NEER-in a buatsaih Draft v1.0 a ni. Mizoram sawrkar, District Council, Village Council, authority emaw local body emaw reng rengin pawm a ni lo a, dan anga thuneihna a nei lo. He draft chungchang

Bung 10 belhchianThehluh tur, Endikna, Kalpui leh Enkawl, leh Dan Zawm Tirna

Heng belhchiante hian Bung 10 an ṭanpui. Compliance calculator (dan zawm endikna chhutna) specification leh a hman dan kaihhruaina (user guide) ruangam, GIS data specification, he Kaihhruaina Bu-in a ruat enkawlna atana luhna (maintenance access) zau zawng, facility chi tin tana O&M plan (kalpui leh enkawl plan) entawn tur, empanelment (thiamna list-a dah luhna) criteria entawn tur, leh Bung 10-in a phut form pariatte an pe. Design Ruahtui Tlak Sheet (Form 2-1) chu Bung 2 belhchian-ah a awm. Form-te hi draft form an ni. Entirna thuziak-te hi competent authority ngaihtuah tur a ni a, hman a ni lo.


Belhchian 10A — Compliance calculator leh a hman dan kaihhruaina

Bung 10-a Clause 10.4.1(g), 10.5 leh 10.9.1(b) a ṭanpui.

Dinhmun. Compliance calculator hi a la awm lo. Clause 10.5.1-in State Stormwater Technical Committee chu a chhuah tur leh a enkawl turin a phut. He belhchian hi calculator-in a tlin tur specification leh a hman dan kaihhruaina ruangam a ni. Calculator chhuah a nih hma chu, design siamtu (designer) chuan Bung 4, 5 leh 8 chhutna aṭangin Form 10-2 chu kutin a ziah khah a, calculator version-ah "chhuah a ni lo" ("not issued") tiin a ziak a, chhutna-te chu a belh ang.

10A.1 Mamawh tlangpui

Calculator chu:

  • (a) spreadsheet emaw web tool a ni tur a ni, a hman dan kaihhruaina leh a chhunga table tin hnar nen, man nei lovin tlangzarh a ni tur a ni (Clause 10.5.4);
  • (b) output phêk tin leh file export tinah a version number leh a chhuah ni a chhut tur a ni (Clause 10.5.3);
  • (c) mipui hmuh theih version log a vawng tur a ni. Version thar chu a chhuah aṭanga thla 6 hnuah thehluh tur (submittal) thar-ah hman a ni ang; thehluh tur pakhat chuan Stage 1 aṭanga Stage 4 thleng version pakhat a hmang reng ang, dilna thehluhtu (Applicant)-in version thar zawk a thlan loh chuan (Clause 10.5.3);
  • (d) site pakhat zelin a hnathawk tur a ni, drainage area pakhat emaw a aia tam nen, pakhat zelin amah outfall (drain tui luan chhuahna) ngeiah a luang (Clause 4.5.1.3);
  • (e) he Kaihhruaina Bu-in a tlangzarh loh value a hmang ngai loh tur a ni. A mamawh table chhuah a nih loh chuan (entirnan Belhchian 4B-a Table 4.3, emaw Belhchian 1C-a S-2 discharge table-te), calculator chuan value chhut thlap lovin chu route chu "hman theih a ni lo" ("not available") tiin a lantir tur a ni; leh
  • (f) a input leh result-te chu Form 10-2 bakah computer-in a chhiar theih file (CSV emaw JSON) angin a export tur a ni, chutiang chuan Authority (phalna petu Authority)-in facility register-ah a dah lut thei ang (Clause 10.17.1(b)).

10A.2 Input-te

Table 10A.1 — Calculator input-te

No. Input Unit Hnar
I1 Authority, tier (A emaw B) leh file number — Clause 1.6
I2 Site zau zawng; lei tihbuai (land disturbance) zau zawng ha Clause 1.5.2
I3 Tui luh theih lohna hmun (impervious) thar; tui luh theih lohna hmun thlak; tihchhiat hma-a tui luh theih lohna hmun awm mek m² Clause 1.5.2, 1.5.6, 4.5.6.1
I4 Hmasawnna hna (development) chi: thar, siam ṭhatna (redevelopment), linear public work, in pakhat chauh — Clause 1.5.6–1.5.8
I5 Tuilian hlauhawm catchment (ruahtui luan khawmna hmun) (aw / aih), leh phalna pek BSMP nei basin (aw / aih) — Clause 4.5.3, 4.13, 11.12
I6 Ruahtui zone — Belhchian 2A
I7 Retention (ruahtui khawl reng, hman nan emaw lei-a luh tir nan emaw) thuk zawng P_R; thla 3 ARI darkar 24 zat P_3m mm Belhchian 2E, 8A
I8 Duration (1–72 h) leh AEP zela design ruahtui tlak zat, climate factor nen, Form 2-1-a ziak angin mm Clause 2.5, 2.8, 2.13
I9 Minute 15 ruahtui tlak chakna i_10 leh i_2, climate factor nen (fixed-coefficient route chauh) mm/h Clause 4.14.4
I10 Drainage area-te: pakhat zelin, zau zawng, lei khuhna (land cover), tui luh theih lohna percentage, HSG leh curve number, hmasawnna hma leh hnu ha, %, — Clause 3.3, 3.7, 3.9
I11 Covenant register-a humhalh hmun-te ha Clause 4.4.7
I12 Retention practice tin bul hnuaia hun bik-a leihnuai tui sang ber thuk zawng m Clause 4.4.3(c), 8.8
I13 Practice tina infiltration (lei-a tui luh) rate teh mm/h Clause 4.4.3
I14 Practice zela retention tui zat siam; retention chu hman lehna (reuse) a nih chuan reuse mamawh zat m³, m³/d Clause 4.4.3, 4.4.5
I15 Route: hydrograph (hun hrang hranga tui luang zat) kalphung kimchang (Clause 4.6); design-aid S-1 (Clause 4.14.2); PSD S-2 (Clause 1.7); fixed-coefficient (Clause 4.14.3); constrained redevelopment (Clause 4.5.6) — Clause 1.7, 4.5.6, 4.6, 4.14
I16 Kalphung kimchang tan: AEP leh duration tin model result — hmasawnna hma leh hnu peak, khawlna hman, routing-a retention credit hmuh m³/s, m³ Clause 4.4.6.2, 4.6
I17 Outlet (luan chhuahna): low-flow orifice (tui chhuahna khur tê) diameter emaw slot zau zawng tlem ber; routing aṭanga tui hniam hun (drawdown time) mm, h Clause 4.7, 4.8.2
I18 Outfall: tidal emaw tidal lo; outfall khar endikna result — Bung 5
I19 Basin tana notify (Gazette-a tarlan) a nih fee-in-lieu (site-a tih aia sum pek) unit rate, route a huam chuan ₹/m³ Clause 4.13.3
I20 Thehluh tur stage (1, 2 emaw 4) leh, Stage 4-ah, I14, I16 leh I17 as-built (siam zawh hnua a awm dan) value-te — Clause 10.5.2, 10.9.1(b)

10A.3 Chhutna-te, clause zelin

Table 10A.2 — Calculator-in a chhut tur-te

Step Chhutna Clause
C1 A huam chin. Development plan pum (common plan of development) chungah, lei tihbuai ≥ 0.1 ha emaw tui luh theih lohna hmun thar leh thlak ≥ 500 m² a nih chuan Bung 4 leh 5 a huam. Hmanlo theihna (exemption)-te report rawh. Dan pangngai (universal provision)-te chu size engkimah a huam tih flag rawh; RWH chu AMCBR regs. 5(6)(ix) leh 33 hnuaiah Aizawl Municipal Corporation area chhunga building tinah a huam tih, roof m² tin litre 25 tal khawlna angin (Clause 4.11, he Kaihhruaina Bu-in a ruat, regulation pahnih hian tui zat an ruat lo va, 2025 green-building chapter-in ruahtui khawl khawm (rainwater harvesting) chu 100 m² aia lian plot tan incentive chauhah a siam avangin), hman lehna kaltlangin chauh retention angin chhiar a ni a, detention (ruahtui dah rihna, a luan chhuah zat tihhniam nan) angin chhiar a ni ngai lo tih flag rawh; recharge (leihnuai tui tihpun) chu Clause 4.11 (recharge dan)-in a phalna hmunah chauh chhiar a ni, chu chu phai lui kam lei (valley alluvium) enchhin tawh leh lui kam zawl (river terrace)-ah, tlang pang aṭanga hla hmun zawl leh 1% AEP tuilian sang zawng chungah a ni a, tlang ram-ah chhiar a ni ngai lo (Clause 4.11, tlang dan) a, tuikhur aṭanga 15 m chhungah pawh chhiar a ni ngai lo (Bung 8-a tuikhur dan). 1.5.2–1.5.8
C2 Process flag-te. Stage 0 tih ngei ngei tur (≥ 2 ha, tuilian hlauhawm, variance emaw regional route, tidal outfall emaw tui awmna (waterbody)); Stage 1 leh 2 chu zawm khawm phal a ni (< 1 ha, tuilian hlauhawm lo); empanelled signatory a ngai; independent check a ngai. 10.3.2, 10.3.3, 10.6.1, 10.6.4
C3 Route hman theihna. Tier B kalphung awlsam: ≤ 2 ha, emaw tuilian hlauhawm catchment-ah ≤ 0.5 ha, Table 4.3 tlangzarh a nih hnu chauhin. Fixed-coefficient route: ≤ 1 ha leh Clause 4.14.3-a hman theih lohna (exclusion) pakhat mah a awm lo. Constrained redevelopment: tui luh theih lohna hmun awm mek ≥ 60% leh ≤ 1 ha. Regional detention emaw fee-in-lieu: phalna pek BSMP nei basin-ah chauh. 4.5.6.1, 4.13.1, 4.14.1, 4.14.3, 11.12.1(b)
C4 Retention tui zat. RRV = 10 × Q_R × A, Q_R chu sub-area tin tan AMC (ruahpui hma lei hnawnna dinhmun) II-a P_R aṭanga SCS-CN runoff, sub-area zawng zawng belh khawm. Ia = 0.2S leh Ia = 0.05S result lian zawk chuan a thunun. Rv form (RRV = 10 × P_R × Rv × A, Rv = 0.05 + 0.009 × I) hi site < 0.5 ha leh Tier B kalphung tan chauh pek a ni. Climate factor hman loh. 4.4.2, 3.8.5(c), 2.8.3
C5 Humhalhna credit. Humhalh hmun-te chu hmasawnna hnu dinhmun-ah an hmasawnna hma CN-in model a ni. 4.4.7
C6 Retention endikna. Design infiltration rate ≤ rate teh chanve; leihnuai tui chu bul hnuaiah ≥ 1.0 m; tui khawl chu design rate-in darkar 72 chhungin a hniam (emaw reuse mamawh tarlan angin). Endikna pakhat emaw a tlin loh practice chuan credit a hmu lo; a tlakchham apiang report a ni a, WQv angin chhiar a ni. 4.4.3–4.4.5, 4.4.6.4
C7 Tui ṭhatna tui zat. P_wq = max(P_ret, P_3m); WQv = 10 × Q_wq × A SCS-CN-in, emaw site < 0.5 ha leh Tier B kalphung tan (P_wq / 1000) × Rv × A (A chu m²-in). Tui khawl zat chu WQv-ah a vaiin chhiar a ni. Climate factor hman loh. 8.4.1–8.4.4, 3.8.5(c)
C8 Retention credit. Tier A: routing-a credit hmuh chu ziah luh a ni (I16); calculator-in a chhut lo. Tier B: V_credit = C_R × RRV siam, Belhchian 4B tlangzarh a nih hma chu C_R = 0. 4.4.6
C9 Design-aid route (S-1). V = SSR × A − V_credit; kum 2 leh kum 100 stage tan Q_PSD,T = PSD_T × A, Table 4.3 aṭangin. Table 4.3 tlangzarh a nih hma chu "hman theih a ni lo" tiin lantir. 1.7.2, 4.14.2
C10 Site aṭanga luan chhuah phal zat (S-2). AEP tin tan Q = PSD (m³/s/ha) × A, S-2 table aṭangin. Chhuah an nih hma chu "hman theih a ni lo" tiin lantir. 1.7.2, 1.7.3(e)
C11 Fixed-coefficient route. Q_cap,10 = 2.78 × C_10 × i_10 × A leh Q_cap,2 = 2.78 × C_2 × i_2 × A (L/s); V_100 leh V_2 = d = 1 aṭanga 72 h thleng tan d chunga [10 × C_v × P(d) × A − 1.8 × Q_cap × d] sang ber, d ≥ 12 h tan tui luh theihna hmun C ≥ 0.50 nen; V = max(V_100, V_2); retention chu credit nei lovin belh. Coefficient-te chu Table 4.3A (provisional) aṭangin. 4.14.4–4.14.7
C12 Luan chhuah tir zat (release rate) screen (kalphung kimchang). AEP leh duration tin tan: Q_post ≤ 0.9 × Q_pre (pangngai), emaw mixed-frequency cap pahnih (tuilian hlauhawm). Duration thunun leh a margin report rawh. 4.5.2, 4.5.3
C13 Constrained redevelopment. Duration tinah kum 2, 10 leh 100 tan Q_post ≤ 0.5 × Q_existing; tlakchham tui zat = greenfield khawlna − khawlna siam; fee = tlakchham × unit rate. 4.5.6.2, 4.5.6.3
C14 Orifice tê ber. Orifice < 50 mm apiang flag rawh. Cap chu stage inmil-a 50 mm orifice tui luang zat aia a hniam chuan, "50 mm orifice hi a tling angin ngaih a ni" ("50 mm orifice deemed to comply") tiin report rawh. 4.5.5.1, 4.8.2
C15 Tui hniam (drawdown). Detention drawdown (kum 10 tui khawl 90% darkar 48 chhungin), WQv luan chhuah hun (darkar 24–48) leh retention ruak hun (≤ 72 h) report rawh. 4.7
C16 Fee-in-lieu. Fee = site-a detention tui zat mamawh × notify a nih unit rate. 4.13.3
C17 Model screen. Kalphung kimchang hman a nih chuan, model result (I16) chu calculator screen value (C9 aṭanga C11 thleng, a awm chuan) nen khaikhin la, hman dan kaihhruaina-a tolerance tarlan aia inthlauhna lian zawk apiang flag rawh. 10.5.2(c)
C18 As-built chhut nawn. Stage 4-ah, as-built value-te hmangin C4 aṭanga C17 thleng chhut nawn la, Stage 2 aṭanga danglamna tin report rawh. 10.9.1(b), 10.9.2

10A.4 Output-te

Calculator chuan a siam chhuak:

  • (a) Form 10-2, ziah khah, phêk tinah calculator version leh a chhuah ni nen;
  • (b) Table 10A.1 leh 10A.2-a input leh result tin computer-in a chhiar theih export; leh
  • (c) flag chhuahte list (C1 aṭanga C3, C6, C14, C17), pakhat zelin a innghahna clause nen (Clause 10.7.7).

10A.5 Chhuah hma enchhinna

Chhuah tin hmain State Stormwater Technical Committee chuan calculator-in he Kaihhruaina Bu-a kalphung inang hmang chhut dan entirna-te, Clause 4.6.7 leh 4.14-a entirna-te leh, a huam chuan, Belhchian 3C-a benchmark test problem (software enchhinna atana chhut tur)-te, a round-na chhungin a chhut chhuak nawn thei tih a endik tur a ni. Enchhinna result-te chu version log nen tlangzarh tur a ni.

10A.6 Hman dan kaihhruaina ruangam

Hman dan kaihhruaina chuan a tlem berah heng hi a keng tur a ni:

  1. Calculator tum, dinhmun leh a huam chin: design-aid route pawn lamah tlangpui leh screening endikna a ni (Clause 10.5.2(c)).
  2. Version thar ber lak dan, leh Clause 10.5.3-a version dan.
  3. Table 10A.1-a input tin, Kaihhruaina Bu leh a belhchiante-a a awmna nen.
  4. Table 10A.2-a chhutna tin, a equation leh clause nen.
  5. Step C17-a tolerance hman, leh a pel chuan drainage report-in a hrilhfiah ngei ngei tur (Clause 10.5.2(c)).
  6. Form 10-2 chhiar dan leh signature thun dan, leh belh tur.
  7. Route tin tan chhut dan entirna pakhat tal, "Entirna chauh — design value a ni lo" tia chhinchhiah.
  8. Calculator chhunga table tin hnar (Clause 10.5.4), leh version log.

Belhchian 10B — GIS data specification leh attribute schema

Bung 10-a Clause 10.4.4, 10.14.1(d), 10.14.3 leh 10.17 a ṭanpui.

10B.1 Format leh reference system-te

  • (a) Format. Thehluh tur pakhatah OGC GeoPackage (.gpkg) pakhat hi duh zawk a ni. Shapefile pawh lo pawm a ni, layer pakhatah pakhat zelin, a component file zawng zawng nen zip-a khung. Field hming-te chu Table 10B.2 aṭanga 10B.6 thleng ang a ni tur a ni; shapefile hming chu hawrawp 10-ah a tawp a, a hnuaia hming-te hian chu chin chu an tling.
  • (b) Horizontal reference. WGS 84 geographic (EPSG:4326), emaw WGS 84 / UTM zone 46N (EPSG:32646), State pum tan, site awmna apiang (Clause 10.4.4(c)). Layer zawng zawng tan system pakhat hman tur a ni.
  • (c) Vertical reference. Level zawng zawng chu hming nei vertical datum nena inzawm metre-in a ni tur a ni, metadata-ah tarlan. Metadata chuan chu datum leh tui dawngtu luipui-te chunga CWC level-monitoring site-te river datum (hnar hmuh reng rengah tarlan a ni lo), NEEPCO-in metre-a a tlangzarh Tuirial dam (tui khuahna) reservoir level (datum tarlan a ni lo) leh Serlui B (hmuh a ni lo), leh Bung 5-a hman gauge nei lo lui, luipui leh dil-te chunga tuilian chhinchhiahna survey-te inzawmna pawh a tarlang tur a ni (Clause 10.4.4(d)).
  • (d) A dik zawng. Awmna (position)-te chu site survey emaw phalna pek drawing aṭanga lak a ni tur a ni. Stage 4 leh hlan (handover) hunah, awmna leh level-te chu as-built (siam zawh hnua a awm dan) survey aṭanga lak a ni tur a ni (Clause 10.9.1(a)).
  • (e) File hming. <Authority file number>_<stage>_<yyyymmdd>.gpkg, entirnan AIZ-BP-2026-0123_S2_20261015.gpkg.
  • (f) Identifier-te. Feature tin hian thehluh tur chhunga inang lo identifier a nei (FAC_ID, OUT_ID, CAT_ID, FLP_ID). Authority (phalna petu Authority) chuan lo pawm (acceptance) hunah register identifier-in a thlak a, a inzawmna (mapping) chu dilna thehluhtu (Applicant) hnenah a pe kir ang.

10B.2 Layer-te

Table 10B.1 — Layer-te

Layer Geometry A chhunga thu A ngaina
SW_SITE Polygon Site ri Stage 1, 2, 4
SW_CATCH Polygon Site-a leh site kaltlanga luang catchment (ruahtui luan khawmna hmun) ri-te, hmasawnna hma leh hnu (Clause 10.4.1(b)) Stage 1, 2, 4
SW_FAC Polygon (5 m aia tê leihnuaia phum thil tan point) Ruahtui facility tin: he Kaihhruaina Bu hnuaia design retention, detention, tui ṭhatna, pump, gate, tui luan tirna (conveyance) element Stage 2, 4; hlanna
SW_OUTF Point Site aṭanga outfall (drain tui luan chhuahna) tin, leh public outfall tin Stage 1, 2, 4; hlanna
SW_FLOW Line Site kaltlang leh site aṭanga major-system tui luan kawng-te, leh pianphung tui luan kawng-te (Clause 10.15.1(g)) Stage 1, 2, 4
SW_CONV Line Bung 6 hnuaia design drain (tui luanna) leh pipe-te Public works tan Stage 4; hlanna
SW_META Table (geometry nei lo) Table 10B.6 metadata Stage tin

10B.3 Attribute schema

Type-te: T = text, I = integer, R = real, D = date (ISO 8601, yyyy-mm-dd). "Req." chuan a ruak loh tur field-te a chhinchhiah; field dang chu a huam chuan ziah khah a ni.

Table 10B.2 — SW_FAC (facility-te) attribute-te

Field Type Unit Req. A chhunga thu Hnar
FAC_ID T — Aw Facility identifier 10B.1(f)
FAC_TYPE T — Aw Table 10B.7 aṭanga code Clause 4.10, Table 10.3
FAC_NAME T — Drawing-a hming —
OWNER_TYP T — Aw PRIVATE / ASSOC / DEVELOPER / ULB / DEPT Clause 10.10, 10.14
OWNER_NM T — Aw Company neitu emaw association hming chauh; mimal tan, "mimal" ("private individual") (Clause 10.17.3) Clause 10.17.3
CTRL_AREA R ha Aw Facility-a luang lut area Clause 4.5.1.3
V_RET R m³ Retention tui zat siam Clause 4.4
V_WQ R m³ Tui ṭhatna tui zat siam Clause 8.4
V_DET R m³ Design level chung berah detention tui zat Clause 4.6
Q_2 R L/s 50% AEP (kum 2) design level-a luan chhuah zat Clause 4.5
Q_10 R L/s 10% AEP (kum 10) design level-a luan chhuah zat Clause 4.5
Q_100 R L/s 1% AEP (kum 100) design level-a luan chhuah zat Clause 4.5
ORIF_MM R mm Low-flow orifice diameter emaw slot zau zawng tlem ber Clause 4.8.2
INV_OUT R m Outlet invert (tui luanna hniam ber) level Clause 10.9.1(a)
TWL_DES R m Design tui level chung ber Clause 10.9.2(a)
SPILL_LV R m Spillway emaw overflow crest level Clause 4.9
PUMPED T — Aw Y / N Clause 10.10.3
REGIONAL T — Aw Y / N Clause 4.13
EMPANEL T — Aw Y / N: Clause 10.6.1(c) emaw (d) hnuaia facility Clause 10.6.1
STATUS T — Aw Table 10B.8 aṭanga code Clause 10.17.1(a)
APPR_DATE D — Stage 2 phalna pek ni Clause 10.3
ASB_DATE D — As-built certificate lo pawm ni Clause 10.9
DECL_REF T — Enkawlna Puanchhuahna (Maintenance Declaration) (Form 10-6) registration reference Clause 10.10.1(e)
HAND_DATE D — Asset Hlanna Certificate (Form 10-8) ni Clause 10.14
LAST_INSP D — Endikna hnuhnung ber ni Clause 10.12
INSP_RES T — Table 10B.9 aṭanga code Clause 10.17.1(a)
OUT_ID T — Aw Facility tui luan chhuahna outfall —

Table 10B.3 — SW_OUTF (outfall-te) attribute-te

Field Type Unit Req. A chhunga thu Hnar
OUT_ID T — Aw Outfall identifier 10B.1(f)
RECEIVER T — Aw Tui drain dawngtu, channel, tui awmna (waterbody) emaw tuifinriat, a hmingin Clause 4.5.1.3
RECV_TYPE T — Aw PUBLIC_DRAIN / CANAL / RIVER / TANK / SEA / OTHER Bung 5
INV_LEVEL R m Aw Outfall invert level Clause 10.9.1(a)
SIZE_MM R mm Aw Diameter, emaw drawing-a ziak zau zawng × sang zawng Bung 6
TIDAL T — Aw Y / N Bung 5
GATE_TYPE T — NONE / FLAP / TIDE / DUCKBILL / PENSTOCK / NRV Clause 5.11, 9.10
GATE_REQ T — Aw Y / N: invert chu 1% AEP still-water level hnuaiah a awm Clause 5.11.1
GPT T — Y / N: gross pollutant trap (bawlhhlawh dawnna) dah Clause 8.10.1
Q_100 R L/s Design 1% AEP tui luang zat Bung 5

Table 10B.4 — SW_CATCH (catchment-te) attribute-te

Field Type Unit Req. A chhunga thu Hnar
CAT_ID T — Aw Catchment identifier 10B.1(f)
CONDITION T — Aw PRE / POST / EXTERNAL (site pawn lama ram, site kaltlanga luang) Clause 10.4.1(b)
AREA_HA R ha Aw Zau zawng —
IMPERV_PC R % Aw Tui luh theih lohna percentage Clause 3.9
HSG T — Aw A / B / C / D, emaw NOTES-a area hlawm nena inpawlh Clause 3.7
CN R — Curve number, AMC II Bung 3
OUT_ID T — Aw A tui luan chhuahna outfall Clause 4.5.1.3
FLOODSENS T — Aw Y / N Clause 4.5.3
NOTES T — Ziah zalen —

Table 10B.5 — SW_FLOW leh SW_CONV (tui luan kawng leh tui luan tirna) attribute-te

Field Type Unit Req. A chhunga thu Hnar
FLP_ID T — Aw Line identifier 10B.1(f)
LINE_TYPE T — Aw OVERLAND / NATURAL / OPEN_DRAIN / COVERED_DRAIN / PIPE / CULVERT Bung 6
US_LEVEL R m Luanna chunglam (upstream) invert emaw lei level Bung 6
DS_LEVEL R m Luanna hnuailam (downstream) invert emaw lei level Bung 6
SIZE_MM R mm Pipe diameter, emaw drain zau zawng (thuk zawng chu NOTES-ah) Clause 6.7.6
Q_DES R L/s Design tui luang zat Bung 6
AEP_DES T — Design AEP, entirnan "10%" emaw "1%" Clause 6.4
RESERVE_M R m Drainage reserve zau zawng, a awm chuan Clause 6.9.7
NOTES T — Ziah zalen —

Table 10B.6 — Metadata (SW_META)

Field A chhunga thu
FILE_NO Authority file number
STAGE 1, 2, 4 emaw HANDOVER
H_CRS Horizontal reference system EPSG code
V_DATUM Vertical datum hming
TIDE_REL Vertical datum leh tui dawngtu luipui-te chunga CWC level-monitoring site-te Bung 5 river datum (hnar hmuh reng rengah tarlan a ni lo), NEEPCO-in metre-a a tlangzarh Tuirial dam reservoir level (datum tarlan a ni lo) leh Serlui B (hmuh a ni lo), leh gauge nei lo lui, luipui leh dil-te chunga tuilian chhinchhiahna survey-te inzawmna (entirnan, site datum-ah MSL = x.xx m)
SURVEYOR Surveyor hming leh licence number
SURV_DATE Survey ni
PREP_BY Certify-tu professional hming leh registration number
CALC_VER Compliance calculator version (Belhchian 10A), emaw "chhuah a ni lo" ("not issued")
DATE File buatsaih ni

10B.4 Code list-te

Table 10B.7 — Facility chi code-te (FAC_TYPE)

Code Facility Table 10.3-a endikna row
RET_SOAK Soakaway, recharge pit emaw shaft Retention / infiltration
RET_TRENCH Infiltration trench emaw basin Retention / infiltration
RET_BIO Bioretention emaw rain garden Retention / infiltration
RET_PERM Permeable pavement Retention / infiltration
RET_REUSE Hman lehna (reuse) hmanga retention (mamawh nei tank) Leihnuai emaw podium detention tank, gravity outlet
DET_BASIN Lei chung detention basin Lei chung detention basin emaw hman tam theih open space area
DET_OSR Open space, park emaw infiamna hmun (playfield)-a hman tam theih detention Lei chung detention basin emaw hman tam theih open space area
DET_ROOF Roof chung detention Leihnuai emaw podium detention tank, gravity outlet
DET_PODIUM Podium emaw landscape-deck detention Leihnuai emaw podium detention tank, gravity outlet
DET_PARK Motor dahna (parking-lot) detention Lei chung detention basin emaw hman tam theih open space area
DET_TANK Leihnuai tank emaw vault, gravity outlet Leihnuai emaw podium detention tank, gravity outlet
DET_PUMP Pump hmang detention emaw pump station Pump hmang detention, pump leh control-te
WQ_POND Wet pond emaw constructed wetland Lei chung detention basin emaw hman tam theih open space area
WQ_SWALE Swale emaw filter strip Mimal drain leh inlet-te
WQ_GPT Gross pollutant trap, first-flush device emaw oil-grit separator Gross pollutant trap / first-flush device
GATE Flap emaw tide gate, non-return valve (tui kir leh dangtu valve) Flap / tide gate, non-return valve
CONV Mimal drain, inlet emaw culvert (kawng hnuaia tui kalna) Mimal drain leh inlet-te

Table 10B.8 — Dinhmun code-te (STATUS)

Code Awmzia
PROPOSED Stage 1 emaw Stage 2 thehluh tur-ah
APPROVED Stage 2 phalna pek; sak a la ni lo
ASBUILT As-built certificate lo pawm (Clause 10.9)
HANDEDOVER ULB-in lo pawm (Clause 10.14)
ALTERED Authority phalna nena thlak danglam (Clause 10.3.5)
REMOVED Authority phalna nena paih

Table 10B.9 — Endikna result code-te (INSP_RES)

Code Awmzia
OK Design angin a hnathawk; chhiatna a awm lo
MINOR Chhiatna hmuh leh siam ṭhat; ni chu endikna record-ah
MAJOR Khawlna, outlet emaw himna tichhe chhiatna; notice pek (Clause 10.15.2, step 1)
NOACCESS Endikna tih theih a ni lo
NOTFOUND Facility a bo, vur khat, khuh emaw a hman dan thlak (Clause 10.15.1(c))

10B.5 Facility register lakchhawn

Clause 10.17.1(a)-a public facility register hi SW_FAC aṭanga lakchhawn a ni: FAC_ID, FAC_TYPE, awmna (centroid), V_DET (leh V_RET, V_WQ), Q_100 (leh Q_2, Q_10), OWNER_NM, ASB_DATE, LAST_INSP leh INSP_RES. Clause 10.17.4-a licence hnuaiah CSV leh GeoPackage angin tlangzarh a ni. Mimal data chu tlangzarh a ni lo (Clause 10.17.3).


Belhchian 10C — Enkawlna atana luhna zau zawng

Bung 10-a Clause 10.13 a ṭanpui.

Clause 10.13 chuan luhna (access) chu a hnathawh zelin a ruat. He belhchian hian he Kaihhruaina Bu-in bung dangah a ruat tawh luhna zau zawng-te a khawn khawm a, a ruat loh zau zawng-te a tarlang. Zau zawng pakhat he Kaihhruaina Bu-in a ruat loh chuan, design siamtu chuan drawing-ah a tarlang tur a ni a, O&M plan-a hming tarlan plant leh hmanrua (equipment) nen a inmil tih a lantir tur a ni (Clause 10.11.1(h)), leh "design-ah finfiah tur" ("to be confirmed in design") tiin a chhinchhiah tur a ni.

Table 10C.1 — He Kaihhruaina Bu-in a ruat luhna zau zawng-te

Element Mamawh Clause
A chung zau zawng 2 m emaw a aia tam drain (tui luanna) khuh lo Kam khatah zau zawng 3.5 m tal enkawlna luhna kawng (maintenance access strip), m 500 aia hla lo inkarah public road nena inzawm 6.9.4
Drainage reserve-te Drain size mamawh innghahin, zau zawng chu Table 6.9 aia tlem lo; Clause 6.9.4-a luhna kawng a zau zawk chuan, a zau zawk chuan a thunun 6.9.7
Drain khuh, cross-section tê ber 0.6 m × 0.6 m awl 6.7.6
Drain khuh, khuhna paih theih Panel-te chu m 10 aia hla lo centre-ah, pakhat zelin 0.6 m tal a sei a, zau zawng awl pum a huam, hnathawktu pahnihin emaw kuta khawih hmanruain emaw chawi theih 6.13.2(a)
Drain khuh, access chamber-te Inzawmna, kawi leh cross-section danglamna tinah, leh kawng dik-ah m 30 aia hla lo centre-ah, 0.6 m × 0.6 m tal kawngka awl 6.13.2(b)
Public drain-a manhole leh access chamber-te Luhna kawngka awl 600 mm tal 9.12.3
Public road-a inlet chamber-te Outlet pipe invert (tui luanna hniam ber) hnuaiah 300 mm tal thuk silt sump (leidip dawnna khur), a chung aṭanga tihfai theih 6.6.7
Leihnuai tank leh vault-te Outlet chamber chung leh inlet tin chungah luhna kawngka; 500 m² aia lian tank-ah, m 30 aia hla lo inkar; chhuat chu outlet-a sump lamah 1% tal a chhuk 4.10.2(b), (c)
1 ha aia tam tan detention outlet Outlet tihhran theihna (stop-log slot emaw penstock) 4.8.6
Outfall gate-te 600 mm aia lian outfall-ah (Bung 5) leh 900 mm emaw a aia lian emaw pump hmang emaw khawlna system tan outfall-ah (Bung 9) luanna chunglamah stop-log slot emaw penstock; gate chamber chu tide zawng zawngah luh theih, a luhna chu HAT + surge + sea-level allowance chungah 5.11.3(d), (e); 9.10.3
Pump station-te 1% AEP thil thlengah hman theih enkawlna motor luhna kawng; mobile pump tan lei khauh hmun leh quick-coupling connection; pump emaw motor kiang inkara hmun awl 0.6 m (unit tê leh lai lawk) emaw 1.0 m (unit lian) 9.9.6, 9.9.10, 9.9.12
Pretreatment device-te BMP ber lut lovin emaw tibuai lovin tihfai theih 8.5.4
Outfall, culvert (kawng hnuaia tui kalna) inlet leh pump sump-a screen-te Platform him aṭanga tihfai theih, motor luhna kawng nen 8.10.3(d)
Infiltration trench-te Trench tin bul thlengin observation well 8.7.6(c)
Mipui luh theih khawlna Sir pang chu 4H:1V aia chhoh lo, a vel ri ṭhena li ṭhena khat tal chu 6H:1V emaw a aia phei 4.15.1(c)
Wet basin-te Zau zawng 3 m tal himna bench, tui level pangngai hnuaiah 0.3 m aia thuk lo 4.15.2
Hung (fencing) Clause 4.15.3-in a phut chuan, 1.2 m tal a sang, lawn theih loh, lock theih kawngka nen 4.15.3

Table 10C.2 — He Kaihhruaina Bu-in a ruat loh luhna zau zawng-te (design-ah finfiah tur)

Element Design siamtu-in a tarlan tur A hnathawh ruattu Clause
Basin, pond emaw open channel inlet, outlet leh bul thlenga motor luhna kawng O&M plan-a plant tan zau zawng, chhoh zawng, her kirna hmun leh design load 10.13.2
Basin emaw pond sira enkawlna kawng Sir khat tal zawh zau zawng 10.13.2
Basin-a luhna ramp Leidip laih chhuahna plant tan zau zawng, chhoh zawng leh a chung lam 10.13.2
Mimal tank luhna kawngka-te Inlet, outlet leh chamber tin chunga kawngka tin size awl 10.13.3(a)
Kailawn leh kailawn ke Chi leh inkar; hmun khap (confined space) luhna tan boruak luh tirna (ventilation) 10.13.3(b)
Leihnuai tank-a lu chung awl Kuta tihfai nan sang zawng awl 10.13.3(d)
Orifice (tui chhuahna khur tê) leh screen thlen theihna Facility khat lut lova outlet tihfai dan 10.13.4

Hrilhfiahna. APWA 5600 (2006, §5608) chuan detention facility tan 15 ft (4.5 m vel) enkawlna luhna kawng a phut. He Kaihhruaina Bu hian mimal site tan zau zawng nghet a hmang lo, Mizoram khawpui-te-ah plot size a inang lo nasa avangin (Clause 10.13, Hrilhfiahna). State Stormwater Technical Committee chuan Belhchian 6C leh 9B-a standard drawing-te a chhuah hunah Table 10C.2-ah standard value a belh thei.


Belhchian 10D — Facility chi zela O&M plan entawn tur-te

Bung 10-a Clause 10.11, 10.12 leh 10.13 a ṭanpui.

A hnuaia plan entawn tur-te hi ṭanna an ni. Design siamtu chuan facility tin atan a siam rem a, "______" tia chhinchhiah thil-te a ziah khah ang. Endikna zat chu Table 10.3-a zat tlem ber a ni; plan chuan endikna zing zawk a ruat thei a, a tlem zawk erawh a ruat thei lo. He belhchian hian value pakhat design siamtu kutah a dah chuan, he Kaihhruaina Bu hian a ruat lo tihna a ni.

10D.1 O&M plan tinin a keng tur-te

Plan tin chuan Clause 10.11.1-a thil-te a keng tur a ni:

Table 10D.1 — O&M plan-in a keng tur-te

Thil A chhunga thu Clause
1 Facility tin inventory leh plan drawing, design level, tui zat leh outlet chipchiar nen (SW_FAC aṭangin, Belhchian 10B) 10.11.1(a)
2 Hna pangngai leh a zat (Table 10D.2 aṭanga 10D.8 thleng) 10.11.1(b)
3 Leidip laih chhuah phut ṭanna (trigger), thuk zawng (mm) emaw design tui zat percentage angin: ______ 10.11.1(c)
4 Form 10-7 nena inmil endikna checklist 10.11.1(d)
5 Pump, gate leh valve tan: kalpui dan (operating rule), test schedule, standby power, leh cyclone emaw ruahpui hriattirna (warning) hunah thil tih tur 10.11.1(e)
6 Tui ding reng leh thosi pung dodalna, Clause 4.7-a tui hniam hun nena inmil 10.11.1(f)
7 Himna: hmun khap, tui thuk, mipui luhna 10.11.1(g)
8 Luhna kawng leh hmanrua (Belhchian 10C) 10.11.1(h)
9 Kumtin senso chhut lawk (kum khatah ₹ ______) leh a pe tur 10.11.1(i)
10 Record vawn tur, leh a rei zawng: kum ______ (pump record kum 5 tal, Clause 9.9.8(c)) 10.11.1(j)

10D.2 Plan entawn tur-te

Table 10D.2 — Retention leh infiltration (soakaway, trench, bioretention, permeable paving)

Hna A zat Standard emaw phut ṭanna Clause
A chung, inlet, pretreatment leh overflow endik Thla 6 tlan zelin; March ni 31 hmain; ruahpui ni tin hnuah Tihtawp (blockage) a awm lo; overflow a awl Table 10.3
Observation well emaw a chungah tui hniam (drawdown) endik Ruah hnua endikna tinah Ruah tawp aṭanga darkar 72 chhungin a ruak; a ruak loh chuan clogging (bal avanga tihtawp) zir chiang 4.4.5, 8.7.6(c)
Pretreatment (forebay, filter strip, silt trap) tihfai Leidip phut ṭanna (thil 3) a thlen hunah BMP ber tibuai lovin pretreatment tihfai 8.5.3, 8.5.4
Bioretention: mulch, thlai, tui tlin Thla 6 tlan zelin Tui tlin chu darkar 48 chhungin a ruak; thlai thi thlak; mulch 50–75 mm 8.7.2
Permeable paving: a chung Thla 6 tlan zelin Phiat emaw vacuum-in tihfai; tui luh theih loh thilin siam thar (resurfacing) loh 8.7.5(e)
Tui luang lutna area chu a nghet reng tur Endikna tin Lei dawh tihnghet; leidip a luang lut lo 10.8.3(b)
Facility chu a hmunah leh hman reng tur Endikna tin Phalna nei lovin vur khat, khuh, paving emaw a chunga sak a ni lo 10.10.1(d)

Table 10D.3 — Lei chung detention basin emaw hman tam theih open space area

Hna A zat Standard emaw phut ṭanna Clause
Inlet, outlet, orifice, trash rack leh spillway endik Thla 6 tlan zelin; March ni 31 hmain; ruahpui ni tin hnuah Orifice leh rack a awl; spillway a dal lo Table 10.3, 4.8, 4.9
Bal (debris) leh leidip laih chhuah Leidip phut ṭanna a thlen hunah, leh thil thleng hnuah Design tui zat siam ṭhat leh 10.11.1(c)
Basin tui a ruak tih endik Ruah hnuah Hmun hniam reng rengah darkar 72 aia rei tui a tlin lo 4.15.7
Thlai Plan-a ruat angin Hlo tan; embankment (dai) emaw outlet zone-ah thing a to lo 10.11.1(b)
Himna thil-te Thla 6 tlan zelin Mizo leh English ṭawnga chhinchhiahna (sign) leh thuk zawng tehna a awm; a ngaiah hung leh kawngka a ṭha 4.15.3, 4.15.5
Embankment (a awm chuan) Thla 6 tlan zelin leh thil thleng hnuah Thuang, tla, tui chiar (seepage) emaw ramsa khur a awm lo 4.9.6

Table 10D.4 — Leihnuai emaw podium detention tank, gravity outlet

Hna A zat Standard emaw phut ṭanna Clause
Luhna kawngka aṭanga endik: inlet, outlet, orifice, screen, sump, vent Thla 6 tlan zelin; March ni 31 hmain; ruahpui ni tin hnuah A awl; vent a inhawng Table 10.3, 4.10.2
Sump leh chhuat tihfai Leidip phut ṭanna a thlen hunah Chhuat chu sump lamah a chhuk fel 4.10.2(c)
Inlet silt trap emaw GPT Thla 3 tlan zelin (GPT tan Table 10.3 row) Tihfai 4.10.2(e)
Overflow kawng Endikna tin Outlet a tawp hunah a hnathawk; lei chunga tui luan kawng (overland path) thlenga kawng a dal lo 4.9.5
Hmun khap luhna Luh tin Enkawlna puanchhuahna-a luh dan tarlan zawm; a hnuah khuhna tala khar 4.15.6
Hmun hman dan Endikna tin Motor dahna emaw thil khawlna atan hman a ni lo; tui zat tihtlem a ni lo 10.10.1(d)

Table 10D.5 — Pump hmang detention, pump leh control-te

Hna A zat Standard emaw phut ṭanna Clause
Pump tin, duty leh standby, tihchhin Thla tin Pump tin chu level control-in a ṭan; hna an inthlak chhawk Table 10.3, 9.9.4(c)
Duty test kimchang March ni 31 hmain Station-in a design duty point a tling Table 10.3, 10.9.3
Standby power Thla tin, tihchhin nen; March ni 31 hmain test kimchang Automatic changeover a hnathawk; duty pump zawng zawng darkar 72 tal tan fuel site-ah a awm 9.9.9
Level sensor, float back-up, alarm, telemetry Thla tin High-level leh fault alarm chu control room-ah a thleng 9.9.8
Screen leh silt trap Thla 3 tlan zelin leh thil thleng hnuah A fai 9.9.7
Record Chhunzawm reng Sump level, a tlan darkar leh power dinhmun ziah; kum 5 tal vawn 9.9.8(c)
Hriattirna hunah thil tih tur IMD ruahpui emaw cyclone hriattirna hunah Plan-a thil tih tur ziak: ______ (entirnan site-ah hnathawktu, fuel tihkhat, mobile pump connection endik) 10.11.1(e), 9.9.12

Table 10D.6 — Flap emaw tide gate, non-return valve

Hna A zat Standard emaw phut ṭanna Clause
Endik leh tihhnathawh Thla 3 tlan zelin; ruahpui ni tin hnuah Head tê-ah a inhawng; bal, sand emaw thil to-in a dang lo Table 10.3, 9.10.4
Seal test March ni 31 hmain Tui dawngtu laka a khar fel Table 10.3, 10.9.3
Tuifinriat kam, estuary leh creek outfall-te Fûr hun chhunga high-tide emaw surge thil thleng tin hnuah Sand leh bal paih fai 9.10.5(b)
Tihhranna (isolation) March ni 31 hmain Stop-log slot emaw penstock hman theih 9.10.3
Hinge, pin leh fixing-te March ni 31 hmain Gate hnathawh dang thei thir ei a awm lo 9.10.6
In leh ram non-return valve-te Thla 3 tlan zelin Cleaning eye thlen theih; valve a khar fel 5.11.4

Table 10D.7 — Gross pollutant trap emaw first-flush device

Hna A zat Standard emaw phut ṭanna Clause
Endik leh tihruak Thla 3 tlan zelin; March ni 31 hmain; ruahpui ni tin hnuah Capture chamber a khat hmain tihruak; bypass a awl Table 10.3, 8.4.6
Screen-te Endikna tin A fai; overflow kawng a awl 8.10.3(b)
Paihna Tihfai tin Thil chu phalna nei bawlhhlawh (solid-waste) facility-ah thlen —

Table 10D.8 — Mimal drain leh inlet-te

Hna A zat Standard emaw phut ṭanna Clause
Drain, inlet leh silt sump endik leh tihfai Thla 6 tlan zelin; March ni 31 hmain Leidip leh bal a awm lo Table 10.3
Ek tui (sewage) connection awm leh awm loh endik Endikna tin A awm lo; cross-connection reng reng paih 1.5.4, 8.9
Lei chunga tui luan kawng-te Endikna tin Bang, lei vur emaw thil dah khawmin a dal lo 6.9.2, 10.15.1(g)

Belhchian 10E — Stormwater Design Professional leh reviewer-te empanelment criteria

Bung 10-a Clause 10.6, 10.7.4 leh 11.4.3 a ṭanpui.

Competent authority ngaihtuah tura entirna thuziak. Hman a ni lo. Clause 10.6.2 chuan empanelment (thiamna list-a dah luhna) criteria chhuah hna chu UD&PA hnenah a ruat. A hnuaia thuziak hi entirna a ni. "[ ]" tia lantir value-te chu competent authority-in a ruat tur a ni; he Kaihhruaina Bu hian a ruat lo.

10E.1 Criteria entawn tur

  1. List-te. Competent authority chuan mipui hmuh theih list pathum a vawng tur a ni:
    • (a) Stormwater Design Professional-te, Clause 10.6.1 hnuaia design-a signature thun thei leh Clause 10.6.4 hnuaia independent checker hna thawk thei;
    • (b) Empanelled Reviewer-te, Clause 10.7.4 hnuaia Authority tana thehluh tur endik thei; leh
    • (c) basin modelling endorsement (thiamna pawmpuina), Clause 11.4.3 hnuaia BSMP buatsaih emaw kaihhruai thei Stormwater Design Professional-in a neih.
  2. List (a) tlin theihna. Dilna thehluhtu chuan:
    • (a) civil engineering degree, emaw competent authority-in a pawmpui qualification inang a nei tur a ni (Clause 10.6.2);
    • (b) Aizawl Municipal Corporation Building Regulations 2012 leh Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations 2017 hnuaiah professional angin register a ni tur a ni (Clause 1.4);
    • (c) graduate hnuah drainage design-ah kum [ ] tal tawnhriat a nei tur a ni, project [ ] tal list, project tina dilna thehluhtu hna nen, hmanga lantir (Clause 10.6.2); leh
    • (d) dilna thehluh hma kum [ ] chhungin he Kaihhruaina Bu chungchang training course, enchhinna (assessment) nen, a zo tawh tur a ni (Clause 10.6.2).
  3. List (b) tlin theihna. List (a) ang, kum [ ] tal tawnhriat nen, chung zinga kum [ ] tal chu he Kaihhruaina Bu emaw standard inang hnuaia drainage design emaw endikna-ah.
  4. Basin modelling endorsement (c). Study [ ] tal-ah calibration tel basin-scale 1D–2D modelling tawnhriat lantir thei Stormwater Design Professional (Clause 11.4.3).
  5. Checker zalenna. Clause 10.6.4 hnuaia checker chu design siamtu firm emaw dilna thehluhtu hnathawktu emaw partner a ni loh tur a ni a, design-ah a thawk tel tawh loh tur a ni.
  6. Reviewer-a hamṭhatna inkalh (conflict of interest). Empanelled Reviewer chuan amah emaw a firm-in eng hna-ah pawh a thawhna site a endik loh tur a ni (Clause 10.7.4), leh endikna a lo pawm hmain hamṭhatna dang reng reng a puang chhuak tur a ni. Authority chu thutlukna siamtu a ni reng (Clause 10.7.4).
  7. Dilna. Dilna chuan degree leh registration finfiahna, reference nena project list, training certificate, leh thu pek a dik tih signature thun puanchhuahna a keng tur a ni.
  8. Hun leh siam tharna. Empanelment chu kum [ ] chhung a dik. Siam tharna atan hna thawh chhunzawm finfiahna leh he Kaihhruaina Bu siam ṭhatna hnua refresher training chhuah reng reng finfiahna a ngai (Clause 1.12).
  9. Tihtawp rihna leh paihna. Competent authority chuan empanelled mi chu certificate dik lo emaw fimkhur lo taka siam hnuah (Clause 10.6.5), Table 10.4 step 6 hnuaia report-ah, emaw registration a bo hunah, a tihtawp rih emaw a paih thei. Chu mi chu notice leh a thu sawi theihna hun pek tur a ni. Tihtawp rihna leh paihna tin chu list-ah tlangzarh tur a ni.
  10. Tlangzarhna. List-te chu tlangzarh leh tihdik reng tur a ni, mi tin hming, registration number, list, endorsement leh a dik chhung ni nen.

Form 10-1 — Drainage Report Checklist

Bung 10-a Clause 10.4.1 aṭanga 10.4.4 thleng leh 10.7.1 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Stage 1 leh Stage 2 thehluh tur (submittal) tin nen thehluh tur a ni. Thil tin tan a sawina phêk emaw sheet, emaw a huam loh chhan pe rawh. Form 10-1 ziah khah kim lovin Authority (phalna petu Authority) chuan technical endikna a ṭan lo (Clause 10.4.3).

Table 10F.1 — Form 10-1, Section A: Thehluh tur

No. Field Ziah luh tur
A1 Authority leh file number ______
A2 Site hming leh address; survey number-te ______
A3 Stage: 1 / 2 / 1 leh 2 zawm khawm (Clause 10.3.3) / public work DPR emaw tender (Clause 10.3.4) ______
A4 Dilna thehluhtu (Applicant) ______
A5 Certify-tu professional (hming, registration leh empanelment number) ______

Table 10F.2 — Form 10-1, Section B: Stage 1-in a keng tur-te (Clause 10.4.1)

No. Thil Clause Phêk / sheet A huam lo: a chhan
B1 Form 1-1; variance emaw waiver dil a nih chuan Form 1-2 10.4.1(a) ______ ______
B2 Site plan: level awm mek leh rawt, tui luh theih lohna hmun (impervious), site-a leh site kaltlanga catchment (ruahtui luan khawmna hmun) ri-te 10.4.1(b) ______ ______
B3 Lei (HSG), hun bik-a leihnuai tui sang ber, infiltration (lei-a tui luh) test emaw test plan 10.4.1(c) ______ ______
B4 Design Ruahtui Tlak Sheet (Form 2-1) 10.4.1(d) ______ ______
B5 Hmasawnna hma lam (pre-development) dinhmun leh hydrology kalphung 10.4.1(e) ______ ______
B6 Hmalakna indawt dan: hmun humhalh, retention (ruahtui khawl reng, hman nan emaw lei-a luh tir nan emaw) kalphung, detention (ruahtui dah rihna, a luan chhuah zat tihhniam nan) ngaihdan, tui luan tirna (conveyance) 10.4.1(f) ______ ______
B7 Retention, WQ leh detention tui zat leh luan chhuah tir zat (release rate) hmasa, Form 10-2 nen 10.4.1(g) ______ ______
B8 Luanna hnuailam (downstream) zau zawng leh tailwater (outfall hnuailama tui sang zawng) case 10.4.1(h) ______ ______
B9 Tui awmna (waterbody), setback (tui kam aṭanga hmun kalhlen tur) leh 1% AEP level 10.4.1(i) ______ ______
B10 Facility leh enkawlna luhna atana ram hauh 10.4.1(j) ______ ______
B11 Professional Design Certificate (Form 10-3) 10.4.5 ______ ______

Table 10F.3 — Form 10-1, Section C: Stage 2-in a keng tur-te (Clause 10.4.2)

No. Thil Clause Phêk / sheet A huam lo: a chhan
C1 Stage 1-in a keng tur siam thar (Section B) 10.4.2 ______ ______
C2 Khawlna duration leh AEP tin tan chhutna tawp, outfall (drain tui luan chhuahna) khar endikna nen 10.4.2(a) ______ ______
C3 Stage–storage–discharge table-te; emergency spillway design 10.4.2(b) ______ ______
C4 Tui luan tirna, inlet leh structure-te hydraulic design 10.4.2(c) ______ ______
C5 Tui ṭhatna design; a ngaiah first-flush device emaw GPT 10.4.2(d) ______ ______
C6 Facility tin construction drawing, detail leh specification 10.4.2(e) ______ ______
C7 Construction indawt dan, retention leh infiltration area venhimna nen 10.4.2(f) ______ ______
C8 Hold point (endik hmaa hna chhunzawm loh tur hun) schedule (Form 10-4, Section A) 10.4.2(g) ______ ______
C9 O&M plan (kalpui leh enkawl plan) draft leh Enkawlna Puanchhuahna (Maintenance Declaration) draft (Form 10-6) 10.4.2(h) ______ ______
C10 Model input file leh GIS data 10.4.2(i) ______ ______
C11 Certificate-te (Form 10-3, design siamtu leh, a ngaiah, checker-in signature thun) 10.4.2(j) ______ ______

Table 10F.4 — Form 10-1, Section D: Digital thehluh tur (Clause 10.4.4)

No. Thil Clause Pek (aw / aih) A chipchiar
D1 Report leh drawing-te, zawn theih PDF angin 10.4.4(a) ______ ______
D2 Model-te a format ngeia tlan theih angin; software hming leh version 10.4.4(b) ______ ______
D3 Belhchian 10B anga GIS data; horizontal reference system (EPSG code) 10.4.4(c) ______ ______
D4 Vertical datum hming; tui dawngtu luipui-te chunga CWC level-monitoring site-te Bung 5 river datum (hnar hmuh reng rengah tarlan a ni lo), NEEPCO-in metre-a a tlangzarh Tuirial dam (tui khuahna) reservoir level (datum tarlan a ni lo) leh Serlui B (hmuh a ni lo), leh gauge nei lo lui, luipui leh dil-te chunga tuilian chhinchhiahna survey-te nena a inzawmna 10.4.4(d) ______ ______

Table 10F.5 — Form 10-1, Section E: Puanchhuahna leh a kim leh kim loh endikna

Field Ziah luh tur
Kei hian he checklist hi a kim a, a dik tih ka nemnghet e. Certify-tu professional: hming, signature, ni ______
Authority tan: dawn ni ______
A kim leh kim loh endik ni (hna ni 5 chhungin, Clause 10.7.1) ______
Result: endik turin lo pawm / pek kir ______
Thil tlachham, pek kir a nih chuan ______
Officer: hming, designation, signature ______

Form 10-2 — Compliance Calculator Tlangpui

Bung 10-a Clause 10.4.1(g), 10.5 leh 10.9.1(b) a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Compliance calculator (dan zawm endikna chhutna) (Belhchian 10A)-in Stage 1, 2 leh 4 thehluh tur nen a siam chhuak. Calculator chhuah a nih hma chu, kutin ziah khah la, A3-ah "chhuah a ni lo" ("not issued") tiin ziak rawh. Site-in outfall pakhat aia tam a neih chuan drainage area pakhatah column pakhat.

Table 10F.6 — Form 10-2, Section A: Site leh route

No. Field Ziah luh tur Clause
A1 Authority, file number, stage (1 / 2 / 4) ______ 10.5.2(a)
A2 Site zau zawng, ha; lei tihbuai (land disturbance), ha; tui luh theih lohna hmun thar + thlak, m² ______ 1.5.2
A3 Calculator version leh a chhuah ni ______ 10.5.3
A4 Tier (A / B); tuilian hlauhawm (aw / aih); basin tan phalna pek BSMP (aw / aih) ______ 1.6, 4.5.3, 11.12
A5 Route: kalphung kimchang / S-1 / S-2 / fixed-coefficient / constrained redevelopment / regional emaw fee-in-lieu (site-a tih aia sum pek) ______ 1.7, 4.5.6, 4.13, 4.14
A6 Calculator-in flag a chhuahte (list) ______ Belhchian 10A.4

Table 10F.7 — Form 10-2, Section B: Ruahtui tlak leh lei

No. Field Ziah luh tur Clause
B1 Ruahtui zone; Form 2-1 reference ______ 2.13
B2 Retention thuk zawng P_R, mm; thla 3 ARI zat P_3m, mm ______ 2.10, 8.4.1
B3 Climate factor hman (≤ 6 h; > 6–72 h) ______ 2.8
B4 Sub-area zela HSG; hun bik-a leihnuai tui sang ber, bul hnuaiah m ______ 3.7, 4.4.3
B5 Infiltration rate teh leh design rate, mm/h ______ 4.4.3

Table 10F.8 — Form 10-2, Section C: Tui zat-te

No. Zat Mamawh (m³) Siam (m³) Clause
C1 Retention tui zat (RRV) ______ ______ 4.4.2
C2 Tui ṭhatna tui zat (WQv) ______ ______ 8.4.2
C3 Detention laka retention credit ______ — 4.4.6
C4 Detention tui zat ______ ______ 4.6, 4.14
C5 Fee-in-lieu emaw regional tui zat, leh fee (₹) ______ ______ 4.5.6.3, 4.13.3

Table 10F.9 — Form 10-2, Section D: Luan chhuah tir zat (outfall tin)

AEP Q_pre emaw cap (L/s) Q_post (L/s) Duration thunun (h) Criterion a tling (aw / aih) Clause
50% (kum 2) ______ ______ ______ ______ 4.5
10% (kum 10) ______ ______ ______ ______ 4.5
1% (kum 100) ______ ______ ______ ______ 4.5

Table 10F.10 — Form 10-2, Section E: Outlet, tui hniam (drawdown) leh stage khaikhinna

No. Field Ziah luh tur Clause
E1 Low-flow orifice (tui chhuahna khur tê), mm (a tê ber 50 mm) ______ 4.8.2
E2 Detention: kum 10 tui khawl 90% luan chhuah hun, h (≤ 48 h) ______ 4.7.1
E3 WQv luan chhuah hun, h (24–48 h) ______ 4.7.2
E4 Retention ruak hun, h (≤ 72 h) ______ 4.7.3
E5 Model result chu calculator screen aiin guide tolerance aia tamin a inthlau em? Aw a nih chuan, a hrilhfiahna report section ______ 10.5.2(c)
E6 Stage 4 chauh: Stage 2 value aṭanga danglamna (list), leh criterion tin a la tlin em ______ 10.9.2
E7 Buatsaihtu (hming, registration number), signature, ni ______ 10.6.3(b)

Form 10-3 — Professional Design Certificate

Bung 10-a Clause 10.6.1 aṭanga 10.6.5 thleng a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Stage 1 leh Stage 2 thehluh tur tin nen design siamtu (designer)-in signature a thun a, Clause 10.6.1(c) leh (d) hnuaia facility tan independent checker-in a thun bawk.

Table 10F.11 — Form 10-3, Section A: Project leh signature thuntu

No. Field Ziah luh tur Clause
A1 Authority, file number, stage ______ —
A2 He certificate-in a huam site leh facility-te ______ —
A3 Design siamtu: hming, qualification, AMCBR/SD&SM registration number ______ 10.6.1
A4 Empanelment number, a ngaiah, leh a chhan: Tier A ≥ 1 ha / tuilian hlauhawm / embankment emaw high-hazard basin / pump hmang, tide gate emaw regional facility ______ 10.6.1(a)–(d)
A5 Variance emaw waiver phalna pek (Form 1-2 reference), emaw "a awm lo" ______ 10.6.3(a)

Table 10F.12 — Form 10-3, Section B: Design siamtu certificate

No. Kei hian heng hi ka certify e: Initials
B1 A5-a variance tarlan, phalna pek tawh bak chu, design hi Mizoram Ruahtui Luanna Design Kaihhruaina Bu nen a inmil ______
B2 Ruahtui tlak, lei leh tailwater input-te chu Form 2-1 leh Form 10-2-a ziak ang a ni ______
B3 Model thehluhte hian result report-te an chhuah nawn thei ______
B4 Certificate dik lo emaw fimkhur lo taka siam chu Clause 10.15 hnuaia dan bawhchhiatna (contravention) a ni tih ka hre thiam ______

Table 10F.13 — Form 10-3, Section C: Independent checker certificate (Clause 10.6.4)

No. Field emaw thusawi Ziah luh tur
C1 Checker: hming, registration leh empanelment number ______
C2 Design siamtu leh dilna thehluhtu laka ka zalen a, he design-ah hian ka thawk lo ______
C3 Facility tarlan-te ka endik a: ______, Section B-a certificate nen ka inrem ______
C4 Ka remtih loh thil, a awm chuan ______

Table 10F.14 — Form 10-3, Section D: Signature-te

Mawhphurhna Hming Hmingziak Ni
Design siamtu ______ ______ ______
Independent checker (a ngaiah) ______ ______ ______

Form 10-4 — Hold-Point Endikna Record

Bung 10-a Clause 10.4.2(g), 10.8 leh 10.9.3 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Section A hi hold point (endik hmaa hna chhunzawm loh tur hun) schedule a ni, Stage 2-ah phalna pek. Section B chu hold point tinah ziah khah a ni, ni leh geotag nei milem nen (Clause 10.8.2). Section B signature thun a nih hma chu hold point pel chhuakin hna chhunzawm loh tur a ni. Milem 10.2 en rawh.

Table 10F.15 — Form 10-4, Section A: Hold-point schedule

Hold point Facility (FAC_ID) Hna stage Ruat ni Authority hnena notice thawn (ni)* Authority a tel (aw / aih)
(a) Bul laih zawh, media, liner emaw structure dah hmain ______ ______ ______ ______ ______
(b) Outlet structure, orifice leh trash screen, backfill emaw tihkhat hmasak hmain ______ ______ ______ ______ ______
(c) Infiltration leh finfiahna test (Clause 10.9.3) ______ ______ ______ — ______
(d) Outfall, flap emaw tide gate leh non-return valve (tui kir leh dangtu valve), luanna hnuailam inzawm hmain ______ ______ ______ — ______
(e) Pump leh control-te, commissioning hunah ______ ______ ______ — ______
Authority-in hold point dang a belhte ______ ______ ______ ______ ______

* Clause 10.6.1 hnuaia site tan, hold point (a) leh (b) chungchang hna ni 3 tal hmaa notice (Clause 10.8.2).

Table 10F.16 — Form 10-4, Section B: Endikna record (hold point pakhatah pakhat)

No. Field Ziah luh tur
B1 Hold point leh facility ______
B2 Endikna ni leh hun; khawchin ______
B3 Endiktu (certify-tu professional); a tel dangte ______
B4 Phalna pek drawing leh revision, a nena khaikhin ______
B5 Level, zau zawng leh thil hman hmuh, phalna pek value nena khaikhin ______
B6 (a) tan: retention leh infiltration area chu motor leh thil dah khawm laka venhim (Clause 10.8.3(a)) ______
B7 (b) tan: orifice size leh invert; screen a awm ______
B8 (c) tan: infiltration test result leh ruak hun (≤ 72 h); pump duty point; gate inhawn leh khar fel ______
B9 (d) leh (e) tan: gate chi, a dahna leh test; pump commissioning record ______
B10 Milem reference (ni leh geotag nei) ______
B11 Result: phalsak / phalsak lo; siam ṭhat tur hna ______
B12 Siam ṭhat hna endik (ni, endiktu) ______
B13 Certify-tu professional signature, ni ______

Form 10-5 — As-built Certificate

Bung 10-a Clause 10.9 leh 10.3.5 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Completion certificate hmain thehluh a ni. He form hi lo pawm a nih hma chu Authority chuan completion certificate a chhuah loh tur a ni (Clause 10.9.4).

Table 10F.17 — Form 10-5, Section A: Project leh survey

No. Field Ziah luh tur Clause
A1 Authority, file number; Stage 2 phalna reference leh ni ______ —
A2 Licensed surveyor: hming, licence number, survey ni ______ 10.9.1(a)
A3 Vertical datum ______ 10.4.4(d)
A4 Belhchian 10B anga GIS data, as-built (siam zawh hnua a awm dan) (file hming) ______ 10.4.4(c)

Table 10F.18 — Form 10-5, Section B: Phalna pek leh as-built khaikhinna (facility pakhatah block pakhat)

Thil Phalna pek As-built Lo pawm (aw / aih) Clause
Design level tina khawlna tui zat, m³ ______ ______ ______ 10.9.2(a)
Outlet zau zawng (orifice, weir), mm ______ ______ ______ 10.9.2(b)
Outlet leh outfall (drain tui luan chhuahna) invert, m ______ ______ ______ 10.9.2(b)
Spillway emaw overflow level, m ______ ______ ______ 4.9
Retention (ruahtui khawl reng, hman nan emaw lei-a luh tir nan emaw) tui zat, m³ ______ ______ ______ 4.4

Table 10F.19 — Form 10-5, Section C: Chhut nawn leh test-te

No. Field Ziah luh tur Clause
C1 As-built value hmanga compliance calculator chhut nawn: version, leh Form 10-2 (Stage 4) belh ______ 10.9.1(b)
C2 As-built value hmanga model tlan nawn (model hman a nih chuan): file hming ______ 10.9.1(b)
C3 Chhut nawnah Bung 4 leh 5 criterion tin a tling (aw / aih; a tlin loh apiang list rawh) ______ 10.9.2(c)
C4 Infiltration retention: ruak hun teh, h (≤ 72 h) ______ 10.9.3
C5 Pump: duty point a tling (head-a tui luang zat) ______ 10.9.3
C6 Tide gate leh non-return valve-te: an inhawng a, an khar fel tih lantir ______ 10.9.3
C7 Kalsanna (deviation)-te, leh Clause 10.3.5 hnuaia siam ṭhat dan emaw certify nawn dan ______ 10.9.2

Table 10F.20 — Form 10-5, Section D: Thil belh leh certificate

No. Field Ziah luh tur
D1 Hold-point record ziah khah (Form 10-4) ______
D2 O&M plan (kalpui leh enkawl plan) tawp ______
D3 Signature thun Enkawlna Puanchhuahna (Maintenance Declaration) (Form 10-6) emaw hlanna thuziak (Form 10-8) ______
D4 Kei hian facility tarlan-te hi C7-a tarlan bak chu phalna pek angin sak a ni a, design angin a hnathawk tih ka certify e. Certify-tu professional: hming, registration number, signature, ni ______
D5 Authority tan: lo pawm / pek kir; officer, ni ______

Form 10-6 — Enkawlna Puanchhuahna (Maintenance Declaration)

Bung 10-a Clause 10.10.1, 10.10.2, 10.10.4 leh 10.13.1 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Competent authority ngaihtuah tura entirna thuziak. Hman a ni lo. Completion certificate chhuah a nih hmain mimal ruahtui facility tin neitu-in signature a thun a, ram nena a kal zel theih nan register a ni.

Thuziak buatsaihna hriat tur D10A.1. He puanchhuahna register-na thuziak (instrument), leh Authority hnena luh theihna dikna (right of entry) leh neitu-in a tih loh hna thawh theihna (works in default) petu Act chu competent authority-in a nemnghet tur a ni. He form hian statute section a tarlang lo.

Table 10F.21 — Form 10-6, Section A: Inremtu leh ram

No. Field Ziah luh tur
A1 Neitu (puangtu): hming leh address; company emaw association tan, a registration number ______
A2 Authority ______
A3 Ram: survey number, khua, sub-division, district; a zau zawng ______
A4 Phalna reference (file number, Stage 2 phalna pek ni) ______
A5 Neitu tam tak development tan: developer hnua thuneitu association emaw pawl (Clause 10.10.2) ______

Table 10F.22 — Form 10-6, Section B: Facility tarlanna

Facility (FAC_ID) Chi Plan belh-a a awmna Design tui zat (m³) Outlet O&M plan reference
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______

Entirna puanchhuahna. Kei/Keini, Section A-a neitu hming tarlan hian, keimah/keimahni tan leh ram rochungtu (successor in title) tin tan, heng hi kan puang a, kan intiam e:

  1. Section B-a facility tin chu phalna pek O&M plan hnuaiah kalpui, endik leh enkawl tur, leh Clause 10.12-a endikna-te tih tur (Clause 10.10.1(b));
  2. Authority, a officer-te leh a contractor-te hnenah facility tin leh plan-a lantir luhna kawng endik nan luh theihna dikna (right of entry) pek tur, leh Clause 10.15 hnuaia neitu-in a tih loh hna thawh theihna, a senso neitu hnen aṭanga lak theih nen (Clause 10.10.1(c));
  3. Authority-in ziaka phalna a pek lovin, facility reng reng paih, vur khat, khuh, tihtlem emaw a hman dan thlak loh tur, emaw a luhna kawng dal loh tur (Clause 10.10.1(d), 10.13.5);
  4. Clause 10.10.3 a huam chuan, kum tin March ni 31 thlengin Kumtin Enkawlna Puanchhuahna leh Endikna Report (Form 10-7) thehluh tur;
  5. leihnuai tank tan, hetah tarlan hmun khap (confined space) luh dan zawm tur: ______ (Clause 4.15.6);
  6. ram emaw a ṭhenkhat hralh emaw hlan hunah, he puanchhuahna leh Form 10-7 thar ber chu leitu hnenah puang chhuak tur, leitu chuan hlan ni aṭangin heng mawhphurhna hi a la ang (Clause 10.10.4); leh
  7. neitu tam tak development tan, A5-a pawl hming tarlan chu dan angin din a nih a, he puanchhuahna hi ziakin a lo pawm hma chu developer chu mawhphurtu a ni reng ang (Clause 10.10.2).

Table 10F.23 — Form 10-6, Section C: Signature thunna leh registration

Field Ziah luh tur
Neitu: signature, hming, ni ______
Thuhretu 1: signature, hming, address ______
Thuhretu 2: signature, hming, address ______
A5-a association emaw pawl-in lo pawmna (din a nih hunah): signature, ni ______
Registration: office, document number, ni ______
Authority tan: dawn leh facility register-ah ziah luh; officer, ni ______

Form 10-7 — Kumtin Enkawlna Puanchhuahna leh Endikna Report

Bung 10-a Clause 10.10.3, 10.11.1(d) leh 10.12 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Tier A area-a facility neitu tin leh, khawi hmunah pawh, pump hmang facility, tide gate emaw regional facility neitu tin hnen aṭangin kum tin March ni 31 thlengin thehluh tur a ni (Clause 10.10.3). Milem 10.3 en rawh.

Table 10F.24 — Form 10-7, Section A: Neitu leh facility-te

No. Field Ziah luh tur
A1 Report kum (April ni 1 aṭanga March ni 31 thleng) ______
A2 Neitu emaw association; Enkawlna Puanchhuahna registration reference ______
A3 A huam facility-te (FAC_ID leh chi) ______
A4 Clause 10.6.1(c) emaw (d) hnuaia facility a awm em (aw / aih). Aw a nih chuan, Section E a ngai ______

Table 10F.25 — Form 10-7, Section B: Kum chhunga endikna tih-te (Table 10.3)

Facility Endikna pangngai (ni-te) Fûr hma endikna (ni) Ruahpui thil thleng hnuah (ni-te) Thla tin pump tihchhin (zat)
______ ______ ______ ______ ______
______ ______ ______ ______ ______

Table 10F.26 — Form 10-7, Section C: Fûr hma checklist (facility pakhatah pakhat)

No. Thil Dinhmun (OK / chhiatna) Chhiatna leh siam ṭhat ni
C1 Inlet, pretreatment leh silt trap a awl ______ ______
C2 Orifice, trash screen leh outlet a awl; orifice size thlak a ni lo ______ ______
C3 Leidip chu O&M plan-a phut ṭanna hnuaiah a awm ______ ______
C4 Khawlna tui zat tihtlem a ni lo; vur khat, khuh emaw hman dan thlak a awm lo ______ ______
C5 Overflow leh spillway kawng a awl ______ ______
C6 Retention chu darkar 72 chhungin a ruak (observation well emaw a chung) ______ ______
C7 Pump: duty test kimchang; standby pump leh standby power enchhin; darkar 72 tan fuel site-ah ______ ______
C8 Alarm leh telemetry enchhin ______ ______
C9 Flap emaw tide gate leh non-return valve-te: tihhnathawh leh seal test ______ ______
C10 Himna: khuhna tala khar, hung, chhinchhiahna (sign) leh thuk zawng tehna a awm ______ ______
C11 Luhna kawng a awl a, motor dahna atan hman a ni lo ______ ______

Table 10F.27 — Form 10-7, Section D: Neitu puanchhuahna

Field Ziah luh tur
Kei/Keini hian Clause 10.12-a fûr hma endikna chu tih a ni tawh a, chhiatna hmuhte chu Section C-a tarlan angin siam ṭhat a ni a, facility-te chu phalna pek O&M plan hnuaiah enkawl a ni tih kan puang e. Neitu: hming, signature, ni ______

Table 10F.28 — Form 10-7, Section E: Empanelled professional (Clause 10.6.1(c) leh (d) hnuaia facility-te)

Field Ziah luh tur
Kei hian facility tarlan-te ka endik a, Section C chu ka nemnghet e. Hming, empanelment number, signature, ni ______

Table 10F.29 — Form 10-7, Section F: Authority tan

Field Ziah luh tur
Dawn ni; hun takah (March ni 31 thlengin) aw / aih ______
Facility register-ah ziah luh (Clause 10.17), ni ______
Hmalakna zawm, a awm chuan (Clause 10.15) ______

Form 10-8 — Asset Hlanna Certificate

Bung 10-a Clause 10.14 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Developer-in a sak drain (tui luanna), open space facility, regional facility emaw ruahtui asset dang hlan an nih hunah developer leh ULB-in signature an thun.

Table 10F.30 — Form 10-8, Section A: Asset leh inremtu-te

No. Field Ziah luh tur
A1 Developer: hming leh address ______
A2 ULB ______
A3 Layout emaw project, phalna reference ______
A4 Asset hlan (FAC_ID, chi, a sei zawng emaw tui zat), plan nen ______

Table 10F.31 — Form 10-8, Section B: Hlanna thuthlung (Clause 10.14.1)

No. Thuthlung A tling em (aw / aih) Reference emaw ni
B1 As-built certificate (Form 10-5) lo pawm ______ ______
B2 Facility tihfai; pipe leh culvert (kawng hnuaia tui kalna)-te a chhung lam endik (CCTV emaw mihring lut), record hlan ______ ______
B3 Ram, emaw a chunga easement (mi ram kal tlanga hman phalna), ULB hnenah hlan ______ ______
B4 O&M plan, drawing, GIS data (Belhchian 10B) leh warranty-te hlan ______ ______

Table 10F.32 — Form 10-8, Section C: Defects liability leh register

No. Field Ziah luh tur Clause
C1 Defects liability period (chhiatna mawhphurh hun): ______ aṭanga ______ thleng (hlan hnua fûr hun pum khat tal, April ni 1 aṭanga October ni 31 thleng, a huam) ______ 10.14.2
C2 Hun chhunga chhiatna leh enkawlna pangngai mawhphurtu developer ______ 10.14.2
C3 ULB-in security deposit a vawn, ₹, leh a pek chhuah ni ______ 10.14.2
C4 ULB GIS drainage asset register leh facility register-ah ziah luh: ni ______ 10.14.3

Table 10F.33 — Form 10-8, Section D: Signature-te

Inremtu Hming leh designation Hmingziak Ni
Developer ______ ______ ______
Certify-tu professional ______ ______ ______
ULB ______ ______ ______