Bung 6 belhchianTui Luanna System Tenau leh Lian
Heng belhchiante hian Bung 6 an ṭanpui. Belhchian 6A (standard inlet (luan lutna) leh an theihna curve) leh Belhchian 6B (sediment yield) hian test leh survey data, tuna la awm lo, an mamawh a; belhchian tinin a chhunga awm tur leh a tlangzarh hma chhunga interim dan hman tur a tarlang. Belhchian 6C-in standard drawing, Bung 6 leh Bung 9-in an ruat tawh lenzawng chauh keng, a pe; lenzawng dang zawng zawng chu "design-ah finfiah tur" ("to be confirmed in design") tia chhinchhiah a ni. Form 6-1 hi draft form a ni: Clause 6.15-in a phut a tarlang a, engmah a belh lo.
Belhchian 6A — Mizoram tana standard inlet chi, theihna curve nen (grade chungah leh sag-ah)
Bung 6-a Clause 6.6.1 aṭanga 6.6.7 thleng leh Bung 9-a Clause 9.11 a ṭanpui.
Buatsaih tur. He belhchian hian Mizoram kawngpui tana standard inlet chi tlem tê list (kerb-opening, grate leh combination inlet, drain (tui luanna) khuh-a kawng level-a bang kawngka inlet tiamin), leh chi tin tan grade chunga leh sag (kawng hniam lai)-a theihna curve-te a keng ang. Kawng neitu agency-te nena inremna standard inlet geometry set nghet, leh chung geometry-te rating test (laboratory emaw full-scale), emaw geometry tin tan test nena endik HEC-22 chhutna a mamawh (data leh a hnar awm theihte: Public Works Department (PWD), national-highway agency-te leh Aizawl Municipal Corporation standard detail-te, NIT Mizoram leh Mizoram University, chutah chuan State khawpuite tana ruahtui tlak frequency (IDF) zirchianna hmuh a ni lo a, an hydraulic test theihna pawh zirchianna hunah finfiah a ni lo [TBC], emaw hydraulic laboratory dangte, manufacturer test rating-te). A tlangzarh hma chuan, inlet rawt ngei tihfai lai theihna (clean capacity) chu FHWA HEC-22 (4th edition, 2024) kalphungte hmangin emaw chu geometry chiah tana manufacturer test rating aṭangin chhut rawh (Clause 6.6.2), Table 6.5-a clogging factor (bal avanga tihtawp factor)-te hmangin tihtlem rawh (Clause 6.6.3), leh Table 6A.1-a interim thupekte zawm rawh.
Table 6A.1 — Belhchian 6A tlangzarh hma chhunga inlet tana interim thupekte (Bung 6 leh 9 aṭanga)
| Thil | Mamawh | Clause |
|---|---|---|
| Public kawngpui-a inlet chi | Kerb-opening emaw combination inlet, Approving Authority (phalna petu Authority)-in hmun pakhat tan grate chauh inlet a lo pawm loh chuan | 6.6.1(a) |
| Inlet level | Kawngka chu kawng level-ah; theih chinah gutter depression | 6.6.1(b) |
| Tihfai lai theihna | FHWA HEC-22 (4th ed., 2024) emaw geometry chiah tana manufacturer test rating; CPHEEO §5.6.2 equation-te chu cross-check atan chauh | 6.6.2 |
| Clogging, grade chungah | Grate 50%; kerb opening 10% | 6.6.3, Table 6.5 |
| Clogging, sag-ah | Grate 50%; kerb opening 20% | 6.6.3, Table 6.5 |
| Inkar | Gutter run tin chhip aṭanga ṭan chhutna inzui hmangin; kerb nei kawngah 30 m aia hla lo | 6.6.4 |
| Kerb opening lenzawng | Sanzawng chiang 100 mm tal; a sei zawng 1.0 m tal | 9.11.4 |
| Grate pianphung | Motor kal lam nena inzawn kawngka 25 mm aia zau lo | 9.11.3(a) |
| Load class | Carriageway (motor kalna kawng) leh median-ah D400; kerb aṭanga 0.5 m chhungah C250; kekawng (footpath) leh cycle track-ah B125 (emaw IS class tluk) | 9.11.2 |
| Connection pipe | Diameter 300 mm tal; inlet design flow-ah 0.9 m/s tal petu gradient | 6.6.6 |
| Silt sump | Outlet (luan chhuahna) pipe invert (tui luanna hniam ber) hnuaiah 300 mm tal thuk, lei chung aṭanga tihfai theih | 6.6.7, 9.11.6 |
Belhchian ruangam tur chu Table 6A.2 aṭanga 6A.4 thleng-ah pek a ni.
Table 6A.2 — Standard inlet chi register (layout)
| Type code | A hrilhfiahna | Grate lenzawng emaw kerb opening (mm) | Gutter depression (mm) | Load class | Standard drawing |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
Table 6A.3 — Grade chunga theihna (layout; inlet chi tin tan table pakhat)
| Cross slope Sx (m/m) | Longitudinal slope SL (m/m) | Gutter tui luang Q (L/s) | Spread T (m) | Tihfai lai tui man (L/s) | Clogging hnua design tui man (L/s) | Bypass flow (L/s) |
|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Table 6A.4 — Sag-a theihna (layout; inlet chi tin tan table pakhat)
| Inlet-a tui tlin thuk zawng (mm) | Tihfai lai theihna (L/s) | Clogging factor (Table 6.5) | Design theihna (L/s) | Flow regime (weir, orifice emaw transition) |
|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ |
Belhchian 6B — Silt-trap lenzawng ruatna leh sediment allowance calibration tana sediment yield
Bung 6-a Clause 6.7.4, 6.7.8, 6.13.3 leh 6.13.10 a ṭanpui.
Buatsaih tur. He belhchian hian Mizoram khawpui drain-te sediment yield (bal (sediment) lo awm zat), ram hman dan (land use) leh drain chi zelin, Clause 6.13.3-a silt trap (leidip dawnna) lenzawng ruat nan, leh Clause 6.7.8-a sediment allowance chu leidip (silt) thuk zawng teh tak nena calibration a keng ang. Leidip laih chhuah (desilting) record-te (drain sei zawng leh catchment (ruahtui luan khawmna hmun) area zela paih chhuah tui zat emaw rihna, ni nen), fûr hun hma leh hnua leidip thuk zawng survey-te, leh catchment ram hman dan leh lei data a mamawh (data leh a hnar awm theihte: Aizawl Municipal Corporation leh urban local body dangte leidip laih chhuah record-te, channel tan IWRD record-te, NRSC aṭanga land cover, Mizoram soil survey leh NBSS&LUP aṭanga lei, IMD aṭanga ruahtui tlak). A tlangzarh hma chuan, silt trap tin chu tihfai hun ruat inkara sediment lo awm tur, designer-in a chhut, drain ngei emaw local body ang chhunga drain inang dangte leidip laih chhuah record-a innghat, aṭangin lenzawng ruat rawh, leh tihfai inkar hun ngaih chu sawi rawh; inkar hun chu Clause 6.13.10-a kumtin fûr hma leidip laih chhuah aia a rei loh tur a ni. Inlet silt sump-te chu 300 mm tal thuk an ni reng (Clause 6.6.7), leh Clause 6.7.8-a sediment allowance chu thlak danglam lovin hman a ni.
Kalphung tum chu tui zat inbuk (volume balance) awlsam a ni a, a term tin chu design-ah sawi tur a ni:
V_trap = Y · A · t_c
heta V_trap chu trap outlet invert hnuaia sediment khawlna tui zat (m³), Y chu catchment ram hman dan leh drain chi tana sediment yield (kum khatah m³/ha, Table 6B.2 tlangzarh a nih hnuah chuta mi), A chu trap-a luang catchment area (ha), leh t_c chu tihfai inkar hun ruat (kum) a ni. Belhchian hian safety margin belh a ni em tih a sawi ang.
Table 6B.1 — Bung 6-in a ruat tawh sediment allowance-te (provisional, calibrate tur)
| Element | Invert-a sediment allowance | Clause |
|---|---|---|
| Drain khuh lo leh drain khuh | 75 mm leh chhung lam thuk zawng chiang 10% zinga lian zawk | 6.7.8(a) |
| Diameter 600 mm emaw a aia lian pipe | Chhung lam diameter 5% | 6.7.8(b) |
| 600 mm hnuai pipe | Allowance a awm lo; Clause 6.7.3(a)-a velocity tlem ber hman a ni | 6.7.8(c) |
| Velocity tlem ber thleng thei lo drain leh pipe | Allowance let hnih; machine-a leidip laih chhuahna kawng siam | 6.7.4(b), (c) |
| Inlet silt sump | Outlet pipe invert hnuaiah 300 mm tal | 6.6.7 |
Table 6B.2 — Ram hman dan leh drain chi zela sediment yield (layout)
| Ram hman dan emaw catchment chi | Drain chi | Sediment yield Y (kum khatah m³/ha) | Bulk density (t/m³) | Local body leh record hman | Record kum zat |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
Table 6B.3 — Sediment allowance calibration (layout)
| Drain emaw pipe ID | Chhung lam thuk zawng chiang emaw diameter (mm) | Clause 6.7.8 hnuaia allowance (mm) | Fûr hma leidip laih chhuah hmaa leidip thuk zawng teh (mm) | Fûr hun tawpa leidip thuk zawng teh (mm) | Teh leh allowance ratio |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
Belhchian 6C — Standard drawing: cover sawn theih nei kawng sir drain khuh, access chamber, silt sump nei inlet
Bung 6-a Clause 6.6, 6.7.6 aṭanga 6.7.10 thleng leh 6.13, leh Bung 9-a Clause 9.11 leh 9.12 a ṭanpui.
A hnuaia drawing-te hi schematic standard drawing an ni. Bung 6 leh Bung 9-in an ruat lenzawng chauh an lantir. Bang leh slab chhah zawng, reinforcement, concrete grade leh cover, chamber plan lenzawng leh frame detail-te chu design-ah finfiah tur a ni: structural design (Clause 9.1.2) leh Clause 9.13-a exposure class aṭangin an lo chhuak. Table 6C.1-in lenzawng lantirte leh an Clause hnar-te a tarlang.
Milem 6C.1 — Standard drawing: cover sawn theih nei kawng sir drain khuh, kawng level-a kerb inlet, kekawng slot, soffit thlenga freeboard (tui sang ber chunga zau dah) leh sediment allowance, kekawng zawha cover panel leh access chamber plan nen. He Kaihhruaina Bu tana milem siam thar, CPHEEO, Manual on Storm Water Drainage Systems (2019), Chapter 5, leh IRC:SP:50-2013 aṭanga siam danglam.
Milem 6C.2 — Standard drawing: drain khuh chunga access leh junction chamber, kawngka chiang, junction zau zawng, drain lut luhna kil, chamber floor hnuaia invert chhuak, leh cover thupekte nen. He Kaihhruaina Bu tana milem siam thar, CPHEEO, Manual on Storm Water Drainage Systems (2019), §5.3.4 leh Chapter 11 aṭanga siam danglam.
Milem 6C.3 — Standard drawing: kawng level-a kerb inlet, silt sump, connection pipe leh cover nen, leh kerb opening elevation. He Kaihhruaina Bu tana milem siam thar, CPHEEO, Manual on Storm Water Drainage Systems (2019), Figure 5.9, leh FHWA, HEC-22 Urban Drainage Design Manual (4th ed., 2024) aṭanga siam danglam.
Table 6C.1 — Standard drawing-a lenzawng-te leh an Clause hnar
| Drawing | Thil | Lenzawng emaw dan | Clause |
|---|---|---|---|
| 6C.1 | Public drain khuh chhung lam lenzawng chiang | 0.6 m zau leh 0.6 m thuk tal | 6.7.6(c) |
| 6C.1 | Cover soffit thlenga freeboard | Table 6.7; kawng sir drain reng reng tan 150 mm aia tlem lo | 6.7.9, 6.13.1(a) |
| 6C.1 | Sediment allowance | 75 mm leh thuk zawng chiang 10% zinga lian zawk | 6.7.8(a) |
| 6C.1 | Cover panel sawn theih | 10 m centre aia hla lo; panel tin 0.6 m tal sei leh zau zawng chiang pum kal tlang; lifting point thlak lut; kekawng nena inrual | 6.13.2(a) |
| 6C.1 | Kekawng ruahtui luang | Cover-a slot emaw grate kawngka kal tlangin | 6.13.1(c) |
| 6C.1 | Kerb inlet | Kawng level-a drain bang kawngka, tin silt sump nen; inkar chhutna hmangin, 30 m aia hla lo | 6.13.1(b), 6.6.4 |
| 6C.1, 6C.2 | Access chamber | Junction, kawi leh cross-section inthlakna tinah, leh run dik-ah 30 m centre aia hla lo | 6.13.2(b) |
| 6C.2 | Luhna kawngka chiang | 0.6 m × 0.6 m (600 mm) tal | 6.13.2(b), 9.12.3 |
| 6C.2 | Junction chamber | Chhung lam zau zawng chu drain chhuak zau zawng let hnih tal; drain lut chu kil dik aia tlemin; invert chhuak chu chamber floor hnuaiah | 6.7.10(b) |
| 6C.2 | Cover | Hmun tana load class; hinge emaw lock nei; 1% AEP HGL cover chunga a sang theihnaah bolt emaw lock nei | 9.11.2, 9.11.5, 9.12.6 |
| 6C.2 | Tihfai | Lei chung aṭanga machine-in; kailawn (ladder), dah a nih chuan, thir ei lo (corrosion-resistant) leh khuh (encapsulated) | 9.12.7 |
| 6C.3 | Kerb opening | Kawng level-ah; sanzawng chiang 100 mm tal; a sei zawng 1.0 m tal | 6.6.1(b), 9.11.4 |
| 6C.3 | Silt sump | Outlet pipe invert hnuaiah 300 mm tal; suction emaw grab machine-in tihruak | 6.6.7, 9.11.6 |
| 6C.3 | Connection pipe | Diameter 300 mm tal; design flow-ah 0.9 m/s tal | 6.6.6 |
| 6C.3 | Combination inlet-a grate | Motor kal lam nena inzawn kawngka 25 mm aia zau lo; ṭhen tinah Table 6.5 clogging | 9.11.3, 6.6.3 |
| Zawng zawng | Bang leh slab chhah zawng, reinforcement, concrete grade leh cover, chamber plan lenzawng, gutter depression thuk zawng | Design-ah finfiah tur | 9.1.2, 9.13 |
Form 6-1 — Tui Luan Tirna Design Report checklist
Bung 6-a Clause 6.15 a ṭanpui.
Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Dan anga hman tur a ni lo.
He checklist hi Tui Luan Tirna Design Report hmaah belh rawh. Item tin tan, Aw, Aih emaw A huam lo ziak rawh, leh a lanna drawing emaw phêk ziak rawh.
Section A — Project
Table 6F.1 — Form 6-1, Section A: project
| Field | Ziah luh tur |
|---|---|
| Project hming leh hmun | ______ |
| Local body, leh Tier A emaw Tier B (Bung 1) | ______ |
| Dilna thehluhtu (applicant) | ______ |
| Designer (hming leh registration) | ______ |
| Catchment area pumpui a rawngbawl (ha) | ______ |
| 10% AEP (kum khatah a lo thlen theih dan) tui luanna system tenau (minor system) tana high-density area dinhmun (Clause 6.4.4) | ______ |
| Clause 6.11.6-a coastal band (tuifinriat kam ram) chhungah (Aw / Aih) | ______ |
| Ni leh revision | ______ |
Section B — Clause 6.15-in a phut thu awmte
Table 6F.2 — Form 6-1, Section B: Clause 6.15-in a phut thu awmte
| No. | Thil | Clause | Pek (Aw / Aih / NA) | Drawing emaw phêk |
|---|---|---|---|---|
| 1 | Catchment plan: sub-catchment, tui luanna system tenau, inlet awmna leh 1% AEP tui luanna system lian (major system) overland flow path (lei chunga tui luan kawng)-te | 6.3.2 | ||
| 2 | Element tin tana ram hman dan leh kawng class AEP hman, leh high-density area dinhmun | Table 6.1, 6.4.4 | ||
| 3 | Design flow, Bung 2-a ruahtui tlak sheet leh Bung 3-a kalphung nen | 6.3.4 | ||
| 4 | Minor, check leh 1% event tana gutter spread (kawng chunga tui zau zawng), thuk zawng leh D·V endikna | Table 6.2, 6.3 | ||
| 5 | Inlet schedule: tihfai lai theihna, clogging factor, design theihna leh bypass flow (inlet kal pelh tui) | 6.6 | ||
| 6 | Pipe leh drain design table: n, velocity, sediment allowance leh freeboard | 6.7 | ||
| 7 | Minor leh check event tana HGL profile, tailwater (outfall hnuailama tui sang zawng) hman nen | 6.8 | ||
| 8 | Sag tui tlin level, tawp vek endikna tiamin | 6.10 | ||
| 9 | Building tin tana floor-level schedule | 6.11 | ||
| 10 | Culvert (kawng hnuaia tui kalna) leh kal tlangna chhutna (Form 9-1 nen) | 6.12, Bung 9 | ||
| 11 | Utility kal tlangna schedule leh drain khuh tana luhna kawngka layout | 6.13 |
Section C — Design innghahna
Table 6F.3 — Form 6-1, Section C: design innghahna
| Field | Ziah luh tur | Clause |
|---|---|---|
| Tui luanna system tenau design AEP hman | ______ | Table 6.1 |
| Kawng class(-te) leh kawng drainage leh kal tlangna tana design / check AEP | ______ | Table 6.1, 6.4.2 |
| Ruahtui tlak hnar leh climate factor hman | ______ | 6.3.4, Bung 2 |
| Kalphung: Rational Method (catchment ≤ 16 ha, element pakhat) emaw routing nena hydrograph (hun hrang hranga tui luang zat) kalphung | ______ | 6.3.4(a), (b) |
| Time of concentration (catchment hla ber aṭanga tui lo thlen hun) hniam ber hman (minute 10 aia tlem lo) | ______ | 6.3.4(c) |
| HGL tana outfall (drain tui luan chhuahna)-a tailwater (tidal outfall-ah MHWS + 0.3 m, emaw dawngtu level) | ______ | 6.8.2 |
| Catchment pianphung inkara tui sawn reng reng (6.3.5 hnuaia lo pawm a nih loh chuan a awm lo) | ______ | 6.3.5 |
Section D — Dan zawm endikna
Table 6F.4 — Form 6-1, Section D: dan zawm endikna
| No. | Endikna | Limit | Clause | A zawm (Aw / Aih / NA) |
|---|---|---|---|---|
| D1 | Inlet, sag, pipe, drain, culvert leh khawlna element tin hian 1% AEP overland path an nei | Plan-ah lantir | 6.3.2 | |
| D2 | Tui luanna system lian tui luang = 1% AEP peak, tui luanna system tenau theihna tawp paihin | Hmun tinah chhut | 6.3.3 | |
| D3 | Minor event-a spread | Table 6.2 | 6.5.2 | |
| D4 | Check leh 1% event-a thuk zawng | Crown (kawng laili sang ber)-ah ≤ 150 mm; a thuk berah ≤ 350 mm | Table 6.2 | |
| D5 | Hmun zela tui luan hlauhawmna (D·V) | Table 6.3 | 6.5.3 | |
| D6 | Inlet clogging factor hman | Table 6.5 | 6.6.3 | |
| D7 | Kerb nei kawng-a inlet inkar | ≤ 30 m | 6.6.4(a) | |
| D8 | Sag inlet design theihna ≥ minor design flow lo thleng; a ngaih lai chuan flanking inlet | — | 6.6.5 | |
| D9 | Inlet connection pipe leh silt sump | ≥ 300 mm dia, ≥ 0.9 m/s; sump ≥ 300 mm | 6.6.6, 6.6.7 | |
| D10 | Manning's n chu design value hniam ber aia tlem lo | Table 6.6 | 6.7.2 | |
| D11 | Minor design flow-a velocity tlem ber | Drain 0.6 m/s; pipe 0.9 m/s | 6.7.3(a) | |
| D12 | Velocity sang ber leh Froude number | Drain lined leh pipe 3.0 m/s; Fr ≤ 0.8 | 6.7.3(b), (d) | |
| D13 | Velocity tlem ber tlin theih loh hmunah: velocity tarlan, sediment allowance let hnih, leidip laih chhuahna kawng siam | — | 6.7.4 | |
| D14 | Pipe chu pipe khat theihna atan lenzawng ruat, 0.95-thuk peak ni lovin | — | 6.7.5 | |
| D15 | Lenzawng tlem ber | Pipe 300 mm (public main 450 mm); drain khuh lo bed 0.3 m; public drain khuh 0.6 m × 0.6 m | 6.7.6 | |
| D16 | Pipe chunga lei khuh (cover); crown aṭanga 1 m chhunga leihnuai tui a awm chuan flotation endikna | ≥ 0.6 m; carriageway hnuaiah ≥ 0.9 m | 6.7.7 | |
| D17 | Theihna-a sediment allowance | 6.7.8 value | 6.7.8 | |
| D18 | Freeboard, kawi-a superelevation tiamin | Table 6.7 | 6.7.9 | |
| D19 | Kawi radius leh junction sump | 6.7.10 | 6.7.10 | |
| D20 | Run dik-a manhole inkar | Table 6.8 | 6.7.11 | |
| D21 | Minor event-ah HGL chu inlet chhip leh manhole cover hnuaiah | ≥ 0.3 m | 6.8.3 | |
| D22 | Lei chung thlenga surcharge (tui khat luat a nek chhuahna) thei manhole: bolt emaw lock nei cover | — | 6.8.4 | |
| D23 | Soffit inrual emaw soffit chhuak hniam zawk; invert chhuak chu invert lut hniam ber chungah ni lo | — | 6.8.6 | |
| D24 | HGL-ah gate leh valve loss tel; a ngaih lai chuan private connection-ah non-return valve (tui kir leh dangtu valve) | — | 6.8.7, 6.8.8 | |
| D25 | Kawngpui pawna overland flow path: zau zawng, neihna (tenure), dal tur awm lo, chhuk zel | ≥ 1% chhip zau zawng + lam tin 0.5 m, ≥ 3.0 m | 6.9.2 | |
| D26 | Map-a flow path kal tlang compound wall (in hung bang): kawngka chuan 50% tihtawp (blockage) chungin 1% tui luang a luan tir | — | 6.9.3 | |
| D27 | Chhip zau zawng ≥ 2 m drain khuh lo zawha luhna kawng (access strip) | ≥ 3.5 m, ≤ 500 m-ah kawng nen inzawm | 6.9.4 | |
| D28 | A ngaih laia drainage reserve: zau zawng, plot hran, structure awm lo, chhinchhiahna (marker), service, 2 m stability endikna | Table 6.9 | 6.9.6–6.9.8 | |
| D29 | 1% event-a sag tui tlin, overflow kawng, leh tawp vek endikna | A thuk berah ≤ 350 mm | 6.10.2, 6.10.3 | |
| D30 | Trapped sag leh kawng underpass (kawng hnuai kal tlang) | 6.10.4, 6.10.5 | 6.10.4, 6.10.5 | |
| D31 | Floor level | ≥ 1% AEP level + 0.5 m; level chhut a awm loh chuan 6.11.3 default-te | 6.11.1–6.11.3 | |
| D32 | Basement leh building service-te | 6.11.4, 6.11.5 | 6.11.4, 6.11.5 | |
| D33 | Coastal band: floor ≥ 1% still-water level + 2 × SLA (+ a huam chuan wave set-up) + 0.5 m; basement room emaw plant awm lo | — | 6.11.6 | |
| D34 | Culvert: design AEP, a chung tui luan kai (overtopping), 50% / 20% tihtawp endikna, lenzawng tlem ber | ≥ 900 mm | 6.12 | |
| D35 | Drain khuh: panel sawn theih leh access chamber | ≤ 10 m; ≤ 30 m | 6.13.1, 6.13.2 | |
| D36 | Silt trap, bypass nei screen leh 50% tihtawp endikna | — | 6.13.3, 6.13.4 | |
| D37 | Drain chungah building sak loh; flow area emaw freeboard-ah utility awm lo; kal tlangna awm mek chu 50% tihtawp nen paih | — | 6.13.5, 6.13.6 | |
| D38 | Ek tui (sewage) connection awm lo; sewer bulah tui put chhuak thei lo joint (sealed joint); 1.0 m aia thuk drain khuh lo-ah kam humhimna | — | 6.13.7, 6.13.8 | |
| D39 | Outfall: tailwater, 1% still-water level hnuaia flap gate emaw non-return valve, outlet humhimna | — | 6.14 |
Section E — Variance
Table 6F.5 — Form 6-1, Section E: variance
| Clause | Thupek zawm loh | A chhan leh thlan dang rawt | Phalna petu leh ni |
|---|---|---|---|
| ______ | ______ | ______ | ______ |
Section F — Signature
Report hi registered professional-in a buatsaih leh a hmingziak tur a ni a, Professional Design Certificate (Form 10-3) belh tur a ni (Bung 10-a Clause 10.6.1 leh 10.6.3). Drainage reserve kam aṭanga 2 m chhunga structure a din chuan, stability design chu structural engineer thiam-in a hmingziak bawk tur a ni (Clause 6.9.8(f)).
Table 6F.6 — Form 6-1, Section F: signature
| Mawhphurhna | Hming | Registration emaw empanelment no. | Hmingziak | Ni |
|---|---|---|---|---|
| Designer | ______ | ______ | ______ | ______ |
| Structural engineer (Clause 6.9.8(f), a huam chuan) | ______ | ______ | ______ | ______ |
Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0.