SupplementUnion Territory of Lakshadweep
Status. This Supplement is part of Draft v1.0 of the Manual. Neer prepared it as a proposal for applying the Manual in the Union Territory of Lakshadweep.
Not adopted. This Supplement has not been adopted, notified or endorsed by the Union Territory of Lakshadweep Administration, or by any of its departments, authorities, panchayats or agencies. Where it names a body, such as the Collector or the Lakshadweep Public Works Department, it describes the role that body would have if the Manual and this Supplement were adopted. It does not say the body has agreed to that role. Until a competent authority adopts it, the regulations, bye-laws and approval conditions in force in the Union Territory continue to apply.
S2.1 Scope
S2.1.1 This Supplement applies to all the islands of the Union Territory of Lakshadweep.
S2.1.2 How this Supplement works. On the islands, the chapters and annexes of the Manual apply as written, except as modified by Table S2.1 and by Clauses S2.3 to S2.8. Clauses S2.4 to S2.6 (the coral-atoll rules) take precedence over any clause of the Manual that they contradict. Clause, table, annex and form numbers do not change.
S2.1.3 Values marked [TBC] are to be confirmed from the primary source before adoption. Until they are confirmed, the clause concerned states the rule that applies in the meantime.
S2.2 How the Manual applies: clause-by-clause modifications
S2.2.1 The clauses of the Manual listed in Table S2.1 apply on the islands with the changes shown. Clauses not listed apply unchanged.
Table S2.1 — Modifications to the Manual for Lakshadweep
| Manual clause | What changes in Lakshadweep |
|---|---|
| 1.3.1 Notification | Statutory effect would be given through the building bye-laws of the Union Territory, which the Draft Lakshadweep Building Bye-Laws, 2025 propose to frame under section 131(h) of the Lakshadweep Panchayat Regulation, 2022, with the approval of the Administrator. Whether those bye-laws have been notified is [TBC]. KMBR/KPBR 2019 does not apply. |
| Building rules ("KMBR/KPBR 2019" throughout) | Read as the building bye-laws in force in the Union Territory. |
| 1.3.2 State Stormwater Technical Committee | The committee would be constituted by the Administrator. CPHEEO (2019) allows a committee "constituted by State/UT Government". |
| 1.4.1 Approving Authority | The authority that grants building permission under the bye-laws in force. The draft bye-laws of 2025 (cl. 2.15) name Authority I (the Collector), Authority II (the SDO or Deputy Collector of the island), Authority III (the Superintending Engineer, Lakshadweep Public Works Department (LPWD)), Authority IV (the Assistant Engineer, LPWD, of the island) and Authority V (the Assistant Engineer, Electricity). The LPWD for its own works. |
| 1.5.3 RWH | Replaced by Clause S2.5. |
| 1.6 Tiers | All authorities are Tier B (set by this Supplement), with technical review by Authority III. |
| 1.10.2 Waiver of detention | Clause S2.6.2. |
| 2.3 Approved sources of design rainfall | Clause S2.3. The CWC subzone floor of Clause 2.3.3(b) does not apply: the CWC flood estimation subzones do not cover the islands. |
| 4.4, 8.8, 8.11 Retention, infiltration and recharge | Clauses S2.4 and S2.5 govern. |
| 5.7 Tidal tailwater | Applies, with Clause S2.7. |
| 5.8, 5.13 River backwater, sand bars | Do not apply; there are no rivers. |
| 6.11 Floor levels | Applies, with Clause S2.6.3. |
| 6.11.6 Coastal band | The High Tide Line is the one demarcated in the Integrated Island Management Plan (IIMP) of the island. |
| Chapter 7 Waterbodies | Applies to ponds, tanks and wells (Clause S2.8.1). The lagoon is dealt with under Clauses S2.6 and S2.8. |
| Chapter 11 Basin plans | The planning unit is the island (Clause S2.8.3). |
Commentary. The Union Territory is administered by an Administrator, with a Collector who is also District Magistrate (CGWB, c. 2012). The Draft Lakshadweep Building Bye-Laws, 2025 were published for comment in May 2025, framed under section 131(h) of the Lakshadweep Panchayat Regulation, 2022, which lets bye-laws "regulate construction of buildings" and "sanitation, conservancy and drainage". The draft says that any authority giving construction-related permission, "including Fire Department, Panchayat, and CRZ committees", "shall abide by these Bye-Laws" (cl. 1.4). It defines a rainwater harvesting system as one "prescribed by Authority-III" (cl. 2.103). Its operative rainwater harvesting clause (§14.1.2) could not be read for this draft [TBC]. The status of elected panchayats is uncertain after the Kerala High Court held in 2023 that notifications declaring Gram Panchayat areas were "premature and ultra vires" (A.P. Nazeer v. UT of Lakshadweep), so this Supplement ties approval to whichever authority the bye-laws in force name.
S2.3 Design rainfall
S2.3.1 Source. NIH-DHAARA coverage of the islands is [TBC]. Until it is confirmed, and until a Lakshadweep IDF relationship is published, design depths shall be taken from a frequency analysis of the IMD record at the nearer of the Minicoy and Amini observatories, or at another IMD station on the island group agreed with the Authority:
- (a) for 24 hours and longer, from the daily record;
- (b) for shorter durations, from the recording-gauge (autographic) record of the same station where it is available, and otherwise by ratios agreed with the Authority under Clause 2.6.2; and
- (c) with the method, record length and values stated on Form 2-1.
These values are provisional. Where NIH-DHAARA covers the island, its value shall be reported and the greater of the two used.
S2.3.2 Durations. Clause 2.5 applies. For rooftop storage under Clause S2.5, the designer shall also report the monthly totals of Table S2.2 or of the station used, because storage for use is sized on monthly and multi-day totals, not on the peak.
S2.3.3 Retention depth. P_R is computed under Annex 2E, 2E.1 from the daily record of the station of Clause S2.3.1.
S2.3.4 The climate factor of Clause 2.8 applies.
Table S2.2 — Monthly normal rainfall, Minicoy and Amini (mm)
| Station | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual | Rainy days |
|---|---|---|---|---|---|---|---|---|---|---|
| Minicoy | 179.6 | 309.1 | 238.3 | 209.3 | 158.2 | 179.1 | 143.3 | 85.9 | 1,640 | 94.1 |
| Amini | 125.2 | 380.7 | 311.9 | 217.2 | 149.6 | 141.1 | 85.6 | 40.9 | 1,504 | 80.4 |
Source: CGWB Groundwater Information Booklet, Lakshadweep, Table 2.1 (50 years of data). The annual totals include the months not shown.
Commentary. The south-west monsoon, from late May to October, brings most of the rain, with a further retreating-monsoon component from October to December. More than 40 mm falls in each month from May to December, and rainfall decreases from south to north (CGWB, c. 2012). The IMD 1991–2020 normal for Amini is reported as 1,610.1 mm (secondary source). No IDF study for Lakshadweep was found, and the CWC flood estimation subzones stop at the mainland coast, so the Manual's default sources cannot be assumed to reach the islands. Clause S2.3.1 is set by this Supplement as an interim rule.
S2.4 The freshwater lens: no recharge wells
S2.4.1 Prohibited. No recharge well, recharge shaft, injection well, borewell or other bored or drilled structure shall be used to put stormwater or roof water into the ground.
S2.4.2 Infiltration allowed only at the surface. Infiltration is allowed only as dispersed surface infiltration:
- (a) through unpaved, vegetated open space, shallow vegetated depressions and permeable paving; and
- (b) where the seasonal high groundwater table is at least 1.0 m below the base of the practice (Clause 8.8.1).
Below-ground infiltration devices (soakaways, recharge pits and infiltration trenches) are not allowed, except a shallow trench that meets (b) and that the Authority accepts on a hydrogeological report. The reduced separation of Clause 8.8.9(d) does not apply.
S2.4.3 Separation from sanitation and wells. A surface infiltration practice that receives runoff from roads or paved areas shall meet Clause 8.8.6. Where a plot cannot meet Clause 8.8.6(c) or (d), its paved-area runoff shall be dispersed over vegetated open space at least as far from the well or septic tank as the plot allows, and the drainage report shall show the distances [TBC: an island-specific separation distance, to be sourced from CGWB or CPHEEO].
S2.4.4 No groundwater drainage. Clause 8.8.9(b) and (c) apply: no drain shall lower the water table, and no groundwater shall be pumped to a drain.
Commentary. The lens is thin and floats on seawater. CGWB reports that "ground elevation above sea level and thickness of the fresh water lens are directly proportional", that "any perforation like drilling … acts as a conduit for up-coning of sea water", and that "single point pumping … is not recommended" (CGWB, c. 2012). The aquifer study of Kadmat concluded that, because surface runoff is absent and rain recharges the ground naturally, "the need for artificial recharge is ruled out" (CGWB, 2020). The recharge wells that the Manual allows on the mainland (Clause 8.11.3(a)) would therefore do harm here. The same study names soak pits and septic tanks as "the major agents of pollution", which is why Clause S2.4.3 keeps paved-area runoff away from them.
S2.5 Rainwater: storage for use
S2.5.1 Rooftop storage. Every new building with a roof shall collect roof water through eave gutters, a first-flush diverter and a filter into a surface or sub-surface storage tank for use, with the capacity required by the bye-laws in force or, where they set none, by the Authority [TBC: capacity rule in §14.1.2 of the draft bye-laws].
S2.5.2 Retention. The retention requirement of Clause 4.4 is met first by rooftop storage drawn down by use, and then by surface infiltration under Clause S2.4.2. A storage tank counts toward retention only for the volume its stated demand draws down within 72 hours (Clause 8.11.4).
S2.5.3 Overflow. The overflow of every tank shall discharge at grade to vegetated open space on the plot, never to a neighbouring plot, a well or a septic tank. The draft bye-laws already provide that "no rainwater from the roof shall be drained in the adjoining property".
S2.5.4 Open space. At least 50% of the open space of a plot shall be left unpaved or paved with material that lets rain percolate, as the draft bye-laws propose.
Commentary. CGWB found that harvesting rainwater through "suitable storage options is the most suitable and cost-effective" measure on the islands, using eave gutters into tanks with coir, charcoal, sand and gravel filters and first-flush diversion (CGWB, c. 2012). The Kadmat study recommended that "Rooftop Rainwater harvesting should be mandatory" (CGWB, 2020), which implies it was not mandatory then. On the islands, therefore, the Manual's separation between harvesting, recharge and detention (Clause 8.11.2) collapses to one rule: store roof water for use, and let the rest soak in at the surface.
S2.6 Lagoon, coast and floor levels
S2.6.1 No-development zone. No stormwater facility shall be built within 20 m of the High Tide Line, on the landward side, except works that the IIMP of the island permits. The CRZ (Island Coastal Regulation Zone) Notification, 2019, applies a 20 m No Development Zone uniformly to Lakshadweep; beyond 20 m, development is governed by the IIMPs and local regulations.
S2.6.2 Detention. A site that drains by overland flow directly to the lagoon or the sea, with no drain, building or road downstream that its runoff could flood, may be treated by the Authority as eligible for the waiver of Clause 1.10.2. Retention (Clause S2.5) and water quality treatment (S2.6.4) still apply.
S2.6.3 Floor levels.
- (a) The plinth shall be at least 0.45 m above the established ground level, as the draft bye-laws propose (cl. 10.1.5), where "ground level" is the higher of the road crown, the existing ground and the high flood level (cl. 2.67).
- (b) Clause 6.11 also applies, and the higher level governs. On plots where no flood level is available, the coastal flood level of Clause 6.11.6 shall include an allowance for storm surge from a site study [TBC: island surge levels for Annex 5A].
- (c) A hollow (stilt) plinth, as the draft bye-laws allow, is a means of meeting (b).
- (d) No building shall be placed on a plot liable to flood unless it is shown to the satisfaction of Authority I that it will not be subject to flooding or erosion, as the draft bye-laws propose.
S2.6.4 Lagoon water quality. Every drain or overland outfall that discharges to the lagoon shall pass the WQv of its catchment through vegetated treatment or a sediment trap before it reaches the beach (Chapter 8; Clause 8.10). Concentrated discharge across the beach shall be avoided where flow can be spread over vegetation.
S2.6.5 Dunes and storm beaches. Sand dunes and storm beaches shall not be cut or lowered to drain ponded water. The IIMP guidelines treat dunes as a "natural barrier in the event of flooding".
Commentary. Under the Island Coastal Regulation Zone Notification, 2019, the island zones apply only to the larger Andaman and Nicobar islands. Lakshadweep falls under paragraph 6, under which the islands are managed through IIMPs and "a No Development Zone (NDZ) of 20 meters from the HTL on the landward side shall uniformly apply" (MoEF&CC, 2019). The Ministry reported in 2024 that IIMPs had been approved for ten inhabited islands, with drafts for Kadmat, Suheli and Minicoy still being finalised; the two statements do not agree and are [TBC]. Peak detention matters little on the islands: runoff paths are short, and they end at the lagoon or the reef flat. What matters is ponding on low ground and the sediment and nutrients carried onto coral, which is why the Supplement relaxes detention where safe and keeps treatment.
S2.7 Tailwater, surge and sea level
S2.7.1 Tide levels. The tide-table ports to be used for Kavaratti and Minicoy, and the open-sea tidal range, are [TBC]. Until confirmed, the designer shall use the nearest island port in the current Indian Tide Tables and state it on Form 5-1. Tidal fluctuation in wells is damped and shall not be used as the tailwater.
S2.7.2 Sea-level allowance. Clause 5.7.4 applies. Because buildings on 1–2 m land have little margin, the sensitivity run of Clause 5.7.4(c) shall be reported for every element with a design life of more than 25 years (set by this Supplement).
Commentary. CGWB measured tidal fluctuations of about 0.01–0.26 m in island wells, varying by island (CGWB, c. 2012); these are much smaller than the ocean tide and say nothing about the outfall. An IIT Kharagpur study (2021) projected a sea-level rise of about 0.78 m by 2100 and large shoreline losses on several islands (secondary source). With land at 1–2 m above sea level, the sea-level allowance matters more here than anywhere on the mainland.
S2.8 Ponds, wells and island plans
S2.8.1 Ponds and wells. Chapter 7 applies to ponds and tanks. No pond shall be filled, and no drain shall lower a pond's normal level (Clause 7.12.2 applied to ponds). Stormwater shall not be led into a well or a pond used for water supply.
S2.8.2 Disused ponds and wells. Where a development contains a disused pond or well, it shall be kept and protected, not filled.
S2.8.3 Island plans. A stormwater plan under Chapter 11 shall be prepared island by island, with the IIMP, and shall map low ground where water ponds after rain.
Commentary. The Kadmat study counted many ponds and 948 wells on that island, of which 99 ponds and 26 wells were disused and should be "rejuvenated and protected" (CGWB, 2020). On an island with no rivers, those ponds are the only surface storage.
S2.9 Event evidence
Commentary. Cyclone Ockhi (29 November – 5 December 2017) became a severe cyclonic storm over the Lakshadweep area on 1 December, about 110 km north-north-east of Minicoy, and a very severe cyclonic storm later that day about 90 km north of Minicoy. It was the first cyclone from the Comorin area to cross Lakshadweep rather than strike the mainland (IMD, 2018). A storm surge of about 1 m was reported over Lakshadweep, and the Kalpeni breakwater jetty, houses and coconut trees were damaged (secondary sources). In May 2021, Cyclone Tauktae formed over the Lakshadweep area, and IMD warned of "inundation of low lying areas of the Islands". Coral debris piled on the eastern reefs records earlier cyclones (CGWB, c. 2012). The Ockhi rainfall totals at Minicoy and Amini are [TBC] from the IMD autographic charts.
References
- Central Ground Water Board (c. 2012). Groundwater Information Booklet, Lakshadweep (data to 2011). https://cgwb.gov.in/old_website/District_Profile/Lakshadweep/Lakshadweep.pdf
- Central Ground Water Board (2020). NAQUIM report, Kadmat island, Lakshadweep. https://cgwb.gov.in/old_website/AQM/NAQUIM_REPORT/Lakshadweep/Kadmat_merged.pdf
- UT of Lakshadweep Administration, Department of Panchayat (2025). Draft Lakshadweep Building Bye-Laws, 2025 (notice of 07-05-2025). https://lakshadweep.gov.in/notice/the-draft-lakshadweep-building-bye-laws-2025-for-union-territory-of-lakshadweep/ ; https://cdn.s3waas.gov.in/s358238e9ae2dd305d79c2ebc8c1883422/uploads/2025/05/2025050750.pdf
- Lakshadweep Panchayat Regulation, 2022 (Regulation 5 of 2022). https://www.thc.nic.in/Central%20Governmental%20Regulations/Lakshadweep%20Panchayat%20Regulation%202022.pdf
- Lakshadweep Ground Water (Development and Control) Regulation, 2001. https://www.thc.nic.in/Central%20Governmental%20Regulations/Lakshadweep%20Ground%20Water%20(Development%20&%20Control)%20Regulation,%20%202001.pdf
- MoEF&CC (2019). Island Coastal Regulation Zone Notification, 2019, S.O. 1242(E), 8 Mar 2019, para 6 and Annexure IV. https://environmentclearance.nic.in/writereaddata/CRZ_Notifications/ICRZ_Notification_2019/0.pdf
- MoEF&CC (2024). Reply in NGT O.A. No. 10 of 2023 (IIMP status). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20R-13%20in%20OA%20No.10-2023%20(page%20nos.1743-1843).pdf
- LiveLaw (2023). Kerala High Court: Lakshadweep Gram Panchayat notifications ultra vires (A.P. Nazeer v. UT of Lakshadweep, WP(C) 40183/2022) (secondary). https://www.livelaw.in/amp/news-updates/kerala-high-court-lakshadweep-administration-notifications-gram-panchayat-elections-ultra-vires-224825
- India Meteorological Department (2018). Very Severe Cyclonic Storm Ockhi: A Report. https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_83ec45_ockhi%20pre.pdf
- India Meteorological Department (2021). National Bulletin, 14 May 2021 (Cyclone Tauktae). https://rsmcnewdelhi.imd.gov.in/uploads/archive/1/1_9d5860_6.%20National%20Bulletin%2020210514_2100%20UTC.pdf
- IMD. MAUSAM chapter on storm surge (Ockhi surge over Lakshadweep) (secondary). https://mausam.imd.gov.in/responsive/pdf_viewer_css/met1/Chapter-4%20page%2052-98/Chapter-4%20.5.pdf
- Down To Earth (2017). Cyclone Ockhi damage in Lakshadweep (secondary). https://www.downtoearth.org.in/news/natural-disasters/death-toll-in-cyclone-ockhi-touches-22-heavy-damage-done-to-lakshadweep-59272
- Mongabay India (2021). Safeguard Lakshadweep islands from future sea-level rise (reporting IIT Kharagpur, 2021) (secondary). https://india.mongabay.com/2021/06/safeguard-lakshadweep-islands-from-future-sea-level-rise-study/
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Note 2 to Table 4.1).
Commentary. The islands are coral atolls. The land is about 1–2 m above sea level, with storm beaches and dunes up to 8 m; the land area is about 32 km², against about 4,200 km² of lagoon. There are "no surface water bodies such as streams and rivers". Coral sand is "highly permeable" and takes rain readily, except on the coast and lagoon side, where "ponded water is often found after rainfall". Fresh water occurs only as a thin lens floating on seawater, in hydraulic continuity with it (CGWB, c. 2012). A manual written for a mainland with rivers, tanks and deep aquifers needs different rules here: rainwater is a water supply to be stored, the freshwater lens must not be pierced, and the main stormwater problems are ponding on low ground and runoff into the lagoon.