Draft v1.0 prepared by NEER. Not adopted by the Government of Goa, and has no legal force. About this draft

Goa · Draft v1.0

Goa Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Goa Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Goa.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Goa or by any of its departments, local bodies or agencies, including the Corporation of the City of Panaji (CCP), the planning and development authorities (PDAs) and the Municipal Councils. Where it names a body, such as the Town and Country Planning (TCP) Department, the Water Resources Department (WRD), the Public Works Department (PWD), GSDMA, GCZMA, a PDA, the CCP, a Municipal Council or a Village Panchayat, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.

Names. Goa has three districts: North Goa, South Goa and Kushavati, notified on 31 December 2025. Plans and reports made before then, including the State and district disaster management plans, describe two districts; this Manual cites them as they were published. The capital is called Panaji in this Manual; the name Panjim is kept where a source uses it, as for the IMD observatory.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Goa's towns and villages flood for three reasons. The floods of July 2021, when the State received more than twice its normal rainfall over two weeks, showed all three across the State, and Panaji shows them in an ordinary monsoon, on the days when heavy rain meets a high tide.

  1. Inadequate drain capacity. Drains are too small for the rain they receive, and many are older than the town around them. Panjim observatory recorded 366.3 mm in a day on 12 June 1999, and about 271 mm fell on Canacona in 7 hours on 2 October 2009. Much of central Panaji still drains through Portuguese-era drains, and no Goa town has a published design return period for its drains. Sewage flows in storm drains too, taking up capacity meant for rain: in 2025 the High Court directed that the discharge of sewage from Margao's storm water drains into the River Sal be stopped. Roofs, roads and paving now send more water to the drains, and faster.
  2. Lost storage. Goa's low-lying land once held storm water: the khazans, tidal fields reclaimed behind bunds; the paddy fields of the valleys; and the village tanks (tollems) and lakes. Much of it has been filled or converted. In 2025 the High Court observed that almost all the zone changes it examined were from paddy fields, natural cover, no development zone and orchard to settlement zones; it has also ordered a filled lagoon at Siolim restored and illegal structures in low-lying paddy fields demolished. Of the State's 25 notified wetlands, 16 were reported in June 2026 to be under pressure, with hydrological alteration a growing concern. Where khazan bunds and sluice gates are not maintained, the fields behind them are open to every tide, and the storage they gave is lost. The water this land used to store now runs into streets and homes.
  3. Blocked outfalls. Goa's drains empty into tidal water. The tide reaches about 40 km up the Mandovi and the Zuari, and when heavy rain coincides with a high tide the outfalls close, the water backs up, and even a well-sized drain cannot empty. The State and district disaster management plans describe this as the cause of flooding in low-lying areas, and Panaji floods this way on 15 to 20 days of a monsoon. The tidal flushing of St Inez creek, which carries most of the city's storm water, is impeded by a box conduit, a sand bar and a footbridge at its mouth. Where a drain empties into a khazan, it reaches the estuary only through the bund, by a sluice gate (mano) worked by the khazan tenants. Inland, the outfalls are rivers regulated by dams: in August 2019 releases from the Tillari dam in Maharashtra flooded villages in Pernem, Bicholim and Bardez, and Paroda, on the Kushavati below the Selaulim dam, flooded every year from 2017 to 2021.

A further hazard sits alongside these. In the Sahyadri foothills and on steep slopes, intense rain brings flash floods and slips: the Canacona flood of 2009 came with mudslides on the slopes above it. Drains cannot carry them; development has to keep away from them, and runoff must not be concentrated onto steep or unstable ground.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the tide, the estuary or the river is high.

The Manual also sets how public drains, roads, nallahs, khazan outfalls, tollems and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Goa's single long south-west monsoon and its storms in May and October, the very heavy rain of the Western Ghats, its laterite plateaux and scarps, the Mandovi–Zuari estuaries and the other tidal rivers, its khazans with their bunds, sluice gates and poiems, its village tollems, its sand-dune coast, rivers regulated by dams upstream, and outfalls locked by the tide.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for the west coast region (1992), as the interim source, and frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for climate-change ratios.
  4. Tropical and coastal practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites, drainage reserves and coastal platform levels. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Goa Land Development and Building Construction Regulations, 2010 (GLDBCR), the Goa, Daman and Diu Town and Country Planning Act, 1974 and the Regional Plan for Goa 2021, the Goa, Daman and Diu Irrigation Act, 1973, the Goa Agricultural Tenancy Act, 1964, the wetland notifications of the Goa State Wetland Authority, and the CRZ Notification 2011 as applied in Goa through its Coastal Zone Management Plan, which this Manual follows or, where disclosed, makes stricter.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval. GLDBCR 2010 makes a rainwater harvesting tank mandatory only on plots larger than 4,000 m², for storage and reuse, and only recommends it on all other plots; a 2019 Rajya Sabha answer gives the threshold as 2,000 m² [TBC]. Neither GLDBCR nor the Model Building Bye-Laws 2016 sets a detention volume or a release rate.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain on a Panaji arterial road can cite 1, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. The curve for Panjim in IMD's 2022 national set of rainfall intensity curves appears to repeat a generic curve shared with Mumbai and Mahabaleshwar, and the reanalysis grids of NIH-DHAARA give only about 15 mm in one hour for a 2-year storm at Panaji, far below what the gauges record.

Goa has no drainage design standard of its own. Research for this Manual found no Goa design standard, State IDF relationship or departmental circular that fixes return periods or design rainfall for urban drains, and no official IDF for any town in the State. GLDBCR sets the widths of roadside drains by road width and a minimum size for cross drains, but no design storm, return period or runoff coefficient, and no State rule requires on-site detention or limits peak runoff. In particular:

  • neither GLDBCR nor the Regional Plan for Goa 2021 sets a numeric setback from a nallah or river. The Regional Plan places all rivers, nallahs, creeks and tanks in its no-development zone, but says that seasonal nallahs and small ponds may not appear on its taluka maps. The Irrigation Act, 1973 (section 11) lets the Government prohibit obstructions along a natural drainage course within notified limits; no such notification was found;
  • the main control on filling low-lying land is section 17A of the TCP Act, which requires permission to fill land 50 cm or more below the adjoining ground; it sets no test of flood storage;
  • the bunds and sluice gates of the khazans are maintained and operated by their tenants and tenants' associations under the Goa Agricultural Tenancy Act, 1964, not by the State;
  • the CRZ Notification 2019 does not yet apply in Goa. The Coastal Zone Management Plan made under the CRZ Notification 2011, reported as approved in September 2022, governs until a plan under the 2019 notification is approved; that plan was still in draft in June 2026;
  • no stormwater master plan or design return period was found for Panaji, Margao, Mapusa, Vasco or Ponda. A High Court order of 1997 is reported to have directed a flood-control master plan for Panaji; a committee set up in 2024 to map the city's storm drain network has published no output that was found; and
  • no audit by the Comptroller and Auditor General (CAG) of drainage, flood control or khazans in Goa was found.

So each region and each local body interprets the central manual its own way. The Corporation, Municipal Councils, Village Panchayats, PDAs, PWD, WRD, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. Neighbouring local bodies on one estuary can work to different standards, though the water does not stop at their boundary. A town drain can be built to empty through a khazan bund with no agreed level for the sluice gate it depends on. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls (Chapter 5); and
  • basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). The Corporation, a Municipal Council, a Village Panchayat or a planning and development authority can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines; MoHUA Model Building Bye-Laws (2016); Lok Sabha Unstarred Question 1847 (July 2026); Goa Land Development and Building Construction Regulations, 2010 (consolidated to September 2018), Regulations 12.1–12.2 and 14.3.2; Rajya Sabha answer of 8 July 2019 (Unstarred Question 1664); Goa, Daman and Diu Town and Country Planning Act, 1974, s.17A; Regional Plan for Goa 2021, Release One, §3.6; Goa, Daman and Diu Irrigation Act, 1973, s.11; Goa Agricultural Tenancy Act, 1964, ss.26(3), 35 and 38; CRZ Notification 2011, para 8.V.3, as amended by S.O. 1422(E) (1 May 2020); CRZ Notification 2019, para 6(i); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 1 November 2026); CWC, Flood Estimation Report for West Coast Region, Subzones 5(a) and 5(b), K&M/19/1992; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); Goa State Action Plan on Climate Change 2020–2030; Goa State Disaster Management Plan, Part I (December 2014); District Disaster Management Plan, North Goa (2012–13); South Goa Disaster Management Plan 2022, Part I; LiveLaw (May 2026), on Goa Foundation v. State of Goa, WP 16/2023 (13 March 2025); Down To Earth (25 July 2021); Gomantak Times (22 June 2023); The Goan (7 April 2024; 14 August 2025; 15 February 2026; 14 June 2026; 18 June 2026; 3 August 2026); Navhind Times (24 September 2025); Sundar and Shetye (2005), J. Earth Syst. Sci. 114(5); press reports of the Chief Minister's statement on the Tillari releases (August 2019).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Khazans and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Goa
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Goa locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and land
7E.2Parts of a waterbody and its system
7E.3Management terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Tollem, nallah, khazan and estuary: a connected system
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CCP Corporation of the City of Panaji
CCP Act City of Panaji Corporation Act, 2002 (Goa Act 1 of 2003)
CD Chart datum
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ / CZMP Coastal Regulation Zone / Coastal Zone Management Plan
CSE Centre for Science and Environment
CWC Central Water Commission
DDMA District Disaster Management Authority
ESL Extreme sea level
FER Flood Estimation Report (CWC)
FTL / MWL Full tank level / maximum water level
GCZMA Goa Coastal Zone Management Authority
GLDBCR Goa Land Development and Building Construction Regulations, 2010
GPPDA Greater Panaji Planning and Development Authority
GSDMA Goa State Disaster Management Authority
GSPCB Goa State Pollution Control Board
GSWA Goa State Wetland Authority
HAT / MHWS Highest astronomical tide / mean high water springs
HGL Hydraulic grade line
HSG Hydrologic soil group
HTL High tide line
IDF Intensity–duration–frequency
IMD India Meteorological Department
INCOIS Indian National Centre for Ocean Information Services
IPSCDL Imagine Panaji Smart City Development Limited
IRC Indian Roads Congress
MoHUA Ministry of Housing and Urban Affairs
MSL Mean sea level
NDMA National Disaster Management Authority
NDZ No Development Zone (CRZ)
NGPDA / SGPDA North Goa / South Goa Planning and Development Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
ODP Outline Development Plan
PDA Planning and Development Authority
PSD Permissible site discharge
PSMSL Permanent Service for Mean Sea Level
PWD Public Works Department, Goa
RPG-21 Regional Plan for Goa 2021
RRV Required retention volume
RWH Rainwater harvesting
SAPCC State Action Plan on Climate Change (Goa)
SIDCGL Sewerage and Infrastructural Development Corporation of Goa Limited
SLA Sea-level allowance
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
TCP Town and Country Planning Department, Goa
TCP Act Goa, Daman and Diu Town and Country Planning Act, 1974
TRG Telemetric rain gauge
ULB Urban local body (the Corporation of the City of Panaji or a Municipal Council)
WQv Water quality volume
WRD Water Resources Department, Goa