Draft v1.0 prepared by NEER. Not adopted by the Government of Telangana, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Telangana. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration depression storms of July–October, which fall on soils and tanks already filled by weeks of monsoon rain, as well as for short-duration intensities;
  • (d) to design outfalls for river and downstream-tank tailwater, including the case where the outfall is closed;
  • (e) to protect tanks (cheruvulu), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the common building rules issued by G.O.Ms.No.168, MA&UD Department, dated 07-04-2012, as amended in Telangana (the Telangana Building Rules 2012), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Floods in Telangana come from three kinds of storm. In Hyderabad, depressions with embedded convective storms fall on a city built over its lake chains and nalas: on 24 Aug 2000 Begumpet recorded 241.5 mm, the highest daily rainfall in the IMD record there since 1901, and on 14 Oct 2020 it recorded 190.2 mm, while gauges at Singapur Township (Ghatkesar) and Hayathnagar recorded 32 cm and 29 cm in the 24 hours to 08:30 and about 14.7 cm fell at Begumpet in six hours; official estimates put the deaths in Hyderabad at 40 (Singh and Khole, 2024, quoting press reports). On the night of 17/18 Oct 2020 the bund of Gurram Cheruvu at Balapur breached and flooded Hafiz Baba Nagar (press reports). In the north and east, monsoon depressions bring far larger falls: Laxmidevipeta in Mulugu district recorded 65 cm in the 24 hours to 08:30 on 27 Jul 2023, the State's highest, with 46 cm at Parkal in Hanumakonda district, and on 1 Sep 2024 Mahabubabad recorded 37 cm and Kusumanchi in Khammam district 32 cm (IMD), when the Munneru at Khammam rose to a reported 36 ft (press reports). On the Godavari, towns drain against the river: at Bhadrachalam it reached 71.3 ft on 16 Jul 2022, against 75.6 ft in 1986 (press reports). For Hyderabad the CAG found 173 storm water drains of 390 km in the GHMC area, 461 water-logging points of which 52 were critical, only 24 of the 71 drains identified for improvement by Kirloskar Consultants in 2006 taken up, the Voyants master plan and detailed project reports for 102 drains of December 2011 still unapproved, and 16 drain works stopped by encroachments (CAG Report No. 3 of 2018). Three failure modes recur: nalas narrowed, covered or built over; lost storage in cheruvulu and kuntas, and bunds that breach; and outfalls held up by a full downstream tank or by river backwater on the Musi, the Godavari and the Munneru. Objectives (b) to (e) address the last two, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Telangana Building Rules 2012 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Telangana, the top layer has a particular meaning: much of the State's flood storage sits in its tanks, the cheruvulu and kuntas that pass water from one to the next over their surplus weirs (alugu). The first Census of Water Bodies counted 64,055 water bodies in the State, 16,292 of them tanks and 27,003 ponds, only 992 of them in urban areas, and reported encroachment in 3,032 (Ministry of Jal Shakti, 2023). Mission Kakatiya took up the chain tanks of each mandal first and restored tanks "to its original FTL by raising the weir" (G.O.Ms.No.44, I&CAD, 13-03-2015). Hyderabad's lakes were connected by a cascade, now broken by encroachment (Rangari et al., 2021), and the Irrigation Department counted 8,718 encroachments within the FTL and 5,343 within the buffer of the lakes in the GHMC area (counter affidavit in NGT O.A. No. 163 of 2021, 2022). Losing that storage cannot be offset economically by pipes.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Telangana through:

  • (a) an amendment to the Telangana Building Rules 2012 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Telangana the building code is still the common building rules issued by undivided Andhra Pradesh as G.O.Ms.No.168, MA&UD Department, dated 07-04-2012, and continued in Telangana, where filings call them the Telangana Building Rules 2012; Andhra Pradesh replaced them in 2017, Telangana did not. They apply in Municipal Corporations, Municipalities, Nagar Panchayats and Urban Development Authority areas, and G.O.Ms.No.52, PR&RD Department, dated 12-03-2022, adopted them with their amendments for every Gram Panchayat in the State. Telangana amends them piecemeal: G.O.Ms.No.7 of 05-01-2016 replaced the river buffer and allowed a walking and cycling track in lake buffers, and G.O.Ms.No.49 of 31-03-2023 added dual piping for buildings of 10,000 m² or more and group housing of 100 units or more; G.O.Ms.No.49 cites as its powers s.585 read with s.592 of the GHMC Act, 1955, the Telangana Urban Areas (Development) Act, 1975, s.56(1) of the HMDA Act, 2008 and s.238 of the Telangana Municipalities Act, 2019. No consolidated text exists, and the rule numbers cited in this Manual are those of the 2012 text [TBC: to be checked against all later amendments]. The rules already bar building in the bed of a river or nala and within the FTL of any lake, cheruvu, kunta or shikam land and set green buffers beyond it (Rule 3(a)), ask group developments for "a Services and Utilities Plan as per standards for ... drainage and storm water disposal system" without annexing any standard (Rule 8(e)(i)), and annex the rainwater harvesting order (Rule 15(a)(vii)). A search of the text found no rule on flood levels, low-lying land or plinth height above flood. The rules, with the TS-bPASS Rules for the approval workflow, are the natural instrument for a statewide condition of approval. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: in the Core Urban Region, the Greater Hyderabad, Cyberabad or Malkajgiri Municipal Corporation; HMDA, the Future City Development Authority or another Urban Development Authority; DTCP where the rules require its approval; or a Municipal Corporation, Municipality or Gram Panchayat within the powers delegated to it, including approvals issued through TG-bPASS, or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Telangana Building Rules 2012 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The Hussain Sagar catchment of Hyderabad, including its inlet nalas, the catchments of Osman Sagar and Himayat Sagar above Hyderabad, the Gurram Cheruvu catchment at Balapur and the land below its bund, the catchments of the nalas and vagus draining to the Munneru at Khammam, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (cheruvu), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Telangana Building Rules 2012 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Telangana Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Telangana Building Rules 2012;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Telangana, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply as set by G.O.Ms.No.350 MA of 09-06-2000, which is Annexure-VI to the Telangana Building Rules 2012 (Rule 15(a)(vii)): to every building on a plot of 300 m² or more, with percolation pits or trenches of not less than 6 m³ for each 100 m² of roof area; and by section 17 of the Telangana Water, Land and Trees Act, 2002 (Rule 15(a)(viii)): to premises of 200 m² or more, as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Telangana plots are small and the cumulative effect of many small plots is what fills Hyderabad's drains. Under the TS-bPASS Act, 2020, a plot of up to 75 sq yd (63 m²) with a building of up to 7 m needs only online registration, and a plot of up to 500 m² with a building of up to 10 m receives instant approval on self-certification, checked afterwards by post-verification teams (ss.7(2) and 7(3); TS-bPASS Rules, Rule 8(1)). That route is unaffected for small buildings that fall under the single-dwelling exemption or below the thresholds. On those plots, Clause 1.5.4 and the RWH mandate would be met through a self-certified stormwater item in the same online declaration (roof area, RWH pit volume, point of discharge and distance from any FTL, nala or river), which the post-verification teams can check. Instant registration is already not available for plots in a buffer zone, shikam land or the FTL of a water body (TS-bPASS Rules, Rule 9(12)).

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Greater Hyderabad Municipal Corporation (GHMC), the Cyberabad Municipal Corporation and the Malkajgiri Municipal Corporation, constituted under the GHMC Act, 1955 for the Core Urban Region up to the Outer Ring Road (G.O.Ms.No.55 of 11-02-2026);
  • (b) all Approving Authorities within the Hyderabad Metropolitan Region (the area of the Hyderabad Metropolitan Development Authority, HMDA, as redrawn by G.O.Ms.No.68 MA&UD of 12-03-2025), as notified from time to time, including HMDA and the Municipalities and Gram Panchayats in it, and the Future City Development Authority for the area carved out of the Region by G.O.Ms.No.69 MA&UD of 12-03-2025; and
  • (c) the Greater Warangal Municipal Corporation and every other Municipal Corporation in the State.

1.6.2 Tier B authorities. All other Municipalities are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with DTCP regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Hyderabad Metropolitan Region (the area of the Hyderabad Metropolitan Development Authority, HMDA), or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Greater Hyderabad Municipal Corporation, with its engineering maintenance divisions and its Strategic Nala Development Programme (SNDP) wing, and a small Municipality with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Hyderabad.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
RWH mandate (G.O.Ms.No.350 MA, 09-06-2000, Annexure-VI to the Telangana Building Rules 2012, Rule 15(a)(vii); Telangana Water, Land and Trees Act 2002, s.17, Rule 15(a)(viii)) Continues unchanged: every building on a plot of 300 m² or more provides recharge, with percolation pits or trenches of not less than 6 m³ for each 100 m² of roof area, about 60 mm of roof runoff; s.17 of the 2002 Act covers premises of 200 m² or more. The Telangana Municipalities Act, 2019 adds a property-tax rebate for buildings with rainwater harvesting. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and RWH pits and sumps are assumed full at the start of August–October storms (Chapter 4). Recharge structures may count toward retention where they meet Chapters 4 and 8.
Waterbody buffers (Telangana Building Rules 2012, Rule 3(a), as amended by G.O.Ms.No.7 MA&UD of 05-01-2016; MDP-2031 zoning regulations, G.O.Ms.No.33 MA&UD of 24-01-2013) Continue as statutory minima: no building or development in the bed of a river or nala or within the FTL of any lake, pond, cheruvu, kunta or shikam land; 30 m from the FTL of lakes and tanks of 10 ha or more; 9 m from smaller ones and from shikam land; 9 m from canals, vagus, nalas and storm water drains more than 10 m wide and 2 m from those up to 10 m wide; for rivers, 50 m from the boundary within Municipal Corporation, Municipality, Nagara Panchayat, HMDA and UDA limits (G.O.Ms.No.7 of 2016, which replaced the 2012 text). A 12 ft walking and cycling track may be provided in the 30 m strip, and the buffer may carry a 12 m road where feasible and counts as open space, not as setback. FTL and river boundaries are as measured and certified by the Irrigation and Revenue Departments, and a site needs the no-objection of both (MA&UD Memo No.13612/M1/2012); the tank boundary is the bund where one exists and the FTL elsewhere (MA&UD Letter No.20687/M1/2013, as quoted in an NGT filing). In the HMDA area MDP-2031 also keeps an open space buffer of at least 30 m around the FTL of existing water bodies. The setbacks of Chapter 7 apply as the larger of the statutory buffer and a hydraulic corridor set by this Manual (the design flood width plus a maintenance strip); a 2 m strip is too narrow to maintain a nala, and where the corridor is wider, this Manual is stricter than the rules.
Osman Sagar and Himayat Sagar (G.O.Ms.No.111 MA, 08-03-1996; Telangana Building Rules 2012, Rule 3(a)(iv)) The restrictions of G.O.Ms.No.111 on development in the catchment of the two reservoirs, up to 10 km from their full tank level, apply in the HMDA area under Rule 3(a)(iv). They are reported to have been replaced by G.O.Ms.No.69 of 12-04-2022 [TBC: replacement text not read]. Whatever their status, this Manual lists the two catchments as flood-sensitive (Chapter 4).
Flood-prone land No Telangana rule found sets a floodplain limit or a plinth level above flood, and cellars are regulated by plot size only. The floor-level rule of Clause 1.5.4(b), the 1% AEP levels of Chapter 6 and the no-fill zone of Chapter 7 supply the test that the rules lack.
TS-bPASS Act 2020 (Act No.12 of 2020) and TS-bPASS Rules (G.O.Ms.No.201 MA&UD, 16-11-2020) Continue. Plots of up to 75 sq yd are registered online; plots of up to 500 m² with buildings of up to 10 m are approved instantly on self-certification; larger and non-residential buildings go through a single window with a 21-day limit and deemed approval. Instant registration is not available in buffer zones, shikam land or the FTL of a water body (Rule 9(12)), and single-window cases need Irrigation and Revenue no-objections where they apply (Rule 11(2)). The submittals of Chapter 10 fit the single window; on plots below it, Clause 1.5.4 and the RWH mandate would be met by a self-certified item in the online declaration (Clause 1.5 commentary).
Group developments (Telangana Building Rules 2012, Rule 8(e)) A Services and Utilities Plan "as per standards for ... drainage and storm water disposal system" is required, but no standard is annexed. This Manual is offered as that standard for a competent authority that chooses to adopt it.
Municipal law on drains (GHMC Act 1955, ss.290, 292, 295 and 299, as cited by the CAG, and s.374-B; Telangana Municipalities Act 2019, ss.119–121, 171 and 186) Public drains vest in the Corporation or Municipality; a Municipality must map its drains and storm water drains with their missing gaps, plan their cleaning each year, and no one may obstruct a drain or build over it (ss.119–121); Master Plans carry a Drainage Plan (s.171); water bodies are to be protected "in the manner, as prescribed" (s.186; rules not found). Under s.374-B of the GHMC Act (Act No.3 of 2025, in force from 03-10-2024) the Government may give an agency, HYDRAA, the Corporation's powers to protect drains and water bodies from encroachment. Chapters 6, 7 and 8 build on these duties.
Telangana Water, Land and Trees Act 2002 (as adapted by G.O.Ms.No.18 PR&RD, 31-01-2015), ss.23 and 35(2) Lakes, ponds, tanks and nalas may be notified, demarcated and cleared of encroachment, and encroachment is an offence (1–6 months and/or Rs 2,000–50,000). The setbacks and storage rules of Chapter 7 apply in addition.
HMDA FTL notifications (HMDA Act 2008; Lake Protection Committee, G.O.Ms.No.157 MA&UD, 06-04-2010) The HMDA lakes portal listed 2,978 lakes with preliminary FTL notifications and 1,352 with final notifications on 1 Nov 2026. FTL and buffer lines are taken from the final notification or, where there is none, the preliminary one, and shown on the drainage plan; a water body in the revenue record that is not yet notified (a kunta or shikam land) is subject to Rule 3(a) all the same.
Master plans (MDP-2031 for the HMDA area; Telangana Municipalities Act 2019, s.171; Telangana Urban Areas (Development) Act 1975) MDP-2031 asks that layout drains and nalas be channelised so as "to conserve or harvest the water in nearest water body or public open space". No master plan for the HMDA region as redrawn in 2025 was found. Flood-sensitive catchments, nala corridors and regional facility sites should be shown on the next plans.
Mission Kakatiya (G.O.Ms.No.44 I&CAD, 13-03-2015) The State's tank programme takes up the chain tanks of each mandal first and restores tanks to their original FTL by raising the weir. Tank works under it are tank works under Chapter 7, and the chain is the unit of analysis there.
Wetlands (Conservation and Management) Rules, 2017 No Ramsar site in Telangana was found. Whether any Telangana wetland is notified under the Rules [TBC].
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Telangana is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a September or October storm arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

The CAG found that Hyderabad's drainage plans had not been carried out: GHMC took up only 24 of the 71 drains identified by Kirloskar Consultants in 2006 and 2 of the 102 drains in the Voyants draft master plan of December 2011, which was still unapproved in 2017, and it evicted 847 of 12,182 encroachments along nalas and water bodies (CAG Report No. 3 of 2018). After the 2020 floods the Strategic Nala Development Programme was sanctioned at ₹858 crore (G.O.Rt.No.286 MA&UD of 06-04-2021, as stated by the Irrigation Department to the NGT), but no design return period or intensity for it, or for the Kirloskar and Voyants plans, was found. The only capacity figure in an official document, that Hyderabad's drains can "handle 12 mm/hour rainfall", is given without a source (Telangana SAPCC; NIH, 2013–16). No Telangana rule requires on-site detention or limits the peak flow from a site; the nearest provisions are the storm water disposal plan of Rule 8(e) and the MDP-2031 aim to conserve layout runoff in the nearest water body. No development-control condition limits the runoff from new plots into the nalas such works create. Linking Chapters 4–5 to approvals closes that gap.

Courts have so far set the pace on lakes. The HMDA Lake Protection Committee was constituted in 2010 in compliance with orders of the High Court in W.P. No. 9386 of 2007, and the NGT (Southern Zone) has heard a series of applications on Hyderabad's lakes, among them O.A. No. 85 of 2015 on Hussain Sagar and the suo motu O.A. No. 163 of 2021 on tank encroachment; in December 2024 the High Court ordered eviction from the bed and buffer of the Musi (W.P. No. 27110 of 2024, as reported). The buffer figures published on HYDRAA's website include a 15 m buffer for rivers and canals that does not appear in Rule 3(a); this Manual uses the figures of the rules. The corridor and section rules of Chapters 6 and 7 are offered as technical standards that agencies could use in meeting such directions. Showing flood-sensitive catchments, nala corridors and regional facility sites on the next master plan for the redrawn HMDA region is cheaper than retrofitting later.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Municipal Administration and Urban Development (MA&UD) Department Would own the Manual. Would issue the amendments of Clause 1.3.1 to the Telangana Building Rules 2012 and the TS-bPASS Rules. Would constitute and service the State Stormwater Technical Committee.
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Greater Hyderabad, Cyberabad and Malkajgiri Municipal Corporations Approving Authority for building permission in the Core Urban Region. Owners of the drains vested in them (GHMC Act, s.290) and of the nala works of the SNDP in their areas. Would apply this Manual to the drains they design and build, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15).
Hyderabad Metropolitan Development Authority (HMDA) and its Lake Protection Committee Approving Authority for layouts and development permission in the Hyderabad Metropolitan Region within its powers. The Lake Protection Committee notifies the FTL and buffer boundaries of the lakes in the Region. Would publish each lake's FTL map and notification status for Chapter 7, and embed flood-sensitive catchments, nala corridors and regional facility sites in its master plans.
Future City Development Authority and the other Urban Development Authorities Approving Authority for layouts and development permission in their areas. Would embed flood-sensitive catchments and regional facility sites in their master plans.
Other Municipal Corporations and Municipalities Approving Authority for building permission and layouts within their delegated powers, through TG-bPASS. Owners of the public drains vested in them, which they are to map and clean each year (Telangana Municipalities Act, 2019, ss.119–120). Would receive handed-over assets, and inspect and enforce.
Directorate of Town and Country Planning (DTCP) Would approve layouts and larger developments where the rules require it. Would provide technical support to Tier B authorities and maintain the empanelled reviewer list (Clause 10.7).
Commissioner and Director of Municipal Administration (CDMA) Supervises the urban local bodies. Would require compliance with this Manual in drainage works it funds or monitors.
Hyderabad Disaster Response and Asset Protection Agency (HYDRAA) Protects lakes, nalas, drains and open spaces from encroachment and responds to urban floods in the Core Urban Region, under powers given by s.374-B of the GHMC Act. Would enforce the setbacks and no-fill zone of Chapter 7 there, hold the record of flood-prone locations and support the post-event review (Clause 10.16).
Irrigation and Command Area Development Department (Irrigation Department) Custodian of rivers, tanks, canals and surplus courses. Surveys and certifies tank FTL and river boundaries with the Revenue Department and gives no-objections for sites near them. Would provide FTL, MWL and surplus-weir (alugu) crest levels and the design flood levels of the Musi, Godavari, Krishna and Munneru (Chapters 5 and 7), consent to outfalls into tanks and canals and concur with regional tank-storage credits (Chapter 4).
Revenue Department Maintains land and waterbody records, certifies FTL and river boundaries with the Irrigation Department, certifies the cadastral maps used for final FTL notifications, and evicts encroachments.
Telangana State Water, Land and Trees Authority Would notify and demarcate lakes, tanks and nalas under s.23 of the 2002 Act, and issue rainwater harvesting guidance under s.17.
Telangana State Development Planning Society (TGDPS) Runs the State's automatic weather station network. Would supply data for station IDF and Annexes 2A–2E.
Telangana State Disaster Management Authority (TGSDMA) and District Disaster Management Authorities Would notify or recommend flood-sensitive catchments and lead the post-event review (Clause 10.16) outside the Core Urban Region.
Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) and the other sewerage agencies Would remove sewage connections and sewer overflows from storm drains (Chapter 8).
Telangana State Pollution Control Board (TGPCB) Would act on dry-weather flow and sewage reaching drains, lakes and rivers (Chapter 8).
Ground Water Department Would supply groundwater levels for the infiltration checks of Chapters 4 and 8.
Roads and Buildings Department, NHAI, Indian Railways and other road and rail owners Would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7), and match culvert capacity to the drains they connect.

Commentary. Ownership of Hyderabad's drainage is split several ways. Since February 2026 the drains of the Core Urban Region belong to three corporations (G.O.Ms.No.55 of 2026), while HYDRAA protects lakes and nalas across all three, the HMDA Lake Protection Committee notifies lake boundaries, and the Irrigation and Revenue Departments certify the FTL on which every buffer depends. HYDRAA was set up by G.O.Ms.No.99, MA&UD (GHMC.I) Department, and its powers were given a statutory basis in s.374-B of the GHMC Act after its standing was challenged in the High Court (as reported). The CAG found that 16 of 71 drain works in Hyderabad were stopped "due to failure of GHMC in evicting encroachments" (CAG Report No. 3 of 2018). How the storm water drain functions and the SNDP are divided among the three corporations, and what role TGSDMA now has in urban floods, were not found during research for this draft. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Telangana has no coast and no tidal reach, so no site in the State qualifies for this waiver.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; the CAG found that only 847 (7%) of the 12,182 encroachments identified along Hyderabad's nalas and water bodies had been evicted by July 2017, and that 17 of the 185 lakes in the GHMC area could not be traced (CAG Report No. 3 of 2018).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the HMDA area boundary
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model Building Rules amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request