Draft v1.0 prepared by NEER. Not adopted by the Government of Keralam, the Government of Puducherry (for Mahé) or the Lakshadweep Administration, and has no legal force. About this draft

SupplementMahé (Union Territory of Puducherry)

Status. This Supplement is part of Draft v1.0 of the Manual. Neer prepared it as a proposal for applying the Manual in Mahé, a town on the north Keralam coast. Mahé is administered as a region of the Union Territory of Puducherry, so the authority that could adopt this Supplement is the Government of Puducherry.

Not adopted. This Supplement has not been adopted, notified or endorsed by the Government of Puducherry, or by any of its departments, Planning Authorities, local bodies or agencies. Where it names a body, such as the Mahé Planning Authority or the Public Works Department, it describes the role that body would have if the Manual and this Supplement were adopted. It does not say the body has agreed to that role. Until a competent authority adopts it, the bye-laws, regulations and approval conditions in force in the Union Territory continue to apply.


S1.1 Scope

S1.1.1 This Supplement applies to the Mahé region of the Union Territory of Puducherry (about 9 km²): Mahé town and the Naluthara pockets of Pandakkal, Pallur, Chalakkara and Chembra, within the Mahé Municipality.

S1.1.2 How this Supplement works. In the Mahé region, the chapters and annexes of the Manual apply as written, except as modified by Table S1.1 and Clauses S1.3 to S1.6. Where the Manual names a Keralam body, statute or rule, the Union Territory equivalent in Table S1.1 is read in its place. Clause, table, annex and form numbers do not change.

S1.1.3 Values marked [TBC] are to be confirmed from the primary source before adoption. Until they are confirmed, the clause concerned states the rule that applies in the meantime.

Commentary. Mahé is a small enclave on the Arabian Sea coast, surrounded by the Kannur and Kozhikode districts of Keralam, at the mouth of the Mayyazhi (Mahé) river (NCSCM, 2024). Its climate, soils and rivers are those of north Keralam, so the engineering of this Manual applies to it unchanged. Its law is that of Puducherry: the Puducherry Town and Country Planning Act, the Puducherry building bye-laws and the Puducherry groundwater Act apply, not the Kerala Municipality Building Rules. Its rivers and drains, however, flow through or along Keralam. This Supplement deals with that mismatch.


S1.2 How the Manual applies: clause-by-clause modifications

S1.2.1 The clauses of the Manual listed in Table S1.1 apply in the Mahé region with the changes shown. Clauses not listed apply unchanged.

Table S1.1 — Modifications to the Manual for the Mahé region

Manual clause What changes in the Mahé region
1.3.1 Notification Statutory effect would be given by an amendment to the building bye-laws in force in the Mahé planning area, made under section 47 of the Puducherry Town and Country Planning Act, 1969, by Government Order of the Chief Secretariat (Housing), Government of Puducherry, and by bye-laws or standing orders of the Mahé Municipality. KMBR/KPBR 2019 does not apply in Mahé.
Building rules ("KMBR/KPBR 2019" throughout) Read as the Puducherry Building Bye-laws and Zoning Regulations, 2012, as applied to the Mahé planning area. Whether the 2012 Bye-laws apply in full in Mahé, or with Mahé-specific variants, is [TBC].
1.3.2 State Stormwater Technical Committee The committee would be constituted by the Government of Puducherry. CPHEEO (2019) allows a committee "constituted by State/UT Government".
1.4.1 Approving Authority The Mahé Planning Authority, constituted under section 11 of the Puducherry Town and Country Planning Act, 1969, for planning permission, layouts and building permits; the Mahé Municipality within its powers; and a department for its own works. "Notified" means published in the Puducherry Gazette.
1.5.3 RWH The rainwater harvesting requirement of the Puducherry Bye-laws, as in force, applies in place of Rule 76 of KMBR/KPBR 2019. Its clause, threshold and specification are [TBC].
1.6 Tiers The Mahé Municipality is a Tier B authority (set by this Supplement).
1.8, 1.9 Other instruments and roles The Keralam instruments (KMBR/KPBR 2019, the Kerala Town and Country Planning Act, 2016, and the Kerala paddy and wetland Act) do not apply. Roles are as in Table S1.2.
2.3 to 2.12 Design rainfall Chapter 2 applies unchanged, using the site's coordinates (Clause S1.3).
5.7.2(a) Tidal levels The tide-table port to be used for Mahé is [TBC]. Until it is confirmed, the designer shall use the nearest port in the current Indian Tide Tables and state it on Form 5-1.
5.3, 5.8 Downstream analysis and river backwater The analysis continues across the boundary into Kerala (Clause S1.4).
6.11.3 Floor level default Where the Puducherry Bye-laws apply, they set the plinth at not less than 450 mm above the average level of the road in front (2012 Bye-laws as amended in 2013, cl. 30(i)). Clause 6.11.3 (0.65 m above the road crown) also applies; the higher governs.
6.11.6, 7.12 Coastal band and estuaries The High Tide Line is the one demarcated in the Coastal Zone Management Plan of the Union Territory in force (Clause S1.5).
Chapter 7 custodian and NOC Where the Manual names the Irrigation Department as custodian, or requires its NOC, read the Public Works Department (PWD), Mahé Division, Government of Puducherry, for waterbodies in Mahé. For a waterbody in Keralam, the Keralam custodian remains.
7.4 The Zone 1 minimum No Puducherry statute setting a waterbody setback was found. The Zone 1 minimum of Clause 7.4.7 applies as the Manual's minimum.
8.8, 8.11 Infiltration and recharge Apply unchanged. Any well used for recharge or reuse is also subject to the Puducherry Ground Water (Control and Regulation) Act, 2002.
10.3, 10.7 Submittals For commercial, industrial, institutional and mixed-use buildings, the Mahé Planning Authority is the nodal agency and single point of contact for all NOCs (G.O. Ms. No. 10/2026-Hg).
10.16 Post-event review Led by the Revenue and Disaster Management Department of the Government of Puducherry, in place of KSDMA, with the Mahé regional administration.

Table S1.2 — Roles in the Mahé region

Body Role under this Manual
Chief Secretariat (Housing), Government of Puducherry Would issue the bye-laws amendment and constitute the committee of Clause 1.3.2.
Mahé Planning Authority Approving Authority; nodal agency for NOCs.
Mahé Municipality Owner of local drains; approves and executes works within its powers; receives handed-over assets (Clause 10.14); inspects and enforces.
Public Works Department, Mahé Division Custodian of waterbodies and primary drains in Mahé; issues the waterbody NOC; consults the Keralam bodies under Clause S1.4.2.
Revenue and Disaster Management Department; Regional Administrator, Mahé Flood records; post-event review.
Puducherry Coastal Zone Management Authority CRZ clearances and the Coastal Zone Management Plan for Mahé.

Commentary. The Mahé Planning Authority is one of the four Planning Authorities created under section 11 of the 1969 Act (TCP Department, Citizens' Charter); its 126th meeting, in March 2026, revised permit charges (Puducherry Gazette, Part I No. 99 of 2026). The 2012 Bye-laws apply to the planning areas notified in 1984, 1985 and 1989 "and such other areas … notified from time to time". Whether those notifications include the Mahé planning area, and whether Mahé has its own variant, could not be checked for this draft, which is why the building-rule row is marked [TBC]. The tier is set as B because Mahé is a single small municipality.


S1.3 Design rainfall and season

S1.3.1 Chapter 2 of this Manual applies unchanged: the south-west monsoon governs, and the rainfall sources, cross-checks, durations and climate factor are those set in Chapter 2 for Keralam.

S1.3.2 Rain gauge. No IMD rain gauge in Mahé was found [TBC]. Where Chapter 2 or Annex 2E calls for a station record, the designer shall use the nearest long-record IMD station in Keralam agreed with the Authority, and state it on Form 2-1.

Commentary. The Mahé administration gives an average rainfall of 353 cm, of which about 80% falls from June to September and about 10% in October and November; July is the rainiest month, with about 120 rainy days in the year (NCSCM, 2024, citing mahe.gov.in). That is the regime of the north Keralam coast, so the Keralam design-rainfall rules fit it.


S1.4 Rivers, outfalls and the boundary with Keralam

S1.4.1 Mahé river. The Mayyazhi (Mahé) river, which bounds the region to the north, is a tidal waterbody. Clauses 5.7, 5.8, 5.13 and 7.12 apply to outfalls into it and to its estuary.

S1.4.2 Downstream analysis across the boundary. Where the downstream analysis of Chapter 5 reaches a drain, channel or river reach in Keralam, the analysis shall continue to the point required by Clause 5.3, whatever the boundary. The Mahé Planning Authority should send the drainage report for such a development to the Keralam local body and the Irrigation Department for comment before approval. This consultation step is set by this Supplement; it is not a statutory requirement.

S1.4.3 River levels. Until design flood levels for the Mahé river are available [TBC], river levels for Clause 5.8.2 shall be taken from a hydraulic model of the reach, or from recorded highest flood levels where the Authority accepts them.

Commentary. The Mahé river is about 54 km long, with a basin of about 394 km², and rises on the Western Ghats slopes (secondary source). Almost all of its catchment lies in Keralam, and much of the town's drainage reaches the sea through reaches shared with, or bordering, Keralam. A site in Mahé follows Puducherry's bye-laws, while the water it sends downstream is managed under Keralam's. Clause S1.4.2 makes the analysis follow the water, not the boundary.


S1.5 Coastal zone

S1.5.1 Works shall comply with the CRZ Notification, 2019, and the Coastal Zone Management Plan of the Union Territory in force for Mahé. The Mahé estuary is a tidal waterbody; in CRZ-III the No Development Zone along it is 50 m or the width of the creek, whichever is less.

S1.5.2 The draft Coastal Zone Management Plan for Mahé under the 2019 Notification was taken to public hearing on 24 March 2023. Its approval was not found [TBC]. Until approval is confirmed, the High Tide Line and zones of the plan in force shall be used.


S1.6 Event evidence

Table S1.3 — Rainfall in Mahé, 5–6 July 2023

Day Rainfall (mm)
5 July 2023 145.8
6 July 2023 221.2

Commentary. On 5 and 6 July 2023, Mahé received 145.8 mm and 221.2 mm on consecutive days. The low-lying areas of Pandakkal, Palloor and Chalakkara were inundated, about 30 houses were affected, and the water receded in about 24 hours (Government of Puducherry, reply material for Lok Sabha Question 2238). The event shows the Mahé pattern: short, intense monsoon rain on low ground beside the river, with flooding that drains within a day once the river falls. A record of Mahé in the 2018 floods was not found [TBC]. These totals are evidence only and are not design values (Clause 2.3.4(c)).


References