Draft v1.0 prepared by NEER. Not adopted by the Government of Mizoram, any District Council, Village Council, authority or local body, and has no legal force. About this draft

Annexes to Chapter 9Hydraulic Design of Structures

These annexes support Chapter 9. Annex 9A gives the FHWA HDS-5 inlet-control equations in SI units, with published coefficients for common inlets, and a full worked culvert example. Annex 9B gives standard drawings that carry only the dimensions Chapter 9 and Chapter 6 already set; every other dimension is marked "to be confirmed in design". Annex 9C is a pump station design checklist with a standard control philosophy drawn from Clause 9.9. Form 9-1 is a draft form: it lists what Clause 9.14 requires and does not add to it.


Annex 9A — HDS-5 inlet-control coefficients and worked culvert example in SI units

Supports Clauses 9.4.1 to 9.4.7 of Chapter 9 and Clause 6.12 of Chapter 6.

9A.1 Inlet-control equations

FHWA Hydraulic Design of Highway Culverts, HDS-5, 3rd edition (2012), Appendix A, gives three inlet-control equations. In SI units:

Unsubmerged, Form 1: HWi/D = Hc/D + K · [Ku · Q / (A · D^0.5)]^M + Ks · S

Unsubmerged, Form 2: HWi/D = K · [Ku · Q / (A · D^0.5)]^M

Submerged: HWi/D = c · [Ku · Q / (A · D^0.5)]² + Y + Ks · S

where HWi is the headwater depth above the inlet invert under inlet control (m), D is the interior height (rise) of the barrel (m), Hc is the specific head at critical depth, dc + Vc²/2g (m), Q is the discharge (m³/s), A is the full cross-sectional area of the barrel (m²), S is the barrel slope (m/m), K, M, c and Y are the constants of Table 9A.1, Ku = 1.811 in SI units (1.0 in US units), and Ks is the slope correction: −0.5, or +0.7 for mitred inlets.

Which equation applies depends on X = Ku · Q / (A · D^0.5):

  • X ≤ 3.5: unsubmerged equation (Form 1 or Form 2 as listed in Table 9A.1);
  • X ≥ 4.0: submerged equation;
  • 3.5 < X < 4.0 (transition): use FHWA HY-8, which implements the HDS-5 transition. Where a hand calculation is used, take the higher of the unsubmerged and submerged results. This is a conservative simplification made by this annex, not an HDS-5 rule.

Table 9A.1 — HDS-5 inlet-control coefficients for common inlets

Barrel Inlet edge Form K M c Y
Circular concrete Square edge with headwall 1 0.0098 2.0 0.0398 0.67
Circular concrete Groove (socket) end with headwall 1 0.0018 2.0 0.0292 0.74
Circular concrete Groove (socket) end projecting 1 0.0045 2.0 0.0317 0.69
Circular corrugated metal Headwall 1 0.0078 2.0 0.0379 0.69
Circular corrugated metal Mitred to slope 1 0.0210 1.33 0.0463 0.75
Circular corrugated metal Projecting 1 0.0340 1.50 0.0553 0.54
Rectangular box Wingwalls flared 30° to 75° 1 0.026 1.0 0.0347 0.81
Rectangular box Wingwalls flared 90° and 15° 1 0.061 0.75 0.0400 0.80
Rectangular box Wingwalls at 0° (extensions of the sides) 1 0.061 0.75 0.0423 0.82
Rectangular box 90° headwall with 19 mm (3/4 in) chamfers 2 0.515 0.667 0.0375 0.79
Rectangular box 90° headwall with 45° bevels 2 0.495 0.667 0.0314 0.82
Rectangular box 90° headwall with 33.7° bevels 2 0.486 0.667 0.0252 0.865

Source: FHWA HDS-5 (2012), Appendix A, Table A.1 (the coefficients are dimensionless and apply in SI units with Ku = 1.811). The values were checked against HIF-12-026, Table A.1 (chart and scale numbers 1/1–1/3, 2/1–2/3, 8/1–8/3 and 10/1–10/3). Where a later edition of HDS-5 differs, the later table governs. Entrance loss coefficients for outlet control are in Table 9.1 of Chapter 9.

9A.2 Worked example: pipe culvert under a collector road

Illustrative — not design values. The inputs below are invented to show the method; the results are not design values for any site.

Inputs.

Table 9A.2 — Inputs for the worked example

Item Value Source
Road class Collector; design AEP 4% (25-yr), check event 2% (50-yr), and the 1% AEP check Table 6.1, Clause 6.12.2
Design flow, 4% AEP 1.80 m³/s (including the climate factor) Illustrative
Check flow, 2% AEP 2.20 m³/s Illustrative
1% AEP flow 3.00 m³/s Illustrative
Barrel One 1,200 mm RCC pipe with collar joints, n = 0.015 Table 6.6
Inlet Square edge with headwall: ke = 0.5; K = 0.0098, M = 2.0, c = 0.0398, Y = 0.67, Form 1 Tables 9.1 and 9A.1
Length and slope L = 20.0 m; S = 0.005 (inlet invert 20.00 m, outlet invert 19.90 m, local datum) Illustrative
Road levels at the inlet Shoulder edge 22.00 m; lowest point of the road crest 22.10 m Illustrative
Tailwater above the outlet invert, TW 0.60 m at 1.80 m³/s; 0.70 m at 2.20 m³/s; 0.85 m at 3.00 m³/s (normal depth in the downstream channel) Illustrative; Clause 9.4.4
Receiving channel Unlined sandy loam Table 9.2

Minimum size: 1,200 mm ≥ 900 mm (Clause 6.12.5). The span is below 1.5 m, so the blockage check uses 50% of the inlet area blocked (Clause 6.12.4(a)).

Step 1 — Barrel properties. A = π · 1.2² / 4 = 1.131 m²; full-barrel hydraulic radius R = D/4 = 0.300 m; D^0.5 = 1.095.

Step 2 — Critical depth. For each flow, dc is found by trial from the critical-flow condition for a circular section, Q² · T / (g · Ac³) = 1, where Ac and T are the flow area and top width at depth dc.

Table 9A.3 — Critical depth and specific head (D = 1.2 m)

Q (m³/s) dc (m) Ac (m²) T (m) Vc = Q/Ac (m/s) Hc = dc + Vc²/2g (m) Hc/D
1.80 0.737 0.728 1.168 2.471 1.048 0.873
2.20 0.817 0.820 1.119 2.683 1.184 0.987
3.00 0.952 0.962 0.972 3.118 1.447 1.206

Step 3 — Headwater under inlet control. X = 1.811 · Q / (1.131 × 1.095) = 1.462 · Q.

Table 9A.4 — Inlet-control headwater

Q (m³/s) X Equation HWi/D HWi (m)
1.80 2.631 Unsubmerged, Form 1: 0.873 + 0.0098 × 2.631² − 0.5 × 0.005 = 0.873 + 0.068 − 0.003 0.939 1.127
2.20 3.216 Unsubmerged, Form 1: 0.987 + 0.0098 × 3.216² − 0.003 = 0.987 + 0.101 − 0.003 1.085 1.302
3.00 4.385 Submerged: 0.0398 × 4.385² + 0.67 − 0.003 = 0.765 + 0.67 − 0.003 1.433 1.719

Step 4 — Headwater under outlet control (Clause 9.4.3). The friction term is 19.63 · n² · L / R^1.33 = 19.63 × 0.015² × 20.0 / 0.300^1.33 = 0.0883 / 0.2016 = 0.438, so H = (1 + 0.5 + 0.438) · V²/2g = 1.938 · V²/2g. L · S = 20.0 × 0.005 = 0.100 m.

Table 9A.5 — Outlet-control headwater

Q (m³/s) V = Q/A (m/s) V²/2g (m) H (m) (dc + D)/2 (m) TW (m) ho (m) HWo = ho + H − L·S (m)
1.80 1.592 0.129 0.250 0.969 0.60 0.969 1.119
2.20 1.945 0.193 0.374 1.009 0.70 1.009 1.283
3.00 2.653 0.359 0.695 1.076 0.85 1.076 1.671

Step 5 — Governing headwater (Clause 9.4.1): the greater of HWi and HWo.

Table 9A.6 — Governing headwater and checks

Event Q (m³/s) HWi (m) HWo (m) Control HW (m) HW level (m) HW/D
Design, 4% AEP 1.80 1.127 1.119 Inlet 1.127 21.13 0.94
Check, 2% AEP 2.20 1.302 1.283 Inlet 1.302 21.30 1.09
1% AEP 3.00 1.719 1.671 Inlet 1.719 21.72 1.43

Step 6 — Headwater limits at the design AEP (Clause 9.4.5):

  • (a) HW/D = 0.94 ≤ 1.2. Complies.
  • (b) HW level 21.13 m ≤ shoulder edge 22.00 m − 0.30 m = 21.70 m. Complies.
  • (c) Water levels at upstream buildings and property boundaries are compared with the existing condition under Clause 6.12.2(d). This needs the upstream survey and is not shown here.

Step 7 — Road overtopping (Clauses 6.12.2, 6.12.3 and 9.4.6). The 1% AEP headwater level, 21.72 m, is below the lowest road crest, 22.10 m, so the road is not overtopped in the check or 1% AEP events. Had the headwater exceeded the crest, the overtopping flow Qr = Cd · L · h^1.5 (Cd ≤ 1.66) would be balanced with the culvert flow at a common headwater, and the overtopping depth checked against Clause 6.12.2(a).

Step 8 — Outlet velocity (Clause 9.4.7). Under inlet control, the outlet velocity is the velocity at normal depth in the barrel. The barrel's full-flow capacity is (1/n) · A · R^(2/3) · S^0.5 = (1/0.015) × 1.131 × 0.448 × 0.0707 = 2.39 m³/s.

  • 1.80 m³/s: normal depth 0.778 m, outlet velocity 2.32 m/s.
  • 2.20 m³/s: normal depth 0.908 m, outlet velocity 2.40 m/s.
  • 3.00 m³/s: above the full-flow capacity, so the barrel flows full at the outlet; velocity = Q/A = 2.65 m/s.

The receiving channel is unlined sandy loam, with a permissible velocity of 0.53 m/s (Table 9.2), so outlet protection is required (Clause 9.6.1). All barrel velocities are below 3.0 m/s (Clause 6.7.3(b)).

Step 9 — Riprap apron (Clause 9.6.3; Figure 9.2). D50 = 0.2 · D · [Q / (g^0.5 · D^2.5)]^(4/3) · (D/TW), with g^0.5 · D^2.5 = 3.132 × 1.577 = 4.941.

Table 9A.7 — Riprap apron sizing

Q (m³/s) TW (m) Q / (g^0.5 · D^2.5) [ ]^(4/3) D50 (m)
1.80 0.60 0.364 0.260 0.2 × 1.2 × 0.260 × 2.00 = 0.125
2.20 0.70 0.445 0.340 0.2 × 1.2 × 0.340 × 1.71 = 0.140
3.00 0.85 0.607 0.514 0.2 × 1.2 × 0.514 × 1.41 = 0.174

Clause 9.4.7 requires the outlet to be protected for the design AEP and the 1% AEP, so the apron is sized here for the largest D50, 0.174 m. From Table 9.3, Class 2 (D50 = 150 mm) is too small, so Class 3 (D50 = 250 mm) is used:

  • apron length 5D = 5 × 1.2 = 6.0 m;
  • apron thickness 2.4 × D50 = 2.4 × 0.25 = 0.60 m;
  • apron width at the outlet at least 3D = 3.6 m, flaring to the downstream channel;
  • stone placed on a granular filter or geotextile (Clause 9.6.4).

Step 10 — Blockage check (Clause 6.12.4(a)). Steps 3 to 7 are repeated for the 1% AEP flow with 50% of the inlet area blocked, and the results must meet Clause 6.12.2(a) and (d). This Manual does not yet set a standard way of representing a partly blocked inlet, so this check is carried out in HY-8 or by a method agreed with the Approving Authority. It is not worked here.

Table 9A.8 — Summary of the worked example (Illustrative — not design values)

Check Result Clause
Minimum size 1,200 mm ≥ 900 mm 6.12.5
Design HW/D 0.94 ≤ 1.2 9.4.5(a)
Design HW below shoulder edge 21.13 m ≤ 21.70 m 9.4.5(b)
Overtopping in the check and 1% events None (21.72 m < 22.10 m) 6.12.2, 9.4.6
Outlet protection Class 3 riprap apron, 6.0 m long, 0.60 m thick, 3.6 m wide at the outlet 9.6.1, 9.6.3
Blockage check To be run in HY-8 or by an agreed method 6.12.4

Annex 9B — Standard drawings: headwalls, riprap aprons, drop structures, trash racks, detention risers

Supports Clauses 9.4, 9.6, 9.7 and 9.8 of Chapter 9.

The drawings below are schematic standard drawings. They show only the dimensions and rules that Chapter 9 and Chapter 6 set. Structural dimensions, reinforcement, foundations and fixings are to be confirmed in design (Clause 9.1.2). The riprap apron standard drawing is Figure 9.2 of Chapter 9, with dimensions from Table 9.3; it is not repeated here. Table 9B.1 lists the dimensions shown and their source clauses.

Culvert headwalls and wingwalls Standard drawing: culvert headwalls, wingwalls and cut-off walls (not to scale) (a) Plan Road Outlet protection where velocity exceeds Table 9.2 (9.6.1; Figure 9.2) Wingwall flare θ: select ke from Table 9.1 for the flare built (e.g. 30°–75° box: ke = 0.4) Barrel ≥ 900 mm dia, or 900 × 900 mm box, under public roads (6.12.5) Single barrel preferred; multi-barrel: one barrel for dry-weather flow and a debris fin or deflector at the inlet (9.4.8(a)) (b) Longitudinal section HW at design AEP: HW/D ≤ 1.2, and ≥ 0.3 m below shoulder edge (9.4.5) ≥ 0.3 m Road crest: overtopping by weir equation in check and 1% events (9.4.6) Barrel: length L, slope S Inlet invert matches the drain bed; never set above it (9.4.8(c)) TW (9.4.4) Cut-off walls at inlet and outlet (9.4.9); depth to be confirmed in design Headwall, wingwall and cut-off dimensions, reinforcement and foundation: to be confirmed in design (IRC:SP:13; Clause 9.1.2).

Figure 9B.1 — Standard drawing: culvert headwalls, wingwalls and cut-off walls, in plan and long section, with the headwater limits, invert rule and debris provisions. Original drawing for this Manual, adapted from FHWA, Hydraulic Design of Highway Culverts, HDS-5 (3rd ed., 2012).

Straight vertical drop structure Standard drawing: straight vertical drop structure (section, not to scale) End sill Drop height h ≤ 1.5 m in a public drain (9.6.6(c)) Ld = 4.30 · D^0.27 · h Yp = 1.00 · D^0.22 · h y1 = 0.54 · D^0.425 · h y2 = 1.66 · D^0.27 · h Edge protection (6.13.8) Drop number D = q² / (g · h³) q: unit discharge (m²/s); h: drop height (m) Rand (1955) relationships (9.6.6(a)) Basin beyond Ld and end sill: to be confirmed in design (HEC-14 / US Bureau of Reclamation, 9.6.6(b)) Wall and floor thickness, reinforcement, cut-offs and scour protection downstream: to be confirmed in design.

Figure 9B.2 — Standard drawing: straight vertical drop structure with the Rand (1955) pool geometry and the 1.5 m height limit. Original drawing for this Manual, adapted from Chow, Open-Channel Hydraulics (1959), and FHWA, HEC-14 (3rd ed., 2006).

Trash rack at a conduit entrance Standard drawing: trash rack at a conduit or culvert entrance (not to scale) (a) Section (b) Front view of bars Conduit 1V:2H or flatter (hand raking) Working platform and handrail (9.8.2(d)) Overflow route when the rack is fully blocked (9.8.4) Required where an open drain enters a conduit, covered drain or culvert longer than 30 m (9.8.1(a)). Designed for the hydrostatic load of a fully blocked rack; prevents people being drawn in (9.8.7). b t 50% blocked Clear spacing: 75 mm ≤ b ≤ half the smallest internal dimension of the conduit (9.8.2(a)) Gross area ≥ 4 × conduit area (9.8.2(b)) Velocity through rack ≤ 1.0 m/s at design flow with 50% blocked (9.8.2(c)) Head loss (Kirschmer): hr = β (t/b)^(4/3) (V²/2g) sin θ; β = 2.42 rectangular, 1.79 circular bars (9.8.3) HGL and headwater checked 50% blocked (9.8.3) Bar size t, framing and fixings: to be confirmed in design

Figure 9B.3 — Standard drawing: trash rack at a conduit or culvert entrance, in section and front view, with bar spacing, area, velocity, slope and overflow requirements. Original drawing for this Manual, adapted from CIRIA, Culvert, screen and outfall manual, C786 (2019), and CPHEEO, Manual on Storm Water Drainage Systems (2019), §8.3.1.3.

Detention outlet riser Standard drawing: detention basin outlet riser and emergency spillway (section, not to scale) Embankment crest Emergency spillway crest design head + 0.3 m freeboard (9.7.6) Anti-vortex plate where the head above the riser crest exceeds the riser diameter (9.7.8) Riser crest Low-flow orifice ≥ 50 mm, with trash screen: openings smaller than the orifice, open area ≥ 10 × orifice area (9.7.1(c), 9.8.5) Upper orifice or weir slot (stage 2; 9.7.2, 9.7.3) Outlet pipe: filter diaphragm or seepage collars (9.7.7) Flap gate / non-return valve where the receiving water can rise above the outlet (9.7.5, 9.10); outlet protection (9.6, Figure 9.2) Emergency spillway passes the 1% AEP inflow with the primary outlet blocked and the basin full (9.7.6); high-hazard basins also checked at 0.2% AEP Stage–discharge rating: at each stage, the smallest discharge of every possible control (9.7.4). Primary outlet works without moving parts and is accessible from the surface (9.7.1(b), (d)). Orifice sizes, stage levels, riser size and structural details: to be confirmed in design.

Figure 9B.4 — Standard drawing: detention basin outlet riser with low-flow orifice and screen, upper stage, anti-vortex plate, outlet pipe through the embankment, flap gate and emergency spillway. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 (2006, 5608.4).

Table 9B.1 — Dimensions and rules on the standard drawings and their source clauses

Drawing Item Dimension or rule Clause
9B.1 Minimum culvert size under public roads 900 mm diameter, or 900 mm × 900 mm box 6.12.5
9B.1 Headwater at the design AEP HW/D ≤ 1.2; at least 0.3 m below the shoulder edge at the upstream face 9.4.5
9B.1 Entrance loss coefficient From Table 9.1 for the inlet built (for example 0.4 for a box with wingwalls at 30°–75°) 9.4.3
9B.1 Inverts Match the drain bed; never above it 9.4.8(c)
9B.1 Multi-barrel culverts Avoided in debris-prone drains; where used, one barrel for dry-weather flow and a debris fin or deflector 9.4.8(a)
9B.1 Headwalls, wingwalls, cut-off walls Required; dimensions to be confirmed in design 9.4.9
9B.1 Road overtopping Qr = Cd · L · h^1.5, Cd ≤ 1.66 9.4.6
Figure 9.2 Riprap apron Width at the outlet ≥ 3D, flaring to the channel; length and thickness from Table 9.3; filter or geotextile 9.6.3, 9.6.4
9B.2 Single vertical drop in a public drain Height h ≤ 1.5 m; edge protection 9.6.6(c), 6.13.8
9B.2 Pool geometry D = q²/(g h³); Ld/h = 4.30 D^0.27; Yp/h = 1.00 D^0.22; y1/h = 0.54 D^0.425; y2/h = 1.66 D^0.27 9.6.6(a)
9B.2 Basin beyond Ld, end sill To be confirmed in design (HEC-14 or US Bureau of Reclamation) 9.6.6(b)
9B.3 Where required Where an open drain enters a conduit, covered drain or culvert longer than 30 m 9.8.1(a)
9B.3 Clear bar spacing b Not less than 75 mm and not more than half the smallest internal dimension of the conduit 9.8.2(a)
9B.3 Gross rack area At least 4 times the conduit area 9.8.2(b)
9B.3 Velocity through the rack Not more than 1.0 m/s at the design flow with 50% blocked 9.8.2(c)
9B.3 Inclination No steeper than 1V:2H where raked by hand; working platform and handrail 9.8.2(d)
9B.3 Head loss and blocked check Kirschmer equation; HGL and headwater checked with 50% blocked 9.8.3
9B.3 Overflow and safety Overflow route for a fully blocked rack; designed for the full hydrostatic load 9.8.4, 9.8.7
9B.4 Low-flow orifice Not smaller than 50 mm; trash screen with openings smaller than the orifice and open area at least 10 times the orifice area 9.7.1(c), 9.8.5
9B.4 Orifice and weir flow Q = Cd · A · (2gh)^0.5, Cd = 0.60 sharp-edged; weir coefficients of Clause 9.7.3 9.7.2, 9.7.3
9B.4 Stage–discharge rating Smallest discharge of every possible control at each stage 9.7.4
9B.4 Anti-vortex plate Where the design head above the riser crest exceeds the riser diameter 9.7.8
9B.4 Outlet pipe through the embankment Filter diaphragm or seepage collars; flared or headwalled inlet 9.7.7
9B.4 Flap gate or non-return valve Where the receiving water can rise above the outlet 9.7.5, 9.10
9B.4 Emergency spillway Passes the 1% AEP inflow with the primary outlet blocked and the basin full, with 0.3 m freeboard to the embankment crest; 0.2% AEP check for high-hazard basins 9.7.6
All Structural dimensions, reinforcement, foundations, bar sizes, orifice sizes and stage levels To be confirmed in design 9.1.2

Annex 9C — Pump station design checklist and standard control philosophy

Supports Clauses 9.8.6, 9.9 and 9.10 of Chapter 9, with Clause 6.10.5 of Chapter 6 and the outfall-closed check of Chapter 5.

9C.1 Design checklist

Submit this checklist with the pump station design report of Clause 9.14, item 6.

Table 9C.1 — Pump station design checklist

No. Item Requirement Clause Provided (Yes / No / NA)
1 Need for pumping Gravity drainage cannot meet Chapters 5 and 6; reason stated 9.9.1  
2 Inflow Inflow hydrograph routed through the catchment and any upstream storage 9.9.2  
3 Design standard Design AEP of the element served; for underpasses, 2% AEP with a 1% AEP check 9.9.2(a), 6.10.5(a)  
4 Tidal outfall Storage plus pumps hold the 48 h design volume with the outfall throttled for the tidal-lock duration (default two high tides of 6 h each) 9.9.2(b), Chapter 5  
5 Head range Pumps selected from the lowest sump level against the lowest tailwater to the highest tailwater (HAT + surge + 0.3 m); pump and system curves submitted 9.9.2(c), 9.14  
6 Wet-well volume Greatest of: 5 min of minimum inflow (variable speed and automatic control); 10 to 15 min of peak inflow, or the manufacturer's minimum cycle volume; V = Θ · q / 4 for each constant-speed pump 9.9.3  
7 Duty pumps Same size where practicable 9.9.4(a)  
8 Standby At least equal to the largest duty pump, and not less than 50% of the number of duty pumps 9.9.4(b)  
9 Alternation Duty and standby roles alternate automatically 9.9.4(c)  
10 Pump type Solids-handling (non-clog); axial-flow only behind a screen meeting Clause 9.8.6 9.9.5  
11 Sump and intake Manufacturer's requirements and ANSI/HI 9.8; clear space 0.6 m (small and medium) or 1.0 m (large units) 9.9.6  
12 Model study Physical model where any pump exceeds 1 m³/s or the sump departs from ANSI/HI 9.8 geometry 9.9.6  
13 Silt trap and screen Upstream of the wet well; screen spacing smaller than the pumps' solids size; removable modules; mechanical raking where inflow exceeds 1 m³/s 9.9.7, 9.8.6  
14 Screen overflow Overflow route when the screen is fully blocked 9.8.4  
15 Level control Primary level sensor (ultrasonic, radar or pressure) with an independent float-switch back-up 9.9.8(a)  
16 Alarms High-level and pump-fault alarms by telemetry to the local body's control room 9.9.8(b)  
17 Records Sump levels, pump run hours and power status logged and kept at least 5 years 9.9.8(c)  
18 Power sources Grid supply plus a standby generator or second independent feeder able to run all duty pumps at once 9.9.9(a)  
19 Fuel At least 72 h of all duty pumps, stored above the flood level of Clause 9.9.10 9.9.9(b)  
20 Changeover Automatic changeover to standby power 9.9.9(c)  
21 Flood protection Electrical and control room floor, generator and transformer at least 0.5 m above the 1% AEP flood level; vehicle access usable in the 1% AEP event 9.9.10  
22 Discharge Separate rising mains, or a non-return and an isolating valve where mains combine; delivery chamber or outfall with a flap gate or non-return valve; mains sized by a recognised friction formula 9.9.11  
23 Gates Flap or tide gate on outfalls below the 1% AEP still-water level; penstock or stop-log slot upstream for outfalls of 900 mm or more and every pumped outfall; head loss from tested data 9.10.1, 9.10.3, 9.10.4  
24 Sand and debris at the outfall Gate in a chamber with surface access, or elastomeric check valves, at beach, estuary and creek outfalls 9.10.5  
25 Emergency connection Hard-standing and quick-coupling connection for mobile pumps into the delivery chamber 9.9.12  
26 Materials Exposure class of Clause 9.13; stainless steel grade 316, galvanised and coated steel, or non-metallic fixings within 5 km of the coast 9.13  
27 Design life At least 50 years for civil works and 25 years for mechanical and electrical equipment 9.2.4  
28 Underpass stations Depth markers and automatic warning or closure signals at 150 mm depth on the carriageway 6.10.5(d)  
29 Certification Designed by an empanelled professional and checked by an independent empanelled professional 10.6.1(d), 10.6.4  

9C.2 Standard control philosophy

This is the standard control philosophy for a stormwater pump station designed under Clause 9.9. The designer adapts it to the station and submits it with the design report. Items marked "recommended" are good practice that Chapter 9 does not require; all others restate a clause.

Table 9C.2 — Control levels (values to be set in design)

Level Rule for setting it Clause
Pump stop Not below the minimum submergence required by the pump manufacturer and ANSI/HI 9.8 9.9.6
Duty pump 1 start Above the pump-stop level by at least the effective wet-well volume of Clause 9.9.3 9.9.3
Duty pumps 2, 3 … start Staged above duty pump 1 start; spacing to be confirmed in design 9.9.2
High-level alarm Above the highest duty-pump start level; to be confirmed in design 9.9.8(b)
Float back-up high Independent float; starts the duty pumps 9.9.8(a)
Float back-up low Independent float; stops the pumps 9.9.8(a)
  1. Normal (automatic) operation. As the wet-well level rises to the duty pump 1 start level, the lead pump starts. If the level keeps rising, each further duty pump starts at its start level. The pumps stop when the level falls to the pump-stop level. The primary level sensor controls this sequence (Clause 9.9.8(a)).
  2. Duty rotation. The lead pump changes automatically, after each pump-down cycle or by run hours as set in the design, so that duty and standby roles alternate and wear is shared (Clause 9.9.4(c)).
  3. Pump fault. A pump that trips or fails to start is locked out. The next available pump, including the standby pump, takes its place, and a pump-fault alarm is sent by telemetry (Clauses 9.9.4(b) and 9.9.8(b)).
  4. Level-sensor failure. If the primary sensor fails, or disagrees with the float switches, control passes to the independent float back-up: at the float-high level the duty pumps run, and at the float-low level they stop. An alarm is sent (Clause 9.9.8(a), (b)).
  5. Power failure. Supply changes over automatically to the standby generator or second feeder (Clause 9.9.9(c)). Recommended: pumps restart one at a time after changeover, to limit the starting load on the generator.
  6. High level. At the high-level alarm level an alarm is sent by telemetry to the local body's control room (Clause 9.9.8(b)). At an underpass, the warning or closure signals operate at 150 mm depth on the carriageway (Clause 6.10.5(d)).
  7. Outfall and gates. Rising mains discharge to a delivery chamber or outfall fitted with a flap gate or non-return valve (Clause 9.9.11). Flap gates open and close under head difference without control action. The upstream penstock or stop logs are closed only for maintenance, or if the flap gate jams open (Clause 9.10.3). Recommended: penstock position is shown at the control panel and logged.
  8. Tide-locked operation. Where the outfall is tide-locked, storage and pumping together hold the 48 h design volume for the tidal-lock duration (Clause 9.9.2(b) and Chapter 5). Where the station also has a gravity outfall, gravity discharge resumes through the flap gate when the tide falls.
  9. Screens. Mechanically raked screens (required where inflow exceeds 1 m³/s, Clause 9.8.6) are run automatically. Recommended: raking is started by a timer and by the level difference across the screen, with an alarm when the difference stays high.
  10. Manual operation. Recommended: each pump has a hand–off–auto selector at the panel, and the float back-up high-level start remains active in hand mode.
  11. Mobile pumps. When fixed pumps are out of service or overwhelmed, mobile pumps discharge into the delivery chamber through the quick-coupling connection (Clause 9.9.12).
  12. Records. Sump levels, pump run hours and power status are logged and kept for at least 5 years (Clause 9.9.8(c)). Recommended: alarms, pump starts and stops, and changeovers are logged as well.
  13. Testing. The controls, floats, alarms, telemetry, changeover and generator are tested in the pre-monsoon inspection of Chapter 10 (Clause 10.12), and the results reported in the Annual Maintenance Declaration (Form 10-7; Clause 10.10.3).

Form 9-1 — Hydraulic Structures Report checklist

Supports Clause 9.14 of Chapter 9.

Draft form — Mizoram Stormwater Design Manual, Draft v1.0. Not for statutory use.

Attach this checklist to the front of the Hydraulic Structures Report. For each item, enter Yes, No or Not applicable, and the drawing or page where it is shown.

Section A — Project

Table 9F.1 — Form 9-1, Section A: project

Field Entry
Project name and location ______
Local body, and Tier A or Tier B (Chapter 1) ______
Applicant ______
Designer (name and registration) ______
Structures covered (culverts, channels, dissipators, outlets, screens, pumps, gates, inlets, manholes) ______
Tailwater conditions used: MHWS, HAT + surge, sea-level allowance, joint case (Clause 9.2.1) ______
Date and revision ______

Section B — Contents required by Clause 9.14

Table 9F.2 — Form 9-1, Section B: contents required by Clause 9.14

No. Item Clause Provided (Yes / No / NA) Drawing or page
1 Culvert calculations (HDS-5 or HY-8 output) with HWi, HWo, outlet velocity, tailwater, overtopping and the blockage check 9.4, 6.12    
2 Channel water-surface profiles, velocities, Froude numbers and freeboard 9.5    
3 Outlet protection and dissipator design, with riprap sizing 9.6    
4 Detention outlet stage–discharge tables and the emergency spillway check 9.7    
5 Screen and rack design with the 50% blocked check 9.8    
6 Pump station design report: inflow hydrograph, storage, pump and system curves, wet-well volume, controls, power supply and the Chapter 5 outfall-closed check (with Annex 9C) 9.9    
7 Gate and valve selection with head-loss data 9.10    
8 Inlet, grate and cover load classes 9.11    
9 Exposure class and materials statement 9.13    

Section C — Compliance checks

Table 9F.3 — Form 9-1, Section C: compliance checks

No. Check Limit Clause Complies (Yes / No / NA)
C1 Climate factor included in design flows Clause 2.8 9.2.2  
C2 Blocked condition checked where debris can block; safe overflow route — 9.2.5  
C3 Pipes and box drains: design n (box drains ≥ 0.015); supercritical pipes: jump located in a structure, air venting — 9.3.1, 9.3.4  
C4 Pipe size does not decrease downstream; joins only at manholes or junction chambers; no change of direction over 90° — 9.3.5  
C5 Culvert design headwater = greater of HWi and HWo — 9.4.1  
C6 Culvert headwater at the design AEP HW/D ≤ 1.2; ≥ 0.3 m below shoulder edge 9.4.5  
C7 Road overtopping weir coefficient Cd ≤ 1.66 9.4.6  
C8 Culvert inverts match the drain bed; headwalls, wingwalls and cut-off walls — 9.4.8(c), 9.4.9  
C9 Channel Froude number at the design flow ≤ 0.8; none between 0.8 and 1.2 9.5.2  
C10 Channel velocity Table 9.2 9.5.3  
C11 Channel slope in engineered channels ≤ 0.4% natural, ≤ 0.2% concrete, or drops / chute 9.5.4  
C12 Side slopes; low-flow channel where bed width ≥ 3 m; uplift or weep holes — 9.5.6, 9.5.7, 9.5.9  
C13 Outlet protection where outlet velocity exceeds Table 9.2 Table 9.3 apron, or basin 9.6.1, 9.6.3  
C14 Single vertical drop height ≤ 1.5 m 9.6.6(c)  
C15 Detention primary outlet: no moving parts; minimum orifice ≥ 50 mm with screen 9.7.1  
C16 Emergency spillway 1% AEP, outlet blocked, basin full, 0.3 m freeboard; 0.2% AEP for high-hazard basins 9.7.6  
C17 Outlet pipe through embankment; anti-vortex plate where needed — 9.7.7, 9.7.8  
C18 Conduit-entrance racks Spacing 75 mm to half the smallest conduit dimension; area ≥ 4×; ≤ 1.0 m/s at 50% blocked 9.8.2  
C19 Detention orifice screens Openings smaller than the orifice; open area ≥ 10× 9.8.5  
C20 Pump station Annex 9C checklist complete 9.9  
C21 Gates on outfalls below the 1% AEP still-water level; secondary closure; corrosion-resistant fittings — 9.10  
C22 Grate load classes, parallel openings ≤ 25 mm, kerb openings ≥ 100 mm × 1.0 m, locked covers — 9.11  
C23 Manhole sizes (Table 9.4), 600 mm access openings, drops, benching, surcharge covers — 9.12  
C24 Exposure class (Table 9.5); chloride and sulphate tests in coastal and delta areas; sulphide protection; metalwork within 5 km of the coast — 9.13  

Section D — Variances

Table 9F.4 — Form 9-1, Section D: variances

Clause Requirement not met Reason and proposed alternative Approved by and date
______ ______ ______ ______

Section E — Signatures

The report shall be prepared and signed by a registered professional, and the Professional Design Certificate (Form 10-3) attached (Clauses 10.6.1 and 10.6.3 of Chapter 10). For a facility with an embankment, a high-hazard basin, a pumped facility, a tide gate or a regional facility, the signatory shall be an empanelled Stormwater Design Professional, and a second, independent empanelled professional shall sign as checker (Clauses 10.6.1(c), (d) and 10.6.4).

Table 9F.5 — Form 9-1, Section E: signatures

Role Name Registration or empanelment no. Signature Date
Designer ______ ______ ______ ______
Independent checker (Clause 10.6.4, where applicable) ______ ______ ______ ______

Draft form — Mizoram Stormwater Design Manual, Draft v1.0.