NEER-in a buatsaih Draft v1.0 a ni. Mizoram sawrkar, District Council, Village Council, authority emaw local body emaw reng rengin pawm a ni lo a, dan anga thuneihna a nei lo. He draft chungchang

Bung 8 belhchianTui Ṭhatna leh Recharge

Heng belhchiante hian Bung 8 an ṭanpui. Tui ṭhatna ruahtui tlak table-te ruangam, Level of Service leh Value Rating kalphung kimchang, BMP calibration programme ruangam, BMP tin tan design sheet, hnathawh laia erosion leh sediment control (lei kaih leh leidip thununna) standard detail, leh Clause 8.14-in a phut form pahnih an pe. Belhchian 8A leh 8C hian data la awm lo a mamawh a; chu chu an sawi a, chu chhung hman tur dan an pe. Form-te hi draft form an ni.


Belhchian 8A — Zone zela 3-month ARI darkar 24 zat leh IDF

Bung 8-a Clause 8.2, 8.4.1 leh 8.4.5 a ṭanpui.

Buatsaih tur. He belhchian hian Bung 2 ruahtui zone tin tan, darkar 24 3-month ARI (thla 3 zela vawi khat a lo thlen ṭhin) zat P_3m leh Q_wq tana hman 3-month ARI intensity–duration inzawmna a keng ang. Ni tin leh ni khat aia tawi (sub-daily) ruahtui tlak record rei tak (IMD station leh grid data, NIH chu Bung 2 hnar ber atan), partial-duration series anga zirchian, a mamawh. A tlangzarh hma chuan, design siamtu (designer) chuan site zone tana ni tin record rei ber awm aṭangin P_3m chu a chhut tur a ni, kum khatah chawhrual vawi li a inang emaw a pel ṭhin darkar 24 zat angin (Clause 8.2), record, a rei zawng leh kalphung chu Tui Ṭhatna Sheet (Form 8-1)-ah a tarlang tur a ni a, P_wq = max (P_ret, P_3m) a hmang tur a ni (Clause 8.4.1). Climate factor hman a ni lo (Clause 8.4.3).

8A.1 Belhchian buatsaih nana kalphung hman tur

  • (a) A awm chuan kum 30 tal ni tin record hmang rawh (Bung 2-a station IDF ang).
  • (b) Darkar 24 zat partial-duration series siam rawh, event inzawm lo-te chu ni ro khat tal inkar nen.
  • (c) A chunga event zat chu kum khatah chawhrual vawi li a nih theih nan threshold thlang rawh; P_3m chu chu threshold chu a ni.
  • (d) Minute 10 aṭanga darkar 24 thleng duration tan 3-month ARI intensity chu ni khat aia tawi record aṭangin, emaw ni tin value aṭanga scale Bung 2 kalphung hmangin chhut chhuak rawh, khawi nge tih sawiin.
  • (e) Climate factor hmang suh (Clause 8.4.3).

Table 8A.1 — Zone zela tui ṭhatna ruahtui tlak zat (layout)

Zone (Bung 2) Station emaw grid aiawhtu Record (kum) P_ret, Belhchian 2E (mm) P_3m (mm) P_wq = max (mm)
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______

Table 8A.2 — Duration zela 3-month ARI intensity (layout)

Zone 10 min (mm/h) 15 min (mm/h) 30 min (mm/h) 1 h (mm/h) 2 h (mm/h) 6 h (mm/h) 24 h (mm/h)
______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______

Belhchian 8B — Siam ṭhatna (redevelopment) LoS table leh treatment-train composite VR

Bung 8-a Clause 8.6.2 aṭanga 8.6.5 thleng a ṭanpui.

8B.1 Siam ṭhatna tana Level of Service mamawh

Buatsaih tur. He ṭhen hian siam ṭhatna site (site-a tui luh theih lohna hmun (impervious) awm mek 20% emaw a aia tam, Clause 8.6.2) tana Level of Service mamawh a pe ang. MARC/APWA BMP Manual (2012, Table 4.3) chuan siam ṭhatna LoS chu tihbuai area chhunga impervious cover percentage aṭangin a ruat; Mizoram value-te chu State Stormwater Technical Committee-in a ruat ang a, local siam ṭhatna case-te nena endik a ngai. A tlangzarh hma chuan, siam ṭhatna site tana LoS mamawh chu tihbuai area tan 6 a ni. Table 8.2, dinhmun awm mek aṭanga post-development thlenga CN danglamna-ah hman, chuan LoS sang zawk a pek chuan, chu LoS sang zawk chu hman a ni. He interim value hi he Kaihhruaina Bu-in a ruat a ni. Bung 4 hnuaia a WQv pum site-a khawl siam ṭhatna site chuan, pretreatment, hotspot control leh outfall (drain tui luan chhuahna) mamawh (Clause 8.4.4) bakah, chu area tan tihfaina dang a mamawh lo.

Table 8B.1 — Siam ṭhatna tana LoS mamawh (layout)

Tihbuai area chhunga impervious cover awm mek (%) Impervious cover danglamna LoS mamawh
______ ______ ______
______ ______ ______
______ ______ ______

8B.2 Composite Value Rating: area-weighted kalphung

Site composite VR chu site ṭhen tin chhawmtu BMP-te VR area-weighted chawhrual a ni (Clause 8.6.3):

VR_site = Σ (A_i × VR_i) / Σ A_i + VR_signage

hetah hian:

  • A_i = site ṭhen i zau zawng, ha;
  • VR_i = ṭhen i chhawmtu BMP Value Rating (Table 8.3), BMP chuan A_i pum tan Clause 8.6.4 a tlin chauhin chhiar a ni;
  • Σ A_i = site zau zawng pum: site ṭhen tin chu BMP pakhatah, emaw thing leh hnim pianpui humhalh (preserved native vegetation)-ah ruat a ni; BMP-in a chhawm loh ṭhen chu VR_i = 0 nen ziah a ni; leh
  • VR_signage = 0.25 mipui zirtirna signage a awm chuan (Table 8.3), a nih loh chuan 0.

VR_site ≥ LoS mamawh a nih chuan site chuan dan a zawm (Clause 8.6.3).

Entirna chauh — design value a ni lo. Site 1.0 ha, siam ṭhatna ni lo, ΔCN = 18. LoS mamawh = 8 (Table 8.2).

Table 8B.2 — Chhut dan entirna: composite VR (entirna)

Ṭhen Zau zawng A_i (ha) BMP VR_i (Table 8.3) A_i × VR_i
Bioretention-a luang in chung leh paving 0.60 Bioretention 8.5 5.100
Car park 0.25 Permeable pavement 7.5 1.875
Ramri zawh hmun humhalh 0.15 Thing leh hnim pianpui (humhalh) 9.25 1.388
A vaiin 1.00 8.363
  • Area-weighted VR = 8.363 / 1.00 = 8.36
  • Signage awm: + 0.25
  • VR_site = 8.61 ≥ 8. Site chuan dan a zawm.

Permeable pavement tel lovin (car park tihfai lova luang, VR = 0): (5.100 + 0 + 1.388) / 1.00 + 0.25 = 6.74 < 8. Site chuan dan a zawm lo ang.

8B.3 Treatment train

Buatsaih tur. He ṭhen hian BMP indawt (treatment train (tihfaina kalphung indawt)) composite VR a pe ang, MARC/APWA BMP Manual (2012, Table 4.6) kalphung zuiin, Clause 8.13.4 calibration programme (Belhchian 8C)-in Mizoram tan value a nemnghet turin. A tlangzarh hma chuan, site ṭhen tin chu chu ṭhen tan Clause 8.6.4 tlin train-a BMP pakhat VR, a tlangpuiin luan chhuah hma BMP hnuhnung ber, chhiar sak a ni a, BMP indawt tan credit belh a awm lo. Credit nei BMP chunglama pretreatment device, silt trap (leidip dawnna) leh oil-grit separator-te hian VR an nei hran lo (Clause 8.6.4(c), 8.7.11(c) leh 8.7.12(c)).

Table 8B.3 — Treatment train composite VR (layout)

BMP hmasa BMP pahnihna Composite VR Condition
______ ______ ______ ______
______ ______ ______ ______

Belhchian 8C — Mizoram BMP hnathawh calibration

Bung 8-a Clause 8.6.3, 8.13 leh 8.15.1 a ṭanpui.

Buatsaih tur. He belhchian hian State Stormwater Technical Committee BMP hnathawh calibration programme (Clause 8.13.4) a report ang: Mizoram-a BMP sak-te inflow leh outflow concentration leh tui zat tehte, leh chung aṭanga Value Rating siam ṭhat-te. Fûr hun (monsoon season) engemaw zat chhunga BMP-te ruah sur laia monitoring, CPCB kalphung anga laboratory analysis nen, leh Clause 10.17 hnuaia tlangzarh Clause 8.13.1-a outfall monitoring a mamawh. A tlangzarh hma chuan, Table 8.3-a Value Rating (MARC/APWA 2012) hman a ni a, proprietary device chuan test data finfiah aṭangin chauh VR a nei thei (Table 8.3).

A hnuaia ruangam-te hian programme-in a vawn tur record tlem ber a ruat, authority hrang hrang result-te an chawhkhawm theih nan.

Table 8C.1 — Monitoring site register (layout)

Site ID BMP chi (Table 8.3) Awmna leh authority Catchment (ruahtui luan khawmna hmun) zau zawng (ha) Impervious (%) Lei leh leihnuai tui dinhmun Hman ṭan ni Pretreatment
______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______

Table 8C.2 — Event record (layout; Clause 8.13.2 parameter-te)

Site ID Event ni Ruahtui tlak (mm) Inflow tui zat (m³) Outflow tui zat (m³) TSS lut / chhuak (mg/L) BOD lut / chhuak (mg/L) COD lut / chhuak (mg/L) Faecal coliform lut / chhuak (MPN/100 mL) TN lut / chhuak (mg/L) TP lut / chhuak (mg/L) Oil leh grease lut / chhuak (mg/L) Heavy metal (industrial catchment)
______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

Table 8C.3 — Hnathawh tlangpui leh VR rawt (layout)

BMP chi Site Event Tui zat tihtlem (%) Median effluent TSS (mg/L) Hmuh dang Table 8.3-a VR VR rawt
______ ______ ______ ______ ______ ______ ______ ______

Belhchian 8D — BMP design sheet, media specification, thing leh hnim tarlanna

Bung 8-a Clause 8.5, 8.7, 8.8 leh 8.11 a ṭanpui.

Design sheet tinin BMP pakhat tana Bung 8 mamawh-te a khawm. Clause 8.7.1-a "ṭan nana value rawt" tia chhinchhiah value-te chu chhan nen kalsan phal a ni. He Kaihhruaina Bu-in a ruat loh value-te chu "design-ah finfiah tur" tia chhinchhiah a ni; design siamtu chuan a sawi leh a chhan a pe tur a ni. BMP tinin heng hi a mamawh bawk: WQv emaw Q_wq tana size (Clause 8.6.4(a)), pretreatment (Clause 8.5.3), Q_wq aia tam tui luang tan bypass him (Clause 8.4.6) leh enkawlna kalna (maintenance access) (Bung 10).

8D.1 Design sheet

Table 8D.1 — Pretreatment (BMP zawng zawng)

Thil Mamawh Clause
A ngaihna Bioretention cell, infiltration facility, run-on dawng permeable pavement, wet pond leh constructed wetland zawng zawngah, inflow khawm tinah 8.5.3
Chi Sediment forebay, grass filter strip, silt trap emaw proprietary device 8.5.3
Size A ruahtui luang lut zau zawng WQv 10% tal a khawl; emaw Q_wq tan size (flow-through device) 8.5.3
Kalna (access) BMP ber luh emaw tihbuai lovin tihfai theih 8.5.4
Silt trap leh catch pit Paving nei lo lei aṭanga ruahtui luang (runoff) dawng inlet (luan lutna) tinah, leh BMP emaw tui awmna (waterbody)-a luang drain (tui luanna) tin inlet-ah; sump chu outlet invert aia 300 mm tal hniam; VR an nei lo 8.7.12

Table 8D.2 — Bioretention leh rain garden (Milem 8.2)

Thil Mamawh Clause
Ponding thuk zawng Mulch chunga ≤ 300 mm, ponding level sang berah overflow nen 8.7.2(a)
Ponding drawdown Darkar 48 chhungin 8.7.2(b)
Filter media 600–900 mm engineered sandy loam, fines tlem, phosphorus tlem (Table 8D.12) 8.7.2(c)
Mulch 50–75 mm 8.7.2(c)
Transition (choker) leh gravel drainage layer A ngai; thuk zawng leh grading chu design-ah finfiah tur 8.7.2(d)
Underdrain Perforated; design infiltration rate-in darkar 48 drawdown a tlin theih lohnaah, emaw lined a nihnaah a ngai; diameter chu design-ah finfiah tur 8.7.2(e)
Lining Clause 8.8 tlin theih lohnaah, leh hotspot-ah a ngai 8.7.2(f)
Thing leh hnim Pianpui emaw naturalise tawh, tui chiah leh ni ro rei tuar thei (Table 8D.13 leh 8D.14) 8.7.2(g)
VR 8.5 (rain garden / infiltration 9.0) Table 8.3

Table 8D.3 — Vegetated swale

Thil Mamawh Clause
Cross-section Trapezoidal emaw parabolic; side slope chu 1V:3H aia chhoh lo 8.7.3(a)
Longitudinal slope 0.5% aṭanga 4% thleng; a chhoh zawknaah check dam 8.7.3(b)
Q_wq-a tui luang Thuk zawng chu hnim sang zawng aia tam lo; velocity ≤ 0.3 m/s 8.7.3(c)
1% AEP emaw bypass flow Erosion a awm lo (Bung 9 permissible velocity) 8.7.3(d)
Underdrain nei ("dry") swale Slope < 1% emaw lei hnuai lam tui a luan chhuah ṭhat lohnaah; filter media Table 8D.12 angin 8.7.3(e)
VR 4.0 (native vegetation swale) Table 8.3

Table 8D.4 — Vegetated filter strip

Thil Mamawh Clause
Inflow Sheet flow chauh; tui khawm a lo thlennaah level spreader 8.7.4(a)
Tui luan zawnga a sei zawng ≥ 5 m 8.7.4(b)
Slope 1% aṭanga 8% thleng 8.7.4(b)
Hman dan Bioretention, infiltration leh swale tana pretreatment atan ber 8.7.4(c)
VR 5.0 Table 8.3

Table 8D.5 — Permeable pavement

Thil Mamawh Clause
Run-on Impervious run-on zau zawng ≤ 2 × permeable zau zawng; paving nei lo emaw erosion awmna aṭanga a awm lo 8.7.5(a)
Base reservoir Aggregate fai open-graded, a void-ah WQv a chanvo khawl; void ratio chu test-in nemnghet 8.7.5(b)
Open (infiltrating) base Clause 8.8 tlin a nihnaah chauh; a nih loh chuan underdrain nen lined a ni a, filtration chauh angin chhiar 8.7.5(c)
Structure Kawng authority standard anga traffic loading tan design 8.7.5(d)
Hman lohna Hotspot-ah hman loh; tui luh theih loh thil hmanga resurface a nih dawnnaah hman loh 8.7.5(e)
VR 7.5 Table 8.3

Table 8D.6 — Infiltration trench leh basin (Milem 8.3)

Thil Mamawh Clause
Pretreatment Engtik lai pawhin (Table 8D.1) 8.7.6(a)
Fill Aggregate fai sawp, void ratio test-in nemnghet; a sir leh a chungah geotextile; sand base 8.7.6(b)
Observation well Trench tin base thleng 8.7.6(c)
Khawlna WQv (emaw Bung 4 retention volume, a lian zawk chuan) void-ah khawl 8.7.6(d)
Drawdown Design infiltration rate-ah darkar 72 chhungin a ruak 8.7.6(d), 8.8.7
Overflow Lei chung level-ah, tui luanna system tenau emaw lian-ah 8.7.6(e)
Hman ṭanna (commissioning) Ruahtui luang lut zau zawng a nghet hma chu hman loh 8.7.6(f)
Tehna (criteria) Clause 8.8 zawng zawng (Table 8D.11) 8.8

Table 8D.7 — Wet pond (extended wet detention)

Thil Mamawh Clause
Permanent pool ≥ WQv 8.7.7(a)
Extended detention Pool chunga WQv, darkar 24–48 chhunga luan chhuah tir 8.7.7(a), 8.4.7
Forebay Inlet tinah 8.7.7(b)
Tui luan kawng Sei leh zau ratio ≥ 3:1; short-circuiting a awm lo 8.7.7(c)
Pool thuk zawng 1.0–2.5 m, safety bench nen (Clause 7.9.4) 8.7.7(d)
Tui inmilna (water balance) IMD ruahtui tlak leh pan evaporation hmanga thla tin inmilna: kum 10-a kum ro ber chhungin pool tui zat ≥ 50% vawn reng; leihnuai tui, in tur tui (potable water) emaw ek tui hmanga tihkhah loh 8.7.8
Tuilian detention Bung 4 detention chu extended detention level chungah a awm thei 8.7.7(f)
VR 5.0 Table 8.3

Table 8D.8 — Constructed wetland

Thil Mamawh Clause
Ruangam Inlet sedimentation pond (forebay), a hnuah macrophyte zone thuk lo 8.7.9(a)
Extended detention Tui sang zawng pangngai chunga WQv, darkar 24–48 chhunga luan chhuah tir; thuk zawng ≤ 0.5 m 8.7.9(b)
Tui luan kawng Sei leh zau ratio ≥ 3:1; tui luan kawng kal tlangin zone thuk 8.7.9(c)
Bypass Tuilianin macrophyte zone a kaih chhiat loh nan high-flow bypass 8.7.9(d)
Dil (tank) inlet-ah Dil setback (tui kam aṭanga hmun kalhlen tur) chhungah, a tui zau zawng (waterspread) pawnah; dil khawlna angin chhiar loh 8.7.9(e)
Tui inmilna Wet pond ang (wetland thuk zawng tlem ber vawn reng) 8.7.8
VR 7.0 (extended detention wetland) Table 8.3

Table 8D.9 — Gross pollutant trap leh outfall screen

Thil Mamawh Clause
Tihfai tur tui luang Q_wq; 1% AEP thleng tui luang zawng zawng chu thil man tawh sawp chhuak lovin a kal tlang 8.7.10(a)
Man theih size 5 mm vel thleng 8.7.10(b)
Head loss Drain HGL-ah (Bung 9), screen 50% tihtawp 8.7.10(c), 8.10.3(a)
Khawlna O&M tihfai inkar hun tan; thla 3 zela tihfai aia tlem lo 8.7.10(d)
Kalna (access) Suction emaw grab-a tihfai nan motor kalna; tihfaina platform him 8.7.10(e), 8.10.3(d)
Screen tihtawp Screen tawp vekin in leh ram tuilianin a chim loh nan overflow emaw bypass kawng 8.10.3(b)
Bar inkar Hlauhawmna (hazard) azirin thlan: bawlhhlawh man nan hnai zawk, tihtawpin tuilian a thlen theihnaah zau zawk; design-ah finfiah tur 8.10.3(c)

Table 8D.10 — Oil-grit separator

Thil Mamawh Clause
Awmna Fuel station; motor siamna leh sawpna; bus leh truck depot; motor dah hmun 50 aia tam nei parking area 8.7.11(a)
Size Q_wq, high-flow bypass nen 8.7.11(b)
A mal chauhin hman loh Site-in VR 5 aia sang a mamawh chuan filtering BMP-in a zui; hotspot-ah infiltration reng reng hmaah lined filtering BMP 8.7.11(c), 8.8.8

Table 8D.11 — Infiltration leh recharge tehna (infiltrating BMP zawng zawng)

Thil Mamawh Clause
Leihnuai tui inhlatna Hun bik-a leihnuai tui sang ber chu base hnuaia ≥ 1.0 m (notify (Gazette-a tarlan) coastal sand-a in chung tui chauh: mounding endikna nen ≥ 0.5 m, mound chu base hnuaia ≥ 0.3 m) 8.8.1, 8.8.9(d)
Lungpui (bedrock) emaw tui luh theih loh layer Base chu a chungah ≥ 1.0 m, Clause 8.8.10 hnuaia lungpui aquifer recharge atana design a nih loh chuan 8.8.2
Test Basin, bioretention, permeable pavement tan double-ring (ASTM D3385); trench, soakaway, pit, well tan falling-head borehole emaw trial-pit soakage (entirnan BRE Digest 365); facility tinah ≥ 2 leh base 100 m² tinah emaw trench 50 m tinah ≥ 1; Form 8-2 8.8.3
Design rate Teh rate ÷ 2.0 (test-in 8.8.3(c) a tlin a, factor 2 aia tam a danglam loh chuan), a nih loh chuan ÷ 3.0 8.8.4
Rate tlem ber Full infiltration ≥ 13 mm/h; partial 3–13 mm/h, underdrain nen, darkar 72 chhunga lei-a lut tui zat tan chauh credit; < 3 mm/h credit a awm lo 8.8.5
Setback (paving chung aṭanga ruahtui luang) Foundation 3 m, basement 5 m; ram ri (property boundary) 1.5 m; in tur tui well emaw borewell 30 m; septic tank emaw soak pit 15 m; 1V:3H aia chhoh tlang pang chhip 6 m 8.8.6
Expansive soil Foundation setback let hnih 8.8.11(b)
Drawdown Design rate-ah darkar 72 chhungin a ruak; sak zawh hnuah test 8.8.7
Hotspot Tihfai lovin infiltration a awm lo; bawlhhlawh paihna leh lei bawlhhlawh (contaminated land)-ah engmah a awm lo 8.8.8
Kawng ruahtui luang Well, borewell emaw recharge shaft-ah engtikah mah luan lut nghal tir loh 8.11.3(b)

8D.2 Bioretention drawdown endikna

Darkar 48 ponding drawdown (Clause 8.7.2(b)) leh Clause 8.8.5-a rate tlem ber-te hian cell-in underdrain a mamawh em tih an thutlukpui.

  • Ponding thuk zawng sang ber darkar 48-a luan chhuah nana rate mamawh = 300 mm / 48 h = 6.25 mm/h.
  • Design rate ≥ 13 mm/h: full infiltration, underdrain a ngai lo, Clause 8.8 a tlin chuan.
  • Design rate 6.25 mm/h aṭanga 13 mm/h thleng: ponding chu a hun takah a ruak, mahse Clause 8.8.5(b) a hman a, chuvangin underdrain a ngai.
  • Design rate 6.25 mm/h aia hniam: infiltration-in darkar 48-ah ponding a ruak thei lo; underdrain a ngai (Clause 8.7.2(e)), leh 3 mm/h hnuaiah infiltration credit pek a ni lo.

Entirna chauh — design value a ni lo. Cell rawt base-a test pahnih chuan 30 mm/h leh 22 mm/h a pe. Result pahnih chu factor 30 / 22 = 1.36-in an danglam a, chu chu 2 aia tam a ni lo, leh test zat chuan Clause 8.8.3(c) a tlin, chuvangin safety factor chu 2.0 a ni. Result hniam zawk lain, design rate = 22 / 2.0 = 11 mm/h. Hei hi 6.25 mm/h aia sang a ni a, chuvangin ponding chu 300 / 11 = 27 h-ah a ruak, darkar 48 chhungin. 13 mm/h aia hniam a ni a, chuvangin cell hi underdrain nei partial-infiltration design a ni (Clause 8.8.5(b)).

8D.3 Filter media specification

Table 8D.12 — Bioretention filter media leh layer-te

Layer Bung 8 mamawh Design-a finfiah tur value
Mulch 50–75 mm (Clause 8.7.2(c)); thing sak tihsawm emaw organic mulch ang chi, ponding thuk zawngah a lang chhuak lo Thil leh a hnar
Filter media 600–900 mm engineered sandy loam, fines tlem leh phosphorus tlem (Clause 8.7.2(c)) Particle size grading; fines (silt + clay) chin; organic matter zat; phosphorus chin; media tihkhauh saturated hydraulic conductivity; batch tin hnar leh test certificate
Transition (choker) layer Media leh gravel inkarah, media gravel-a a luan luh loh nan (Clause 8.7.2(d)) Thuk zawng leh grading, media leh gravel nena inmil
Gravel drainage layer Transition layer hnuaiah, underdrain hual vel (Clause 8.7.2(d)) Thuk zawng, grading, sawp
Underdrain Clause 8.7.2(e) a hman chuan perforated pipe, cleanout nen Diameter, slope, perforation, outlet level
Liner Clause 8.7.2(f) a hman chuan (Clause 8.8 a tlin thei lo; hotspot) Liner chi leh a venhimna

Media chu dah hmain test tur a ni a, nasa taka tihkhauh lovin layer zelin dah tur a ni. State Stormwater Technical Committee chuan he belhchian a endik hunah grading, fines, organic matter leh phosphorus tan number chin, sand leh compost hnar local nen, a ruat a ṭha.

8D.4 Thing leh hnim tarlanna

He Kaihhruaina Bu zirchianna hunah ruahtui BMP tana thing leh hnim phun chungchang Mizoram thu hnar hmuh a ni lo, leh thu hnar chhiar zinga pakhatin mah State-a bioretention, swale, filter strip emaw constructed wetland-a hman tur thing leh hnim pianpui a sawi lo. Chuvangin he belhchian hian Mizoram tan thing leh hnim chi engmah a tarlang lo, leh Mizo thing leh hnim hming a pe lo, State dang tana buatsaih tarlanna lak chhawn emaw local hming siam chawp aiin. State Stormwater Technical Committee-in tarlanna a chhuah hma chuan, BMP tin tana thing leh hnim chi chu horticulturist emaw EF&CC-in, site-a Belhchian 2A sub-area, a sanzawng (altitude), a lei leh a leihnuai tui sang zawng (water table) azirin, heng dan (he Kaihhruaina Bu-in a ruat) hnuaiah thlan leh BMP design sheet-ah chhinchhiah tur a ni:

  • (a) Thing leh hnim pianpui emaw rei tawha naturalise chauh, EF&CC-in site tan a nemnghet angin; Table 8D.15-a sawi emaw State-ah invasive (darh chak) tia hriat reng reng a awm tur a ni lo.
  • (b) Lei hnawng leh lei ro. April ni 1 aṭanga October ni 31 thleng hun chhunga lei tui chiah tuar thei, leh a nghet tawh hnuah tui pek lovin December aṭanga March thleng thla ro chhunga nung thei chi.
  • (c) Tlang pang. Tlang chhip leh an tlang pang-ah, terrace (tlang panga hmun zawl siam), kam, lei laih pang (cut slope) leh lui kam-a lei kaih ngheh nan thlan hmasak chi; tlang panga bioretention chu lined a ni (Clause 8.8.1).
  • (d) Tui luanna kawngah phun loh. Lui bed emaw kam-ah, emaw embankment-ah, a enkawltu (custodian) (Aizawl Municipal Corporation, IWRD, EF&CC, Village Council emaw District Council, a nih dan azirin) remtihna tel lovin phun loh tur a ni a, channel, terrace swale, interceptor drain (cut chung lama ruahtui dangtu drain) emaw dil outlet tui luang dangtu tur pawh phun loh tur a ni.
  • (e) Tui awmna leh an catchment-ah phun loh. He belhchian hnuaiah dil, tuikhur emaw a catchment humhalh-ah, emaw Palak Dil-ah phun loh tur a ni; Palak Dil thing leh hnim chu a enkawltu-in Bung 7 hnuaiah a enkawl.

Table 8D.13 — Bioretention, swale leh filter strip tana thing leh hnim kawhhmuhna

Hman dan Botanical hming Local hming Hriat tur
Clause 8.7-a BMP zawng zawng He draft-ah Mizoram tan tarlan a awm lo — A chunga dan (a) aṭanga (e) thleng hnuaia thlan leh BMP design sheet (Belhchian 8D)-a chhinchhiah

Table 8D.14 — Constructed wetland leh wet pond tana thing leh hnim kawhhmuhna

Zone Botanical hming Local hming Hriat tur
Zone zawng zawng He draft-ah Mizoram tan tarlan a awm lo — A chunga dan (a) aṭanga (e) thleng hnuaia thlan; constructed wetland chu tui awmna pangngai reng reng tui zau zawng (waterspread) pawnah sak a ni (Clause 8.7.9(e))

Table 8D.15 — Phun loh tur thing leh hnim chi

Botanical hming Local hming A chhan
EF&CC-in Mizoram-a invasive anga a tarlan chi reng reng — He Kaihhruaina Bu tan Mizoram invasive chi tarlanna reng reng chhiar a ni lo [TBC]

Belhchian 8E — Erosion leh sediment control standard detail

Bung 8-a Clause 8.12 a ṭanpui.

A hnuaia detail-te hian hmalakna tin ruangam a lantir. He Kaihhruaina Bu-in a ruat zat (dimension)-te pek a ni. He Kaihhruaina Bu-in a ruat loh zat-te chu "design-ah finfiah tur" tia chhinchhiah a ni a, ESC plan-ah lantir tur a ni (Clause 8.12.1). Hmalakna rei lo (temporary measure)-te chu Bung 2 ruahtui tlak leh climate factor 1.0 hmangin design a ni (Clause 8.12.4).

Table 8E.1 — Hmalakna thlan dan (Clause 8.12.3)

Dinhmun Hmalakna Detail
Tihbuai area aṭanga luang chhuak sheet flow, a tlang pang hnuai lam kam zawh Silt fence Milem 8E.1
Tihbuai area 2 ha thleng aṭanga tui luang khawm Sediment trap Milem 8E.2
Tihbuai area 2 ha aia tam Surface dewatering outlet nei sediment basin Milem 8E.2
Site ruahtui luang dawng drain (tui luanna) inlet awm mek Inlet protection Milem 8E.4
Public kawng-a motor chhuahna Wheel washing nena stabilised construction exit Milem 8E.3
Lei leh thil chhawp (stockpile) Tui awmna setback (tui kam aṭanga hmun kalhlen tur) reng reng Zone 1 pawnah; drain reng reng aṭanga ≥ 10 m; fûr hunah khuh Milem 8E.1 hriat tur
Dewatering Sediment basin, settling tank emaw filter bag kal tlangin; drain emaw tui awmna-ah pump luh nghal engtikah mah loh Milem 8E.2 hriat tur
Concrete washout Lined pit; drain-ah engtikah mah loh Milem 8E.3 hriat tur

8E.1 Silt fence

Silt fence (cross-section leh plan, scale ang a ni lo) Silt fence (cross-section leh plan, scale ang a ni lo) Cross-section Plan sheet flow tihbuai area tlang pang chung lam sir-ah geotextile post a hnuai kam anchor trench-a phum, lei vur leh tihkhauh bal man: fence sang zawng chanve a thlenin la chhuak Fence sang zawng, post inkar, trench zau zawng leh thuk zawng: design-ah finfiah tur contour tihbuai area contour zawha fence a tawp-te tlang pang chung lamah hawi stockpile, Zone 1 pawnah, fûr hunah khuh drain ≥ 10 m Kar tin leh ruahpui hnu darkar 24 chhungin endik; darkar 48 chhungin siam ṭha (Clause 8.12.5). Fence tin tui luang lut area: Belhchian 8E (buatsaih tur).

Milem 8E.1 — Silt fence: post-a geotextile, a hnuai kam chu tlang pang chung lam sir anchor trench-a phum, lantirna cross-section, leh a tawp-ah kir (return) nena contour zawha fence lantirna plan. He Kaihhruaina Bu-in a ruat loh zat-te chu design-ah finfiah tur a ni. He Kaihhruaina Bu tana milem siam thar, US EPA, NPDES Construction General Permit (2022), leh CIRIA, The SuDS Manual (C753), 2015 aṭanga siam danglam.

Buatsaih tur. Clause 8.12.3(a) hian silt fence tinah tui luang lut theih area chin tan he belhchian a kawhhmuh. Chu chin, leh fence chunga tlang pang sei zawng sang ber chu, Mizoram ruahtui tlak tan State Stormwater Technical Committee-in a ruat a ngai. An tlangzarh hma chuan, US hmanna pangngai aṭanga lak heng interim chin-te hi hman a ni (US EPA, Stormwater Best Management Practice fact sheet: Silt Fence):

  • tui luang lut area: fence 30 m tinah 0.1 ha aia tam lo;
  • fence chunga tlang pang sei zawng: tlang pang 2% hnuaiah 30 m, 2–5%-ah 23 m, 5–10%-ah 15 m, 10–20%-ah 8 m leh 20% aia chhoh-ah 5 m aia tam lo;
  • tui luang khawm a lo thlennaah emaw, chin pakhat tlin theih a nih lohnaah, a aiah sediment trap (Milem 8E.2) hman a ni.

Design siamtu (designer) chuan fence tinin a chhawm tui luang lut area leh tlang pang sei zawng chu ESC plan-ah a lantir tur a ni.

Hriat tur:

  1. Tihbuai area tlang pang hnuai lam kam-ah contour zawhin dah rawh, tui luang khawm kawng kal tlangin engtikah mah dah suh.
  2. A tawp-te chu tlang pang chung lamah hawitir rawh, tuiin a hual luan loh nan.
  3. Kar tin leh ruahpui tin hnu darkar 24 chhungin endik rawh; darkar 48 chhungin siam ṭha rawh; bal (sediment) chu fence sang zawng chanve a thlen hunah la chhuak rawh (Clause 8.12.5).
  4. A chunga tui luang lut area a nghet hnu chauhin la chhuak rawh (Clause 8.12.6).
  5. Lei leh thil chhawp: Zone 1 pawnah, drain reng reng aṭanga 10 m tal, leh fûr hun chhungin khuh (Clause 8.12.3(f)).

8E.2 Sediment trap leh sediment basin

Surface dewatering outlet nei sediment basin (cross-section, scale ang a ni lo) Surface dewatering outlet nei sediment basin (cross-section, scale ang a ni lo) bal-in a chanve a khah hunah laih chhuak bal tla khawm tihbuai area aṭanga tui luang lut outlet hnuaia khawlna ≥ kum 2 darkar 24 ruahtui luang leh tui luang lut hectare tinah 250 m³ zinga a lian zawk surface (skimmer) outlet-in pool chung aṭangin tui a la embankment kal tlang outlet pipe emergency spillway: level leh capacity design-ah finfiah tur embankment outlet tihnghet Sediment trap: tihbuai area 2 ha thleng. Sediment basin: 2 ha aia tam (Clause 8.12.3(b), (c)). Design ruahtui tlak chu Bung 2 aṭangin, climate factor 1.0 nen (Clause 8.12.4). Lei laih dewatering chu basin, settling tank emaw filter bag kal tlangin a kal.

Milem 8E.2 — Sediment trap emaw basin cross-section: inflow, outlet hnuaia khawl tui zat, pool chung aṭanga tui la surface dewatering outlet (skimmer), emergency spillway, leh khawl tui zat chanve-a bal laih chhuah level. He Kaihhruaina Bu tana milem siam thar, US EPA, NPDES Construction General Permit (2022) aṭanga siam danglam.

Hriat tur:

  1. Sediment trap: tihbuai area 2 ha thleng aṭanga tui luang khawm tan (Clause 8.12.3(b)). Khawl tui zat, thuk zawng leh outlet: design-ah finfiah tur.
  2. Sediment basin: tihbuai area 2 ha aia tam tan. Outlet hnuaia khawlna ≥ (a) 50% AEP (kum 2) darkar 24 ruahpui ruahtui luang leh (b) tui luang lut area hectare tinah 250 m³ zinga a lian zawk (Clause 8.12.3(c)).
  3. Dewatering outlet chuan chung lam aṭangin tui a la (Clause 8.12.3(c)).
  4. Emergency spillway leh a capacity: design-ah finfiah tur. Basin hi detention facility nghet a nih bawk chuan, Bung 4 spillway dan-te hman a ni.
  5. Bal-in a chanve a khah hunah laih chhuak rawh (Clause 8.12.5). Facility nghet reng reng chu a as-built survey hmain bal la chhuak rawh (Clause 8.12.6).
  6. Lei laih (excavation) dewatering chu sediment basin, settling tank emaw filter bag kal tlangin a kal tur a ni (Clause 8.12.3(g)).

Entirna chauh — design value a ni lo. Sediment basin chuan tihbuai ram 3.0 ha a chhawm. Kum 2 darkar 24 ruahtui tlak 100 mm (climate factor 1.0, Clause 8.12.4) leh Bung 2 antecedent moisture condition hnuaia lei ruak tihkhauh tan curve number 86 ngai ta ila.

  • S = 25,400 / 86 − 254 = 41.35 mm; Ia = 0.2S = 8.27 mm
  • Q = (P − Ia)² / (P − Ia + S) = (100 − 8.27)² / (100 − 8.27 + 41.35) = 8,414 / 133.08 = 63.2 mm
  • (a) Ruahtui luang tui zat = 10 × Q × A = 10 × 63.2 × 3.0 = 1,896 m³
  • (b) 250 m³/ha × 3.0 ha = 750 m³
  • Outlet hnuaia khawlna mamawh = max (1,896, 750) = 1,896 m³. Hetah chuan kum 2 ruahtui luang hian a thunun.

8E.3 Stabilised construction exit leh concrete washout

Stabilised construction exit leh concrete washout (plan leh cross-section, scale ang a ni lo) Stabilised construction exit leh concrete washout (plan leh cross-section, scale ang a ni lo) Plan sakna site public kawng motor-in site an chhuahsan geotextile chunga aggregate lian pad sei zawng, zau zawng, thuk zawng: design-ah finfiah tur wheel-wash bay sawpna tui sediment trap-ah sediment trap concrete washout: lined pit, drain-ah engtikah mah ni lo drain inlet venhim (Milem 8E.4) A A Cross-section A–A aggregate geotextile subgrade Clause 8.12.3(e) leh (h). Ni tin hna tawpah public kawnga bal kal pawh chu hrut fai rawh.

Milem 8E.3 — Stabilised construction exit: site leh public kawng inkara geotextile chunga aggregate lian pad, sediment trap-a luang wheel-wash bay, leh lined concrete washout pit lantirna plan leh cross-section. He Kaihhruaina Bu-in a ruat loh zat-te chu design-ah finfiah tur a ni. He Kaihhruaina Bu tana milem siam thar, US EPA, NPDES Construction General Permit (2022) aṭanga siam danglam.

Hriat tur:

  1. Motor-in site an chhuahsan a public kawng an luhna hmun tinah, wheel washing nen, siam rawh (Clause 8.12.3(e)).
  2. Pad sei zawng, zau zawng, thuk zawng leh aggregate size: design-ah finfiah tur.
  3. Sawpna tui chu sediment trap emaw basin-ah a luang a, drain-ah engtikah mah a luang lo.
  4. Concrete washout chu lined pit-ah, drain-ah engtikah mah ni lovin (Clause 8.12.3(h)).
  5. Ni tin hna tawpah public kawnga bal kal pawh chu hrut fai rawh.

8E.4 Inlet protection

Drain inlet protection (cross-section leh plan, scale ang a ni lo) Drain inlet protection (cross-section leh plan, scale ang a ni lo) Cross-section Plan drain awm sa bal nei site ruahtui luang inlet-ah a luang liam tui tlin a san hunah tui tlin chuan bal a tla tir filter barrier: a chi lehsang zawng: design-ahfinfiah tur grate kawng kerb kawng grate hual vela barrier overflow chu kawng zawhin, in leh ram lam ni lovin Clause 8.12.3(d). Ruahpui thil thleng tin hnuah bal la chhuak rawh (Clause 8.12.5). Humhalhna hian inlet a khap loh ngei ngei tur a ni.

Milem 8E.4 — Drain inlet awm mek-a inlet protection: grate emaw kerb inlet hual vela filter barrier, tui tlin (ponding)-in kawng emaw in leh ram a chim loh nan overflow kawng nen. He Kaihhruaina Bu tana milem siam thar, US EPA, NPDES Construction General Permit (2022), leh CIRIA, The SuDS Manual (C753), 2015 aṭanga siam danglam.

Hriat tur:

  1. Site aṭanga ruahtui luang dawng drain inlet awm mek tinah (Clause 8.12.3(d)).
  2. Protection hian inlet a tihtawp tur a ni lo: a hnunga tui tlin chu inlet-ah emaw kawng zawhin a liam thei ngei ngei tur a ni.
  3. Barrier chi leh sang zawng: design-ah finfiah tur.
  4. Ruahpui tin hnuah bal la chhuak rawh (Clause 8.12.5).

8E.5 Hun leh endikna

Table 8E.2 — ESC hun leh endikna (Clause 8.12.2 leh 8.12.5)

Thil Mamawh
Lei hna zawh tawh March ni 31 hmain thing leh hnim, mulch, matting emaw paving hmangin tihnghet
April ni 1 leh October ni 31 inkara ram thing hnim tihfai Tihfai hmain sediment control dah
Fûr hunah area hawng A theih chin chinah tê
Endikna Kar tin, leh ruahpui tin hnu darkar 24 chhungin (Bung 10)
Siam ṭhatna Darkar 48 chhungin
Tihfaina Bal-in a chanve a khah hunah
Lak chhuahna Hmalakna-a tui luang lut area a nghet hnu chauhin

Form 8-1 — Tui Ṭhatna Sheet

Bung 8-a Clause 8.4, 8.6 leh 8.14 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0.

Table 8F.1 — Form 8-1, Section A: Site leh ruahtui tlak

No. Field Ziah luh tur Clause
A1 Project hming leh Authority file number ______ —
A2 Tier (A / B) leh site zau zawng, ha ______ 8.6.1
A3 Ruahtui zone (Bung 2) ______ 8.4.1
A4 P_ret, mm (Belhchian 2E) ______ 8.4.1
A5 P_3m, mm (Belhchian 8A, emaw interim chhutna: record, kum, kalphung) ______ 8.4.1
A6 P_wq = max (P_ret, P_3m), mm (climate factor tel lo) ______ 8.4.1, 8.4.3
A7 WQv kalphung: SCS-CN, emaw Rv (site < 0.5 ha leh Tier B simplified method chauh) ______ 8.4.2
A8 Siam ṭhatna (redevelopment) (impervious awm mek ≥ 20%)? ______ 8.6.2

Table 8F.2 — Form 8-1, Section B: Drainage area zela tui ṭhatna tui zat leh tui luang

Area ID Zau zawng (ha) Impervious I (%) Q_wq ruahtui luang thuk zawng (mm) emaw Rv WQv (m³) Q_wq (m³/s) Tui zat khawl, Bung 4 (m³) WQv khawl loh (m³) Area chhawmtu BMP Pretreatment
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
A vaiin ______ ______ ______ ______

Table 8F.3 — Form 8-1, Section C: Level of Service leh Value Rating (Tier A)

No. Field Ziah luh tur Clause
C1 Pre-development CN; post-development CN; ΔCN ______ 8.6.2
C2 LoS mamawh (Table 8.2, emaw siam ṭhatna tan Belhchian 8B) ______ 8.6.2
C3 Composite VR (Belhchian 8B chhutna belh) ______ 8.6.3
C4 Composite VR ≥ LoS mamawh? ______ 8.6.3
C5 Tier B: Clause 8.6.5 hnuaia route hman (a) site-a khawl / (b) bioretention, rain garden emaw infiltration ______ 8.6.5

Table 8F.4 — Form 8-1, Section D: Thehluh tur dangte (Clause 8.14)

No. Thil Belh (aw / aih / a huam lo) Clause
D1 Clause 8.7 leh Belhchian 8D anga BMP design, pretreatment nen ______ 8.14(3)
D2 Infiltration Test Record (Form 8-2), hun bik-a leihnuai tui sang ber level leh a hnar, design rate, drawdown time, setback ______ 8.14(4)
D3 Ek tui (sewage) leh in chhunga tui bal (sullage) inzawmna plan; dye emaw smoke test record ______ 8.9.2, 8.14(5)
D4 Tui awmna-a outfall reng reng tan GPT leh first-flush (ruah tlak hmasa ber tui bal) design ______ 8.10, 8.14(6)
D5 Ruahtui khawl khawm, recharge leh detention hrang taka lantirtu RWH ruangam ______ 8.11, 8.14(7)
D6 ESC plan ______ 8.12, 8.14(8)
D7 Hotspot control, Clause 8.8.8 a hman chuan ______ 8.8.8

Table 8F.5 — Form 8-1, Section E: Buatsaihtu

Field Ziah luh tur
Hming, registration leh empanelment number (Clause 10.6) ______
Signature leh ni ______

Form 8-2 — Infiltration Test Record

Bung 8-a Clause 8.8.1 aṭanga 8.8.7 thleng leh 8.11.4 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Facility tin tan record pakhat. Test hmunte lantirna plan leh test tin chhiar (reading) belh rawh.

Table 8F.6 — Form 8-2, Section A: Facility

No. Field Ziah luh tur Clause
A1 Project leh facility ID; facility chi ______ 8.8.3
A2 Infiltration base zau zawng (m²) emaw trench sei zawng (m) ______ 8.8.3(c)
A3 Facility base level rawt, m (datum) ______ 8.8.3
A4 Ruahtui luang hnar: in chung chauh / paving / a pawlh; hotspot (aw / aih) ______ 8.8.6, 8.8.8
A5 Lei dinhmun: sandy coastal / laterite emaw lung khauh / delta clay emaw black cotton / a dang ______ 8.8.9–8.8.11

Table 8F.7 — Form 8-2, Section B: Test

Test no. Awmna (grid ref.) Ni Kalphung: double-ring (ASTM D3385) / falling-head borehole emaw trial-pit soakage (entirnan BRE Digest 365) Test level, m Test hunlaia leihnuai tui level, m Teh rate (mm/h)
1 ______ ______ ______ ______ ______ ______
2 ______ ______ ______ ______ ______ ______
3 ______ ______ ______ ______ ______ ______

Test zat tlem ber: facility tinah 2, leh base area 100 m² tinah emaw trench 50 m tinah 1 (Clause 8.8.3(c)).

Table 8F.8 — Form 8-2, Section C: Design rate leh drawdown

No. Thil Ziah luh tur Clause
C1 Test siam zat; mamawh zat ______ 8.8.3(c)
C2 Teh rate sang ber leh hniam ber; ratio (sang ber ÷ hniam ber) ______ 8.8.4
C3 Safety factor: 2.0 (test-in 8.8.3(c) a tlin a, ratio ≤ 2) emaw 3.0 ______ 8.8.4
C4 Design rate = teh rate hman ÷ safety factor, mm/h (teh rate khawi nge hman tih sawi rawh) ______ 8.8.4
C5 Category: ≥ 13 mm/h full infiltration / 3–13 mm/h partial, underdrain nen / < 3 mm/h credit awm lo ______ 8.8.5
C6 Lei-a luh tur tui thuk zawng, mm; drawdown time = thuk zawng ÷ design rate, h (≤ 72 h) ______ 8.8.7

Table 8F.9 — Form 8-2, Section D: Inhlatna leh setback

No. Thil Ziah luh tur Clause
D1 Hun bik-a leihnuai tui sang ber level, m, leh a hnar (Clause 3.10.2) ______ 8.8.1
D2 Facility base aṭanga hun bik-a leihnuai tui sang ber inhlatna, m (≥ 1.0; notify coastal sand-a in chung tui chauh tan mounding endikna nen ≥ 0.5) ______ 8.8.1, 8.8.9(d)
D3 Base hnuaia lungpui emaw tui luh theih loh layer thuk zawng, m (Clause 8.8.10 a nih loh chuan ≥ 1.0) ______ 8.8.2
D4 Hlatna: foundation / basement / ram ri / in tur tui well emaw borewell / septic tank emaw soak pit / 1V:3H aia chhoh tlang pang chhip, m ______ 8.8.6
D5 Expansive soil: foundation setback let hnih em? ______ 8.8.11(b)

Table 8F.10 — Form 8-2, Section E: Puanchhuahna

Field Ziah luh tur
Testtu: hming, geotechnical testing thiamna, hnathawhna pawl (organisation) ______
Kei hian test-te hi hmun leh level sawi-ah, kalphung sawi hmangin siam a ni a, chhiar (reading) belh-te hi a kim a ni tih ka nemnghet e. Signature leh ni ______
Design siamtu (Clause 10.6): hming leh signature ______