Draft v1.0 prepared by NEER. Not adopted by the Government of Karnataka, and has no legal force. About this draft

Karnataka · Draft v1.0

Karnataka Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Karnataka Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Karnataka.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Karnataka or by any of its departments, local bodies or agencies, including the Greater Bengaluru Authority (GBA) and the City Corporations. Where it names a body, such as UDD, the GBA, a City Corporation, BDA, BWSSB, KTCDA, the Minor Irrigation Department, the Water Resources Department, KSNDMC, KSDMA or a local body, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.

Names of bodies. Bengaluru's municipal corporation, the Bruhat Bengaluru Mahanagara Palike (BBMP), ceased on 2 September 2025. Its functions passed to five City Corporations under the Greater Bengaluru Authority, set up under the Greater Bengaluru Governance Act (Karnataka Act 36 of 2025). This Manual cites reports, plans and filings by the name of the body that made them, such as BBMP.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Karnataka's cities and towns flood for three reasons. The Bengaluru floods of September 2022 showed all three at once, and the floods of Yelahanka in October 2024 showed them again.

  1. Inadequate drain capacity. Drains are too small for the rain they receive, and many are narrower than they were built. On the night of 4–5 September 2022 gauges at Marathahalli and Doddanekundi were reported to have recorded 125–129 mm by about 3 a.m.; on 21–22 October 2024 the GKVK agromet observatory in north Bengaluru recorded 186.2 mm in 24 hours. Bengaluru's 2010 storm water drain master plan sized most drains for a 2-year storm. The Comptroller and Auditor General (CAG) found about 780 MLD of sewage flowing in the city's storm water drains, taking up capacity meant for rain. Roofs, roads and paving now send more water to the drains, and faster.
  2. Lost storage. Karnataka's plateau towns grew up on cascades of tanks (keres), each spilling over its surplus weir (kodi) to the next. Many that once held storm water have been filled or built over. CAG, citing the Indian Institute of Science, records that Bengaluru's 1,452 water bodies of the early 1800s had fallen to 194 by 2016. A committee of the State legislature reported in January 2016 that about 11,000 acres of lake land in and around Bengaluru were encroached. Layouts now stand on the valley floors between tanks: Rainbow Drive, flooded in 2022, was built on former paddy land in the valley that links Halanayakanahalli and Junnasandra lakes to Saul Kere. The water these tanks and valleys used to store now runs into streets and homes.
  3. Blocked outfalls. A Bengaluru drain empties along a rajakaluve into the next kere. When that kere is full, or the rajakaluve is narrowed or built over, the water backs up, and even a well-sized drain cannot empty. CAG counted 2,626 encroachments on the city's storm water drains, 714 of them not acted on. In September 2022, 126 lakes overflowed; in November 2021 and three times in October 2024 Yelahanka lake spilled into the Kendriya Vihar housing complex. In north Karnataka the outfalls are rivers: in August 2019 the Krishna, Malaprabha and Ghataprabha rose on heavy rain upstream and on dam releases, and flooded the towns and villages along them. On the coast, the drains of Mangaluru, Udupi and Karwar empty into estuaries whose mouths shift, and on the Sharavathi and the Kali the estuary level depends on releases from the dams upstream.

A further hazard sits alongside these. In the Western Ghats, the floods of August 2018 and 2019 in Kodagu came with landslides on saturated slopes cut for houses and roads. Drains cannot carry them; development has to keep away from them, and runoff must not be concentrated onto steep or unstable ground.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the kere, the river or the tide is high.

The Manual also sets how public drains, roads, rajakaluves, keres and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Karnataka's very wet coast and Western Ghats and its much drier interior plateau, the May and September–October storms of Bengaluru and the south interior, its kere cascades with their bunds and kodis, the rajakaluves of Bengaluru's valleys, its granite outcrops and red soils, the black cotton soils of the north and the laterite of the Malnad and the coast, the landslide-prone slopes of the Ghats, rivers regulated by dams, and the estuary outfalls of the coast.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. Frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee.
  4. Tropical and coastal practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites, drainage reserves and coastal platform levels. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Bengaluru City Corporation Building Bye-Laws, 2003, the zoning regulations of the Revised Master Plan 2015 for Bengaluru under the Karnataka Town and Country Planning Act, 1961, the Karnataka Tank Conservation and Development Authority Act, 2014 as amended by Karnataka Act No. 19 of 2026, the drain buffers notified for the Bengaluru Metropolitan Region in October 2025, and the CRZ Notification 2019 as applied in Karnataka, which this Manual follows or, where disclosed, makes stricter.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval. The Bengaluru building bye-laws of 2003, section 72A of the Bangalore Water Supply and Sewerage Board Act and the Model Building Bye-Laws 2016 require rainwater harvesting, but they set no detention volume and no release rate. None of the Karnataka texts read for this Manual sets a storage volume even for rainwater harvesting.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain on a Bengaluru arterial road can cite 1, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. Bengaluru's 2010 storm water drain master plan used IMD rainfall to 2008 and a 2-year storm for most locations. A BBMP drain calculation filed before the National Green Tribunal in 2024 used a 5-year storm "at 70mm"; another took its intensity from a table in the CPHEEO manual.

Karnataka has no drainage design standard of its own. Research for this Manual found no Karnataka design standard, State IDF relationship or departmental circular that fixes return periods or design rainfall for urban drains, and no official IDF for any city in the State. No State rule requires on-site detention or limits peak runoff. CAG's performance audit of storm water management in Bengaluru (Report No. 2 of 2021) found that:

  • BBMP had not prepared a storm water drain manual "to systematically design, execute and maintain the SWD infrastructure", and no design calculations could be found in any of the work files examined;
  • BBMP's records held 842 km of primary and secondary drains, with no record of the length of tertiary drains;
  • the city's Revised Master Plan 2015 and its storm water drain master plan disagreed on which drains existed and how they were classed;
  • about 780 MLD of sewage flowed in the storm water drains;
  • none of the drains test-checked had boundary markings, and 714 of 2,626 identified encroachments had not been acted on; and
  • the rainfall patterns recorded by KSNDMC needed to be factored into design.

The statutory buffers that protect tanks and drains were reduced in 2025–26. Karnataka Act No. 19 of 2026 replaced the uniform 30 m buffer around tanks with a buffer graded by tank size, from 0 m for the smallest to 30 m for the largest. In October 2025 the State set buffers of 15, 10 and 5 m from the edge of primary, secondary and tertiary drains in the Bengaluru Metropolitan Region. Except around the largest tanks, both are smaller than the buffers of the Revised Master Plan 2015 and of the National Green Tribunal's 2016 order, whose general buffer direction the Supreme Court set aside in 2019. No stormwater master plan or design return period was found for Mangaluru, Mysuru, Hubballi–Dharwad, Belagavi or Kalaburagi.

So each region and each local body interprets the central manual its own way. Corporations, municipal councils, panchayats, development authorities, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. Neighbouring local bodies in one river basin can work to different standards, though the water does not stop at their boundary. A city drain can be designed without regard to the kere it empties into, as Kendriya Vihar showed in 2021 and 2024. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls (Chapter 5); and
  • basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A City Corporation, City or Town Municipal Council, Town Panchayat, Gram Panchayat or development authority can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines; MoHUA Model Building Bye-Laws (2016); Lok Sabha Unstarred Question 1847 (July 2026); Bengaluru City Corporation Building Bye-Laws, 2003; Bangalore Water Supply and Sewerage Board Act, 1964, s.72A; CAG, Performance Audit of Management of Storm Water in Bengaluru Urban Area, Report No. 2 of 2021, Government of Karnataka, Chapters 1, 4 and 5; BBMP, Master Plan for Remodeling of Storm Water Drains in Eight Zones of BBMP, Vol. 1 (STUP Consultants, October 2010); BBMP technical notes in NGT OA 150/2022 (SZ) and OA 1219/2024; KTCDA Act 2014, s.12(3) as substituted by Karnataka Act No. 19 of 2026; UDD notification 468 MNJ 2025(E) (15 October 2025); Supreme Court, Mantri Techzone v. Forward Foundation, CA 5016/2016 (5 March 2019); UAS Bangalore, GKVK agromet observations (October 2024); The News Minute (23 November 2021; 5 and 10 September 2022; 22 October 2024); Business Standard (8 January 2016); SANDRP (12 August 2019); The News Minute (11 September 2019), on the GSI analysis of the Kodagu landslides.


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Tanks (Keres) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Karnataka
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Karnataka locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Parts of a tank and its system
7E.3Flood terms
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use park and open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Tank (kere) cascade in a Bengaluru valley
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
BBMP Bruhat Bengaluru Mahanagara Palike (Bengaluru's municipal corporation until 2 September 2025)
BDA Bangalore Development Authority
BMR Bengaluru Metropolitan Region
BMRDA Bangalore Metropolitan Region Development Authority
BSMP Basin Stormwater Master Plan
BWSSB Bangalore Water Supply and Sewerage Board
CAG Comptroller and Auditor General of India
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ / CZMP Coastal Regulation Zone / Coastal Zone Management Plan
CSE Centre for Science and Environment
CWC Central Water Commission
DDMA District Disaster Management Authority
DMA Directorate of Municipal Administration, Karnataka
FTL / MWL Full tank level / maximum water level
GBA Greater Bengaluru Authority
GBG Act Greater Bengaluru Governance Act (Karnataka Act 36 of 2025)
HAT / MHWS Highest astronomical tide / mean high water springs
HGL Hydraulic grade line
HSG Hydrologic soil group
IDF Intensity–duration–frequency
IISc Indian Institute of Science, Bengaluru
IMD India Meteorological Department
IRC Indian Roads Congress
KLR Act Karnataka Land Revenue Act, 1964
KMC Act Karnataka Municipal Corporations Act, 1976
KSDMA Karnataka State Disaster Management Authority
KSNDMC Karnataka State Natural Disaster Monitoring Centre
KSPCB Karnataka State Pollution Control Board
KTCDA Karnataka Tank Conservation and Development Authority
KTCP Act Karnataka Town and Country Planning Act, 1961
LPA Local Planning Authority
MI Minor Irrigation and Ground Water Development Department, Karnataka
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NE monsoon / OND North-east monsoon, October–December
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
PSD Permissible site discharge
RMP Revised Master Plan (Bengaluru)
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
TRG Telemetric rain gauge
UDD Urban Development Department, Karnataka
ULB Urban local body (City Corporation, City or Town Municipal Council, or Town Panchayat)
WQv Water quality volume
WRD Water Resources Department, Karnataka