Annexes to Chapter 4Site Runoff Control: Retention and Detention
These annexes support Chapter 4. Annex 4C is a complete Tier A worked example with routing tables, built on the illustrative example of Clause 4.6.7. Annex 4B sets out the structure of the Tier B tables, the provisional fixed release coefficients and a standard orifice table computed from the Chapter 4 orifice equation; the values that need NIH-DHAARA depths are still to be derived. Annex 4A needs GIS and groundwater data that this draft does not yet contain; it gives the intended layout and the interim rules of Chapter 4. Forms 4-1 to 4-3 are the submittal forms required by Clause 4.17. They are draft forms and have no statutory status.
Annex 4A — Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map
Supports Clauses 4.5.3, 4.5.4 and 4.12 of Chapter 4.
4A.1 Flood-sensitive catchment boundaries. The catchments are those listed in Clause 4.5.3.2, with any catchment notified under Clause 4.5.4. Their maps and GIS layer are the same data set as Annex 1B, which lists the catchments and gives the attribute layout of the layer. The two annexes shall be issued together.
4A.2 Shallow-groundwater zone map. This map shows the areas where Clause 4.12 applies: the coastal sand zone, the Kaveri delta, and any area where the groundwater table lies within 3 m of the surface at any time of year (Clause 4.12.1).
To be prepared. This annex will contain (a) the boundaries of the flood-sensitive catchments as a GIS layer and as maps at a scale fit for deciding whether a plot lies inside them, and (b) a map of the shallow-groundwater zone of Clause 4.12.1, with the seasonal high groundwater depth during and after the NE monsoon. It needs basin and sub-basin boundaries from a digital elevation model and the drainage network (WRD, NRSC, Survey of India), the delta command areas and canal systems (WRD), town boundaries (DTCP, CMDA, the Commissionerate of Municipal Administration), flood maps held by TNSDMA, observation-well records of the CGWB and the State Ground & Surface Water Resources Data Centre, and the extent of coastal sand from soil survey maps (NBSS&LUP, the Tamil Nadu soil survey). Until it is published: (a) the catchments named in Clause 4.5.3.2 apply, and whether a site lies in one is decided and recorded as set out in Annex 1B; and (b) every site to which Clause 4.12.1 may apply establishes its design groundwater level from site piezometer readings over one October–January season or, failing that, from the nearest CGWB or State observation well plus 0.5 m and the level of any adjacent tidal water body at MHWS (Clause 4.12.1(b)). For the flotation check in the coastal sand zone without piezometer readings, the design groundwater level is existing ground level (Clause 4.12.1).
Table 4A.1 — Attributes of the shallow-groundwater zone layer (layout)
| Field | Content | Unit or format |
|---|---|---|
| zone_id | Unique identifier | text |
| zone_class | Coastal sand zone; Kaveri delta; other area with groundwater within 3 m of the surface (Clause 4.12.1) | text |
| shgw_depth_m | Seasonal high groundwater depth below ground, NE monsoon season | m |
| shgw_basis | Wells or piezometers used, and period of record | text |
| tidal_influence | Whether the groundwater level follows an adjacent tidal water body (Clause 4.12.1(b)) | yes / no |
| source | Source agency and date of the data | text |
| geometry | Zone boundary | polygon |
Annex 4B — Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A)
Supports Clauses 4.4.6.3, 4.14.1, 4.14.2 and 4.14.4 to 4.14.6 of Chapter 4.
4B.1 This annex will hold four tables. Their status in this draft is:
Table 4B.1 — Contents of Annex 4B and their status
| Table | Content | Clause | Status in this draft |
|---|---|---|---|
| 4B.2 | Tier B permissible site discharge (PSD) and site storage requirement (SSR), the values of Table 4.3 | 4.14.2 | To be prepared |
| 4B.3 | Retention credit factor C_R | 4.4.6.3 | To be prepared; C_R = 0 until published |
| 4B.4 | Standard outlet sizes | 4.14.2 step 4, 4.14.6 | Computed in this annex from the orifice equation of Clause 4.6.5.2 |
| 4B.5 | Fixed release coefficients C_10 and C_2 (Table 4.3A) | 4.14.4 | Provisional values of Table 4.3A; confirmed values to be prepared |
4B.2 PSD and SSR (Table 4.3)
To be prepared. This table will give, for each rainfall zone, hydrologic soil group and post-development imperviousness, the PSD for the 2-yr and 100-yr stages and the SSR, for standard and flood-sensitive catchments, in the layout of Table 4.3. It needs NIH-DHAARA design depths with the climate factor for each zone (Chapter 2, Annex 2A), the sub-daily ratios of Annex 2B, and routing of a set of standard sites by the full method of Clause 4.6 for every AEP and duration of Table 4.1. Each PSD shall be the governing release cap and each SSR the governing storage per hectare, with a margin so that the simplified method is never cheaper than routing. Until it is published, Tier B sites use Clause 4.6, or the fixed-coefficient route of Clause 4.14.3 where the site is 1 ha or less (Clauses 4.14.1 and 4.14.3).
Table 4B.2 — Tier B PSD and SSR (layout of Table 4.3)
| Zone (Annex 2A) | HSG | Imperviousness | PSD 2-yr (L/s/ha) | PSD 100-yr (L/s/ha), standard | PSD 100-yr (L/s/ha), flood-sensitive | SSR (m³/ha), standard | SSR (m³/ha), flood-sensitive |
|---|---|---|---|---|---|---|---|
| North coastal (Chennai–Cuddalore) | A / B / C / D | 50% / 70% / 90% | — | — | — | — | — |
| Kaveri delta | C / D | 50% / 70% / 90% | — | — | — | — | — |
| Southern coastal | A / B / C / D | 50% / 70% / 90% | — | — | — | — | — |
| Western interior | B / C / D | 50% / 70% / 90% | — | — | — | — | — |
| Hill areas | B / C | 50% / 70% / 90% | — | — | — | — | — |
4B.3 Retention credit factor C_R
To be prepared. This table will give C_R for each rainfall zone, hydrologic soil group and design infiltration or drawdown rate of the retention practice (Clauses 4.4.3 and 4.4.6.3). It needs routing of the full duration set of Clause 2.5.2 with NIH-DHAARA depths, with the retention practice modelled as in Clause 4.4.6.2, and the credit expressed as the reduction in governing storage per cubic metre of retention provided. Until it is published, C_R = 0 (Clause 4.4.6.3).
Table 4B.3 — Retention credit factor C_R (layout)
| Zone (Annex 2A) | HSG | Design infiltration or drawdown rate (mm/h) | C_R (–) |
|---|---|---|---|
4B.4 Standard outlet sizes
4B.4.1 Table 4B.4 gives the largest circular orifice, in 5 mm steps, whose discharge does not exceed a stated permissible discharge at a stated head. It is computed from the orifice equation with the discharge coefficient of Clause 4.6.5.2:
Q = 0.60 × (π d² / 4) × √(2 g H)
where Q is the discharge (m³/s), d the orifice diameter (m), g = 9.81 m/s² and H the head from the water level to the centre of the orifice (m). Sizes are rounded down, so that the orifice never passes more than the permissible discharge. Where the computed size is below 50 mm, the 50 mm minimum of Clause 4.8.2 is shown; it is deemed to comply under Clause 4.5.5.1.
4B.4.2 The table assumes free discharge. Where the tailwater can rise above the orifice (Clause 4.6.6), H is the difference between the upstream and downstream water levels and the orifice shall be checked by routing. The State Stormwater Technical Committee may replace this table when it issues Annex 4B.
Table 4B.4 — Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
| Permissible discharge (L/s) | H = 0.5 m | H = 1.0 m | H = 1.5 m | H = 2.0 m |
|---|---|---|---|---|
| 5 | 55 | 50 | 50 | 50 |
| 10 | 80 | 65 | 60 | 55 |
| 15 | 100 | 80 | 75 | 70 |
| 20 | 115 | 95 | 85 | 80 |
| 30 | 140 | 115 | 105 | 100 |
| 50 | 180 | 150 | 135 | 130 |
| 75 | 225 | 185 | 170 | 155 |
| 100 | 260 | 215 | 195 | 180 |
| 150 | 315 | 265 | 240 | 225 |
| 200 | 365 | 305 | 275 | 260 |
| 300 | 450 | 375 | 340 | 315 |
Check: for 50 L/s at H = 1.0 m, the area is 0.050 / (0.60 × √(2 × 9.81 × 1.0)) = 0.0188 m², so d = √(4 × 0.0188 / π) = 0.155 m, rounded down to 150 mm.
4B.5 Fixed release coefficients (Table 4.3A)
4B.5.1 Table 4B.5 repeats the provisional coefficients of Table 4.3A. They may be used now under the fixed-coefficient route (Clause 4.14.4).
Table 4B.5 — Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
| Hydrologic soil group | C_10 | C_2 | Clause | Status |
|---|---|---|---|---|
| A (sandy, well drained) | 0.05 | 0.02 | 4.14.4 | Provisional |
| B | 0.08 | 0.03 | 4.14.4 | Provisional |
| C | 0.15 | 0.08 | 4.14.4 | Provisional |
| D (clay, poorly drained) | 0.25 | 0.15 | 4.14.4 | Provisional |
To be prepared. The confirmed coefficients will replace Table 4B.5. They need NIH-DHAARA depths for each zone and the greenfield curve numbers of Clause 3.3, as described in the commentary to Clause 4.14. Until they are published, the provisional values of Table 4.3A apply.
Annex 4C — Worked example (Tier A) with full routing tables
Supports Clauses 4.4 to 4.9, 4.15 and 4.17 of Chapter 4.
Illustrative — not design values. This example continues the illustrative example of Clause 4.6.7. Its inputs are invented to be plausible for coastal Tamil Nadu; they are not NIH-DHAARA values and must not be used for design. Part 1 sets out the inputs, hydrographs and routing step by step, for a trial outlet. Part 2 finds that the trial outlet fails the drawdown check with the blockage of Clause 4.8.3, and revises it to the outlet reported in Table 4.2. Part 3 completes the spillway, outlet, safety and retention checks. The outfall-closed check of Chapter 5 for the same facility on a tidal outfall is in Annex 5C.
Part 1 — Inputs, hydrographs and routing (Clauses 4.6.1 to 4.6.4)
4C.1 Inputs.
Table 4C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Site area A | 2.0 ha (0.02 km²), one outfall | Clause 4.6.7 |
| Catchment class | Flood-sensitive (Clause 4.5.3) | Clause 4.6.7 |
| Land cover and curve numbers, AMC II | Pre-development: all pervious, CN 70. Post-development, as two sub-areas: directly connected impervious 1.57 ha at CN 98, and pervious open space 0.43 ha at CN 70 (same soil as pre-development). Impervious fraction f = (92 − 70) / (98 − 70) = 0.786, so the area-weighted CN is 92 | Clauses 3.9.2, 4.6.7 |
| AMC III conversion | Pervious areas only, for storms of 12 h and longer: CN_III = 23·CN / (10 + 0.13·CN) = 84.3. The impervious CN 98 is not converted | Clause 3.8.4 |
| Initial abstraction | Ia = 0.2S; Ia = 0.05S as a sensitivity run | Clause 3.8.5 |
| Time of concentration Tc | 45 min pre-development; 15 min post-development, used for both sub-areas, because the open space is small and drains through the same site system | Clause 4.6.7 |
| Unit hydrograph | SCS triangular; tL = 0.6 Tc; tp = Δt/2 + tL; base 2.67 tp | Clauses 3.6.5, 3.11.2 |
| Time step Δt | 5 min (= Tc/3 of the post-development site) | Clause 4.6.2, step 8 |
| 24-h depths, 2-, 10-, 100-yr | 110, 200, 350 mm, taken as including the climate factor | Clause 4.6.7 |
| Shorter durations | P(t) = P24 · (t/24)^0.40 (assumed ratio set, not Annex 2B) | Clause 4.6.7 |
| 48-h and 72-h depths | 1.25 and 1.40 × P24, with the 24-h depth on the last day | Clauses 4.6.7, 2.9.2 |
| Storage | Open, vertical-walled, 2,500 m² plan area, excavated, no embankment, not publicly accessible | Clause 4.6.7 |
| Trial outlet | Stage 1: 120 mm orifice at the floor. Stage 2: 470 mm orifice, invert 0.533 m above the floor. No Stage 3 | Trial for this annex; Part 2 revises it |
| Outfall | Free outfall to a receiving drain whose level stays below the outlet invert | Illustrative input |
The example follows Clauses 3.8.4 and 3.9.2: the runoff of each sub-area is computed separately and the two are added before routing.
4C.2 Design rainfall. Table 4C.2 gives the depths. For example, the 100-yr 6-hour depth is 350 × (6/24)^0.40 = 350 × 0.574 = 201.0 mm.
Table 4C.2 — Design rainfall depths, mm (Illustrative — not design values)
| Duration (h) | 1 | 2 | 3 | 6 | 12 | 24 | 48 | 72 |
|---|---|---|---|---|---|---|---|---|
| 50% AEP (2-yr) | 30.9 | 40.7 | 47.9 | 63.2 | 83.4 | 110.0 | 137.5 | 154.0 |
| 10% AEP (10-yr) | 56.1 | 74.0 | 87.1 | 114.9 | 151.6 | 200.0 | 250.0 | 280.0 |
| 1% AEP (100-yr) | 98.2 | 129.5 | 152.3 | 201.0 | 265.3 | 350.0 | 437.5 | 490.0 |
4C.3 Hyetographs. Storms up to 24 h use the alternating-block method in 5-minute blocks with the peak block at mid-storm (Clause 2.9.1). The 48- and 72-hour storms spread the depth in excess of the 24-hour depth uniformly over the first 24 or 48 h and place the 24-hour alternating-block storm on the last day (Clause 2.9.2). For the 100-yr 72-hour storm: (490.0 − 350.0) / 576 blocks = 0.243 mm per 5 minutes for the first 48 h; the peak 5-minute block on the last day is 350 × (5/1440)^0.40 = 36.3 mm, at 60:00–60:05 h.
4C.4 Losses. Table 4C.3 gives S = 25,400/CN − 254 (mm) and Ia = 0.2S. The runoff depth for a rainfall depth P is Q = (P − Ia)² / (P − Ia + S) for P > Ia, and zero otherwise.
Table 4C.3 — Curve numbers and abstractions (Illustrative — not design values)
| Condition | AMC | CN | S (mm) | Ia = 0.2S (mm) |
|---|---|---|---|---|
| Pre-development | II (durations ≤ 6 h) | 70 | 108.9 | 21.8 |
| Pre-development | III (durations ≥ 12 h) | 84.3 | 47.3 | 9.5 |
| Post-development pervious open space (0.43 ha) | II (durations ≤ 6 h) | 70 | 108.9 | 21.8 |
| Post-development pervious open space (0.43 ha) | III (durations ≥ 12 h) | 84.3 | 47.3 | 9.5 |
| Post-development directly connected impervious (1.57 ha) | All durations (not converted) | 98 | 5.2 | 1.0 |
Check: 100-yr 24 h, post-development. Impervious: Q = (350.0 − 1.0)² / (350.0 − 1.0 + 5.2) = 343.9 mm. Pervious, AMC III: Q = (350.0 − 9.5)² / (350.0 − 9.5 + 47.3) = 299.0 mm. Site: 0.786 × 343.9 + 0.214 × 299.0 = 334.2 mm. The post-development columns of Table 4C.4 are these area-weighted site depths.
Table 4C.4 — Storm runoff depth Q, mm (Illustrative — not design values)
| Duration (h) | AMC | 2-yr pre | 2-yr post | 10-yr pre | 10-yr post | 100-yr post |
|---|---|---|---|---|---|---|
| 1 | II | 0.7 | 20.1 | 8.2 | 41.3 | 79.2 |
| 2 | II | 2.8 | 28.2 | 16.9 | 57.2 | 108.5 |
| 3 | II | 5.1 | 34.2 | 24.5 | 69.0 | 130.2 |
| 6 | II | 11.4 | 47.5 | 42.9 | 94.7 | 177.1 |
| 12 | III | 45.0 | 70.5 | 106.6 | 137.2 | 249.9 |
| 24 | III | 68.4 | 96.4 | 152.6 | 185.1 | 334.2 |
| 48 | III | 93.5 | 123.3 | 201.0 | 234.7 | 421.5 |
| 72 | III | 108.9 | 139.6 | 230.3 | 264.5 | 473.9 |
The runoff volume is 10 × Q × A = 20 × Q m³ for this 2.0 ha site: for example 9,478 m³ for the 100-yr 72-hour storm. The routed hydrographs carry up to 0.5% less, because the 5-minute alternating-block storm places 349.5 mm rather than 350.0 mm on the last day.
4C.5 Unit hydrographs. The runoff in each 5-minute block (for the post-development site, the sum of the two sub-areas) is convolved with the triangular unit hydrograph of Table 4C.5. The peak is qp = 0.208 × A × Q / tp, with A in km² and Q = 1 mm (Clause 3.11.2).
Table 4C.5 — Unit hydrograph parameters (Illustrative — not design values)
| Condition | Tc (h) | tL = 0.6 Tc (h) | tp = Δt/2 + tL (h) | Base 2.67 tp (h) | qp (L/s per mm of runoff) |
|---|---|---|---|---|---|
| Pre-development | 0.75 | 0.45 | 0.492 | 1.313 | 8.5 |
| Post-development | 0.25 | 0.15 | 0.192 | 0.512 | 21.7 |
4C.6 Release caps (Clause 4.5.3). The site is flood-sensitive, so the mixed-frequency rule applies. The 100-yr cap is the largest pre-development 10-yr peak over all durations: 356 L/s (72 h; Table 4.2). The 2-yr cap is the largest pre-development 2-yr peak: 180 L/s (72 h). Each cap applies to every post-development duration (Clause 4.5.3.1).
4C.7 Stage–storage–discharge. The basin is vertical-walled, so storage S = 2,500 × h (m³), where h is the stage above the floor (m). Outlet discharge follows Clause 4.6.5.2 with Cd = 0.60:
- Stage 1, for h ≥ d: Q1 = 0.60 × A1 × √(2g (h − d/2)). For h < d (orifice part-full), the head is taken as d/2 and the result is multiplied by h/d.
- Stage 2 is counted once the water is above its centre: Q2 = 0.60 × A2 × √(2g (h − z2 − d2/2)), where z2 is its invert. Below its centre its flow is ignored, which slightly over-states storage.
Table 4C.6 — Stage–storage–discharge, trial outlet (Illustrative — not design values)
| Stage h (m) | Storage (m³) | Stage 1, 120 mm (L/s) | Stage 2, 470 mm (L/s) | Total (L/s) |
|---|---|---|---|---|
| 0.00 | 0 | 0.0 | 0.0 | 0.0 |
| 0.06 | 150 | 3.7 | 0.0 | 3.7 |
| 0.12 | 300 | 7.4 | 0.0 | 7.4 |
| 0.20 | 500 | 11.2 | 0.0 | 11.2 |
| 0.30 | 750 | 14.7 | 0.0 | 14.7 |
| 0.40 | 1,000 | 17.5 | 0.0 | 17.5 |
| 0.50 | 1,250 | 19.9 | 0.0 | 19.9 |
| 0.60 | 1,500 | 22.1 | 0.0 | 22.1 |
| 0.70 | 1,750 | 24.0 | 0.0 | 24.0 |
| 0.80 | 2,000 | 25.9 | 83.0 | 108.9 |
| 0.90 | 2,250 | 27.5 | 167.8 | 195.3 |
| 1.00 | 2,500 | 29.1 | 222.3 | 251.4 |
| 1.10 | 2,750 | 30.7 | 265.8 | 296.5 |
| 1.20 | 3,000 | 32.1 | 303.2 | 335.3 |
| 1.30 | 3,250 | 33.5 | 336.4 | 369.9 |
| 1.40 | 3,500 | 34.8 | 366.7 | 401.5 |
Check at h = 1.00 m: Q1 = 0.60 × 0.01131 × √(19.62 × 0.94) = 0.0291 m³/s; Q2 = 0.60 × 0.1735 × √(19.62 × (1.00 − 0.533 − 0.235)) = 0.2223 m³/s.
4C.8 Routing. Each storm is routed by level-pool continuity (Clause 4.6.1): over each 5-minute step, the change in storage equals inflow volume minus outflow volume. The computation used six 50-second sub-steps per 5-minute step. Each row of Table 4C.7 can be checked by hand as ΔS ≈ (I − Ō) × 300 s, where I is the mean inflow over the 5-minute step ending at the time shown and Ō is the mean of the outflows at the start and end of the step. For example, between 60:15 and 60:20: ΔS = 2,853.0 − 2,613.3 = 239.7 m³, and (1.0891 − (0.2655 + 0.3069)/2) × 300 = 240.9 m³.
Table 4C.7 — Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
| Time (h:min) | Rainfall in step (mm) | Inflow I (L/s) | Outflow O (L/s) | Storage S (m³) | Stage h (m) |
|---|---|---|---|---|---|
| 60:00 | 8.44 | 286.3 | 169.5 | 2,164.0 | 0.866 |
| 60:05 | 36.33 | 354.2 | 184.1 | 2,216.9 | 0.887 |
| 60:10 | 11.61 | 703.3 | 218.0 | 2,367.1 | 0.947 |
| 60:15 | 6.88 | 1,066.0 | 265.5 | 2,613.3 | 1.045 |
| 60:20 | 5.23 | 1,089.1 | 306.9 | 2,853.0 | 1.141 |
| 60:25 | 4.34 | 897.5 | 334.8 | 3,025.0 | 1.210 |
| 60:30 | 3.77 | 653.2 | 349.9 | 3,117.6 | 1.247 |
| 60:35 | 3.36 | 403.6 | 353.8 | 3,132.9 | 1.253 |
| 60:40 | 3.05 | 301.5 | 352.3 | 3,117.3 | 1.247 |
| 60:45 | 2.81 | 254.8 | 348.6 | 3,088.7 | 1.235 |
| 60:50 | 2.61 | 224.9 | 343.7 | 3,052.4 | 1.221 |
| 60:55 | 2.45 | 203.3 | 337.9 | 3,011.3 | 1.205 |
Storage is greatest at the end of the step ending at 60:35. In the next step the mean inflow (302 L/s) is below the outflow (about 352 L/s), so storage falls.
Table 4C.8 — Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
| Time (h) | Cumulative rainfall (mm) | Inflow (L/s) | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 12 | 35.0 | 14 | 8 | 0.130 | 325 |
| 24 | 70.0 | 15 | 12 | 0.215 | 536 |
| 36 | 105.0 | 16 | 14 | 0.264 | 660 |
| 48 | 140.0 | 16 | 15 | 0.294 | 736 |
| 54 | 181.7 | 47 | 19 | 0.469 | 1,172 |
| 57 | 213.5 | 69 | 23 | 0.623 | 1,559 |
| 59 | 248.5 | 120 | 91 | 0.789 | 1,971 |
| 60 | 293.3 | 286 | 170 | 0.866 | 2,164 |
| 61 | 378.0 | 187 | 332 | 1.187 | 2,967 |
| 62 | 399.3 | 106 | 237 | 0.968 | 2,421 |
| 63 | 414.5 | 80 | 142 | 0.829 | 2,072 |
| 66 | 446.9 | 51 | 52 | 0.771 | 1,927 |
| 72 | 489.5 | 33 | 33 | 0.768 | 1,920 |
| 84 | 489.5 | 0 | 18 | 0.405 | 1,012 |
| 96 | 489.5 | 0 | 10 | 0.167 | 418 |
| 108 | 489.5 | 0 | 4 | 0.058 | 146 |
The routed outflow volume equals the inflow volume (about 9,470 m³): detention delays the volume but does not remove it.
4C.9 Results, trial outlet. Table 4C.9 gives the peaks, maximum stages and drawdown times for the trial outlet.
Table 4C.9 — Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
| Duration (h) | 2-yr detained (L/s) | 2-yr max stage (m) | 10-yr detained (L/s) | 10-yr max stage (m) | 100-yr detained (L/s) | 100-yr max stage (m) | 100-yr storage (m³) | 10-yr 90% drawdown, clean (h) | 10-yr 90% drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 9 | 0.15 | 15 | 0.30 | 22 | 0.59 | 1,468 | 27.2 | 54.2 |
| 2 | 11 | 0.20 | 18 | 0.42 | 89 | 0.79 | 1,966 | 28.3 | 57.0 |
| 3 | 13 | 0.24 | 20 | 0.50 | 135 | 0.82 | 2,058 | 29.3 | 59.1 |
| 6 | 15 | 0.31 | 23 | 0.64 | 190 | 0.89 | 2,229 | 31.1 | 63.4 |
| 12 | 17 | 0.40 | 49 | 0.77 | 279 | 1.06 | 2,647 | 36.2 | 69.2 |
| 24 | 19 | 0.45 | 87 | 0.79 | 334 | 1.20 | 2,991 | 42.8 | 75.4 |
| 48 | 20 | 0.51 | 144 | 0.83 | 353 | 1.25 | 3,129 | 42.5 | 72.7 |
| 72 | 20 | 0.52 | 147 | 0.84 | 354 | 1.25 | 3,133 | 42.5 | 71.9 |
The drawdown time is measured from the time of maximum 10-yr storage until 90% of that storage has been released (Clause 4.7.1).
Part 2 — Checks and revision of the outlet (Clauses 4.5, 4.7 and 4.8)
4C.10 Release caps. Every 100-yr detained peak is at or below 356 L/s, and every 2-yr detained peak is far below the 2-yr cap of 180 L/s. Both caps are met. The 2-yr peaks are not compared duration by duration with the pre-development peaks: for a flood-sensitive site the 2-yr cap is the single largest pre-development 2-yr peak (Clause 4.5.3.1).
4C.11 Drawdown. Clause 4.8.3 requires the low-flow orifice to be assumed 50% blocked when drawdown is checked. With the 120 mm orifice at half its area, 90% of the 10-yr storage takes 54 to 75 h to drain (Table 4C.9), against the 48-hour limit of Clause 4.7.1. The trial outlet fails. With a clean orifice it would drain in about 42 h.
4C.12 Revised outlet. The low-flow orifice was increased in 10 mm steps until the blocked drawdown met 48 h for every duration, and Stage 2 was then re-sized so that the 100-yr cap was still met. The result:
- Stage 1: 170 mm orifice at the floor;
- Stage 2: 460 mm orifice, invert 0.53 m above the floor (centre at 0.76 m);
- no Stage 3.
The larger low-flow orifice releases more in frequent storms. That is acceptable here because the 2-yr cap of a flood-sensitive site is the largest pre-development 2-yr peak (Clause 4.5.3.1). The WQv is assumed to be treated in a separate practice upstream (Chapter 8), so Stage 1 is not required to hold the WQv for 24–48 h (Clause 4.6.5.1); where Stage 1 also releases the WQv, Clause 4.7.2 must be checked as well.
Table 4C.10 — Stage–storage–discharge, revised outlet (Illustrative — not design values)
| Stage h (m) | Storage (m³) | Stage 1, 170 mm (L/s) | Stage 2, 460 mm (L/s) | Total (L/s) |
|---|---|---|---|---|
| 0.00 | 0 | 0.0 | 0.0 | 0.0 |
| 0.085 | 213 | 8.8 | 0.0 | 8.8 |
| 0.17 | 425 | 17.6 | 0.0 | 17.6 |
| 0.30 | 750 | 28.0 | 0.0 | 28.0 |
| 0.40 | 1,000 | 33.9 | 0.0 | 33.9 |
| 0.50 | 1,250 | 38.9 | 0.0 | 38.9 |
| 0.60 | 1,500 | 43.3 | 0.0 | 43.3 |
| 0.70 | 1,750 | 47.3 | 0.0 | 47.3 |
| 0.76 | 1,900 | 49.6 | 0.0 | 49.6 |
| 0.80 | 2,000 | 51.0 | 88.3 | 139.3 |
| 0.90 | 2,250 | 54.5 | 165.3 | 219.7 |
| 1.00 | 2,500 | 57.7 | 216.4 | 274.1 |
| 1.10 | 2,750 | 60.8 | 257.5 | 318.3 |
| 1.17 | 2,925 | 62.8 | 282.8 | 345.6 |
| 1.20 | 3,000 | 63.7 | 293.0 | 356.7 |
| 1.30 | 3,250 | 66.5 | 324.6 | 391.1 |
Table 4C.11 — Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
| Duration (h) | 2-yr detained (L/s) | 2-yr max stage (m) | 10-yr detained (L/s) | 10-yr max stage (m) | 10-yr storage (m³) | 100-yr detained (L/s) | 100-yr max stage (m) | 100-yr storage (m³) | 10-yr 90% drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 15 | 0.14 | 28 | 0.29 | 734 | 42 | 0.57 | 1,426 | 31.3 |
| 2 | 20 | 0.19 | 34 | 0.40 | 990 | 79 | 0.76 | 1,911 | 32.1 |
| 3 | 22 | 0.22 | 37 | 0.46 | 1,147 | 139 | 0.80 | 1,999 | 32.8 |
| 6 | 25 | 0.26 | 41 | 0.56 | 1,386 | 194 | 0.86 | 2,154 | 34.2 |
| 12 | 30 | 0.33 | 46 | 0.68 | 1,692 | 276 | 1.01 | 2,512 | 39.0 |
| 24 | 32 | 0.37 | 49 | 0.75 | 1,870 | 320 | 1.11 | 2,766 | 45.3 |
| 48 | 34 | 0.40 | 82 | 0.77 | 1,913 | 343 | 1.17 | 2,913 | 44.8 |
| 72 | 34 | 0.41 | 84 | 0.77 | 1,915 | 343 | 1.16 | 2,911 | 44.7 |
Findings:
- 100-yr cap: largest detained peak 343 L/s ≤ 356 L/s. Met.
- 2-yr cap: largest detained peak 34 L/s ≤ 180 L/s. Met.
- Drawdown: longest blocked drawdown 45.3 h ≤ 48 h (Clause 4.7.1). Met.
- Governing storage: 2,913 m³ (100-yr, 48 h), at a maximum stage of 1.17 m. The larger low-flow orifice releases more water early in the long storms, so the revised outlet needs about 220 m³ less storage than the trial outlet. Table 4.2 in Clause 4.6.7 reports this revised design.
- Governing storms (Clause 4.6.2, step 12): storage, the 100-yr 48-hour storm; Stage 1, the 10-yr 24-hour storm (drawdown); Stage 2, the 100-yr 48-hour storm (cap).
Part 3 — Sensitivity, retention, spillway, outlet details and safety
4C.13 Ia = 0.05S sensitivity (Clause 3.8.5). With S converted as S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15, the governing 100-yr 48-hour run gives 2,898 m³ of storage and a 341 L/s peak, slightly below the default run. The pre-development 10-yr peak, and so the 100-yr cap, falls to 344 L/s. The design is based on the default run (Clause 3.8.5(c)); the sensitivity results are reported on Form 3-2.
4C.14 Retention and retention credit (Clauses 4.4.2 and 4.4.6). With an illustrative retention depth P_R = 40 mm, Q_R is computed for each sub-area at AMC II, because a composite CN is not used for retention (Clause 3.9.4). Impervious, CN 98: S = 5.2 mm, Ia = 1.0 mm, Q_R = (40 − 1.0)² / (40 − 1.0 + 5.2) = 34.4 mm. Pervious, CN 70: S = 108.9 mm, Ia = 21.8 mm, Q_R = (40 − 21.8)² / (40 − 21.8 + 108.9) = 2.6 mm. RRV = 10 × (34.4 × 1.571 + 2.6 × 0.429) = 552 m³. The retention is modelled as a store that is empty at the start of the storm and captures all runoff until full, with no infiltration during the storm (Clause 4.4.6.2).
Table 4C.12 — Retention credit by routing, revised outlet (Illustrative — not design values)
| 100-yr storm | Storage without retention (m³) | Storage with retention (m³) | Reduction (m³) |
|---|---|---|---|
| 24 h | 2,766 | 2,628 | 138 |
| 48 h | 2,913 | 2,906 | 7 |
| 72 h | 2,911 | 2,911 | 0 |
The governing storage falls from 2,913 to 2,906 m³, so the retention credit is 7 m³, about 1% of the RRV. The retention is still required in full for its own purposes (Clause 4.4.1, Chapter 8).
4C.15 Emergency spillway (Clause 4.9). The facility is excavated, with no embankment, so Clause 4.9.7 applies: the overflow route is treated as the spillway and must meet Clause 4.9.1.
- Design flow: the 1% AEP peak inflow, 1,089 L/s, with the outlet blocked and the basin full to the crest.
- Crest: the 1% AEP maximum water level with the outlet working is 1.17 m; with the recommended 0.15 m clearance (Clause 4.9.3) the crest is set at 1.35 m.
- Crest length: a broad-crested weir with Q = C × L × H^1.5, C = 1.7 (an illustrative coefficient for a broad-crested weir in SI units; Clause 4.6.5.2 requires a coefficient suited to the shape). With L = 4.0 m: H = (1.089 / (1.7 × 4.0))^(2/3) = 0.295 ≈ 0.30 m.
- Maximum level with the spillway flowing: 1.35 + 0.30 = 1.65 m. With 0.3 m freeboard (Clause 4.9.1), the top of the walls is at least 1.95 m above the floor.
- The spillway discharges to the 1% AEP overland flow path, away from buildings (Clause 4.9.4).
4C.16 Outlet details (Clause 4.8).
Table 4C.13 — Outlet checks, revised outlet (Illustrative — not design values)
| Item | Requirement | Value | Result |
|---|---|---|---|
| Minimum orifice | ≥ 50 mm (Clause 4.8.2) | 170 mm | Met |
| Rack bar spacing | ≤ half the smallest opening and ≥ 25 mm (Clause 4.8.3) | ≤ 85 mm | Set at 75 mm |
| Rack open area | ≥ 10 × area protected (Clause 4.8.3) | 10 × (0.0227 + 0.1662) m² = 1.89 m² for one rack around both orifices | Provide ≥ 1.89 m² |
| Anti-vortex, Stage 1 | Needed if head > 1.5 d (Clause 4.8.4) | Head up to 1.08 m > 0.26 m | Required |
| Anti-vortex, Stage 2 | Needed if head > 1.5 d (Clause 4.8.4) | Head above centre up to 0.41 m < 0.69 m | Not required |
| Isolation | Facility serving > 1 ha (Clause 4.8.6) | Serves 2.0 ha | Stop-log slot or penstock, normally open |
| Outlet barrel | ≥ 300 mm (Clause 4.8.5) | Sized under Chapter 9 for 343 L/s | To be designed |
4C.17 Safety (Clause 4.15). The 10-yr depth (0.77 m) exceeds the 0.45 m limit for publicly accessible storage (Clause 4.15.1(a)), so the facility is not open to the public. It has vertical walls higher than 0.6 m and a depth of more than 1.2 m when the spillway flows, so a non-climbable fence at least 1.2 m high with a lockable gate is required (Clause 4.15.3). Signs and a depth marker are provided (Clause 4.15.5).
4C.18 Summary of the design (Illustrative — not design values).
Table 4C.14 — Summary of the revised design (Illustrative — not design values)
| Item | Value |
|---|---|
| Storage | 2,500 m² plan area; 2,913 m³ at the 1% AEP maximum level of 1.17 m |
| Stage 1 | 170 mm orifice at the floor, with trash rack and anti-vortex plate |
| Stage 2 | 460 mm orifice, invert 0.53 m |
| Spillway | Crest 1.35 m, length 4.0 m, maximum level 1.65 m |
| Top of walls | ≥ 1.95 m above the floor |
| 100-yr peak release | 343 L/s (cap 356 L/s) |
| 2-yr peak release | 34 L/s (cap 180 L/s) |
| 10-yr drawdown, 50% blocked | 45.3 h (limit 48 h) |
| Retention | RRV 552 m³ provided in addition; credit 7 m³ |
| Still to be checked | Outfall-closed check on a tidal outfall (Annex 5C); downstream analysis (Chapter 5); groundwater and flotation (Clause 4.12); WQv (Chapter 8) |
Form 4-1 — Site Runoff Control Report
Supports Clauses 4.3 to 4.17 of Chapter 4.
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0. One form for each site. Where the site drains to more than one outfall, complete Sections E to J for each outfall (Clause 4.5.1.3). Tier B sites using Clause 4.14.2 attach Form 4-2 in place of Sections F and G; sites using the fixed-coefficient route attach Form 4-3 in place of Sections F and G (Clause 4.17).
A. Site and route
Table 4F.1 — Form 4-1: site and route
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Approving Authority and tier (Tier A / Tier B) | |
| A4. Site area, land disturbance and new or replaced impervious area (ha, ha, m²) (Clause 4.1.2) | |
| A5. Number of outfalls (Clause 4.5.1.3) | |
| A6. Sizing route: full method (Clause 4.6) / Tier B tables (Clause 4.14.2) / fixed-coefficient route (Clause 4.14.3) | |
| A7. Constrained redevelopment route used (Clause 4.5.6)? If yes, attach the Constraint Statement, the existing-condition model and the shortfall and fee computation |
B. Inputs (Clause 4.17, item 1)
Table 4F.2 — Form 4-1: inputs
| Field | Entry |
|---|---|
| B1. Design Rainfall Sheet reference (Form 2-1) | |
| B2. Hydrologic Calculation Summary reference (Form 3-1) | |
| B3. HSG of each sub-area and the tests that confirm it (Clause 4.6.2, step 1) | |
| B4. Pre-development condition and CN (Clause 4.5.1.2) | |
| B5. Post-development CN of each sub-area, and Tc pre and post | |
| B6. Routing method and software, with version; time step (Clauses 4.6.1, 4.6.2) |
C. Order of measures (Clause 4.3.1; Clause 4.17, item 2)
Table 4F.3 — Form 4-1: order of measures
| Step | What the design does | Why this step cannot do more |
|---|---|---|
| 1. Preserve | ||
| 2. Retain | ||
| 3. Detain | ||
| 4. Convey |
D. Retention (Clause 4.4; Clause 4.17, items 3 and 4)
Table 4F.4 — Form 4-1: retention
| Field | Entry |
|---|---|
| D1. Retention depth P_R (mm) and zone (Annex 2E) | |
| D2. Runoff depth Q_R (mm) by sub-area and RRV (m³) (Clause 4.4.2) | |
| D3. Retention practices and volume provided (m³) | |
| D4. Infiltration tests: number, locations and depths, measured rates (mm/h) (Clause 4.4.3(a)) | |
| D5. Design infiltration rate (mm/h), not more than half the measured rate (Clause 4.4.3(b)) | |
| D6. Seasonal high groundwater depth below the base of each practice (m), at least 1.0 m (Clause 4.4.3(c)) | |
| D7. Reuse demand calculation, where retention is by reuse (Clause 4.4.3) | |
| D8. Retention drawdown time (h), not more than 72 h (Clause 4.4.5) | |
| D9. Shortfall in RRV (m³), if any, treated as WQv (Clause 4.4.4.2) | |
| D10. Governing storage without and with retention, and the retention credit (m³) (Clause 4.4.6) | |
| D11. Preservation credit areas and covenant reference (Clause 4.4.7) |
E. Release criteria (Clause 4.5; Clause 4.17, item 5)
Table 4F.5 — Form 4-1: release criteria
| Field | Entry |
|---|---|
| E1. Catchment class: standard (Clause 4.5.2) or flood-sensitive (Clause 4.5.3), with the Annex 4A map extract | |
| E2. Release caps by AEP (L/s), and the duration that sets each cap | |
| E3. Clause 4.5.5 used (50 mm orifice deemed to comply, or the short-duration 2-yr relief)? Report any 2-yr exceedance |
F. Results (Clause 4.6; Clause 4.17, item 6)
Complete one row for each duration, in the format of Table 4.2. Mark the governing case for storage, for each outlet stage and for the spillway (Clause 4.6.2, step 12).
Table 4F.6 — Form 4-1: results by duration (L/s; m³)
| Duration (h) | 2-yr pre | 2-yr post, detained | 10-yr pre | 10-yr post, detained | 100-yr post, uncontrolled | 100-yr post, detained | 100-yr storage used |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 6 | |||||||
| 12 | |||||||
| 24 | |||||||
| 48 | |||||||
| 72 |
G. Facility, drawdown and outlet (Clauses 4.7, 4.8, 4.10; Clause 4.17, items 7 to 9)
Table 4F.7 — Form 4-1: facility, drawdown and outlet
| Field | Entry |
|---|---|
| G1. Facility type (Clause 4.10) and storage provided (m³) | |
| G2. Stage–storage and stage–discharge tables and plots; inflow and outflow hydrographs for the governing cases (attach) | |
| G3. 10-yr drawdown: time to release 90% of the maximum stored volume (h), with the low-flow orifice 50% blocked (Clauses 4.7.1, 4.8.3) | |
| G4. WQv release time (h), 24 to 48 h (Clause 4.7.2) | |
| G5. Tidal outfall: drawdown with the tidal tailwater, and any pumped drawdown (Clause 4.7.4) | |
| G6. Each outlet stage: type, size (mm), invert level (m) | |
| G7. Trash racks: clear bar spacing (mm) and open area (m²) (Clause 4.8.3) | |
| G8. Anti-vortex devices (Clause 4.8.4); outlet barrel diameter and seepage control (Clause 4.8.5); isolation (Clause 4.8.6) | |
| G9. Proprietary devices: certified head–discharge curve and minimum clear opening (Clause 4.6.5.3) |
H. Spillway, freeboard and embankment (Clause 4.9; Clause 4.17, item 10)
Table 4F.8 — Form 4-1: spillway and freeboard
| Field | Entry |
|---|---|
| H1. Hazard classification, with reasons (Clause 4.9.2) | |
| H2. 1% AEP peak inflow (L/s); 0.2% AEP peak inflow for high-hazard facilities (L/s) | |
| H3. 1% AEP maximum water level with the outlet working (m); spillway crest level (m) (Clause 4.9.3) | |
| H4. Spillway or overflow route: type, dimensions, maximum level with the outlet blocked (m) | |
| H5. Freeboard to the embankment crest or wall top (m), at least 0.3 m (Clause 4.9.1) | |
| H6. Spillway location and discharge path (Clause 4.9.4) | |
| H7. Embankment height (m); geotechnical report where more than 2 m (Clause 4.9.6) |
I. RWH accounting, groundwater and flotation (Clauses 4.11, 4.12; Clause 4.17, items 11 and 12)
Table 4F.9 — Form 4-1: RWH, groundwater and flotation
| Field | Entry |
|---|---|
| I1. RWH storage provided (m³), assumed full at the start of every storm (Clause 4.11.2) | |
| I2. Combined RWH and detention tanks: zone levels and the detention orifice level (Clause 4.11.3); attach tank sections | |
| I3. Design groundwater level and its basis (Clause 4.12.1) | |
| I4. Lined or unlined storage; volume below the design groundwater level not counted (Clause 4.12.2) | |
| I5. Flotation factor of safety, at least 1.2 (Clause 4.12.3) |
J. Downstream, tailwater, safety and maintenance (Clause 4.17, items 13 and 14)
Table 4F.10 — Form 4-1: downstream, tailwater, safety and maintenance
| Field | Entry |
|---|---|
| J1. Downstream and Tailwater Report (Form 5-1) or Simplified Downstream Statement (Form 5-2) reference | |
| J2. Tailwater used in routing, and flap gate where tailwater governs (Clause 4.6.6) | |
| J3. Public access, depths in the 10% and 1% AEP storms, slopes, fencing, grates, signs and depth markers (Clause 4.15) | |
| J4. Draft maintenance declaration reference (Chapter 10) |
K. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 4 of the Tamil Nadu Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 4 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 4F.11 — Form 4-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0.
Form 4-2 — Tier B Site Sheet
Supports Clauses 4.4.6.3, 4.14.1 and 4.14.2 of Chapter 4.
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0. This sheet replaces items 6 and 7 of the Site Runoff Control Report (Form 4-1) for Tier B sites using Clause 4.14.2. It can be used only after Table 4.3 is published in Annex 4B; until then, Tier B sites use Clause 4.6 or, for sites of 1 ha or less, the fixed-coefficient route (Clauses 4.14.1 and 4.14.3).
A. Eligibility (Clause 4.14.1)
Table 4F.12 — Form 4-2: eligibility
| Field | Entry |
|---|---|
| A1. Local body (Tier B) | |
| A2. Site area A (ha): 2 ha or less outside flood-sensitive catchments; 0.5 ha or less inside them | |
| A3. Catchment class: standard or flood-sensitive (Annex 4A) |
B. Table 4.3 values (Clause 4.14.2, step 1)
Table 4F.13 — Form 4-2: values read from Table 4.3
| Field | Entry |
|---|---|
| B1. Rainfall zone (Annex 2A) | |
| B2. Hydrologic soil group | |
| B3. Post-development imperviousness (%) | |
| B4. PSD 2-yr (L/s/ha) | |
| B5. PSD 100-yr (L/s/ha), for the catchment class | |
| B6. SSR (m³/ha), for the catchment class |
C. Storage and release (Clause 4.14.2, steps 2 and 3)
Table 4F.14 — Form 4-2: storage and release
| Line | Quantity | Computation | Value |
|---|---|---|---|
| C1 | RRV provided (m³) | Clause 4.4 | |
| C2 | C_R | Annex 4B; 0 until published | |
| C3 | V_credit (m³) | C2 × C1 (Clause 4.4.6.3) | |
| C4 | Required storage V (m³) | B6 × A − C3 | |
| C5 | Storage provided (m³) | From drawings | |
| C6 | Q_PSD,2 (L/s) | B4 × A | |
| C7 | Q_PSD,100 (L/s) | B5 × A |
D. Outlet and other provisions (Clause 4.14.2, steps 4 and 5)
Table 4F.15 — Form 4-2: outlet and other provisions
| Field | Entry |
|---|---|
| D1. Low-flow orifice: diameter (mm) from the Annex 4B outlet table, head (m), at least 50 mm | |
| D2. Upper control: type, size and level | |
| D3. Spillway or overflow (Clause 4.9) | |
| D4. RWH accounting (Clause 4.11) | |
| D5. Safety provisions (Clause 4.15) |
E. Statement
I state that the values above are taken from Annex 4B for the site's zone, soil group, imperviousness and catchment class, and that the storage and outlets shown on the drawings match them.
Table 4F.16 — Form 4-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0.
Form 4-3 — Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7)
Supports Clauses 4.14.3 to 4.14.7 of Chapter 4.
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0. This sheet replaces items 6 and 7 of the Site Runoff Control Report (Form 4-1) for sites using the fixed-coefficient route. Complete it for each point where runoff leaves the site (Clause 4.14.4). Figure 4.3 shows the method.
A. Eligibility (Clause 4.14.3)
Table 4F.17 — Form 4-3: eligibility
| Check | Yes / No |
|---|---|
| A1. Site area 1 ha or less | |
| A2. The design does not count tank or waterbody storage (Clause 4.14.3(a)) | |
| A3. No part of the site lies within a waterbody setback (Clause 4.14.3(b)) | |
| A4. The site does not drain to a tank cascade whose storage is counted in a downstream design (Clause 4.14.3(c)) |
B. Release caps (Clause 4.14.4)
Table 4F.18 — Form 4-3: release caps
| Line | Quantity | Source or computation | Value |
|---|---|---|---|
| B1 | Site area A (ha) | Survey | |
| B2 | Area of each hydrologic soil group (ha) | Clause 3.7 | |
| B3 | C_10 and C_2, area-weighted | Table 4.3A | |
| B4 | i_10 and i_2 (mm/h), 15-minute duration, with the climate factor | Form 2-1; Clause 2.8 | |
| B5 | Q_cap,10 (L/s) | 2.78 × C_10 × i_10 × A | |
| B6 | Q_cap,2 (L/s) | 2.78 × C_2 × i_2 × A | |
| B7 | Discharge of a 50 mm orifice at the corresponding stage (L/s), where a cap is smaller (Clause 4.5.5.1) | Orifice equation, Clause 4.6.5.2 |
C. Volumetric coefficient (Clause 4.14.5)
Table 4F.19 — Form 4-3: volumetric coefficient C_v
| Line | Quantity | Value |
|---|---|---|
| C1 | Composite C of Table 3.2 (upper half of each range) | |
| C2 | Cf of Table 3.3 for the 1% AEP | |
| C3 | C_v for durations below 12 h (C1 × C2) | |
| C4 | C_v for durations of 12 h or more, with C for every pervious surface not less than 0.50 |
D. Storage (Clause 4.14.5)
For each duration: inflow = 10 × C_v × P(d) × A (m³); release = 1.8 × Q_cap × d (m³); difference = inflow − release. V_100 and V_2 are the largest differences; V is the larger of the two.
Table 4F.20 — Form 4-3: storage by duration
| d (h) | P_100(d) (mm) | 100-yr inflow (m³) | 1.8 × Q_cap,10 × d (m³) | 100-yr difference (m³) | P_2(d) (mm) | 2-yr inflow (m³) | 1.8 × Q_cap,2 × d (m³) | 2-yr difference (m³) |
|---|---|---|---|---|---|---|---|---|
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 6 | ||||||||
| 12 | ||||||||
| 24 | ||||||||
| 48 | ||||||||
| 72 |
Table 4F.21 — Form 4-3: storage required and provided
| Line | Quantity | Value |
|---|---|---|
| D1 | V_100 (m³) and governing duration | |
| D2 | V_2 (m³) and governing duration | |
| D3 | V = larger of D1 and D2 (m³) | |
| D4 | Storage provided (m³) |
E. Outlet, retention and other checks (Clauses 4.14.3, 4.14.6, 4.14.7)
Table 4F.22 — Form 4-3: outlet, retention and other checks
| Field | Entry |
|---|---|
| E1. Low-flow orifice: diameter (mm) and invert; discharge (L/s) with the storage holding V_2 full, not more than Q_cap,2 | |
| E2. Upper orifice or weir: size and level; total release (L/s) at the top of V, not more than Q_cap,10 | |
| E3. Retention volume of Clause 4.4 provided in addition to V (m³); no retention credit taken | |
| E4. Drawdown (Clause 4.7), trash racks (Clause 4.8), spillway (Clause 4.9): reference to Form 4-1 Sections G and H | |
| E5. Downstream and tailwater checks (Chapter 5) and water quality (Chapter 8): references |
F. Statement
I state that the site meets the eligibility conditions of Clause 4.14.3 and that the caps, storage and outlets above have been computed by Clauses 4.14.4 to 4.14.7.
Table 4F.23 — Form 4-3: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Tamil Nadu Stormwater Design Manual, Draft v1.0.