Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the primary rajakaluves of the Bengaluru valleys (Koramangala–Challaghatta, Hebbal and Vrishabhavathi), or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, kere or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or kere under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, GBA, KSDMA or WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next kere or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Karnataka. In the kere cascades of Bengaluru's three valleys (Koramangala–Challaghatta, Hebbal and Vrishabhavathi), where a drain passes through a chain of keres linked by rajakaluves before it leaves the city (Bellandur alone receives about 148 km² from three chains of lakes and spills on to Varthur), and in the tank chains of the south interior, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Bengaluru, where the Epsilon layout at Yemalur, below the overflowing lakes of Mahadevapura, was still under about 3 ft of water on 6–7 September 2022, two days after the storm of 4–5 September, and the Kendriya Vihar complex at Yelahanka, below Yelahanka lake, was flooded three times in October 2024, to a depth of up to 6 ft on 21–22 October (press reports). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the Netravati–Gurupura estuary at Mangaluru, the Swarna–Sita estuary at Udupi and Malpe, the Panchagangavali at Kundapur, the Sharavathi at Honnavar, the Aghanashini at Kumta and the Kali at Karwar), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, BDA or the Authority adopts a higher projection for the planning area, for example a projection based on the INCOIS (2025) estimates for Mangalore of about 0.47 m (SSP2-4.5) and 0.71 m (SSP5-8.5) of mean-sea-level rise by 2100; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the INCOIS (2025) estimate that surge and wave set-up add about 1.22 m to the 100-year sea level at Mangalore, on a coast where Cyclones Ockhi (2017) and Tauktae (2021) did their damage through high waves rather than a recorded surge (IMD), showed why it is needed in Karnataka.
Indian tide tables have been published by the Survey of India since the nineteenth century; in Karnataka the Survey of India gauges at Mangalore (Panambur) and Karwar have records from 1976 and 1970 (PSMSL stations 1423 and 1273), and an older gauge in the Mangalore estuary (PSMSL station 696, 1953–1976) shows a seasonal cycle of mean sea level that PSMSL describes as very different from that on the open coast (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. Its 2025 technical report gives a 100-year extreme sea level for Mangalore of 3.04 m above the 1995–2014 mean sea level at present, of which surge and wave set-up make up 1.22 m, rising to 3.52 m (SSP2-4.5) and 3.73 m (SSP5-8.5) by 2100. No published MHWS or HAT for New Mangalore or Karwar (values [TBC] from the NHO Indian Tide Tables or the port authorities), and no extreme sea level for Karwar, Malpe or Honnavar, was found during research. IMD issued no storm-surge warning for the Karnataka coast in Cyclones Ockhi (2017) or Tauktae (2021); the damage there came from high waves, sea erosion at Ullal and Someshwar, and heavy rain. No statewide surge return-level product suitable for design was found during research, which is why Annex 5A is needed.
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- in Bengaluru: the primary and secondary rajakaluves of the Koramangala–Challaghatta, Hebbal and Vrishabhavathi valleys, the keres of their cascades (with the tailwater of Clause 5.8.5), including Bellandur and Varthur, and the Dakshina Pinakini below Varthur;
- in Mangaluru: the Netravati and Gurupura and their estuary, and the rajakaluves that fall into them;
- in Udupi, Malpe and Kundapur: the Swarna, Sita and Panchagangavali and their estuaries;
- in Honnavar and Karwar: the lower Sharavathi below Gerusoppa and the lower Kali, with the releases of Clause 5.8.3;
- in the Krishna basin: the Krishna, including the reaches above and below Almatti, the Ghataprabha below Hidkal and the Malaprabha below the Malaprabha reservoir, and the Bhima below the Sonna barrage;
- the Tungabhadra and the Kaveri where towns drain to them, including the Kaveri at Kushalnagar; and
- elsewhere: any river or WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example Hidkal to the Ghataprabha, the Malaprabha reservoir to the Malaprabha, Almatti to the Krishna, the Sonna barrage, and the Ujani and Veer dams in Maharashtra, to the Bhima, Linganamakki and Gerusoppa to the Sharavathi, or the Kali hydro-electric dams above Karwar), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 Kere cascades, rajakaluves, irrigation canals and dam ponds.
-
(a) Receiving kere. For an outfall to a kere, kunte or katte, or to a rajakaluve or feeder channel that ends in one, the tailwater at the kere shall be:
- for the minor system, its FTL, the surveyed crest of its surplus weir (kodi) (Clauses 7.2 and 7.7.1); and
- for the major system and storage, the higher of its MWL (Clause 7.2) and the maximum level computed by routing the kere for the coincident case of 5.8.4, starting at FTL (Clause 7.7.3), with the inflow of the whole cascade above it, the kodi at its surveyed crest and length, and the surplus course below it in its present condition.
The water level along the rajakaluve or channel between the outfall and the kere shall be computed with that tailwater at the kere, not as a free outfall.
-
(b) Down the cascade. Where the project raises the maximum level of the receiving kere (Clause 5.3.2), the analysis shall continue through each kere below it, each with the tailwater of (a), until the rise is less than 10 mm or the cascade reaches a river or a major drain.
-
(c) No credit for drawdown. No storage below FTL shall be credited, and no drawdown through a sluice (tubu) or by lowering the kodi shall be assumed, unless a flood-cushion operating rule under Clause 7.8 is in force for the kere.
-
(d) Irrigation canals. Town drainage shall not be discharged to an irrigation canal without the permission of WRD or the canal's owner. Where permission is given, the tailwater is the higher of the canal's full supply level (FSL) during irrigation releases and its flood level for the coincident case of 5.8.4, and the outfall shall have a flap gate where the FSL is above the outfall invert.
-
(e) Dam and barrage ponds. For outfalls into the pond or backwater of a dam or barrage, the river level of Clause 5.8.2 shall be the pond level for the release of 5.8.3 at the river flow being checked, and not less than the pond's full reservoir level (FRL).
No gate, sluice or surplus-weir operation that helps drainage shall be assumed unless the custodian's operating records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have a flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12).
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Karnataka's rivers often break that assumption. In August 2019 rainfall over Belagavi district was 135% above normal to 11 August (469.7 mm over 1–11 August) and statewide rainfall was 279% above normal over 3–10 August (SANDRP, 2019; KSNDMC, as reported by TNM), so the same spell raised the town drains and the Ghataprabha, Malaprabha and Krishna together. The west-coast rivers are short and rise with the same monsoon spell that floods Mangaluru, Udupi and Karwar. In Bengaluru the receiving water is usually a downstream kere, which fills in the same storm as the drain that runs into it (Clause 5.8.5). Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the August 2019 lesson in the Krishna basin. Hidkal on the Ghataprabha raised its release from about 2,400 cusecs to 100,945 cusecs (9 August), the Malaprabha reservoir released 81,048 cusecs (8 August), and Almatti on the Krishna, with an inflow peaking at 600,049 cusecs, released 504,802 cusecs on 11 August (SANDRP, 2019, from KSNDMC reservoir data). On the Bhima in October 2020, releases from the Sonna barrage near Afzalpur were reported at 5.11 lakh cusecs rising to a record 8 lakh cusecs over 16–19 October, with releases from the Veer and Ujani dams in Maharashtra adding to the flow (press reports). On the coast, the Sharavathi below Linganamakki and Gerusoppa and the Kali below its chain of hydro-electric dams are regulated rivers, so the estuary levels at Honnavar and Karwar depend on KPCL releases as well as on the tide. No record of release levels coinciding with town flooding was found for either estuary during research.
Clause 5.8.5 is set by this Manual. Karnataka has no delta drains or polders; its inland equivalent is the kere cascade. Bengaluru drains through three valleys, Koramangala–Challaghatta, Hebbal and Vrishabhavathi, in which rajakaluves link one kere to the next. Bellandur, for example, receives three chains of lakes from a catchment of about 148 km² and spills on to Varthur and the Dakshina Pinakini (secondary sources). BBMP told the National Green Tribunal that the city's storm drains "were not planned for flood water management but are erstwhile irrigation channels" (BBMP compliance report in O.A. 125/2017, 26 February 2021). A drain into such a chain discharges into a kere that can be full before the storm begins, because many of the lakes receive sewage through the dry season (about 780 MLD of sewage enters the city's storm drains, CAG Report No. 2 of 2021), and that rises in the same storm. That is why Clause 5.8.5(a) takes FTL as the minor-system tailwater and the MWL or the routed level for the major system, why (c) gives no credit for a kere drawn down below FTL, and why (b) follows the cascade down while the level still rises: in September 2022, 126 lakes overflowed, and in November 2019 the breach of Hulimavu lake flooded about 800 houses (press reports). The Karnataka Tank Conservation and Development Authority Act, 2014, as amended by Karnataka Act No. 19 of 2026, now names the FTL and the MWL of a tank and allows roads, pipes and treatment plants between them only where "the original capacity of the tanks is not reduced" (new section 12(2)); the band between FTL and MWL is the flood storage that sets the tailwater of Clause 5.8.5(a). No published FTL, MWL or surplus-weir record was found for the Bengaluru keres during research, so both are to be surveyed (Clause 7.7.1). The canal and dam-pond rules in (d) and (e) are also set by this Manual; no WRD rule on town drainage into irrigation canals was found during research.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Karnataka requirement in this Manual. Karnataka's coast is a low-surge, high-wave coast, so here an outfall is shut less by surge than by the tide, the mouth and the river. INCOIS puts the modelled tidal maximum at Mangalore at about 1.78 m above mean sea level (INCOIS, 2025), outfalls cross mobile beaches and estuary mouths, and an estuary in flood holds the outfalls behind it closed for as long as the river stays high. Inland the receiving water is usually a kere, not the sea: a drain whose outlet lies below the kere's FTL cannot discharge while the kere is full, and a Bengaluru lake that receives sewage through the dry season can be full before the storm begins. In October 2024 the Kendriya Vihar complex at Yelahanka was flooded three times in one month from Yelahanka lake (press reports), and in August 2019 town drains on the Krishna tributaries could not discharge while the rivers were in flood. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 30 April each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. Both failures occur on Karnataka's sandy coast, where outfalls cross a mobile beach. The 30 April inspection date is set ahead of the monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 30 April each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the Netravati–Gurupura mouth (Mangaluru, between the Bengre spit and Ullal), the Swarna–Sita mouth (Udupi and Malpe), the Panchagangavali mouth (Kundapur), and the Sharavathi (Honnavar), Aghanashini (Kumta) and Kali (Karwar) mouths, and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the June–October season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Most urban outfalls on the Karnataka coast end not on the open beach but in estuaries with mobile mouths: the Netravati–Gurupura at Mangaluru, between the Bengre spit and Ullal; the Swarna–Sita at Udupi and Malpe; the Panchagangavali at Kundapur; the Sharavathi at Honnavar; the Aghanashini at Kumta, a Ramsar site; and the Kali at Karwar. NCCR found 74.34 km (23.7%) of the State's 313.02 km of coast eroding over 1990–2018, and Ullal has had wide-scale sea erosion since the late 1990s. The old Mangalore estuary gauge (PSMSL station 696) shows a seasonal cycle of mean sea level very different from the open-coast gauge at Panambur, so levels inside an estuary can differ from the open-coast tide (Clause 5.7.2(c)). No mouth-by-mouth record of closure or migration, pre-monsoon bar crest levels or mouth-opening procedure was found during research. The mouths named in Clause 5.13.1 are therefore those where a restricted or closed mouth must be assumed until shown otherwise; the status of each is to be confirmed in Annex 5B, and Clause 5.13.4 gives no credit for cutting at present. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- SANDRP (12 Aug 2019). Krishna basin floods in Karnataka: the role of dams (KSNDMC reservoir data, Hidkal, Malaprabha and Almatti releases). https://sandrp.in/2019/08/12/krishna-basin-floods-in-karnataka-the-role-of-dams/
- Wikipedia. 2019 Karnataka floods (taluks and districts affected, as reported). https://en.wikipedia.org/wiki/2019_Karnataka_floods
- Deccan Herald (Oct 2020). Record 8 lakh cusecs of water released from Sonna barrage into Bhima river, villages inundated (as reported). https://www.deccanherald.com/state/kalaburagi/record-8l-cusecs-of-water-released-from-sonna-barrage-into-bhima-river-villages-inundated-903258.html
- The News Minute (10 Sep 2022). 126 lakes overflowed in Bengaluru following heavy rains in September, says BBMP. https://www.thenewsminute.com/karnataka/126-lakes-overflowed-bengaluru-following-heavy-rains-september-says-bbmp-167743
- Inquirer / Reuters (Sep 2022). Water recedes in parts of India's Bengaluru (Rainbow Drive and Yemalur, as reported). https://newsinfo.inquirer.net/1659860/water-recedes-in-parts-of-indias-bengaluru-residents-venture-out/amp
- The News Minute (22 Oct 2024). Bengaluru's Kendriya Vihar apartments in Yelahanka flood for the third time in a month. https://www.thenewsminute.com/amp/story/karnataka/bengalurus-kendriya-vihar-apartments-in-yelahanka-flood-for-the-third-time-in-a-month
- Wikipedia. Bellandur Lake (catchment and inflowing lake chains, as reported). https://en.wikipedia.org/wiki/Bellandur_Lake
- BBMP (2021). Compliance report to the National Green Tribunal in O.A. 125/2017, 26 February 2021. https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20BBMP%20IN%20OA%20NO.%20125%20of%202017%20(COURT%20ON%20ITS%20OWN%20MOTION%20VS%20STATE%20OF%20KARNATAKA)_0.pdf
- Comptroller and Auditor General of India (2021). Performance Audit of Management of Storm Water in Bengaluru Urban Area, Report No. 2 of 2021, Government of Karnataka. https://cag.gov.in/en/audit-report/details/114419
- Government of Karnataka (2026). Karnataka Tank Conservation and Development Authority (Amendment) Act, 2025, Karnataka Act No. 19 of 2026, Gazette Part IVA No. 160, 18 February 2026. https://data.opencity.in/dataset/2a2c0701-853e-4db3-b1d4-06ee8674c628/resource/ffff8ed9-228d-42a2-a596-3b4c06a8d726/download/lake-tank-buffer.pdf
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- INCOIS (2025). Technical Report ESSO-INCOIS-OMDA-TR-04(2025) (extreme sea-level components and projections, Mangalore). https://incois.gov.in/documents/Reports/TechnicalReports/TR_ESSO-INCOIS-OMDA-TR-04(2025)_20250725114934.pdf
- PSMSL. Stations 1423, Mangalore (Panamburu); 1273, Karwar; and 696, Mangalore (estuary gauge, 1953–1976). https://psmsl.org/data/obtaining/stations/1423.php ; https://psmsl.org/data/obtaining/stations/1273.php ; https://psmsl.org/data/obtaining/stations/696.php
- India Meteorological Department. Very Severe Cyclonic Storm Ockhi (29 November–5 December 2017): a report. RSMC New Delhi. https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_83ec45_ockhi%20pre.pdf
- India Meteorological Department (2021). National Bulletin No. 06 (ARB/01/2021), Cyclone Tauktae, 15 May 2021. https://rsmcnewdelhi.imd.gov.in/uploads/archive/1/1_9d5860_6.%20National%20Bulletin%2020210514_2100%20UTC.pdf
- National Centre for Coastal Research (MoES). Coastal processes and shoreline management: shoreline change 1990–2018, Table 1. https://www.nccr.gov.in/?q=activities/coastal-process
- Wikipedia. Sharavati; Kali River (Karnataka); Ullal (dams and sea erosion, as reported). https://en.wikipedia.org/wiki/Sharavati ; https://en.wikipedia.org/wiki/Kali_River_(Karnataka) ; https://en.wikipedia.org/wiki/Ullal
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a Mangaluru coastal site |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. Karnataka's recent floods failed in places that site design does not see. In Bengaluru in September 2022 the problem was downstream: 126 lakes overflowed from 1 September, 42 of them in Mahadevapura zone (BBMP, as reported by TNM, 2022), and the layouts built on the valley floor below them, such as Rainbow Drive and Yemalur, were flooded as the lakes above them overflowed (Reuters, as reported). In the north in August 2019 the problem was the river. Towns on the Krishna, Ghataprabha and Malaprabha drain into rivers that rose on rain over the Western Ghats and on releases from Hidkal, the Malaprabha reservoir and Almatti (SANDRP, 2019, from KSNDMC reservoir data), and 103 taluks in 22 districts were affected. On the coast the problem is the outfall: the drains of Mangaluru, Udupi, Kundapur, Honnavar and Karwar end in estuaries whose mouths move, and on the Sharavathi and the Kali the estuary level also depends on releases from upstream dams. A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if its outfall is shut. This chapter makes both failure modes part of the design.