꯣꯔꯃꯨꯂꯥ ꯑꯁꯤ Chow, Maidment ꯑꯃꯁꯨꯡ Mays-ꯅꯥ (1988, Table 15.1.2) ꯄꯤꯕ SI ꯃꯑꯣꯡꯅꯤ, ꯇꯦꯅꯦꯁꯤ (Tennessee)-ꯒꯤ ꯑꯄꯤꯛꯄ ꯂꯧꯎ-ꯁꯤꯡꯎꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗꯒꯤ ꯂꯥꯛꯈꯤꯕꯅꯤ (Kirpich, 1940), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯁꯤ ꯁꯍꯔꯒꯤ ꯂꯩꯃꯥꯏꯁꯤꯡꯒꯥ ꯌꯥꯅꯗꯦ꯫ ꯂꯦꯒ ꯔꯦꯁꯤꯑꯣ 0.6 ꯑꯁꯤ NRCS-ꯒꯤ ꯚꯦꯜꯌꯨꯅꯤ, APWA-ꯅꯥ ꯁꯨ ꯁꯤꯖꯤꯟꯅꯩ (2011, §5602.7C)꯫


3.7 ꯂꯩꯃꯥꯏꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯛ ꯁꯣꯏꯜ ꯒ꯭ꯔꯨꯞꯁꯤꯡ

3.7.1 ꯃꯦꯞ ꯇꯧꯕ. HSG ꯑꯁꯤ ꯅꯦꯁꯅꯦꯜ ꯕ꯭ꯌꯨꯔꯣ ꯑꯣꯐ ꯁꯣꯏꯜ ꯁꯔꯚꯦ ꯑꯃꯁꯨꯡ ꯂꯦꯟꯗ ꯌꯨꯖ ꯄ꯭ꯂꯥꯅꯤꯡ (National Bureau of Soil Survey and Land Use Planning, NBSS&LUP) ꯅꯠꯔꯒꯥ ꯁ꯭ꯇꯦꯠꯀꯤ ꯁꯣꯏꯜ ꯁꯔꯚꯦ (ꯑꯦꯖꯦꯟꯁꯤ ꯁꯣꯏꯗꯅꯥ ꯈꯡꯒꯗꯕ [TBC])-ꯅꯥ ꯃꯦꯞ ꯇꯧꯔꯕ ꯁꯣꯏꯜ ꯁꯤꯔꯤꯖꯗꯒꯤ, ꯑꯍꯦꯟꯕ 3A-ꯒꯤ ꯁꯣꯏꯜ-ꯁꯤꯔꯤꯖ-ꯇꯨ-HSG ꯂꯨꯛꯑꯞ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ ꯄꯤꯒꯗꯕꯅꯤ꯫ ꯍꯧꯔꯛꯐꯝ ꯃꯦꯞ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯁ꯭ꯀꯦꯜ ꯇꯥꯛꯀꯗꯕꯅꯤ꯫

3.7.2 ꯄꯤꯕꯒꯤ ꯔꯨꯜ. ꯁꯤꯔꯤꯖ ꯑꯃꯒꯤꯗꯃꯛ ꯑꯍꯦꯟꯕ 3A ꯍꯧꯖꯤꯛꯐꯥꯎꯕ ꯐꯡꯗ꯭ꯔꯤꯕ ꯃꯐꯝꯗ, HSG ꯑꯁꯤ NEH Part 630, Ch. 7-ꯒꯤ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯥꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ, ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯁꯦꯆꯨꯔꯦꯇꯦꯗ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯀꯟꯗꯛꯇꯤꯚꯤꯇꯤ ꯑꯃꯁꯨꯡ ꯏꯝꯄꯔꯃꯤꯌꯦꯕꯜ ꯂꯦꯌꯔ ꯅꯠꯔꯒꯥ ꯋꯥꯇꯔ ꯇꯦꯕꯜ ꯐꯥꯎꯕꯒꯤ ꯑꯔꯨꯛꯇꯒꯤ ꯄꯤꯒꯗꯕꯅꯤ꯫ ꯑꯍꯦꯟꯕ 3A ꯐꯣꯡꯗꯣꯛꯠꯔꯤꯐꯥꯎꯕ, ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯅꯤꯄꯨꯔꯒꯤꯗꯃꯛ ꯃꯈꯥꯒꯤ ꯃꯇꯝ ꯈꯔꯒꯤ ꯒ꯭ꯔꯨꯞꯁꯤꯡ ꯊꯝꯃꯤ: ꯂꯧꯕꯨꯛ (paddy land) ꯑꯃꯁꯨꯡ ꯃꯃꯥꯡꯒꯤ ꯄꯥꯠ (pat; lake or wetland)-ꯁꯤꯡ ꯌꯥꯎꯕ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-A ꯑꯃꯁꯨꯡ MN-A1-ꯗ ꯂꯩꯕ ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯂꯦꯀꯨꯁ꯭ꯇ꯭ꯔꯥꯏꯟ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯨ, ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ HSG D; ꯂꯣꯛꯇꯥꯛ ꯑꯃꯁꯨꯡ ꯑꯇꯣꯞꯄ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯀꯣꯏꯕꯗ ꯂꯩꯕ ꯅꯦꯝꯕ ꯂꯝꯒꯤ ꯄꯤꯠ, ꯑꯃꯁꯨꯡ ꯐꯨꯝꯗꯤ (phumdi)-ꯒꯤ ꯃꯅꯥꯛꯁꯤꯡ, HSG D, ꯏꯁꯤꯡꯅꯥ ꯃꯄꯨꯡ ꯊꯟꯂꯦ ꯍꯥꯌꯅꯥ ꯂꯧꯗꯨꯅꯥ, ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯀ꯭ꯔꯦꯗꯤꯠ ꯄꯤꯗꯅꯥ ꯑꯃꯁꯨꯡ ꯁꯦꯇꯜꯃꯦꯟꯠ ꯆꯦꯛ ꯇꯧꯒꯗꯕ ꯑꯣꯏꯅꯥ (ꯀ꯭ꯂꯣꯖ 4.11, ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯔꯨꯜ); ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯕ ꯂꯩꯉꯣꯏ, ꯅꯨꯡꯀꯨꯞ ꯑꯃꯁꯨꯡ ꯅꯨꯡ ꯑꯆꯧꯕꯒꯤ ꯐꯨꯠꯍꯤꯜ ꯐꯦꯟꯁꯤꯡ, ꯇꯦꯛꯁꯆꯔ ꯃꯇꯨꯡ ꯏꯟꯅ HSG B ꯅꯠꯔꯒꯥ C, ꯁꯥꯏꯠ ꯇꯦꯁ꯭ꯠ ꯑꯃꯒꯤ ꯃꯈꯥꯗ; ꯆꯤꯡꯁꯤꯡꯒꯤ ꯑꯃꯁꯨꯡ ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯆꯤꯡ ꯑꯄꯤꯛꯄꯁꯤꯡꯒꯤ ꯗꯤꯁꯥꯡ ꯁꯦꯜ, ꯃꯁꯤꯒꯤ ꯄꯥꯛꯄ ꯂꯩꯃꯥꯏꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ, ꯔꯟꯑꯣꯐꯀꯤꯗꯃꯛ HSG D, ꯂꯩꯃꯥꯏ ꯃꯁꯥꯅꯥ ꯀꯔꯤ ꯒ꯭ꯔꯨꯞ ꯂꯧꯔꯕꯁꯨ; ꯆꯤꯡꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯆꯤꯡ ꯑꯄꯤꯛꯄꯁꯤꯡꯒꯤ ꯕꯔꯦꯜ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟ ꯀꯦꯄꯤꯡꯁꯤꯡ, ꯁꯥꯏꯠ ꯇꯦꯁ꯭ꯠ ꯑꯃꯒꯤ ꯃꯈꯥꯗ HSG C, ꯁ꯭ꯀꯥꯔꯄꯁꯤꯡꯗꯒꯤ ꯂꯥꯞꯅꯥ; ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-C1-ꯗ ꯂꯩꯕ ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟꯒꯤ ꯕꯔꯥꯛ ꯑꯃꯁꯨꯡ ꯖꯤꯔꯤꯒꯤ ꯑꯦꯂꯨꯚꯤꯌꯝ, HSG C, ꯑꯃꯁꯨꯡ 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ 1% AEP-ꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ HSG D; ꯀꯣꯂꯨꯚꯤꯌꯝ (colluvium) ꯑꯃꯁꯨꯡ ꯂꯦꯟꯗꯁ꯭ꯂꯥꯏꯗꯀꯤ ꯗꯦꯕ꯭ꯔꯤ, ꯗꯤꯖꯥꯏꯟꯒꯤꯗꯃꯛ HSG D, ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯀ꯭ꯔꯦꯗꯤꯠ ꯄꯤꯗꯅꯥ; ꯑꯃꯁꯨꯡ ꯁꯍꯔꯒꯤ ꯐꯤꯜ (urban fill), HSG C, ꯑꯃꯁꯨꯡ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ ꯌꯥꯝꯕ ꯅꯠꯔꯒꯥ ꯀꯝꯄꯦꯛꯠ ꯇꯧꯔꯕ ꯃꯐꯝꯗ HSG D꯫ ꯇꯤꯌꯔ A ꯂꯝ ꯑꯃꯒꯤ ꯁꯥꯏꯠ ꯈꯨꯗꯤꯡꯃꯛꯇ ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 4.14.1-ꯒꯤ ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯊꯧꯑꯣꯡꯒꯤ ꯂꯤꯃꯤꯠꯇꯒꯤ ꯍꯦꯟꯅꯥ ꯆꯥꯎꯕ ꯑꯇꯣꯞꯄ ꯁꯥꯏꯠ ꯈꯨꯗꯤꯡꯃꯛꯇ, ꯄ꯭ꯔꯄꯣꯖ ꯇꯧꯔꯕ ꯐꯦꯁꯤꯂꯤꯇꯤꯒꯤ ꯑꯔꯨꯛꯇ ꯐꯤꯜꯗ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯇꯦꯁ꯭ꯠ ꯑꯃꯥ ꯃꯊꯧ ꯇꯥꯏ; ꯍꯦꯟꯅꯥ ꯑꯄꯤꯛꯄ ꯁꯥꯏꯠꯁꯤꯡꯗ, ꯇꯦꯁ꯭ꯠ ꯇꯧꯗꯕ ꯂꯩꯃꯥꯏ ꯑꯃꯗ ꯃꯁꯤꯒꯤꯗꯃꯛ ꯄꯤꯔꯤꯕ ꯒ꯭ꯔꯨꯞꯁꯤꯡꯒꯤ ꯃꯅꯨꯡꯗ ꯏꯁꯤꯡ ꯍꯦꯟꯅꯥ ꯆꯨꯞꯄ ꯉꯝꯗꯕ ꯑꯗꯨ ꯄꯤꯒꯗꯕꯅꯤ꯫ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯄ꯭ꯔꯦꯛꯇꯤꯁ ꯑꯃꯥ ꯁꯥꯕ ꯌꯥꯕ ꯅꯠꯔꯒꯥ ꯌꯥꯗꯕ ꯑꯁꯤ ꯃꯁꯤꯒꯤ HSG-ꯅꯥ ꯅꯠꯇꯅꯥ, ꯀ꯭ꯂꯣꯖ 4.11-ꯒꯤ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟꯒꯤ ꯔꯨꯜ ꯑꯍꯨꯝ (ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯔꯨꯜ, ꯆꯤꯡꯒꯤ ꯔꯨꯜ ꯑꯃꯁꯨꯡ ꯔꯤꯆꯥꯔꯖꯀꯤ ꯔꯨꯜ)-ꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ꯫ ꯀ꯭ꯂꯣꯖ 3.10.1 ꯑꯁꯤ ꯒ꯭ꯔꯨꯞ ꯑꯁꯤ ꯄꯨꯝꯅꯃꯛꯇ ꯆꯠꯂꯤ꯫

3.7.3 ꯁꯥꯏꯠꯇ ꯆꯦꯛ ꯇꯧꯕ. ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟꯅꯥ ꯔꯤꯇꯦꯟꯁꯟ ꯇꯧꯕꯗ ꯊꯥꯖꯕ ꯊꯝꯕ ꯁꯥꯏꯠ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ (ꯁꯔꯨꯛ 4), ꯃꯦꯞ ꯇꯧꯔꯕ HSG ꯑꯁꯤ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯐꯦꯁꯤꯂꯤꯇꯤ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯃꯐꯝ ꯑꯃꯁꯨꯡ ꯑꯔꯨꯛꯇ ꯁꯥꯏꯠ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯇꯦꯁ꯭ꯠꯁꯤꯡꯅꯥ ꯆꯦꯛ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯇꯦꯁ꯭ꯠꯁꯤꯡꯅꯥ ꯃꯦꯞ ꯇꯧꯔꯕ HSG-ꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯀꯦꯄꯦꯁꯤꯇꯤ ꯎꯠꯂꯕꯗꯤ, ꯇꯦꯁ꯭ꯠꯀꯤ ꯃꯍꯩ ꯑꯗꯨꯅꯥ ꯔꯤꯇꯦꯟꯁꯟ ꯗꯤꯖꯥꯏꯟ ꯑꯃꯁꯨꯡ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ CN ꯑꯅꯤꯃꯛ ꯂꯦꯞꯊꯣꯀꯏ꯫ ꯃꯈꯣꯌꯅꯥ ꯍꯦꯟꯅꯥ ꯆꯥꯎꯕ ꯀꯦꯄꯦꯁꯤꯇꯤ ꯎꯠꯂꯕꯗꯤ, ꯑꯣꯊꯣꯔꯤꯇꯤꯒꯤ ꯑꯦꯞꯔꯨꯚꯦꯜ ꯌꯥꯑꯣꯗꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ HSG ꯍꯣꯡꯗꯣꯛꯔꯣꯏꯗꯕꯅꯤ꯫

3.7.4 ꯁꯣꯛꯍꯜꯂꯕ ꯑꯃꯁꯨꯡ ꯐꯤꯜ ꯇꯧꯔꯕ ꯂꯝ. ꯀ꯭ꯂꯣꯖ 3.3.3(b) ꯆꯠꯂꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. NBSS&LUP-ꯒꯤ ꯁꯣꯏꯜ ꯃꯦꯞꯁꯤꯡ ꯃꯍꯧꯁꯥꯅꯥ 1:250,000-ꯗꯒꯤ 1:50,000-ꯒꯤ ꯁ꯭ꯀꯦꯜꯗ ꯂꯩ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯥꯏꯁꯤꯡ HSG-ꯅꯥ ꯅꯠꯇꯅꯥ ꯁꯤꯔꯤꯖ ꯑꯃꯁꯨꯡ ꯇꯦꯛꯁꯣꯅꯣꯃꯤꯅꯥ ꯈꯥꯌꯗꯣꯀꯏ꯫ ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯂꯨꯛꯑꯞ ꯇꯦꯕꯜ ꯑꯃꯥ ꯃꯊꯧ ꯇꯥꯏ (ꯑꯍꯦꯟꯕ 3A)꯫ ꯁꯥꯏꯠ ꯑꯃꯅꯥ ꯒ꯭ꯔꯨꯞ ꯑꯅꯤ ꯌꯥꯎꯕ ꯌꯥꯕ ꯃꯐꯝꯁꯤꯡꯗ ꯁꯥꯏꯠ ꯇꯦꯁ꯭ꯠꯁꯤꯡ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯃꯔꯨꯑꯣꯏ: ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯥꯛꯇ, ꯃꯐꯝ ꯑꯗꯨꯗ ꯂꯩꯉꯣꯏ ꯑꯃꯁꯨꯡ ꯅꯨꯡꯀꯨꯞꯀꯤ ꯐꯨꯠꯍꯤꯜ ꯐꯦꯟ ꯑꯃꯅꯥ ꯈꯔ ꯈꯛꯇꯒꯤ ꯂꯝꯕꯤꯗ ꯂꯦꯀꯨꯁ꯭ꯇ꯭ꯔꯥꯏꯟ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯗ ꯆꯡꯏ ꯑꯃꯁꯨꯡ ꯋꯥꯇꯔ ꯇꯦꯕꯜ ꯑꯁꯤ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯗ ꯆꯠꯂꯤꯉꯩꯗ ꯋꯥꯡꯈꯠꯂꯛꯏ; ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯆꯤꯡ ꯑꯄꯤꯛꯄꯁꯤꯡꯗ, ꯃꯐꯝ ꯑꯗꯨꯗ ꯗꯤꯁꯥꯡ ꯁꯦꯜꯅꯥ ꯕꯔꯦꯜ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟ ꯀꯦꯄꯤꯡ ꯑꯃꯥ ꯄꯨꯔꯤ; ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯗ, ꯃꯐꯝ ꯑꯗꯨꯗ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯂꯩꯉꯣꯏꯒꯤ ꯂꯦꯟꯁ ꯑꯃꯅꯥ ꯃꯥꯔꯆꯗ ꯐꯅꯥ ꯇꯦꯁ꯭ꯠ ꯇꯧꯕ ꯌꯥꯏ ꯑꯃꯁꯨꯡ ꯑꯒꯁ꯭ꯠꯇ ꯋꯥꯇꯔ ꯇꯦꯕꯜꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯌꯥꯏ; ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟꯗ, ꯃꯐꯝ ꯑꯗꯨꯗ ꯑꯦꯂꯨꯚꯤꯌꯝ ꯑꯁꯤ ꯅꯣꯡ ꯆꯨꯗꯕ ꯃꯇꯝꯗ ꯕꯔꯥꯛꯀꯤ ꯃꯊꯛꯇ ꯀꯡꯅꯥ ꯂꯩ ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯗ ꯃꯁꯤꯒꯤ ꯃꯈꯥꯗ ꯂꯩ; ꯑꯃꯁꯨꯡ ꯆꯤꯡꯒꯤ ꯁꯥꯏꯠꯁꯤꯡꯗ, ꯃꯐꯝ ꯑꯗꯨꯗ ꯀꯣꯂꯨꯚꯤꯌꯝ ꯅꯠꯔꯒꯥ ꯐꯤꯜꯗ ꯇꯨꯝꯕ ꯀꯣꯡ ꯑꯃꯗ ꯂꯩꯕ ꯌꯥꯝꯅꯥ ꯊꯨꯅꯕ ꯔꯦꯠ ꯑꯁꯤ ꯂꯧꯕ ꯉꯝꯗꯕ ꯅꯥꯄꯣꯝ ꯑꯃꯗ ꯆꯡꯂꯤꯕ ꯏꯁꯤꯡ ꯑꯣꯏꯕ ꯌꯥꯏ (ꯀ꯭ꯂꯣꯖ 4.11)꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯔꯤꯁꯔꯆ ꯇꯧꯔꯤꯉꯩꯗ NBSS&LUP-ꯒꯤ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯁꯣꯏꯜ-ꯁꯤꯔꯤꯖ ꯃꯦꯞ, HSG ꯃꯦꯞ ꯅꯠꯔꯒꯥ ꯇꯦꯕꯜ, SCS-CN ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯦꯠꯀꯤ ꯁꯥꯏꯠ ꯑꯃꯍꯦꯛꯇꯒꯤ ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯔꯦꯠ ꯑꯃꯠꯇ ꯐꯡꯈꯤꯗꯦ [TBC]꯫ ꯃꯇꯝ ꯈꯔꯒꯤ ꯒ꯭ꯔꯨꯞꯁꯤꯡ ꯑꯁꯤ ꯔꯤꯖꯅꯦꯜ ꯍꯧꯔꯛꯐꯝꯁꯤꯡꯅꯥ ꯇꯥꯀꯄ ꯂꯩꯃꯥꯏ ꯑꯃꯁꯨꯡ ꯖꯤꯑꯣꯂꯣꯖꯤꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯩ꯫ "ꯃꯅꯤꯄꯨꯔ ꯇꯝꯄꯥꯛ ꯑꯁꯤ ꯑꯦꯂꯨꯚꯤꯌꯝꯅꯥ ꯃꯄꯨꯡ ꯊꯟꯂꯕ ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯇꯝꯄꯥꯛ ꯑꯃꯅꯤ … ꯃꯦꯟ ꯁꯤ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 780 m ꯋꯥꯡꯏ ꯑꯃꯁꯨꯡ ꯈꯥ ꯊꯡꯕ ꯃꯥꯏꯀꯩꯗ ꯌꯥꯝꯅꯥ ꯅꯦꯝꯕ ꯒ꯭ꯔꯦꯗꯤꯌꯦꯟꯠ ꯂꯩ" ("Manipur Valley is virtually a flat alluvium filled valley … nearly 780 m high above the mean sea level with a very low southerly gradient"), "ꯐ꯭ꯂꯨꯚꯤꯑꯣ ꯂꯦꯀꯨꯁ꯭ꯇ꯭ꯔꯥꯏꯟ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯑꯦꯂꯨꯚꯤꯌꯝꯅꯥ ꯁꯦꯝꯕ" ("made up of alluvium of fluvio lacustrine origin"), ꯃꯁꯤꯒꯤ "ꯃꯔꯨꯑꯣꯏꯕ ꯄꯣꯠꯂꯝꯁꯤꯡ ꯑꯁꯤ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ, ꯂꯩꯃꯨ ꯑꯃꯁꯨꯡ ꯂꯩꯉꯣꯏꯅꯤ, ꯑꯗꯨꯕꯨ ꯐꯨꯠꯍꯤꯜꯒꯤ ꯂꯝꯁꯤꯡꯗ ꯂꯩꯉꯣꯏ, ꯅꯨꯡꯀꯨꯞ, ꯅꯨꯡ ꯑꯄꯤꯛꯄ ꯑꯃꯁꯨꯡ ꯅꯨꯡ ꯑꯆꯧꯕꯁꯤꯡ ꯐꯡꯏ" ("principal constituents are clay, silt and sand whereas sand, gravel, pebbles and boulders are found in the foothill regions"); "ꯇꯝꯄꯥꯛꯀꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯆꯤꯡ ꯑꯄꯤꯛꯄꯁꯤꯡ ꯃꯔꯨꯑꯣꯏꯅꯥ ꯗꯤꯁꯥꯡ ꯁꯦꯜꯅꯥ ꯁꯦꯝꯕꯅꯤ ꯑꯗꯨꯕꯨ ꯈꯔꯗ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟ ꯀꯦꯄꯤꯡ ꯂꯩ … ꯃꯔꯨꯑꯣꯏꯅꯥ ꯕꯔꯦꯜ" ("The hillocks inside the valley are basically composed of Disang shales but some have sandstone capping … mainly Barails"); ꯑꯃꯁꯨꯡ ꯗꯤꯁꯥꯡ, "ꯃꯔꯨꯑꯣꯏꯅꯥ ꯁꯦꯜ ꯑꯣꯏꯕ, ꯆꯤꯡꯒꯤ ꯂꯝꯒꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 85 p.c. ꯂꯧꯏ, ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯏ ꯑꯃꯁꯨꯡ ꯔꯟꯑꯣꯐ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯏ" ("which is predominantly shale, occupies almost 85 p.c. of the hilly region, have less infiltration and more run off") (MASTEC, Flood Hazard Zonation in Manipur Valley)꯫ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ ꯑꯁꯤ ꯑꯆꯨꯝꯕ: ꯏꯝꯐꯥꯜ ꯋꯦꯁ꯭ꯠ (Imphal West)-ꯗ "ꯈꯔ ꯊꯣꯏꯅꯥ 30-ꯗꯒꯤ 50 m ꯐꯥꯎꯕ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯐꯣꯔꯃꯦꯁꯟ ꯂꯩꯕꯅꯥ, ꯁꯦꯂꯣ ꯇ꯭ꯌꯨꯕ ꯋꯦꯜ ꯁꯥꯕ ꯑꯁꯤ ꯑꯔꯨꯕꯥ ꯑꯣꯏ" ("approximately 30 to 50 m of clayey formation, construction of shallow tube wells is problematic"), "30-ꯗꯒꯤ 65 m bgl ꯐꯥꯎꯕꯒꯤ ꯑꯔꯨꯛ ꯐꯥꯎꯕ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯗꯤꯄꯣꯖꯤꯠ" ("clayey deposit down to depth range of 30 to 65 m bgl") ꯑꯃꯁꯨꯡ "ꯃꯐꯝ ꯈꯔꯗ ꯗꯤꯞ ꯇ꯭ꯌꯨꯕ ꯋꯦꯜ ꯁꯥꯕꯗ ꯒꯦꯁ ꯊꯣꯀꯄ" ("emanation of gas while constructing deep tube wells in some places") ꯂꯩ (CGWB, Imphal West district booklet, 2013)꯫ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯀꯣꯏꯕꯗ "ꯑꯣꯔꯒꯦꯅꯤꯛ ꯂꯩꯃꯥꯏꯁꯤꯡꯅꯥ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯀꯣꯏꯕꯗ ꯂꯩꯕ ꯅꯦꯝꯕ ꯂꯝꯁꯤꯡ ꯀꯨꯞꯈꯤ꯫ ꯃꯃꯨ ꯑꯣꯏꯕ ꯃꯆꯨ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯂꯣꯝ ꯇꯦꯛꯁꯆꯔ ꯂꯩꯕ ꯄꯤꯠꯀꯤ ꯂꯩꯃꯥꯏ ꯑꯁꯤꯁꯤꯡꯗ ꯑꯦꯁꯤꯗꯤꯇꯤ ꯌꯥꯝꯅꯥ ꯆꯥꯎꯏ, ꯑꯣꯔꯒꯦꯅꯤꯛ ꯃꯦꯇꯔ ꯌꯥꯝꯅꯥ ꯂꯩ" ("The organic soils covered the low-lying areas surrounding the lakes. With dark grey colour and clayed loam texture, these peaty soils have high acidity, abundance of organic matter"), ꯑꯃꯁꯨꯡ "ꯂꯦꯀꯨꯁ꯭ꯇ꯭ꯔꯥꯏꯟ ꯂꯦꯃꯤꯅꯦꯇꯦꯗ ꯂꯩꯉꯣꯏ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯅꯥ ꯑꯅꯧꯕ ꯗꯤꯁꯥꯡ ꯁꯦꯜꯒꯤ ꯃꯊꯛꯇ ꯂꯩ" ("lacustrine laminated sand and clay overlies the fresh Disang shale") (CGWB, Bishnupur district booklet, 2013)꯫ ꯇꯝꯄꯥꯛ ꯑꯁꯤ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯂꯩꯕꯥꯛ ꯑꯃꯥ ꯑꯣꯏꯈꯤ: "ꯃꯅꯤꯄꯨꯔ ꯇꯝꯄꯥꯛꯇ ꯈꯔ ꯊꯣꯏꯅꯥ ꯄꯥꯠ 500 ꯂꯩꯈꯤ" ("there were nearly 500 lakes in Manipur Valley"), ꯃꯈꯣꯌꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯝꯐꯦꯜꯄꯥꯠ, ꯄꯣꯔꯣꯝꯄꯥꯠ, ꯇꯥꯛꯌꯦꯜꯄꯥꯠ (Takyelpat), ꯁꯉꯥꯏꯄꯥꯠ (Sangaipat), ꯈꯥꯔꯨꯡꯄꯥꯠ (Kharungpat) ꯑꯃꯁꯨꯡ ꯏꯀꯣꯞ ꯄꯥꯠ ꯌꯥꯑꯣꯏ (MASTEC), ꯑꯃꯁꯨꯡ "ꯇꯝꯄꯥꯛ ꯑꯁꯤ ꯃꯃꯥꯡꯗ ꯄꯥꯠꯊꯕꯤ ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡ ꯌꯥꯝꯕ ꯂꯝꯅꯥ ꯃꯄꯨꯡ ꯊꯟꯂꯝꯃꯤ, ꯃꯁꯤ 'ꯄꯥꯠ' (PAT, lake) ꯍꯥꯌꯕ ꯋꯥꯍꯩ ꯂꯩꯕ ꯃꯐꯝꯁꯤꯡꯅꯥ ꯎꯠꯂꯤ" ("This valley was once full of swamps and marshy land represented by the places having the word PAT meaning lake") (CGWB, Imphal West); ꯃꯃꯥꯡꯒꯤ ꯄꯥꯠ ꯑꯃꯗ ꯂꯩꯕ ꯁꯥꯏꯠ ꯑꯃꯥ ꯍꯧꯖꯤꯛ ꯀꯔꯤꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯕꯁꯨ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯅꯤ꯫ ꯏꯝꯐꯥꯜ ꯋꯦꯁ꯭ꯠꯀꯤ ꯃꯐꯝ ꯌꯥꯝꯕꯗ ꯏꯁꯤꯡ ꯑꯁꯤ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯗ 2–5 m-ꯗ ꯂꯩ, ꯑꯃꯁꯨꯡ ꯆꯤꯡꯁꯤꯡꯒꯤ ꯃꯅꯥꯛꯇ 5–7 m-ꯗ ꯂꯩ (CGWB, Imphal West), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ ꯑꯁꯤ ꯃꯁꯤꯒꯤ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ ꯈꯛꯇꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ HSG D-ꯅꯤ, ꯑꯃꯁꯨꯡ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯗ ꯍꯦꯟꯅꯥ ꯏꯁꯤꯡ ꯌꯥꯝꯏ (ꯀ꯭ꯂꯣꯖ 3.10-ꯒꯤ ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ)꯫ ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟ ꯅꯠꯔꯒꯥ ꯕꯔꯦꯜ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟꯁꯤꯡꯒꯤ ꯂꯩꯃꯥꯏꯒꯤꯗꯃꯛ ꯄ꯭ꯔꯥꯏꯃꯔꯤ ꯍꯧꯔꯛꯐꯝ ꯑꯃꯠꯇ ꯄꯥꯈꯤꯗꯦ [TBC]; ꯃꯈꯣꯌꯒꯤ ꯒ꯭ꯔꯨꯞꯁꯤꯡ ꯑꯁꯤ ꯁꯤꯔꯤꯖ ꯑꯁꯤꯅꯥ ꯃꯈꯥ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯕꯔꯥꯛ ꯄ꯭ꯂꯦꯟ ꯑꯃꯁꯨꯡ ꯁꯦꯟꯗꯁ꯭ꯇꯣꯟ ꯆꯤꯡꯁꯤꯡ ꯂꯧꯈꯤꯕ ꯃꯑꯣꯡꯗꯒꯤ ꯊꯝꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯇꯦꯁ꯭ꯠꯁꯤꯡꯅꯥ ꯁꯣꯏꯗꯅꯥ ꯈꯉꯍꯅꯒꯗꯕꯅꯤ꯫ ꯄꯤꯠꯀꯤ ꯁꯕꯁꯤꯗꯦꯟꯁ ꯅꯠꯔꯒꯥ ꯑꯆꯨꯝꯕꯒꯤ ꯔꯦꯀꯣꯔꯗ ꯑꯃꯠꯇ ꯐꯡꯈꯤꯗꯦ [TBC]꯫ ꯂꯣꯁꯁꯤꯡꯒꯤ ꯔꯤꯖꯅꯦꯜ ꯃꯦꯖꯔ ꯑꯃꯈꯛꯇꯅꯤ CWC ꯁꯕꯖꯣꯟ 2(b)-ꯒꯤ ꯔꯤꯄꯣꯔꯠꯀꯤ ꯗꯤꯖꯥꯏꯟ ꯂꯣꯁ ꯔꯦꯠ, 0.35 cm/h (3.5 mm/h), ꯃꯁꯤ ꯁ꯭ꯇꯦꯠꯀꯤ ꯃꯄꯥꯟꯗ ꯂꯩꯕ ꯊꯣꯡꯁꯤꯡꯗ ꯒꯦꯖ ꯇꯧꯔꯕ ꯂꯃꯗꯝꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯊꯧꯗꯣꯛ 100-ꯒꯤ ꯃꯣꯗꯦꯜ ꯚꯦꯜꯌꯨꯅꯤ, ꯃꯈꯣꯌꯒꯤ ꯑꯃꯠꯇꯅꯥ ꯃꯅꯤꯄꯨꯔꯗꯒꯤ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯇꯦ (ꯑꯍꯦꯟꯕ 3E)꯫ ꯃꯁꯤ ꯀ꯭ꯂꯣꯖ 3.11.4-ꯒꯤ ꯃꯈꯥꯗ 2(b) SUH ꯆꯦꯛ ꯔꯟ ꯑꯃꯗ ꯈꯛꯇꯃꯛ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ, HSG ꯄꯤꯅꯕ, ꯁꯍꯔꯒꯤ SCS-CN ꯅꯠꯔꯒꯥ SWMM ꯃꯣꯗꯦꯜ ꯑꯃꯗ ꯅꯠꯔꯒꯥ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯄ꯭ꯔꯦꯛꯇꯤꯁ ꯑꯃꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯅꯕ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫ ꯀ꯭ꯂꯣꯖ 3.7.2-ꯒꯤ ꯃꯇꯝ ꯈꯔꯒꯤ ꯒ꯭ꯔꯨꯞꯁꯤꯡ, ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ, ꯄꯤꯠ ꯑꯃꯁꯨꯡ ꯗꯤꯁꯥꯡ ꯁꯦꯜ ꯒ꯭ꯔꯨꯞ D ꯑꯣꯏꯅꯥ ꯂꯧꯕ, ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟꯒꯤꯗꯃꯛ ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯔꯨꯜ ꯑꯃꯁꯨꯡ ꯑꯄꯤꯛꯄ ꯁꯥꯏꯠꯁꯤꯡꯗ ꯇꯦꯁ꯭ꯠ ꯇꯧꯗꯕ ꯂꯩꯃꯥꯏꯒꯤ ꯔꯨꯜ ꯑꯁꯤ ꯃꯅꯤꯄꯨꯔꯒꯤꯗꯃꯛ ꯁꯣꯏꯜ-ꯁꯤꯔꯤꯖ ꯂꯨꯛꯑꯞ ꯑꯃꯥ ꯐꯡꯗ꯭ꯔꯤꯐꯥꯎꯕ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ꯫ ꯊꯧꯑꯣꯡꯒꯤ ꯔꯨꯜꯁꯤꯡ ꯑꯁꯤ ꯂꯩꯃꯥꯏꯒꯥ ꯆꯞ ꯃꯥꯟꯅꯅꯥ ꯃꯔꯨꯑꯣꯏ, ꯃꯔꯝꯗꯤ ꯁ꯭ꯇꯦꯠꯀꯤ ꯂꯝ ꯑꯁꯤ CWC-ꯒꯤ ꯃꯔꯤ ꯑꯃꯠꯇꯅꯥ ꯇꯥꯀꯄ ꯉꯃꯗꯕ ꯃꯈꯜ ꯑꯅꯤꯒꯤꯅꯤ: ꯇꯨꯔꯦꯜꯁꯤꯡꯗ ꯄꯟ (bund) ꯁꯥꯔꯕ ꯑꯃꯁꯨꯡ ꯇꯨꯔꯦꯜꯁꯤꯡ ꯋꯥꯡꯂꯕ ꯃꯇꯝꯗ ꯑꯥꯎꯠꯐꯣꯜ (outfall)-ꯁꯤꯡ ꯊꯤꯡꯂꯛꯄ ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯄꯥꯠꯀꯤ ꯕꯦꯁꯤꯟ ꯑꯃꯥ, ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯒꯤ ꯈꯣꯡꯁꯤꯡꯅꯥ ꯃꯤꯅꯠ ꯈꯔꯒꯤ ꯃꯅꯨꯡꯗ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯗ ꯌꯧꯕ ꯁꯦꯜꯒꯤ ꯆꯤꯡꯁꯤꯡ꯫ ꯇꯝꯄꯥꯛꯀꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯁꯤꯡ ꯆꯤꯡꯁꯤꯡꯗꯒꯤ ꯂꯥꯀꯏ: ꯇꯝꯄꯥꯛꯀꯤ ꯈꯨꯠꯊꯣꯛꯇꯥ ꯆꯦꯟꯊꯔꯛꯄ 6,332 km²-ꯒꯤ ꯃꯅꯨꯡꯗ, ꯆꯤꯡꯁꯤꯡ 4,432 km² (70%) ꯑꯃꯁꯨꯡ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ 1,900 km² (30%)-ꯅꯤ (MASTEC; ꯃꯥꯁ꯭ꯇꯔ ꯄ꯭ꯂꯥꯟꯅꯥ ꯕꯦꯁꯤꯟꯒꯤ ꯂꯝ 6,332 km² ꯍꯥꯌꯅꯥ ꯐꯣꯡꯗꯣꯀꯏ), ꯑꯃꯁꯨꯡ ꯇꯝꯄꯥꯛꯀꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯁꯤꯡ ꯑꯁꯤ ꯆꯤꯡꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗ ꯅꯨꯃꯤꯠ ꯀꯌꯥ ꯅꯣꯡ ꯆꯨꯔꯕꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯥꯀꯏ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ 28 ꯖꯨꯂꯥꯏ–1 ꯑꯒꯁ꯭ꯠ 1989, 22–28 ꯁꯦꯞꯇꯦꯝꯕꯔ 1997, 24 ꯑꯒꯁ꯭ꯠ–3 ꯁꯦꯞꯇꯦꯝꯕꯔ 1999 ꯑꯃꯁꯨꯡ 26 ꯑꯒꯁ꯭ꯠ–6 ꯁꯦꯞꯇꯦꯝꯕꯔ 2000 (MASTEC)꯫ ꯃꯈꯥꯒꯤ ꯔꯨꯜꯁꯤꯡ ꯑꯁꯤ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ꯫ (a) Tc ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 3.6.2-ꯒꯤ ꯚꯦꯂꯣꯁꯤꯇꯤꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯁꯦꯒꯃꯦꯟꯠ ꯊꯧꯑꯣꯡꯅꯥ, ꯁꯦꯒꯃꯦꯟꯠ ꯑꯃꯗꯒꯤ ꯑꯃꯗ ꯊꯤꯒꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 2-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯗꯤꯖꯥꯏꯟ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯒꯥ ꯃꯥꯟꯅꯕ ꯀ꯭ꯂꯣꯖ 3.6.1-ꯒꯤ ꯃꯤꯅꯠ 10-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯑꯗꯨꯗꯒꯤ ꯅꯦꯝꯅꯥ ꯂꯧꯔꯣꯏꯗꯕꯅꯤ; ꯅꯥꯄꯣꯝ ꯃꯌꯥꯏ ꯑꯣꯏꯕ ꯑꯄꯤꯛꯄ ꯂꯧꯎ-ꯁꯤꯡꯎꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗꯒꯤ ꯂꯥꯀꯄ ꯀꯔꯄꯤꯆ ꯐꯣꯔꯃꯨꯂꯥ ꯑꯁꯤ ꯐ꯭ꯂꯣ ꯄꯥꯊꯀꯤ ꯑꯦꯚꯔꯦꯖ ꯅꯥꯄꯣꯝ 10%-ꯗꯒꯤ ꯍꯦꯟꯕ ꯃꯐꯝꯗ ꯀ꯭ꯔꯣꯁ-ꯆꯦꯛ ꯑꯣꯏꯅꯥ ꯐꯥꯎꯕ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫ (b) ꯃꯄꯥꯟ ꯊꯣꯛꯂꯕ ꯅꯨꯡ, ꯀꯠ ꯇꯧꯔꯕ ꯅꯥꯄꯣꯝ ꯅꯠꯔꯒꯥ ꯄꯦꯚ ꯇꯧꯔꯕ ꯆꯤꯡꯒꯤ ꯂꯝꯕꯤ ꯑꯃꯒꯤ ꯃꯊꯛꯇ ꯂꯩꯕ ꯁꯤꯠ-ꯐ꯭ꯂꯣ ꯁꯦꯒꯃꯦꯟꯠꯅꯥ ꯇꯦꯕꯜ 3.4-ꯒꯤ ꯆꯦꯟꯕ ꯂꯩꯃꯥꯏꯒꯤ n ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ 30 m-ꯗꯒꯤ ꯍꯦꯟꯔꯣꯏꯗꯕꯅꯤ꯫ (c) ꯆꯤꯡꯒꯤ ꯅꯥꯄꯣꯝ ꯑꯃꯗꯒꯤ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ ꯅꯠꯔꯒꯥ ꯄ꯭ꯂꯦꯟ ꯑꯃꯗ ꯆꯠꯄ ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯥ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ "ꯂꯣꯛꯇꯥꯛ ꯄꯥꯠꯇ ꯌꯧꯗ꯭ꯔꯤꯉꯩꯗ ꯈꯔ ꯈꯛꯇꯒꯤ ꯂꯝꯕꯤꯗ ꯑꯉꯃꯕ ꯅꯥꯄꯣꯝꯗ ꯆꯦꯟꯊꯔꯛꯄ" ("flow down with steep slope for a short distance before meeting the Loktak Lake") ꯆꯤꯡꯒꯤ ꯈꯣꯡꯁꯤꯡ (MASTEC), ꯀꯥꯡꯄꯣꯛꯄꯤ, ꯎꯈ꯭ꯔꯨꯜ ꯑꯃꯁꯨꯡ ꯆꯨꯔꯆꯥꯟꯗꯄꯨꯔꯒꯤ ꯆꯤꯡꯁꯤꯡꯗꯒꯤ ꯇꯝꯄꯥꯛꯇ ꯂꯥꯀꯄ ꯈꯣꯡꯁꯤꯡ, ꯅꯠꯔꯒꯥ ꯅꯣꯡꯆꯨꯞꯀꯤ ꯆꯤꯡꯁꯤꯡꯗꯒꯤ ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟꯗ ꯂꯥꯀꯄ ꯈꯣꯡꯁꯤꯡ, ꯑꯁꯤ ꯅꯥꯄꯣꯝ ꯍꯣꯡꯕ ꯃꯐꯝꯗ ꯈꯥꯌꯗꯣꯛꯀꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ ꯆꯤꯡꯒꯤ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ ꯑꯗꯨ ꯃꯁꯥ ꯃꯊꯟꯇ, ꯆꯤꯡꯒꯤ ꯃꯐꯝꯗ ꯀ꯭ꯂꯣꯖ 2.3.6(c)(iii) ꯅꯠꯔꯒꯥ (c)(ii)-ꯒꯤ ꯆꯤꯡꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯍꯦꯟꯅꯥ ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯃꯈꯥꯒꯤ ꯔꯤꯆ ꯑꯃꯅꯥ ꯆꯤꯡꯒꯤ ꯊꯨꯅꯥ ꯍꯥꯌꯕꯤꯕ ꯑꯗꯨ ꯑꯦꯚꯔꯦꯖ ꯇꯧꯗꯨꯅꯥ ꯃꯥꯡꯍꯜꯂꯣꯏ꯫ (d) ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯗ (ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-A ꯑꯃꯁꯨꯡ MN-A1), ꯀ꯭ꯂꯣꯖ 3.4-ꯒꯤ ꯃꯈꯥꯗ ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗꯅꯥ ꯑꯄꯤꯛꯄ, ꯍꯦꯟꯅꯥ ꯑꯉꯃꯕ ꯅꯥꯄꯣꯝ ꯂꯩꯕ ꯁꯕ-ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗ ꯈꯛꯇꯃꯛ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯆꯤꯡ ꯑꯄꯤꯛꯄꯁꯤꯡ, ꯐꯨꯠꯍꯤꯜ ꯐꯦꯟꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯆꯤꯡꯒꯤ ꯃꯅꯥꯛꯀꯤ ꯀꯣꯂꯣꯅꯤꯁꯤꯡꯗ, ꯀꯟꯚꯦꯌꯦꯟꯁ ꯑꯦꯂꯤꯃꯦꯟꯠ ꯑꯃꯈꯛꯇꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯏ; ꯑꯇꯣꯞꯄ ꯁꯤꯁ꯭ꯇꯦꯝ ꯈꯨꯗꯤꯡꯃꯛ, ꯑꯃꯁꯨꯡ ꯇꯨꯔꯦꯜ, ꯄꯥꯠ ꯅꯠꯔꯒꯥ ꯂꯣꯛꯇꯥꯛ ꯌꯧꯕ ꯁꯤꯁ꯭ꯇꯦꯝ ꯈꯨꯗꯤꯡꯃꯛ, SWMM ꯅꯠꯔꯒꯥ HEC-HMS-ꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯇꯧꯏ, ꯃꯁꯤꯒꯤ ꯑꯥꯎꯠꯐꯣꯜꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯁ꯭ꯇꯣꯔꯦꯖ (ꯒꯦꯠꯀꯤ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯗ ꯂꯩꯕ ꯈꯣꯡꯕꯥꯟ, ꯁꯝꯞ, ꯄꯨꯈ꯭ꯔꯤ, ꯄꯥꯠ ꯑꯃꯁꯨꯡ ꯂꯧꯕꯨꯛꯁꯤꯡ)-ꯒꯤ ꯂꯦꯚꯦꯜ-ꯄꯨꯜ ꯔꯥꯎꯇꯤꯡ, ꯄꯝꯞꯀꯤ ꯔꯦꯇꯤꯡꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯒꯦꯠꯀꯤ ꯔꯨꯜ (ꯀ꯭ꯂꯣꯖ 3.12.1), ꯇꯦꯜꯋꯥꯇꯔ ꯑꯣꯏꯅꯥ ꯑꯥꯎꯠꯐꯣꯜꯗ ꯂꯩꯕ ꯇꯨꯔꯦꯜ ꯅꯠꯔꯒꯥ ꯄꯥꯠꯀꯤ ꯂꯦꯚꯦꯜ (ꯁꯔꯨꯛ 5) ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯐꯣꯜ ꯏꯁꯤꯡꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯃꯐꯝꯗ ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ ꯔꯥꯎꯇꯤꯡ (ꯀ꯭ꯂꯣꯖ 3.12.4)-ꯒꯥ ꯂꯣꯌꯅꯅꯥ꯫ (e) ꯑꯁꯤꯒꯨꯝꯕ ꯁꯤꯁ꯭ꯇꯦꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ ꯗꯤꯖꯥꯏꯟ ꯀꯦꯁ ꯑꯅꯤ ꯆꯂꯥꯏꯒꯗꯕꯅꯤ: ꯁꯍꯔꯒꯤ ꯃꯇꯝ ꯅꯦꯝꯕ ꯅꯣꯡ ꯆꯨꯕ ꯑꯃꯥ, ꯀ꯭ꯂꯣꯖ 2.5.2-ꯒꯤ ꯄꯨꯡ 6 ꯐꯥꯎꯕ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯁꯤꯡꯒꯤ, ꯇꯨꯔꯦꯜ ꯑꯗꯨ ꯃꯁꯤꯒꯤ WRD-ꯒꯤ ꯋꯥꯔꯅꯤꯡ ꯂꯦꯚꯦꯜ (WL)-ꯗ ꯂꯩꯅꯥ ꯑꯃꯁꯨꯡ ꯇꯨꯔꯦꯜ ꯑꯗꯨ ꯒꯦꯠꯀꯤ ꯁꯤꯜꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯔꯤꯉꯩ ꯈꯛꯇꯗ ꯒꯦꯠ ꯍꯥꯡꯗꯣꯛꯅꯥ; ꯑꯃꯁꯨꯡ ꯃꯇꯝ ꯁꯥꯡꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯃꯥ, ꯆꯤꯡꯁꯤꯡ ꯌꯥꯑꯣꯅꯥ ꯀꯦꯆꯃꯦꯟꯠ ꯄꯨꯝꯅꯃꯛꯇ ꯀ꯭ꯂꯣꯖ 2.3.6(e)-ꯒꯤ ꯄꯨꯡ 72-ꯒꯤ ꯊꯧꯗꯣꯛ, ꯇꯨꯔꯦꯜ ꯑꯗꯨ ꯃꯁꯤꯒꯤ WRD-ꯒꯤ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ (FL)-ꯗ ꯂꯩꯅꯥ, ꯃꯁꯤꯒꯤ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ (HFL) ꯅꯠꯔꯒꯥ ꯃꯗꯨꯒꯤ ꯃꯊꯛꯇ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯋꯥꯡꯕ ꯔꯤꯗꯤꯡꯗ ꯆꯦꯛ ꯇꯧꯗꯨꯅꯥ, ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯐꯣꯜ ꯑꯗꯨ ꯀ꯭ꯂꯣꯖ 5.8.5(a)-ꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯁꯤꯡꯒꯤꯗꯃꯛ ꯊꯤꯡꯂꯒꯥ, ꯅꯠꯔꯒꯥ ꯂꯣꯛꯇꯥꯛꯀꯤ ꯃꯅꯥꯛꯇ, ꯄꯥꯠ ꯑꯗꯨ ꯀ꯭ꯂꯣꯖ 5.8.5(c)-ꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯂꯦꯚꯦꯜꯗ ꯂꯩꯅꯥ꯫ (f) 25–5,000 km²-ꯒꯤ ꯂꯃꯗꯝꯒꯤ ꯇꯨꯔꯦꯜꯁꯤꯡ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯏꯔꯤꯜ (Iril), ꯊꯧꯕꯥꯜ, ꯁꯦꯛꯃꯥꯏ, ꯈꯨꯒꯥ (Khuga), ꯆꯛꯄꯤ (Chakpi), ꯏꯔꯥꯡ (Irang), ꯃꯀ꯭ꯔꯨ (Makru) ꯑꯃꯁꯨꯡ ꯖꯤꯔꯤ, ꯃꯈꯣꯌ ꯃꯁꯥꯒꯤ CWC ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯑꯃꯠꯇ ꯂꯩꯇꯦ: ꯃꯈꯣꯌꯕꯨ ꯀ꯭ꯂꯣꯖ 3.15-ꯒꯤ ꯃꯈꯥꯗ WRD-ꯒꯤ ꯗꯤꯁꯆꯥꯔꯖꯁꯤꯡꯗ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯔꯕ HEC-HMS ꯅꯠꯔꯒꯥ SWMM-ꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯏ, ꯃꯈꯣꯌꯒꯤ ꯃꯅꯨꯡꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕꯁꯤꯡꯅꯤ ꯃꯣꯏꯔꯥꯡ ꯀꯝꯄꯨ (Moirang Kampu)-ꯗ ꯏꯔꯤꯜꯗ 532.488 m³/s (2 ꯁꯦꯞꯇꯦꯝꯕꯔ 2000), ꯊꯧꯕꯥꯜ ꯊꯣꯡꯗ ꯊꯧꯕꯥꯜꯗ 391.636 m³/s (30 ꯑꯒꯁ꯭ꯠ 1999), ꯏꯝꯐꯥꯜꯗ 202.006 m³/s (2 ꯁꯦꯞꯇꯦꯝꯕꯔ 2000) ꯑꯃꯁꯨꯡ ꯅꯝꯕꯨꯜꯗ 68.495 m³/s (2 ꯖꯨꯂꯥꯏ 2001) (MASTEC, 1999–2001-ꯒꯤ WRD-ꯒꯤ ꯗꯦꯇꯥꯗꯒꯤ), ꯃꯈꯣꯌꯒꯤ ꯁ꯭ꯇꯦꯖ–ꯗꯤꯁꯆꯥꯔꯖ ꯀꯔꯚꯁꯤꯡ ꯂꯨꯞ ꯑꯣꯏꯕꯅꯥ ꯁ꯭ꯇꯦꯖ ꯑꯃꯈꯛꯇꯅꯥ ꯋꯥꯡꯈꯠꯂꯛꯄꯗ ꯑꯃꯁꯨꯡ ꯍꯟꯊꯔꯛꯄꯗ ꯇꯣꯉꯥꯟꯕ ꯐ꯭ꯂꯣ ꯄꯤ ꯍꯥꯌꯕ ꯅꯤꯡꯁꯤꯡꯗꯨꯅꯥ; CWC ꯁꯕꯖꯣꯟ 2(b)-ꯒꯤ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ, ꯃꯁꯤꯒꯤ ꯄꯤꯛ ꯑꯁꯤ ꯂꯝ ꯈꯛꯇꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯠꯇꯅꯥ ꯃꯅꯤꯄꯨꯔꯗꯒꯤ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯇꯦ, ꯃꯁꯤ ꯀ꯭ꯂꯣꯖ 3.11.4-ꯒꯤ ꯆꯦꯛ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯃꯛ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯏ (ꯑꯍꯦꯟꯕ 3E)꯫ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-C ꯑꯃꯁꯨꯡ MN-C1-ꯗ, 1 km²-ꯗꯒꯤ ꯍꯦꯟꯕ ꯀ꯭ꯔꯣꯁ-ꯗ꯭ꯔꯦꯅꯦꯖ ꯁ꯭ꯇ꯭ꯔꯛꯆꯔ ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯐꯣꯜ ꯈꯨꯗꯤꯡꯃꯛꯅꯥ ꯀ꯭ꯂꯣꯖ 2.3.6(c)(ii)-ꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯅꯣꯡ ꯆꯨꯕ, ꯀ꯭ꯂꯣꯖ 3.8.4-ꯒꯤ AMC ꯑꯃꯁꯨꯡ ꯄꯨꯡ 72-ꯒꯤ ꯊꯧꯗꯣꯛꯀꯤ ꯔꯥꯎꯇꯤꯡ ꯌꯥꯑꯣꯕ ꯁꯥꯏꯠ ꯑꯗꯨꯒꯤ ꯈꯛꯇꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤ ꯁ꯭ꯇꯗꯤ ꯑꯃꯥ ꯃꯊꯧ ꯇꯥꯏ, ꯃꯔꯝꯗꯤ ꯃꯐꯝ ꯑꯗꯨꯗ ꯄꯤꯛꯀꯥ ꯂꯣꯌꯅꯅꯥ ꯚꯣꯂꯨꯝꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ꯫ (g) ꯔꯤꯖꯔꯚꯣꯌꯔ ꯑꯃꯗ ꯅꯠꯔꯒꯥ ꯗꯦꯝ ꯑꯃꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯔꯤꯆ ꯑꯃꯗ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯄ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯃꯄꯤꯊꯦꯜ ꯗꯦꯝ (Mapithel dam)-ꯒꯤ ꯃꯈꯥꯗ ꯊꯧꯕꯥꯜ, ꯃꯁꯤꯒꯤ ꯗꯦꯝꯒꯤ ꯃꯈꯥꯗ ꯈꯨꯒꯥ ꯑꯃꯁꯨꯡ ꯁꯤꯡꯗꯥ ꯗꯦꯝ (Singda dam)-ꯒꯤ ꯃꯈꯥꯗ ꯅꯝꯕꯨꯜ [TBC], ꯑꯁꯤ ꯄꯤꯛ-ꯐ꯭ꯂꯣ ꯊꯧꯑꯣꯡ ꯑꯃꯈꯛꯇꯅꯥ ꯅꯠꯇꯅꯥ, ꯁ꯭ꯇꯣꯔꯦꯖ ꯔꯥꯎꯇꯤꯡ ꯑꯃꯁꯨꯡ ꯑꯣꯄꯔꯦꯇꯔꯒꯤ ꯔꯤꯂꯤꯖ ꯁꯤꯅꯥꯔꯤꯑꯣꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯏ (ꯀ꯭ꯂꯣꯖ 3.12; ꯀ꯭ꯂꯣꯖ 5.8.5(d))꯫ (h) ꯁꯔꯨꯛ ꯑꯁꯤꯒꯤ ꯊꯧꯑꯣꯡ ꯑꯃꯠꯇꯅꯥ ꯗꯦꯕ꯭ꯔꯤ ꯐ꯭ꯂꯣ ꯄ꯭ꯔꯤꯗꯤꯛꯠ ꯇꯧꯗꯦ; ꯆꯤꯡꯒꯤ ꯈꯣꯡꯁꯤꯡꯗ ꯗꯤꯖꯥꯏꯟ ꯐ꯭ꯂꯣ ꯑꯁꯤ ꯁꯦꯗꯤꯃꯦꯟꯠ ꯑꯃꯁꯨꯡ ꯗꯦꯕ꯭ꯔꯤꯒꯤꯗꯃꯛ ꯍꯦꯅꯒꯠꯍꯜꯂꯤ, ꯑꯃꯁꯨꯡ ꯆꯤꯡ ꯑꯃꯁꯨꯡ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯃꯔꯛꯇ ꯂꯩꯕ ꯁꯤꯜꯠ ꯇ꯭ꯔꯦꯞ (silt trap)-ꯁꯤꯡ, ꯏꯟꯂꯦꯠ ꯑꯃꯁꯨꯡ ꯀꯜꯚꯔꯠꯁꯤꯡ ꯁꯔꯨꯛ 6 ꯑꯃꯁꯨꯡ 9-ꯒꯤ ꯃꯈꯥꯗ ꯕ꯭ꯂꯣꯀꯦꯖꯀꯤꯗꯃꯛ ꯗꯤꯖꯥꯏꯟ ꯇꯧꯏ (ꯀ꯭ꯂꯣꯖ 6.3.6)꯫


3.8 SCS ꯀꯔꯚ ꯅꯝꯕꯔ (SCS-CN) ꯂꯣꯁ ꯊꯧꯑꯣꯡ

3.8.1 ꯔꯟꯑꯣꯐ ꯏꯀ꯭ꯋꯦꯁꯟ. ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯞꯊ ꯃꯈꯥꯒꯤ ꯃꯑꯣꯡꯗ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ:

Q = (P − Ia)² / (P − Ia + S), P > Ia ꯑꯣꯏꯔꯕꯗꯤ; ꯅꯠꯇꯕꯗꯤ Q = 0 S = 25,400 / CN − 254

ꯃꯐꯝ ꯑꯁꯤꯗ Q ꯑꯁꯤ ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯞꯊꯅꯤ (mm), P ꯑꯁꯤ ꯀ꯭ꯌꯨꯃꯨꯂꯦꯇꯤꯚ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯗꯦꯞꯊꯅꯤ (mm), S ꯑꯁꯤ ꯄꯣꯇꯦꯟꯁꯤꯌꯦꯜ ꯃꯦꯛꯁꯤꯃꯝ ꯔꯤꯇꯦꯟꯁꯟꯅꯤ (mm) ꯑꯃꯁꯨꯡ Ia ꯑꯁꯤ ꯏꯅꯤꯁꯤꯌꯦꯜ ꯑꯦꯕꯁ꯭ꯇ꯭ꯔꯦꯛꯁꯟꯅꯤ (mm)꯫ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯃꯣꯗꯦꯜꯁꯤꯡꯗ ꯏꯀ꯭ꯋꯦꯁꯟ ꯑꯁꯤ ꯇꯥꯏꯝ ꯁ꯭ꯇꯦꯞ ꯈꯨꯗꯤꯡꯃꯛꯇ ꯀ꯭ꯌꯨꯃꯨꯂꯦꯇꯤꯚ ꯅꯣꯡ ꯆꯨꯕꯗ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ ꯏꯟꯀ꯭ꯔꯤꯃꯦꯟꯇꯦꯜ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯑꯦꯛꯁꯦꯁ ꯐꯡꯏ꯫

3.8.2 ꯀꯔꯚ ꯅꯝꯕꯔꯁꯤꯡ. AMC II-ꯗ CN ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 3.7-ꯒꯤ HSG-ꯒꯤꯗꯃꯛ ꯇꯦꯕꯜ 3.5-ꯗꯒꯤ ꯂꯧꯒꯗꯕꯅꯤ꯫

ꯇꯦꯕꯜ 3.5 — ꯔꯟꯑꯣꯐ ꯀꯔꯚ ꯅꯝꯕꯔꯁꯤꯡ, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a ꯑꯃꯁꯨꯡ 2-2c)

ꯀꯚꯔꯒꯤ ꯃꯈꯜ HSG A HSG B HSG C HSG D
ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯔꯦꯐꯔꯦꯟꯁ (ꯀ꯭ꯂꯣꯖ 3.3.2): ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ, ꯐꯕ ꯐꯤꯚꯝ (ꯒ꯭ꯔꯥꯁ > 75%) 39 61 74 80
ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ, ꯃꯌꯥꯏ ꯑꯣꯏꯕ ꯐꯤꯚꯝ (ꯒ꯭ꯔꯥꯁ 50–75%) 49 69 79 84
ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ, ꯐꯠꯇꯕ ꯐꯤꯚꯝ (ꯒ꯭ꯔꯥꯁ < 50%) 68 79 86 89
ꯏꯝꯄꯔꯚꯤꯌꯁ: ꯌꯨꯝꯊꯛ, ꯄꯦꯚ ꯇꯧꯔꯕ ꯄꯥꯔꯀꯤꯡ, ꯗ꯭ꯔꯥꯏꯚꯋꯦ, ꯀꯔꯕ ꯑꯃꯁꯨꯡ ꯈꯣꯡꯕꯥꯟ ꯂꯩꯕ ꯄꯦꯚ ꯇꯧꯔꯕ ꯂꯝꯕꯤꯁꯤꯡ 98 98 98 98
ꯍꯥꯡꯗꯣꯛꯂꯕ ꯈꯣꯡꯕꯥꯟ (open ditches) ꯂꯩꯕ ꯄꯦꯚ ꯇꯧꯔꯕ ꯂꯝꯕꯤꯁꯤꯡ (ꯔꯥꯏꯠ-ꯑꯣꯐ-ꯋꯦ ꯌꯥꯑꯣꯅꯥ) 83 89 92 93
ꯅꯨꯡꯀꯨꯞꯀꯤ ꯂꯝꯕꯤꯁꯤꯡ (ꯔꯥꯏꯠ-ꯑꯣꯐ-ꯋꯦ ꯌꯥꯑꯣꯅꯥ) 76 85 89 91
ꯂꯩꯃꯥꯏꯒꯤ ꯂꯝꯕꯤꯁꯤꯡ (ꯔꯥꯏꯠ-ꯑꯣꯐ-ꯋꯦ ꯌꯥꯑꯣꯅꯥ) 72 82 87 89
ꯑꯅꯧꯅꯥ ꯒ꯭ꯔꯦꯗ ꯇꯧꯔꯕ ꯂꯝꯁꯤꯡ (ꯄꯔꯚꯤꯌꯁ, ꯄꯥꯝꯕꯤ ꯂꯩꯇꯕ) 77 86 91 94
ꯐꯦꯂꯣ, ꯃꯄꯥꯟ ꯊꯣꯛꯂꯕ ꯂꯩꯃꯥꯏ 77 86 91 94
ꯃꯦꯗꯣ (ꯃꯈꯥ ꯆꯠꯅꯕ ꯒ꯭ꯔꯥꯁ, ꯁꯥ ꯆꯥꯕꯗꯒꯤ ꯉꯥꯛꯊꯣꯀꯄ) 30 58 71 78
ꯕ꯭ꯔꯁ, ꯐꯕ ꯐꯤꯚꯝ 30 48 65 73
ꯎꯃꯡ, ꯐꯕ ꯐꯤꯚꯝ 30 55 70 77
ꯎꯃꯡ, ꯃꯌꯥꯏ ꯑꯣꯏꯕ ꯐꯤꯚꯝ 36 60 73 79
ꯎꯃꯡ, ꯐꯠꯇꯕ ꯐꯤꯚꯝ 45 66 77 83
ꯏꯁꯤꯡꯒꯤ ꯃꯊꯛ, ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯋꯥꯇꯔꯁ꯭ꯞꯔꯦꯗ, ꯋꯦꯠ ꯗꯤꯇꯦꯟꯁꯟ ꯕꯦꯁꯤꯟꯁꯤꯡ ꯔꯟꯑꯣꯐ = ꯅꯣꯡ ꯆꯨꯕ (ꯂꯣꯁ ꯂꯩꯇꯦ)

3.8.3 ꯇꯦꯕꯜ 3.5 ꯁꯤꯖꯤꯟꯅꯕ.

  • (a) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ CN ꯑꯁꯤ ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯂꯩꯃꯥꯏꯁꯤꯡꯗꯒꯤ ꯁꯦꯝꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.9)꯫ TR-55-ꯒꯤ ꯑꯔꯕꯟ ꯗꯤꯁ꯭ꯇ꯭ꯔꯤꯛꯠ ꯑꯃꯁꯨꯡ ꯔꯦꯁꯤꯗꯦꯟꯁꯤꯌꯦꯜ ꯂꯣꯠ-ꯁꯥꯏꯖ ꯔꯣꯁꯤꯡ ꯁꯥꯏꯠꯀꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫
  • (b) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝꯗ ꯂꯩꯕ ꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡꯅꯥ ꯂꯦꯟꯗꯁ꯭ꯀꯦꯞ ꯄ꯭ꯂꯥꯟꯅꯥ ꯐꯡꯒꯗꯕ ꯐꯤꯚꯝꯗ "ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ" ("open space") ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯂꯦꯟꯗꯁ꯭ꯀꯦꯞ ꯄ꯭ꯂꯥꯟ ꯄꯤꯗꯕ ꯃꯐꯝꯗ ꯃꯌꯥꯏ ꯑꯣꯏꯕ ꯐꯤꯚꯝ ꯆꯠꯂꯤ꯫
  • (c) TR-55-ꯒꯤ ꯂꯧꯎ-ꯁꯤꯡꯎ ꯇꯧꯔꯕ ꯔꯣꯁꯤꯡ ꯁꯥꯏꯠꯀꯤ ꯃꯄꯥꯟꯒꯤ ꯍꯧꯖꯤꯛꯀꯤ ꯐꯤꯚꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ, ꯑꯗꯨꯕꯨ ꯀ꯭ꯂꯣꯖ 3.3.2-ꯒꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯔꯦꯐꯔꯦꯟꯁꯀꯤꯗꯃꯛ ꯀꯩꯗꯧꯉꯩꯗꯁꯨ ꯅꯠꯇꯦ꯫

3.8.4 ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯃꯣꯏꯁꯆꯔ. AMC ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.11.4-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯒꯗꯕꯅꯤ: ꯑꯍꯦꯟꯕ 2A-ꯒꯤ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-A (ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯩꯃꯥꯏ) ꯅꯠꯔꯒꯥ MN-B (ꯑꯋꯥꯡ, ꯅꯣꯡꯄꯣꯛ ꯑꯃꯁꯨꯡ ꯈꯥꯒꯤ ꯆꯤꯡꯁꯤꯡ)-ꯗ ꯂꯩꯕ ꯁꯥꯏꯠ ꯑꯃꯗ 1 ꯖꯨꯟꯗꯒꯤ 15 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ, ꯑꯃꯁꯨꯡ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-C (ꯅꯣꯡꯆꯨꯞꯀꯤ ꯆꯤꯡꯁꯤꯡ) ꯅꯠꯔꯒꯥ MN-C1 (ꯖꯤꯔꯤꯕꯥꯝ ꯄ꯭ꯂꯦꯟ)-ꯗ ꯂꯩꯕ ꯁꯥꯏꯠ ꯑꯃꯗ 1 ꯃꯦꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ, ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ, ꯃꯁꯤꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯀꯔꯤꯒꯨꯝꯕꯥ ꯑꯣꯏꯔꯕꯁꯨ, AMC III; ꯁꯕ-ꯑꯦꯔꯤꯌꯥ ꯈꯨꯗꯤꯡꯃꯛꯇ, ꯇꯨꯔꯦꯜ, ꯈꯣꯡ ꯅꯠꯔꯒꯥ ꯂꯣꯛꯇꯥꯛꯀꯤ 1% AEP-ꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯂꯝꯗ, ꯄꯤꯠꯇ, ꯄꯥꯠ ꯅꯠꯔꯒꯥ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯃꯅꯥꯛꯁꯤꯡꯗ ꯑꯃꯁꯨꯡ ꯇꯨꯔꯦꯜꯒꯤ ꯄꯟ (bund) ꯑꯃꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯂꯝꯗ, 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ AMC III; ꯁꯕ-ꯑꯦꯔꯤꯌꯥ MN-A1 (ꯂꯣꯛꯇꯥꯛꯀꯤ ꯃꯅꯥꯛ)-ꯗ ꯑꯃꯁꯨꯡ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯑꯃꯗ ꯅꯠꯔꯒꯥ ꯃꯁꯤꯒꯤ ꯕꯦꯛꯋꯥꯇꯔꯗ, ꯅꯠꯔꯒꯥ ꯗꯦꯝꯅꯥ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯄ ꯗꯦꯝ ꯑꯃꯒꯤ ꯃꯈꯥꯒꯤ ꯔꯤꯆ ꯑꯃꯗ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯄ ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯗ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖ (Ithai barrage)-ꯅꯥ ꯊꯤꯡꯕ ꯂꯣꯛꯇꯥꯛ, ꯊꯧꯕꯥꯜ (ꯃꯄꯤꯊꯦꯜ) ꯑꯃꯁꯨꯡ ꯈꯨꯒꯥ ꯔꯤꯖꯔꯚꯣꯌꯔꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯒꯤ ꯗꯦꯝꯁꯤꯡꯒꯤ ꯃꯈꯥꯒꯤ ꯔꯤꯆꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯅꯝꯕꯨꯜꯗ ꯂꯩꯕ ꯁꯤꯡꯗꯥ ꯔꯤꯖꯔꯚꯣꯌꯔ [TBC], ꯆꯍꯤꯒꯤ ꯃꯇꯝ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ AMC III; ꯑꯇꯣꯞꯄ ꯁꯥꯏꯠ ꯅꯠꯔꯒꯥ ꯃꯇꯝ ꯑꯃꯍꯦꯛꯇꯗꯤ, ꯅꯨꯃꯤꯠ 5-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯄꯨꯟꯕ 53 mm-ꯗꯒꯤ ꯍꯦꯟꯕ ꯑꯃꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯥꯀꯄ ꯅꯠꯔꯒꯥ ꯃꯗꯨ ꯌꯥꯎꯕ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯑꯃꯒꯤꯗꯃꯛ AMC III; ꯑꯃꯁꯨꯡ ꯑꯇꯣꯞꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ AMC II꯫ AMC I ꯁꯤꯖꯤꯟꯅꯗꯦ꯫ AMC I ꯑꯃꯁꯨꯡ III-ꯒꯤ CN ꯑꯁꯤ AMC II-ꯗꯒꯤ ꯃꯈꯥꯒꯤ ꯃꯑꯣꯡꯗ ꯐꯡꯒꯗꯕꯅꯤ:

CN(I) = 4.2 CN(II) / (10 − 0.058 CN(II)) CN(III) = 23 CN(II) / (10 + 0.13 CN(II))

ꯀꯟꯚꯔꯁꯟ ꯑꯁꯤ ꯄꯔꯚꯤꯌꯁ ꯀꯝꯄꯣꯅꯦꯟꯠ ꯈꯛꯇꯗ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯩꯃꯥꯏꯁꯤꯡ AMC ꯄꯨꯝꯅꯃꯛꯇ CN 98-ꯗ ꯂꯩꯔꯤ꯫ ꯀꯝꯄꯣꯖꯤꯠ CN-ꯁꯤꯡ ꯍꯛꯊꯦꯡꯅꯅꯥ ꯀꯟꯚꯔꯠ ꯇꯧꯔꯣꯏꯗꯕꯅꯤ꯫

ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫ AMC III-ꯗ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯔꯦꯐꯔꯦꯟꯁ CN-ꯁꯤꯡ ꯑꯁꯤ: HSG A 59.5; HSG B 78.2; HSG C 86.7; HSG D 90.2꯫

3.8.5 ꯏꯅꯤꯁꯤꯌꯦꯜ ꯑꯦꯕꯁ꯭ꯇ꯭ꯔꯦꯛꯁꯟ.

  • (a) ꯗꯤꯐꯣꯜꯠ: Ia = 0.2S, ꯇꯦꯕꯜ 3.5-ꯒꯤ CN-ꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ꯫

  • (b) ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯔꯟ (ꯇꯧꯒꯗꯕ): ꯁ꯭ꯇꯣꯔꯦꯖ ꯗꯤꯖꯥꯏꯟ ꯈꯨꯗꯤꯡꯃꯛ Ia = 0.05S-ꯒꯥ ꯂꯣꯌꯅꯅꯥꯁꯨ ꯆꯂꯥꯏꯒꯗꯕꯅꯤ꯫ ꯔꯟ ꯑꯁꯤꯒꯤꯗꯃꯛ S ꯑꯁꯤ S0.05 = 1.33 · S0.20^1.15 (S ꯑꯁꯤ ꯏꯟꯆꯇ) ꯑꯣꯏꯅꯥ ꯀꯟꯚꯔꯠ ꯇꯧꯒꯗꯕꯅꯤ, ꯃꯁꯤ SI-ꯗ:

    S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15 (mm)

  • (c) ꯗꯤꯖꯥꯏꯟ ꯑꯁꯤ ꯗꯤꯐꯣꯜꯠ ꯔꯟꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯒꯗꯕꯅꯤ꯫ ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤꯒꯤ ꯃꯍꯩꯁꯤꯡ ꯐꯣꯔꯝ 3-2-ꯗ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯔꯟꯅꯥ ꯃꯊꯧ ꯇꯥꯕ ꯔꯤꯇꯦꯟꯁꯟ ꯚꯣꯂꯨꯝ ꯅꯠꯔꯒꯥ ꯏꯁꯤꯡꯒꯤ ꯀ꯭ꯋꯥꯂꯤꯇꯤꯒꯤ ꯚꯣꯂꯨꯝ ꯍꯦꯅꯒꯠꯍꯜꯂꯕꯗꯤ, ꯚꯣꯂꯨꯝ ꯑꯗꯨꯒꯤꯗꯃꯛ ꯍꯦꯟꯅꯥ ꯆꯥꯎꯕ ꯚꯦꯜꯌꯨ ꯑꯗꯨꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ꯫

2026-10-31T09:51:23.520885 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 50 100 150 200 250 300 350 400 ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯗꯦꯞꯊ P (mm) 0 50 100 150 200 250 300 350 400 ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯞꯊ Q (mm) Q = P (ꯗꯣꯠ ꯂꯥꯏꯟ) CN 98 (ꯏꯝꯄꯔꯚꯤꯌꯁ) CN 90 CN 80 (ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ, HSG D) CN 74 (ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ, HSG C) CN 61 (ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ, HSG B) CN 39 (ꯍꯥꯡꯗꯣꯛꯂꯕ ꯂꯝ, HSG A) CN 74, Ia = 0.05S (ꯗꯦꯁ ꯂꯥꯏꯟ) Hawkins et al. (2002) ꯃꯇꯨꯡ ꯏꯟꯅ S ꯀꯟꯚꯔꯠ ꯇꯧꯔꯦ ꯁꯣꯂꯤꯗ ꯂꯥꯏꯟꯁꯤꯡ: Ia = 0.2S (ꯗꯤꯐꯣꯜꯠ)꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫

ꯃꯃꯤ 3.3 — Ia = 0.2S-ꯗ ꯈꯟꯖꯤꯟꯔꯕ ꯀꯔꯚ ꯅꯝꯕꯔꯁꯤꯡꯒꯤꯗꯃꯛ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯗꯦꯞꯊꯀꯥ ꯆꯥꯡꯗꯝꯅꯕ SCS-CN ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯞꯊ, CN 74-ꯒꯤꯗꯃꯛ Ia = 0.05S ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯀꯦꯁꯀꯥ ꯂꯣꯌꯅꯅꯥ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯑꯅꯧꯅꯥ ꯁꯦꯝꯕ ꯗ꯭ꯔꯣꯏꯡ, USDA NRCS, NEH Part 630, Ch. 10 (2004) ꯑꯃꯁꯨꯡ USDA SCS TR-55 (1986)-ꯒꯤ ꯔꯟꯑꯣꯐ ꯏꯀ꯭ꯋꯦꯁꯟ, ꯑꯃꯁꯨꯡ Hawkins et al. (2002)-ꯒꯤ S-ꯀꯟꯚꯔꯁꯟꯗꯒꯤ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯈꯤꯕ꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯇꯦꯕꯜ 3.5-ꯅꯥ NRCS TR-55 (1986)-ꯒꯤ ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯚꯦꯜꯌꯨꯁꯤꯡ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯄꯤꯔꯤ꯫ ꯃꯈꯣꯌ US-ꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗꯒꯤ ꯂꯥꯛꯈꯤꯕꯅꯤ ꯑꯃꯁꯨꯡ ꯃꯅꯤꯄꯨꯔꯗ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯈꯤꯗꯦ꯫ AMC ꯀꯟꯚꯔꯁꯟꯒꯤ ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡ ꯑꯁꯤ Chow, Maidment ꯑꯃꯁꯨꯡ Mays-ꯅꯥ (1988, §5.5) ꯄꯤꯕ NEH-4-ꯒꯤ ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯃꯔꯤꯁꯤꯡꯅꯤ꯫ ꯄꯔꯚꯤꯌꯁ ꯀꯝꯄꯣꯅꯦꯟꯠ ꯈꯛꯇꯃꯛ ꯀꯟꯚꯔꯠ ꯇꯧꯕ ꯑꯁꯤ APWA-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ, APWA-ꯅꯥ "ꯀꯝꯄꯣꯖꯤꯠ ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯃꯣꯏꯁꯆꯔ ꯀꯟꯗꯤꯁꯟꯁꯤꯡ ꯍꯛꯊꯦꯡꯅꯅꯥ ꯀꯟꯚꯔꯠ ꯇꯧꯕ ꯑꯁꯤ ꯆꯨꯝꯗꯦ" ("direct conversion of composite antecedent moisture conditions is not appropriate") ꯍꯥꯌꯅꯥ ꯍꯥꯏ (KC Metro APWA 5600, 2011, §5602.2C)꯫ ꯀꯝꯄꯣꯖꯤꯠ CN ꯑꯃꯥ ꯀꯟꯚꯔꯠ ꯇꯧꯔꯕꯗꯤ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯃꯐꯝꯒꯤ CN ꯑꯔꯥꯟꯕ ꯃꯑꯣꯡꯗ ꯍꯟꯊꯍꯅꯒꯅꯤ꯫

Ia = 0.2S ꯑꯁꯤ NRCS-ꯒꯤ ꯑꯍꯥꯅꯕ ꯔꯦꯁꯤꯑꯣꯅꯤ꯫ US-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕ–ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯇꯥꯒꯤ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁꯅꯥ ꯑꯦꯚꯔꯦꯖ ꯑꯣꯏꯅꯥ 0.05S ꯍꯦꯟꯅꯥ ꯐꯖꯩ ꯍꯥꯌꯅꯥ ꯐꯡꯈꯤ (Hawkins et al., 2002; Woodward et al., 2003), ꯑꯃꯁꯨꯡ 3.8.5(b)-ꯒꯤ ꯀꯟꯚꯔꯁꯟ ꯑꯗꯨ ꯄꯤꯈꯤ꯫ NRCS-ꯅꯥ 0.2S ꯐꯣꯔꯃꯦꯜ ꯑꯣꯏꯅꯥ ꯍꯣꯡꯗꯣꯛꯈꯤꯗ꯭ꯔꯤ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯁꯤ ꯗꯤꯐꯣꯜꯠ ꯑꯣꯏꯅꯥ ꯊꯝꯃꯤ꯫ ꯃꯃꯤ 3.3-ꯅꯥ ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯔꯟ ꯀꯔꯤꯒꯤ ꯃꯊꯧ ꯇꯥꯕꯒꯦ ꯎꯠꯂꯤ: CN 74-ꯒꯤꯗꯃꯛ, 0.05S ꯀꯦꯁꯅꯥ ꯑꯄꯤꯛꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗ ꯔꯟꯑꯣꯐ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯅꯥ ꯄꯤ (25 mm ꯅꯣꯡ ꯆꯨꯕꯗꯒꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 2.0 mm ꯑꯃꯁꯨꯡ 0.5 mm) ꯑꯗꯨꯕꯨ ꯑꯆꯧꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯗꯅꯥ ꯄꯤ (350 mm-ꯗꯒꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 242 mm ꯑꯃꯁꯨꯡ 262 mm)꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫ ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯔꯦꯁꯤꯑꯣ ꯑꯁꯤ ꯔꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡꯒꯤ ꯀ꯭ꯋꯥꯂꯤꯇꯤꯒꯤ ꯚꯣꯂꯨꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯃꯔꯨꯑꯣꯏ, ꯑꯃꯁꯨꯡ ꯗꯤꯐꯣꯜꯠ 0.2S ꯑꯁꯤ ꯄꯤꯛ ꯑꯃꯁꯨꯡ ꯗꯤꯇꯦꯟꯁꯟ ꯗꯤꯖꯥꯏꯟꯒꯤꯗꯃꯛ ꯀꯟꯁꯔꯚꯦꯇꯤꯚ ꯈꯟꯕꯅꯤ꯫ ꯍꯦꯟꯅꯥ ꯆꯥꯎꯕ ꯔꯤꯇꯦꯟꯁꯟ ꯅꯠꯔꯒꯥ ꯏꯁꯤꯡꯒꯤ ꯀ꯭ꯋꯥꯂꯤꯇꯤꯒꯤ ꯚꯣꯂꯨꯝꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ ꯍꯥꯌꯕ 3.8.5(c)-ꯒꯤ ꯔꯨꯜ ꯑꯁꯤꯒꯤ ꯍꯛꯊꯦꯡꯅꯕ ꯃꯃꯥꯡꯒꯤ ꯈꯨꯗꯝ ꯂꯩꯇꯦ; 0.05S ꯀꯦꯁꯅꯥ ꯚꯣꯂꯨꯝ ꯑꯗꯨꯁꯤꯡ ꯂꯦꯞꯄ ꯑꯄꯤꯛꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯌꯥꯝꯕ ꯔꯟꯑꯣꯐ ꯄꯤꯕꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯁꯤ ꯊꯝꯃꯤ꯫


3.9 ꯏꯝꯄꯔꯚꯤꯌꯁ ꯀꯅꯦꯛꯇꯤꯚꯤꯇꯤ

3.9.1 ꯈꯥꯌꯗꯣꯀꯄ. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝꯗ ꯂꯩꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯩꯃꯥꯏ ꯈꯨꯗꯤꯡꯃꯛ ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ (DCIA) ꯅꯠꯔꯒꯥ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯑꯣꯏꯅꯥ ꯈꯥꯌꯗꯣꯛꯀꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯏꯔꯝꯒꯤ ꯄ꯭ꯂꯥꯟꯗ ꯎꯠꯀꯗꯕꯅꯤ꯫

3.9.2 ꯍꯦꯟꯅꯥ ꯄꯥꯝꯕ ꯎꯠꯄꯒꯤ ꯃꯑꯣꯡ. ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯃꯣꯗꯦꯜꯁꯤꯡꯗ, DCIA ꯑꯃꯁꯨꯡ ꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡ ꯇꯣꯉꯥꯟꯕ ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯁꯤꯡ ꯑꯣꯏꯅꯥ (ꯅꯠꯔꯒꯥ SWMM ꯁꯕꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯒꯤ ꯇꯣꯉꯥꯟꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯃꯁꯨꯡ ꯄꯔꯚꯤꯌꯁ ꯐ꯭ꯔꯦꯛꯁꯟꯁꯤꯡ ꯑꯣꯏꯅꯥ) ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ, ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯃꯁꯥꯒꯤ ꯂꯣꯁ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ꯫ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡꯒꯤ ꯔꯟꯑꯣꯐ ꯑꯁꯤ ꯂꯧꯔꯤꯕ ꯄꯔꯚꯤꯌꯁ ꯂꯝꯗ ꯔꯥꯎꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.9.3 ꯗꯤꯁꯀꯅꯦꯛꯁꯟꯒꯤ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯥꯁꯤꯡ. ꯃꯈꯥꯒꯤ ꯄꯨꯝꯅꯃꯛ ꯆꯨꯝꯂꯕꯗꯤ ꯈꯛꯇꯃꯛ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝ ꯑꯃꯥ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯑꯣꯏꯅꯥ ꯈꯥꯌꯗꯣꯀꯄ ꯌꯥꯏ:

  • (a) ꯃꯁꯤꯒꯤ ꯔꯟꯑꯣꯐꯅꯥ ꯄꯥꯏꯞ, ꯆꯦꯅꯦꯜ ꯅꯠꯔꯒꯥ ꯀꯔꯕ ꯌꯥꯑꯣꯗꯅꯥ ꯄꯔꯚꯤꯌꯁ ꯂꯝ ꯑꯃꯗ ꯁꯤꯠ ꯐ꯭ꯂꯣ ꯑꯣꯏꯅꯥ ꯊꯥꯗꯣꯀꯏ;
  • (b) ꯄꯔꯚꯤꯌꯁ ꯐ꯭ꯂꯣ ꯄꯥꯊ ꯑꯁꯤ ꯃꯗꯨꯗ ꯆꯦꯟꯊꯔꯛꯄ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯐ꯭ꯂꯣ ꯄꯥꯊ ꯑꯗꯨꯒꯨꯝꯅꯥ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯁꯥꯡꯏ;
  • (c) ꯄꯔꯚꯤꯌꯁ ꯂꯝ ꯑꯁꯤ ꯀꯝꯄꯦꯛꯠ ꯇꯧꯗꯕ, HSG D ꯅꯠꯇꯕ, ꯑꯃꯁꯨꯡ ꯑꯦꯞꯔꯨꯚ ꯇꯧꯔꯕ ꯄ꯭ꯂꯥꯟꯅꯥ ꯄꯦꯚ ꯇꯧꯕꯗꯒꯤ ꯉꯥꯛꯊꯣꯀꯄꯅꯤ; ꯑꯃꯁꯨꯡ
  • (d) ꯄꯨꯡ 12 ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯁꯥꯡꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯒꯤꯗꯃꯛ, ꯃꯁꯤ RWH ꯁꯝꯞ ꯅꯠꯔꯒꯥ ꯇꯦꯉ꯭ꯛ (tank) ꯑꯃꯗ ꯆꯦꯟꯊꯔꯛꯇꯦ (ꯀ꯭ꯂꯣꯖ 3.3.3(c))꯫

3.9.4 ꯀꯝꯄꯣꯖꯤꯠ CN. 3.9.2-ꯒꯤ ꯃꯍꯨꯠꯇ ꯀꯝꯄꯣꯖꯤꯠ CN ꯑꯃꯈꯛꯇ ꯁꯤꯖꯤꯟꯅꯔꯕꯗꯤ, ꯃꯁꯤ ꯃꯈꯥꯒꯤ ꯃꯑꯣꯡꯗ ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ:

  • ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯒꯤꯗꯃꯛ: CNc = CNp + (Pimp / 100)(98 − CNp);
  • ꯄꯨꯝꯅꯃꯛ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝ 30%-ꯗꯒꯤ ꯅꯦꯝꯕ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯃꯐꯝ ꯈꯔ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯑꯣꯏꯔꯕꯗꯤ: CNc = CNp + (Pimp / 100)(98 − CNp)(1 − 0.5 R),

ꯃꯐꯝ ꯑꯁꯤꯗ CNp ꯑꯁꯤ ꯄꯔꯚꯤꯌꯁ CN-ꯅꯤ, Pimp ꯑꯁꯤ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯒꯤ ꯄꯔꯁꯦꯟꯇꯦꯖꯅꯤ ꯑꯃꯁꯨꯡ R ꯑꯁꯤ ꯄꯨꯝꯅꯃꯛ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯒꯥ ꯗꯤꯁꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯒꯤ ꯔꯦꯁꯤꯑꯣꯅꯤ꯫ ꯀꯝꯄꯣꯖꯤꯠ CN ꯑꯁꯤ ꯔꯤꯇꯦꯟꯁꯟ ꯅꯠꯔꯒꯥ ꯏꯁꯤꯡꯒꯤ ꯀ꯭ꯋꯥꯂꯤꯇꯤꯒꯤ ꯚꯣꯂꯨꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯀꯝꯄꯣꯖꯤꯠ ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡ ꯑꯁꯤ TR-55 (USDA SCS, 1986, Ch. 2, Figures 2-3 ꯑꯃꯁꯨꯡ 2-4)-ꯗꯒꯤ ꯂꯥꯛꯄꯅꯤ꯫ ꯀꯝꯄꯣꯖꯤꯠ CN ꯑꯃꯅꯥ ꯏꯝꯄꯔꯚꯤꯌꯁꯀꯤ ꯔꯦꯁ꯭ꯄꯣꯟꯁ ꯑꯁꯤ ꯂꯝ ꯄꯨꯝꯅꯃꯛꯇ ꯁꯟꯗꯣꯀꯏ, ꯃꯁꯤꯅꯥ ꯑꯄꯤꯛꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯒꯤ ꯔꯟꯑꯣꯐ ꯍꯟꯊꯍꯜꯂꯤ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ 3.9.2-ꯗ ꯇꯣꯉꯥꯟꯅꯥ ꯎꯠꯄ ꯑꯗꯨ ꯍꯦꯟꯅꯥ ꯄꯥꯝꯏ꯫ HSG B-ꯒꯤ ꯍꯥꯡꯗꯣꯛꯂꯕ ꯃꯐꯝ (CNp 61)-ꯗ 50% ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯑꯣꯏꯕ ꯁꯥꯏꯠ ꯑꯃꯗ, ꯃꯐꯝ ꯑꯅꯤ ꯑꯁꯤ ꯇꯣꯉꯥꯟꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯔꯕꯗꯤ 25 mm ꯅꯣꯡ ꯆꯨꯕꯅꯥ ꯈꯔ ꯊꯣꯏꯅꯥ 9.9 mm ꯔꯟꯑꯣꯐ ꯄꯤ, ꯑꯗꯨꯕꯨ ꯀꯝꯄꯣꯖꯤꯠ CN 79.5-ꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯈꯔ ꯊꯣꯏꯅꯥ 1.8 mm ꯈꯛꯇꯃꯛ ꯄꯤ꯫ 200 mm-ꯗ ꯊꯧꯑꯣꯡ ꯑꯅꯤꯃꯛ ꯌꯥꯅꯩ (139.5 mm ꯑꯃꯁꯨꯡ 138.4 mm)꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫ ꯔꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡꯒꯤ ꯀ꯭ꯋꯥꯂꯤꯇꯤꯒꯤ ꯚꯣꯂꯨꯝꯁꯤꯡ ꯂꯦꯞꯄ ꯌꯥꯝꯅꯥ ꯊꯣꯀꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗ ꯑꯔꯥꯟꯕ ꯑꯁꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯏ꯫ 3.9.3-ꯒꯤ ꯗꯤꯁꯀꯅꯦꯛꯁꯟꯒꯤ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯥꯁꯤꯡ ꯑꯁꯤ US-ꯒꯤ ꯔꯟꯑꯣꯐ-ꯔꯤꯗꯛꯁꯟ ꯃꯦꯅꯨꯌꯦꯜꯁꯤꯡꯒꯤ ꯑꯃꯨꯛꯇꯥ ꯇꯧꯕ ꯄ꯭ꯔꯦꯛꯇꯤꯁꯇꯒꯤ ꯂꯧꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ꯫ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯟ (d) ꯑꯁꯤ RWH ꯁꯝꯞꯁꯤꯡ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯍꯧꯕ ꯃꯇꯝꯗ ꯃꯄꯨꯡ ꯊꯟꯂꯦ ꯍꯥꯌꯕ ꯀ꯭ꯂꯣꯖ 3.3.3(c)-ꯒꯤ ꯔꯨꯜꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ꯫


3.10 ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡ, ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜ ꯑꯃꯁꯨꯡ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯕꯦꯛꯋꯥꯇꯔ

3.10.1 ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜ (ꯗ꯭ꯌꯨꯑꯦꯜ HSG). ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡꯒꯤ ꯇꯦꯕꯜ ꯑꯁꯤ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯊꯛꯇꯒꯤ 0.6 m-ꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯔꯕꯗꯤ, ꯂꯩꯃꯥꯏ ꯑꯗꯨ ꯁꯔꯨꯛ 10-ꯒꯤ ꯃꯈꯥꯗ ꯃꯦꯟꯇꯦꯟ ꯇꯧꯔꯤꯕ ꯊꯕꯛꯁꯤꯡꯅꯥ ꯂꯦꯞꯇꯅꯥ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯛꯇꯕꯗꯤ, ꯃꯁꯤꯒꯤ ꯇꯦꯛꯁꯆꯔ ꯀꯔꯤꯒꯨꯝꯕꯥ ꯑꯣꯏꯔꯕꯁꯨ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯔꯟ ꯑꯅꯤꯃꯛꯀꯤꯗꯃꯛ HSG D ꯄꯤꯒꯗꯕꯅꯤ꯫ ꯔꯨꯜ ꯑꯁꯤ AMC III-ꯗ ꯆꯂꯥꯏꯕ (ꯀ꯭ꯂꯣꯖ 2.11.4) ꯄꯨꯡ 12 ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯁꯥꯡꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗ ꯃꯇꯝ ꯄꯨꯝꯕꯗ ꯆꯠꯂꯤ꯫

3.10.2 ꯋꯥꯇꯔ-ꯇꯦꯕꯜꯒꯤ ꯗꯦꯇꯥ. ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜ ꯑꯁꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯗ (ꯑꯦꯞꯔꯤꯜ–ꯑꯣꯛꯇꯣꯕꯔ) ꯔꯦꯀꯣꯔꯗ ꯇꯧꯈꯤꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯋꯥꯡꯕ ꯂꯦꯚꯦꯜ ꯑꯣꯏꯅꯥ, ꯁꯥꯏꯠꯀꯤ ꯄꯥꯏꯖꯣꯃꯤꯇꯔ ꯅꯠꯔꯒꯥ ꯇ꯭ꯔꯥꯏꯑꯦꯜ ꯄꯤꯠꯁꯤꯡꯗꯒꯤ, ꯅꯠꯔꯒꯥ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯛꯄ ꯁꯦꯟꯇ꯭ꯔꯦꯜ ꯒ꯭ꯔꯥꯎꯟꯗ ꯋꯥꯇꯔ ꯕꯣꯔꯗ (Central Ground Water Board, CGWB) ꯅꯠꯔꯒꯥ WRD-ꯒꯤ ꯑꯣꯕꯖꯔꯚꯦꯁꯟ ꯋꯦꯜꯗꯒꯤ, ꯒ꯭ꯔꯥꯎꯟꯗ ꯂꯦꯚꯦꯜꯒꯤꯗꯃꯛ ꯑꯦꯗꯖꯁ꯭ꯠ ꯇꯧꯗꯨꯅꯥ ꯂꯧꯒꯗꯕꯅꯤ꯫

3.10.3 ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯂꯣꯁꯁꯤꯡ. SCS-CN-ꯒꯤ ꯃꯍꯨꯠꯇ ꯒ꯭ꯔꯤꯟ–ꯑꯦꯝꯞꯠ, ꯍꯣꯔꯇꯟ ꯅꯠꯔꯒꯥ ꯁꯣꯏꯜ-ꯃꯣꯏꯁꯆꯔ-ꯑꯦꯀꯥꯎꯟꯇꯤꯡ ꯂꯣꯁꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯔꯕꯗꯤ, ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯀ꯭ꯌꯨꯃꯨꯂꯦꯇꯤꯚ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯑꯁꯤ ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜꯒꯤ ꯃꯊꯛꯇ ꯂꯩꯕ ꯂꯩꯃꯥꯏꯒꯤ ꯐꯡꯕ ꯌꯥꯕ ꯁ꯭ꯇꯣꯔꯦꯖꯗꯒꯤ ꯍꯦꯟꯔꯣꯏꯗꯕꯅꯤ꯫

3.10.4 ꯄꯨꯈ꯭ꯔꯤ ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡ ꯂꯩꯐꯝꯒꯤ ꯕꯦꯛꯋꯥꯇꯔ. ꯁꯥꯏꯠ ꯅꯠꯔꯒꯥ ꯁꯕ-ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯅꯥ ꯄꯨꯈ꯭ꯔꯤ (tank; pukhri), ꯃꯥꯔꯁ ꯅꯠꯔꯒꯥ ꯑꯇꯣꯞꯄ ꯏꯁꯤꯡ ꯂꯩꯐꯝ ꯑꯃꯗ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯂꯕꯗꯤ:

  • (a) ꯂꯧꯔꯤꯕ ꯏꯁꯤꯡ ꯂꯩꯐꯝꯒꯤ ꯏꯁꯤꯡꯒꯤ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯁꯔꯨꯛ 5 ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 7 ꯃꯇꯨꯡ ꯏꯟꯅ ꯃꯣꯗꯦꯜꯒꯤ ꯃꯈꯥ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯕꯧꯟꯗꯔꯤ ꯑꯣꯏꯅꯥ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ;
  • (b) ꯗꯤꯖꯥꯏꯟ ꯏꯚꯦꯟꯠꯇ ꯂꯧꯔꯤꯕ ꯏꯁꯤꯡ ꯂꯩꯐꯝꯒꯤ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯂꯝ (FTL-ꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯐꯣꯔꯁꯣꯔ ꯌꯥꯑꯣꯅꯥ) ꯑꯁꯤ ꯂꯣꯁ ꯌꯥꯑꯣꯗꯅꯥ ꯏꯁꯤꯡꯒꯤ ꯃꯊꯛ ꯅꯠꯔꯒꯥ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯣꯏꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ; ꯑꯃꯁꯨꯡ
  • (c) ꯏꯁꯤꯡ ꯂꯩꯐꯝꯒꯤ ꯂꯦꯚꯦꯜꯅꯥ ꯑꯥꯎꯠꯐꯣꯜ ꯑꯗꯨ ꯏꯁꯤꯡꯒꯤ ꯃꯈꯥꯗ ꯊꯝꯂꯕꯗꯤ, ꯔꯥꯎꯇꯤꯡꯅꯥ ꯀ꯭ꯂꯣꯖ 3.12.4-ꯒꯤ ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ ꯊꯧꯑꯣꯡ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯒ꯭ꯔꯨꯞ ꯑꯅꯤꯒꯤ ꯔꯨꯜ ꯑꯁꯤ NEH Part 630, Ch. 7 (USDA NRCS, 2009)-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ, ꯃꯁꯤꯅꯥ ꯃꯊꯛꯇꯒꯤ 60 cm (24 in)-ꯒꯤ ꯃꯅꯨꯡꯗ ꯋꯥꯇꯔ ꯇꯦꯕꯜ ꯂꯩꯕ ꯏꯁꯤꯡ ꯌꯥꯝꯕ ꯂꯩꯃꯥꯏꯁꯤꯡꯕꯨ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯛꯇꯕ ꯐꯤꯚꯝꯗ ꯒ꯭ꯔꯨꯞ D-ꯗ ꯊꯝꯏ, ꯑꯃꯁꯨꯡ ꯏꯔꯝ ꯇꯧꯕ ꯌꯥꯕ ꯃꯐꯝꯗ ꯒ꯭ꯔꯨꯞ ꯑꯅꯤ (A/D, B/D, C/D) ꯄꯤ꯫ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯃꯤꯌꯥꯝ ꯌꯥꯝꯕꯥ ꯂꯩꯕ ꯂꯝ, ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝ, ꯆꯍꯤꯒꯤ ꯃꯇꯝ ꯌꯥꯝꯕꯗ ꯏꯁꯤꯡ ꯌꯥꯝꯕꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯇꯝ ꯁꯥꯡꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯗ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯛꯇꯕ ꯒ꯭ꯔꯨꯞ ꯑꯗꯨ ꯁꯤꯖꯤꯟꯅꯩ꯫ ꯏꯝꯐꯥꯜ ꯋꯦꯁ꯭ꯠꯇ "ꯄꯅꯥꯒꯤ ꯃꯔꯨꯑꯣꯏꯕ ꯃꯐꯝꯁꯤꯡꯗ ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜ ꯐꯥꯎꯕꯒꯤ ꯑꯔꯨꯛ ꯑꯁꯤ 2-ꯗꯒꯤ 5 m bgl ꯐꯥꯎꯕ ꯍꯣꯡꯏ" ("Depth to water level in major parts of the district varies from 2 to 5 m bgl"), ꯑꯃꯁꯨꯡ "ꯆꯤꯡꯁꯤꯡꯒꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯈꯥ ꯑꯃꯁꯨꯡ ꯈꯥ-ꯅꯣꯡꯆꯨꯞ ꯊꯡꯕ ꯃꯐꯝꯁꯤꯡꯗ" ("In the extreme southern and south-western parts close to hills") 5-ꯗꯒꯤ 7 m; ꯑꯦꯀ꯭ꯋꯤꯐꯔꯁꯤꯡ ꯑꯁꯤ "ꯈꯔ ꯊꯣꯏꯅꯥ 30-ꯗꯒꯤ 50 m ꯐꯥꯎꯕ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯐꯣꯔꯃꯦꯁꯟ" ("approximately 30 to 50 m of clayey formation")-ꯒꯤ ꯃꯈꯥꯗ ꯂꯩ, "30-ꯗꯒꯤ 65 m bgl ꯐꯥꯎꯕꯒꯤ ꯑꯔꯨꯛ ꯐꯥꯎꯕ ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯒꯤ ꯗꯤꯄꯣꯖꯤꯠ" ("clayey deposit down to depth range of 30 to 65 m bgl") ꯂꯩ, ꯑꯃꯁꯨꯡ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡ ꯑꯁꯤ ꯈꯥꯗꯒꯤ ꯑꯋꯥꯡꯗ ꯆꯦꯟꯏ (CGWB, Imphal West district booklet, Technical Report Series D No. 28/2013-14, 2013)꯫ ꯕꯤꯁ꯭ꯅꯨꯄꯨꯔꯗ ꯄꯥꯏꯖꯣꯃꯦꯇ꯭ꯔꯤꯛ ꯍꯦꯗ ꯑꯁꯤ 44 m-ꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯑꯦꯀ꯭ꯋꯤꯐꯔ ꯑꯃꯈꯛꯇꯇ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯗ 2.50–4.30 m-ꯗ ꯂꯩ, ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄ ꯄꯥꯛꯄꯒꯥ ꯂꯣꯌꯅꯅꯥ; ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯑꯦꯞꯔꯤꯜ ꯑꯃꯁꯨꯡ ꯃꯦꯗ ꯋꯥꯡꯈꯠꯂꯛꯏ ꯑꯃꯁꯨꯡ "ꯃꯥꯔꯆꯒꯤ ꯑꯔꯣꯏꯕꯗ ꯃꯁꯤꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕꯗ ꯌꯧꯏ" ("reaches its minimum during March-end") (CGWB, Bishnupur district booklet, 2013)꯫ ꯕꯨꯛꯂꯦꯠ ꯑꯗꯨꯃꯛꯀꯤ ꯁꯝꯃꯔꯤ ꯇꯦꯕꯜꯅꯥ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯔꯣꯁꯤꯡꯒꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯗ 2.73–16.02 m ꯑꯃꯁꯨꯡ 1.47–3.36 m ꯐꯣꯡꯗꯣꯀꯏ, ꯑꯗꯨꯕꯨ ꯄꯥꯈꯤꯕ ꯀꯣꯄꯤꯗ ꯃꯁꯤꯒꯤ ꯀꯂꯝꯁꯤꯡ ꯆꯨꯅꯕ ꯑꯁꯤ ꯁꯣꯏꯗꯅꯥ ꯈꯡꯗꯦ, ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯃꯁꯤꯡꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯗꯦ [TBC]꯫ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯀꯣꯏꯕꯗ ꯂꯩꯃꯥꯏ ꯑꯁꯤ ꯄꯤꯠꯅꯤ, "ꯄꯤꯠꯀꯤ ꯂꯩꯃꯥꯏꯁꯤꯡ" ("peaty soils") "ꯑꯦꯁꯤꯗꯤꯇꯤ ꯌꯥꯝꯅꯥ ꯆꯥꯎꯕ" ("high acidity") (CGWB, Bishnupur), ꯑꯃꯁꯨꯡ ꯐꯨꯝꯗꯤꯒꯤ ꯇꯥꯎꯕ ꯃꯦꯠꯁꯤꯡꯅꯥ ꯂꯣꯛꯇꯥꯛꯀꯤ ꯃꯐꯝ ꯌꯥꯝꯕꯥ ꯀꯨꯞꯏ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ ꯇꯝꯄꯥꯛ ꯑꯁꯤ ꯃꯃꯥꯡꯗ ꯄꯥꯠꯁꯤꯡꯒꯤ ꯂꯩꯕꯥꯛ ꯑꯃꯥ ꯑꯣꯏꯈꯤ, "ꯃꯅꯤꯄꯨꯔ ꯇꯝꯄꯥꯛꯇ ꯈꯔ ꯊꯣꯏꯅꯥ ꯄꯥꯠ 500" ("nearly 500 lakes in Manipur Valley") (MASTEC), ꯑꯃꯁꯨꯡ ꯂꯧꯕꯨꯛ ꯌꯥꯝꯕꯥ ꯑꯃꯁꯨꯡ ꯁꯍꯔꯒꯤ ꯂꯩꯀꯥꯏ ꯀꯌꯥ ꯃꯃꯥꯡꯒꯤ ꯄꯥꯠꯁꯤꯡꯗ ꯂꯩ꯫ ꯑꯔꯨꯛ ꯑꯁꯤꯁꯤꯡ ꯏꯁꯤꯡ ꯇꯨꯝꯕꯁꯤꯡꯒꯤꯅꯤ: ꯂꯩꯃꯨ ꯑꯆꯦꯠꯄꯗ, ꯄꯥꯠ ꯑꯃꯒꯤ ꯃꯅꯥꯛꯇ ꯅꯠꯔꯒꯥ ꯇꯨꯔꯦꯜꯒꯤ ꯄꯟ ꯑꯃꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯁꯥꯏꯠ ꯑꯃꯒꯤ ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯍꯦꯟꯅꯥ ꯋꯥꯡꯏ, ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡ ꯏꯆꯥꯎ ꯑꯃꯗ ꯂꯝ ꯑꯁꯤ "ꯍꯞꯇꯥ ꯀꯌꯥ" ("several weeks") ꯏꯁꯤꯡꯒꯤ ꯃꯈꯥꯗ ꯂꯩ (AIIB, Approval Project Document, 2024)꯫ ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯗ ꯐ꯭ꯂꯣꯇꯦꯁꯟꯒꯤꯗꯃꯛ ꯗꯤꯖꯥꯏꯟ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡꯒꯤ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯒ꯭ꯔꯥꯎꯟꯗ ꯂꯦꯚꯦꯜꯅꯤ (ꯀ꯭ꯂꯣꯖ 4.12.1)꯫ ꯁ꯭ꯇꯦꯠꯀꯤ ꯑꯣꯕꯖꯔꯚꯦꯁꯟ-ꯋꯦꯜ ꯅꯦꯠꯋꯥꯔꯛ ꯑꯃꯠꯇ ꯐꯡꯈꯤꯗꯦ: ꯏꯝꯐꯥꯜ ꯋꯦꯁ꯭ꯠꯇ CGWB-ꯒꯤ ꯗꯒ-ꯋꯦꯜ ꯃꯣꯅꯤꯇꯔꯤꯡ "ꯑꯥꯏꯟ ꯑꯃꯁꯨꯡ ꯑꯆꯨꯝꯕꯒꯤ ꯐꯤꯚꯝ ꯁꯣꯛꯍꯜꯂꯕꯅꯥ 1991-ꯗꯒꯤ" ("since 1991 due to disturbed law and order") ꯂꯦꯞꯈꯤ (CGWB, Imphal West), ꯑꯃꯁꯨꯡ ꯏꯝꯐꯥꯜ, ꯊꯧꯕꯥꯜ, ꯀꯛꯆꯤꯡ, ꯕꯤꯁ꯭ꯅꯨꯄꯨꯔ, ꯃꯣꯏꯔꯥꯡ ꯅꯠꯔꯒꯥ ꯖꯤꯔꯤꯕꯥꯝꯒꯤ ꯁꯥꯏꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯋꯥꯇꯔ-ꯇꯦꯕꯜꯒꯤ ꯑꯔꯨꯛ, ꯑꯃꯁꯨꯡ ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜꯒꯤ ꯃꯦꯞ ꯑꯃꯠꯇ ꯐꯡꯈꯤꯗꯦ [TBC]; ꯑꯍꯦꯟꯕ 3A-ꯅꯥ ꯃꯈꯣꯌ ꯄꯤꯒꯅꯤ꯫ ꯗꯤꯁꯥꯡ ꯁꯦꯜꯒꯤ ꯆꯤꯡꯁꯤꯡꯗ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡ ꯑꯁꯤ ꯐ꯭ꯔꯦꯛꯆꯔꯁꯤꯡ, ꯋꯦꯗꯔ ꯇꯧꯔꯕ ꯅꯨꯡ ꯑꯃꯁꯨꯡ ꯗꯦꯕ꯭ꯔꯤꯗ ꯂꯩ ꯑꯃꯁꯨꯡ ꯃꯐꯝ ꯈꯔꯗ ꯄꯔꯆ ꯑꯣꯏꯅꯥ ꯂꯩ; ꯂꯩꯃꯥꯏꯁꯤꯡ ꯄꯥꯛꯏ ꯑꯃꯁꯨꯡ ꯅꯥꯄꯣꯝꯁꯤꯡꯅꯥ ꯏꯁꯤꯡ ꯈꯣꯡꯁꯤꯡꯗ ꯊꯥꯗꯣꯀꯏ꯫ ꯀ꯭ꯂꯣꯖ 3.10.4-ꯅꯥ ꯁ꯭ꯇꯦꯠꯀꯤ ꯏꯁꯤꯡ ꯂꯧꯔꯤꯕ ꯃꯐꯝꯁꯤꯡ ꯎꯠꯂꯤ, ꯃꯈꯣꯌꯁꯤꯡ ꯑꯁꯤ ꯁꯍꯔꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯋꯥꯡꯅꯥ ꯊꯣꯀꯄ ꯄꯟ ꯁꯥꯔꯕ ꯇꯨꯔꯦꯜꯁꯤꯡ, ꯕꯦꯔꯥꯖ ꯑꯃꯁꯨꯡ ꯅꯨꯡꯒꯤ ꯁꯤꯜ ꯑꯃꯅꯥ ꯊꯤꯡꯕ ꯄꯥꯠ ꯑꯃꯥ, ꯄꯥꯠ ꯑꯃꯁꯨꯡ ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯒꯦꯖ ꯂꯩꯇꯕ ꯆꯤꯡꯒꯤ ꯈꯣꯡꯁꯤꯡꯅꯤ꯫ "ꯁꯍꯔ ꯑꯁꯤ ꯏꯝꯐꯥꯜ ꯇꯨꯔꯦꯜꯒꯤ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ ꯂꯩ ꯑꯃꯁꯨꯡ ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯤꯌꯥꯝꯒꯤ ꯂꯩꯐꯝ ꯑꯗꯨ ꯃꯇꯝ ꯃꯇꯝꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯗꯒꯤ ꯉꯥꯛꯊꯣꯛꯅꯕ ꯇꯨꯔꯦꯜꯒꯤ ꯃꯥꯏꯀꯩ ꯑꯅꯤꯃꯛꯇ ꯄꯟꯒꯤ ꯂꯝꯕꯤꯁꯤꯡ ꯂꯩ" ("The town is below the high flood level of Imphal river and hence there are embankment roads on both sides of the river to protect the settlement from seasonal floods") (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification))꯫ WRD-ꯅꯥ ꯄꯥꯎꯖꯦꯜꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ, ꯃꯁꯤꯒꯤ ꯇꯝꯄꯥꯛꯀꯤ ꯒꯦꯖꯁꯤꯡꯒꯤꯗꯃꯛ ꯋꯥꯔꯅꯤꯡ ꯂꯦꯚꯦꯜ, ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ ꯐꯣꯡꯗꯣꯀꯏ, ꯗꯦꯇꯝ ꯇꯥꯛꯇꯅꯥ (ꯃꯦꯟ ꯁꯤ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯃꯤꯇꯔ ꯑꯣꯏꯒꯗꯕꯅꯤ ꯍꯥꯌꯅꯥ ꯈꯟꯖꯩ [TBC]): ꯁꯍꯔꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯃꯤꯅꯨꯊꯣꯡ (Minuthong)-ꯗ ꯏꯝꯐꯥꯜ, 785.900 m, 786.900 m ꯑꯃꯁꯨꯡ 788.400 m, 29 ꯃꯦ 2024-ꯗ "ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯊꯛꯇ" ("above the highest flood level") ꯏꯁꯤꯡ ꯂꯥꯛꯈꯤ; ꯂꯤꯂꯣꯡꯗ ꯏꯝꯐꯥꯜ 780.350 m ꯑꯃꯁꯨꯡ 781.350 m (2024-ꯒꯤ ꯔꯤꯄꯣꯔꯠ ꯑꯃꯗ 781.250 m), ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯂꯦꯚꯦꯜ 782.850 m ꯂꯩꯕ, 15 ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ ꯇꯨꯔꯦꯜ ꯑꯗꯨꯅꯥ 783.250 m-ꯗ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯈꯤ; ꯏꯔꯤꯜꯕꯨꯡ (Irilbung)-ꯗ ꯏꯔꯤꯜ 786.700 m ꯑꯃꯁꯨꯡ 787.700 m, ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯂꯦꯚꯦꯜ 782.200 m ꯍꯥꯌꯅꯥ ꯐꯣꯡꯗꯣꯛꯈꯤ, ꯃꯁꯤꯒꯤ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ, ꯃꯁꯤꯡꯁꯤꯡꯗ ꯑꯔꯥꯟꯕ ꯑꯃꯥ [TBC]; ꯊꯧꯕꯥꯜ 778.915 m ꯑꯃꯁꯨꯡ 779.915 m (ꯒꯦꯖꯀꯤ ꯃꯃꯤꯡ ꯂꯧꯗꯕ); ꯊꯣꯡ ꯅꯝꯕꯣꯟꯕꯤ (Thong Nambonbi, Hump Bridge)-ꯗ ꯅꯝꯕꯨꯜ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯂꯦꯚꯦꯜ 783.695 m; ꯅꯝꯕꯣꯜ ꯊꯣꯡꯈꯣꯡ (Nambol Thongkhong)-ꯗ ꯅꯝꯕꯣꯜ 774.700 m ꯅꯠꯔꯒꯥ 774.400 m (2024 ꯑꯃꯁꯨꯡ 2025-ꯒꯤ ꯔꯤꯄꯣꯔꯠꯁꯤꯡ ꯇꯣꯉꯥꯟꯅꯩ); ꯑꯃꯁꯨꯡ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯗ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯂꯦꯚꯦꯜ 769.320 m, 15 ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ 770.05 m-ꯗ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯈꯤ (Sangai Express, 30 May 2024 ꯑꯃꯁꯨꯡ 16 September 2025, WRD-ꯒꯤ ꯃꯁꯤꯡꯁꯤꯡ ꯐꯣꯡꯗꯣꯛꯇꯨꯅꯥ; ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ ꯏꯝꯐꯥꯜ ꯑꯁꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 790 m-ꯗ ꯂꯩ (AIIB), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯏꯝꯐꯥꯜ ꯇꯨꯔꯦꯜꯒꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯕ ꯁꯍꯔꯒꯤ ꯈꯣꯡꯕꯥꯟꯁꯤꯡꯅꯥ ꯃꯁꯤꯒꯤ ꯐ꯭ꯂꯗ ꯁ꯭ꯇꯦꯖꯇꯒꯤ ꯃꯤꯇꯔ ꯑꯃꯥ ꯅꯠꯔꯒꯥ ꯑꯅꯤꯒꯤ ꯃꯅꯨꯡꯗ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯏ (NEER-ꯒꯤ ꯄꯥꯕ)꯫ ꯇꯝꯄꯥꯛꯀꯤ ꯇꯨꯔꯦꯜ ꯈꯨꯗꯤꯡꯃꯛ ꯌꯧꯕ ꯄꯥꯠ ꯂꯣꯛꯇꯥꯛ ꯑꯁꯤ NHPC-ꯒꯤ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯅꯥ ꯐꯨꯜ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯂꯦꯚꯦꯜ 768.5 m-ꯗ ꯊꯤꯡꯏ, ꯃꯤꯅꯤꯃꯝ ꯗ꯭ꯔꯣꯗꯥꯎꯟ ꯂꯦꯚꯦꯜ 766.2 m-ꯒꯥ ꯂꯣꯌꯅꯅꯥ (NHPC, ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ; CEA-ꯅꯥ 766.01 m ꯄꯤ, ꯑꯃꯁꯨꯡ ORF-ꯒꯤ ꯑꯥꯔꯇꯤꯀꯜ ꯑꯃꯅꯥ ꯐꯨꯜ ꯂꯦꯚꯦꯜꯒꯤꯗꯃꯛ 769.63 m ꯑꯃꯁꯨꯡ "ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ" ("flood level") ꯑꯣꯏꯅꯥ 768.50 m ꯄꯤ, ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ: ꯃꯁꯤꯡꯁꯤꯡ ꯑꯁꯤ ꯌꯥꯅꯗꯦ), ꯑꯃꯁꯨꯡ ꯕꯦꯔꯥꯖꯀꯤ ꯃꯈꯥꯗ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜꯒꯤ ꯃꯈꯥ ꯑꯁꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 800 m-ꯒꯤ ꯃꯅꯨꯡꯗ "ꯑꯉꯝꯅꯥ 763.7 m ꯐꯥꯎꯕ" ("steeply upto 763.7 m") ꯋꯥꯡꯈꯠꯂꯛꯏ, ꯒꯦꯠꯁꯤꯡꯅꯥ ꯀꯔꯤ ꯇꯧꯔꯕꯁꯨ ꯑꯥꯎꯠꯐ꯭ꯂꯣ ꯊꯤꯡꯕ ꯃꯍꯧꯁꯥꯒꯤ ꯁꯤꯜ ꯑꯃꯅꯤ (MASTEC)꯫ ꯁꯍꯔꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩꯕ ꯂꯝꯐꯦꯜꯄꯥꯠ ꯑꯁꯤ "ꯆꯍꯤ ꯈꯨꯗꯤꯡꯒꯤ ꯅꯨꯃꯤꯠ ꯀꯌꯥ ꯏꯁꯤꯡ ꯊꯨꯝꯗꯅꯥ ꯂꯩ" ("remains waterlogged for many days every year") (NDB, project summary) ꯑꯃꯁꯨꯡ ꯏꯁꯤꯡ ꯏꯆꯥꯎ ꯆꯥꯎꯕ ꯃꯇꯝꯗ ꯁꯃꯨꯁꯥꯡ ꯅꯥꯂꯥ (Shamushang nallah)-ꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯅꯝꯕꯨꯜꯗ ꯄꯝꯞ ꯇꯧꯗꯨꯅꯥ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯏ (HC PIL No. 8 of 2025-ꯗ WRD-ꯒꯤ ꯁꯥꯏꯠ ꯔꯤꯄꯣꯔꯠ)꯫ ꯃꯐꯝ ꯑꯗꯨꯗ ꯂꯩꯕ ꯁꯥꯏꯠ ꯑꯃꯅꯥ ꯇꯨꯔꯦꯜ, ꯕꯦꯔꯥꯖ ꯅꯠꯔꯒꯥ ꯄꯝꯞꯁꯤꯡꯅꯥ ꯊꯤꯡꯕ ꯏꯁꯤꯡꯒꯤ ꯃꯊꯛ ꯑꯃꯗ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯏ, ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 3.12-ꯒꯤ ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥꯗ ꯊꯝꯕ ꯂꯧꯔꯤꯕ ꯏꯁꯤꯡꯒꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 5.8.5-ꯒꯤ ꯇꯦꯜꯋꯥꯇꯔꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯂꯝꯗ ꯀ꯭ꯂꯣꯖ 3.10.4(b) ꯆꯠꯂꯤ꯫ CWC-ꯒꯤ ꯁ꯭ꯇꯦꯠꯇ ꯁꯥꯏꯠ ꯑꯃꯈꯛꯇ ꯂꯩ, ꯖꯤꯔꯤꯕꯥꯝꯒꯤ ꯃꯅꯥꯛꯇ ꯂꯩꯕ ꯆꯣꯇꯦꯕꯦꯀ꯭ꯔꯥ (Chotebekra)-ꯗ ꯕꯔꯥꯛꯀꯤ ꯂꯦꯚꯦꯜ-ꯃꯣꯅꯤꯇꯔꯤꯡ ꯁꯥꯏꯠ ꯑꯃꯥ, 31 ꯖꯨꯂꯥꯏ 1989-ꯗ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ 32.1 m ꯂꯩꯕ (CWC, SANDRP-ꯅꯥ ꯏꯔꯛꯄ ꯃꯇꯨꯡ ꯏꯟꯅ); ꯏꯝꯐꯥꯜ, ꯅꯝꯕꯨꯜ, ꯏꯔꯤꯜ, ꯊꯧꯕꯥꯜ ꯅꯠꯔꯒꯥ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜꯗ ꯑꯃꯠꯇ ꯂꯩꯇꯦ꯫


3.11 ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯔꯟꯑꯣꯐ ꯇ꯭ꯔꯥꯟꯁꯐꯣꯔꯃꯦꯁꯟ

3.11.1 ꯌꯥꯍꯜꯂꯤꯕ ꯇ꯭ꯔꯥꯟꯁꯐꯣꯔꯝꯁꯤꯡ.

  • (a) 25 km²-ꯗꯒꯤ ꯅꯦꯝꯕ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ ꯑꯃꯁꯨꯡ ꯆꯥꯎꯕ ꯃꯣꯗꯦꯜ ꯑꯃꯒꯤ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ ꯑꯃꯍꯦꯛꯇꯒꯤꯗꯃꯛ, SCS (NRCS)-ꯒꯤ ꯗꯥꯏꯃꯦꯟꯁꯟꯂꯦꯁ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ, ꯀꯔꯚꯤꯂꯤꯅꯤꯌꯔ ꯅꯠꯔꯒꯥ ꯇ꯭ꯔꯥꯏꯑꯦꯉ꯭ꯒꯨꯂꯔ;
  • (b) ꯀꯥꯏꯅꯦꯃꯦꯇꯤꯛ ꯑꯣꯚꯔꯂꯦꯟꯗ ꯐ꯭ꯂꯣꯒꯥ ꯂꯣꯌꯅꯕ SWMM-ꯒꯤ ꯅꯟ-ꯂꯤꯅꯤꯌꯔ ꯔꯤꯖꯔꯚꯣꯌꯔ;
  • (c) ꯀ꯭ꯂꯣꯖ 3.15-ꯒꯤ ꯃꯈꯥꯗ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯔꯕ ꯃꯐꯝꯗ, HEC-HMS-ꯗ ꯀ꯭ꯂꯥꯔꯛ ꯅꯠꯔꯒꯥ ꯃꯣꯗꯀ꯭ꯂꯥꯔꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ; ꯑꯃꯁꯨꯡ
  • (d) 25–5,000 km²-ꯒꯤꯗꯃꯛ CWC-ꯒꯤ ꯁꯤꯟꯊꯦꯇꯤꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ (ꯀ꯭ꯂꯣꯖ 3.11.4)꯫

3.11.2 SCS ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ. ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤ ꯄꯤꯛ ꯑꯃꯁꯨꯡ ꯄꯤꯛ ꯐꯥꯎꯕꯒꯤ ꯃꯇꯝ ꯃꯈꯥꯒꯤꯁꯤꯡ ꯑꯣꯏꯒꯗꯕꯅꯤ:

qp = PRF′ · A · Q / tp, PRF′ = 0.208 ꯑꯣꯏꯅꯥ (ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ 484-ꯒꯤ SI ꯃꯑꯣꯡ) tp = Δt / 2 + tL, tL = 0.6 Tc

ꯃꯐꯝ ꯑꯁꯤꯗ qp ꯑꯁꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣꯅꯤ (m³/s); A ꯑꯁꯤ ꯂꯝꯅꯤ (km²); Q ꯑꯁꯤ ꯔꯟꯑꯣꯐꯀꯤ ꯗꯦꯞꯊꯅꯤ (mm), ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤꯗꯃꯛ 1 mm-ꯒꯥ ꯃꯥꯟꯅꯩ; tp ꯑꯁꯤ ꯄꯤꯛ ꯐꯥꯎꯕꯒꯤ ꯃꯇꯝꯅꯤ (h); ꯑꯃꯁꯨꯡ Δt ꯑꯁꯤ ꯀꯝꯞꯌꯨꯇꯦꯁꯟ ꯏꯟꯇꯔꯚꯦꯜꯅꯤ (h)꯫

3.11.3 ꯀꯝꯞꯌꯨꯇꯦꯁꯟ ꯏꯟꯇꯔꯚꯦꯜ ꯑꯃꯁꯨꯡ ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯁꯤꯡ.

  • (a) Δt ꯑꯁꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯑꯄꯤꯛꯄ ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯒꯤ 0.133 Tc-ꯗꯒꯤ, ꯅꯠꯔꯒꯥ ꯀ꯭ꯂꯣꯖ 2.9.1-ꯒꯤ ꯍꯥꯏꯌꯦꯇꯣꯒ꯭ꯔꯥꯐ ꯇꯥꯏꯝ ꯁ꯭ꯇꯦꯞꯇꯒꯤ ꯍꯦꯟꯔꯣꯏꯗꯕꯅꯤ꯫
  • (b) ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯁꯤꯡ ꯑꯁꯤ HSG, ꯂꯝꯒꯤ ꯀꯚꯔ ꯑꯃꯁꯨꯡ ꯅꯥꯄꯣꯝꯗ ꯆꯨꯝꯅꯥ ꯃꯥꯟꯅꯒꯗꯕꯅꯤ꯫ ꯄꯔꯚꯤꯌꯁ ꯑꯃꯁꯨꯡ ꯗꯥꯏꯔꯦꯛꯇꯂꯤ ꯀꯅꯦꯛꯇꯦꯗ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡ ꯀ꯭ꯂꯣꯖ 3.9.2 ꯃꯇꯨꯡ ꯏꯟꯅ ꯇꯣꯉꯥꯟꯕ ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯁꯤꯡ ꯑꯣꯏꯒꯗꯕꯅꯤ꯫

3.11.4 CWC ꯁꯤꯟꯊꯦꯇꯤꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ. CWC ꯁꯕꯖꯣꯟ 2(c) (Barak and others)-ꯗ ꯂꯩꯕ 25–5,000 km²-ꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ, ꯃꯁꯤꯅꯥ ꯃꯅꯤꯄꯨꯔ ꯄꯨꯝꯅꯃꯛ ꯌꯥꯎꯏ ꯍꯥꯌꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯂꯧꯏ (ꯀ꯭ꯂꯣꯖ 2.3.6(b)) ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤꯗꯃꯛ CWC-ꯅꯥ ꯐ꯭ꯂꯗ ꯑꯦꯁ꯭ꯇꯤꯃꯦꯁꯟ ꯔꯤꯄꯣꯔꯠ (Flood Estimation Report) ꯑꯃꯠꯇ ꯐꯣꯡꯗꯣꯛꯈꯤꯗꯦ; ꯁꯕꯖꯣꯟ 2(b) (South Brahmaputra)-ꯒꯤ ꯔꯤꯄꯣꯔꯠ ꯑꯁꯤ ꯃꯁꯤꯒꯤ ꯑꯦꯔꯤꯌꯦꯜ ꯔꯤꯗꯛꯁꯟ ꯀꯔꯚꯁꯤꯡꯒꯤꯗꯃꯛ ꯑꯃꯁꯨꯡ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯤꯡꯒꯤ ꯆꯦꯛ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯃꯛ ꯃꯗꯨꯒꯤ ꯃꯍꯨꯠꯇ ꯁꯤꯖꯤꯟꯅꯩ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯀ꯭ꯂꯣꯖ 2.3.3(b)-ꯒꯤ ꯀ꯭ꯔꯣꯁ-ꯆꯦꯛꯀꯤꯗꯃꯛ CWC-ꯒꯤ ꯄꯣꯏꯟꯠ ꯅꯣꯡ ꯆꯨꯕ ꯑꯃꯠꯇ ꯂꯩꯇꯦ:

  • (a) SUH ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ, ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟ, ꯂꯣꯁ ꯔꯦꯠ, ꯕꯦꯖ ꯐ꯭ꯂꯣ, ꯑꯦꯔꯤꯌꯦꯜ ꯔꯤꯗꯛꯁꯟ ꯑꯃꯁꯨꯡ ꯇꯥꯏꯝ ꯗꯤꯁ꯭ꯇ꯭ꯔꯤꯕ꯭ꯌꯨꯁꯟ ꯑꯁꯤ ꯁꯔꯚꯦ ꯅꯠꯔꯒꯥ DEM ꯑꯃꯗꯒꯤ ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯐꯤꯖꯤꯑꯣꯒ꯭ꯔꯥꯐꯤꯛ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ, ꯆꯠꯅꯕ CWC ꯐ꯭ꯂꯗ ꯑꯦꯁ꯭ꯇꯤꯃꯦꯁꯟ ꯔꯤꯄꯣꯔꯠꯇꯒꯤ ꯂꯧꯒꯗꯕꯅꯤ;
  • (b) ꯄꯨꯡ 24-ꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯅꯣꯡ ꯆꯨꯕ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.3.3(b) ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 2.7.3-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯒꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 2.8-ꯒꯤ ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ;
  • (c) SUH-ꯒꯤ ꯃꯍꯩ ꯑꯁꯤ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯃꯍꯧꯁꯥꯒꯤ ꯐꯤꯚꯝꯒꯤꯗꯃꯛ HEC-HMS ꯅꯠꯔꯒꯥ SWMM-ꯒꯤ ꯃꯍꯩꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯒꯗꯕꯅꯤ; ꯑꯃꯁꯨꯡ
  • (d) ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯃꯣꯗꯦꯜꯅꯥ CWC SUH-ꯗꯒꯤ ꯅꯦꯝꯕ 1% AEP-ꯒꯤ ꯄꯤꯛ ꯄꯤꯔꯕꯗꯤ, ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯀ꯭ꯂꯣꯖ 3.15-ꯒꯤ ꯃꯈꯥꯗ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟꯅꯥ ꯃꯣꯗꯦꯜ ꯑꯗꯨ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯀꯗꯕꯅꯤ ꯅꯠꯔꯒꯥ CWC SUH-ꯒꯤ ꯄꯤꯛ ꯑꯗꯨ ꯂꯧꯒꯗꯕꯅꯤ꯫

3.11.5 ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯀꯣꯁ꯭ꯇꯦꯜ ꯂꯝꯒꯤꯗꯃꯛ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ. ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯐꯦꯛꯇꯔ (484; PRF′ = 0.208) ꯑꯁꯤ ꯗꯤꯐꯣꯜꯠꯅꯤ꯫ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯐꯦꯛꯇꯔ ꯑꯃꯥ ꯃꯈꯥꯒꯤ ꯐꯤꯚꯝꯁꯤꯡꯗ ꯈꯛꯇꯃꯛ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ:

  • (a) ꯄꯥꯏꯞ ꯅꯠꯔꯒꯥ ꯂꯥꯏꯟ ꯇꯧꯔꯕ ꯏꯔꯝ ꯂꯩꯇꯕ, ꯆꯦꯅꯦꯜ ꯂꯩꯇꯕ, ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯀꯣꯁ꯭ꯇꯦꯜ-ꯄ꯭ꯂꯦꯟꯒꯤ ꯂꯝꯒꯤꯗꯃꯛ;
  • (b) ꯆꯦꯅꯦꯜ ꯂꯩꯇꯅꯥ ꯂꯩꯔꯤꯕ ꯂꯝ ꯑꯃꯍꯦꯛꯇꯒꯤꯗꯃꯛ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯔꯟ ꯑꯅꯤꯃꯛꯇ ꯃꯑꯣꯡ ꯑꯗꯨꯃꯛꯇ; ꯑꯃꯁꯨꯡ
  • (c) ꯑꯣꯊꯣꯔꯤꯇꯤꯅꯥ ꯑꯍꯦꯟꯕ 3D-ꯗ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯔꯕ ꯚꯦꯜꯌꯨꯁꯤꯡ ꯂꯧꯔꯕꯥ ꯃꯇꯨꯡꯗ꯫

ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝꯗ ꯄꯥꯏꯞ, ꯂꯥꯏꯟ ꯇꯧꯔꯕ ꯈꯣꯡꯕꯥꯟ ꯅꯠꯔꯒꯥ ꯀꯔꯕꯁꯤꯡꯅꯥ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯄ ꯂꯝꯅꯥ ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯐꯦꯛꯇꯔ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. SCS ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ, 0.6 ꯂꯦꯒ ꯔꯦꯁꯤꯑꯣ ꯑꯃꯁꯨꯡ 0.133 Tc ꯏꯟꯇꯔꯚꯦꯜ ꯑꯁꯤ NEH Part 630, Ch. 16 (USDA NRCS, 2007)-ꯗꯒꯤ ꯂꯥꯛꯄꯅꯤ꯫ ꯏꯟꯇꯔꯚꯦꯜ ꯑꯁꯤ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯀꯤ ꯖꯤꯑꯣꯃꯦꯇ꯭ꯔꯤꯗꯒꯤ ꯊꯣꯀꯏ: tp = Δt/2 + 0.6 Tc ꯑꯃꯁꯨꯡ Tc + Δt = 1.7 tp ꯑꯣꯏꯔꯕꯗꯤ, Δt = 0.133 Tc꯫ SI ꯀꯟꯁ꯭ꯇꯦꯟꯠ 0.208 ꯑꯁꯤ 484 (cfs, mi², in, h)-ꯒꯤ ꯍꯛꯊꯦꯡꯅꯅꯥ ꯍꯣꯡꯗꯣꯛꯂꯕꯅꯤ꯫ APWA-ꯅꯥ SCS-ꯒꯤ ꯗꯥꯏꯃꯦꯟꯁꯟꯂꯦꯁ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯃꯁꯤꯒꯤ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯅꯥ ꯁꯤꯖꯤꯟꯅꯩ (2011, §5602.5)꯫ CWC-ꯒꯤ ꯐ꯭ꯂꯗ ꯑꯦꯁ꯭ꯇꯤꯃꯦꯁꯟ ꯔꯤꯄꯣꯔꯠꯁꯤꯡꯅꯥ ꯁꯕꯖꯣꯟ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ SUH ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡꯒꯤ ꯔꯤꯒ꯭ꯔꯦꯁꯟ ꯏꯀ꯭ꯋꯦꯁꯟꯁꯤꯡ, ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟ, ꯃꯥꯟꯅꯕ ꯂꯣꯁ ꯔꯦꯠ ꯑꯃꯁꯨꯡ ARF ꯑꯃꯁꯨꯡ ꯇꯥꯏꯝ-ꯗꯤꯁ꯭ꯇ꯭ꯔꯤꯕ꯭ꯌꯨꯁꯟ ꯀꯔꯚꯁꯤꯡ ꯄꯤ (CWC 2000; ꯁꯔꯨꯛ 2 ꯌꯦꯡꯕꯤꯌꯨ)꯫ ꯃꯈꯣꯌ 2000-ꯒꯤ ꯔꯤꯄꯣꯔꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯗꯦꯇꯥ ꯂꯩꯕ ꯃꯍꯧꯁꯥꯒꯤ, ꯃꯔꯨꯑꯣꯏꯅꯥ ꯂꯃꯗꯝꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯗꯒꯤ ꯂꯥꯛꯈꯤꯕꯅꯤ (ꯃꯁꯤꯒꯤ ꯒꯦꯖ ꯇꯧꯔꯕ ꯀꯦꯆꯃꯦꯟꯠ 14 ꯑꯁꯤ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯃꯄꯥꯟꯗ ꯂꯩꯕ ꯊꯣꯡꯒꯤ ꯁꯥꯏꯠꯁꯤꯡꯅꯤ, 1961-ꯗꯒꯤ 1983 ꯐꯥꯎꯕ ꯔꯦꯜꯋꯦ ꯊꯣꯡꯁꯤꯡꯗ ꯑꯃꯁꯨꯡ 1981-ꯗꯒꯤ ꯅꯦꯁꯅꯦꯜ-ꯍꯥꯏꯋꯦ ꯊꯣꯡꯁꯤꯡꯗ ꯒꯦꯖ ꯇꯧꯈꯤ, ꯑꯃꯁꯨꯡ ꯑꯃꯠꯇꯅꯥ ꯃꯅꯤꯄꯨꯔꯗꯒꯤ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯇꯦ; CWC-ꯅꯥ ꯁ꯭ꯇꯦꯠ ꯑꯁꯤ ꯌꯥꯎꯕ ꯁꯕꯖꯣꯟ 2(c)-ꯒꯤꯗꯃꯛ ꯔꯤꯄꯣꯔꯠ ꯑꯃꯠꯇ ꯐꯣꯡꯗꯣꯛꯈꯤꯗꯦ), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯈꯣꯌꯅꯥ ꯁꯍꯔ ꯑꯣꯏꯔꯕ ꯐꯤꯚꯝꯁꯤꯡ ꯅꯠꯇꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯐꯤꯚꯝꯁꯤꯡ ꯎꯠꯂꯤ꯫ ꯃꯔꯝ ꯑꯁꯤꯅꯥ SUH ꯑꯁꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯃꯣꯗꯦꯜ ꯑꯣꯏꯅꯥ ꯅꯠꯇꯅꯥ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯑꯣꯏꯅꯥ ꯁꯤꯖꯤꯟꯅꯩ꯫ ꯀ꯭ꯂꯣꯖ 3.11.4(d)-ꯅꯥ ꯀ꯭ꯂꯣꯖ 2.3.3-ꯒꯤ ꯐ꯭ꯂꯣꯔ ꯄ꯭ꯔꯤꯟꯁꯤꯄꯜ ꯑꯗꯨ ꯎꯠꯂꯤ꯫ ꯏꯟꯗꯤꯌꯥꯒꯤ ꯁ꯭ꯇꯗꯤꯁꯤꯡꯗ HEC-HMS ꯑꯁꯤ CWC ꯁꯕꯖꯣꯟꯒꯤ SUH ꯔꯦꯁ꯭ꯄꯣꯟꯁꯁꯤꯡꯒꯥ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯈ꯭ꯔꯦ, ꯃꯁꯤꯅꯥ ꯃꯈꯣꯌ ꯑꯅꯤ ꯁꯝꯅꯕ ꯌꯥꯏ ꯍꯥꯌꯕ ꯎꯠꯂꯤ꯫

3.11.5-ꯒꯤ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯐꯦꯛꯇꯔꯒꯤ ꯑꯣꯄꯁꯟ ꯑꯁꯤ NRCS-ꯒꯤ ꯗꯦꯜꯃꯥꯔꯚꯥ (Delmarva) ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏ, ꯃꯁꯤꯅꯥ ꯗꯦꯜꯃꯥꯔꯚꯥ ꯄꯦꯅꯤꯅꯁꯨꯂꯥꯒꯤ ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ, ꯆꯦꯅꯦꯜ ꯐꯅꯥ ꯂꯩꯇꯕ ꯀꯣꯁ꯭ꯇꯦꯜ-ꯄ꯭ꯂꯦꯟꯒꯤ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ 284 (PRF′ ≈ 0.122) ꯁꯤꯖꯤꯟꯅꯩ (Welle et al., 1980, NRCS-ꯅꯥ ꯂꯧꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ; New Jersey Department of Agriculture, Delmarva bulletin, ꯃꯁꯤꯅꯥ 285 ꯁꯤꯖꯤꯟꯅꯩ)꯫ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯐꯦꯛꯇꯔ ꯑꯃꯅꯥ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ, ꯍꯦꯟꯅꯥ ꯃꯇꯨꯡꯗ ꯂꯥꯀꯄ ꯄꯤꯛ ꯑꯃꯥ ꯄꯤ꯫ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯔꯟ ꯈꯛꯇꯗ ꯁꯤꯖꯤꯟꯅꯔꯕꯗꯤ, ꯃꯁꯤꯅꯥ Q_pre ꯍꯟꯊꯍꯅꯒꯅꯤ ꯑꯃꯁꯨꯡ ꯔꯤꯂꯤꯖ ꯀꯦꯞ ꯑꯗꯨ ꯍꯦꯟꯅꯥ ꯀꯟꯊꯍꯅꯒꯅꯤ; ꯄꯥꯏꯞ ꯂꯩꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯔꯟ ꯑꯃꯗ ꯁꯤꯖꯤꯟꯅꯔꯕꯗꯤ, ꯃꯁꯤꯅꯥ Q_post ꯍꯟꯊꯍꯅꯒꯅꯤ꯫ ꯀ꯭ꯂꯣꯖ 3.11.5(b)-ꯅꯥ ꯕꯥꯏꯌꯁ ꯑꯅꯤꯃꯛ ꯊꯤꯡꯏ꯫


3.12 ꯔꯥꯎꯇꯤꯡ

3.12.1 ꯁ꯭ꯇꯣꯔꯦꯖ ꯔꯥꯎꯇꯤꯡ. ꯗꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯔꯤꯇꯦꯟꯁꯟ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡ, ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡ, ꯄꯣꯟꯗꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯄꯟ (embankment)-ꯁꯤꯡꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯍꯦꯛꯇꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯔꯥꯎꯇꯤꯡ ꯇꯧꯕꯗ ꯂꯦꯚꯦꯜ-ꯄꯨꯜ (ꯃꯣꯗꯤꯐꯥꯏꯗ ꯄꯨꯂꯁ, ꯁ꯭ꯇꯣꯔꯦꯖ-ꯏꯟꯗꯤꯀꯦꯁꯟ) ꯔꯥꯎꯇꯤꯡ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ, ꯃꯈꯥꯒꯤꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ:

  • (a) ꯗꯤꯖꯥꯏꯟ ꯒ꯭ꯔꯦꯗꯤꯡ ꯅꯠꯔꯒꯥ ꯁꯔꯚꯦꯗꯒꯤ ꯂꯧꯕ ꯁ꯭ꯇꯦꯖ–ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯔꯤ;
  • (b) ꯑꯥꯎꯠꯂꯦꯠ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ (ꯑꯣꯔꯤꯐꯤꯁ, ꯋꯤꯌꯔ, ꯁꯔꯞꯂꯁ ꯋꯤꯌꯔ, ꯄꯝꯞꯁꯤꯡ) ꯁ꯭ꯇꯦꯖ–ꯗꯤꯁꯆꯥꯔꯖꯀꯤ ꯃꯔꯤ, ꯁꯔꯨꯛ 4-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯑꯄꯤꯛꯄ ꯑꯣꯔꯤꯐꯤꯁ ꯑꯃꯁꯨꯡ ꯇ꯭ꯔꯦꯁ ꯁ꯭ꯀ꯭ꯔꯤꯟ ꯌꯥꯑꯣꯅꯥ; ꯑꯃꯁꯨꯡ
  • (c) ꯇꯦꯜꯋꯥꯇꯔꯅꯥ ꯑꯥꯎꯠꯂꯦꯠꯀꯤ ꯔꯦꯇꯤꯡꯗ ꯁꯣꯛꯍꯜꯂꯕ ꯃꯐꯝꯗ, ꯁꯔꯨꯛ 5-ꯒꯤ ꯇꯦꯜꯋꯥꯇꯔ ꯕꯧꯟꯗꯔꯤ꯫

3.12.2 ꯆꯦꯅꯦꯜ ꯔꯥꯎꯇꯤꯡ. ꯆꯦꯅꯦꯜ ꯑꯃꯁꯨꯡ ꯈꯣꯡꯕꯥꯟꯁꯤꯡꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯔꯥꯎꯇꯤꯡ ꯇꯧꯕꯗ ꯃꯁ꯭ꯀꯤꯡꯒꯝ–ꯀꯨꯟꯖ (Muskingum–Cunge) ꯊꯧꯑꯣꯡ, ꯅꯠꯔꯒꯥ ꯆꯦꯅꯦꯜꯒꯤ ꯖꯤꯑꯣꯃꯦꯇ꯭ꯔꯤ ꯅꯠꯔꯒꯥ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟꯗꯒꯤ ꯂꯧꯕ ꯄꯦꯔꯥꯃꯤꯇꯔ K ꯑꯃꯁꯨꯡ X-ꯒꯥ ꯂꯣꯌꯅꯕ ꯃꯁ꯭ꯀꯤꯡꯒꯝ ꯊꯧꯑꯣꯡ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯃꯁ꯭ꯀꯤꯡꯒꯝ ꯊꯧꯑꯣꯡꯒꯤꯗꯃꯛ, ꯔꯥꯎꯇꯤꯡ ꯏꯟꯇꯔꯚꯦꯜ Δt-ꯅꯥ 2KX ≤ Δt ≤ 2K(1 − X) ꯃꯄꯨꯡ ꯐꯥꯍꯅꯒꯗꯕꯅꯤ꯫

3.12.3 ꯏꯟꯁꯤꯗꯦꯟꯇꯦꯜ ꯁ꯭ꯇꯣꯔꯦꯖ. ꯑꯦꯞꯔꯨꯚ ꯇꯧꯔꯕ ꯐꯦꯁꯤꯂꯤꯇꯤ ꯑꯃꯒꯤ ꯃꯅꯨꯡꯗ ꯌꯥꯎꯗꯕ ꯂꯝꯕꯤꯒꯤ ꯄꯟ, ꯀꯜꯚꯔꯠ ꯅꯠꯔꯒꯥ ꯕꯧꯟꯗꯔꯤ ꯋꯣꯜꯁꯤꯡꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯁꯤ ꯗꯤꯖꯥꯏꯟ ꯂꯥꯏꯐ ꯄꯨꯝꯅꯃꯛꯇ ꯃꯦꯟꯇꯦꯟ ꯇꯧꯒꯅꯤ ꯍꯥꯌꯅꯥ ꯑꯣꯊꯣꯔꯤꯇꯤꯅꯥ ꯊꯥꯖꯔꯕꯗꯤ ꯅꯠꯇꯅꯥ ꯗꯤꯖꯥꯏꯟꯗ ꯃꯁꯤꯡ ꯊꯤꯔꯣꯏꯗꯕꯅꯤ꯫

3.12.4 ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ ꯔꯥꯎꯇꯤꯡ. SWMM ꯅꯠꯔꯒꯥ HEC-RAS ꯑꯟꯁ꯭ꯇꯦꯗꯤ ꯐ꯭ꯂꯣꯗ ꯗꯥꯏꯅꯥꯃꯤꯛ-ꯋꯦꯚ (ꯃꯄꯨꯡ ꯐꯥꯕ ꯁꯦꯟꯠ-ꯚꯦꯅꯥꯟꯠ) ꯔꯥꯎꯇꯤꯡ ꯑꯁꯤ ꯃꯈꯥꯒꯤ ꯃꯐꯝꯁꯤꯡꯗ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ:

  • (a) ꯑꯥꯎꯠꯐꯣꯜ ꯑꯁꯤ ꯇꯥꯏꯗꯦꯜ, ꯇꯨꯔꯦꯜ ꯅꯠꯔꯒꯥ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯕꯦꯛꯋꯥꯇꯔꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯔꯕꯗꯤ (ꯁꯔꯨꯛ 5, ꯀ꯭ꯂꯣꯖ 3.10.4);
  • (b) ꯐ꯭ꯂꯣꯅꯥ ꯍꯜꯂꯛꯄ ꯌꯥꯔꯕꯗꯤ, ꯅꯠꯔꯒꯥ ꯅꯦꯠꯋꯥꯔꯛꯇ ꯂꯨꯞ ꯅꯠꯔꯒꯥ ꯑꯣꯚꯔꯐ꯭ꯂꯣ ꯂꯤꯉ꯭ꯛ ꯂꯩꯔꯕꯗꯤ; ꯅꯠꯔꯒꯥ
  • (c) ꯗꯤꯖꯥꯏꯟ ꯏꯚꯦꯟꯠꯇ ꯅꯦꯠꯋꯥꯔꯛ ꯁꯔꯆꯥꯔꯖ (surcharge) ꯑꯣꯏꯔꯕꯗꯤ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯒ꯭ꯔꯦꯗ ꯂꯥꯏꯟꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯂꯦꯞꯊꯣꯛꯂꯕꯗꯤ꯫

3.12.5 ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯀꯦꯁ꯭ꯀꯦꯗꯁꯤꯡ. ꯀꯦꯁ꯭ꯀꯦꯗ ꯑꯃꯗ ꯂꯩꯕ ꯄꯨꯈ꯭ꯔꯤ ꯈꯨꯗꯤꯡꯃꯛ ꯀ꯭ꯂꯣꯖ 3.12.1 ꯃꯇꯨꯡ ꯏꯟꯅ, ꯁꯔꯞꯂꯁ ꯋꯤꯌꯔ ꯑꯃꯁꯨꯡ ꯏꯊꯣꯡ (sluice)-ꯒꯤ ꯔꯦꯇꯤꯡꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 7-ꯒꯤ ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯠ ꯇꯧꯔꯕ ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯔꯥꯎꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ (ꯀ꯭ꯂꯣꯖ 3.13)-ꯅꯥ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯂꯦꯚꯦꯜ ꯑꯃꯥ ꯁꯄꯣꯔꯠ ꯇꯧꯗ꯭ꯔꯕꯗꯤ, ꯄꯨꯈ꯭ꯔꯤ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯏꯁꯤꯡꯒꯤ ꯂꯦꯚꯦꯜ ꯑꯁꯤ FTL ꯑꯣꯏꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤꯗꯃꯛ ꯃꯣꯗꯤꯐꯥꯏꯗ ꯄꯨꯂꯁ ꯔꯥꯎꯇꯤꯡ ꯑꯃꯁꯨꯡ ꯆꯦꯅꯦꯜꯁꯤꯡꯒꯤꯗꯃꯛ ꯃꯁ꯭ꯀꯤꯡꯒꯝ–ꯀꯨꯟꯖ ꯑꯁꯤ APWA-ꯒꯤ ꯃꯊꯧ ꯇꯥꯕꯁꯤꯡꯅꯤ (KC Metro APWA 5600, 2011, §5602.8)꯫ APWA-ꯅꯥ ꯃꯦꯟꯇꯦꯟ ꯇꯧꯒꯅꯤ ꯍꯥꯌꯗ꯭ꯔꯕꯗꯤ ꯄꯟꯁꯤꯡꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ "ꯏꯟꯁꯤꯗꯦꯟꯇꯦꯜ ꯗꯤꯇꯦꯟꯁꯟ" ("incidental detention")-ꯁꯨ ꯂꯧꯊꯣꯀꯏ, 3.12.3-ꯅꯥ ꯃꯁꯤ ꯂꯧꯏ꯫ CPHEEO-ꯒꯤ ꯗꯤꯇꯦꯟꯁꯟ ꯄ꯭ꯔꯣꯁꯤꯖꯔꯅꯥ 3.12.1-ꯒꯤ ꯏꯟꯄꯨꯠ ꯑꯍꯨꯝ ꯑꯗꯨꯃꯛ ꯁꯤꯖꯤꯟꯅꯩ: ꯏꯟꯐ꯭ꯂꯣ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ, ꯁ꯭ꯇꯦꯖ–ꯁ꯭ꯇꯣꯔꯦꯖ ꯀꯔꯚ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯦꯖ–ꯗꯤꯁꯆꯥꯔꯖ ꯀꯔꯚ (CPHEEO 2019, Part A §8.5.3)꯫ ꯃꯁ꯭ꯀꯤꯡꯒꯝꯒꯤ ꯁ꯭ꯇꯦꯕꯤꯂꯤꯇꯤ ꯂꯤꯃꯤꯠꯁꯤꯡ ꯑꯁꯤ ꯁ꯭ꯇꯦꯟꯗꯔꯗꯅꯤ (Chow, Maidment ꯑꯃꯁꯨꯡ Mays, 1988, §8.4)꯫ ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯇ ꯑꯆꯧꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯁꯤ ꯇꯨꯔꯦꯜꯁꯤꯡ ꯋꯥꯡꯂꯕ, ꯄꯟꯁꯤꯡꯒꯤ ꯈꯨꯠꯊꯥꯡꯒꯤ ꯑꯥꯎꯠꯐꯣꯜꯁꯤꯡ ꯊꯤꯡꯂꯕ ꯑꯃꯁꯨꯡ ꯃꯈꯣꯌꯒꯤ ꯃꯇꯨꯡꯗ ꯂꯩꯕ ꯏꯁꯤꯡ ꯍꯟꯊꯗꯅꯥ ꯋꯥꯡꯈꯠꯂꯛꯂꯤꯕ ꯃꯇꯝꯗ ꯂꯥꯀꯄꯅꯥ ꯃꯔꯝ ꯑꯣꯏꯗꯨꯅꯥ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ 3.12.5-ꯗ ꯄꯥꯠ, ꯄꯨꯈ꯭ꯔꯤ ꯑꯃꯁꯨꯡ ꯂꯣꯛꯇꯥꯛ ꯃꯈꯣꯌꯒꯤ ꯑꯥꯎꯠꯂꯦꯠ ꯅꯠꯔꯒꯥ ꯗꯤꯖꯥꯏꯟ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯍꯧꯍꯜꯂꯤ꯫ ꯇꯝꯄꯥꯛ ꯑꯁꯤꯗ ꯑꯥꯎꯠꯂꯦꯠ ꯑꯃꯈꯛꯇ ꯂꯩ: ꯃꯁꯤꯗ ꯆꯡꯂꯛꯄ ꯇꯨꯔꯦꯜꯁꯤꯡꯅꯥ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯗ ꯆꯦꯀꯟꯗ ꯈꯨꯗꯤꯡꯗ ꯀ꯭ꯌꯨꯕꯤꯛ ꯃꯤꯇꯔ ꯂꯤꯁꯤꯡ ꯈꯔ ꯄꯨꯔꯛꯏ, ꯑꯗꯨꯒꯨꯝꯕꯥ ꯃꯇꯝꯗ "ꯏꯊꯥꯏꯗ, ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯗ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜꯒꯤ ꯐ꯭ꯂꯣ ꯑꯁꯤ 400 cumecs ꯔꯣꯝ ꯑꯣꯏ ꯑꯃꯁꯨꯡ ꯕꯦꯔꯥꯖꯀꯤ ꯃꯈꯥꯒꯤ ꯇꯨꯔꯦꯜ ꯑꯁꯤꯅꯥ ꯑꯁꯤꯒꯨꯝꯕ ꯐ꯭ꯂꯣ ꯂꯧꯕ ꯉꯝꯗꯦ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯊꯛ ꯊꯡꯕ ꯃꯐꯝꯗ ꯏꯁꯤꯡ ꯆꯤꯟꯊꯔꯛꯏ" ("At Ithai, flow of the Manipur river during monsoon is of the order of 400 cumecs and river down below the barrage does not have the capacity to cope up with such flow, as a result, water is piled up upstream") (MASTEC)꯫ ꯏꯁꯤꯡ ꯑꯁꯤ ꯂꯣꯛꯇꯥꯛ ꯑꯃꯁꯨꯡ ꯄꯥꯠꯁꯤꯡꯗ ꯊꯝꯃꯤ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ "ꯇꯨꯔꯦꯜꯒꯤ ꯄꯟꯁꯤꯡ ꯀꯛꯄꯅꯥ ꯅꯦꯝꯕ ꯂꯝꯁꯤꯡꯗ ꯍꯞꯇꯥ ꯀꯌꯥ ꯏꯁꯤꯡ ꯊꯨꯝꯗꯕ ꯊꯣꯛꯍꯜꯂꯤ" ("the failure of river dikes causes waterlogging in the low-lying areas for several weeks") (AIIB, Approval Project Document, 2024), ꯑꯃꯁꯨꯡ ꯂꯝꯐꯦꯜꯄꯥꯠ "ꯆꯍꯤ ꯈꯨꯗꯤꯡꯒꯤ ꯅꯨꯃꯤꯠ ꯀꯌꯥ ꯏꯁꯤꯡ ꯊꯨꯝꯗꯅꯥ ꯂꯩ" ("remains waterlogged for many days every year") (NDB, project summary)꯫ ꯁ꯭ꯇꯦꯠꯀꯤ ꯄꯥꯠ ꯅꯠꯔꯒꯥ ꯄꯨꯈ꯭ꯔꯤ ꯑꯃꯠꯇꯗ ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯠ ꯇꯧꯔꯕ ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜ, ꯂꯦꯚꯦꯜ ꯔꯦꯀꯣꯔꯗ ꯅꯠꯔꯒꯥ ꯁ꯭ꯇꯦꯖ–ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯔꯤ ꯂꯩꯕ ꯐꯡꯈꯤꯗꯦ [TBC]꯫ ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜꯁꯤꯡ ꯃꯈꯥꯒꯤꯁꯤꯡꯅꯤ (ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕ):

  • ꯒꯦꯠ ꯂꯩꯕ, ꯐ꯭ꯂꯦꯞ ꯒꯦꯠ (flap gate) ꯂꯩꯕ ꯅꯠꯔꯒꯥ ꯄꯝꯞꯅꯥ ꯊꯥꯗꯣꯀꯄ ꯑꯥꯎꯠꯐꯣꯜ ꯑꯃꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯀꯄ ꯄꯥꯠ, ꯄꯨꯈ꯭ꯔꯤ ꯅꯠꯔꯒꯥ ꯗꯤꯇꯦꯟꯁꯟ ꯄꯣꯟꯗ ꯑꯃꯥ ꯑꯥꯎꯠꯐꯣꯜ ꯊꯤꯡꯂꯕ ꯃꯇꯝ ꯈꯨꯗꯤꯡꯗ ꯃꯁꯤꯒꯤ ꯑꯥꯎꯠꯂꯦꯠꯀꯤ ꯂꯦꯚꯦꯜ ꯐꯥꯎꯕ ꯃꯄꯨꯡ ꯊꯟꯅꯥ ꯍꯧꯒꯗꯕꯅꯤ, ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯐꯣꯜ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 5.8.5(a)-ꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯁꯤꯡꯒꯤꯗꯃꯛ ꯊꯤꯡꯂꯦ ꯍꯥꯌꯅꯥ ꯂꯧꯏ (ꯀ꯭ꯂꯣꯖ 5.8.5(e))꯫ ꯇꯝꯄꯥꯛꯇ ꯃꯁꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯀꯦꯁꯅꯤ: ꯃꯦ 2024-ꯗ ꯑꯃꯁꯨꯡ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ ꯏꯝꯐꯥꯜ, ꯅꯝꯕꯨꯜ ꯑꯃꯁꯨꯡ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜ ꯃꯈꯣꯌꯒꯤ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜꯁꯤꯡꯗ ꯅꯠꯔꯒꯥ ꯃꯗꯨꯒꯤ ꯃꯊꯛꯇ ꯂꯦꯞꯈꯤ (WRD-ꯒꯤ ꯃꯁꯤꯡꯁꯤꯡ, ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ; ꯀ꯭ꯂꯣꯖ 3.10-ꯒꯤ ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ)꯫
  • ꯂꯝꯐꯦꯜꯄꯥꯠ (Lamphelpat), ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯣꯏꯅꯥ ꯗꯦꯚꯦꯂꯞ ꯇꯧꯔꯤꯕ ꯄꯥꯠ ꯑꯃꯥ, 9 ꯅꯣꯚꯦꯝꯕꯔ 2023-ꯒꯤ ꯋꯔꯛ ꯑꯣꯔꯗꯔ ꯑꯃꯒꯤ ꯃꯈꯥꯗ ꯈꯔ ꯊꯣꯏꯅꯥ ꯑꯦꯀꯔ 300 ꯗ꯭ꯔꯦꯖ ꯇꯧꯔꯤꯕ, "ꯏꯁꯤꯡ ꯏꯆꯥꯎ ꯆꯥꯎꯕ ꯃꯇꯝꯗ ꯂꯝꯐꯦꯜ ꯄꯥꯠ ꯏꯁꯤꯡ ꯂꯩꯐꯝꯗꯒꯤ ꯁꯃꯨꯁꯥꯡ ꯅꯥꯂꯥꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯅꯝꯕꯨꯜ ꯇꯨꯔꯦꯜꯗ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯏꯁꯤꯡ ꯄꯝꯞ ꯇꯧꯕꯒꯤ ꯊꯧꯔꯥꯡ" ("provision for pumping of flood water from the Lamphel pat water body to the Nambul River through Shamushang Nalla during high flood season") ꯂꯩꯕ (HC PIL No. 8 of 2025-ꯗ WRD-ꯒꯤ ꯁꯥꯏꯠ ꯔꯤꯄꯣꯔꯠ), ꯅꯣꯇꯤꯐꯥꯏ ꯇꯧꯔꯕ ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜ ꯑꯃꯅꯥ ꯅꯣꯡ ꯆꯨꯗ꯭ꯔꯤꯉꯩꯗ ꯄꯝꯞ ꯇꯧꯗꯨꯅꯥ ꯍꯟꯊꯍꯅꯒꯅꯤ ꯍꯥꯌꯅꯥ ꯋꯥꯁꯛ ꯂꯧꯗ꯭ꯔꯕꯗꯤ, ꯃꯁꯤꯒꯤ ꯄꯝꯞꯁꯤꯡ ꯍꯧꯕ ꯂꯦꯚꯦꯜ ꯐꯥꯎꯕ ꯃꯄꯨꯡ ꯊꯟꯅꯥ ꯍꯧꯒꯗꯕꯅꯤ; ꯃꯁꯤꯒꯤ ꯁ꯭ꯇꯦꯖ–ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯔꯤ ꯑꯃꯁꯨꯡ ꯄꯝꯞꯀꯤ ꯔꯦꯇꯤꯡꯁꯤꯡ WRD-ꯗꯒꯤ ꯐꯡꯒꯗꯕꯅꯤ [TBC]꯫
  • ꯐ꯭ꯔꯤ ꯑꯥꯎꯠꯂꯦꯠ ꯂꯩꯕ ꯄꯥꯠ ꯅꯠꯔꯒꯥ ꯄꯨꯈ꯭ꯔꯤ ꯑꯃꯥ ꯃꯁꯤꯒꯤ ꯁꯔꯚꯦ ꯇꯧꯔꯕ ꯑꯥꯎꯠꯂꯦꯠ ꯅꯠꯔꯒꯥ ꯁ꯭ꯄꯤꯜ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯍꯧꯏ, ꯑꯃꯁꯨꯡ ꯁꯍꯔ ꯑꯃꯁꯨꯡ ꯈꯨꯖꯤꯡꯁꯤꯡꯒꯤ ꯅꯣꯡꯅꯥ ꯊꯟꯍꯜꯂꯤꯕ ꯑꯄꯤꯛꯄ ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝ ꯄꯨꯝꯕꯗ ꯃꯄꯨꯡ ꯊꯟꯅꯥ ꯍꯧꯏ꯫
  • ꯂꯣꯛꯇꯥꯛ. ꯄꯥꯠ ꯑꯁꯤ NHPC-ꯒꯤ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯅꯥ ꯊꯤꯡꯏ, ꯃꯁꯤꯒꯤ ꯐꯨꯜ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯂꯦꯚꯦꯜ 768.5 m ꯑꯃꯁꯨꯡ ꯃꯤꯅꯤꯃꯝ ꯗ꯭ꯔꯣꯗꯥꯎꯟ ꯂꯦꯚꯦꯜ 766.2 m (NHPC, ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ); CEA-ꯅꯥ ꯃꯤꯅꯤꯃꯝ ꯗ꯭ꯔꯣꯗꯥꯎꯟ ꯂꯦꯚꯦꯜ 766.01 m ꯄꯤ (ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ), ꯑꯃꯁꯨꯡ ORF-ꯒꯤ ꯑꯥꯔꯇꯤꯀꯜ ꯑꯃꯅꯥ ꯐꯨꯜ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯂꯦꯚꯦꯜ 769.63 m ꯄꯤ ꯑꯃꯁꯨꯡ 768.50 m-ꯕꯨ "ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ" ("flood level") ꯍꯥꯌꯅꯥ ꯀꯧꯏ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ ꯃꯁꯤꯡꯁꯤꯡ ꯑꯁꯤ ꯌꯥꯅꯗꯦ, ꯑꯃꯁꯨꯡ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯃꯈꯣꯌ ꯌꯥꯅꯍꯟꯗꯦ꯫ ꯂꯣꯛꯇꯥꯛ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 5.8.5(c)-ꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯄꯥꯠꯀꯤ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯍꯧꯏ, ꯃꯁꯤ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯗ WRD-ꯒꯤ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ 769.320 m-ꯅꯤ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ), 15 ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ ꯌꯧꯈꯤꯕ 770.05 m-ꯗ ꯆꯦꯛ ꯇꯧꯗꯨꯅꯥ, ꯑꯃꯁꯨꯡ ꯖꯨꯟꯗꯒꯤ ꯁꯦꯞꯇꯦꯝꯕꯔ ꯐꯥꯎꯕ ꯐꯨꯜ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯂꯦꯚꯦꯜꯒꯤ ꯃꯈꯥꯗ ꯀꯩꯗꯧꯉꯩꯗꯁꯨ ꯅꯠꯇꯅꯥ꯫ ꯑꯒꯁ꯭ꯠ 2026-ꯒꯤ CEA-ꯒꯤ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯔꯤꯄꯣꯔꯠꯁꯤꯡꯅꯥ ꯄꯥꯠ ꯑꯁꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 767.46–767.73 m-ꯗ ꯂꯩ ꯍꯥꯌꯅꯥ ꯎꯠꯂꯤ (ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ), ꯃꯁꯤ ꯃꯁꯤꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯂꯦꯚꯦꯜꯅꯤ, ꯑꯃꯁꯨꯡ ꯂꯣꯛꯇꯥꯛ ꯑꯒꯁ꯭ꯠ 2002-ꯗ 768.5 m-ꯗ ꯌꯧꯈꯤ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ ꯕꯦꯔꯥꯖꯀꯤ ꯃꯈꯥꯗ ꯂꯩꯕ ꯁꯨꯒꯅꯨ ꯍꯝꯞ (Sugnu hump), ꯃꯐꯝ ꯑꯗꯨꯗ ꯃꯈꯥ ꯑꯁꯤ ꯈꯔ ꯊꯣꯏꯅꯥ 800 m-ꯒꯤ ꯃꯅꯨꯡꯗ 756.7 m-ꯗꯒꯤ 763.7 m-ꯗ ꯋꯥꯡꯈꯠꯂꯛꯏ (MASTEC), ꯃꯁꯤꯅꯥ ꯒꯦꯠꯁꯤꯡꯅꯥ ꯀꯔꯤ ꯇꯧꯔꯕꯁꯨ ꯑꯥꯎꯠꯂꯦꯠ ꯊꯤꯡꯏ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯄꯥꯠꯀꯤ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯏꯚꯦꯟꯠꯀꯤꯗꯃꯛ ꯁ꯭ꯇꯦꯇꯤꯛ ꯇꯦꯜꯋꯥꯇꯔꯅꯤ (ꯁꯔꯨꯛ 5)꯫
  • ꯔꯤꯖꯔꯚꯣꯌꯔꯁꯤꯡ. ꯊꯧꯕꯥꯜ (ꯃꯄꯤꯊꯦꯜ) ꯗꯦꯝꯒꯤ ꯐꯨꯜ ꯔꯤꯖꯔꯚꯣꯌꯔ ꯂꯦꯚꯦꯜ 880.7 m (WRD, ꯁꯦꯞꯇꯦꯝꯕꯔ 2025, ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ); ꯃꯁꯤ ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ 878.10 m-ꯗ ꯂꯩꯈꯤ, ꯑꯃꯁꯨꯡ 1 ꯑꯒꯁ꯭ꯠ 2015-ꯗ 876 m-ꯗ ꯂꯩꯈꯤ, "ꯁ꯭ꯄꯤꯜꯋꯦꯁꯤꯡꯒꯤ ꯃꯊꯛꯇ ꯈꯔ ꯊꯣꯏꯅꯥ 2 m" ("nearly 2 m above the spillways") (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ), ꯃꯁꯤꯡꯁꯤꯡ ꯑꯁꯤ ꯌꯥꯅꯗꯦ [TBC]꯫ ꯃꯁꯤ ꯃꯁꯤꯒꯤ ꯑꯣꯄꯔꯦꯇꯔꯅꯥ ꯏꯕꯗꯥ ꯐꯣꯡꯗꯣꯀꯄ ꯃꯦꯛꯁꯤꯃꯝ ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜꯗꯒꯤ ꯍꯧꯏ ꯑꯃꯁꯨꯡ ꯃꯗꯨ ꯐꯥꯎꯕ 880.7 m-ꯗꯒꯤ ꯍꯧꯏ꯫ ꯈꯨꯒꯥ ꯗꯦꯝ ꯅꯠꯔꯒꯥ ꯅꯝꯕꯨꯜꯗ ꯂꯩꯕ ꯁꯤꯡꯗꯥ ꯗꯦꯝꯒꯤꯗꯃꯛ ꯂꯦꯚꯦꯜ ꯑꯃꯠꯇ ꯐꯡꯈꯤꯗꯦ [TBC]; ꯃꯈꯣꯌꯒꯤ ꯑꯣꯄꯔꯦꯇꯔꯁꯤꯡꯅꯥ ꯐꯨꯜ ꯅꯠꯔꯒꯥ ꯃꯦꯛꯁꯤꯃꯝ ꯂꯦꯚꯦꯜ ꯐꯣꯡꯗꯣꯛꯇ꯭ꯔꯤꯐꯥꯎꯕ ꯃꯈꯣꯌ ꯃꯈꯣꯌꯒꯤ ꯁꯔꯚꯦ ꯇꯧꯔꯕ ꯁ꯭ꯄꯤꯜꯋꯦ ꯀ꯭ꯔꯦꯁ꯭ꯠꯇꯒꯤ ꯍꯧꯏ꯫ ꯃꯈꯣꯌ ꯑꯍꯨꯝꯒꯤ ꯔꯤꯂꯤꯖꯁꯤꯡ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 5.8.5(d)-ꯒꯤ ꯇꯦꯜꯋꯥꯇꯔꯅꯤ, ꯁꯍꯔ ꯑꯃꯒꯤꯗꯃꯛ ꯁ꯭ꯇꯣꯔꯦꯖ ꯅꯠꯇꯦ꯫
  • ꯂꯧꯕꯨꯛ. ꯇꯝꯄꯥꯛꯀꯤ ꯂꯝꯒꯤ ꯂꯧꯕꯨꯛ (paddy land) ꯑꯁꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝ ꯄꯨꯝꯕꯗ ꯃꯁꯤꯒꯤ ꯄꯟ ꯑꯃꯁꯨꯡ ꯔꯤꯖꯁꯤꯡꯒꯤ ꯃꯇꯨꯡꯗ ꯏꯁꯤꯡ ꯂꯦꯞꯏ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯂꯧꯒꯤ ꯄꯟꯁꯤꯡꯒꯤ ꯀ꯭ꯔꯦꯁ꯭ꯠ ꯐꯥꯎꯕ ꯃꯄꯨꯡ ꯊꯟꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯏ; ꯃꯁꯤꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯁꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠ ꯑꯃꯒꯤ ꯅꯠꯇꯅꯥ ꯇꯝꯄꯥꯛꯀꯤꯅꯤ, ꯑꯃꯁꯨꯡ ꯃꯁꯤ ꯐꯤꯜ ꯇꯧꯔꯕ ꯃꯐꯝꯗ ꯀ꯭ꯂꯣꯖ 7.6.4-ꯒꯤ ꯃꯈꯥꯗ ꯃꯍꯨꯠ ꯁꯤꯟꯅꯩ (ꯁꯔꯨꯛ 7)꯫

ꯒꯦꯠ ꯂꯩꯕ ꯄꯥꯠ, ꯔꯤꯖꯔꯚꯣꯌꯔ ꯅꯠꯔꯒꯥ ꯄꯥꯠ ꯑꯁꯤ ꯃꯁꯤꯒꯤ ꯑꯣꯄꯔꯦꯇꯔꯗꯒꯤ ꯂꯧꯕ ꯒꯦꯠꯀꯤ ꯔꯨꯜꯒꯥ ꯂꯣꯌꯅꯅꯥ ꯃꯣꯗꯦꯜ ꯇꯧꯏ, ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 3.13-ꯒꯤ ꯃꯈꯥꯗ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯅꯠꯔꯒꯥ ꯅꯣꯇꯤꯐꯥꯏ ꯇꯧꯔꯕ ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜ ꯑꯃꯅꯥ ꯁꯄꯣꯔꯠ ꯇꯧꯔꯕ ꯃꯐꯝꯗ ꯈꯛꯇꯃꯛ ꯏꯁꯤꯡ ꯂꯩꯐꯝ ꯑꯃꯥ ꯂꯦꯚꯦꯜ ꯑꯁꯤꯁꯤꯡꯒꯤ ꯃꯈꯥꯗ ꯃꯣꯗꯦꯜ ꯇꯧꯏ꯫ ꯀ꯭ꯂꯣꯖ 3.13.5(a)-ꯒꯤ 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕꯒꯤ ꯋꯤꯟꯗꯣ ꯑꯁꯤ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ ꯑꯃꯁꯨꯡ ꯃꯦꯅꯨꯌꯦꯜꯒꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯅꯤ꯫ ꯃꯁꯤ ꯈꯥ-ꯅꯣꯡꯆꯨꯞꯀꯤ ꯃꯣꯟꯁꯨꯟꯒꯥ ꯅꯠꯇꯅꯥ 1 ꯑꯦꯞꯔꯤꯜꯗ ꯍꯧꯏ, ꯃꯗꯨꯒꯤ ꯏꯝꯐꯥꯜꯗ ꯃꯍꯧꯁꯥꯒꯤ ꯍꯧꯔꯛꯐꯝ 5 ꯖꯨꯟꯅꯤ (ꯃꯃꯥꯡꯗ 1 ꯖꯨꯟ; 2020-ꯗꯒꯤ ꯁꯤꯖꯤꯟꯅꯔꯤꯕ IMD-ꯒꯤ ꯅꯣꯔꯃꯦꯜꯁꯤꯡ, IMD-ꯒꯤ ꯄ꯭ꯔꯦꯁ ꯔꯤꯂꯤꯖꯗ ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ), ꯃꯔꯝꯗꯤ ꯑꯦꯞꯔꯤꯜ ꯑꯃꯁꯨꯡ ꯃꯦꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯑꯁꯤ ꯁ꯭ꯇꯦꯠꯀꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕꯁꯤꯡꯒꯤ ꯃꯅꯨꯡꯗ ꯂꯩ: ꯑꯦꯞꯔꯤꯜ ꯑꯃꯁꯨꯡ ꯃꯦꯒꯤꯗꯃꯛ ꯏꯝꯐꯥꯜꯒꯤ ꯄꯨꯡ 24-ꯒꯤ ꯔꯦꯀꯣꯔꯗꯁꯤꯡ 105.9 mm (16 ꯑꯦꯞꯔꯤꯜ 2004) ꯑꯃꯁꯨꯡ 122.4 mm (27 ꯃꯦ 1956)-ꯅꯤ, ꯊꯥ ꯑꯣꯏꯅꯥ 459.6 mm (ꯑꯦꯞꯔꯤꯜ 2004) ꯑꯃꯁꯨꯡ 464.3 mm (ꯃꯦ 1956) (IMD Extremes, Imphal (Tulihal)); ꯅꯛꯇꯕꯤꯒꯤ ꯃꯥꯡꯍꯟ ꯇꯥꯛꯍꯟꯈꯤꯕ ꯇꯝꯄꯥꯛꯀꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯁꯤꯡꯒꯤ ꯃꯅꯨꯡꯗ ꯑꯅꯤ, 28–31 ꯃꯦ 2024-ꯒꯤ ꯁꯥꯏꯛꯂꯣꯟ ꯔꯦꯃꯥꯜ (Cyclone Remal)-ꯒꯤ ꯑꯃꯁꯨꯡ 30 ꯃꯦ–2 ꯖꯨꯟ 2025-ꯒꯤ, ꯍꯧꯔꯛꯐꯝꯒꯤ ꯃꯃꯥꯡꯗ ꯂꯥꯛꯈꯤ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ); ꯑꯃꯁꯨꯡ ꯍꯧꯔꯛꯐꯝꯁꯤꯡꯅꯥ "ꯃꯥꯔꯆꯗꯒꯤ ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯀꯟꯅꯥ ꯆꯨꯕ ꯅꯣꯡ" ("intense rains from March to October") (AIIB) ꯑꯃꯁꯨꯡ "ꯑꯦꯞꯔꯤꯜꯒꯤ ꯑꯔꯣꯏꯕꯗꯒꯤ ꯍꯧꯕ" ("starts from the month of April end") ꯅꯣꯡ ꯆꯨꯕ (CGWB, Bishnupur) ꯇꯥꯀꯏ꯫ ꯃꯣꯟꯁꯨꯟꯅꯥ ꯏꯝꯐꯥꯜꯗꯒꯤ ꯃꯍꯧꯁꯥꯅꯥ ꯂꯥꯄꯊꯣꯀꯄ ꯑꯁꯤ 15 ꯑꯣꯛꯇꯣꯕꯔꯅꯤ (ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ) ꯑꯃꯁꯨꯡ ꯑꯣꯛꯇꯣꯕꯔꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯑꯁꯤ ꯑꯁꯦꯡꯕ ꯈꯨꯗꯣꯡꯊꯤꯕꯥ ꯑꯃꯅꯤ, ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ 5 ꯑꯣꯛꯇꯣꯕꯔ 1980-ꯒꯤ 119.4 mm ꯑꯃꯁꯨꯡ ꯑꯣꯛꯇꯣꯕꯔ 1992-ꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎ (IMD Extremes; MASTEC), ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯃꯁꯤ 31 ꯑꯣꯛꯇꯣꯕꯔꯗ ꯂꯣꯏ꯫ ꯄꯝꯞ, ꯒꯦꯠ ꯑꯃꯁꯨꯡ ꯁ꯭ꯀ꯭ꯔꯤꯟꯁꯤꯡ 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯁ꯭ꯇꯦꯟꯗꯕꯥꯏꯗ ꯂꯩꯏ (ꯁꯔꯨꯛ 10)꯫


3.13 ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ

3.13.1 ꯀꯗꯥꯏꯗ ꯃꯊꯧ ꯇꯥꯕꯒꯦ. ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁꯀꯥ ꯂꯣꯌꯅꯅꯥ, ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯑꯁꯤ ꯃꯈꯥꯒꯤꯁꯤꯡꯒꯤꯗꯃꯛ ꯇꯧꯒꯗꯕꯅꯤ:

  • (a) 25 km²-ꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯄ ꯔꯤꯖꯅꯦꯜ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡ; ꯑꯃꯁꯨꯡ
  • (b) ꯗꯤꯖꯥꯏꯟꯗ ꯃꯁꯤꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯊꯤꯡꯂꯤꯕ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯀꯦꯁ꯭ꯀꯦꯗ ꯑꯃꯥ ꯌꯥꯎꯕ ꯁꯤꯁ꯭ꯇꯦꯝ ꯑꯃꯍꯦꯛꯇꯗꯤ (ꯁꯔꯨꯛ 7)꯫

ꯍꯧꯔꯛꯐꯝꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯂꯦꯚꯦꯜꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯂꯦꯞꯊꯣꯀꯄ ꯐꯦꯁꯤꯂꯤꯇꯤ ꯑꯃꯍꯦꯛꯇꯒꯤꯗꯃꯛ ꯑꯣꯊꯣꯔꯤꯇꯤꯅꯥ ꯃꯁꯤ ꯃꯊꯧ ꯇꯥꯍꯅꯕꯁꯨ ꯌꯥꯏ꯫

3.13.2 ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯏꯟꯄꯨꯠ.

  • (a) IMD ꯅꯠꯔꯒꯥ ꯀꯦꯆꯃꯦꯟꯠ ꯑꯗꯨ ꯎꯠꯄ ꯑꯇꯣꯞꯄ ꯑꯦꯞꯔꯨꯚ ꯇꯧꯔꯕ ꯔꯦꯀꯣꯔꯗꯤꯡ ꯒꯦꯖ ꯑꯃꯗꯒꯤ ꯐꯡꯕ ꯌꯥꯕ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯁꯥꯡꯕ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯔꯦꯀꯣꯔꯗ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫
  • (b) ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯗꯦꯇꯥ ꯆꯍꯤ 30-ꯗꯒꯤ ꯅꯦꯝꯂꯕꯗꯤ, ꯔꯦꯀꯣꯔꯗ ꯑꯁꯤ IMD-ꯒꯤ 0.25° ꯒ꯭ꯔꯤꯗ ꯇꯧꯔꯕ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯗꯦꯇꯥꯅꯥ ꯁꯥꯡꯍꯅꯒꯗꯕꯅꯤ꯫ ꯃꯄꯨꯡ ꯐꯥꯕ ꯒ꯭ꯔꯤꯗ ꯇꯧꯔꯕ ꯔꯦꯀꯣꯔꯗ (1901-ꯗꯒꯤ ꯍꯧꯖꯤꯛ ꯐꯥꯎꯕ) ꯁꯤꯖꯤꯟꯅꯕ ꯐꯩ; ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯅꯛꯇꯕꯤꯒꯤ ꯆꯍꯤ 30 ꯑꯗꯨ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯗꯦꯇꯥ ꯑꯁꯤ ꯁꯕꯃꯤꯇꯦꯜꯗ ꯇꯥꯀꯄ ꯊꯧꯑꯣꯡ ꯑꯃꯅꯥ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯑꯣꯏꯅꯥ ꯗꯤꯁꯑꯦꯒ꯭ꯔꯤꯒꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ ꯆꯞ ꯃꯥꯟꯅꯕ ꯆꯍꯤꯁꯤꯡꯒꯤꯗꯃꯛ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯒꯦꯖꯀꯥ ꯆꯦꯛ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯆꯠꯅꯕ ꯃꯐꯝꯗ ꯒ꯭ꯔꯤꯗ ꯚꯦꯜꯌꯨꯁꯤꯡ ꯀ꯭ꯂꯣꯖ 2.7.1-ꯒꯤ ꯃꯈꯥꯗ ꯄꯣꯏꯟꯠ ꯚꯦꯜꯌꯨꯁꯤꯡꯗ ꯍꯣꯡꯗꯣꯛꯀꯗꯕꯅꯤ꯫
  • (c) ꯇꯨꯡꯒꯤ-ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯔꯟ ꯑꯃꯅꯥ ꯔꯦꯀꯣꯔꯗ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.8-ꯒꯤ ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔꯁꯤꯡꯅꯥ ꯁ꯭ꯀꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.13.3 ꯃꯣꯗꯦꯜꯒꯤ ꯑꯌꯥꯎꯕ. ꯃꯣꯗꯦꯜ ꯑꯁꯤꯗ ꯏꯚꯦꯄꯣꯔꯦꯁꯟ (IMD ꯄꯦꯟ ꯏꯚꯦꯄꯣꯔꯦꯁꯟ ꯅꯠꯔꯒꯥ ꯃꯗꯨꯒꯥ ꯃꯥꯟꯅꯕ)-ꯒꯥ ꯂꯣꯌꯅꯕ ꯁꯣꯏꯜ-ꯃꯣꯏꯁꯆꯔ ꯑꯦꯀꯥꯎꯟꯇꯤꯡ, ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡ ꯅꯠꯔꯒꯥ ꯕꯦꯖ ꯐ꯭ꯂꯣ, ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜ ꯑꯃꯁꯨꯡ ꯏꯔꯤꯒꯦꯁꯟ ꯂꯧꯊꯣꯀꯄꯒꯥ ꯂꯣꯌꯅꯕ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ, ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 5-ꯒꯤ ꯇꯦꯜꯋꯥꯇꯔ ꯁꯤꯔꯤꯖ (ꯀꯣꯁ꯭ꯇꯦꯜ ꯑꯥꯎꯠꯐꯣꯜꯁꯤꯡꯒꯤꯗꯃꯛ ꯄ꯭ꯔꯤꯗꯤꯛꯠ ꯇꯧꯔꯕ ꯇꯥꯏꯗꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯁꯔꯖ ꯑꯦꯂꯥꯎꯑꯦꯟꯁ) ꯌꯥꯎꯒꯗꯕꯅꯤ꯫

3.13.4 ꯃꯍꯩꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯕ. ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜ, ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯁꯨꯡ ꯚꯣꯂꯨꯝꯒꯤ ꯆꯍꯤ ꯈꯨꯗꯤꯡꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯐꯣꯜ ꯊꯤꯡꯂꯕꯒꯤ ꯗ꯭ꯌꯨꯔꯦꯁꯟ, ꯂꯧꯊꯣꯛꯇꯨꯅꯥ ꯐ꯭ꯔꯤꯀ꯭ꯋꯦꯟꯁꯤ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁꯅꯥ ꯐꯤꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯃꯍꯩꯁꯤꯡ ꯑꯁꯤ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯃꯍꯩꯁꯤꯡꯒꯥ ꯆꯥꯡꯗꯝꯅꯒꯗꯕꯅꯤ꯫ AEP ꯈꯨꯗꯤꯡꯃꯛꯇ ꯍꯦꯟꯅꯥ ꯀꯟꯕ ꯃꯍꯩ ꯑꯗꯨꯅꯥ ꯂꯦꯞꯊꯣꯀꯏ꯫ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯔꯦꯀꯣꯔꯗ ꯑꯁꯤ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯗꯦꯇꯥꯗꯒꯤ ꯗꯤꯁꯑꯦꯒ꯭ꯔꯤꯒꯦꯠ ꯇꯧꯔꯕ ꯃꯐꯝꯗ, ꯅꯨꯃꯤꯠ ꯑꯃꯗꯒꯤ ꯅꯦꯝꯕ ꯔꯦꯁ꯭ꯄꯣꯟꯁ ꯇꯥꯏꯝ ꯂꯩꯕ ꯈꯣꯡꯕꯥꯟ ꯑꯃꯁꯨꯡ ꯆꯦꯅꯦꯜꯁꯤꯡꯒꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣꯁꯤꯡ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁꯇꯒꯤ ꯂꯧꯒꯗꯕꯅꯤ, ꯃꯔꯝꯗꯤ ꯗꯤꯁꯑꯦꯒ꯭ꯔꯤꯒꯦꯠ ꯇꯧꯔꯕ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯄꯤꯛꯁꯤꯡ ꯑꯁꯤ ꯁꯤꯟꯊꯦꯇꯤꯛꯅꯤ꯫

3.13.5 ꯈꯣꯡꯊꯥꯡ ꯑꯅꯤꯒꯤ ꯑꯦꯞꯔꯣꯆ. ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟꯅꯥ ꯃꯄꯨꯡ ꯐꯥꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜ ꯁꯤꯖꯤꯟꯅꯒꯗꯕ ꯅꯠꯇꯦ꯫ ꯃꯁꯤꯅꯥ 3.13.3-ꯒꯤ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯣꯏꯁꯆꯔ, ꯂꯩꯃꯥꯏꯒꯤ ꯃꯈꯥꯒꯤ ꯏꯁꯤꯡ, ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ, ꯑꯣꯄꯔꯦꯇꯤꯡ ꯔꯨꯜꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯇꯦꯜꯋꯥꯇꯔ ꯎꯠꯄ, ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡ ꯅꯠꯔꯒꯥ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯁ꯭ꯇꯦꯞ ꯑꯃꯗ ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯣꯗꯦꯜ ꯑꯃꯥ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯏ꯫ ꯃꯗꯨꯒꯤ ꯃꯍꯩꯁꯤꯡ ꯑꯗꯨꯗꯒꯤ ꯃꯄꯨꯡ ꯐꯥꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜꯒꯤ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝ ꯔꯟꯁꯤꯡꯗ ꯃꯈꯥꯒꯤ ꯑꯣꯏꯅꯥ ꯄꯤꯒꯗꯕꯅꯤ:

  • (a) ꯄꯨꯈ꯭ꯔꯤ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ, ꯔꯦꯀꯣꯔꯗ ꯄꯨꯝꯅꯃꯛꯇ 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯅꯨꯃꯤꯠꯁꯤꯡꯒꯤ 10%-ꯗ ꯍꯦꯟꯕ ꯂꯦꯚꯦꯜ ꯑꯣꯏꯅꯥ ꯂꯧꯕ; ꯑꯃꯁꯨꯡ
  • (b) ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯁꯣꯏꯜ-ꯃꯣꯏꯁꯆꯔ ꯀꯟꯗꯤꯁꯟ, ꯅꯨꯃꯤꯠ ꯑꯗꯨꯁꯤꯡꯗꯒꯤꯃꯛ ꯂꯧꯕ ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 3.8-ꯒꯤ AMC ꯔꯨꯜꯒꯥ ꯆꯥꯡꯗꯝꯅꯕ꯫

ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯃꯣꯗꯦꯜꯅꯥ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯔꯦꯀꯣꯔꯗ ꯇꯧꯔꯕ ꯏꯚꯦꯟꯠ ꯑꯃꯒꯤꯗꯃꯛ ꯃꯄꯨꯡ ꯐꯥꯕ ꯃꯣꯗꯦꯜꯒꯤ ꯋꯥꯇꯔ ꯕꯦꯂꯦꯟꯁ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯄꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯀꯗꯕꯅꯤ꯫

ꯈꯣꯡꯊꯥꯡ ꯑꯅꯤꯒꯤ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ: ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ ꯊꯝꯕ (ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯁ꯭ꯀꯦꯜ ꯃꯇꯨꯡ ꯏꯟꯅ ꯅꯠꯇꯦ) ꯈꯣꯡꯊꯥꯡ ꯑꯅꯤꯒꯤ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ: ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ ꯊꯝꯕ (ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯁ꯭ꯀꯦꯜ ꯃꯇꯨꯡ ꯏꯟꯅ ꯅꯠꯇꯦ) ꯈꯣꯡꯊꯥꯡ 1 — ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯣꯗꯦꯜ ꯑꯃꯒꯥ ꯂꯣꯌꯅꯕ ꯁꯥꯡꯕ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯔꯟ (ꯅꯨꯃꯤꯠ ꯅꯠꯔꯒꯥ ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯁ꯭ꯇꯦꯞ) ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯔꯦꯀꯣꯔꯗ: ꯄꯨꯡ ꯈꯨꯗꯤꯡꯒꯤ ꯒꯦꯖ, IMD 0.25° ꯒ꯭ꯔꯤꯗ ꯇꯧꯔꯕ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯗꯦꯇꯥꯅꯥ ꯁꯥꯡꯍꯜꯂꯕ (ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯆꯍꯤ 30; ꯃꯄꯨꯡ ꯐꯥꯕ ꯔꯦꯀꯣꯔꯗ ꯍꯦꯟꯅꯥ ꯐꯩ) ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜ ꯆꯍꯤ 1 ꯆꯍꯤ 2 ꯆꯍꯤ 3 ꯆꯍꯤ 4 ꯆꯍꯤ 5 ꯆꯍꯤ n ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝ FTL (ꯁꯔꯞꯂꯁ ꯋꯤꯌꯔꯒꯤ ꯀ꯭ꯔꯦꯁ꯭ꯠ) 0 10 50 100 ꯂꯦꯚꯦꯜ ꯍꯦꯟꯈꯤꯕ ꯅꯨꯃꯤꯠꯁꯤꯡꯒꯤ % ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯒꯤ ꯅꯨꯃꯤꯠ ꯄꯨꯝꯅꯃꯛꯀꯤ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜꯁꯤꯡ, ꯔꯦꯉ꯭ꯛ ꯇꯧꯔꯕ L10 L10 = ꯔꯦꯀꯣꯔꯗ ꯄꯨꯝꯕꯗ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯒꯤ ꯅꯨꯃꯤꯠꯁꯤꯡꯒꯤ 10%-ꯗ ꯍꯦꯟꯕ ꯂꯦꯚꯦꯜ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝ ꯔꯟꯁꯤꯡꯗ ꯄꯤꯕ (ꯀ꯭ꯂꯣꯖ 3.13.5): (a) ꯄꯨꯈ꯭ꯔꯤ ꯈꯨꯗꯤꯡꯒꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ = L10; (b) ꯅꯨꯃꯤꯠ ꯑꯗꯨꯃꯛꯇꯒꯤ ꯑꯦꯟꯇꯤꯁꯤꯗꯦꯟꯠ ꯂꯩꯃꯥꯏꯒꯤ ꯃꯣꯏꯁꯆꯔ, AMC ꯔꯨꯜꯒꯥ ꯆꯥꯡꯗꯝꯅꯕ ꯈꯣꯡꯊꯥꯡ 2 — ꯃꯄꯨꯡ ꯐꯥꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜꯒꯤ ꯗꯤꯖꯥꯏꯟ-ꯁ꯭ꯇꯣꯔꯝ ꯔꯟ, L10-ꯗꯒꯤ ꯍꯧꯗꯨꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯒꯤ ꯍꯥꯏꯌꯦꯇꯣꯒ꯭ꯔꯥꯐ (ꯁꯔꯨꯛ 2) ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜ 0 12 24 36 48 60 72 ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯍꯧꯔꯛꯂꯒꯥ ꯃꯇꯝ (h) FTL (ꯁꯔꯞꯂꯁ ꯋꯤꯌꯔꯒꯤ ꯀ꯭ꯔꯦꯁ꯭ꯠ) ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜ, L10-ꯗ ꯍꯧꯏ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯌꯥꯑꯣꯗꯕ ꯗꯤꯐꯣꯜꯠ: FTL-ꯗ ꯍꯧꯏ (ꯀ꯭ꯂꯣꯖ 3.12.5) ꯄꯤꯛ ꯗꯤꯖꯥꯏꯟ ꯂꯦꯚꯦꯜ ꯆꯦꯛ: ꯔꯦꯀꯣꯔꯗ ꯇꯧꯔꯕ ꯏꯚꯦꯟꯠ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯑꯃꯒꯤꯗꯃꯛ ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯃꯣꯗꯦꯜꯅꯥ ꯃꯄꯨꯡ ꯐꯥꯕ ꯃꯣꯗꯦꯜꯒꯤ ꯋꯥꯇꯔ ꯕꯦꯂꯦꯟꯁ ꯑꯗꯨꯃꯛ ꯑꯣꯏꯅꯥ ꯎꯠꯂꯤ꯫

ꯃꯃꯤ 3.4 — ꯀ꯭ꯂꯣꯖ 3.13.5-ꯒꯤ ꯈꯣꯡꯊꯥꯡ ꯑꯅꯤꯒꯤ ꯑꯦꯞꯔꯣꯆ꯫ ꯈꯣꯡꯊꯥꯡ 1: ꯂꯥꯏꯊꯣꯛꯍꯟꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯃꯣꯗꯦꯜ ꯑꯃꯒꯥ ꯂꯣꯌꯅꯕ ꯁꯥꯡꯕ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯔꯟ ꯑꯃꯅꯥ 1 ꯑꯦꯞꯔꯤꯜꯗꯒꯤ 31 ꯑꯣꯛꯇꯣꯕꯔ ꯐꯥꯎꯕ ꯅꯨꯃꯤꯠꯁꯤꯡꯒꯤ 10%-ꯗ ꯍꯦꯟꯕ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯂꯦꯚꯦꯜ (L10) ꯄꯤ꯫ ꯈꯣꯡꯊꯥꯡ 2: ꯀ꯭ꯂꯣꯖ 3.12.5-ꯒꯤ FTL-ꯗ ꯗꯤꯐꯣꯜꯠ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯃꯍꯨꯠꯇ, ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯁꯤꯡ ꯃꯄꯨꯡ ꯐꯥꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜꯗ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜ ꯑꯗꯨꯗꯒꯤ ꯆꯂꯥꯏ꯫ ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ, ꯑꯁꯦꯡꯕ ꯗꯦꯇꯥ ꯅꯠꯇꯦ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯑꯅꯧꯅꯥ ꯁꯦꯝꯕ ꯗ꯭ꯔꯣꯏꯡ, ꯀ꯭ꯂꯣꯖ 3.13.5-ꯗ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕ ꯈꯣꯡꯊꯥꯡ ꯑꯅꯤꯒꯤ ꯑꯦꯞꯔꯣꯆ ꯑꯗꯨ ꯎꯠꯂꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯁꯤꯡꯅꯥ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯐꯤꯚꯝ ꯑꯃꯈꯛꯇ ꯂꯧꯏ, ꯑꯗꯨꯕꯨ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯀꯦꯁ꯭ꯀꯦꯗ ꯑꯃꯗ ꯂꯦꯞꯊꯣꯀꯄ ꯚꯦꯔꯤꯌꯦꯕꯜ ꯑꯗꯨꯗꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯂꯥꯀꯄ ꯃꯇꯝꯗ ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡ ꯀꯌꯥ ꯊꯟꯂꯕꯒꯦ ꯍꯥꯌꯕꯅꯤ, ꯃꯁꯤ ꯃꯗꯨꯒꯤ ꯃꯃꯥꯡꯒꯤ ꯍꯞꯇꯥ ꯀꯌꯥꯒꯤ ꯅꯣꯡꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏ꯫ ꯑꯁꯦꯡꯕ ꯑꯣꯟ-ꯁꯥꯏꯠ ꯗꯤꯇꯦꯟꯁꯟ ꯁꯤꯁ꯭ꯇꯦꯝ 20-ꯒꯤ ꯑꯣꯁ꯭ꯇ꯭ꯔꯦꯂꯤꯌꯥꯒꯤ ꯁ꯭ꯇꯗꯤ ꯑꯃꯅꯥ, ꯇꯦꯝꯄꯣꯔꯦꯜ ꯄꯦꯇꯔꯟ ꯑꯃꯗ, ꯅꯠꯔꯒꯥ ꯇꯔꯥꯒꯤ ꯑꯦꯟꯁꯦꯝꯕꯜ ꯑꯃꯗꯁꯨ, ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯗꯤꯖꯥꯏꯟꯁꯤꯡꯅꯥ ꯑꯁꯦꯡꯕ ꯅꯣꯡꯗ "ꯃꯇꯝ ꯄꯨꯝꯕꯗ ꯀꯥꯟꯅꯒꯅꯤ ꯍꯥꯌꯕ OSD ꯁꯤꯁ꯭ꯇꯦꯝꯒꯤ ꯗꯤꯖꯥꯏꯟ ꯑꯃꯥ ꯊꯥꯖꯕ ꯌꯥꯅꯥ ꯄꯤꯕ ꯉꯝꯗꯦ" ("cannot reliably produce an OSD system design that will always be effective") ꯍꯥꯌꯅꯥ ꯐꯡꯈꯤ, ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟꯅꯥ ꯌꯥꯝꯅꯥ ꯊꯣꯀꯄ ꯏꯚꯦꯟꯠꯁꯤꯡꯒꯤ ꯄꯤꯛꯁꯤꯡꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯂꯦꯚꯦꯜꯁꯤꯡꯗꯒꯤ ꯍꯦꯟꯏ ꯍꯥꯌꯅꯥ ꯎꯠꯈꯤ (Water Science and Engineering, 2019)꯫ 3.13.2(b)-ꯒꯤ ꯆꯍꯤ 30-ꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯅꯦꯝꯕ ꯑꯁꯤ ꯀ꯭ꯂꯣꯖ 2.3.2-ꯒꯤ ꯁ꯭ꯇꯦꯁꯟ IDF ꯔꯨꯜꯒꯥ ꯃꯥꯟꯅꯩ; ꯍꯦꯟꯅꯥ ꯁꯥꯡꯕ ꯔꯦꯀꯣꯔꯗ ꯑꯃꯥ ꯍꯦꯟꯅꯥ ꯐꯩ, ꯑꯃꯁꯨꯡ 1901-ꯗ ꯍꯧꯕ IMD-ꯒꯤ ꯒ꯭ꯔꯤꯗ ꯇꯧꯔꯕ ꯅꯨꯃꯤꯠ ꯈꯨꯗꯤꯡꯒꯤ ꯔꯦꯀꯣꯔꯗ ꯑꯁꯤ ꯃꯅꯤꯄꯨꯔꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯕ ꯌꯥꯕ ꯁꯥꯡꯕ ꯁꯤꯔꯤꯖꯅꯤ꯫ ꯔꯦꯀꯣꯔꯗꯀꯤ ꯁꯥꯡꯕ ꯑꯁꯤ ꯁꯤꯃꯨꯂꯦꯁꯟ ꯑꯁꯤ ꯀꯔꯤꯒꯤꯗꯃꯛꯇꯒꯦ ꯍꯥꯌꯕꯗꯒꯤ ꯍꯦꯟꯅꯥ ꯃꯔꯨꯑꯣꯏꯗꯦ꯫ ꯃꯐꯝ ꯑꯁꯤꯗ ꯃꯁꯤꯒꯤ ꯃꯔꯨꯑꯣꯏꯕ ꯄꯥꯟꯗꯝ ꯑꯁꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯃꯇꯝꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯃꯥ ꯂꯥꯀꯄ ꯃꯇꯝꯗ ꯄꯨꯈ꯭ꯔꯤ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯥꯏꯁꯤꯡ ꯃꯍꯧꯁꯥꯅꯥ ꯀꯌꯥ ꯊꯟꯂꯤꯕꯒꯦ, ꯑꯃꯁꯨꯡ ꯑꯆꯧꯕ ꯅꯣꯡ ꯑꯁꯤ ꯊꯤꯡꯂꯕ ꯑꯥꯎꯠꯐꯣꯜ ꯑꯃꯒꯥ ꯀꯌꯥ ꯌꯥꯝꯅꯥ ꯆꯥꯟꯅꯕꯒꯦ ꯍꯥꯌꯕ ꯊꯤꯕꯅꯤ꯫ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯑꯃꯅꯥ ꯍꯛꯊꯦꯡ ꯑꯃꯠꯇꯒꯤ ꯄꯥꯎꯈꯨꯝ ꯄꯤꯕ ꯉꯝꯗꯦ, ꯃꯔꯝꯗꯤ ꯃꯁꯤ ꯂꯧꯈꯤꯕ ꯐꯤꯚꯝ ꯑꯃꯈꯛꯇꯗꯒꯤ ꯍꯧꯏ꯫ ꯃꯁꯤ ꯁꯍꯔꯒꯤ ꯈꯣꯡꯕꯥꯟꯁꯤꯡꯒꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣꯒꯤꯗꯃꯛ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯁꯤꯡꯒꯤ ꯃꯍꯨꯠ ꯁꯤꯟꯅꯕ ꯅꯠꯇꯦ꯫ ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯀ꯭ꯂꯣꯖ 3.13.5-ꯅꯥ ꯁꯥꯡꯕ ꯔꯟ ꯑꯁꯤ ꯃꯤꯅꯠ ꯈꯔꯗ ꯂꯣꯏꯕ ꯂꯥꯏꯕ ꯁ꯭ꯇꯣꯔꯦꯖ ꯃꯣꯗꯦꯜ ꯑꯃꯅꯥ ꯇꯧꯕ ꯌꯥꯍꯜꯂꯤ, ꯑꯃꯁꯨꯡ ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯍꯧꯔꯛꯐꯝꯒꯤ ꯂꯦꯚꯦꯜꯁꯤꯡ ꯑꯁꯤ ꯗꯤꯇꯦꯜ ꯍꯥꯏꯗ꯭ꯔꯣꯂꯤꯛ ꯃꯣꯗꯦꯜꯗ ꯄꯤ, ꯃꯗꯨ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯈꯛꯇꯃꯛ ꯆꯂꯥꯏ꯫ ꯗꯤꯇꯦꯜ 1D–2D ꯁꯤꯇꯤ ꯃꯣꯗꯦꯜ ꯑꯃꯥ ꯆꯍꯤ ꯇꯔꯥ ꯀꯌꯥꯒꯤꯗꯃꯛ ꯃꯈꯥ ꯆꯠꯅꯕ ꯆꯂꯥꯏꯕ ꯑꯁꯤ ꯌꯥꯝꯅꯥ ꯅꯦꯝꯅꯥ ꯌꯥꯏ ꯑꯃꯁꯨꯡ ꯃꯊꯧ ꯇꯥꯗꯦ꯫ 3.13.5(a)-ꯒꯤ 10% ꯑꯦꯛꯁꯤꯗꯦꯟꯁ ꯂꯦꯚꯦꯜ ꯑꯁꯤ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ: ꯃꯁꯤꯅꯥ ꯏꯁꯤꯡ ꯌꯥꯝꯕ ꯑꯗꯨꯕꯨ ꯑꯈꯟꯅꯕ ꯅꯠꯇꯕ ꯃꯣꯟꯁꯨꯟ ꯑꯃꯥ ꯎꯠꯂꯤ, ꯃꯔꯝ ꯑꯗꯨꯅꯥ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯑꯁꯤ ꯍꯥꯟꯅꯅꯥ ꯐꯅꯥ ꯊꯟꯂꯕ ꯄꯨꯈ꯭ꯔꯤꯁꯤꯡꯗ ꯂꯥꯀꯏ, ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯗ ꯊꯣꯛꯈꯤꯕꯒꯨꯝꯅꯥ, ꯃꯇꯝ ꯑꯗꯨꯗ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯗ ꯃꯅꯤꯄꯨꯔ ꯇꯨꯔꯦꯜ ꯑꯁꯤ 770.05 m-ꯗ ꯂꯩꯈꯤ, ꯃꯁꯤꯒꯤ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜ 769.320 m-ꯒꯤ ꯃꯊꯛꯇ, ꯑꯃꯁꯨꯡ ꯂꯤꯂꯣꯡꯗ ꯏꯝꯐꯥꯜ 783.250 m-ꯗ, ꯃꯁꯤꯒꯤ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ 782.850 m-ꯒꯤ ꯃꯊꯛꯇ (WRD-ꯒꯤ ꯃꯁꯤꯡꯁꯤꯡ, ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫


3.14 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕꯒꯤ ꯄ꯭ꯔꯣꯁꯤꯖꯔ

3.14.1 ꯀ꯭ꯂꯣꯖ 2.11 ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 4-ꯅꯥ ꯃꯊꯧ ꯇꯥꯕ ꯆꯥꯡꯗꯝꯅꯕ ꯑꯁꯤ ꯃꯈꯥꯒꯤ ꯈꯣꯡꯊꯥꯡꯁꯤꯡꯅꯥ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯃꯍꯩꯁꯤꯡ ꯐꯣꯔꯝ 3-2-ꯗ ꯔꯦꯀꯣꯔꯗ ꯇꯧꯒꯗꯕꯅꯤ꯫

2026-10-31T09:51:23.621054 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ ꯃꯇꯝ (ꯁꯤꯅꯥꯔꯤꯑꯣ ꯑꯅꯤꯃꯛꯀꯤꯗꯃꯛ ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯑꯗꯨꯃꯛ) ꯗꯤꯁꯆꯥꯔꯖ 0.9 × Q_pre (ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯀꯦꯞ, ꯀ꯭ꯂꯣꯖ 2.11.2) Q_pre Q_post (ꯀꯟꯇ꯭ꯔꯣꯜ ꯇꯧꯗꯕ): ꯍꯦꯟꯅꯥ ꯋꯥꯡꯕ ꯑꯃꯁꯨꯡ ꯍꯦꯟꯅꯥ ꯊꯨꯅꯥ ꯂꯥꯛꯄ ꯄꯤꯛ ꯁ꯭ꯇꯣꯔꯦꯖ ꯚꯣꯂꯨꯝ ꯔꯥꯎꯠ ꯇꯧꯔꯕ ꯄꯤꯛ ≤ ꯀꯦꯞ; ꯚꯣꯂꯨꯝ ꯑꯁꯤ ꯍꯦꯟꯅꯥ ꯁꯥꯡꯕ ꯃꯇꯝꯗ ꯊꯥꯗꯣꯀꯏ (ꯗ꯭ꯔꯣꯗꯥꯎꯟ, ꯁꯔꯨꯛ 4) ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ (ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ, ꯀ꯭ꯂꯣꯖ 3.3.2) ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡ, ꯀꯟꯇ꯭ꯔꯣꯜ ꯂꯩꯇꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡ, ꯁ꯭ꯇꯣꯔꯦꯖꯗꯒꯤ ꯔꯥꯎꯠ ꯇꯧꯔꯕ

ꯃꯃꯤ 3.5 — ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝ ꯑꯗꯨꯃꯛꯀꯤꯗꯃꯛ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ, ꯀꯟꯇ꯭ꯔꯣꯜ ꯇꯧꯗꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯑꯃꯁꯨꯡ ꯔꯥꯎꯠ ꯇꯧꯔꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯤꯡ꯫ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯑꯅꯧꯅꯥ ꯁꯦꯝꯕ ꯗ꯭ꯔꯣꯏꯡ, CPHEEO, Manual on Storm Water Drainage Systems, Part A §8.5, 2019, ꯑꯃꯁꯨꯡ KC Metro APWA Section 5600, 2025.01-ꯗ ꯂꯩꯕ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯗꯤꯇꯦꯟꯁꯟ ꯀꯟꯁꯦꯞꯠꯇꯒꯤ ꯍꯣꯡꯗꯣꯛꯂꯒꯥ ꯂꯧꯈꯤꯕ꯫ ꯁ꯭ꯀꯤꯃꯦꯇꯤꯛ꯫ ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯈꯛꯇꯅꯤ — ꯗꯤꯖꯥꯏꯟ ꯚꯦꯜꯌꯨ ꯅꯠꯇꯦ꯫

3.14.2 ꯈꯣꯡꯊꯥꯡ 1 — ꯁꯥꯏꯠ, ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯄꯣꯏꯟꯠ ꯑꯣꯐ ꯀꯝꯄꯦꯔꯤꯁꯟꯁꯤꯡ ꯂꯦꯞꯊꯣꯀꯄ.

  • (a) ꯁꯔꯚꯦꯗꯒꯤ ꯁꯥꯏꯠ ꯑꯃꯁꯨꯡ ꯃꯗꯨꯗ ꯏꯁꯤꯡ ꯆꯦꯟꯊꯔꯛꯄ ꯂꯝ ꯈꯨꯗꯤꯡꯃꯛ ꯈꯥꯌꯗꯣꯛꯀꯗꯕꯅꯤ꯫
  • (b) ꯔꯟꯑꯣꯐꯅꯥ ꯁꯥꯏꯠ ꯊꯥꯗꯣꯛꯄ POC ꯈꯨꯗꯤꯡꯃꯛ ꯈꯡꯗꯣꯛꯀꯗꯕꯅꯤ꯫ POC ꯈꯨꯗꯤꯡꯃꯛ ꯇꯣꯉꯥꯟꯅꯥ ꯇꯦꯁ꯭ꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯟ ꯃꯄꯨꯡ ꯐꯥꯍꯟꯅꯕ ꯔꯟꯑꯣꯐ ꯑꯁꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯑꯃꯗꯒꯤ ꯑꯃꯗ ꯂꯝꯕꯤ ꯍꯣꯡꯗꯣꯛꯔꯣꯏꯗꯕꯅꯤ꯫
  • (c) ꯁꯥꯏꯠꯀꯤ ꯃꯄꯥꯟꯗꯒꯤ ꯂꯥꯀꯄ ꯔꯟ-ꯑꯣꯟ ꯑꯁꯤ ꯔꯟ ꯑꯅꯤꯃꯛꯇ ꯃꯍꯧꯖꯤꯛꯀꯤ ꯐꯤꯚꯝꯗ ꯃꯑꯣꯡ ꯑꯃꯈꯛꯇꯗ ꯃꯣꯗꯦꯜ ꯇꯧꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.3.5(b))꯫ ꯃꯁꯤ ꯁꯥꯏꯠꯀꯤ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯆꯠꯂꯕꯗꯤ, ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯟ ꯑꯁꯤ POC-ꯗ ꯂꯩꯕ ꯄꯨꯝꯅꯃꯛ ꯑꯥꯎꯠꯐ꯭ꯂꯣꯗ ꯆꯠꯂꯤ꯫

3.14.3 ꯈꯣꯡꯊꯥꯡ 2 — ꯂꯩꯃꯥꯏꯁꯤꯡ. HSG ꯃꯦꯞ ꯇꯧꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.7), ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ-ꯇꯦꯕꯜꯒꯤ ꯔꯨꯜ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.10.1) ꯑꯃꯁꯨꯡ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯇꯦꯁ꯭ꯠꯁꯤꯡ ꯔꯦꯀꯣꯔꯗ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.14.4 ꯈꯣꯡꯊꯥꯡ 3 — ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯃꯣꯗꯦꯜ. ꯀ꯭ꯂꯣꯖ 3.3.2 ꯃꯇꯨꯡ ꯏꯟꯅ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯃꯣꯗꯦꯜ ꯁꯦꯝꯒꯗꯕꯅꯤ: ꯒ꯭ꯔꯤꯟꯐꯤꯜꯗ CN (ꯇꯦꯕꯜ 3.5), Tc (ꯀ꯭ꯂꯣꯖ 3.6, n = 0.15-ꯒꯥ ꯂꯣꯌꯅꯅꯥ), ꯑꯃꯁꯨꯡ ꯍꯧꯖꯤꯛ ꯂꯩꯔꯤꯕ ꯏꯁꯤꯡ ꯂꯩꯐꯝ ꯑꯃꯁꯨꯡ ꯆꯦꯅꯦꯜꯁꯤꯡ꯫ AMC II ꯑꯃꯁꯨꯡ AMC III-ꯗ CN ꯀꯦꯜꯀꯨꯂꯦꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.14.5 ꯈꯣꯡꯊꯥꯡ 4 — ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯃꯣꯗꯦꯜ. ꯀ꯭ꯂꯣꯖ 3.3.3 ꯃꯇꯨꯡ ꯏꯟꯅ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯃꯣꯗꯦꯜ ꯁꯦꯝꯒꯗꯕꯅꯤ: ꯃꯦꯖꯔ ꯇꯧꯔꯕ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝꯁꯤꯡ, ꯀꯅꯦꯛꯇꯤꯚꯤꯇꯤ (ꯀ꯭ꯂꯣꯖ 3.9), ꯁꯣꯛꯍꯜꯂꯕ ꯂꯩꯃꯥꯏꯒꯤ HSG, CN, Tc, ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯣꯏꯅꯥ ꯄ꯭ꯔꯄꯣꯖ ꯇꯧꯔꯕ ꯔꯤꯇꯦꯟꯁꯟ, ꯗꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯂꯦꯠꯁꯤꯡ (ꯀ꯭ꯂꯣꯖ 3.12.1)꯫

3.14.6 ꯈꯣꯡꯊꯥꯡ 5 — ꯗꯤꯖꯥꯏꯟ ꯁ꯭ꯇꯣꯔꯝꯁꯤꯡ. ꯁꯔꯨꯛ 2-ꯗꯒꯤ, ꯃꯊꯧ ꯇꯥꯕ AEP ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ (50%, 10% ꯑꯃꯁꯨꯡ 1%; ꯆꯍꯤ 2-, 10- ꯑꯃꯁꯨꯡ 100) ꯑꯃꯁꯨꯡ {1, 2, 3, 6, 12, 24, 48, 72 h}-ꯗ ꯂꯩꯕ ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ ꯃꯈꯥꯒꯤꯁꯤꯡ ꯁꯦꯝ ꯁꯥꯒꯗꯕꯅꯤ:

  • ꯀ꯭ꯂꯥꯏꯃꯦꯠ ꯐꯦꯛꯇꯔꯒꯥ ꯂꯣꯌꯅꯕ ꯗꯦꯞꯊ (ꯀ꯭ꯂꯣꯖ 2.8), ꯁꯥꯏꯠꯀꯤꯗꯃꯛ ARF = 1.0 (ꯀ꯭ꯂꯣꯖ 2.7.4);
  • ꯍꯥꯏꯌꯦꯇꯣꯒ꯭ꯔꯥꯐ (ꯀ꯭ꯂꯣꯖ 2.9); ꯑꯃꯁꯨꯡ
  • AMC (ꯀ꯭ꯂꯣꯖ 2.11.4)꯫

ꯔꯟ ꯑꯅꯤꯃꯛꯇ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯑꯗꯨꯃꯛ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 2.11.1)꯫

3.14.7 ꯈꯣꯡꯊꯥꯡ 6 — ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯃꯣꯗꯦꯜ ꯆꯂꯥꯏꯕ, ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ, ꯑꯃꯁꯨꯡ Q_pre(T, d) ꯇꯦꯕꯨꯂꯦꯠ ꯇꯧꯕ꯫ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯗ ꯁꯦꯟꯁꯤꯇꯤꯚ ꯑꯣꯏꯕ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤꯗꯃꯛ, ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯄꯨꯝꯅꯃꯛꯇ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕ 10% AEP-ꯒꯤ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ ꯄꯤꯛ ꯈꯡꯗꯣꯛꯀꯗꯕꯅꯤ; ꯚꯦꯜꯌꯨ ꯑꯗꯨ ꯀ꯭ꯂꯣꯖ 2.11.3-ꯒꯤ ꯀꯦꯞ ꯑꯗꯨꯅꯤ꯫

3.14.8 ꯈꯣꯡꯊꯥꯡ 7 — ꯀꯟꯇ꯭ꯔꯣꯜ ꯌꯥꯑꯣꯗꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯃꯣꯗꯦꯜ ꯆꯂꯥꯏꯕ ꯑꯃꯁꯨꯡ Q_post(T, d) ꯑꯃꯁꯨꯡ ꯔꯟꯑꯣꯐ ꯚꯣꯂꯨꯝꯁꯤꯡ ꯇꯦꯕꯨꯂꯦꯠ ꯇꯧꯕ꯫ ꯃꯁꯤꯅꯥ ꯁꯃꯁ꯭ꯌꯥꯒꯤ ꯆꯥꯡ ꯎꯠꯂꯤ ꯑꯃꯁꯨꯡ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯏ, ꯇꯦꯁ꯭ꯠ ꯇꯧꯗꯦ꯫

3.14.9 ꯈꯣꯡꯊꯥꯡ 8 — ꯔꯤꯇꯦꯟꯁꯟ ꯑꯃꯁꯨꯡ ꯗꯤꯇꯦꯟꯁꯟ ꯍꯥꯄꯆꯤꯟꯕ.

  • (a) ꯁꯔꯨꯛ 4-ꯒꯤ ꯔꯤꯇꯦꯟꯁꯟ ꯚꯣꯂꯨꯝ ꯑꯁꯤ ꯁꯔꯨꯛ 4-ꯒꯤ ꯃꯈꯥꯗ ꯆꯦꯛ ꯇꯧꯔꯕ ꯗ꯭ꯌꯨꯔꯦꯁꯟꯒꯤ ꯃꯅꯨꯡꯗ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯅꯠꯔꯒꯥ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯁꯤꯖꯤꯟꯅꯕꯗ ꯃꯥꯡꯈꯤꯕ (POC-ꯗ ꯊꯥꯗꯣꯛꯇꯕ) ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯣꯏꯅꯥ ꯎꯠꯀꯗꯕꯅꯤ꯫
  • (b) ꯂꯦꯃꯍꯧꯔꯤꯕ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯑꯗꯨ ꯗꯤꯇꯦꯟꯁꯟ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯂꯦꯠꯁꯤꯡꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯔꯥꯎꯠ ꯇꯧꯒꯗꯕꯅꯤ (ꯀ꯭ꯂꯣꯖ 3.12.1)꯫
  • (c) ꯑꯥꯎꯠꯐꯣꯜ ꯑꯁꯤ ꯇꯥꯏꯗꯦꯜ ꯑꯣꯏꯔꯕ ꯅꯠꯔꯒꯥ ꯕꯦꯛꯋꯥꯇꯔꯒꯤ ꯃꯈꯥꯗ ꯂꯩꯔꯕꯗꯤ, ꯀ꯭ꯂꯣꯖ 2.12-ꯒꯤ ꯖꯣꯏꯟꯠ ꯀꯦꯁꯁꯤꯡ ꯌꯥꯑꯣꯅꯥ ꯁꯔꯨꯛ 5-ꯒꯤ ꯇꯦꯜꯋꯥꯇꯔ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫
  • (d) ꯈꯣꯡꯊꯥꯡ 9 ꯃꯄꯨꯡ ꯐꯥꯕ ꯐꯥꯎꯕ ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯂꯦꯠꯁꯤꯡ ꯑꯦꯗꯖꯁ꯭ꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.14.10 ꯈꯣꯡꯊꯥꯡ 9 — ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯟ ꯇꯦꯁ꯭ꯠ ꯇꯧꯕ, POC ꯈꯨꯗꯤꯡꯃꯛꯇ, AEP ꯈꯨꯗꯤꯡꯃꯛ ꯑꯃꯁꯨꯡ ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ:

  • (a) ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡ: 50%, 10% ꯑꯃꯁꯨꯡ 1% AEP-ꯒꯤꯗꯃꯛ Q_post(T) ≤ 0.9 × Q_pre(T) (ꯀ꯭ꯂꯣꯖ 2.11.2);
  • (b) ꯏꯁꯤꯡ ꯏꯆꯥꯎꯗ ꯁꯦꯟꯁꯤꯇꯤꯚ ꯑꯣꯏꯕ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡ: Q_post(1% AEP) ≤ Q_pre(10% AEP), ꯑꯃꯁꯨꯡ Q_post(50% AEP) ≤ Q_pre(50% AEP) (ꯀ꯭ꯂꯣꯖ 2.11.3)꯫

ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤꯗꯃꯛ ꯂꯦꯞꯊꯣꯀꯄ ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯑꯁꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕ ꯁ꯭ꯇꯣꯔꯦꯖ ꯃꯊꯧ ꯇꯥꯕ ꯅꯠꯔꯒꯥ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜ ꯄꯤꯕ ꯑꯗꯨꯅꯤ; ꯄꯨꯡ 24, 48 ꯑꯃꯁꯨꯡ 72-ꯒꯤ ꯔꯟꯁꯤꯡ ꯃꯇꯝ ꯄꯨꯝꯕꯗ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯏ (ꯀ꯭ꯂꯣꯖ 2.5.2)꯫

3.14.11 ꯈꯣꯡꯊꯥꯡ 10 — ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯔꯟꯁꯤꯡ. ꯂꯦꯞꯊꯣꯀꯄ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡꯒꯤꯗꯃꯛ ꯈꯣꯡꯊꯥꯡ 6–9 ꯑꯁꯤ Ia = 0.05S-ꯒꯥ ꯂꯣꯌꯅꯅꯥ (ꯀ꯭ꯂꯣꯖ 3.8.5) ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯇꯧꯒꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ, ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ ꯑꯃꯥ ꯁꯤꯖꯤꯟꯅꯔꯕꯗꯤ, ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯐꯦꯛꯇꯔꯒꯥ ꯂꯣꯌꯅꯅꯥ (ꯀ꯭ꯂꯣꯖ 3.11.5)꯫ ꯄꯤꯛꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯃꯊꯧ ꯇꯥꯕ ꯁ꯭ꯇꯣꯔꯦꯖꯗ ꯑꯍꯣꯡꯕ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.14.12 ꯈꯣꯡꯊꯥꯡ 11 — ꯃꯔꯤ ꯂꯩꯅꯕ ꯆꯦꯛꯁꯤꯡ. ꯑꯔꯣꯏꯕ ꯔꯥꯎꯠ ꯇꯧꯔꯕ ꯃꯣꯗꯦꯜ ꯁꯤꯖꯤꯟꯅꯗꯨꯅꯥ, ꯁꯔꯨꯛ 4-ꯒꯤ ꯗ꯭ꯔꯣꯗꯥꯎꯟ ꯃꯇꯝꯁꯤꯡ, ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯑꯄꯤꯛꯄ ꯑꯣꯔꯤꯐꯤꯁ ꯑꯃꯁꯨꯡ ꯏꯃꯔꯖꯦꯟꯁꯤ ꯁ꯭ꯄꯤꯜꯋꯦ, ꯁꯔꯨꯛ 5-ꯒꯤ ꯑꯥꯎꯠꯐꯣꯜ ꯊꯤꯡꯂꯕ ꯃꯇꯝꯒꯤ ꯁ꯭ꯇꯣꯔꯦꯖ ꯆꯦꯛ, ꯑꯃꯁꯨꯡ ꯁꯔꯨꯛ 5-ꯒꯤ ꯃꯈꯥ ꯊꯡꯕ ꯃꯐꯝꯒꯤ ꯑꯦꯅꯥꯂꯥꯏꯁꯤꯁ ꯆꯦꯛ ꯇꯧꯒꯗꯕꯅꯤ꯫

3.14.13 ꯈꯣꯡꯊꯥꯡ 12 — ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯠ ꯇꯧꯕ: ꯃꯍꯩꯁꯤꯡ ꯐꯣꯔꯝ 3-1 ꯑꯃꯁꯨꯡ 3-2-ꯗ (ꯀ꯭ꯂꯣꯖ 3.17)꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯈꯣꯡꯊꯥꯡꯁꯤꯡꯒꯤ ꯊꯥꯛ ꯑꯁꯤ ꯏꯚꯦꯟꯠꯇ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯁ꯭ꯇꯦꯟꯗꯔꯗ ꯋꯔꯛꯐ꯭ꯂꯣꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯩ: ꯈꯥꯌꯗꯣꯀꯄ; ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡꯒꯤ CN ꯑꯃꯁꯨꯡ Tc ꯊꯝꯕ; ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ CN ꯑꯃꯁꯨꯡ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ Tc ꯊꯝꯕ; ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯅꯠꯔꯒꯥ ꯀꯥꯏꯅꯦꯃꯦꯇꯤꯛ ꯃꯣꯗꯦꯜ ꯑꯃꯒꯤ ꯈꯨꯠꯊꯥꯡꯗ ꯃꯥꯟꯅꯕ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ ꯆꯂꯥꯏꯕ; ꯄꯤꯛ ꯑꯃꯁꯨꯡ ꯚꯣꯂꯨꯝꯁꯤꯡ ꯆꯥꯡꯗꯝꯅꯕ; ꯑꯃꯁꯨꯡ ꯃꯣꯗꯤꯐꯥꯏꯗ ꯄꯨꯂꯁ ꯔꯥꯎꯇꯤꯡꯅꯥ ꯁ꯭ꯇꯣꯔꯦꯖꯒꯤ ꯁꯥꯏꯖ ꯂꯦꯞꯄ꯫ ꯃꯁꯤꯅꯥ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯑꯦꯂꯤꯃꯦꯟꯠꯁꯤꯡ ꯍꯥꯄꯆꯤꯜꯂꯤ: ꯄꯨꯡ 48–72-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛꯁꯤꯡ, AMC III ꯑꯃꯁꯨꯡ ꯇꯦꯜꯋꯥꯇꯔ꯫ ꯃꯃꯤ 3.5-ꯅꯥ ꯃꯇꯝ ꯁꯥꯡꯕ ꯔꯟꯁꯤꯡ ꯀꯔꯤꯒꯤ ꯃꯔꯨꯑꯣꯏꯕꯒꯦ ꯎꯠꯂꯤ: ꯔꯥꯎꯠ ꯇꯧꯔꯕ ꯄꯤꯛ ꯑꯁꯤꯅꯥ ꯀꯦꯞ ꯃꯄꯨꯡ ꯐꯥꯍꯅꯕ ꯌꯥꯏ ꯑꯗꯨꯒꯨꯝꯕꯥ ꯃꯇꯝꯗ ꯁ꯭ꯇꯣꯔꯦꯖꯅꯥ ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯇꯨꯡꯒꯤ ꯑꯃꯁꯨꯡ ꯃꯃꯥꯡꯒꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯁꯤꯡꯒꯤ ꯃꯔꯛꯇ ꯂꯩꯕ ꯚꯣꯂꯨꯝꯒꯤ ꯈꯦꯠꯅꯕ ꯑꯗꯨ ꯊꯝꯃꯤ, ꯃꯗꯨ ꯃꯇꯨꯡꯗ ꯁꯔꯨꯛ 4-ꯒꯤ ꯂꯤꯃꯤꯠꯁꯤꯡꯒꯤ ꯃꯅꯨꯡꯗ ꯏꯁꯤꯡ ꯊꯥꯗꯣꯛꯀꯗꯕꯅꯤ꯫ 3.14.2(b)-ꯗ ꯀꯦꯆꯃꯦꯟꯠꯁꯤꯡꯒꯤ ꯃꯔꯛꯇ ꯔꯟꯑꯣꯐ ꯂꯝꯕꯤ ꯍꯣꯡꯗꯣꯀꯄ ꯊꯤꯡꯕ ꯑꯁꯤꯅꯥ ꯁꯥꯏꯠ ꯑꯃꯅꯥ ꯐ꯭ꯂꯣ ꯑꯗꯨ ꯌꯨꯃꯂꯣꯟꯅꯕ ꯃꯤꯑꯣꯏ ꯑꯃꯒꯤ ꯈꯣꯡꯕꯥꯟꯗ ꯍꯣꯡꯗꯣꯛꯇꯨꯅꯥ POC ꯑꯃꯗ ꯔꯨꯜ ꯃꯄꯨꯡ ꯐꯥꯍꯅꯕꯗꯒꯤ ꯊꯤꯡꯏ꯫


3.15 ꯃꯣꯗꯦꯜ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯚꯦꯂꯤꯗꯦꯁꯟ

3.15.1 ꯀꯗꯥꯏꯗ ꯃꯊꯧ ꯇꯥꯕꯒꯦ. ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯚꯦꯂꯤꯗꯦꯁꯟ ꯑꯁꯤ ꯃꯈꯥꯒꯤꯁꯤꯡꯒꯤꯗꯃꯛ ꯃꯊꯧ ꯇꯥꯏ:

  • (a) 25 km² ꯅꯠꯔꯒꯥ ꯃꯁꯤꯗꯒꯤ ꯍꯦꯟꯕ ꯀꯦꯆꯃꯦꯟꯠ ꯃꯣꯗꯦꯜꯁꯤꯡ;
  • (b) ꯀ꯭ꯂꯣꯖ 3.13-ꯒꯤ ꯃꯈꯥꯗ ꯔꯤꯖꯅꯦꯜ ꯐꯦꯁꯤꯂꯤꯇꯤꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟ;
  • (c) ꯁꯤꯇꯤ ꯅꯠꯔꯒꯥ ꯕꯦꯁꯤꯟꯒꯤ ꯏꯔꯝ ꯃꯥꯁ꯭ꯇꯔ ꯄ꯭ꯂꯥꯟꯁꯤꯡ; ꯑꯃꯁꯨꯡ
  • (d) ꯁꯔꯨꯛ ꯑꯁꯤꯒꯤ ꯗꯤꯐꯣꯜꯠꯁꯤꯡꯗꯒꯤ ꯈꯦꯠꯅꯕ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ ꯂꯩꯕ ꯃꯣꯗꯦꯜ ꯑꯃꯍꯦꯛꯇꯗꯤ (ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯀ꯭ꯂꯥꯔꯛ ꯇ꯭ꯔꯥꯟꯁꯐꯣꯔꯝ ꯅꯠꯔꯒꯥ ꯍꯦꯟꯅꯥ ꯅꯦꯝꯕ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔ)꯫

3.15.2 ꯗꯦꯇꯥ. ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟꯅꯥ ꯎꯕ ꯐꯡꯂꯕ ꯅꯣꯡ ꯆꯨꯕ (ꯒꯦꯖꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯂꯩꯔꯕꯗꯤ ꯔꯦꯗꯥꯔ) ꯑꯃꯁꯨꯡ ꯎꯕ ꯐꯡꯂꯕ ꯐ꯭ꯂꯣ ꯅꯠꯔꯒꯥ ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜꯁꯤꯡ (WRD-ꯒꯤ ꯒꯦꯖꯤꯡ ꯁꯥꯏꯠꯁꯤꯡ, IMC ꯅꯠꯔꯒꯥ MSDMA-ꯒꯤ ꯂꯦꯚꯦꯜ ꯁꯦꯟꯁꯔꯁꯤꯡ, ꯄꯨꯈ꯭ꯔꯤꯒꯤ ꯒꯦꯖꯁꯤꯡ, ꯅꯠꯔꯒꯥ ꯁꯔꯚꯦ ꯇꯧꯔꯕ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯃꯥꯔꯛꯁꯤꯡ) ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫

3.15.3 ꯏꯚꯦꯟꯠꯁꯤꯡ. ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟꯒꯤꯗꯃꯛ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯃꯁꯥ ꯃꯊꯟꯇ ꯂꯩꯕ ꯏꯚꯦꯟꯠ ꯑꯍꯨꯝ ꯑꯃꯁꯨꯡ ꯚꯦꯂꯤꯗꯦꯁꯟꯒꯤꯗꯃꯛ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯑꯇꯣꯞꯄ ꯏꯚꯦꯟꯠ ꯑꯃꯥ ꯁꯤꯖꯤꯟꯅꯒꯗꯕꯅꯤ꯫ ꯏꯚꯦꯟꯠ ꯑꯃꯗꯤ ꯌꯥꯝꯗ꯭ꯔꯕꯗ ꯃꯇꯝ ꯁꯥꯡꯕ ꯃꯣꯟꯁꯨꯟ ꯅꯠꯔꯒꯥ ꯁꯥꯏꯛꯂꯣꯟꯒꯤ ꯏꯚꯦꯟꯠ ꯑꯃꯥ ꯑꯣꯏꯒꯗꯕꯅꯤ (ꯈꯨꯗꯝ ꯑꯣꯏꯅꯥ ꯏꯝꯐꯥꯜ ꯇꯝꯄꯥꯛꯀꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯁꯤꯡ 28–31 ꯃꯦ 2024 (ꯁꯥꯏꯛꯂꯣꯟ ꯔꯦꯃꯥꯜ), 30 ꯃꯦ–ꯖꯨꯟ 2025, ꯁꯦꯞꯇꯦꯝꯕꯔ 2025, ꯖꯨꯂꯥꯏꯒꯤ ꯑꯔꯣꯏꯕ–ꯑꯒꯁ꯭ꯠ 2015 ꯅꯠꯔꯒꯥ ꯖꯨꯂꯥꯏ–ꯑꯒꯁ꯭ꯠ 1989, ꯃꯈꯣꯌꯒꯤꯗꯃꯛ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯒꯤꯗꯃꯛ ꯄꯥꯈꯤꯕ ꯍꯧꯔꯛꯐꯝꯁꯤꯡꯗ ꯂꯩꯕ ꯅꯣꯡ ꯆꯨꯕ ꯑꯃꯈꯛꯇꯗꯤ 30 ꯖꯨꯂꯥꯏ 1989-ꯒꯤ ꯏꯝꯐꯥꯜꯒꯤ 158.6 mm (IMD) ꯑꯃꯁꯨꯡ 2025-ꯒꯤꯗꯃꯛ ꯄꯥꯎꯖꯦꯜꯒꯤ ꯚꯦꯜꯌꯨꯁꯤꯡꯅꯤ [TBC], ꯗꯦꯇꯥ ꯂꯩꯕ ꯃꯐꯝꯗ)꯫

3.15.4 ꯄꯔꯐꯣꯔꯃꯦꯟꯁ. ꯁꯕꯃꯤꯇꯦꯜꯅꯥ ꯏꯚꯦꯟꯠ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ ꯎꯕ ꯐꯡꯂꯕ ꯑꯃꯁꯨꯡ ꯃꯣꯗꯦꯜ ꯇꯧꯔꯕ ꯄꯤꯛ, ꯚꯣꯂꯨꯝ ꯑꯃꯁꯨꯡ ꯄꯤꯛ ꯐꯥꯎꯕꯒꯤ ꯃꯇꯝ, ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯃꯣꯗꯦꯜꯁꯤꯡꯒꯤꯗꯃꯛ ꯅꯥꯁ–ꯁꯠꯛꯂꯤꯐ ꯏꯐꯤꯁꯤꯌꯦꯟꯁꯤ (NSE) ꯑꯃꯁꯨꯡ ꯄꯔꯁꯦꯟꯠ ꯕꯥꯏꯌꯁ ꯔꯤꯄꯣꯔꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫ ꯒꯥꯏꯗ ꯑꯃꯥ ꯑꯣꯏꯅꯥ, ꯀꯦꯂꯤꯕ꯭ꯔꯦꯠ ꯇꯧꯔꯕ ꯃꯣꯗꯦꯜ ꯑꯃꯅꯥ ꯏꯚꯦꯟꯠꯀꯤ ꯄꯤꯛ ꯑꯃꯁꯨꯡ ꯚꯣꯂꯨꯝꯁꯤꯡ ±25%-ꯒꯤ ꯃꯅꯨꯡꯗ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯄꯤꯕ ꯐꯩ, ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯃꯣꯗꯦꯜ ꯑꯃꯅꯥ NSE ≥ 0.5 ꯑꯃꯁꯨꯡ ±25%-ꯒꯤ ꯃꯅꯨꯡꯗ ꯄꯔꯁꯦꯟꯠ ꯕꯥꯏꯌꯁ ꯐꯡꯕ ꯐꯩ꯫

3.15.5 ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟꯒꯤ ꯂꯤꯃꯤꯠꯁꯤꯡ. ꯁꯥꯏꯠꯀꯤ ꯈꯛꯇꯒꯤ ꯐꯦꯛꯇꯔꯁꯤꯡ ꯆꯦꯛꯁꯤꯟꯅꯥ ꯌꯦꯡꯁꯤꯟꯗꯨꯅꯥ ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯠ ꯇꯧꯔꯕ ꯑꯃꯁꯨꯡ ꯑꯣꯊꯣꯔꯤꯇꯤꯅꯥ ꯌꯥꯔꯕꯗꯤ ꯅꯠꯇꯅꯥ, ꯁꯔꯨꯛ ꯑꯁꯤꯒꯤ ꯗꯤꯐꯣꯜꯠ ꯊꯧꯑꯣꯡꯁꯤꯡꯅꯥ ꯄꯤꯕꯗꯒꯤ ꯅꯦꯝꯕ ꯗꯤꯖꯥꯏꯟ ꯐ꯭ꯂꯣꯁꯤꯡ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯅꯕ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ꯫

3.15.6 ꯆꯨꯝꯕꯒꯤ ꯆꯦꯛ. ꯗꯤꯖꯥꯏꯟ ꯄꯤꯛ ꯐ꯭ꯂꯣꯁꯤꯡ ꯑꯁꯤ ꯀꯦꯆꯃꯦꯟꯠꯀꯤ ꯂꯝꯒꯥ ꯆꯥꯡꯗꯝꯅꯅꯥ ꯌꯨꯅꯤꯠ ꯂꯝ ꯑꯃꯒꯤ ꯗꯤꯁꯆꯥꯔꯖ ꯑꯣꯏꯅꯥ ꯄ꯭ꯂꯣꯠ ꯇꯧꯒꯗꯕꯅꯤ ꯑꯃꯁꯨꯡ CWC SUH-ꯒꯤ ꯃꯍꯩꯁꯤꯡ, ꯔꯤꯖꯅꯦꯜ ꯒꯦꯖ ꯇꯧꯔꯕ ꯑꯦꯁ꯭ꯇꯤꯃꯦꯠꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯈꯡꯂꯕ ꯃꯃꯥꯡꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯁꯤꯡꯒꯥ ꯆꯥꯡꯗꯝꯅꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. ꯀ꯭ꯂꯣꯖ 3.15.5 ꯑꯃꯁꯨꯡ 3.15.6 ꯑꯁꯤ APWA-ꯒꯤ ꯃꯇꯨꯡ ꯏꯟꯅꯕꯅꯤ, APWA-ꯅꯥ "ꯕꯦꯖꯂꯥꯏꯟ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯊꯧꯑꯣꯡꯅꯥ ꯄꯤꯕꯗꯒꯤ ꯅꯦꯝꯕ ꯗꯤꯁꯆꯥꯔꯖ ꯑꯦꯁ꯭ꯇꯤꯃꯦꯠꯁꯤꯡ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯅꯕ ꯃꯣꯗꯦꯜ ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯁꯤꯖꯤꯟꯅꯔꯣꯏꯗꯕꯅꯤ" ("model calibration shall not be used to justify discharge estimates that are lower than those provided by the baseline unit hydrograph method") ꯍꯥꯌꯅꯥ ꯍꯥꯏ ꯑꯃꯁꯨꯡ ꯌꯨꯅꯤꯠ ꯗꯤꯁꯆꯥꯔꯖꯁꯤꯡ ꯇ꯭ꯔꯤꯕ꯭ꯌꯨꯇꯔꯤ ꯂꯝꯒꯥ ꯆꯥꯡꯗꯝꯅꯅꯥ ꯄ꯭ꯂꯣꯠ ꯇꯧꯗꯨꯅꯥ ꯔꯤꯒ꯭ꯔꯦꯁꯟ, ꯒꯦꯖ ꯑꯃꯁꯨꯡ ꯃꯃꯥꯡꯒꯤ ꯚꯦꯜꯌꯨꯁꯤꯡꯒꯥ ꯆꯥꯡꯗꯝꯅꯕ ꯃꯊꯧ ꯇꯥꯍꯜꯂꯤ (KC Metro APWA 5600, 2011, §5602.9)꯫ 3.15.3 ꯑꯃꯁꯨꯡ 3.15.4-ꯒꯤ ꯏꯚꯦꯟꯠꯀꯤ ꯃꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯄꯔꯐꯣꯔꯃꯦꯟꯁꯀꯤ ꯚꯦꯜꯌꯨꯁꯤꯡ ꯑꯁꯤ ꯃꯦꯅꯨꯌꯦꯜ ꯑꯁꯤꯅꯥ ꯊꯝꯕꯅꯤ꯫ NSE ≥ 0.5 ꯑꯃꯁꯨꯡ ±25% ꯕꯥꯏꯌꯁꯀꯤ ꯊ꯭ꯔꯦꯁꯍꯣꯜꯗꯁꯤꯡ ꯑꯁꯤ Moriasi et al. (2007)-ꯒꯤ "ꯌꯥꯕ ꯌꯥꯕ" ("satisfactory") ꯁ꯭ꯇ꯭ꯔꯤꯃꯐ꯭ꯂꯣ ꯔꯦꯇꯤꯡꯁꯤꯡꯅꯤ, ꯃꯈꯣꯌ ꯊꯥ ꯈꯨꯗꯤꯡꯒꯤ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯁꯤꯃꯨꯂꯦꯁꯟꯒꯤꯗꯃꯛ ꯁꯦꯝꯈꯤꯕꯅꯤ; ꯃꯐꯝ ꯑꯁꯤꯗ ꯏꯚꯦꯟꯠꯀꯤ ꯄꯤꯛ ꯑꯃꯁꯨꯡ ꯚꯣꯂꯨꯝꯁꯤꯡꯒꯤꯗꯃꯛ ꯃꯈꯣꯌ ꯁꯤꯖꯤꯟꯅꯕ ꯑꯁꯤ ꯁꯥꯡꯍꯟꯕ ꯑꯃꯅꯤ꯫


3.16 ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ ꯌꯥꯕ

3.16.1 ꯌꯥꯕ ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ. ꯃꯈꯥꯒꯤꯁꯤꯡ ꯑꯁꯤ ꯁꯕꯃꯤꯇꯦꯜ ꯇꯧꯕ ꯃꯇꯝꯗ ꯆꯠꯂꯤꯕ ꯚꯔꯁꯟ ꯑꯃꯗ, ꯍꯦꯟꯅꯥ ꯎꯠꯄ ꯃꯊꯧ ꯇꯥꯗꯅꯥ ꯌꯥꯏ:

  • (a) EPA Storm Water Management Model (SWMM 5.x);
  • (b) USACE HEC-HMS ꯑꯃꯁꯨꯡ HEC-RAS;
  • (c) USDA NRCS WinTR-55 ꯑꯃꯁꯨꯡ WinTR-20; ꯑꯃꯁꯨꯡ
  • (d) ꯐꯣꯔꯃꯨꯂꯥ ꯑꯃꯁꯨꯡ ꯏꯟꯄꯨꯠ ꯈꯨꯗꯤꯡꯃꯛ ꯎꯠꯂꯤꯕ, ꯔꯦꯁꯅꯦꯜ ꯃꯦꯊꯗ ꯑꯃꯁꯨꯡ ꯂꯝ ꯑꯃꯈꯛꯇꯒꯤ SCS-CN ꯀꯦꯜꯀꯨꯂꯦꯁꯟꯁꯤꯡꯒꯤ ꯁ꯭ꯞꯔꯦꯗꯁꯤꯠꯁꯤꯡ꯫

3.16.2 ꯑꯇꯣꯞꯄ ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ. SWMM ꯅꯠꯔꯒꯥ HEC ꯏꯟꯖꯤꯟꯁꯤꯡꯗ ꯁꯥꯕ ꯀꯃꯔꯁꯤꯌꯦꯜ ꯄꯦꯀꯦꯖꯁꯤꯡ ꯏꯟꯖꯤꯟ ꯑꯃꯁꯨꯡ ꯚꯔꯁꯟ ꯇꯥꯛꯂꯕꯗꯤ ꯌꯥꯏ꯫ ꯑꯇꯣꯞꯄ ꯊꯧꯑꯣꯡ ꯅꯠꯔꯒꯥ ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ ꯑꯃꯍꯦꯛꯇꯗꯤ, ꯗꯤꯖꯥꯏꯅꯔꯅꯥ ꯁꯕ-ꯑꯦꯔꯤꯌꯥ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ ꯊꯧꯑꯣꯡ ꯑꯗꯨ ꯑꯃꯁꯨꯡ 3.16.1-ꯒꯤ ꯕꯦꯖꯂꯥꯏꯟ ꯊꯧꯑꯣꯡ ꯑꯃꯥ ꯑꯅꯤꯃꯛꯇꯒꯤ ꯄꯤꯛ ꯐ꯭ꯂꯣ, ꯂꯦꯒ, ꯔꯟꯑꯣꯐ ꯚꯣꯂꯨꯝ ꯑꯃꯁꯨꯡ ꯃꯥꯟꯅꯕ CN ꯔꯤꯄꯣꯔꯠ ꯇꯧꯔꯕꯗꯤ, 5%-ꯗꯒꯤ ꯍꯦꯟꯕ ꯈꯦꯠꯅꯕ ꯈꯨꯗꯤꯡꯃꯛ ꯈꯡꯗꯣꯛꯂꯕꯗꯤ, ꯑꯃꯁꯨꯡ ꯍꯦꯟꯅꯥ ꯀꯟꯁꯔꯚꯦꯇꯤꯚ ꯅꯠꯇꯕ ꯃꯍꯩ ꯄꯤꯕ ꯈꯦꯠꯅꯕ ꯈꯨꯗꯤꯡꯃꯛ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯂꯕꯗꯤ ꯈꯛꯇꯃꯛ ꯌꯥꯏ꯫

3.16.3 ꯕꯦꯟꯆꯃꯥꯔꯛ ꯄ꯭ꯔꯣꯕ꯭ꯂꯦꯝꯁꯤꯡ. ꯑꯣꯊꯣꯔꯤꯇꯤꯅꯥ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯇꯦꯁ꯭ꯠ ꯄ꯭ꯔꯣꯕ꯭ꯂꯦꯝꯁꯤꯡ ꯐꯣꯡꯗꯣꯛꯀꯗꯕꯅꯤ (ꯑꯍꯦꯟꯕ 3C)꯫ 3.16.1-ꯗ ꯂꯩꯇꯕ ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔꯅꯥ ꯃꯈꯣꯌꯕꯨ ꯇꯥꯀꯄ ꯇꯣꯂꯔꯦꯟꯁꯀꯤ ꯃꯅꯨꯡꯗ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯄꯤꯒꯗꯕꯅꯤ꯫

3.16.4 ꯃꯣꯗꯦꯜ ꯐꯥꯏꯜꯁꯤꯡ. ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐꯗ ꯌꯨꯝꯐꯝ ꯑꯣꯏꯕ ꯗꯤꯖꯥꯏꯟ ꯈꯨꯗꯤꯡꯃꯛꯀꯥ ꯂꯣꯌꯅꯅꯥ ꯃꯣꯗꯦꯜꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯏꯟꯄꯨꯠ ꯑꯃꯁꯨꯡ ꯑꯥꯎꯠꯄꯨꯠ ꯐꯥꯏꯜꯁꯤꯡ ꯁꯕꯃꯤꯠ ꯇꯧꯒꯗꯕꯅꯤ꯫

ꯁꯟꯗꯣꯛꯅꯥ ꯇꯥꯛꯄꯥ. 5%-ꯒꯤ ꯏꯛꯋꯤꯚꯦꯂꯦꯟꯁ ꯇꯦꯁ꯭ꯠ ꯑꯁꯤ ꯑꯇꯣꯞꯄ ꯊꯧꯑꯣꯡꯁꯤꯡꯒꯤꯗꯃꯛ APWA-ꯒꯤ ꯔꯨꯜꯅꯤ (KC Metro APWA 5600, 2011, §5602.2D)꯫ APWA-ꯅꯥ TR-55, TR-20, HEC-1 ꯑꯃꯁꯨꯡ HEC-HMS-ꯕꯨ ꯕꯦꯖꯂꯥꯏꯟ ꯊꯧꯑꯣꯡꯁꯤꯡ ꯑꯣꯏꯅꯥ ꯃꯃꯤꯡ ꯂꯧꯏ (§5602.2B)꯫ CPHEEO-ꯅꯥ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯑꯃꯁꯨꯡ ꯀꯟꯇꯤꯅ꯭ꯌꯨꯑꯁ ꯃꯣꯗꯦꯂꯤꯡꯒꯤꯗꯃꯛ SWMM-ꯒꯤ ꯃꯃꯤꯡ ꯂꯧꯏ (CPHEEO 2019, Part A §4.4.2)꯫ ꯃꯣꯗꯦꯜꯒꯤ ꯃꯍꯧꯁꯥꯒꯤ ꯐꯥꯏꯜꯁꯤꯡ ꯁꯕꯃꯤꯠ ꯇꯧꯕꯅꯥ ꯑꯣꯊꯣꯔꯤꯇꯤꯕꯨ ꯃꯣꯗꯦꯜ ꯑꯗꯨ ꯑꯃꯨꯛ ꯍꯟꯅꯥ ꯆꯂꯥꯏꯕ ꯌꯥꯍꯜꯂꯤ ꯑꯃꯁꯨꯡ ꯃꯁꯤ ꯔꯤꯚꯤꯎ ꯇꯧꯕ ꯉꯃꯗꯕ ꯕ꯭ꯂꯦꯛ-ꯕꯣꯛꯁ ꯃꯍꯩꯁꯤꯡꯗꯒꯤ ꯉꯥꯛꯊꯣꯀꯄꯒꯤ ꯃꯔꯨꯑꯣꯏꯕ ꯊꯧꯔꯥꯡꯅꯤ꯫


3.17 ꯗꯣꯀ꯭ꯌꯨꯃꯦꯟꯇꯦꯁꯟ

ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯁꯕꯃꯤꯇꯦꯜ ꯈꯨꯗꯤꯡꯃꯛꯇ ꯃꯈꯥꯒꯤꯁꯤꯡ ꯌꯥꯎꯒꯗꯕꯅꯤ:

  1. ꯐꯣꯔꯝ 3-1, ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯀꯦꯜꯀꯨꯂꯦꯁꯟꯒꯤ ꯁꯝꯃꯔꯤ, ꯁꯤꯖꯤꯟꯅꯈꯤꯕ ꯊꯧꯑꯣꯡ ꯑꯃꯁꯨꯡ ꯃꯔꯝ (ꯇꯦꯕꯜ 3.1), ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ ꯑꯃꯁꯨꯡ ꯚꯔꯁꯟ, ꯑꯃꯁꯨꯡ ꯀꯝꯞꯌꯨꯇꯦꯁꯟ ꯏꯟꯇꯔꯚꯦꯜ ꯇꯥꯛꯂꯒꯥ꯫
  2. ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯐꯤꯚꯝꯁꯤꯡꯒꯤ ꯀꯦꯆꯃꯦꯟꯠ ꯃꯦꯞꯁꯤꯡ, ꯁꯕ-ꯑꯦꯔꯤꯌꯥꯁꯤꯡ, Tc-ꯒꯤꯗꯃꯛ ꯁꯤꯖꯤꯟꯅꯈꯤꯕ ꯐ꯭ꯂꯣ ꯄꯥꯊꯁꯤꯡ, POC-ꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯁꯥꯏꯠꯀꯤ ꯃꯄꯥꯟꯗꯒꯤ ꯂꯥꯀꯄ ꯔꯟ-ꯑꯣꯟ ꯎꯠꯂꯒꯥ꯫
  3. ꯂꯩꯃꯥꯏꯁꯤꯡ: HSG ꯃꯦꯞ ꯑꯃꯁꯨꯡ ꯃꯁꯤꯒꯤ ꯍꯧꯔꯛꯐꯝ ꯑꯃꯁꯨꯡ ꯁ꯭ꯀꯦꯜ (ꯀ꯭ꯂꯣꯖ 3.7), ꯋꯥꯇꯔ-ꯇꯦꯕꯜꯒꯤ ꯗꯦꯇꯥ (ꯀ꯭ꯂꯣꯖ 3.10), ꯑꯃꯁꯨꯡ ꯏꯟꯐꯤꯜꯇ꯭ꯔꯦꯁꯟ ꯇꯦꯁ꯭ꯠꯀꯤ ꯃꯍꯩꯁꯤꯡ꯫
  4. ꯁꯕ-ꯑꯦꯔꯤꯌꯥ ꯑꯃꯁꯨꯡ ꯐꯤꯚꯝ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯄꯦꯔꯥꯃꯤꯇꯔ ꯇꯦꯕꯜꯁꯤꯡ: ꯂꯝ, ꯃꯈꯜ ꯑꯃꯁꯨꯡ ꯀꯅꯦꯛꯇꯤꯚꯤꯇꯤ ꯃꯇꯨꯡ ꯏꯟꯅ ꯏꯝꯄꯔꯚꯤꯌꯁ ꯂꯝ, HSG, AMC II ꯑꯃꯁꯨꯡ III-ꯗ CN (ꯅꯠꯔꯒꯥ C ꯑꯃꯁꯨꯡ Cf), Tc ꯋꯔꯛꯁꯤꯠꯁꯤꯡ, ꯑꯃꯁꯨꯡ n ꯚꯦꯜꯌꯨꯁꯤꯡ꯫
  5. ꯅꯣꯡ ꯆꯨꯕ: ꯗꯤꯖꯥꯏꯟ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯁꯤꯠ (ꯐꯣꯔꯝ 2-1) ꯑꯃꯁꯨꯡ ꯁꯤꯖꯤꯟꯅꯈꯤꯕ ꯍꯥꯏꯌꯦꯇꯣꯒ꯭ꯔꯥꯐꯁꯤꯡ꯫
  6. ꯃꯍꯩꯁꯤꯡ: ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯊꯧꯗꯣꯛ ꯈꯨꯗꯤꯡꯃꯛꯀꯤ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ ꯇꯦꯕꯜ ꯑꯃꯁꯨꯡ ꯄ꯭ꯂꯣꯠꯁꯤꯡ; ꯁ꯭ꯇꯦꯖ–ꯁ꯭ꯇꯣꯔꯦꯖ ꯑꯃꯁꯨꯡ ꯁ꯭ꯇꯦꯖ–ꯗꯤꯁꯆꯥꯔꯖ ꯇꯦꯕꯜꯁꯤꯡ; ꯔꯥꯎꯠ ꯇꯧꯔꯕ ꯑꯥꯎꯠꯐ꯭ꯂꯣꯁꯤꯡ; ꯑꯃꯁꯨꯡ ꯄꯤꯛ ꯋꯥꯇꯔ ꯂꯦꯚꯦꯜꯁꯤꯡ꯫
  7. ꯐꯣꯔꯝ 3-2, ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕ, POC, AEP ꯑꯃꯁꯨꯡ ꯗ꯭ꯌꯨꯔꯦꯁꯟ ꯈꯨꯗꯤꯡꯃꯛꯀꯤꯗꯃꯛ Q_pre, Q_post (ꯀꯟꯇ꯭ꯔꯣꯜ ꯇꯧꯗꯕ ꯑꯃꯁꯨꯡ ꯔꯥꯎꯠ ꯇꯧꯔꯕ) ꯑꯃꯁꯨꯡ ꯀ꯭ꯔꯥꯏꯇꯦꯔꯤꯌꯟ, ꯑꯃꯁꯨꯡ ꯀ꯭ꯂꯣꯖ 3.14.11-ꯒꯤ ꯁꯦꯟꯁꯤꯇꯤꯚꯤꯇꯤ ꯔꯟꯁꯤꯡꯒꯥ ꯂꯣꯌꯅꯅꯥ꯫
  8. ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯔꯤꯄꯣꯔꯠ, ꯀ꯭ꯂꯣꯖ 3.15 ꯆꯠꯂꯤꯕ ꯃꯐꯝꯗ꯫
  9. ꯃꯣꯗꯦꯜ ꯐꯥꯏꯜꯁꯤꯡ (ꯀ꯭ꯂꯣꯖ 3.16.4)꯫
  10. ꯊꯧꯗꯥꯡ ꯂꯧꯕ ꯏꯟꯖꯤꯅꯤꯌꯔꯒꯤ ꯁ꯭ꯇꯦꯇꯃꯦꯟꯠ ꯑꯃꯥ, ꯁꯔꯨꯛ ꯑꯁꯤꯒꯤ ꯊꯧꯑꯣꯡ ꯑꯃꯁꯨꯡ ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ ꯁꯤꯖꯤꯟꯅꯈ꯭ꯔꯦ ꯍꯥꯌꯅꯥ, ꯈꯦꯠꯅꯕ ꯑꯃꯍꯦꯛꯇꯗꯤ ꯄꯔꯤꯡ ꯊꯣꯛꯅꯥ ꯏꯔꯒꯥ ꯑꯃꯁꯨꯡ ꯆꯨꯝꯃꯤ ꯍꯥꯌꯅꯥ ꯎꯠꯂꯒꯥ꯫

ꯂꯧꯔꯛꯐꯝꯁꯤꯡ (ꯁꯔꯨꯛ)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Ministry of Housing and Urban Affairs, New Delhi. §4.4 (Rational Method, Table 4.2 runoff coefficients, time of concentration, partial area effect), §8.5 (detention).
  • Kansas City Metro Chapter APWA (2011). Section 5600 Storm Drainage Systems and Facilities (Feb 16, 2011), §5602.2–5602.9.
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01, §5603.4. https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
  • Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Policy Supplement). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55 (TR-55), 2nd ed. Tables 2-2a, 2-2c, 3-1; Figures 2-3, 2-4, 3-1.
  • USDA NRCS. National Engineering Handbook, Part 630 Hydrology: Ch. 7 Hydrologic Soil Groups (2009); Ch. 9 Hydrologic Soil-Cover Complexes; Ch. 10 Estimation of Direct Runoff from Storm Rainfall (2004); Ch. 15 Time of Concentration (2010); Ch. 16 Hydrographs (2007). https://directives.nrcs.usda.gov/
  • Hawkins, R.H., Jiang, R., Woodward, D.E., Hjelmfelt, A.T. and Van Mullem, J.A. (2002). Runoff curve number method: examination of the initial abstraction ratio. Proc. Second Federal Interagency Hydrologic Modeling Conference, Las Vegas.
  • Woodward, D.E., Hawkins, R.H., Jiang, R., Hjelmfelt, A.T., Van Mullem, J.A. and Quan, Q.D. (2003). Runoff curve number method: examination of the initial abstraction ratio. World Water & Environmental Resources Congress, ASCE.
  • Welle, P.I., Woodward, D.E. and Moody, H.F. (1980). A dimensionless unit hydrograph for the Delmarva Peninsula. American Society of Agricultural Engineers paper. ꯑꯃꯁꯨꯡ New Jersey Department of Agriculture, Delmarva Unit Hydrograph bulletin ꯌꯦꯡꯕꯤꯌꯨ꯫ https://nj.gov/agriculture/divisions/anr/pdf/DelmarvaBulletin.pdf
  • Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill. §5.5 (SCS method, AMC), §8.4 (Muskingum), Table 15.1.2 (Kirpich).
  • Kirpich, Z.P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10(6), 362.
  • Merkel, W.H. (2001), USDA NRCS NEH Part 630, Ch. 15 (2010)-ꯗ ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ, ꯁꯤꯠ ꯐ꯭ꯂꯣꯒꯤ ꯁꯥꯡꯕꯒꯤ ꯃꯇꯥꯡꯗ꯫
  • ASCE and WPCF (1969). Design and Construction of Sanitary and Storm Sewers. ASCE Manual of Practice No. 37.
  • Texas Department of Transportation. Hydraulic Design Manual, Ch. 4, §12 Runoff Coefficients. https://www.txdot.gov/manuals/des/hyd/chapter-4--hydrology/section-12--rational-method/runoff-coefficients.html
  • Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised). Design Office Report No. SB-2(b)/R-4/44/99, March 2000, CWC (Hydrology (Regional Studies) Directorate), IMD, RDSO and the Ministry of Surface Transport; approved by the Flood Estimation Planning and Co-ordination Committee at its 55th meeting on 13.3.2000; revises report SB/8/1984. 12 ꯑꯦꯞꯔꯤꯜ 2016-ꯒꯤ Internet Archive ꯀꯣꯄꯤꯗꯒꯤ ꯄꯥꯈꯤꯕ (ꯂꯃꯥꯏ 103, ꯁ꯭ꯀꯦꯟ ꯇꯧꯔꯕ, ꯑꯣꯞꯇꯤꯀꯦꯜ ꯀꯦꯔꯦꯛꯇꯔ ꯔꯤꯀꯣꯒꯅꯤꯁꯟꯅꯥ ꯄꯥꯈꯤꯕ): Annexure 1.1 (ꯁꯕꯖꯣꯟꯒꯤ ꯄꯔꯤꯡ, ꯃꯁꯤꯗ ꯁꯕꯖꯣꯟ 2(c), "Barak and others", ꯑꯁꯤꯅꯥ "Barak, Kalden and Manipur rivers" ꯌꯥꯎꯏ), Table 3.3 (ꯁꯤꯟꯊꯦꯇꯤꯛ ꯌꯨꯅꯤꯠ ꯍꯥꯏꯗ꯭ꯔꯣꯒ꯭ꯔꯥꯐ), Table 4.1 (ꯄꯨꯡ t-ꯒꯤ ꯑꯃꯁꯨꯡ ꯄꯨꯡ 24-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯔꯦꯁꯤꯑꯣꯁꯤꯡ, p. 20), §4.3 ꯑꯃꯁꯨꯡ ꯋꯔꯛ ꯇꯧꯔꯕ ꯈꯨꯗꯝ; Plate 9-ꯒꯤ ꯅꯣꯡꯄꯣꯛꯀꯤ ꯁꯦꯛꯇꯔ ꯂꯃꯥꯏꯒꯤ ꯏꯃꯦꯖ ꯑꯃꯒꯥ ꯆꯦꯛ ꯇꯧꯈꯤ; Figs 11, 12(a) ꯑꯃꯁꯨꯡ 12(b) ꯑꯃꯁꯨꯡ Annex 4.4 ꯄꯥꯈꯤꯗꯦ [TBC]꯫ ꯃꯅꯤꯄꯨꯔꯗ ꯐꯣꯡꯗꯣꯛꯇꯕ 2(c) ꯔꯤꯄꯣꯔꯠꯀꯤ ꯃꯍꯨꯠꯇ ꯈꯛꯇꯃꯛ ꯁꯤꯖꯤꯟꯅꯩ (ꯑꯍꯦꯟꯕ 3E)꯫ http://web.archive.org/web/20160412151207id_/http://www.cwc.gov.in:80/main/downloads/South%20Brahmaputra%20subzone%202%20(b).Pdf
  • Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), Design Office Report No. NB/18/1991. ꯄꯨꯡ t-ꯒꯤ ꯑꯃꯁꯨꯡ ꯄꯨꯡ 24-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕꯒꯤ ꯔꯦꯁꯤꯑꯣꯁꯤꯡꯒꯤ ꯇꯦꯕꯜ ꯈꯛꯇꯃꯛ ꯄꯥꯈꯤꯕ, ꯃꯁꯤ ꯀ꯭ꯂꯣꯖ 2.3.6(f)-ꯅꯥ ꯃꯅꯤꯄꯨꯔꯒꯤ ꯃꯇꯝ ꯈꯔꯒꯤ ꯔꯦꯁꯤꯑꯣꯁꯤꯡꯒꯤ ꯑꯦꯅꯚꯦꯂꯞꯇ ꯁꯤꯖꯤꯟꯅꯩ; ꯃꯅꯤꯄꯨꯔꯒꯤ ꯃꯐꯝ ꯑꯃꯠꯇ ꯁꯕꯖꯣꯟ ꯑꯁꯤꯗ ꯂꯩꯇꯦ꯫
  • Central Water Commission. "Regional Flood Estimation Report" download page, 20 ꯃꯥꯔꯆ 2024-ꯒꯤ Internet Archive ꯀꯣꯄꯤ (ꯁꯕꯖꯣꯟ 2(c), Barak and others-ꯒꯤꯗꯃꯛ ꯔꯤꯄꯣꯔꯠ ꯂꯩꯇꯦ); ꯑꯃꯁꯨꯡ 2(b) ꯔꯤꯄꯣꯔꯠꯇ ꯂꯩꯕ 2000 ꯐꯥꯎꯕ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯔꯤꯄꯣꯔꯠ 21-ꯒꯤ ꯄꯔꯤꯡ, ꯃꯁꯤꯗ 2(c)-ꯒꯤ ꯑꯃꯠꯇ ꯂꯩꯇꯦ꯫ http://web.archive.org/web/20240320001002/https://cwc.gov.in/regional-flood-estimation-report
  • Moriasi, D.N. et al. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Trans. ASABE 50(3), 885–900.
  • "OSD for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Imphal (Tulihal) (A), 42623, rainfall data 1953–2012, p. M155. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • India Meteorological Department. ꯈꯥ-ꯅꯣꯡꯆꯨꯞꯀꯤ ꯃꯣꯟꯁꯨꯟꯒꯤ ꯍꯧꯔꯛꯐꯝ ꯑꯃꯁꯨꯡ ꯂꯥꯄꯊꯣꯀꯄꯒꯤ ꯑꯅꯧꯕ ꯅꯣꯔꯃꯦꯜ ꯇꯥꯡꯁꯤꯡꯒꯤ ꯄ꯭ꯔꯦꯁ ꯔꯤꯂꯤꯖ (1 ꯖꯨꯟ 2020-ꯗꯒꯤ ꯁꯤꯖꯤꯟꯅꯔꯤꯕ), ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ꯫ https://mausam.imd.gov.in/backend/assets/press_release_pdf/IMD_Press_release_new_onset_and_withdrawal_dates%28Final%29.pdf
  • Manipur Science & Technology Council (MASTEC). Flood Hazard Zonation in Manipur Valley, final report to DST-NRDMS (PDF created 2008; data to 2001): ꯇꯝꯄꯥꯛꯀꯤ ꯖꯤꯑꯣꯂꯣꯖꯤ ꯑꯃꯁꯨꯡ ꯂꯩꯃꯥꯏꯁꯤꯡ, 1966–2002-ꯒꯤ ꯏꯁꯤꯡ ꯏꯆꯥꯎꯒꯤ ꯔꯦꯀꯣꯔꯗꯁꯤꯡ, 1974–2000-ꯒꯤ ꯏꯝꯐꯥꯜꯒꯤ ꯆꯍꯤ ꯈꯨꯗꯤꯡꯒꯤ ꯈ꯭ꯕꯥꯏꯗꯒꯤ ꯆꯥꯎꯕ ꯅꯨꯃꯤꯠ 1-ꯒꯤ ꯅꯣꯡ ꯆꯨꯕ (Table 2), ꯂꯣꯛꯇꯥꯛ, ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖ ꯑꯃꯁꯨꯡ ꯁꯨꯒꯅꯨ ꯍꯝꯞ, ꯑꯃꯁꯨꯡ 1999–2001-ꯒꯤ WRD-ꯒꯤ ꯗꯤꯁꯆꯥꯔꯖꯁꯤꯡ꯫ 19 ꯐꯦꯕ꯭ꯔꯨꯋꯥꯔꯤ 2018-ꯒꯤ Internet Archive ꯀꯣꯄꯤ: http://web.archive.org/web/20180219013113id_/http://mastec.nic.in:80/images/Completed_projects/ReportFloodHazard.pdf
  • Central Ground Water Board, North Eastern Region. Ground Water Information Booklets: Imphal West district (Technical Report Series D No. 28/2013-14, September 2013) and Bishnupur district (2013), cgwb.gov.in/District_Profile/Manipur/-ꯒꯤ Internet Archive ꯀꯦꯞꯆꯔꯁꯤꯡ; ꯑꯃꯁꯨꯡ Dynamic Ground Water Resources of Manipur, GWRA 2023 ꯑꯃꯁꯨꯡ GWRA 2024 (ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ https://cgwb.gov.in/cgwbpnm/publication-detail/1535
  • Asian Infrastructure Investment Bank (2024). Approval Project Document, Manipur Urban Road, Drainage and Asset Management Improvement Project (P000723), October 2024. https://aiib.org/en/projects/details/2024/_download/India/AIIB-APD_P000723_Manipur-Urban-Road-Drainage-and-Asset-Management-Improvement-Project.pdf
  • Municipal Administration, Housing and Urban Development Department (MAHUD). Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification), 4 ꯗꯤꯁꯦꯝꯕꯔ 2024-ꯒꯤ No. SCS-401/3/2021-MAHUD-MAHUD-Part(3)-ꯅꯥ ꯅꯣꯇꯤꯐꯥꯏ ꯇꯧꯈꯤꯕ (151.38 km²)꯫ Internet Archive capture 20250810073559 of https://tpmanipur.mn.gov.in/media/filer_public/81/1c/811cef92-cba3-43cb-9e7f-caeef3738b68/revised_imphal_master_plan_report-1st_modification.pdf
  • New Development Bank (2021). Proposed Project Summary, Lamphelpat Waterbody Rejuvenation Project (ꯀꯟꯁꯦꯞꯇ ꯑꯦꯞꯔꯨꯚꯦꯜ 17 ꯅꯣꯚꯦꯝꯕꯔ 2021)꯫ https://www.ndb.int/wp-content/uploads/2021/11/Project-Summary-Lamphelpat.pdf
  • High Court of Manipur. PIL No. 8 of 2025, Meeyam Amata Oina Punsinba Lup v. State of Manipur, 16.06.2025-ꯒꯤ ꯑꯣꯔꯗꯔ, 02.05.2025-ꯒꯤ WRD-ꯒꯤ ꯁꯥꯏꯠ ꯏꯟꯁ꯭ꯄꯦꯛꯁꯟ ꯔꯤꯄꯣꯔꯠꯀꯥ ꯂꯣꯌꯅꯅꯥ (ꯂꯝꯐꯦꯜꯄꯥꯠ ꯑꯃꯁꯨꯡ ꯁꯃꯨꯁꯥꯡ ꯅꯥꯂꯥ (Shamushang nallah))꯫ https://rawlaw.in/wp-content/uploads/2025/06/Meeyam-Amata-Oina-Punsinba-Lup.pdf
  • SANDRP, "Overview of CWC's flood monitoring & forecasting in North East India" (5 August 2018), CWC-ꯒꯤ ꯁꯥꯏꯠ ꯇꯦꯕꯜꯁꯤꯡ ꯏꯔꯛꯇꯨꯅꯥ (ꯆꯣꯇꯦꯕꯦꯀ꯭ꯔꯥꯗ ꯕꯔꯥꯛ)꯫ https://sandrp.in/2018/08/05/overview-of-cwcs-flood-monitoring-forecasting-in-north-east-india/
  • The Sangai Express, 30 ꯃꯦ 2024 ꯑꯃꯁꯨꯡ 16 ꯁꯦꯞꯇꯦꯝꯕꯔ 2025-ꯒꯤ ꯔꯤꯄꯣꯔꯠꯁꯤꯡ, ꯇꯝꯄꯥꯛꯀꯤ ꯇꯨꯔꯦꯜꯁꯤꯡꯒꯤ WRD-ꯒꯤ ꯋꯥꯔꯅꯤꯡ, ꯐ꯭ꯂꯗ ꯑꯃꯁꯨꯡ ꯍꯥꯏꯌꯦꯁ꯭ꯠ ꯐ꯭ꯂꯗ ꯂꯦꯚꯦꯜꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯔꯤꯗꯤꯡꯁꯤꯡ ꯐꯣꯡꯗꯣꯛꯇꯨꯅꯥ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ)꯫ https://www.thesangaiexpress.com/Encyc/2024/5/30/By-Our-Staff-ReporterIMPHAL-May-29-With-incessant-rainfall-causing-massive-flooding-in-Manipur-the-wate.html ; https://www.thesangaiexpress.com/Encyc/2025/9/16/by-our-staff-reporter-imphal-sep-15-with-the-water-levels-of-almost-all-major-rivers-rising-riverbanks-have-br.html
  • ꯂꯣꯛꯇꯥꯛ ꯑꯃꯁꯨꯡ ꯏꯊꯥꯏ ꯕꯦꯔꯥꯖꯀꯤ ꯂꯦꯚꯦꯜꯁꯤꯡꯒꯤ (NHPC ꯑꯃꯁꯨꯡ CEA, ꯀꯣꯠꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ; ORF, ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ) ꯑꯃꯁꯨꯡ ꯊꯧꯕꯥꯜ (ꯃꯄꯤꯊꯦꯜ) ꯗꯦꯝꯒꯤ (ꯄꯥꯎꯗ ꯐꯣꯡꯗꯣꯛꯈꯤꯕ ꯃꯇꯨꯡ ꯏꯟꯅ) ꯔꯤꯄꯣꯔꯠꯁꯤꯡ꯫
  • US EPA. Storm Water Management Model (SWMM 5). US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS and HEC-RAS.

ꯑꯍꯦꯟꯕ ꯑꯃꯁꯨꯡ ꯐꯣꯔꯝꯁꯤꯡ

ꯑꯍꯦꯟꯕ / ꯐꯣꯔꯝ ꯑꯌꯥꯎꯕ
3A ꯃꯅꯤꯄꯨꯔꯒꯤ ꯁꯣꯏꯜ ꯁꯤꯔꯤꯖꯗꯒꯤ HSG ꯂꯨꯛꯑꯞ; ꯃꯇꯝ ꯃꯇꯨꯡ ꯏꯟꯅꯕ ꯑꯋꯥꯡꯕ ꯋꯥꯇꯔ ꯇꯦꯕꯜꯒꯤ ꯃꯦꯞ
3B ꯃꯅꯤꯄꯨꯔꯒꯤ CN ꯀꯦꯂꯤꯕ꯭ꯔꯦꯁꯟ ꯑꯃꯁꯨꯡ ꯍꯥꯄꯆꯤꯟꯕ ꯂꯝꯒꯤ ꯀꯚꯔꯁꯤꯡ (ꯇꯝꯄꯥꯛꯀꯤ ꯂꯧꯕꯨꯛ, ꯄꯥꯠ ꯑꯃꯁꯨꯡ ꯐꯨꯝꯗꯤ, ꯆꯤꯡꯒꯤ ꯎꯃꯡ ꯑꯃꯁꯨꯡ ꯖꯨꯝ (jhum) ꯂꯝ, ꯂꯦꯟꯗꯁ꯭ꯂꯥꯏꯗꯀꯤ ꯁ꯭ꯀꯥꯔꯁꯤꯡ ꯑꯃꯁꯨꯡ ꯆꯤꯡꯒꯤ ꯂꯝꯕꯤ ꯑꯃꯁꯨꯡ ꯔꯦꯜꯋꯦꯒꯤ ꯀꯠꯁꯤꯡ, ꯐꯨꯠꯍꯤꯜ ꯐꯦꯟꯁꯤꯡ, ꯑꯃꯁꯨꯡ ꯂꯣꯛꯇꯥꯛ ꯑꯃꯁꯨꯡ ꯔꯤꯖꯔꯚꯣꯌꯔꯁꯤꯡꯒꯤ ꯃꯅꯥꯛꯁꯤꯡ)
3C ꯁꯣꯐ꯭ꯠꯋꯦꯌꯔ ꯌꯥꯕꯒꯤꯗꯃꯛ ꯕꯦꯟꯆꯃꯥꯔꯛ ꯇꯦꯁ꯭ꯠ ꯄ꯭ꯔꯣꯕ꯭ꯂꯦꯝꯁꯤꯡ
3D ꯃꯥꯏꯊꯣꯏ ꯆꯞ ꯃꯥꯟꯅꯕ ꯀꯣꯁ꯭ꯇꯦꯜ ꯂꯝꯒꯤꯗꯃꯛ ꯄꯤꯛ ꯔꯦꯠ ꯐꯦꯛꯇꯔꯒꯤ ꯁ꯭ꯇꯗꯤ
3E ꯁꯕꯖꯣꯟ 2(b)-ꯒꯤ CWC SUH ꯄꯦꯔꯥꯃꯤꯇꯔꯁꯤꯡ, ꯁꯕꯖꯣꯟ 2(c)-ꯗ ꯆꯦꯛ ꯑꯣꯏꯅꯥ ꯁꯤꯖꯤꯟꯅꯕ, ꯋꯔꯛ ꯇꯧꯔꯕ ꯈꯨꯗꯝꯒꯥ ꯂꯣꯌꯅꯅꯥ
ꯐꯣꯔꯝ 3-1 ꯍꯥꯏꯗ꯭ꯔꯣꯂꯣꯖꯤꯒꯤ ꯀꯦꯜꯀꯨꯂꯦꯁꯟꯒꯤ ꯁꯝꯃꯔꯤ
ꯐꯣꯔꯝ 3-2 ꯗꯦꯚꯦꯂꯞꯃꯦꯟꯠꯀꯤ ꯃꯃꯥꯡ ꯑꯃꯁꯨꯡ ꯃꯇꯨꯡꯒꯤ ꯆꯥꯡꯗꯝꯅꯕ