NEER-in a buatsaih Draft v1.0 a ni. Mizoram sawrkar, District Council, Village Council, authority emaw local body emaw reng rengin pawm a ni lo a, dan anga thuneihna a nei lo. He draft chungchang

Bung 3 belhchianHydrology Kalphungte

Heng belhchiante hian Bung 3 an ṭanpui. Belhchian 3C-ah software lo pawm nan benchmark test problem (software enchhinna atana chhut tur) a tarlang a, Form 3-1 leh 3-2 hi Clause 3.17-in a phut thehluh tur form an ni. Belhchian 3A, 3B, 3D leh 3E hian survey, gauging emaw report tlangzarh data, he draft-in a la neih loh, a mamawh a; belhchian tinin a ruangam tur leh a tlangzarh hma chuan Bung 3-a interim dan hman tur a tarlang. Form-te hi draft form an ni a, dan anga dinhmun (statutory status) an nei lo.


Belhchian 3A — Mizoram soil series leh HSG inmilna (lookup); hun bik-a leihnuai tui sang ber map

Bung 3-a Clause 3.7 leh 3.10 a ṭanpui.

Buatsaih tur. He belhchian hian (a) Mizoram-a soil series map-a lang tin hydrologic soil group (HSG) an nihna, tui luan chhuah tir (drained) leh tui luan chhuah tir loh (undrained) dinhmun pahnihah, hriatna table (lookup), leh (b) fûr hunah (April–October) hun bik-a leihnuai tui sang ber (seasonal high water table), lei chung aṭanga a thuk zawng map a keng ang. Heng hi a mamawh: NBSS&LUP leh State soil survey (agency hi finfiah tur [TBC]) series map-te, an scale nen; series tin saturated hydraulic conductivity tehfiah leh impermeable layer thlenga a thuk zawng; Central Ground Water Board leh IWRD observation-well record-te, piezometer-te belhchhah nen: Sairang, Bairabi leh Vairengte-a phai leh lui kam zawl-ah, Khawthlangtuipui kama Tlabung-ah leh Kau kama Chawngte-ah, leh Champhai phai-ah, chutah chuan leihnuai tui hi lei chung aṭanga 2 m chhungah a awm thei (Lunglei district-a phai dil tê-ah tui hi "lei chung aṭanga 2.0 m hnuai chhungah" (within 2.0 m below ground level) a awm, CGWB); dil (lake emaw pond; dil tê, dil tê emaw tank tê) kam leh Tuirial leh Serlui B reservoir (tui khuah) kamah; leh tlang site, perched water, tuikhur (tuikhur, tui chhuahna) emaw lei laih pang (cut slope) emaw retaining wall hnuaia tui chiar awmna hmunah. A tlangzarh hma chuan Bung 3-a interim dan hmang rawh: HSG chu saturated hydraulic conductivity tehfiah leh impermeable layer emaw leihnuai tui sang zawng thlenga a thuk zawng aṭangin NEH Part 630, Ch. 7 criteria angin ruat rawh (Clause 3.7.2); retention (ruahtui khawl reng, hman nan emaw lei-a luh tir nan emaw)-in infiltration (lei-a tui luh) a innghahna apiangah site infiltration test hmangin finfiah rawh (Clause 3.7.3); hun bik-a leihnuai tui sang ber chu site piezometer, trial pit emaw observation well hnai ber aṭangin la rawh (Clause 3.10.2); leh chu tui sang zawng chu lei chung aṭanga 0.6 m chhunga a awm apiangah HSG D ruat rawh (Clause 3.10.1).

Table 3A.1 — Soil series leh HSG inmilna (layout)

Soil series District Taxonomic class Lei chung texture Saturated hydraulic conductivity (mm/h) Impermeable layer thlenga a thuk zawng (m) HSG, drained HSG, undrained Map hnar leh scale
                 
                 
                 

Table 3A.2 — Hun bik-a leihnuai tui sang ber, mapping unit zelin (layout)

Mapping unit emaw grid cell Observation well hman April–October record kum zat April–October-a lei chung hnuaia tui sang ber (m) Lei chung aṭanga 0.6 m chhungah (Clause 3.10.1)? Data hnar
           
           

Belhchian 3B — Mizoram CN calibration leh land cover dangte (tlang ramngaw leh hnim, lo neihna ram (shifting cultivation), leimin hnuhma leh leimin bal, tlang kawng leh rel kawng lei laih leh lei vur, terrace nei lei laih leh lei vur pang, lung laihna (quarry) hmai leh a bal, Champhai phai buh chinna zawl, leh dil leh reservoir kam)

Bung 3-a Clause 3.8 leh 3.15 a ṭanpui.

Buatsaih tur. He belhchian hian (a) Mizoram catchment (ruahtui luan khawmna hmun)-a ruahtui tlak leh ruahtui luang (runoff) hmuh tak nena calibrate curve number-te, Table 3.5-a TR-55 value nena khaikhin, leh (b) Table 3.5-in a tarlan loh land cover-te curve number a keng ang: tlang ramngaw leh hnim, shale, siltstone leh sandstone chunga lei thuk lo-ah; Mizoram Water Resources (Management and Regulation) Act, 2024 thuhmahruai (preamble)-in luipui catchment-a "tui hnar tlahniam leh tui tlakchham" (depletion and scarcity of water resources) chhan zinga a sawi lo neihna ram, a vah kum chhinchhiah nen; leimin hnuhma thar leh a bal, May ni 24, 2025 aṭanga June ni 3, 2025 thleng leimin 598-te ang (DM&R figure, chanchin tlangzarh angin); tlang kawng leh Bairabi–Sairang rel kawng lei laih leh lei vur, Aizawl-a Hunthar-a NH-6 lei laih ang; Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 regulation 27-a terrace (tlang panga hmun zawl siam) nei lei laih leh lei vur pang, terrace swale (terrace kawnga ruahtui luanna) leh building pad-te; lung laihna (quarry) hman mek leh hman tawh loh hmai leh a bal, Aizawl chhim lam kawna Hlimen–Melthum quarry-te ang; Champhai phai buh chinna zawl, a bund-te nen; leh dilte leh Tuirial reservoir kam, NEEPCO-in full reservoir level 90.5 m leh minimum drawdown level 68.0 m inkara a kalpui (CERC order, Petition 125/MP/2021), ruahpui ṭan laia a lang chhuak emaw tui a tlahniam emaw. Heng hi a mamawh: catchment tê, cover leh lei hriat sa, gauge nei, paired rainfall–runoff record, IWRD gauging site, agricultural research station leh tank gauge aṭanga, event tin leh antecedent moisture zelin zirchian. A tlangzarh hma chuan: site tin tan pre-development reference chu open space dinhmun ṭha a ni reng (Clause 3.3.2), chuvangin heng cover-te hi pre-development run-ah a lut lo; site pawn lam dinhmun awm mek tan Table 3.5 emaw TR-55 cover row hnai ber hmang rawh, cultivated row-te tiamin (Clause 3.8.3(c)), leh row thlan leh a chhan chu Form 3-1-ah sawi rawh; design ruahpui ṭan laia tui ding chhunga ram chu loss nei lo water surface angin model a ni (Table 3.5; Clause 3.10.4(b)). Heng default-te kalsanna reng reng chuan Clause 3.15 hnuaia calibration a mamawh (Clause 3.15.1(d)).

Table 3B.1 — Land cover dangte, AMC II (layout)

Cover chi HSG A HSG B HSG C HSG D Ia ratio Innghahna (catchment, event, kum)
Tlang ramngaw emaw hnim, shale, siltstone emaw sandstone chunga lei thuk lo, lei thuk zawng chhinchhiah nen; lo neihna ram (shifting cultivation), a vah kum chhinchhiah nen            
Leimin hnuhma thar emaw leimin bal; tlang kawng emaw rel kawng lei laih pang emaw lei vur            
Terrace nei lei laih emaw lei vur pang, terrace swale lined leh building pad nen (Site Development and Slope Modification Regulations, 2017, regulation 27)            
Lung laihna (quarry) hmai emaw a bal, hman mek emaw hman tawh loh            
Champhai phai buh chinna zawl, bund-te chhinchhiah nen            
Dil emaw reservoir (Tuirial, Serlui B) kam, ruahpui ṭan laia a lang chhuak emaw tui a tlahniam            
A dang (sawi rawh)            

Table 3B.2 — CN calibration catchment-te (layout)

Catchment District Zau zawng (km²) HSG leh cover tam ber Event hman Table 3.5 CN CN calibrate Calibrate ÷ Table 3.5
               
               

Belhchian 3C — Software lo pawm nan benchmark test problem-te

Bung 3-a Clause 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 leh 3.16 a ṭanpui.

Tum. Clause 3.16.1-a tarlan loh software chuan a hnuaia problem panga result-te chu a chhuah ve tur a ni (Clause 3.16.3). Problem tin hi a kimin sawi a ni a, Bung 3 kalphung leh table chauh a hmang a, chuvangin chhanna tin kutin endik theih a ni. Lo pawm theihna tolerance chu table-a result tinah ±5% a ni, Clause 3.16.2-a inanna tehna (equivalence threshold); closed-form result-te (Problem 3C-1 aṭanga 3C-4 thleng) tan chuan software chu a lantir ang tihkimna (rounding) thlengin a inmil a ṭha. Thehluh tur (submittal)-in a hnuaia chhanna tin bulah software result chu a tarlang tur a ni.

Entirna chauh — design value a ni lo. Input-te (zau zawng, intensity, ruahtui tlak zat, tlang pang leh basin) hi enchhin nan chauh thlan an ni. Site eng mah tan design data an ni lo.

Problem 3C-1 — Rational Method hmanga tui luang zat sang ber (Clause 3.5)

Input-te. Inlet pakhatah luang lut 2.0 ha catchment: concrete paving leh in chung 1.2 ha, C = 0.90 (Table 3.2, 0.80–0.95 chanve chung lam); lei sandy chunga hlobet (lawn) 0.8 ha, tlang pang pangngai, C = 0.15 (Table 3.2, 0.10–0.15 chanve chung lam). Design AEP 1% (kum 100). Tc-a ruahtui tlak chakna (intensity), climate factor tiamin: i = 120 mm/h.

Ṭhen (b): catchment hrang 0.5 ha, a zawng zawng paved, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 chhanna

Step Chhutna A chhuah
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Tui luang zat sang ber (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Ṭhen (b): C · Cf 0.90 × 1.25 = 1.125, 1.0-ah a chin (Clause 3.5.3) 1.00
Ṭhen (b): tui luang zat sang ber 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Segment method hmanga time of concentration chhut dan (Tc, catchment hla ber aṭanga tui lo thlen hun) (Clause 3.6)

Input-te. Pre-development tui luanna kawng: greenfield chunga sheet flow, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP darkar 24 ruahtui tlak, climate factor tel lo) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (pek sa).

Table 3C.2 — Problem 3C-2 chhanna

Segment Chhutna Tui kal hun (travel time)
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN ruahtui luang thuk zawng, AMC leh Ia sensitivity (Clause 3.8)

Input-te. HSG C chunga pre-development reference: AMC II-ah CN = 74 (Table 3.5), a zawng zawng tui luh theihna hmun (pervious). Ruahtui tlak belhkhawm P = 100 mm; case pahnihna P = 25 mm.

Table 3C.3 — Problem 3C-3 chhanna

Case S (mm) Ia (mm) Ruahtui luang Q (mm), P = 100 mm Ruahtui luang Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Ruahtui luang chu Q = (P − Ia)² / (P − Ia + S) a ni. Case (c) hian 100 mm-ah case (a) aiin ruahtui luang a tlem zawk a, 25 mm-ah erawh a tam zawk, Clause 3.8.5 leh Milem 3.3-in a sawi ang hian.

Problem 3C-4 — Impervious hrang leh composite-a entir dan, leh SCS unit hydrograph (hun hrang hranga tui luang zat) peak (Clause 3.9 leh 3.11.2)

Input-te, ṭhen (a). Site, 50% directly connected impervious (CN 98) leh 50% HSG B chunga open space (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Input-te, ṭhen (b). A = 2.5 km² sub-area, Tc = 1.0 h leh computation interval Δt = 0.1 h nen.

Table 3C.4 — Problem 3C-4 chhanna

Step Chhutna A chhuah
(a) Impervious chanve (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious chanve S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted ruahtui luang, sub-area hrang hrang 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Composite CN hmanga ruahtui luang S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval endikna (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h a tling
(b) Lag leh peak thlen hun (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Ṭhen (a) hian Clause 3.9 hrilhfiahna-a khaikhinna (9.9 mm vel leh 1.8 mm) a chhuah ve.

Problem 3C-5 — Level-pool (modified Puls) hmanga storage routing (Clause 3.12.1)

Input-te. Detention basin (ruahtui dah rihna, a luan chhuah zat tihhniam nan), a sir ding tlat (vertical) leh plan area 500 m², Table 3C.5-a stage–storage–discharge inzawmna nen. Triangular inflow hydrograph: t = 0-ah 0, t = 30 min-ah 0.50 m³/s thlengin a sang zel (linear), t = 90 min-ah 0 thlengin a hniam zel. t = 0-ah basin a ruak. Routing interval Δt = 10 min (600 s). Tailwater (outfall hnuailama tui sang zawng) a awm lo.

Table 3C.5 — Problem 3C-5 stage–storage–discharge inzawmna

Stage (m) Khawlna S (m³) Luan chhuah O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Kalphung. Storage-indication equation chu (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2) a ni. Table-in O = S / 5,000 (S chu m³-in, O chu m³/s-in) a pe a, chuvangin 2S/Δt + O = 17.667 O leh 2S/Δt − O = 15.667 O a ni a, step tin chu O2 = [(I1 + I2) + 15.667 O1] / 17.667 a ni. Table 3C.5-a linear interpolate software chuan result inang chiah a chhuah tur a ni.

Table 3C.6 — Problem 3C-5 route hnua luan chhuah

Hun (min) Luan lut I (m³/s) Luan chhuah O (m³/s) Khawlna (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

A chhuah. Luan chhuah sang ber 0.172 m³/s, min 70-ah; khawlna sang ber 859 m³; stage sang ber 1.72 m. Luan lut sang ber 0.50 m³/s chu a value 34%-ah tihhniam a ni.

Table 3C.7 — Dilna thehluhtu (applicant)-in a tarlan tur benchmark result

Problem A chhuah Benchmark Software result Danglamna (%) ±5% chhungah?
3C-1 Q, case bulpui (m³/s) 0.500      
3C-1 Q, ṭhen (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Ruahtui luang, sub-area hrang hrang (mm) 9.85      
3C-4 Ruahtui luang, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Luan chhuah sang ber (m³/s) 0.172      
3C-5 Khawlna sang ber (m³) 859      

Belhchian 3D — Tuifinriat kam ram zawl (flat coastal land) tan peak rate factor zirchianna

Bung 3-a Clause 3.11.5 leh 3.15 a ṭanpui.

Mizoram-ah mamawh a ni lo. Mizoram hi tuifinriat a hnaih lo (landlocked) a, a zawng zawng deuhthaw hi tlang pang chhoh nasa a ni a, chuvangin State-ah ram engmahin Clause 3.11.5(a) a tlin lo va, standard factor 484 (PRF′ = 0.208) hi ram zawng zawngah hman a ni (Clause 3.11.5). Bairabi, Vairengte, Sairang, Tlabung leh Chawngte-a phai leh lui kam zawl leh Champhai phai hi hmun ṭhenkhatah a zawl a, mahse tuifinriat kam phai (coastal plain) an ni lo; an tui chhan muanna hi khawlna leh luipui tailwater (Clause 3.10.4 leh 3.12.4) leh Bung 5-a outfall (drain tui luan chhuahna) khar endikna hmangin entir a ni a, peak rate factor hniam zawk hmangin a ni lo; tlang chhip erawh minute rei lo te chhungin a chhang. Belhchian leh Table 3D.1 ruangam hi belhchian number thlak danglam loh nan chauh vawn a ni.

Table 3D.1 — Calibrate peak rate factor-te (layout)

Catchment Zau zawng (km²) Tlang pang mean (m/m) Drainage dinhmun Event hman Calibrated PRF (US customary) PRF′ (SI) Hman theihna huam chin
               
               

Belhchian 3E — Subzone 2(b) CWC SUH parameter-te, subzone 2(c)-ah endikna atana hman, entirna chhutna nen

Bung 3-a Clause 3.4.3 leh 3.11.4 a ṭanpui.

Buatsaih tur. He belhchian hian CWC subzone 2(b) (South Brahmaputra), subzone 2(c) (Barak and others) report tlangzarh loh aiah he Kaihhruaina Bu-in a report a hman, tan synthetic unit hydrograph parameter-te regression inzawmna, design ruahpui duration, loss rate, base flow, areal reduction leh time distribution, tin te Flood Estimation Report-a a awmna nen, leh catchment pakhat entirna chhutna a table-in a tarlang ang. Heng hi a mamawh: Mizoram zawng zawng huamtu subzone 2(c) (Barak and others) CWC Flood Estimation Report, hmar lam tlangte, Tlawng, Tuirial, Serlui leh Tuivai kaltlanga Barak-a luang; chhim leh chhak lam, Chhimtuipui (Kaladan, CWC subzone list-a "Kalden") kaltlanga luang; leh chhim leh thlang lam, Khawthlangtuipui (Karnaphuli) kaltlanga luang, list-in a sawi loh luipui, "a dangte" (others) hnuaia tel (NEER chhiar dan), huamtu, CWC-in a la tlangzarh ngai loh; CWC aṭanga a awm lo emaw buatsaih mek a ni lo tih ziaka finfiahna, leh Khawthlangtuipui leh Tiau subzone finfiahna [TBC]; chu hma chuan, South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), Mizoram ṭhenkhat mah a huam lohna (a chhim lam ri chu 25°15′ N vel a ni a, Mizoram hmar lam ri chu 24°35′ N; NEER chhutna), a Figs 12(a) leh 12(b)-a areal reduction curve-te, copy hmanah a value chhiar a ni lo [TBC], leh a unit-hydrograph inzawmna, he Kaihhruaina Bu-in endikna atan chauh a hman (Bung 3 Thu hnar en rawh); leh State-a CWC level-monitoring site pasarih level leh discharge record-te (Tlawng-a Sairang, Tuirial-a Turial, Bailley Bridge Tuipui, Chhimtuipui-a Sihthangpui, Tlawng-a Keitum, Tuichang leh Tuichawng; 2018-ah panga hman loh, chanchin tlangzarh angin), Tuirial reservoir tan NEEPCO luan lut leh level record-te, leh Bairabi–Sairang rel kawng bridge-catchment data, heng zinga pakhat mah hmuh a ni lo [TBC], ziak chhawn leh report tlangzarh nena endik; leh survey emaw DEM aṭanga physiographic parameter teh catchment pakhat. A tlangzarh hma chuan, SUH input zawng zawng chu Flood Estimation Report hman tur aṭangin la nghal rawh (Clause 3.11.4(a)), Clause 2.3.3(b) leh 2.7.3-a darkar 24 design ruahtui tlak chu Clause 2.8 climate factor nen hmang rawh (Clause 3.11.4(b)), SUH result chu dinhmun pangngai awm mek tan HEC-HMS emaw SWMM result bulah tarlang rawh (Clause 3.11.4(c)), leh hydrograph model-in 1% AEP peak hniam zawk a pek chuan, Clause 3.15 hnuaia calibration hmangin a chhan sawi emaw SUH peak hmang emaw rawh (Clause 3.11.4(d)).

Table 3E.1 — Subzone zela SUH inzawmna (layout)

Parameter Symbol Unit Subzone 2(b) (South Brahmaputra) inzawmna, Mizoram-ah endikna atan chauh hman
Darkar 1 unit hydrograph tui luang zat sang ber Qp m³/s Qp = 0.905 A^0.758 (Eq. 3.4.3.2); peak hi catchment zau zawng chauh a innghat
Zau zawng unit tin tui luang zat sang ber qp m³/s per km² qp = Qp / A
Unit ruahtui tlak laili aṭanga peak thlen hun tp h tp = 2.87 qp^−0.839
Peak 50%-a UH zau zawng W50 h W50 = 2.304 qp^−1.035
Peak 75%-a UH zau zawng W75 h W75 = 1.339 qp^−0.978
Peak 50%-a rising limb zau zawng WR50 h WR50 = 0.814 qp^−1.018
Peak 75%-a rising limb zau zawng WR75 h WR75 = 0.494 qp^−0.966
UH bul zau zawng (base width) TB h TB = 2.447 tp^1.157
A sang ṭan aṭanga peak thlen hun Tm h Tm = tp + tr/2
Unit duration tr h 1
Design ruahpui duration TD h TD = 1.1 tp
Design loss rate — mm/h 3.5 ("0.35 cm/hr" tia chhuah, tuilian event 100-a modal value); 2(b) SUH endikna run atan chauh, HSG ruat nan emaw urban model-ah emaw hman ngai loh tur (Clause 3.7); Mizoram Surma shale, CGWB-in "tui luh theihna leh infiltration hniam lutuk" (very low permeability and infiltration) nei anga a sawi, tan a sang lutuk ang (NEER chhiar dan)
Design base flow — m³/s per km² 0.05 (event 100 zinga 68 chu 0.01–0.09 chhungah)
Darkar t leh darkar 24 ruahtui tlak ratio — — Kum 10, partial duration, report-a self-recording gauge (amah ngeiin a chhinchhiah ruah tehna) parukte mean: 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Mizoram-ah hman a ni lo, subzone 2(b)-ah a awm loh avangin: sub-area tinah Clause 2.3.6(f)-a Mizoram interim ratio hman a ni
Ruahtui tlak time distribution — darkar zela cumulative fraction Fig. 11 leh Annex 4.4 chhiar a ni lo [TBC]
Ni 1 ruahtui tlak darkar 24-a chantirna — factor 1.15 (§4.3.1); Mizoram-ah hman a ni lo, darkar 24 design ruahtui tlak zat chu Clause 2.3.6 aṭanga lak a nih avangin
Areal reduction factor ARF point ruahtui tlak % Figs 12(a) (1, 3 leh 6 h) leh 12(b) (12 leh 24 h); curve value chhiar a ni lo [TBC]. Mizoram-ah 25–5,000 km² catchment tan, 2(c) report tlangzarh loh aiah hman a ni (Clause 2.7.3)
Mizoram khawpui-a kum 50 darkar 24 point ruahtui tlak — mm Awm lo: report plate-te chu a chhim lam ri, 25°15′ N vel-ah a tawp a, Mizoram hmar lam ri 24°35′ N aia latitude 40′ vel hmar lamah (NEER chhutna); Mizoram khawpui pakhat mah an chungah a awm lo
Mizoram tui luan chhuahna, gauge nei catchment — — Hman 14 zinga pakhat mah a awm lo
Inzawmna hman theihna catchment zau zawng A km² 50 chuang aṭanga 1,500 thleng; 5,000 thleng "fimkhur takin" (judiciously)
Report-a awmna — — Annexure 1.1, §§3.4–3.7, Table 3.3, Table 4.1, §4.3, entirna chhutna

Hriat tur: inzawmna-te hi CWC subzone 2(b) report (Bung 3 Thu hnar)-a an chhuah angin, scan copy aṭanga chhiar a ni a, Table 3.3 hi he series-a North-East edition hmasa zawkte tan a phêk milem nena endik a ni. A hi catchment zau zawng km²-a a ni. Huam chin. Report subzone list-in subzone 2(c), "Barak and others", chu "Barak, Kalden leh Manipur luipuite" (Barak, Kalden and Manipur rivers) huamtu angin a pe (Annexure 1.1). "Kalden" hi Kaladan a ni a, Mizoram-ah chuan Chhimtuipui a ni (NEER chhiar dan). Chuvangin Mizoram luipui zawng zawng hi subzone 2(c)-ah an awm: hmar lam tlangte chu Tlawng (Dhaleswari), Tuirial (Sonai), Serlui, Langkaih leh Tuivai kaltlangin Barak-ah a luang; chhim leh chhak lam chu Chhimtuipui kaltlangin Kaladan-ah a luang; chhim leh thlang lam chu Khawthlangtuipui (Karnaphuli) kaltlangin Bangladesh-ah a luang, list-in a sawi loh luipui, hnawl chhuahna (elimination) avanga "a dangte" (others) hnuaia tel; leh chhak lam ri-a Tiau chu Myanmar-a Manipur luipui system-ah a zawm (heng zawng zawng hi NEER chhiar dan, CWC subzone map-ah finfiah tur [TBC]). State ṭhenkhat mah subzone 2(b)-ah a awm lo, a chhim lam ri chu 25°15′ N vel a ni a, Mizoram hmar lam ri erawh 24°35′ N a ni (NEER chhutna). CWC-in subzone 2(c) tan report a tlangzarh lo: 2(b) report-a 2000 thlenga report tlangzarh 21 list-ah a awm lo va, CWC download phêk 2024-ah pawh a awm lo; CWC aṭanga ziaka finfiahna mamawh a la ni [TBC]. Innghahna. Unit hydrograph hi Mizoram pawn lama rel kawng leh national-highway bridge-a gauge catchment 14 chungah a innghat a, a vaiin bridge-kum 100 record; pakhat mah Mizoram tui a luan chhuahna a ni lo va, pakhat mah Surma shale tlang chhip pang catchment a ni lo. Report-in kum 50 peak a chhuah ve dan hi "+ 40.72% − 57.84%" a dik lo va, "catchment tê tak takte hi an danglamna a lian zawk" (very small catchments have larger variation). Zau zawng chauh. 2(b) peak hi A chauh a innghat: tlang pang hi khawiah mah a lut lo, chuvangin SUH hian catchment zau zawng inang, 30°–45°-a tlang inkar thuk (gorge) kaltlanga luang emaw phai kaltlang emaw, unit hydrograph inang a pe. Entirna chhutna. Report entirna chu Mizoram pawn lama rel kawng bridge 160 a ni (470 km², L 56.35 km, Lc 31.40 km, S 2.02 m/km): Qp = 96.00 m³/s, qp = 0.20 m³/s per km², tp = 11.07 h, 11.50 h-ah siam rem, W50 = 12.19 h, W75 = 6.46 h, WR50 = 4.19 h, WR75 = 2.34 h leh TB = 41.00 h, loss 0.35 cm/h leh base flow 0.05 × 470 = 23.50 m³/s nen. State-a hman dan. 2(b) SUH hi Mizoram-ah Clause 3.11.4 endikna atan chauh hman a ni, Tlawng, Tuirial, Serlui, Tuichang, Tuichawng, Khawthlangtuipui leh an lui pengte-a 50 km² chuang rural catchment tan; design model chu site study, SCS-CN emaw HEC-HMS-a Clark emaw Snyder unit hydrograph a ni a, Clause 3.15 hnuaiah CWC level-monitoring site-te (Tlawng-a Sairang, active hydrograph nei; Tuirial-a Turial; Chhimtuipui-a Sihthangpui; Tuichang leh Tuichawng), Bairabi, Dapchhuah, Tlabung leh hmun dangte-a CWC ruah tehna (rain gauge)-te, Tuirial reservoir tan NEEPCO record-te emaw State gauge-te nen, an awmna apiangah, calibrate a ni (Clause 3.7 Hrilhfiahna). Mizoram luipui eng mah tan discharge record, stage–discharge curve, gauge-a catchment zau zawng emaw unit hydrograph hmuh a ni lo [TBC]. Calibrate model-in 2(b) SUH aia 1% AEP peak hniam zawk a pek chuan, Clause 3.11.4(d) chu a ziak angin hman a ni. Tuirial leh Serlui B dam (tui khuahna) hnuaiah chuan tuilian hi release-in a ruat (Clause 5.8.5(e)), phai-ah chuan outfall-a luipui tui sang zawngin (Clause 5.8.5(c) leh (d)), unit hydrograph-in a ni lo. Aizawl, Lunglei, Serchhip, Champhai leh khawpui dangte urban catchment hi 50 km² aiin an tê fe a, Clause 3.4 hnuaiah Rational Method emaw SWMM hmangin design a ni. Cross-drainage structure leh outfall, catchment 1 km² chuang nei apiang hian Clause 2.3.6-a design ruahtui tlak hmangin site-specific hydrology study a mamawh. Design loss rate 3.5 mm/h hi subzone 2(b) phai leh tlang bul rural catchment tuilian-a fit φ-index a ni a; lei infiltration capacity a ni lo va, HSG ruat nan (Clause 3.7), urban SCS-CN emaw SWMM model-ah, emaw infiltration practice size nan (Bung 4) hman a ni lo.

Table 3E.2 — Entirna chhutna tlangpui (layout)

Step A chhunga thu Clause
1 Catchment zau zawng, lui bulpui sei zawng, centroid thleng sei zawng leh equivalent slope, survey emaw DEM aṭangin 3.11.4(a)
2 Table 3E.1 aṭanga SUH parameter-te leh unit hydrograph plot 3.11.4(a)
3 Design ruahpui duration, point leh areal darkar 24 ruahtui tlak climate factor nen, time distribution 3.11.4(a), (b)
4 Design loss rate hnua effective ruahtui tlak; SUH nena convolution; base flow belh 3.11.4(a)
5 1% AEP peak, dinhmun pangngai awm mek tan HEC-HMS emaw SWMM peak nena khaikhin 3.11.4(c), (d)

Form 3-1 — Hydrology Chhutna Tlangpui

Bung 3-a Clause 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Thehluh tur (submittal) pakhatah form pakhat. Section H-a thuziak tarlante belh rawh.

A. Project

Table 3F.1 — Form 3-1: project

Field Ziah luh tur
A1. Project hming leh dilna thehluhtu (applicant)  
A2. Hmun (khaw emaw ward, survey number, district)  
A3. Site zau zawng (ha) leh khaikhinna hmun (point of comparison, POC) zat  
A4. Catchment chi: standard (Clause 2.11.2) emaw tuilian hlauhawm (flood-sensitive) (Clause 2.11.3)  
A5. Design Ruahtui Tlak Sheet reference (Form 2-1)  

B. Kalphung leh software (Clause 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: kalphung leh software

Field Ziah luh tur
B1. Chhutna tin tum (tui luan tirna, khawlna, khaikhinna, catchment study)  
B2. Tum tin tan ruahtui luan khawmna zau zawng (contributing area) (ha emaw km²)  
B3. Kalphung hman leh a phalna Table 3.1 row  
B4. Kalphung thlan chhan  
B5. Software leh a version; SWMM emaw HEC chunga siam package tan engine leh a version (Clause 3.16.1, 3.16.2)  
B6. Software dang tan: Belhchian 3C benchmark result belh (Table 3C.7) leh Clause 3.16.2-a 5% khaikhinna  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), sub-area tê ber 0.133 Tc leh hyetograph (hun hrang hranga ruahtui tlak zat) time step nen (Clause 3.11.3(a))  
B9. Storage routing leh channel routing kalphung (Clause 3.12.1, 3.12.2)  
B10. Dynamic-wave routing a ngai em? A ngai chuan, Clause 3.12.4 condition khawi nge  
B11. CWC SUH benchmark a ngai em (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation (kum tam tak ruahtui hmanga model) a ngai em (Clause 3.13.1)? Record hman leh dil (tank) tui sang zawng ṭanna (Clause 3.13.5)  
B13. Calibration a ngai em (Clause 3.15.1)? Calibration report reference  

C. Lei leh leihnuai tui (Clause 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: lei leh leihnuai tui

Field Ziah luh tur
C1. HSG map hnar, scale leh lookup hman (Clause 3.7.1, Belhchian 3A) emaw NEH Part 630, Ch. 7 ruatna (Clause 3.7.2)  
C2. Infiltration test: zat, hmun, thuk zawng, result (Clause 3.7.3)  
C3. Hun bik-a leihnuai tui sang ber: lei chung hnuaia a thuk zawng leh hnar (Clause 3.10.2)  
C4. 0.6 m chhunga hmun, HSG D ruat (Clause 3.10.1)  
C5. Tihbuai pervious hmun leh HSG tihhniam hman (Clause 3.3.3(b))  

D. Sub-area leh dinhmun zela parameter (Clause 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: sub-area leh dinhmun zela parameter

Sub-area Dinhmun (pre / post) Zau zawng (ha) Impervious: in chung / paved / kawng (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious ṭhen) C leh Cf (Rational a nih chuan) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

Sub-area leh dinhmun tin tan worksheet pakhat.

Table 3F.5 — Form 3-1: time of concentration chhut nan worksheet

Segment Tui luan dan Surface leh n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel emaw pipe       —    
Tc (10 min aia tlem lo)  

E1. Post-development Tc hi pre-development Tc aiin a tawi zawk em? A tawi zawk loh chuan a chhan sawi rawh (Clause 3.6.6): ______

F. Ruahtui tlak leh loss (Clause 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: ruahtui tlak, loss leh tui sang zawng ṭanna

Field Ziah luh tur
F1. AEP leh duration run; climate factor hman (Bung 2)  
F2. Duration tin tan AMC hman (Clause 3.8.4)  
F3. Design run tan Ia ratio; Ia = 0.05S sensitivity run siam (Clause 3.8.5)  
F4. Peak rate factor hman; 484 aia hniam a nih chuan, Belhchian 3D value leh a hmanna ram (Clause 3.11.5)  
F5. Dil (tank) emaw tui awmna (waterbody) tin tui sang zawng ṭanna, leh a innghahna (Clause 3.12.5, 3.13.5)  
F6. Site pawn aṭanga tui luang lut (off-site run-on): tui luan tirna leh khaikhinna atana ram hman dan (land use) ngaih (Clause 3.3.5)  
F7. Incidental storage chhiar tel em? A tel chuan, authority lo pawmna (Clause 3.12.3)  

G. Kalsanna (departures)

Table 3F.7 — Form 3-1: Bung 3 kalsanna

No. Clause kalsan Bung 3 value aia hman value A chhan
1      
2      

H. Thil belh (Clause 3.17)

Table 3F.8 — Form 3-1: thil belh

Thil Belh (aw / aih / a huam lo) Reference
H1. Catchment map, pre- leh post-development, sub-area, Tc tui luanna kawng, POC leh site pawn aṭanga tui luang lut nen    
H2. HSG map, leihnuai tui sang zawng data leh infiltration test result    
H3. Parameter table (Section D) leh Tc worksheet (Section E)    
H4. Design Ruahtui Tlak Sheet (Form 2-1) leh hyetograph    
H5. Hydrograph table leh plot; stage–storage leh stage–discharge table; route hnua luan chhuah; tui sang zawng sang ber    
H6. POC tin tan Form 3-2    
H7. Calibration report (Clause 3.15)    
H8. Model input leh output file pangngai (native) (Clause 3.16.4)    

I. Mawhphurtu engineer puanchhuahna (Clause 3.17 item 10)

Kei hian Mizoram Ruahtui Luanna Design Kaihhruaina Bu (Draft v1.0) Bung 3-a kalphung leh parameter-te hi he thehluh tur (submittal)-ah hian hman a ni a, kalsanna tin hi Section G-ah tarlan leh a chhan sawi a ni tih ka puang e.

Table 3F.9 — Form 3-1: mawhphurtu engineer puanchhuahna

Field Ziah luh tur
Hming  
Thiamna leh registration number  
Hnathawhna pawl (organisation)  
Hmingziak  
Ni  

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0.


Form 3-2 — Hmasawnna Hma leh Hnu Khaikhinna

Bung 3-a Clause 3.8.5, 3.11.5 leh 3.14 a ṭanpui.

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Khaikhinna hmun (point of comparison, POC) tin tan form pakhat. Tui luang chu m³/s-in, tui zat (volume) chu m³-in.

A. Khaikhinna hmun (Clause 3.14.2)

Table 3F.10 — Form 3-2: khaikhinna hmun

Field Ziah luh tur
A1. POC hming chhinchhiahna leh hmun  
A2. POC-a luang lut zau zawng: site (ha) leh site pawn aṭanga tui luang lut (ha)  
A3. Site pawn aṭanga tui luang lut hi site khawlna kaltlangin a kal em? (Clause 3.14.2(c))  
A4. Catchment chi: standard (Clause 2.11.2) emaw tuilian hlauhawm (flood-sensitive) (Clause 2.11.3)  
A5. Tailwater hman, Clause 2.12 joint case-te tiamin (Clause 3.14.9(c))  
A6. Tuilian hlauhawm chauh: duration zawng zawnga 10% AEP pre-development peak lian ber, Clause 2.11.3 chin (cap) (Clause 3.14.7)  
A7. Tuilian hlauhawm chauh: pre-development critical duration-a 50% AEP pre-development peak (Clause 2.11.3)  

B. Tui luang zat sang ber (Clause 3.14.7–3.14.10)

Chin: standard catchment-ah AEP leh duration inang tan 0.9 × Q_pre (Clause 3.14.10(a)); tuilian hlauhawm catchment-ah chin A6 (1% AEP tan) leh A7 (50% AEP tan) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: AEP leh duration zela tui luang zat sang ber

AEP Duration (h) AMC Q_pre Q_post, thunun loh Q_post, route hnu Chin A tling em?
50% (kum 2) 1 II          
50% (kum 2) 2 II          
50% (kum 2) 3 II          
50% (kum 2) 6 II          
50% (kum 2) 12 III          
50% (kum 2) 24 III          
50% (kum 2) 48 III          
50% (kum 2) 72 III          
10% (kum 10) 1 II          
10% (kum 10) 2 II          
10% (kum 10) 3 II          
10% (kum 10) 6 II          
10% (kum 10) 12 III          
10% (kum 10) 24 III          
10% (kum 10) 48 III          
10% (kum 10) 72 III          
1% (kum 100) 1 II          
1% (kum 100) 2 II          
1% (kum 100) 3 II          
1% (kum 100) 6 II          
1% (kum 100) 12 III          
1% (kum 100) 24 III          
1% (kum 100) 48 III          
1% (kum 100) 72 III          

C. Tui zat leh khawlna (Clause 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: tui zat leh khawlna

AEP Duration ruat (governing) (h) Ruahtui luang zat, pre Ruahtui luang zat, post thunun loh Retention volume Detention storage mamawh Khawlna-a tui sang zawng sang ber (m)
50% (kum 2)            
10% (kum 10)            
1% (kum 100)            

C1. Khawlna tan duration ruat (governing), leh darkar 24, 48 leh 72 result (Clause 3.14.10): ______

D. Sensitivity run (Clause 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity run

Run Ruahpui ruat (AEP, duration) Q_post, route hnu danglamna (%) Khawlna mamawh danglamna (%) Retention volume emaw WQv ruat (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (factor hniam zawk hman a nih chauhin)       —

E. Endikna inzawmte (Clause 3.14.12)

Table 3F.14 — Form 3-2: endikna inzawmte

Endikna A chhuah Thehluh tur-a reference
Tui hniam hun (drawdown time) (Bung 4)    
Orifice (tui chhuahna khur tê) tê ber leh trash screen (Bung 4)    
Emergency spillway (Bung 4)    
Outfall khar endikna (Bung 5)    
Luanna hnuailam zirchianna (Bung 5)    

F. Mawhphurtu engineer puanchhuahna

Kei hian he khaikhinna hi Clause 3.14 kalphung angin, pre- leh post-development run-ah design ruahpui inang hmangin siam a ni a, tehna (criterion) tlin nan catchment pangngai pakhat aṭanga catchment dangah ruahtui luang engmah luan peng tir a ni lo tih ka puang e (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: mawhphurtu engineer puanchhuahna

Field Ziah luh tur
Hming  
Thiamna leh registration number  
Hmingziak  
Ni  

Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0.