Draft v1.0 prepared by NEER. Not adopted by the Government of Telangana, and has no legal force. About this draft

Chapter 7Waterbodies, Tanks (Cheruvulu) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (cheruvu) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Telangana, a State with no coast and no tidal water, means inland marshes and the wet margins of lakes and reservoirs;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Telangana Water, Land and Trees Act, 2002, Rule 3(a) of G.O.Ms.No.168 (the Telangana Building Rules 2012), the Hyderabad Metropolitan Development Authority Act, 2008, or any other law, prohibits.

Commentary. Telangana is a tank state. The 1st Census of Water Bodies (reference year 2017-18) counted 64,055 water bodies in the State, of which 16,292 are tanks and 27,003 ponds; only 992 are urban, and 3,032 were reported as encroached (Ministry of Jal Shakti, 2023). Mission Kakatiya, the State's tank restoration programme, took up the chain tanks of each mandal first (G.O.Ms.No.44, I&CAD, 2015) and targeted 46,531 minor irrigation tanks (NITI Aayog DMEO, 2021). Hyderabad grew around chains of such tanks: the HMDA Lake Protection Committee has issued preliminary FTL notifications for 2,978 lakes in the Hyderabad Metropolitan Region, and final notifications for 1,352 of them (HMDA lakes portal, read 1 November 2026). The CAG found that of the 185 lakes recorded in GHMC after 2007, 17 could not be traced and nine were fully encroached, and that only 847 (7%) of 12,182 encroachments along nalas and water bodies had been evicted by July 2017 (CAG, Report No. 3 of 2018). Loss of tank storage, and of the nalas that link the tanks, recurs in the State's floods: in October 2020 the bund of Gurram Cheruvu at Balapur breached and flooded the colonies below it (The News Minute, 2020). Telangana has no tank protection statute of its own. The legal levers are Rule 3(a) of G.O.Ms.No.168 (the Telangana Building Rules 2012), the Telangana Water, Land and Trees Act, 2002, the FTL notifications made in the HMDA region, and, in Hyderabad's core urban region, the powers given to HYDRAA under section 374-B of the GHMC Act, 1955. This chapter gives the design rules that protect tank storage. It does not replace the Revenue, Irrigation Department, HMDA and local-body procedures that record and protect waterbodies in law.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river, stream (vagu or vanka), canal or channel (kāluva), nala (natural drain or storm water drain), tank (cheruvu), small tank or pond (kunta), lake, reservoir, temple tank, marsh, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (cheruvu) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (alugu) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Irrigation Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (kāluva) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (thoomu) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Telangana terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Cheruvu A tank: a waterbody impounded by an earthen bund (katta), with a surplus weir (alugu) and one or more sluices (thoomu), usually built to irrigate a command area. The Manual's term "tank" includes every cheruvu.
Kunta A small tank or pond. Rule 3(a) of G.O.Ms.No.168 names kuntas with lakes and tanks and gives them the same buffers by area (30 m from FTL at 10 ha or more; 9 m below 10 ha). The same word is also a unit of land area in Revenue records; it shall not be read as one in an area statement for a waterbody.
Shikam land Tank-bed land so described in Revenue records. Rule 3(a)(i) of G.O.Ms.No.168 bars building on it, and Rule 3(a)(ii)(3) gives it a 9 m buffer. For this Manual it is part of the waterbody, and fill on it is fill below FTL (Clause 7.6).
Certified or notified FTL The FTL and the area of a lake or kunta "as measured and as certified by the Irrigation Department and Revenue Department" (G.O.Ms.No.168, Rule 3(a)(i)), and, in the HMDA region, the FTL boundary in the preliminary or final notification of the HMDA Lake Protection Committee. Setbacks under Clause 7.4 are measured from the larger of that boundary, the Revenue record boundary and the surveyed FTL (Clause 7.13.1). A waterbody that has not been notified is still a waterbody for this chapter.
Original FTL Mission Kakatiya restores tanks "to its original FTL by raising the weir where they are disturbed or lowered" (G.O.Ms.No.44, I&CAD, 2015). For this Manual, where a surplus weir crest has been lowered or damaged, FTL is the higher of the present crest and the original FTL in the Irrigation Department's records.
Nala, vagu, vanka A natural stream, drain or watercourse. G.O.Ms.No.168 sets the buffer of canals, vagus, nalas and storm water drains by their width (9 m above 10 m wide, 2 m up to 10 m). For this Manual each is a natural channel for Clause 7.4.1(b), and a nala that links two tanks is also a surplus course or supply channel for Clause 7.10.
Chain tanks (golusukattu cheruvulu) A tank cascade (Clause 7.2). G.O.Ms.No.44 (2015) calls them "chain tanks" and takes them up together, with the feeder channel of each tank.
Lake Protection Committee (LPC) The committee chaired by the Metropolitan Commissioner of HMDA, constituted by G.O.Ms.No.157 MA&UD (2010) after the High Court's order in WP 9386/2007, that notifies the FTL boundaries and buffer zones of lakes in the HMDA region.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the Irrigation Department and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Irrigation Department, the Corporation or Municipality, the Gram Panchayat, a temple, the Forest Department or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) Revenue village maps and survey records, including the shikam land of tanks and kuntas; the FTL and river boundaries measured and certified by the Irrigation and Revenue Departments under Rule 3(a) of G.O.Ms.No.168 (the Telangana Building Rules 2012); the FTL and buffer notifications of the HMDA Lake Protection Committee, with their cadastral maps and survey-number statements; and the memoirs of tanks and nalas referred to in section 23 of the Telangana Water, Land and Trees Act, 2002;
  • (b) Telangana Irrigation Department and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where Telangana Irrigation Department records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. The FTL register of the HMDA Lake Protection Committee is the legal map of the lakes of the Hyderabad region. The Irrigation Department surveys the FTL; the LPC publishes a preliminary notification and invites objections; the Revenue Department reconciles the survey numbers, and the Tahsildar, the RDO and the District Collector certify a cadastral map; the LPC then issues the final notification (Irrigation Department counter in NGT OA 163/2021 (SZ), 2022). Of the 2,978 lakes on the register, 1,352 had final notifications on 1 November 2026, and 1,066 of those were issued in 2024 and 2025 (HMDA lakes portal). To decide whether a claimed tank exists, the Irrigation Department has relied on the Sethwar, the khasra, the pahanis from 1970 to 2015, the village map and the Survey of India toposheet (Irrigation Department report in NGT OA 71/2023 (SZ), 2026); Clause 7.3.3 asks for the same range of records. Who notifies the FTL of tanks outside the HMDA region was not found. No 1% AEP flood map at a scale usable for a site setback was found for any town in the State. Clause 7.3.4 lets the Authority adopt such maps once they are issued. Until then, the Applicant must produce the extent for larger and flood-sensitive sites. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 9 m, the green buffer that Rule 3(a)(ii) of G.O.Ms.No.168 (the Telangana Building Rules 2012) sets for tanks and kuntas under 10 ha, for shikam lands and for channels wider than 10 m, applied by this Manual to every waterbody, including channels up to 10 m wide, for which the Rule sets 2 m (see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the NOC of the Irrigation and Revenue Departments sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 9 m
Channel draining 65 ha to 20 km² 40 m 9 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 9 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 9 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 9 m (Clause 1.10.3(c)).

Commentary. The 9 m minimum is the green buffer that Rule 3(a)(ii)(3) and (4) of G.O.Ms.No.168 set from the FTL of lakes, tanks and kuntas under 10 ha and of shikam lands, and from canals, vagus, nalas and storm water drains wider than 10 m. The Rule sets 2 m for channels up to 10 m wide; this Manual raises that to 9 m, and the wider statutory buffers (30 m from the FTL of tanks of 10 ha or more, and 50 m from rivers within urban and HMDA limits) govern under Clause 7.4.5 (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Telangana flood maps are mostly coarser than US maps, the tank beds and valley floors where towns are growing are flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the statutory 9 m. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Telangana has statutory waterbody buffers. Rule 3(a) of G.O.Ms.No.168 (2012), the building rules in force in the State's urban areas and, since G.O.Ms.No.52 PR&RD (2022), in its Gram Panchayats, bars any building or development in the bed of a river or nala and within the FTL of any lake, pond, cheruvu or kunta or shikam land, with the area and FTL "as measured and as certified by the Irrigation Department and Revenue Department". It keeps these water bodies as a Recreational/Green Buffer Zone with no building within 30 m of the FTL of lakes, tanks and kuntas of 10 ha and above; 9 m of the FTL of those under 10 ha and of shikam lands; 9 m of canals, vagus, nalas and storm water drains wider than 10 m; and 2 m of those up to 10 m wide. G.O.Ms.No.7 MA&UD (2016) replaced the river clause with a buffer of 50 m from the river boundary within Municipal Corporation, Municipality, Nagar Panchayat, HMDA and UDA limits, the boundary being fixed and certified by the Irrigation and Revenue Departments, and allowed a 12 ft (3.7 m) walking or cycling track within the 30 m strip. Unless the Master Plan or Zonal Development Plan says otherwise, the buffer may carry a road or promenade at least 12 m wide, and it counts as tot lot or organised open space, not as a building setback (Rule 3(a)(iii)). In the HMDA region the Master Plan 2031 repeats these buffers and adds an Open Space Buffer of at least 30 m around the FTL of existing water bodies (G.O.Ms.No.33 MA&UD, 2013). NOCs are required from the Irrigation Department (Executive Engineer or above) and the Revenue Department (Joint Collector or above) (MA&UD Memo No.13612/M1/2012). The TS-bPASS Rules exclude plots in a buffer zone, on shikam land or within the FTL of any water body from instant registration (G.O.Ms.No.201 MA&UD, 2020, Rule 9(12)). HYDRAA's website gives a 15 m buffer for rivers and canals; no basis for that figure was found in G.O.Ms.No.168 or its amendments, and this Manual does not use it. Clause 7.4.7 makes 9 m the floor everywhere, and the wider statutory buffers govern under Clause 7.4.5.

Disclosure. The setbacks of this chapter are a hydraulic corridor set by this Manual: Zone 1 is the greatest of a 9 m strip, the floodway (the width the design flood needs) and, for a tank, the MWL contour, and Zone 2 extends to the 1% AEP flood extent plus 10 m (Clauses 7.4.3 and 7.4.4). The corridor is applied as the larger of that corridor and the statutory buffer of Rule 3(a) of G.O.Ms.No.168. It is stricter than the statute in the following respects, each set by this Manual:

  • Narrow channels. The Rule sets 2 m from canals, vagus, nalas and storm water drains up to 10 m wide. This Manual sets 9 m, the statutory buffer for wider channels, because 2 m leaves no room for a maintenance track, desilting machinery or bank planting along drains that depend on regular cleaning, and because many such nalas are natural streams whose flood width is far greater than their bed.
  • Flood extent. The statutory buffers are measured from FTL or the channel boundary and do not change with flood level. Zone 1 here extends also to the floodway and, for a tank, to the MWL contour, and Zone 2 to the 1% AEP flood extent plus 10 m.
  • Roads and paving in Zone 1. Rule 3(a)(iii) allows a road or promenade of at least 12 m in the buffer, and G.O.Ms.No.7 (2016) a 12 ft walking or cycling track in the 30 m strip. This Manual keeps roads, paving and fill out of Zone 1, except crossings (Clause 7.5.1). An unpaved or permeable track at existing ground level is allowed (Clause 7.5.1(d)); a road should be placed in Zone 2 or beyond, at existing ground level.
  • Channel classes. The Rule classes channels by width at 10 m. Table 7.1 classes them by drainage area, and Clause 7.4.1(b) applies setbacks to every natural channel draining 8 ha or more, recorded or not.

Where the statute or a statutory plan is wider, it governs (Clause 7.4.5): 30 m from the FTL of tanks of 10 ha or more; 50 m from rivers within Municipal Corporation, Municipality, Nagar Panchayat, HMDA and UDA limits (G.O.Ms.No.7, 2016); the Open Space Buffer of at least 30 m around existing water bodies in the HMDA Master Plan 2031; and any restriction in force in the catchments of Osman Sagar and Himayat Sagar, first imposed by G.O.Ms.No.111 MA (1996) and reported to have been replaced in 2022 ([TBC]). The reasons for the stricter values are the encroachment of nalas and lakes documented by the CAG (12,182 encroachments in GHMC, with 16 of 71 drain works stopped for want of eviction; CAG, Report No. 3 of 2018), the October 2020 floods and tank breach in Hyderabad, and the chain structure of the State's tanks, in which narrowing one link raises flood levels in every tank upstream. Until G.O.Ms.No.168 is amended (Chapter 1), the statutory buffers remain the legal minimum, and this chapter's values are the Manual's recommended standard. Approving authorities should state in each approval which of the two was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2 (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 9 m (G.O.168 r. 3(a)) greater of 9 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 9 m line Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Setback measured from FTL (tanks, lakes) or top of bank (channels), whichever gives the wider zone.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the statutory 9 m line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the organised open space or tot lot required by the Telangana Building Rules 2012, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Telangana practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. Telangana's tank foreshores and valley floors are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In the lakes of GHMC, the Irrigation Department counted 8,718 encroachments within the FTL and 5,343 within the buffer zone (Irrigation Department counter in NGT OA 163/2021 (SZ), 2022). A flood model of one Hyderabad zone flooded 34.05 km² in October 2020 against 21.95 km² in August 2000, on less rain; its authors attribute the difference to a 16.5% increase in urbanisation and to the encroachment of lakes (Rangari et al., 2021). Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the Hyderabad colonies built on tank beds and below tank bunds, flooded in October 2020, and of the river towns of Khammam on the Munneru and Bhadrachalam on the Godavari, already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Most of Telangana's tanks are rural cheruvulu and kuntas with earthen bunds, an alugu and one or more thoomus, and Clauses 7.7 and 7.8 apply to them as written. Many of Hyderabad's cheruvulu are now urban lakes that have lost their command and receive the sullage carried by the nalas (CAG, Report No. 3 of 2018), so their storage above FTL can be counted only under Clause 7.7.1, and no flood cushion can be assumed without a controllable outlet (Clause 7.8.3). Hussain Sagar, Osman Sagar and Himayat Sagar, the reservoirs and barrages on the Krishna, the Godavari and their tributaries, and other large reservoirs are not tanks for these clauses: their levels enter a design as tailwater (Chapter 5), and their storage is counted only at basin scale.

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. Telangana Irrigation Department, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including every kunta, nala and surplus course down the chain to the river, as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than Telangana Irrigation Department's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Telangana's tanks are often full when the largest storms come. Hyderabad's damaging storms cluster in late September and early October, after the wettest months of the season: ten of the 26 days of 100 mm or more at Begumpet between 1901 and 2020 fell in that window (Singh and Khole, 2024). On 13–14 October 2020 a deep depression gave about 32 cm at Singapur Township and 29 cm at Hayathnagar in 24 hours (Singh and Khole, 2024), and on the night of 17/18 October, four days later, the bund of Gurram Cheruvu at Balapur breached and flooded Hafiz Baba Nagar below it (The News Minute, 2020). Assuming spare tank capacity that is not there is the error Clause 7.7.3 prevents. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

Tank chain (golusukattu cheruvulu) in a Hyderabad valley: plan sketch Tank chain (golusukattu cheruvulu) in a Hyderabad valley: plan sketch (not to scale) Nala over 10 m wide: 9 m buffer each side, from the nala boundary Cheruvu 1 waterspread at FTL Alugu (surplus weir), crest = FTL 30 m buffer from FTL (tank of 10 ha or more) Thoomu (sluice) to the former command area Kunta 2 9 m buffer from FTL (under 10 ha) Urban catchment (colonies) detention + treatment (Chapters 4 and 8) Nala up to 10 m wide: 2 m statutory, 9 m Zone 1 here; inlet + GPT Sewage intercepted to STP (Clause 8.9) Setback (Zone 1 + Zone 2) Cheruvu 3 (10 ha or more) waterspread at FTL 30 m buffer from FTL (G.O.168 Rule 3(a)) Colony on the valley floor: flooded by overflow or breach (gandi), Clause 7.14 To the next cheruvu and the Musi Foreshore, FTL–MWL: floodway (Clause 7.6.1) Legend Tank bund (katta) Alugu (surplus weir), crest = FTL Thoomu (sluice) Nala or surplus course (major system) Nala buffer (G.O.168 Rule 3(a)) Tank buffer from FTL (G.O.168 Rule 3(a)) Foreshore, FTL to MWL (floodway) Setback boundary (Clause 7.4) Each alugu feeds the next tank: route the chain to the river (Clause 7.7).

Figure 7.3 — Tank chain (golusukattu cheruvulu) in a Hyderabad valley, in plan: an upper cheruvu and a kunta with their bunds (katta), surplus weirs (alugu) and sluices (thoomu), joined by nalas with the buffers of Rule 3(a) of G.O.Ms.No.168 (9 m for nalas wider than 10 m, 2 m for narrower ones, which this Manual raises to 9 m); an urban inflow through treatment, with sewage intercepted and kept out of the tank; a large cheruvu with its foreshore between FTL and MWL, its statutory buffer (30 m from FTL at 10 ha or more, 9 m below 10 ha) and the setback of Clause 7.4; the colony on the valley floor below its bund; and the surplus course to the next cheruvu and the Musi. Original drawing for this Manual; concept from the chain tanks of Telangana (G.O.Ms.No.44, I&CAD, 2015) and the buffers of G.O.Ms.No.168, with setback zones adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 (MARC, 2025).


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, TGSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under Telangana Irrigation Department control, the operating rule shall be Telangana Irrigation Department's rule. This Manual does not authorise any other body to operate a Telangana Irrigation Department tank.

Commentary. No Telangana operating rule for a cheruvu or kunta that keeps a flood cushion was found. The State's own programme runs the other way: Mission Kakatiya restores tanks "to its original FTL by raising the weir where they are disturbed or lowered" (G.O.Ms.No.44, I&CAD, 2015), so that they hold more water, not less. After the October 2020 floods the Strategic Nala Development Programme took up the remodelling of nalas and surplus weirs in and around Hyderabad, with ₹858 crore sanctioned for its first phase (G.O.Rt.No.286 MA&UD, 2021, as recited by the Irrigation Department to the NGT); its design basis was not found. HYDRAA's monsoon protocol dispatches pumps when gauges record more than 20 mm in an hour, and the TGDPS network of automatic rain gauges, with its live rain map, could supply the forecast and warning triggers of Clause 7.8.1(e); 20 mm/h is an operating trigger, not a design value. Clause 7.8.2 turns the principle of a flood cushion into a rule that can be checked, with a reliability test, because a cushion that is refilled by the July–August rain gives no protection in a September or October storm. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

Irrigation and drinking water remain the primary purposes of most rural tanks, and many urban cheruvulu now serve recharge and amenity. A flood cushion has a cost in yield, which is why Clause 7.8.2(d) requires the custodian to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Telangana State Pollution Control Board directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).

Commentary. Mission Kakatiya's guidelines desilt each tank between the FTL contour and the sluice-sill contour, with levels taken every 15 m, and repair its feeder channel, bund, weir and sluices (G.O.Ms.No.44, I&CAD, 2015); about 22,500 tanks had been restored by March 2018 (NITI Aayog DMEO, 2021). In towns, the Telangana Municipalities Act, 2019 requires every Municipality to prepare an annual plan for cleaning and desilting its drains (section 120(c)). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Telangana precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Hyderabad, the CAG found that 16 of 71 storm water drain works had stopped "due to failure of GHMC in evicting encroachments", and that a drain from Patancheru to Gangaram cheruvu had to be realigned because "a major length of drain proposed was not traceable" (CAG, Report No. 3 of 2018). The Special Committee on Hussain Sagar appointed by the Supreme Court recommended in 2005 that encroachments on the lake's inlet and outlet nalas be removed as a flood control measure (report in the record of NGT OA 85/2015 (SZ)). Outside GHMC, the Telangana Municipalities Act, 2019 bars any building or fence over a storm water drain (section 121(c)). Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored cheruvu or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). Telangana already has 16,292 tanks and 27,003 ponds (1st Census of Water Bodies), and Mission Kakatiya has shown that the State can restore tanks at scale; a restored tank can serve as regional storage under this Manual once it meets Clause 7.7.1. The HMDA Master Plan 2031 already asks that the nalas of new layouts be channelised "in such a way as to conserve or harvest the water in nearest water body or public open space" (G.O.Ms.No.33 MA&UD, 2013), and G.O.Ms.No.7 (2016) gives transferable development rights equal to the built-up area of any lake or nala recreational buffer developed at the owner's cost, which could fund buffer works alongside a fee-in-lieu scheme. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetland Authority of Telangana;
  • (b) Hussain Sagar, Osman Sagar and Himayat Sagar, and the marshy inlets and margins of other lakes and reservoirs where the Authority records them; and
  • (c) any other marsh or wetland that the Authority notifies.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. No Ramsar site in Telangana was found, and whether any wetland in the State has been notified under the Wetlands (Conservation and Management) Rules, 2017 was not checked. The State's wetlands are therefore mainly its lakes and reservoirs and their marshy margins. Hussain Sagar has been before the courts for two decades: the record of NGT OA 85/2015 (SZ) includes the report of a Special Committee appointed by the Supreme Court (October 2005) and the Court's orders in Dr G. Haragopal v. South Central Railway. Osman Sagar and Himayat Sagar, Hyderabad's drinking-water reservoirs, have had their catchments protected since G.O.Ms.No.111 MA (1996), which barred polluting establishments within 10 km of their FTL; it is reported to have been replaced in 2022, and the controls now in force are [TBC]. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Hyderabad's storm drains carry sullage and septic tank overflow as well as rain (CAG, Report No. 3 of 2018), and most of the city's nalas end in a cheruvu, so a lake receives whatever its nalas carry. The Musi, the outfall of the city's trunk nalas, is the subject of a rejuvenation project and of High Court orders on encroachment in its bed and buffer (WP 27110/2024, as reported by LiveLaw, 2024). Osman Sagar and Himayat Sagar supply drinking water, so no untreated urban runoff should reach them. The rules on outfalls and treatment in Clause 7.12.3 respond to both.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. The CAG counted 12,182 encroachments along nalas and water bodies in GHMC, of which only 847 (7%) had been evicted by July 2017, and found that 17 of the 185 lakes recorded after 2007 could not be traced and nine were fully encroached (CAG, Report No. 3 of 2018). The Irrigation Department later counted 8,718 encroachments within the FTL and 5,343 within the buffer of GHMC lakes, and reported that status-quo orders obtained by patta holders inside the FTL were holding up fencing (Irrigation Department counter in NGT OA 163/2021 (SZ), 2022). Across the State, 3,032 water bodies were reported encroached (1st Census of Water Bodies). The Telangana Water, Land and Trees Act, 2002 provides for notifying and demarcating lakes, tanks and nalas and evicting encroachers (section 23), and punishes encroachment with imprisonment of one to six months or a fine of Rs 2,000 to 50,000 (section 35(2)); its State Authority is reported to have met in May 2025 for the first time in a decade. Since October 2024, section 374-B of the GHMC Act, 1955 has allowed the Government to give an agency (HYDRAA) the Corporation's powers to protect drains, water bodies and open spaces from encroachment; the High Court has both pressed it to act and restrained it in particular cases (press reports). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No register of the heights of Telangana's tank bunds was found. Most cheruvu and kunta bunds are low earthen bunds and are unlikely to be specified dams, but large old tanks, and urban tanks whose bunds stand above built-up land, should be screened under Clause 7.14.1. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. On the night of 17/18 October 2020, four days after the heaviest rain, the bund of Gurram Cheruvu at Balapur breached and flooded Hafiz Baba Nagar to a depth reported as about 10 ft (The News Minute, 2020). Mission Kakatiya repairs bunds, weirs and sluices (G.O.Ms.No.44, I&CAD, 2015), but no breach map or emergency action plan for a Telangana tank was found. A breach of an urban tank floods the colonies built below its bund, which is why Clause 7.14.3 asks for breach mapping of high-hazard tanks. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Telugu waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)