Draft v1.0 prepared by NEER. Not adopted by the Government of Gujarat or the Administration of Dadra and Nagar Haveli and Daman and Diu, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Gujarat. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration multi-day south-west monsoon storms of June–September and the cyclonic storms of May and October–November, as well as for short-duration intensities;
  • (d) to design outfalls for tidal and creek (khadi) tailwater, which is very large in the Gulfs of Khambhat and Kachchh, and river tailwater raised by dam releases, including the case where the outfall is closed;
  • (e) to protect tanks (talavs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the Comprehensive General Development Control Regulations, 2017 (CGDCR 2017), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Gujarat's floods come from three mechanisms, often together. The first is river flooding from dam releases. On 8 August 2006 the outflow from Ukai dam on the Tapi peaked at 907,316 cusecs (about 25,700 m³/s), against a carrying capacity of the river through Surat reported at only 3.5–4.0 lakh cusecs, and the release "coincided with the days of high tide when the river's drainage capacity is further reduced"; most of the city was flooded and the State's own estimate of the damage was over Rs 21,000 crore (SANDRP, 2006, compiling CWC and State statements). Vadodara flooded in 2019 and again in August 2024, when the Vishwamitri rose to about 37 ft against a danger mark of about 25 ft while the Ajwa reservoir stood at its danger level (as reported). The second is the tide and the creeks. Surat's storm drains discharge to the Tapi through 42 gated outfalls (SMC, 2019), and its tidal creeks (khadis) overflowed three times in July 2026, when high tides held back the drainage (as reported). The Gulfs of Khambhat and Kachchh have the largest tides in India: INCOIS puts the tidal maximum at Bhavnagar at 5.22 m above mean sea level (INCOIS, 2025). The third is the short, intense storm on low-lying and filled land: 424 mm in 6 hours at Vadodara on 31 July 2019, and, on 22–24 July 2026 in Ahmedabad, 294.6 mm in 24 hours at the IMD gauge and 467.5 mm at AMC's Bopal gauge, with 82 of the city's 148 known waterlogging spots flooded (as reported). Cyclones add damaging storms outside the monsoon: 367.7 mm fell at Naliya on 21 May 1999 and 452.0 mm at Vallabh Vidyanagar on 9 November 1982 (IMD).

Lost and neglected storage makes all three worse. In 2024 the High Court found the land-filling of ponds and lakes across the State "may also be prime reason for water clogging", and directed every District Collector to survey the water bodies (order of 1 August 2024). Ahmedabad is reported to have had some 630 lakes within its civic limits in 1999, against 122 under AMC in 2020 (as reported); some 117 ha of mangroves were destroyed by salt-pan bunds in Kachchh, and had not been restored by March 2022 despite an order of the National Green Tribunal (CAG, 2022). No city in the State has published a stormwater design standard: the one design basis found in research for this Manual, AUDA's drains for Sanand, uses the CPHEEO 1-year storm with a runoff coefficient of 0.7 and routes the flow through Bhadreti lake into the Gota–Godhavi irrigation canal (ADB, 2023). Objectives (b) to (e) address the storage and tailwater failures, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and CGDCR 2017 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Gujarat, the top layer has a particular meaning: much of the State's flood storage sits in its talavs and lakes, in the tidal creeks (khadis) of Surat and the natural storm channels (kaans) of Vadodara, in the mangroves and mudflats of the Gulfs of Kachchh and Khambhat, and in wetlands such as Nalsarovar and Thol. The lakes and ponds have the strongest protection: since the High Court's judgment in Shailesh R. Shah v. State of Gujarat, 2002 (3) GLH 642, every lake and pond is to be notified, never alienated, recharged "by appropriate storm water drains" and cleared of encroachment, and the Court revived those directions on 1 August 2024. The creeks, kaans and floodplains have no comparable protection beyond the 9 m and 30 m clearances of CGDCR 2017, because the State has no flood lines and no natural drainage course is known to have been notified under section 11 of the Gujarat Irrigation and Drainage Act, 2013. Losing that storage cannot be offset economically by pipes.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Gujarat through:

  • (a) an amendment to CGDCR 2017 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. Gujarat has one building code for the whole State. CGDCR 2017, issued by the Urban Development and Urban Housing Department under section 116A(1) of the GTPUD Act 1976, section 155 of the Gujarat Municipalities Act 1963, section 31(a) of the Gandhidham Act 1957 and section 54 of the Gujarat Industrial Development Act 1962, applies to "all development area in the entire Gujarat State", in categories D1 (the five largest Urban Development Authorities) to D10, including the GIDC industrial estates (CGDCR 1.1.3, Table 1.1). Only the Sabarmati Riverfront, GIFT City and Gandhidham have their own regulations. The copy read for this Manual is consolidated to October 2019; later amendments were not checked, and the number of the notification that brought the regulations into force was not seen. CGDCR 2017 already keeps buildings 30 m from the bank of a river without an embankment, 15 m from a river embankment and 9 m from a talav, canal or nala (17.1); requires rainwater harvesting from 80 m² of ground coverage, with a retention pond of at least 300,000 litres as an option on units of more than 4,000 m² and a storage tank on units of more than 1,000 m² (17.2.2, 17.2.3); limits paving to 50% of the open space (13.1.3); and sets the plinth above a ground level that includes the high flood level (2.55, 13.1.5). It leaves the high flood level, and the manner of discharging rain water to a public drain, to the Competent Authority (2.55, 17.2.1), and the norms for drains to the Gujarat Pollution Control Board (13.10). It sets no design storm, return period, runoff coefficient, release rate or detention volume. An amendment of CGDCR 2017 under section 116A of the GTPUD Act is the natural route for a statewide condition of approval, which is why Clause 1.3.1(a) names it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Competent Authority under CGDCR 2017 (a Municipal Corporation; an Urban Development Authority or Area Development Authority in its development area; a Municipality; GIDC in its industrial estates; or the Competent Authority named for any other area), or, where special regulations prevail over CGDCR 2017 (the Sabarmati Riverfront, GIFT City and Gandhidham), the authority under those regulations, or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under CGDCR 2017 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the tidal creeks (khadis) of Surat, the gated outfalls of Surat to the Tapi, the Vishwamitri and its kaans in Vadodara, and low-lying Ahmedabad (the Ambli, Bopal, Ghuma and Shela area and the locations on AMC's list of known waterlogging spots), and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (talav), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under CGDCR 2017 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Gujarat Government Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under CGDCR 2017;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Gujarat, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply as set by Regulation 17.2 of CGDCR 2017 (rainwater harvesting on every building with a ground coverage of 80 m² or more: a percolation pit or bore recharge up to 500 m², a percolating well on building units of 500–1,500 m², and one percolating well for every 4,000 m² above that or, on units of more than 4,000 m², a water retention pond of at least 300,000 litres with one percolating well for every five that would otherwise be required; and a rainwater storage tank on every building unit of more than 1,000 m²), as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Gujarat plots are small and the cumulative effect of many small plots is what fills Ahmedabad's drains. For small buildings, CGDCR 2017 sets the plinth of habitable floors at least 0.45 m above the established level of the building unit (Reg. 13.1.5), and that level is the highest of the crown of the adjoining road, the existing ground and the high flood level decided by the Competent Authority (Regs. 2.55 and 13.1.2).

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Ahmedabad Municipal Corporation (AMC);
  • (b) every Approving Authority within the development area of an Urban Development Authority of category D1 of CGDCR 2017 (the Ahmedabad, Surat, Vadodara, Rajkot and Gandhinagar Urban Development Authorities: AUDA, SUDA, VUDA, RUDA and GUDA), as those areas are notified from time to time, including the Municipal Corporations of Surat, Vadodara, Rajkot and Gandhinagar, the Urban Development Authorities themselves, and the Municipalities in those areas; and
  • (c) every other Municipal Corporation constituted under the Gujarat Provincial Municipal Corporations Act, 1949, as constituted from time to time, including those of Bhavnagar, Jamnagar and Junagadh.

1.6.2 Tier B authorities. All other Municipalities are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with UDD regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the development area of an Urban Development Authority (UDA) constituted under section 22 of the Gujarat Town Planning and Urban Development Act, 1976, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Ahmedabad Municipal Corporation, with its Drainage Project division and some 42 storm-water pumping stations, and a small Municipality with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Ahmedabad.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7, which is at least the statutory 30 m from the bank of a river without an embankment, 15 m from a river embankment and 9 m from a talav, canal or nala Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
RWH mandate (CGDCR 2017, Regs. 17.2.2 and 17.2.3) Continues unchanged: rainwater harvesting on buildings with 80 m² or more of ground coverage, by percolation pit, bore recharge or percolating well according to plot size, with a water retention pond of at least 300,000 litres as an option on units of more than 4,000 m², and a rainwater storage tank on units of more than 1,000 m². The regulations give no storage volume per m² and no outlet rule. RWH storage, including a retention pond, is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Percolating wells and pits may count toward retention where they meet Chapters 4 and 8.
Level, plinth, paving and rain-water disposal (CGDCR 2017, Regs. 2.55, 13.1.2, 13.1.3, 13.1.5 and 17.2.1) Continue. The plinth of 0.45 m above the established level and the floor level of Clause 1.5.4(b) both apply; the higher governs. Where the Competent Authority has fixed a high flood level with a stated return period of 1% AEP or rarer, it is used as a 1% AEP level; otherwise the method of Chapter 6 applies. The unpaved half of the open space required by Reg. 13.1.3 counts as pervious only as Chapter 3 allows. The "manner of channeling rain water discharge from a building-unit to a public storm water drain", which Reg. 17.2.1 leaves to the Competent Authority, is decided under Chapters 4 and 6.
Statutory waterway setback (CGDCR 2017, Regs. 17.1 and 20.1.4) 30 m from the bank of a river without an embankment to any development work, 15 m from a river embankment to any building, and 9 m from a talav, canal or nala to any building. Reg. 17.1(4) lets the Competent Authority restrict or re-direct a watercourse without defined banks; a re-direction shall carry the flows of Chapter 7 and keep its corridor. The setback of Chapter 7 (Clause 7.4.7) is never less than 30 m, 15 m or 9 m, applies its no-fill zone to all development and not only to buildings, and is wider where the hydraulic corridor or the mapped 1% AEP extent of Chapter 7 requires; that wider part is stricter than the statute and is set by this Manual.
Flood-prone land (CGDCR 2017, Part II, use-zone conditions; Regs. 2.73 and 8.5) Continue. Gujarat has no flood-line system: development in flood-prone areas is regulated by reference to the CWC Flood Atlas and the Vulnerability Atlas of India (1997), and through local plan zones such as the "Restricted Agriculture Zone (High Flood Zone)" (AGZ4) and VUDA's restricted zones RZ1 to RZ4. This Manual does not create flood lines. Where the 1% AEP extent of Chapter 7 is mapped, it governs the setback; where a plan zone is wider, the zone governs (Clause 1.3.3).
Gujarat Town Planning and Urban Development Act, 1976 (GTPUD Act), and Town Planning Schemes Development Plans (s.12) provide for drainage, and Town Planning Schemes (s.40(3)(f)) for "drainage, inclusive of sewerage, surface or sub-soil drainage"; storm drains are usually laid in the scheme roads. Flood-sensitive catchments, drainage corridors and regional facility sites should be shown in the Development Plans and allotted in the schemes. This Manual does not decide zoning. The sections were read only in a third-party extract [TBC].
Gujarat Provincial Municipal Corporations Act, 1949 (GPMC Act); Gujarat Municipalities Act, 1963 Drains vest in the local body. In a Municipal Corporation their construction, maintenance and cleansing is an obligatory duty (GPMC s.63(4)); the Commissioner maintains them and builds new drains (s.153), no new building may be erected without drains (s.171), and the Commissioner may require a separate drain for rain water (s.174); Chapter 8 applies the separation statewide. The drainage sections of the Gujarat Municipalities Act, 1963 were not reviewed for this Manual [TBC].
Gujarat Irrigation and Drainage Act, 2013 (Act No. 6 of 2013), ss.10, 11 and 14 Where obstruction of a river, stream or natural drainage course injures public health or convenience, the State may notify the course and prohibit obstructions within the limits of the notification; the reach is then a drainage work, and obstructions may be removed at the obstructor's cost (ss.11–13). This is the strongest statutory hook for the drainage corridors of Chapter 7. The date on which the Act was brought into force, and whether any urban drainage course has been notified under s.11, were not found [TBC].
Lakes and ponds: Gujarat High Court, Shailesh R. Shah v. State of Gujarat, 2002 (3) GLH 642, para 24; order of 1 August 2024; CGDCR 2017, Reg. 2.118 Every lake and pond in the State is to be notified in the Gazette, not alienated or put to any other use, recharged "by appropriate storm water drains" and cleared of encroachment, with a no-construction periphery fixed for each; in 2024 the Court directed every District Collector to survey the water bodies. No development is permitted on land designated as water body, pond or talav in a Development Plan. Works under this Manual that drain to a talav shall meet the water-quality rules of Chapter 8, and no work shall reduce its area or storage (Chapter 7).
Wetlands (Conservation and Management) Rules, 2017 Apply to notified wetlands and the Ramsar sites (Nalsarovar, Thol, Wadhvana and Khijadia, and Chhari-Dhand in Kachchh as reported). Where their restrictions are wider than the setback of Chapter 7, they govern (Clause 1.3.3). The constitution of a State Wetland Authority under the Rules was not found [TBC].
CRZ Notification 2019, through the approved Coastal Zone Management Plans The plans prepared under CRZ 2019 had not been approved by August 2022 (CAG Report No. 3 of 2022), and no approval was found up to 2026; the plans under CRZ 2011, approved in January 2019 and February 2020, are those in force [TBC]. GCZMA recommends CRZ clearance for outfalls, drains, tide gates and pumping stations in the CRZ. CRZ categories and lines are taken from the approved maps, and govern where wider than Chapter 7 (Clause 1.3.3). Mangroves are protected under the CRZ, but some 117 ha destroyed in Kachchh had not been restored by March 2022 despite the order of the National Green Tribunal of 11 September 2019 (CAG, 2022).
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Gujarat is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July or August monsoon spell arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Gujarat's cities are spending heavily on drainage. Surat had some 986 km of storm drains in 2019, with 42 gated outfalls to the Tapi and sluice regulators on its khadis (SMC, 2019); after the floods of July 2026 the State announced Rs 500 crore for the khadis, and some 188 km of creek had been surveyed by August (as reported). AMC ran Rs 1,088 crore of pre-monsoon storm-water projects in 2026 and is preparing zone master plans (as reported), and AUDA is building 166 km of drains in six towns around Ahmedabad (ADB, 2023). No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

Gujarat's planning law already holds many of the tools. CGDCR 2017 makes every applicant show "the position and level of the outfall of the drain" on the plans, which is where the tailwater check of Chapter 5 belongs; Town Planning Schemes can allot land for drainage; the Irrigation and Drainage Act lets the State protect a natural drainage course by notification; and the High Court's directions protect every lake and pond. Storm water is also discharged to irrigation canals, as at Sanand, where AUDA's drains outfall to the Gota–Godhavi canal through Bhadreti lake (ADB, 2023); an outfall to a canal is designed for the canal's own water level, as for a river (Clause 5.8), and needs the consent of WRD where the canal is its work. None of these instruments says how high a flood reaches or how much storage a filled plot removes; this Manual supplies that technical test.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Development and Urban Housing Department (UDD) Would own the Manual. Would issue the amendment of CGDCR 2017 under section 116A of the GTPUD Act. Would constitute and service the State Stormwater Technical Committee. Sanctions Development Plans and Town Planning Schemes, in which flood-sensitive catchments, drainage corridors and regional facility sites should be shown. Technical support to Tier B authorities, through its town planning offices. Maintains the empanelled reviewer list (Clause 10.7).
State Stormwater Technical Committee (Clause 1.3.2) Adopts higher standards. Issues Annexes, tables and the compliance calculator. Concurs with Tier A alternatives. Decides variances referred to it. Reviews the Manual (Clause 1.12).
Ahmedabad Municipal Corporation (AMC) Competent Authority under CGDCR 2017 in its area. Owner of the municipal drains, the storm-water pumping stations and the lakes in its charge; the construction, maintenance and cleansing of drains is an obligatory duty (GPMC Act, s.63(4); ss.153–181). Would apply this Manual to its own works, including its zone storm-water master plans and lake interlinking. Inspects and enforces (Clauses 10.12–10.15).
Surat (SMC), Vadodara (VMC), Rajkot (RMC) and the other Municipal Corporations Competent Authority under CGDCR 2017 in their areas. Owners of the municipal drains vested in them under the GPMC Act, including SMC's gated outfalls to the Tapi and the sluice regulators on its khadis, and VMC's kaans. Would provide outfall levels and gate operating rules for tailwater (Chapter 5). Receive handed-over assets (Clause 10.14). Inspect and enforce (Clauses 10.12–10.15).
Municipalities Competent Authority under CGDCR 2017 in their areas (category D8). Owners of the public drains vested in them under the Gujarat Municipalities Act, 1963. Inspect and enforce (Clauses 10.12–10.15).
Urban Development Authorities (AUDA, SUDA, VUDA, RUDA, GUDA and the others) and Area Development Authorities Competent Authority under CGDCR 2017 in the parts of their development areas outside the Municipal Corporations and Municipalities. Prepare Development Plans and Town Planning Schemes, and should reserve drainage corridors and regional facility sites in them. Apply this Manual to the drains they build, such as AUDA's drains in the towns around Ahmedabad.
Gujarat Industrial Development Corporation (GIDC) Competent Authority under CGDCR 2017 in its industrial estates (category D9). Applies this Manual to the estates' drains and to development in them.
Sabarmati River Front Development Corporation Limited (SRFDCL) Applies its own regulations in the riverfront zone (CGDCR 2017, Reg. 8.4.4). Would provide the river levels at the riverfront walls and the outfall levels through them (Chapter 5), and apply this Manual to its works.
Narmada, Water Resources, Water Supply and Kalpsar Department (WRD) Operates the State's dams, including Ukai on the Tapi, whose releases set river tailwater, and the Flood Control Cell at the State Water Data Centre, Gandhinagar. Provides design water levels and release scenarios (Chapters 5 and 7). Consents to outfalls into its canals and drainage works. Would notify natural drainage courses under section 11 of the Gujarat Irrigation and Drainage Act, 2013. Holds the State's rain-gauge records (Annex 2A) and the bandharas and tidal regulators of the salinity-ingress programme, which fix tailwater on coastal creeks.
Gujarat State Disaster Management Authority (GSDMA) and the District Disaster Management Authorities Hazard and flood mapping. Notify or recommend flood-sensitive catchments. Pre-monsoon preparedness. With the State Emergency Operation Centre, whose taluka rainfall reports are a record for Annex 2A, lead the post-event review (Clause 10.16).
Gujarat Water Resources Development Corporation (GWRDC) Advises on groundwater levels, recharge, infiltration and coastal salinity (Chapters 3, 4 and 8).
Gujarat Pollution Control Board (GPCB) Sets the norms for drains and sewers to which CGDCR 2017 refers (Reg. 13.10). Regulates discharges of sewage and effluent into rivers, khadis and storm drains. Supports the removal of sewage connections to storm drains (Chapter 8).
Gujarat Coastal Zone Management Authority (GCZMA) and its District Level Committees Recommends CRZ clearance for outfalls, drains, tide gates and pumping stations in the CRZ. Advises on CRZ categories and the HTL from the approved Coastal Zone Management Plans.
Forests and Environment Department Custodian of mangroves and of the Ramsar sites and other wetlands. Consulted on any work in a mangrove or wetland (Chapters 5 and 7).
Gujarat Maritime Board Administers the non-major ports. Would be consulted where an outfall, creek work or tide gate lies within port limits; its role at urban outfalls was not researched for this Manual [TBC].
Revenue Department and the District Collectors Maintain the land records of talavs, nalas and government land used for setbacks and storage. The Collectors survey the water bodies of each district under the High Court's order of 1 August 2024, with separate reports for the Municipal Corporation and UDA areas, and the record is the starting point for the waterbody inventory of Chapter 7.

Commentary. Ownership of Gujarat's drainage is split. Inside the Municipal Corporations the drains vest in the Corporation, but the rivers that receive them are regulated by the State's dams: Ukai on the Tapi at Surat, and the Ajwa and Pratappura reservoirs above the Vishwamitri at Vadodara. Outside the Corporations the Urban Development Authorities plan the land and, as AUDA does around Ahmedabad, build drains that outfall to irrigation canals and lakes. Surat's khadis are worked on by SMC, which built sluice regulators on the Varachha and Chhaprabhatha khadis (SMC, Projects Executed), while the ownership of the creek mouths is not settled in the sources read for this Manual. Surat's flood warning system is run with the Surat Climate Change Trust and draws on WRD and GSDMA (TARU and SMC). After the Vadodara floods of 2024 the State set up a committee led by B. N. Navalawala on the Vishwamitri and its reservoirs (as reported), and VMC has reported to the National Green Tribunal on the Bhukhi kaas (VMC, 2024). A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. A site that drains to the Tapi or a khadi through a gated outfall, as in Surat, does not discharge to a tidal reach for this clause, because the gate is closed whenever the water outside is higher than the water behind it; nor does a site that drains to a creek upstream of a bandhara, the fixed salinity-control weir built with its crest above high tide.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, which is at least the statutory 30 m from the bank of a river without an embankment, 15 m from a river embankment and 9 m from a talav, canal or nala, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in 2024 the Gujarat High Court found "indiscriminate land filling of the ponds/lakes/water bodies" across the State, more than twenty years after its directions in Shailesh R. Shah v. State of Gujarat, and observed that it "may also be prime reason for water clogging" (order of 1 August 2024).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the Urban Development Authority boundaries
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model CGDCR amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request