Draft v1.0 prepared by NEER. Not adopted by the Government of Telangana, and has no legal force. About this draft

Telangana · Draft v1.0

Telangana Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Telangana Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Telangana.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Telangana or by any of its departments, local bodies or agencies, including the Greater Hyderabad Municipal Corporation (GHMC), the Cyberabad and Malkajgiri Municipal Corporations, the Hyderabad Metropolitan Development Authority (HMDA) and HYDRAA. Where it names a body, such as MA&UD, DTCP, CDMA, the Irrigation Department, the Revenue Department, HMDA, HMWSSB, HYDRAA, TGSDMA, TGDPS or a local body, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.

Names of bodies. In 2024 Telangana changed the abbreviation in the names of its bodies from TS to TG, so that TSDPS is now TGDPS and TSDMA is now TGSDMA. Statutes keep the titles under which they were enacted, such as the TS-bPASS Act, 2020. In Hyderabad, 27 municipalities and municipal corporations around GHMC, up to the Outer Ring Road, were merged into GHMC by Ordinances of 1 and 2 December 2025. G.O.Ms.No.55 of 11 February 2026 then constituted three corporations under the GHMC Act, 1955: GHMC, the Cyberabad Municipal Corporation and the Malkajgiri Municipal Corporation. G.O.Ms.No.68 of 12 March 2025 extended the Hyderabad Metropolitan Region to the Regional Ring Road. This Manual cites reports, plans and filings by the name of the body that made them, such as GHMC before 2026.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Telangana's cities and towns flood for three reasons. The Hyderabad floods of August 2000 and October 2020 showed all three at once, and the floods of Mulugu in July 2023 and Khammam in September 2024 showed them again outside the capital.

  1. Inadequate drain capacity. Drains are too small for the rain they receive, and many are narrower than they were built. On 24 August 2000 the IMD observatory at Begumpet recorded 241.5 mm in a day, the highest in its record from 1901. On 14 October 2020 it recorded 190.2 mm, about 147 mm of it in six hours, while gauges at Singapur Township and Hayathnagar recorded 32 cm and 29 cm. Telangana's State Action Plan on Climate Change and a study by the National Institute of Hydrology (NIH) both state that Hyderabad's drainage can handle about 12 mm of rain an hour; the NIH study found that the network of one GHMC zone could not drain a 2-year storm. Outside the city the rain is heavier still: on 27 July 2023 Laxmidevipeta in Mulugu district recorded 65 cm in 24 hours, the highest in the State's record. Roofs, roads and paving now send more water to the drains, and faster.
  2. Lost storage. Telangana is a tank State. The first national Census of Water Bodies counted 64,055 water bodies in Telangana, 3,032 of them encroached, and Mission Kakatiya set out in 2015 to restore 46,531 minor irrigation tanks, chain tanks first. Many cheruvulu and kuntas that once held storm water have been filled or built over. Of the 185 lakes within GHMC in 2007, the Comptroller and Auditor General (CAG) found 17 untraceable and 9 fully encroached ten years later. In 2022 the Irrigation Department reported to the National Green Tribunal 8,718 encroachments within the full tank level of GHMC's lakes and 5,343 within their buffers. A study of the October 2020 flood estimated that 34 km² of one GHMC zone was inundated, against 22 km² in August 2000 when more rain fell, and attributed the difference to urban growth and the encroachment of lakes. The water these tanks used to store now runs into streets and homes.
  3. Blocked outfalls. A Hyderabad nala runs from one cheruvu to the next, over each tank's surplus weir (alugu), and on to the Musi. When the cheruvu is full, or the nala is narrowed or built over, the water backs up, and even a well-sized drain cannot empty. CAG counted 12,182 encroachments along the nalas and water bodies of GHMC, only 847 of them evicted, and 16 of 71 drain works stopped because encroachments had not been removed. Outside Hyderabad the outfalls are rivers. On 1 September 2024 IMD gauges recorded 37 cm at Mahabubabad and 32 cm at Kusumanchi, and the Munneru rose through Khammam to a level reported at 36 ft. In July 2022 the Godavari at Bhadrachalam was reported at 71.3 ft, its highest in more than three decades. Towns on these rivers cannot drain while the river is high.

A further hazard sits alongside these. A cheruvu bund can fail when a storm fills the tank faster than its alugu can pass the water: in October 2020 the bund of Gurram Cheruvu at Balapur was reported to have breached at night, flooding Hafiz Baba Nagar below it. In a chain of tanks, one failure can load the next.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the cheruvu or the river is high.

The Manual also sets how public drains, roads, nalas, cheruvulu and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Telangana's single monsoon season from June to October, the late September and October storms of Hyderabad, the far heavier rains of the Godavari districts of the north-east, its chains of cheruvulu and kuntas with their bunds and alugus, Hyderabad's nalas that run from lake to lake into the Musi, its granite and shallow rock, its red soils and the black cotton soils of the north, and towns such as Khammam and Bhadrachalam whose drains depend on the level of the river.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. Frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee.
  4. Tropical practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Telangana Building Rules, 2012 (G.O.Ms.No.168, MA&UD, 7 April 2012) with their amendments, including the water-body buffers of Rule 3 and the rainwater harvesting standard of G.O.Ms.No.350 (2000) annexed to them; the TS-bPASS Act, 2020 and its Rules; the zoning regulations of the HMDA Metropolitan Development Plan 2031; and the Water, Land and Trees Act, 2002 as adapted to Telangana (WALTA), which this Manual follows or, where disclosed, makes stricter.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval. The Telangana Building Rules, 2012, WALTA and the Model Building Bye-Laws 2016 require rainwater harvesting, but they set no detention volume and no release rate. G.O.Ms.No.350 of 2000, annexed to the Building Rules, does set a volume, 6 m³ of recharge pits for every 100 m² of roof on plots of 300 m² or more, but it is a recharge volume, not a limit on how fast a site releases storm water.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain on a Hyderabad arterial road can cite 1, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. The two published rainfall-frequency studies for the Hyderabad area rest on 19 years and 5 years of hourly records, and the IDF curve that IMD has published for Hyderabad appears to repeat a curve drawn for another city.

Telangana has no drainage design standard of its own. Research for this Manual found no Telangana design standard, State IDF relationship or departmental circular that fixes return periods or design rainfall for urban drains, and no official IDF for any city in the State. No design return period or design rainfall was found for Hyderabad's drain master plans or for its Strategic Nala Development Programme. No State rule requires on-site detention or limits peak runoff. CAG's performance audit of GHMC (Report No. 3 of 2018, covering 2012–17) found that:

  • 173 storm water drains, 390 km long, passed through GHMC, carrying sullage and septic overflow as well as rain, and the city's 800 km of tertiary drains covered only 40% of its road length;
  • of the 71 drains that Kirloskar Consultants, engaged after the 2000 flood, had identified for improvement, GHMC had taken up 24, and the draft master plan and project reports for 102 drains that Voyants Solutions submitted in December 2011 were yet to be approved, with work taken up on only two;
  • the city had 461 water-logging points, 52 of them critical;
  • only 847 (7%) of 12,182 encroachments along nalas and water bodies had been evicted, and 16 of 71 drain works had stopped because encroachments were not removed; and
  • 17 of the 185 lakes within GHMC could not be traced.

The statutory buffers that protect lakes and nalas have not changed since 2012. Rule 3 of the Building Rules keeps a green buffer of 30 m from the full tank level of lakes of 10 ha or more, 9 m for smaller lakes and shikam land, 9 m from nalas and storm water drains wider than 10 m, and only 2 m from those up to 10 m wide, too narrow a strip to maintain a nala from its bank. In 2016 G.O.Ms.No.7 set the river buffer at 50 m inside municipal, HMDA and UDA limits and allowed a 12 ft walking or cycling track within the 30 m strip. The buffers are measured from a notified full tank level, and of the 2,978 lakes on HMDA's register, 1,352 had a final notification on 1 November 2026. No stormwater master plan was found for Warangal.

So each region and each local body interprets the central manual its own way. Corporations, municipalities, panchayats, development authorities, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. Neighbouring local bodies in one river basin can work to different standards, though the water does not stop at their boundary: since 2026 Hyderabad's nalas cross the boundaries of three corporations on their way to the Musi. A city drain can be designed without regard to the cheruvu it empties into. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls (Chapter 5); and
  • basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, Municipality, Gram Panchayat or development authority can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines; MoHUA Model Building Bye-Laws (2016); Lok Sabha Unstarred Question 1847 (July 2026); G.O.Ms.No.168, MA&UD, 7 April 2012, Rules 3 and 15 and Annexure VI (G.O.Ms.No.350, MA, 9 June 2000); G.O.Ms.No.7, MA&UD, 5 January 2016; HMDA lakes portal, FTL notification register (read 1 November 2026); CAG, Report on Local Bodies for the year ended 31 March 2017, Report No. 3 of 2018, Government of Telangana, Chapter IV, para 4.7; Singh, G.P. and Khole, M. (2024), MAUSAM 75(2), 443–460, Table 1; IMD press releases of 27 July 2023 and 1 September 2024; Government of Telangana (EPTRI), State Action Plan on Climate Change, §2.1.5.1; NIH Roorkee, Evaluation of urban storm water network in Hyderabad city using SWMM (2013–16); Dourte, D. et al. (2013), J. Hydrol. Eng. 18(3), 324–330; Das, A.K. et al. (2022), MAUSAM 73(4), 887–898, Fig. 4; Rangari, V.A., Bhatt, C.M. and Umamahesh, N.V. (2021), Current Science 120(12), 1840–1847; Ministry of Jal Shakti, First Census of Water Bodies (2017–18), Telangana; G.O.Ms.No.44, I&CAD, 13 March 2015 (Mission Kakatiya); Irrigation and CAD Department counter affidavit in NGT OA 163/2021 (SZ), March 2022; Ordinances 9 and 11 of 2025 amending the GHMC Act; G.O.Ms.No.55, 11 February 2026; G.O.Ms.No.68, MA&UD, 12 March 2025; The News Minute (2020), on the Gurram Cheruvu breach; The Statesman and Deccan Herald (July 2022), on the Godavari at Bhadrachalam; Siasat (September 2024), on the Munneru at Khammam.


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Tanks (Cheruvulu) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Telangana
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Telangana locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Parts of a tank and its system
7E.3Flood terms
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Tank chain (golusukattu cheruvulu) in a Hyderabad valley
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CDMA Commissioner and Director of Municipal Administration, Telangana
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CURE Core Urban Region (Hyderabad, up to the Outer Ring Road)
CWC Central Water Commission
DDMA District Disaster Management Authority
DTCP Directorate of Town and Country Planning, Telangana
FER Flood Estimation Report (CWC)
FTL / MWL Full tank level / maximum water level
GHMC Greater Hyderabad Municipal Corporation
GHMC Act Greater Hyderabad Municipal Corporation Act, 1955
G.O. / G.O.Ms. Government Order / Government Order (Manuscript series)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Telangana)
HGL Hydraulic grade line
HMDA Hyderabad Metropolitan Development Authority
HMWSSB Hyderabad Metropolitan Water Supply and Sewerage Board
HSG Hydrologic soil group
HYDRAA Hyderabad Disaster Response and Asset Protection Agency
I&CAD Irrigation and Command Area Development Department, Telangana (the Irrigation Department)
IDF Intensity–duration–frequency
IMD India Meteorological Department
IRC Indian Roads Congress
LPC Lake Protection Committee (HMDA)
MA&UD Municipal Administration and Urban Development Department, Telangana
MDP Metropolitan Development Plan (HMDA)
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
PR&RD Panchayat Raj and Rural Development Department, Telangana
PSD Permissible site discharge
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance (coastal term; not applicable in Telangana)
SNDP Strategic Nala Development Programme (Hyderabad)
SUH Synthetic unit hydrograph
TGDPS Telangana State Development Planning Society (formerly TSDPS)
TGSDMA Telangana State Disaster Management Authority
TS-bPASS Telangana State Building Permission Approval and Self-Certification System (TS-bPASS Act, 2020; now TG-bPASS, on the BuildNow portal)
UDA Urban Development Authority
ULB Urban local body (Municipal Corporation or Municipality)
WALTA Water, Land and Trees Act, 2002, as adapted to Telangana
WQv Water quality volume