Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Mizoram soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Mizoram to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the monsoon season (April–October). It needs NBSS&LUP and State soil survey (agency to be confirmed [TBC]) series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the IWRD, supplemented by piezometers in the valley floors and river terraces at Sairang, Bairabi and Vairengte, at Tlabung on the Khawthlangtuipui and at Chawngte on the Kau, and the Champhai flats, where the water table may stand within 2 m of ground (in small valley ponds of Lunglei district water stands "within 2.0 m below ground level", CGWB), the margins of the dils and of the Tuirial and Serlui B reservoirs, and hill sites with perched water, springs (tuikhur) or seepage below a cut slope or retaining wall. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of April–October record | Highest April–October level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Mizoram CN calibration and supplementary land covers (hill forest and scrub, shifting-cultivation land, landslide scars and slide debris, hill-road and railway cuts and fills, terraced cut and fill slopes, stone-quarry faces and spoil, the paddy flats of Champhai, and dil and reservoir margins)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Mizoram catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the forest and scrub of the hills, on thin soil over shale, siltstone and sandstone; the shifting-cultivation land that the preamble of the Mizoram Water Resources (Management and Regulation) Act, 2024 names among the causes of the "depletion and scarcity of water resources" in the catchments of the rivers, with the year of clearing recorded; the fresh scars and debris of landslides, such as those of the 598 landslides of 24 May–3 June 2025 (DM&R figures, as reported); the cuts and fills of hill roads and of the Bairabi–Sairang railway, such as the NH-6 cuts at Hunthar in Aizawl; the terraced cut and fill slopes, terrace swales and building pads of regulation 27 of the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017; the faces and spoil of stone quarries, active and disused, such as the Hlimen–Melthum quarries on Aizawl's southern edge; the paddy flats of the Champhai valley floor, with their bunds; and the margins of the dils and of the Tuirial reservoir, which NEEPCO operates between a full reservoir level of 90.5 m and a minimum drawdown level of 68.0 m (CERC order in Petition 125/MP/2021), exposed or drawn down at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from IWRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Hill forest or scrub on thin soil over shale, siltstone or sandstone, with the depth of soil recorded; shifting-cultivation land, with the year of clearing recorded | ||||||
| Fresh landslide scar or slide debris; hill-road or railway cut slope or fill | ||||||
| Terraced cut or fill slope with lined terrace swales and building pads (Site Development and Slope Modification Regulations, 2017, regulation 27) | ||||||
| Stone-quarry face or spoil, active or disused | ||||||
| Paddy flats of the Champhai valley floor, with the bunds recorded | ||||||
| Margin of a dil or of a reservoir (Tuirial, Serlui B) exposed or drawn down at the start of the storm | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Mizoram. Mizoram is landlocked and almost all of it is steep hill, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The valley floors and terraces at Bairabi, Vairengte, Sairang, Tlabung and Chawngte and the Champhai flats are flat in places but are not coastal plain; their slower response is represented by storage and river tailwater (Clauses 3.10.4 and 3.12.4) and by the outfall-closed check of Chapter 5, not by a lower peak rate factor, while the ridges respond within minutes. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzone 2(b), applied as a check in subzone 2(c), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzone 2(b) (South Brahmaputra), whose report this Manual applies in place of the unpublished report for subzone 2(c) (Barak and others), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs a CWC Flood Estimation Report for subzone 2(c) (Barak and others), which covers the whole of Mizoram: the northern hills, which drain through the Tlawng, the Tuirial, the Serlui and the Tuivai to the Barak, the south-east, which drains through the Chhimtuipui (the Kaladan, "Kalden" in CWC's subzone list), and the south-west, which drains through the Khawthlangtuipui (the Karnaphuli), a river the list does not name and which falls under "others" (NEER's reading), and which CWC has never published, with written confirmation from CWC that none exists or is in preparation, and of the subzone of the Khawthlangtuipui and the Tiau [TBC]; until then, from the South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), in which no part of Mizoram lies (its southern limit is about 25°15′ N and Mizoram's northern limit 24°35′ N; NEER's arithmetic), the areal reduction curves of its Figs 12(a) and 12(b), whose values were not read on the copy used [TBC], and its unit-hydrograph relationships, which this Manual uses only as a check (see the References of Chapter 3); and the level and discharge records of the seven CWC level-monitoring sites in the State (Sairang on the Tlawng, Turial on the Tuirial, Bailley Bridge Tuipui, Sihthangpui on the Chhimtuipui, Keitum on the Tlawng, Tuichang and Tuichawng; five reported inactive in 2018, as reported), NEEPCO's inflow and level records for the Tuirial reservoir, and the bridge-catchment data of the Bairabi–Sairang railway, none of which was obtained [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 2(b) (South Brahmaputra) relationship, applied in Mizoram as a check only |
|---|---|---|---|
| Peak discharge of the 1-hour unit hydrograph | Qp | m³/s | Qp = 0.905 A^0.758 (Eq. 3.4.3.2); the peak depends on the catchment area alone |
| Peak discharge per unit area | qp | m³/s per km² | qp = Qp / A |
| Time from centre of unit rainfall to peak | tp | h | tp = 2.87 qp^−0.839 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.304 qp^−1.035 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.339 qp^−0.978 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 0.814 qp^−1.018 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.494 qp^−0.966 |
| Base width of UH | TB | h | TB = 2.447 tp^1.157 |
| Time to peak from start of rise | Tm | h | Tm = tp + tr/2 |
| Unit duration | tr | h | 1 |
| Design storm duration | TD | h | TD = 1.1 tp |
| Design loss rate | — | mm/h | 3.5 (printed "0.35 cm/hr", the modal value of 100 flood events); for the 2(b) SUH check run only, never to assign an HSG or in an urban model (Clause 3.7); likely too high for the Surma shale of Mizoram, which the CGWB describes as of "very low permeability and infiltration" (NEER's reading) |
| Design base flow | — | m³/s per km² | 0.05 (68 of 100 events in the range 0.01–0.09) |
| Ratio of t-hour to 24-hour rainfall | — | — | 10-yr, partial duration, mean of the six self-recording gauges of the report: 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Not used in Mizoram, which is not in subzone 2(b): the Mizoram interim ratios of Clause 2.3.6(f) apply in every sub-area |
| Time distribution of rainfall | — | cumulative fraction by hour | Fig. 11 and Annex 4.4 not read [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 (§4.3.1); not used in Mizoram, where the 24-hour design depths come from Clause 2.3.6 |
| Areal reduction factor | ARF | % of point rainfall | Figs 12(a) (1, 3 and 6 h) and 12(b) (12 and 24 h); curve values not read [TBC]. Used in Mizoram for catchments of 25–5,000 km² in place of the unpublished 2(c) report (Clause 2.7.3) |
| 50-yr 24-hour point rainfall at Mizoram towns | — | mm | None: the plates of the report stop at its southern boundary, about 25°15′ N, some 40′ of latitude north of Mizoram's northern limit at 24°35′ N (NEER's arithmetic); no Mizoram town is on them |
| Gauged catchments that drain Mizoram | — | — | None of the 14 used |
| Catchment area for which the relationships apply | A | km² | more than 50 to 1,500; up to 5,000 "judiciously" |
| Report reference | — | — | Annexure 1.1, §§3.4–3.7, Table 3.3, Table 4.1, §4.3, worked example |
Note: relationships as printed in the CWC subzone 2(b) report (References of Chapter 3), read from a scanned copy and with Table 3.3 checked against its page images for the earlier North-East editions of this series. A is the catchment area in km². Coverage. The report's subzone list gives subzone 2(c), "Barak and others", as covering the "Barak, Kalden and Manipur rivers" (Annexure 1.1). "Kalden" is the Kaladan, which in Mizoram is the Chhimtuipui (NEER's reading). Mizoram's rivers are therefore all in subzone 2(c): the northern hills drain to the Barak through the Tlawng (the Dhaleswari), the Tuirial (the Sonai), the Serlui, the Langkaih and the Tuivai; the south-east drains to the Kaladan through the Chhimtuipui; the south-west drains through the Khawthlangtuipui (the Karnaphuli) to Bangladesh, a river the list does not name, which falls under "others" by elimination; and the Tiau on the eastern border joins the Manipur river system in Myanmar (all NEER's reading, to be confirmed on CWC's subzone map [TBC]). No part of the State lies in subzone 2(b), whose southern limit is about 25°15′ N, while Mizoram's northern limit is 24°35′ N (NEER's arithmetic). CWC has published no report for subzone 2(c): the 2(b) report's list of the 21 reports published by 2000 has none, and neither has CWC's download page of 2024; written confirmation from CWC is still wanted [TBC]. Basis. The unit hydrograph rests on 14 catchments gauged at railway and national-highway bridges outside Mizoram, 100 bridge-years of record in all; none drains Mizoram, and none is a steep ridge catchment of Surma shale. The 50-yr peaks the report reproduces err by "+ 40.72% − 57.84%", and "very small catchments have larger variation". Area only. The 2(b) peak depends on A alone: slope enters nowhere, so the SUH gives the same unit hydrograph to a catchment of the same area whether it falls through gorges at 30°–45° or crosses a plain. Worked example. The report's example is railway bridge 160, outside Mizoram (470 km², L 56.35 km, Lc 31.40 km, S 2.02 m/km): Qp = 96.00 m³/s, qp = 0.20 m³/s per km², tp = 11.07 h, adjusted to 11.50 h, W50 = 12.19 h, W75 = 6.46 h, WR50 = 4.19 h, WR75 = 2.34 h and TB = 41.00 h, with a loss of 0.35 cm/h and a base flow of 0.05 × 470 = 23.50 m³/s. Use in the State. The 2(b) SUH is used in Mizoram only as the check of Clause 3.11.4, for rural catchments of more than 50 km² on the Tlawng, the Tuirial, the Serlui, the Tuichang, the Tuichawng, the Khawthlangtuipui and their tributaries; the design model is a site study, SCS-CN or a Clark or Snyder unit hydrograph in HEC-HMS, calibrated under Clause 3.15 to the CWC level-monitoring sites (Sairang on the Tlawng, which has an active hydrograph; Turial on the Tuirial; Sihthangpui on the Chhimtuipui; Tuichang and Tuichawng), to the CWC rain gauges at Bairabi, Dapchhuah, Tlabung and elsewhere, to NEEPCO's records for the Tuirial reservoir or to State gauges, wherever any exist (Commentary to Clause 3.7). No discharge record, stage–discharge curve, catchment area at a gauge or unit hydrograph for any Mizoram river was found [TBC]. Where a calibrated model gives a lower 1% AEP peak than the 2(b) SUH, Clause 3.11.4(d) applies as written. Below the Tuirial and Serlui B dams the flood is set by releases (Clause 5.8.5(e)), and on the valley floors by the river level at the outfall (Clause 5.8.5(c) and (d)), not by any unit hydrograph. The urban catchments of Aizawl, Lunglei, Serchhip, Champhai and the other towns are far smaller than 50 km² and are designed by the Rational Method or SWMM under Clause 3.4. Every cross-drainage structure and outfall with a catchment of more than 1 km² needs a site-specific hydrology study with the design rainfall of Clause 2.3.6. The design loss rate of 3.5 mm/h is a φ-index fitted to the floods of rural catchments on the plains and foothills of subzone 2(b); it is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4).
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Mizoram Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Mizoram Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Mizoram Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Mizoram Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Mizoram Stormwater Design Manual, Draft v1.0.