Draft v1.0 prepared by NEER. Not adopted by the Government of Gujarat or the Administration of Dadra and Nagar Haveli and Daman and Diu, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

Commentary. Gujarat's drains fail in two places that site design does not see. At the outfall, the river or the sea shuts them: all 42 of Surat's storm-drain outfalls to the Tapi have flood-protection gates, which are closed when the river is in heavy flood (SMC, 2019), and the khadis (tidal creeks) that take the rest of the city's storm water back up at high tide; Surat had three khadi floods in July 2026 (press reports). On the Gulf of Khambhat the tide itself is the largest in India, with spring ranges of about 10–11 m reported at Bhavnagar (secondary sources). Downstream, the rivers rise on dam releases: in August 2006 the outflow from Ukai rose to 907,316 cusec at 20:00 on 8 August, the release "coincided with the days of high tide", and most of Surat was flooded (SANDRP, 2006, compiling official bulletins); in Vadodara the Ajwa and Pratappura reservoirs overflowed into the Vishwamitri in July 2019, and in August 2024 the river rose to 37 ft against a danger mark of about 25 ft (press reports). In Ahmedabad, storm water is sent to an irrigation canal, the Gota–Godhavi canal, both by AUDA's Sanand scheme (ADB, 2023) and from Bopal lake in July 2026, when 126 housing societies around it were waterlogged (press report). A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if its outfall is shut. This chapter makes both failure modes part of the design.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the khadis of Surat, the kaans of Vadodara (such as the 8.72 km Bhukhi kaas from Chhani talav to the Vishwamitri), any irrigation canal that receives storm water (such as the Gota–Godhavi canal), or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, talav or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or talav under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, AMC, GSDMA or WRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next talav or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Gujarat. In Ahmedabad, where a drain can pass through a chain of interlinked talavs (72 urban lakes were notified for the interlinking programme begun in 2003) before it reaches the Sabarmati or an irrigation canal, and in the AUDA towns, where Sanand's storm water is routed through Bhadreti lake to the Gota–Godhavi canal, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Surat, where the storm-drain outfalls to the Tapi are gated and the gates are closed while the river is in heavy flood (SMC, 2019), so that drainage waits for the river to fall, and where the 2006 flood lasted from 7 to 10 August, and in Vadodara, where the Vishwamitri stood at 35 ft on 26 August 2024 and at 37 ft on 28 August, against a danger mark of about 25 ft (press reports). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the tidal Tapi below the Singanpore weir-cum-causeway at Surat and the khadis that drain to it, the creeks of Bhavnagar and the other ports of the Gulf of Khambhat, where the tidal range grows towards the head of the Gulf, and the creeks of the Gulf of Kachchh at Kandla and Navlakhi), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, AUDA or the Authority adopts a higher projection for the planning area, for example a projection based on the INCOIS (2025) estimates for Bhavnagar of about 0.63 m (SSP2-4.5) and 0.87 m (SSP5-8.5) of mean-sea-level rise by 2100; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because IMD's forecast for Cyclone Biparjoy, a surge of 2–3 m above the astronomical tide on the Kachchh and Saurashtra coast in June 2023, and the INCOIS (2025) estimate that surge and wave set-up add about 1.56 m to the 100-year sea level at Bhavnagar, on top of a modelled tidal maximum of 5.22 m, showed why it is needed in Gujarat.

Indian tide tables have been published by the Survey of India since the nineteenth century; in Gujarat, PSMSL holds tide-gauge records from Okha from 1975 (station 1395) and from Kandla from 1950 (station 596, which PSMSL flags for quality control), and there is no PSMSL station at Bhavnagar, Surat or Hazira (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. Its 2025 technical report gives 100-year extreme sea levels for Bhavnagar (6.88 m above mean sea level at present, made up mainly of a modelled tidal maximum of 5.22 m and 1.56 m of surge and wave set-up; 7.74 m and 7.99 m by 2100 under SSP2-4.5 and SSP5-8.5, the largest change of any site in the report, including about 0.20 m of growth in the tidal maximum), but no value for Kandla, Okha, Porbandar, Surat or any other point on the Gujarat coast. The report itself states that the global tide models it uses underestimate the tidal amplitude in the Gulf regions off Gujarat, and that the underestimate is present in its tidal maxima. No surge return-level product for the Gulfs of Khambhat and Kachchh, the Saurashtra coast or the Surat khadis suitable for design was found during research, and the National Hydrographic Office values of MHWS and HAT for Bhavnagar, Kandla, Navlakhi, Okha, Porbandar, Veraval, Hazira and Dahej were not seen [TBC], which is why Annex 5A is needed. The sources also mix datums. IMD's Cyclone Biparjoy bulletin of 15 June 2023 gives the astronomical tide that day as 7.54 m at Navlakhi, 6.79 m at Kandla, 3.74 m at Okha and 2.61 m at Porbandar, without stating the datum (probably chart datum); the INCOIS levels are above mean sea level; and the Deendayal Port levels for Kandla (MHWS 6.66 m and MSL 3.88 m above chart datum, with a "highest high water level" of 9.50 m) were seen only in a search summary and are to be checked against the original. The range itself is the largest in India: spring ranges of about 10–11 m are reported at Bhavnagar (secondary sources), so the INCOIS tidal maximum of 5.22 m is a level above mean sea level, about half the range, and not the range. Every level used under this chapter shall therefore name its datum. The long-term trend at Okha is 3.41 ± 1.17 mm/yr for 1983–2023 (PSMSL, which warns that its trends are not for planning use); the sea-level allowance of Clause 5.7.4 does not depend on it.


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • in Surat: the Tapi below Ukai, tidal below the Singanpore weir-cum-causeway, with the releases of Clause 5.8.3 and the gated outfalls of Clause 5.8.5, and the khadis (tidal creeks), including the Mithi, Kankara, Bhedwad, Varachha and Chhaprabhatha khadis and the other khadis surveyed by SMC (Clause 5.8.5);
  • in Vadodara: the Vishwamitri, with the releases of Ajwa and Pratappura (Clause 5.8.3), and the kaans that drain to it, such as the Bhukhi kaas;
  • in Ahmedabad and Gandhinagar: the Sabarmati, with the releases of Dharoi (Clause 5.8.3) and the pond of the Vasna barrage (Clause 5.8.5), and the Gota–Godhavi canal and any other irrigation canal that receives storm water (Clause 5.8.5);
  • on the Gulf of Khambhat and the Gulf of Kachchh: the tidal creeks at Bhavnagar, Kandla (Gandhidham) and Navlakhi (Morbi);
  • on the Saurashtra and Kachchh coasts: every river or creek reach above a salinity-ingress bandhara or tidal regulator into which a town drain discharges (Clause 5.8.5); and
  • elsewhere: any river or WRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example Ukai above the Tapi at Surat, Ajwa and Pratappura above the Vishwamitri at Vadodara, Dharoi above the Sabarmati at Ahmedabad, or Dantiwada on the West Banas), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 Khadi and creek outfalls with gates, bandharas and tidal regulators, dam-release and backwater reaches, and irrigation canals.

  • (a) Gated khadi, creek and river outfalls. For an outfall through a flood gate, sluice regulator or embankment to a tidal river, khadi or creek (for example Surat's 42 gated outfalls to the Tapi, and the sluice regulators at the mouths of the Varachha and Chhaprabhatha khadis), or into a khadi that itself drains through such a gate, the designer shall identify the body that operates each gate, and survey the gate sill and the crest of the embankment or retaining wall. The tailwater at the outfall shall be the higher of:

    • the level of Clause 5.7 or Clause 5.8 in the water body beyond the gate; and
    • the maximum level in the khadi or drain behind the gate, computed by routing it as a closed storage for as long as the level beyond the gate stands above the level behind it, with the inflow of the whole catchment that drains to it, including any part outside the city, and its storage as surveyed in its present condition, net of silt, encroachment and vegetation.

    Where the gate can discharge for only part of each tide, or is closed for the whole of a river flood, the lock windows of Clause 5.10 shall be extended to that period (Clause 5.10.6). Floor levels and pumped outfalls behind an embankment shall also be checked for a breach of the embankment, with the land behind it filled to the level beyond it.

  • (b) Bandharas and tidal regulators. For an outfall to a river or creek reach above a salinity-ingress structure, the structure shall be treated as a fixed control on the tailwater. A bandhara (a solid, non-gated wall with its crest above high-tide level) shall be modelled as a weir at its surveyed crest level, with the head needed to pass the river flow over it. A tidal regulator (a gated structure that stops the tide entering a river) shall be assumed closed in every case of Clause 5.9 unless its operator's written procedure and records show it opened in comparable events, and the reach behind it shall then be routed as in (a).

  • (c) Dam-release and backwater reaches. For an outfall to a river reach whose level is set by releases from dams upstream, or by the pond of a barrage or weir downstream (for example the Tapi at Surat below Ukai, the Vishwamitri at Vadodara below Ajwa and Pratappura, or the Sabarmati at Ahmedabad between Dharoi and the Vasna barrage), the river level of Clause 5.8.2 shall:

    • include the releases of Clause 5.8.3 from every dam above the reach, combined as they occurred in the largest recorded event, unless an operating rule in force staggers them;
    • be computed with the downstream boundary of the river model at the full pond level of the next barrage or weir downstream, or at its recorded level in the largest recorded event if that is higher, or, on the tidal Tapi, at the tidal boundary of Clause 5.9.3, unless the model is carried far enough downstream that moving the boundary changes the level at the outfall by less than 10 mm; and
    • for the major-system cases, be not less than the high flood level fixed by the Competent Authority under CGDCR 2017 (Regulation 2.55) at the outfall, where one has been fixed, or the highest recorded flood level there, where WRD or the local body has recorded one.
  • (d) Irrigation canals. Town drainage shall not be discharged to an irrigation canal, such as the Gota–Godhavi canal, without the permission of WRD or the canal's owner. Where permission is given:

    • the discharge shall not exceed the rate the permission allows;
    • the tailwater is the higher of the canal's full supply level during irrigation releases and its flood level for the coincident case of Clause 5.8.4, with the canal level computed from all the storm water it receives, including lake overflows and other towns' drains; and
    • the outfall shall have a flap gate (Clause 5.11) where the full supply level is above the outfall invert.

No gate or release operation that helps drainage, such as opening a khadi or outfall gate early, drawing a khadi or lake down before a storm or staggering dam releases, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the khadi, the river level or the canal level (Clause 5.12.3).

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Gujarat's rivers break that assumption in two ways. The Vishwamitri at Vadodara, its kaans and the khadis of Surat have small catchments close to the city, so the storm that fills the town drains also fills them: on 31 July 2019 about 424 mm fell at Vadodara in six hours (State Emergency Operation Centre figures, as reported) and the Ajwa and Pratappura reservoirs overflowed into the Vishwamitri. The Tapi at Surat is the opposite case: it drains 62,225 km² above Ukai, 82% of it in Maharashtra, so its flood comes from rain far from the city. But it reaches Surat through one dam, and in August 2006 the release arrived at high tide (SANDRP, 2006), so the river flood, the tide and the city's own monsoon rain met at its gated outfalls. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects three Gujarat cases. At Ukai in August 2006, the outflow rose from 254,780 cusec at 20:00 on 6 August to 816,036 cusec at 20:00 on 7 August and 907,316 cusec at 20:00 on 8 August, after an inflow peak of 1,072,680 cusec, and the reservoir rose to 105.38 m, above its full reservoir level of 105.16 m. The dam's flood cushion had been designed on the assumption that the Tapi could carry 8.5 lakh cusec through Surat, while the river's capacity in the city was put at only 3.5–4.0 lakh cusec, and Surat had already flooded at 6.73 lakh cusec in 1998 (SANDRP, 2006, compiling CWC and other official figures). At Vadodara, the Ajwa and Pratappura reservoirs overflowed into the Vishwamitri in July 2019, and in August 2024 Ajwa stood at 213.8 ft against its 214 ft danger mark with its gates closed to cut the flow to the river (press reports); the State's committee chaired by B N Navalawala, formed in September 2024, is reported to have recommended an additional spillway at Ajwa, but its report was not found. At Ahmedabad, a release of about 1.3 lakh cusec from Dharoi in 2017 submerged the lower promenade of the Sabarmati Riverfront (press reports), and the design discharge of the riverfront channel is disputed: about 4.75 lakh cusec, based on Dharoi outflow alone, against an Irrigation Department peak of 5.5 lakh cusec for 1973 (Down To Earth, 2007; SANDRP). No published operating rule or release hydrograph for any of these dams was found, so until one is published the largest recorded release applies, and that record is itself to be obtained from WRD.

Clause 5.8.5 is set by this Manual. Gujarat has no delta drains, but it has four settings in which the tailwater at a town outfall is set by a structure, and by how it is worked, rather than by the open tide or a free river.

The first is Surat's gated system. The city's drains discharge to the Tapi at 42 outfalls in five zones, and "all the outlets are covered by flood protection gates", which are normally kept open and closed during heavy Tapi floods; the rest of the storm water goes to the khadis (SMC, 2019). SMC has built sluice regulators at the mouths of the Varachha khadi (four 4.0 m × 4.0 m electric gates, 2013–14, designed for a Tapi flood of 8.0 lakh cusec) and the Chhaprabhatha khadi (2016, designed for 10.0 lakh cusec), and raised its Tapi retaining wall from RL +14.0 m to +16.0 m in 2014 (SMC, datum not stated). When those gates shut, each khadi becomes a closed reservoir for its own catchment. That is the khadi flood, which SMC and its partners treat as a flood type of its own, separate from the Tapi flood (TARU, SMC and SCCT). It struck three times in July 2026; the State announced ₹500 crore for khadi works, and a consultant surveyed about 188 km of creeks and began a hydrology study to reset the danger levels (press reports). Backflow from the Kankara khadi into the Mithi khadi has been described in a 2025 civil-society study (as summarised). Danger levels for individual khadis circulate without an official source or a stated datum, and are not used in this Manual. Clause 5.8.5(a) therefore routes the khadi behind its gate, with the whole catchment that drains to it and its present, silted storage.

The second is the salinity-ingress structure. Along the Saurashtra and Kachchh coasts, WRD has built bandharas, each "a solid non-gated wall with crest level above high tide level", and tidal regulators, each a "structure with gates on large river to stop tidal ingress into the river bed"; by March 2010 only 64 of the 127 bandharas and 11 of the 53 tidal regulators recommended by the High Level Committees had been built, 22 bandharas had been built away from the river mouths, and the gates of the Rukmavati tidal regulator were not working (CAG, 2010). A bandhara keeps the sea out, but it also holds the river behind it at or above high-tide level, so to a town outfall upstream it is a fixed tailwater, whatever the tide is doing. Clause 5.8.5(b) treats it as one.

The third is the dam-release and backwater reach. Surat lies below Ukai, Vadodara below Ajwa and Pratappura, and Ahmedabad's riverfront between Dharoi and the Vasna barrage, in a channel narrowed to about 275 m (263 m in another source) from a natural width of 330 m or more (Down To Earth, 2007). Gujarat has no flood lines of the kind that other States draw along urban rivers: CGDCR 2017 makes the high flood level a matter for the Competent Authority (Regulation 2.55) without stating its return period, and points to the CWC Flood Atlas for flood-prone areas. Clause 5.8.5(c) therefore uses that high flood level, or the highest recorded level, as a floor for the major-system cases, and requires the model to show the rest.

The fourth is the irrigation canal. AUDA's ADB-funded scheme for Sanand routes storm water through Bhadreti lake, by the Modified Puls method, and sends the overflow by box drain to the Gota–Godhavi canal (ADB, 2023). In July 2026 the excess from Bopal lake was released to the same canal while 126 housing societies around it were waterlogged, and AMC's storm-water master plan for Ambli, Bopal, Ghuma and Shela looks for solutions "along the Gota-Godhavi Canal and the Sabarmati River" (press reports). A canal used in this way is a shared outfall whose level depends on every drain and lake that discharges to it, and on irrigation releases. The Gujarat Irrigation and Drainage Act, 2013 lets the Government approve the crossing or diversion of a natural drain by a canal (s.10(3)), but no provision or WRD rule on town storm water discharged into a canal was found in the parts read, so the canal rule in Clause 5.8.5(d) is set by this Manual.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Gujarat requirement in this Manual. Surat shows why. All 42 of its storm-drain outfalls to the Tapi have gates, and they are closed when the river is in heavy flood (SMC, 2019); behind a closed gate the drain can discharge only to storage or to pumps. In August 2006 the release from Ukai "coincided with the days of high tide when the river's drainage capacity is further reduced" (SANDRP, 2006), and in July 2026 high tides were reported to be hindering drainage during the khadi floods, in which between 17 and 26 deaths were reported (press reports; the figures conflict). Ahmedabad, inland, depends on pumping as well: in July 2026 AMC ran 245 pumps at 42 storm-water pumping stations at full capacity (press report). The coast is harder still. On the creeks of the Gulf of Khambhat, where spring ranges of about 10–11 m are reported (secondary sources), a gravity outfall above low water but below high water can discharge for only part of each tide. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 31 May each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. Both failures matter in Gujarat. All 42 of Surat's storm-drain outfalls to the Tapi have flood-protection gates, which are kept open in normal times and closed only when the river is in heavy flood (SMC, 2019), so each closure relies on a gate that has stood open in a silt-laden tidal river since the last flood; SMC installed 22 manually operated cast-iron gates on its storm-drain outlets in 1999 (SMC). On the Saurashtra coast, the CAG found the gates of the Rukmavati tidal regulator not working (CAG, 2010). The 31 May inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 May each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes any river or creek mouth on the Saurashtra, Kachchh or south Gujarat coast that a pre-monsoon survey shows closed or restricted by sand, and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. The research for this Manual found no record of seasonal sand-bar closure at the mouths of Gujarat's rivers or creeks, and no WRD or municipal procedure for clearing them. The structures that close Saurashtra's river mouths are built ones, the bandharas and tidal regulators of the salinity-ingress programme, and they are dealt with under Clause 5.8.5(b). So Clause 5.13.4 gives no credit for cutting at present, and the mouths to which Clause 5.13.1 applies are to be confirmed by pre-monsoon survey and listed in Annex 5B. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a Surat khadi-side site
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)