Draft v1.0 prepared by NEER. Not adopted by the Government of Karnataka, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Karnataka. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration monsoon storms of June–October, which last several days on the coast and in the Malnad and fall on wet ground in the interior, as well as for short-duration intensities;
  • (d) to design outfalls for tidal and river tailwater, including the case where the outfall is closed;
  • (e) to protect tanks (keres), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the Bengaluru City Corporation Building Bye-Laws, 2003 and the building bye-laws of the other urban local bodies (the Building Bye-laws), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Floods in Karnataka come from three kinds of storm. In Bengaluru, short intense storms fall on a city built over its tank cascades and valley drains: on 14–15 Aug 2017 a KSNDMC gauge at Bilekahalli recorded 184 mm and Koramangala flooded; on the night of 4–5 Sep 2022 gauges at Marathahalli and Doddanekundi recorded 125–129 mm by about 03:00, Bellandur lake overflowed, the Outer Ring Road was waterlogged and 126 lakes in the city overflowed; and on 21–22 Oct 2024 GKVK recorded 186.2 mm in the 24 hours to 08:30 while Yelahanka lake overflowed into the Kendriya Vihar complex for the third time that month (UAS Bangalore; KSNDMC and BBMP figures as reported). In the Western Ghats, multi-day monsoon rain on steep slopes brought floods and landslides to Kodagu in August 2018, when about 768 mm was reported over 15–17 August, and again in August 2019 (Mongabay, 2018; TNM, 2019). In north Karnataka the floods of August 2019 on the Krishna, Malaprabha and Ghataprabha came from heavy rain upstream and reservoir releases, affected 103 taluks in 22 districts and killed at least 61 people (SANDRP, 2019; secondary sources for the losses). For Bengaluru the CAG found about 780 MLD of sewage flowing in the storm water drains and 2,626 encroachments identified on them, and that "BBMP failed to prepare a SWD manual" (CAG Report No. 2 of 2021). Three failure modes recur: valley drains (rajakaluves) narrowed, covered or built over; lost storage in keres, kuntes and kattes; and outfalls held up by a full downstream tank, river backwater or a closed estuary mouth. Objectives (b) to (e) address the last two, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Building Bye-laws mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Karnataka, the top layer has a particular meaning: much of the State's flood storage sits in its tank cascades, the keres, kuntes and kattes that pass water from one to the next over their surplus weirs (kodi). The CAG, citing IISc, recorded that Bengaluru's water bodies fell from 1,452, holding about 35 TMC, in the early 1800s to 194, holding about 5 TMC, by 2016, of which about 1.2 TMC was usable after siltation (CAG Report No. 2 of 2021). A committee of the State Legislature reported in 2016 that about 11,000 acres of lake land in 1,545 lakes of Bengaluru Urban and Rural districts had been encroached (Koliwad committee, interim findings, as reported). Losing that storage cannot be offset economically by pipes.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Karnataka through:

  • (a) an amendment to the Building Bye-laws that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Bengaluru the building code is still the Bangalore Mahanagara Palike Building Bye-Laws 2003, approved by Government Order No. UDD/223/MNU/2001 dated 21-02-2004 under section 428 of the Karnataka Municipal Corporations Act, 1976, in operation from 5 June 2004, and now titled the Bengaluru City Corporation Building Bye-Laws, 2003. Since 2 September 2025, when the five City Corporations under the Greater Bengaluru Authority replaced BBMP, the bye-laws are amended by each corporation under the Greater Bengaluru Governance Act, 2024 (Karnataka Act No. 36 of 2025); the amendment bye-laws in force from 14 May 2026 deal only with ground rent, deviations and compounding, and leave the drainage, rainwater harvesting and plinth rules unchanged. The bye-laws already bar sites that are "not drained properly or … incapable of being well drained" and sites within 9 m of the water spread of a tank at full tank level (7.1(a) and (d)), require a plinth of at least 0.45 m set "so that adequate drainage from the site is assured" (19.1), keep surface drainage out of basements (18.7(iv)) and forbid building over drains (33.1). Zoning is under the Karnataka Town and Country Planning Act, 1961: the RMP 2015 Zoning Regulations (G.O. No. UDD 540 BEM AA SE 2004, 22-06-2007), as amended by Notification UDD 235 MNJ 2025(E) of 05-01-2026, which asks that setbacks not be paved with hard surfaces "as far as possible" and bars basements in flood-prone and low-lying areas "as notified by the competent authority". The Bill for the 2024 Act provides for the GBA to make common building bye-laws (section 232 of the Bill), which would be the natural instrument for a condition of approval across the five corporations. Outside Bengaluru the bye-laws of each Municipal Corporation and Municipal Council, and the zonal regulations of each planning authority, would need the same amendment; they were not reviewed for this draft. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: in the Greater Bengaluru Authority (GBA) area, the City Corporation concerned or the GBA as planning authority; the Bangalore Development Authority (BDA) or another planning authority under the Karnataka Town and Country Planning Act, 1961, including the Local Planning Authorities of the Bengaluru Metropolitan Region; or a Municipal Corporation, City or Town Municipal Council, Town Panchayat or Gram Panchayat within the powers delegated to it, or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Building Bye-laws or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The Koramangala–Challaghatta valley of Bengaluru, including the Bellandur and Varthur lake catchments, the catchments of Yelahanka and Doddabommasandra lakes in north Bengaluru, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (kere), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Building Bye-laws to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Karnataka Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Building Bye-laws;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Karnataka, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply as set in Bengaluru by section 72A of the Bangalore Water Supply and Sewerage Board Act, 1964 and the notification under it, by Bye-law 32 of the Bengaluru City Corporation Building Bye-Laws, 2003 (every building with a plinth area of more than 100 m² on a site of 200 m² or more) and by the rainwater harvesting section of the Greater Bengaluru Governance Act, 2024 (section 233 of the Bill: sites of 108 m² or more; storage, use and recharge from 216 m²; dual piping from 1,000 m²), and elsewhere by the bye-laws of the local body, as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Karnataka plots are small and the cumulative effect of many small plots is what fills Bengaluru's drains. Bengaluru's automated plan approval for residential plots of up to 50 × 80 ft with up to four units, submitted through an empanelled architect or engineer (Nambike Nakshe, from 2024), is unaffected for small buildings that fall under the single-dwelling exemption or below the thresholds.

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Greater Bengaluru Authority (GBA) and the five City Corporations in its area: Bengaluru Central, North, South, East and West;
  • (b) all Approving Authorities within the Bengaluru Metropolitan Region (the area of the Bangalore Metropolitan Region Development Authority, BMRDA), as notified from time to time, including the Bangalore Development Authority (BDA), the other Local Planning Authorities and the local bodies in it; and
  • (c) the City Corporations of Mysuru and Mangaluru, and every other Municipal Corporation in the State.

1.6.2 Tier B authorities. All other City and Town Municipal Councils and Town Panchayats are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with UDD regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Bengaluru Metropolitan Region (the area of the Bangalore Metropolitan Region Development Authority, BMRDA), or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Greater Bengaluru Authority, with the storm water drain engineering of the five City Corporations in its area, and a Town Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Bengaluru.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
RWH mandate (BWSSB Act 1964, s.72A; Building Bye-laws 2003, Bye-law 32 and Schedule XII; Greater Bengaluru Governance Act 2024, s.233 of the Bill) Continues unchanged: in Bengaluru, every building with a plinth area of more than 100 m² on a site of 200 m² or more (Bye-law 32), and sites of 108 m² or more under the 2024 Act, with storage, use and recharge from 216 m² and dual piping from 1,000 m² (Bill numbering); elsewhere, the bye-laws of the local body. No instrument sets a storage volume, and the CAG found 60% compliance among the 2.12 lakh properties required to adopt RWH, and no mandate outside the BWSSB area. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and RWH sumps are assumed full at the start of September–October storms (Chapter 4). Recharge structures may count toward retention where they meet Chapters 4 and 8.
Lake buffers (KTCDA Act 2014, s.12(2) and (3), as substituted by Karnataka Act No. 19 of 2026, in force 18-02-2026) Statewide statutory minima, measured from the revenue boundary of the tank and graded by its area (acre.gunta): none up to 0.05; 1 m to 0.10; 3 m to 1.00; 6 m to 10.00; 12 m to 25.00; 24 m to 100.00; 30 m above 100.00. Public utilities may be built in the buffer with the Authority's prior approval, and roads, bridges, pipelines and STPs between FTL and MWL only if the original capacity of the tank is not reduced and its inflow and outflow are not obstructed. "Tank" includes the rajakaluve feeders, weirs, sluices and drainage channels "to and fro" (s.2(1)(g)). These buffers are smaller than every earlier figure: 30 m under RMP 2015 and the Act before 2026, and 75 m under the NGT order of 4 May 2016, whose general buffer direction the Supreme Court set aside on 5 Mar 2019 except against the two builders before it (Civil Appeal No. 5016 of 2016). The setbacks of Chapter 7 apply as the larger of the statutory buffer and a hydraulic corridor set by this Manual; where the corridor is wider, this Manual is stricter than the statute.
Drain (rajakaluve) buffers in the Bengaluru Metropolitan Region (Notification UDD 468 MNJ 2025(E), 15-10-2025, under s.13-E of the KTCP Act 1961) Continue as statutory minima, measured on either side from the edge of the drain as per revenue records: 15 m for a primary drain (lake to lake, or lake to river), 10 m for a secondary drain (to a lake or a primary drain) and 5 m for a tertiary drain (to a secondary drain); none for the drains that lead to tertiary drains. They override the zonal regulations and replace the RMP 2015 buffers of 50, 25 and 15 m from the centre of the drain. Outside the Region, drain buffers are those of each planning authority's zonal regulations. The corridors of Chapters 6 and 7 apply as the larger of the two.
Valley zone and flood-prone land (RMP 2015 Zoning Regulations, 4.12.2(ii); Notification UDD 235 MNJ 2025(E), 05-01-2026) Continue. No fresh development permission is granted in the valley zone, where only STPs, WTPs and roads, drains, culverts and bridges that "will not obstruct the water course" are allowed, and basements are barred in flood-prone and low-lying areas notified by the competent authority. Valley and lake-buffer land may be counted toward park reservation in a layout (KTCP Act s.17; BDA Act s.32); this Manual credits such land as flood storage or conveyance only while it stays unpaved (Chapter 7). The 1% AEP levels of Chapter 6 and the flood-sensitive catchments of Chapter 4 offer a technical basis for notifying flood-prone areas.
Master plans and zonal regulations (KTCP Act 1961; BDA Act 1976; BMRDA Act 1985; Greater Bengaluru Governance Act 2024) RMP 2015 remains the plan in force for Bengaluru; the draft RMP 2031 was not approved, and BDA tendered for an RMP 2041 in 2025. The CAG found that RMP 2015 and the BBMP master plan of drains disagree on which drains exist and their class. Flood-sensitive catchments, valley corridors and regional facility sites should be shown on the next plan, and drain classes taken from a revenue-record survey (Chapter 7).
Municipal law on drains (KMC Act 1976, ss.58, 230 and 234, as cited by the CAG; Greater Bengaluru Governance Act 2024, ss.203 and 221 of the Bill; BWSSB Act 1964, s.72) Drains, drainage works and culverts in or along streets vest in the City Corporation; boundary marks on drains are an obligatory function; no sewer line may be laid inside a storm water drain; no structure may be built on or obstruct a storm water drain, and the Commissioner may remove one. Chapter 8 (no sewage in storm drains) and Chapter 7 (drain corridors) build on these duties. The drain sections of the Karnataka Municipalities Act, 1964 were not reviewed for this draft.
Drain and tank land (Karnataka Land Revenue Act, 1964) Land under storm water drains is Revenue land (s.67), and encroachments are removed on a Tahsildar's order under s.104 after a survey by the Assistant Director of Land Records (as described by the World Bank, 2024). Drain and tank boundaries used in Chapter 7 are those of the revenue records, surveyed on the ground.
CRZ Notification 2019 and the Karnataka Coastal Zone Management Plan Governs development along the coast and tidal waters of Dakshina Kannada, Udupi and Uttara Kannada. The NCSCM portal lists a Karnataka CZMP 2019 among its approved CZMP maps [TBC: approval letter and date]; Karwar and Coondapur (Kundapur) are Critically Vulnerable Coastal Areas. Where a CRZ width is wider than the setback of Chapter 7, the CRZ width governs (Clause 1.3.3).
Ramsar sites (Ranganathittu; Aghanashini Estuary; Magadi Kere; Ankasamudra) No fill, bund or drain re-routing within a site. Magadi Kere and Ankasamudra are man-made tanks, which shows that a kere is a wetland and not only an irrigation work. Whether any other Karnataka wetland is notified under the Wetlands (Conservation and Management) Rules, 2017 [TBC].
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Karnataka is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a September or October storm arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

The CAG found that in Bengaluru "a robust policy governing storm water management does not exist", that RMP 2015 and the BBMP master plan of drains "deprived the planners of a single source of truth", and that BBMP had not prepared a storm water drain manual, although the State said in January 2019 that a maintenance manual would be prepared (CAG Report No. 2 of 2021). No Karnataka rule requires on-site detention or limits the peak flow from a site; the nearest provisions are the recharge "based on paved and unpaved areas" asked of sites of 1,000 m² or more by the Greater Bengaluru Governance Bill (s.233(3)) and the note of UDD 235 MNJ 2025(E) that setbacks should not be hard-paved. The World Bank-supported Karnataka Water Security and Resilience Program (P506272, approved June 2025) includes about 173 km of new lined storm water drains, 80 km of rehabilitation and flood management plans for Bengaluru's sub-catchments. No development-control condition limits the runoff from new plots into the drains such works create. Linking Chapters 4–5 to approvals closes that gap.

Courts have so far set the pace on drains and lakes. The High Court of Karnataka directed in September 2022 the immediate removal of all storm water drain encroachments in Bengaluru, and in August 2023 a joint action plan by the civic agencies (WP 38401/2014, as reported), and the NGT directed in the Bellandur case on 18 December 2019 "No further channelization and concretization of Rajakaluves" (as quoted by BBMP). The corridor and section rules of Chapters 6 and 7 are offered as technical standards that agencies could use in meeting such directions. Showing flood-sensitive catchments, valley corridors and regional facility sites on the next master plans is cheaper than retrofitting later.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Development Department (UDD) Would own the Manual. Would issue the notifications under the KTCP Act 1961 and the bye-law amendments of Clause 1.3.1. Would constitute and service the State Stormwater Technical Committee.
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Greater Bengaluru Authority (GBA) Planning authority for the GBA area (about 712 km²) and responsible for storm water drain works that cut across City Corporations. Would apply this Manual to the primary and secondary drains (rajakaluves) and lakes it designs and builds, make it part of the common building bye-laws, and embed flood-sensitive catchments and regional facility sites in its plans.
Bengaluru Central, North, South, East and West City Corporations Approving Authority for building sanction in their areas (Commissioner or zonal Joint Commissioner). Owners of the drains vested in them. Would receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15).
Bangalore Development Authority (BDA), BMRDA and the Local Planning Authorities of the Bengaluru Metropolitan Region Approving Authority for layouts and development permission in their areas. Would embed flood-sensitive catchments, valley corridors and regional facility sites in master plans and zonal regulations.
Other Municipal Corporations, City and Town Municipal Councils and Town Panchayats Approving Authority for building permits and layouts within their delegated powers. Owners of road-side and outfall drains. Would receive handed-over assets, and inspect and enforce.
Directorate of Municipal Administration (DMA) Supervises the urban local bodies outside Bengaluru. Would require compliance with this Manual in drainage works it funds, tenders or monitors.
Minor Irrigation and Ground Water Development Department, and the Karnataka Tank Conservation and Development Authority (KTCDA) Minor Irrigation holds the tanks with a command of up to 2,000 ha, including the tanks within Municipal Corporations; KTCDA regulates tanks statewide and gives prior approval for works in a tank buffer or between FTL and MWL. Would provide FTL, MWL and kodi (surplus weir) crest levels and the revenue boundary of each tank (Chapter 7), consent to outfalls into tanks and concur with regional tank-storage credits (Chapter 4).
Lake custodians (GBA lakes wing, BDA, Forest Department) Would apply Chapter 7 to the lakes in their custody and keep each tank's level records and operating rules.
Water Resources Department (WRD) Custodian of rivers, dams and reservoirs. Would provide design flood levels and reservoir release data for outfall tailwater (Chapter 5), including on the Krishna, Malaprabha, Ghataprabha and Bhima, and, with the reservoir operators, on the dam-regulated Sharavathi and Kali estuaries.
Revenue Department (Tahsildars and the Assistant Directors of Land Records) Maintains the land records of drains and tanks, surveys them, and orders the eviction of encroachments. Would certify the revenue boundaries used for buffers and corridors (Chapter 7).
Karnataka State Natural Disaster Monitoring Centre (KSNDMC) Runs the telemetric rain-gauge network (about 6,500 gauges reporting every 15 minutes) and the Bengaluru urban flood model. Would supply data for station IDF and Annexes 2A–2E, hold the record of flood-prone locations and support the post-event review (Clause 10.16).
Karnataka State Disaster Management Authority (KSDMA) and District Disaster Management Authorities Would notify or recommend flood-sensitive catchments and lead the post-event review (Clause 10.16).
Bangalore Water Supply and Sewerage Board (BWSSB) Responsible for sewerage and for the RWH mandate under s.72A of its Act. Would remove sewage connections and sewer lines from storm drains (Chapter 8).
Karnataka State Pollution Control Board (KSPCB) Would act on dry-weather flow and sewage reaching drains, lakes and rivers (Chapter 8).
Public Works Department, NHAI, Indian Railways and other road and rail owners Would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7), and match culvert capacity to the drains they connect.
Karnataka State Coastal Zone Management Authority (KSCZMA) Advises on CRZ limits for coastal sites and outfalls.

Commentary. Ownership of Bengaluru's drainage is split several ways. The land under a storm water drain is Revenue land; the drain is built and maintained by the storm water drain wing, BBMP's until September 2025; encroachments are surveyed by the Assistant Director of Land Records, ordered out by the Tahsildar and removed by the zonal Executive Engineer; sewage in the drains is BWSSB's to remove; and the lakes the drains connect are held by the city's lakes wing, BDA, the Forest Department and Minor Irrigation, with KTCDA as regulator (World Bank, 2024 and 2025). The World Bank found that BBMP's storm water drain and lake departments "largely work in silos", and that KSDMA, constituted in 2008, "is yet to become operational", its functions being done by the Revenue Department or KSNDMC. How the storm water drain functions are divided between the GBA and the five City Corporations had not been published when this draft was prepared. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; the CAG found that 714 of the 2,626 encroachments identified on Bengaluru's storm water drains had not been acted on, and that none of the drains it test-checked had boundary marks (CAG Report No. 2 of 2021).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the GBA and BMRDA area boundaries
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model building bye-law amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request