Chapter 7Waterbodies, Tanks (Kulams) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (kulam) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, including the kayals (backwaters) and paddy wetlands;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Kerala Conservation of Paddy Land and Wetland Act, 2008, the Kerala Irrigation and Water Conservation Act, 2003, the Coastal Regulation Zone Notification, 2019, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (puzha), stream or canal (thodu), kayal (backwater), estuary or tidal creek, lake, tank or pond (kulam), temple tank, paddy wetland (vayal or padasekharam), marsh or mangrove, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (kulam) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Irrigation Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder thodu) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (shutter or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Keralam terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Kulam | A tank or pond. Most kulams in Keralam are excavated, often with a laterite or stone-lined edge, and have no surplus weir. For such a kulam, FTL is the invert of its overflow or outlet or, where it has none, the lowest point of its rim. |
| Kayal (backwater) | A coastal lagoon or backwater, brackish or fresh, fed by rivers and connected to the sea through an azhi (permanent inlet) or a pozhi (seasonal sand-bar mouth). For Table 7.1 it is a marsh, estuary or backwater. |
| Paddy wetland (vayal) | Paddy land or wetland within the meaning of the Kerala Conservation of Paddy Land and Wetland Act, 2008, whether or not it is in the data bank under that Act. Its storage is flood storage. Unless a survey shows that it lies above the 1% AEP flood level, fill in a paddy wetland is fill below that level, and Clause 7.6 applies to it in addition to any permission under the Act. |
| Padasekharam (polder) | A block of paddy fields cultivated as one unit, enclosed by an outer (puram) bund and drained by pumps, as in Kuttanad. A polder that is pumped dry for a crop is not free storage; its storage may be counted only under Clauses 7.7 and 7.8. |
| Thodu | A natural stream or an artificial channel; the usual Malayalam word for both. A thodu that brings water into a kulam, paddy wetland or kayal is a supply channel; one that carries its overflow is a surplus course. |
| Pozhi | A sand bar that closes a river or lagoon mouth in the dry season and opens, or is cut, in the monsoon. Tailwater at a pozhi is taken from Chapter 5. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the Irrigation Department and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Irrigation Department, the ULB, the Grama Panchayat, a devaswom, the Forest Department or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue village maps and survey records, the Basic Tax Register (BTR), and the data bank of paddy land and wetland under the Kerala Conservation of Paddy Land and Wetland Act, 2008;
- (b) Irrigation Department and Grama Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where Irrigation Department records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. The CAG found that Keralam's flood hazard map, prepared by NCESS in 2010, is at 1:50,000 and does not meet the CWC criterion for flood-prone areas; the post-disaster needs assessment of 2018 said that maps at 1:10,000 or 1:5,000 are needed (CAG 2021, para 2.4). KSDMA has since published flood probability maps for return periods of 10 to 500 years, modelled at about 1.4 km and rescaled to 90 m (KSDMA, 2022). They are riverine, not urban pluvial, and too coarse to fix a setback on a site. Clause 7.3.4 lets the Authority adopt larger-scale maps once they are issued. Until then, the Applicant must produce the extent for larger and flood-sensitive sites. The Kerala High Court has directed that a drainage map of Kochi be made "using scientific methods" (WP(C) 23911/2018, as reported by LiveLaw, 2025). The State Wetland Authority Kerala had a draft list of 40 wetlands for notification under the Wetlands (Conservation and Management) Rules, 2017, but none had been notified by August 2024 (SWAK reports to the NGT, 2020 and 2024). Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (Keralam has no general statutory setback from waterways; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or an Irrigation Department NOC sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, because KMBR/KPBR 2019 and the Kerala Acts that deal with waterways set no general setback from them (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Keralam flood maps are mostly coarser than US maps, the ground on the coastal plain is very flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Keralam's building rules set no general setback from rivers, canals, kayals or ponds. KMBR/KPBR 2019 Rule 22(3), as substituted on 29 October 2025, bars construction on a plot liable to be flooded and on land shown as floodable in a Master Plan, Detailed Town Planning Scheme or Interim Development Order. Rule 22(4) bars any construction that obstructs natural drains and streams on a plot, with a penalty under section 51 of the Disaster Management Act, 2005. Distances from waterbodies come only from other regimes: the Coastal Regulation Zone along tidal waters (see the Disclosure below); Master Plan zones, such as the Water Body and Buffer-Water Body Zones of the Thiruvananthapuram Master Plan 2040 and a 5 m green strip along the Meenachil river under the Pala Master Plan; and, in landslide-hazard zones, a distance of 15 m from small streams on slopes over 15 degrees, reported in the news in 2024 (the order itself was not traced). The Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 sets distances only for sand removal (10 m from the bank) and vehicle parking (25 m); they are not building setbacks. Clause 7.4.7 makes 15 m the floor everywhere.
Disclosure. Keralam has no general statutory setback from waterways. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual. It is not found in KMBR/KPBR 2019 or in any Kerala Act. What does exist is narrower in scope:
- CRZ Notification, 2019. Along tidal-influenced water bodies (backwaters, tidal rivers, canals and creeks, to the 5 ppt salinity line), the CRZ covers the land from the High Tide Line to 50 m or the width of the creek, whichever is less; 100 m or the creek width applied until the Coastal Zone Management Plan under the 2019 Notification was approved, which news reports place in late 2024 (the approval letter was not seen). Backwater islands have a uniform CRZ of 20 m from the HTL, with no new construction in it, and mangroves larger than 1,000 m² have a 50 m buffer. Vembanad is listed as a Critically Vulnerable Coastal Area. KMBR/KPBR refer sites in a CRZ to the Kerala Coastal Zone Management Authority.
- Kerala Conservation of Paddy Land and Wetland Act, 2008. Section 11 imposes a total prohibition on reclaiming wetland. Section 27A (inserted in 2018) requires the conversion of unnotified land to keep the free flow of water to neighbouring paddy lands, and, on a parcel larger than 20.2 ares, 10% of the land to be set apart for water conservancy measures such as tanks, ponds, pits and trenches. Neither is a distance setback.
- Wetlands (Conservation and Management) Rules, 2017. They protect notified wetlands, but no Keralam wetland had been notified under them by August 2024.
This Manual sets 15 m as the floor because it matches the one inland waterway distance already reported in Keralam practice (15 m from small streams in landslide-hazard zones); because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for a maintenance track and bank planting along the thodus and canals that depend on regular cleaning. It adds nothing where the CRZ applies, which is wider, but sets a floor on the many thodus, canals, kulams and paddy-wetland edges that no rule now protects. The CAG observed that the CRZ distance alone "would not suffice" for flood plain zoning (CAG 2021, para 2.3). Until a statute, rule or Master Plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by KMBR/KPBR 2019, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Keralam practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. Keralam's coastal plains are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
Below Idukki dam at Cheruthoni, 238.72 ha was declared a Construction Free Zone within the KSEBL maximum flood level in 1980. The CAG found about 285 constructions in that zone in January 2021; many earlier buildings there were washed away in 2018, and rebuilding was seen in 2019 (CAG 2021, para 4.2). Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Kuttanad, Alappuzha and the backwater fringes of Kochi already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Keralam has few impounded irrigation tanks with surplus weirs and sluices. In this Manual, Clauses 7.7 and 7.8 apply to any impounded or bunded waterbody whose storage is counted: a chira or a bunded kulam, a padasekharam operated under a pumping and bund rule, or a reach of kayal held by a regulator or barrage. A chain of kulams, paddy wetlands and thodus in which each drains into the next is a tank cascade for Clause 7.7.2.
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. Irrigation Department, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including any paddy wetland, padasekharam or kayal through which the outflow passes, as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than Irrigation Department's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. In August 2018 most of Keralam's reservoirs were at or near full reservoir level on 14 August, before the heaviest rain of 15–17 August, and Vembanad lake absorbed only about 0.6 of the roughly 1.63 billion m³ that flowed into it (CWC study of the 2018 floods, as reported). Kulams and paddy wetlands should likewise be expected to be full, or their soils saturated, by the peak of the south-west monsoon. The CAG found that Idamalayar reservoir had no rule curve in 2018 and that the Idukki rule curve of 1983 had not been reviewed (CAG 2021, para 3.6). A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — Kulam, paddy wetland and kayal in section: an urban catchment with detention and treatment, a kulam with its overflow and setback, a thodu, a valley paddy wetland (vayal), a padasekharam polder below mean sea level with its outer (puram) bunds and pump, the kayal (backwater) and the pozhi (sand bar) at the sea mouth. Original drawing for this Manual; concept from the Kuttanad polder and Vembanad backwater system as described by Ramakumar (2023) and the Ramsar record for Vembanad–Kol, with setback zones adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 (MARC, 2025).
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, KSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under Irrigation Department control, the operating rule shall be Irrigation Department's rule. This Manual does not authorise any other body to operate a Irrigation Department tank.
Commentary. No Keralam operating rule for a kulam, chira or padasekharam that keeps a flood cushion was found. The nearest precedents are the large reservoirs and barrages. After the 2018 floods the CWC recommended a review of the rule curves of all reservoirs, especially those with more than 200 million m³ of live storage, to provide a flood cushion (as reported). Under its 2020 rule curve, Idukki is held at 2,386.81 ft during 11–20 August, a dynamic flood cushion of 270.63 million m³ below its full reservoir level (CAG 2021, para 3.6). Thanneermukkom barrage, which holds the southern part of Vembanad lake, is meant to be closed from 15 December to 15 March for the paddy crop; in 2025 it reopened only on 11 April, after a decision by an advisory committee chaired by the District Collector (news reports). These are rules for specified dams and a barrage, outside the scope of this Manual, but they show that an agreed rule with dates and levels is the only basis on which storage can be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by June and July rain gives no protection in a late-July or August monsoon depression. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Irrigation, drinking water and paddy cultivation remain the primary purposes of most of these waterbodies. A flood cushion has a cost in yield or in the crop calendar, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Kerala State Pollution Control Board directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 15 May each year (Chapter 10).
Commentary. Desilting has been the main flood work in Keralam's cities. Operation Anantha desilted and widened about 30 km of canals and storm drains in Thiruvananthapuram in 2015–16 (KSDMA). The Kerala High Court has required an annual cleaning calendar for Kochi, with canals cleaned by the Irrigation Department and drains by the Corporation, and in April 2026 directed that dredged debris not be left on canal banks (WP(C) 23911/2018, as reported by LiveLaw). The 15 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Keralam precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Kochi, the High Court has ordered railway culverts to be rebuilt and utilities to be moved out of drains (WP(C) 23911/2018). In Kozhikode, a drain widened from 40 cm to 1.5 m still ends in a 200 m reach of 40 cm through private land (CAG, AMRUT audit, 2025). The MSSRF study of Kuttanad (2007) found waterways blocked by roads, bridges and culverts built without regard to drainage (as summarised by Ramakumar, 2023). Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored kulam or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). Keralam's kulams, chiras and paddy wetlands can serve the same purpose if their storage is restored and controlled. Section 27A of the Kerala Conservation of Paddy Land and Wetland Act, 2008 already requires 10% of a converted parcel larger than 20.2 ares to be set apart for water conservancy measures, including tanks and ponds. Such set-asides could be designed as storage under this Manual, though the Act sets no technical standard for them. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetland Authority Kerala (SWAK);
- (b) the Ramsar sites Vembanad–Kol, Ashtamudi and Sasthamkotta;
- (c) the other kayals and coastal lagoons, such as Kayamkulam, Paravur and Akkulam–Veli, the estuaries and pozhis at their mouths, and mangroves; and
- (d) any other marsh, estuary or backwater that the Authority notifies.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Vembanad–Kol, a Ramsar site of 151,250 ha designated in 2002, is described in its Ramsar record as giving flood protection to the thickly populated coastal areas of three districts. Its storage has shrunk sharply, though the figures differ: one study gives a fall in carrying capacity from 2.45 to 0.56 km³ (NCESS, as reported in 2016), another a fall in retention capacity from 2,617.5 to 384.7 million m³, with the lake area down from 365 km² to about 206 km² and its average depth from 8.5 m to 1.8 m (KUFOS, as reported). About 55,000 ha of the backwater was reclaimed as paddy polders. In August 2018 the lake absorbed only about 0.6 of some 1.63 billion m³ of inflow (CWC, as reported). Keralam had notified no wetland under the Wetlands (Conservation and Management) Rules, 2017 by August 2024 (SWAK report to the NGT, 2024). Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sasthamkotta lake is spring-fed and is the source of drinking water for about half a million people in Kollam district (Ramsar), so no untreated urban runoff should reach it. In Kochi, sewage continued to mix with stormwater in drains built under AMRUT (CAG, AMRUT audit, 2025), and the city's drains discharge to the backwaters. The rules on outfalls and treatment in Clause 7.12.3 respond to both.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. The CAG found 913 encroachments of waterbodies in the districts it audited. Of these, 832, covering 17.97 ha of the Kanoli canal in Thrissur, had been identified in 2011 and were still not evicted, and in Devikulam taluk only 1 of 53 complaints had led to eviction (CAG 2021, Appendix 2.1). The CAG recommended flood plain zoning legislation and an authority to demarcate zones and to prohibit or restrict their use (Recommendation 2.3). Operation Anantha evicted numerous encroachments to widen Thiruvananthapuram's canals (KSDMA). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 15 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. Kulams, chiras and the outer (puram) bunds of padasekharams in Keralam are low earthen banks, well under 10 m high, and will not be specified dams; Keralam's large reservoirs, such as Idukki and Idamalayar, are specified dams and are outside this Manual. Where the storage of a padasekharam is counted under Clause 7.7, its outer bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. The CAG found no CWC flood forecasting station in Keralam at the time of its audit (CAG 2021, para 3.3), and that construction continued in the Construction Free Zone below Idukki dam (para 4.2). The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Comptroller and Auditor General of India (2021). Report No. 6 of 2021: Preparedness and Response to Floods in Kerala (paras 2.3, 2.4, 3.3, 3.6, 4.1, 4.2; Appendix 2.1). https://d1jmc0u14z2tmp.cloudfront.net/uploads/download_audit_report/2021/Kerala_Au.I_Rep_6_2021-0618cb7f2db0035.98377057.pdf
- Comptroller and Auditor General of India (2025). Implementation of AMRUT in Kerala, Chapter IV (storm water drainage). https://cag.gov.in/uploads/download_audit_report/2025/CHAPTER-IV---PROJECT-IMPLEMENTATION-0699d30255af021.03377366.pdf
- Government of Kerala. Kerala Municipality Building Rules, 2019 and Kerala Panchayat Building Rules, 2019, with the 2020 amendments (Rules 5, 22, 26 and 76). https://buildingpermit.lsgkerala.gov.in/Content/Rules/2019_kmbr.pdf ; https://buildingpermit.lsgkerala.gov.in/Content/Rules/2019_kpbr.pdf ; amendments of 29 October 2025 (SRO 1240/2025 and 1241/2025). https://buildingpermit.lsgkerala.gov.in/Content/Rules/KBR2025.pdf
- Government of Kerala. Kerala Conservation of Paddy Land and Wetland Act, 2008 (Act 28 of 2008), text at https://elaw.in/wetland/kcpwact.html ; Amendment Bill 149 of 2018, https://prsindia.org/files/bills_acts/bills_states/kerala/2018/Bill%20149%20of%202018%20Kerala.pdf ; section 27A as quoted by the Kerala High Court in W.P.(C) 26592 of 2022 (28 Nov 2024), https://livelaw.in/pdf_upload/21570026592202211-574008.pdf
- Government of Kerala. Kerala Irrigation and Water Conservation Act, 2003 (Act 31 of 2003). https://www.indiacode.nic.in/bitstream/123456789/16780/1/the_kerala_irrigation_and_water_conservation_act%2c_2003.pdf
- Government of Kerala. Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 (Act 18 of 2001). https://prsindia.org/files/bills_acts/acts_states/kerala/2001/2001KERALA18.pdf
- Ministry of Environment, Forest and Climate Change (2019). Coastal Regulation Zone Notification, G.S.R. 37(E), 18 January 2019 (paras 1(ii), 2.1.1, 2.3, 10.2). https://czmp.ncscm.res.in/2019-notification.pdf
- Thiruvananthapuram Master Plan 2040, draft variation notification LSGD-RD3/101/2025-LSGD (12 Feb 2026). https://tmc.lsgkerala.gov.in/system/files/2026-06/Master%20Plan%20Tvpm-%20variation%20-%20Final%20Draft%20-%20Notification%20%281%29.pdf ; LSGD Adalat record on the Pala Master Plan green strip. https://adalatapp.lsgkerala.gov.in/pap/application/25808
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Ramsar Convention. Annotated summary of Ramsar sites, India (Vembanad–Kol 1214, Ashtamudi 1204, Sasthamkotta 1212). https://rsis.ramsar.org/sites/default/files/rsiswp_search/exports/Ramsar-Sites-annotated-summary-India.pdf
- Reports of the NCESS and KUFOS studies of Vembanad lake: India Environment Portal (The Hindu, 28 Sep 2016), https://indiaenvironmentportal.org.in/news-clippings/vembanad-lake-may-vanish-in-50-years-study ; ICSF, https://icsf.net/?p=115474
- Reports of the CWC study of the 2018 Kerala floods (secondary): Mongabay India (2018), https://india.mongabay.com/2018/09/cwc-report-on-kerala-floods-dams-not-to-be-blamed/ ; The News Minute, https://thenewsminute.com/kerala/storage-release-water-dams-should-be-reviewed-cwc-report-kerala-floods-88242
- State Wetland Authority Kerala, reports to the NGT (23 Oct 2020; Aug 2024, MA 58/2024 in OA 147/2022). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20KERALA%20STATE%20WETLAND%20AUTHORITY%20IN%20MA%20NO.%2058%20of%202024%20IN%20OA%20NO.%20147%20of%202022%20Krishna%20Das%20K%20V%20VS%20State%20of%20Kerala.pdf
- KSDMA (2022). Flood Probability Report. https://sdma.kerala.gov.in/wp-content/uploads/2022/06/Flood-Probability-Report-2022_Final.pdf ; KSDMA, Operation Anantha (Thiruvananthapuram 2015). https://sdma.kerala.gov.in/thiruvananthapuram-2015/
- Kerala High Court, W.P.(C) 23911/2018 (Kochi waterlogging): order of 24 May 2024, https://verdictum.in/app-lite/pdf_upload/wpc-no-23911-of-2018l-1620085.pdf ; LiveLaw reports (2025, 2026), https://www.livelaw.in/amp/high-court/kerala-high-court/kerala-high-court-district-collectors-committee-oversee-canal-and-drainage-system-in-kochi-308757 ; https://www.livelaw.in/amp/high-court/kerala-high-court/kerala-high-court-flags-plastic-waste-canal-debris-pre-monsoon-action-529883
- Ramakumar, R. (2023). An integrated vision for Kuttanad. Review of Agrarian Studies 13(2) (summarising the MSSRF Kuttanad report of 2007). https://ras.org.in/articles/321/text/article.html
- Onmanorama (1 Aug 2024). Report of the 15 m stream distance in landslide-hazard zones. https://www.onmanorama.com/news/kerala/2024/08/01/wayanad-landslides-gadgil-report-kerala-western-ghats-causes-prevention.amp.html ; Onmanorama (19 Dec 2025; 16 Apr 2026), Thanneermukkom barrage operation. https://www.onmanorama.com/news/kerala/2025/12/19/thanneermukkom-bund-shutters-closed.html ; https://www.onmanorama.com/news/kerala/2026/04/16/thanneermukkom-bund-delay-livelihood-crisis.html ; Onmanorama (24 Sep 2024), Kerala CZMP approval. https://onmanorama.com/news/kerala/2024/09/24/coastal-zone-management-plan-centre-approves-proposal-of-kerala.html
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Malayalam waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. The CAG audit of the 2018 Keralam floods found that the State had not enacted flood plain zoning legislation and had not identified or demarcated its flood plains (para 2.3), that its flood hazard map was at 1:50,000 and did not meet the CWC criterion (para 2.4), and that the districts it audited had 913 encroachments of waterbodies, 832 of them on the Kanoli canal in Thrissur (Appendix 2.1) (CAG Report No. 6 of 2021). The IISc study done for the CAG found that the built-up area of the Periyar basin grew by about 450% between 1985 and 2015 while its waterbodies shrank by about 17% (para 4.1). Vembanad lake has lost most of its storage: published estimates of the loss range from 78% to 85% (NCESS and KUFOS studies, as reported). Loss of storage in kayals, paddy wetlands and kulams, together with blocked canals and closed river mouths, recurs in Keralam's floods. This chapter gives the design rules that protect that storage. It does not replace the Revenue, Irrigation Department and local-body procedures that record and protect waterbodies in law.