Chapter 4Site Runoff Control: Retention and Detention
4.1 Purpose and scope
4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:
- (a) the order in which runoff-control measures are to be applied (Clause 4.3);
- (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
- (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
- (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
- (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
- (f) regional detention and fee-in-lieu (Clause 4.13);
- (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
- (h) public safety (Clause 4.15).
4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (regulation 33 of the Aizawl Municipal Corporation Building Regulations, 2012, "A suitable rain water harvesting facility shall also be provided in all buildings", with the plans to "include provision for a suitable rain water harvesting facility" under regulation 5(6)(ix), in the area of the Aizawl Municipal Corporation, and the rainwater-harvesting incentive of the Chapter VIIIA that the 2025 amendment added for plots above 100 m²; none sets a volume, and all are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.
4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.
4.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Retention | Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall. |
| Retention depth | The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E). |
| Required retention volume (RRV) | The runoff volume from the retention depth over the post-development site (Clause 4.4.2). |
| Detention | Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5. |
| Retention credit | The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume. |
| Permissible site discharge (PSD) | The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha. |
| Site storage requirement (SSR) | The detention storage required per hectare of site under the simplified method of Clause 4.14. |
| Multi-stage outlet | An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2). |
| Drawdown time | Time from the peak stored volume until the stated fraction of that volume has been released. |
| Emergency spillway | A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment. |
| Freeboard | Vertical distance between the maximum design water level and the embankment crest or other critical level. |
| Flood-sensitive catchment | A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4. |
| Authority | The approving authority under Chapter 1 (the Aizawl Municipal Corporation in its area, for the building permit through OBPAS, the site development permit under the Site Development and Slope Modification Regulations, 2017 and connections to its drains, with its Local Councils for no-objection certificates; the Lunglei Municipal Council in its area, under the Mizoram Municipalities Act, 2007 (no regulation of its own found [TBC]); in a Village Council area, the Village Council, for building only once the State Government frames the model building bye-laws of section 13(6) of the Mizoram (Village Councils) Act, 2025 (none found); for a public work, the department that executes it; and, in the area of the Lai, Mara or Chakma Autonomous District Council, the District Council and its Village Councils, only if the District Council adopts the Manual (none has), as applicable). |
| Tier A / Tier B | Adoption tiers defined in Chapter 1. Tier A: the Aizawl Municipal Corporation, for its whole area. Tier B: Municipal Councils, Village Councils and Autonomous District Councils. |
4.3 Order of measures
4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:
- Preserve. Keep existing waterbodies, dils, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
- Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
- Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
- Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).
4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.
Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.
4.4 Retention
4.4.1 Requirement
The site shall retain the RRV. Retention shall be achieved by one or more of the following:
- infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
- rainwater reuse that is drawn down by a demonstrated non-potable demand;
- green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.
The limits of Clause 4.4.4 apply.
4.4.2 Computation of the RRV
RRV (m³) = 10 × Q_R × A
where:
- Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
- A (ha) is the area of the site that drains to the outfall.
Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.
The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.
Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.
4.4.3 Verification
Retention by infiltration shall be supported by:
- (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
- (b) a design infiltration rate of no more than half of the measured rate; and
- (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).
Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.
Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.
4.4.4 Limits on retention
4.4.4.1 Infiltration practices shall not be used:
- where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
- on contaminated land;
- within the setbacks from foundations, wells and septic systems set in Chapter 8; or
- on fill, unless tested after placement.
4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.
4.4.5 Drawdown of retention
Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.
4.4.6 Retention credit: definition and computation
4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.
4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:
- (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
- (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
- (c) once it is full, route its overflow to the detention facility; and
- (d) size the detention for the residual hydrograph.
The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.
4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:
V_credit = C_R × RRV_provided
where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.
4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.
Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Mizoram, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.
The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).
This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).
4.4.7 Preservation credit
Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:
- they are protected by a registered covenant or dedication; and
- their runoff is not concentrated onto impervious surfaces.
This lowers both the RRV and the detention required. No other preservation credit applies.
4.5 Release-rate criteria
4.5.1 General
4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.
4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.
4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.
4.5.2 Standard catchments
For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:
Q_post(T, d) ≤ 0.9 × Q_pre(T, d)
4.5.3 Flood-sensitive catchments
4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).
Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).
4.5.3.2 The flood-sensitive catchments are:
- (a) Aizawl east, the Chite lui catchment: the land of Aizawl that drains to the Chite lui and its tributaries, the Chanmari, Ramthar, Mirawng, Tlak, Bangla, Taite, Bethlehem veng, Lawibual, Hmawngkawn, Zemabawktuikhur, Zuangtui and Kawmthlang lui, down to the Tuirial;
- (b) Aizawl west, the Ser lui catchment: the land of Aizawl that drains to the Ser lui and its streamlets, with the Khatla, Tuikual, Vaivakawn and Chanmari west lui, down to the Tlawng;
- (c) the Hlimen–Melthum quarry belt: the land on Aizawl's southern edge that drains across or below the stone quarries of Hlimen and Melthum, active and disused (Clause 2.3.6(i));
- (d) Hunthar Veng and the NH-6 corridor at Aizawl: the land that drains to and across the sinking area of Hunthar Veng and the cut slopes of NH-6 at Hunthar;
- (e) Durtlang and the Bawngkawn–Durtlang road: the land of Durtlang and of both sides of the Bawngkawn–Durtlang (Leitan) road, with the slopes below them;
- (f) Sairang on the Tlawng: the land of Sairang that drains to the Tlawng, with its valley-floor land;
- (g) Bairabi and Vairengte: the land of the two towns, on the valley floors and river terraces of sub-area MZ-A1, with the hill slopes that drain onto them;
- (h) Tlabung on the Khawthlangtuipui: the land of Tlabung that drains to the Khawthlangtuipui, on the valley floor of sub-area MZ-D1;
- (i) Lunglei town: the land of the area of the Lunglei Municipal Council;
- (j) Serchhip town: the land of Serchhip town, with the slopes that drain to it;
- (k) Champhai town and the Champhai flats: the land of Champhai town and the paddy flats of the Champhai valley floor (sub-area MZ-C1);
- (l) Siaha and Lawngtlai: the land of the two towns, in the areas of the Mara and the Lai Autonomous District Councils, where a District Council adopts the Manual for its area (none has);
- (m) the release reach below the Tuirial dam: the land that drains to the Tuirial below the dam, as far downstream as the dam's releases raise the river; and
- (n) any catchment notified under Clause 4.5.4.
The boundaries shall be those mapped in Annex 4A.
4.5.4 Notification of further flood-sensitive catchments
4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:
- (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
- (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
- (c) an outfall that is held up by a river in flood on a valley floor or terrace, such as the Tlawng at Sairang and Bairabi, the Khawthlangtuipui at Tlabung, the Kau at Chawngte or the streams of the Champhai flats, by the Tuirial or Serlui B reservoir near its full level or by releases into a reach below either dam, or that is buried or blocked by slide debris, boulders and garbage in a steep lui, for part of the monsoon season (Chapter 5);
- (d) loss of more than a quarter of the mapped tank and dil storage in the catchment since the earliest available survey; or
- (e) a basin master plan that relies on limiting site discharge.
4.5.4.2 The procedure shall be:
- The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
- The State-level technical committee constituted under Chapter 1 reviews the note.
- The draft notification and map are published for public comment for at least 60 days.
- The Government notifies the catchment and the map is added to Annex 4A.
- The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.
4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.
Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The list follows Mizoram's two hazards: the landslide that drainage starts, on the ridges where nearly every town stands, and the river that rises above the drains of the few valley-floor towns. In Mizoram a catchment is flood-sensitive less because water ponds in it than because water released from it moves the slopes below: the Directorate of Geology and Mineral Resources (the "Directorate of Geology and Mining" in the press) found that "two-thirds of large-scale landslides" it investigated in 2022-23 "were due to improper drainage" (as reported), and "more than 71 per cent of the total area is in Very High to Moderate Hazard Zone" (CAG, Report No. 1 of 2025). The two Aizawl entries follow the city's two drainage systems: the Chite lui takes "more than two-third of eastern portion" of the city to the Tuirial, and the Ser lui and its streamlets take the west to the Tlawng; the master plan describes the Chite, Chanmari, Theihai, Bethlehem, Tuikhurhlu, Mirawng and Bangla lui as "turbulent with high velocities of currents during the monsoon season and they are very destructive", and the Khatla, Tuikual, Vaivakawn and Chanmari west lui as "the worst destructive streams and nullahs" (Master Plan for Aizawl: Vision 2030); the Chite stream is a CPCB Priority II stretch below the Chite sewage treatment plant, and a "Tuikual stream" is also Priority II (CPCB, 2025; that it is the Tuikual lui of the master plan is NEER's reading, to be confirmed). In Aizawl W-I, 33% of the area is water-logged "for several days or for hours", blamed on solid waste in the roadside drains (master plan). The Laipuitlang rockslide at Ramhlun Venglai, at about 3 a.m. on 11 May 2013 (15 May in one paper; the dates conflict), destroyed 15 houses; 17 bodies were exhumed and 8 people rescued (Science Vision paper), or 8 lives were lost by another review (the counts conflict), on the Middle Bhuban Formation, on ground that MIRSAC's 2011 map had rated "Very High" (Science Vision paper). The quarry-belt entry follows two collapses: the South Hlimen stone quarry on 9 August 1992, which "claimed the lives of almost 100 people" (MIRSAC, 2013, citing earlier work), and the disused quarry between Melthum and Hlimen that collapsed at about 6 a.m. on 28 May 2024 in Cyclone Remal, killing 15 by a later police update, with 5 more killed at Hlimen; the toll for Aizawl district rose through the day to 29 with 7 missing (29 May), a later report gave 34 killed in seven Aizawl areas, and the State toll was given as 27–29 (all as reported: the counts conflict). The master plan proposes check dams below Melthum and Hlimen among eight below the city's streams. The Hunthar entry follows the Hunthar Veng sinking area, where the only soil testing that the CAG found was done (report of 2017), and the NH-6 cuts at Hunthar, which were unstable in June 2018 and failed again in Remal (as reported). The Durtlang entry follows the collapse of 3 of the 20 blocks of the BSUP housing at Durtlang on 2 July 2019, with 3 dead, 11 injured and 140 families relocated, after which the suggestions of an IIT study of 2020 were not carried out (CAG, Report No. 1 of 2025), and the Gauhati High Court's order, in a suo motu public interest litigation reported on 23 July 2024, that "no new construction activity shall henceforth be allowed on either side of the Bawngkawn – Durtlang (Leitan) road" (as reported). The valley-floor entries follow the river floods: Sairang families were stranded in June 2018; Bairabi and Vairengte, on the river terraces of the north, are "the lowest-lying towns in the State" (NEER's reading), and a landslide at Vairengte killed one boy and injured four in September 2026 (as reported); and Tlabung, on the Khawthlangtuipui, flooded in June 2017, when about 350 houses in the sub-division were reported submerged (or 9 fully and more than 60 partly, by the count of disaster-management officials), again in June 2018, in July 2019 (about 400 houses, 150 of them in the town) and in August 2023, when 40 families were evacuated (all as reported). "Mizoram being a hilly state, there is no flood plain zone in the catchment area" (Mizoram Pollution Control Board, report to the NGT in OA 593/2017 and OA 673/2018); at these valley floors the statement does not hold. The Lunglei entry follows the second municipal body of the State, on ridges of Surma shale with "very steep slopes that are more than 20%" (CGWB, Lunglei district booklet), and Lunglei district's 61 landslides of 24 May–3 June 2025 (DM&R figures, as reported). The Serchhip entry follows the town's slopes, 89.2% of it steeper than 30° (NEER's arithmetic from MIRSAC's slope shares), and the 677 mm that fell over Serchhip district in 1–13 June 2018 (SANDRP, as reported). The Champhai entry follows Champhai district's 209 landslides of 24 May–3 June 2025, the most of any district (DM&R figures, as reported), and the flat valley floor of paddy, which may pond (no record found [TBC]). The Siaha and Lawngtlai entry follows the two towns of the south, where NIH-DHAARA's depths are among the State's highest (50-yr 24-hour: Siaha 304.5 mm, Lawngtlai 270.6 mm); in the areas of the Lai and Mara Autonomous District Councils the State's municipal, village-council and water-resources Acts do not apply and no building or drainage regulation of the District Councils was found, so the entry reaches them only if a District Council adopts the Manual. The release-reach entry follows the Tuirial dam, for which a dam-break study routed a peak of 3,035.34 m³/s "near the confluence" (IAHR abstract, 2025, as reported). Kolasib, Mamit, Khawzawl, Saitual, Hnahthial, Chawngte and Zokhawthar are candidates for notification under Clause 4.5.4. The official final tolls of DM&R were not obtained [TBC]. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.
4.5.5 Minimum outlet and short-duration 2-yr checks
4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.
4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:
- size the low-flow orifice as the smallest opening that meets Clause 4.7; and
- report the resulting 2-yr exceedance for those durations.
The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.
Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).
4.5.6 Constrained redevelopment sites
4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:
- (a) the existing site is at least 60% impervious, as surveyed before demolition;
- (b) the site is 1 ha or less; and
- (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.
New development on undeveloped land is never eligible.
4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:
- (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
- (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
- (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).
4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:
- (a) paid into the ring-fenced account of the basin in which the site lies;
- (b) spent only on regional detention or on restoring dil or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
- (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.
Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with IWRD agreement.
4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.
Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as Chanmari, Khatla, Tuikual and Vaivakawn in Aizawl, whose lui the master plan lists among "the worst destructive streams", the part of Aizawl W-I that the master plan reports as water-logged, or the centre of Lunglei [TBC], there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.
4.6 Detention sizing procedure
4.6.1 Method
Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.
4.6.2 Steps
- Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
- Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
- Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
- Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 May to 31 October in every sub-area, from 1 April to 31 October on valley-floor land below the 1% AEP flood level and on dil margins, at all times in catchments draining to the Tuirial or Serlui B reservoir, its backwater or a release reach below either dam, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
- Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
- Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
- Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
- Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
- Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
- Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
- Size the emergency spillway and set freeboard (Clause 4.9).
- Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).
4.6.3 Storms to be routed
Every facility shall be routed for the full matrix:
Table 4.1 — Design storms to be routed for detention sizing
| AEP | Durations (h) | AMC |
|---|---|---|
| 50% (2-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 10% (10-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 1% (100-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.
4.6.4 Initial conditions
Each run shall start with:
- detention storage empty, down to the invert of the lowest outlet;
- any permanent pool full;
- retention practices empty, except as limited by Clause 4.11; and
- RWH storage full (Clause 4.11).
The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.
4.6.5 Multi-stage outlet design
4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:
- Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
- Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
- Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
- Emergency spillway: separate from the primary outlet (Clause 4.9).
Stages may be combined where routing shows that every cap is met.
4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).
4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.
4.6.6 Tailwater on the outlet
The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:
- for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
- for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).
Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.
4.6.7 Illustrative example
Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a hillside colony in Lunglei town draining to a hill stream (lui). They are not NIH-DHAARA values and must not be used for design.
Inputs:
- Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
- Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
- Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
- 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
- Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
- Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
- Storage: vertical-walled, 2,500 m² plan area.
- Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
- Stage 1: 170 mm orifice at the invert.
- Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
- Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.
Results (discharges in L/s; storage in m³):
Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
| Duration (h) | 2-yr pre | 2-yr post, detained | 10-yr pre | 10-yr post, detained | 100-yr post, uncontrolled | 100-yr post, detained | 100-yr storage used | 10-yr drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|
| 1 | 4 | 15 | 51 | 28 | 922 | 42 | 1,426 | 31.3 |
| 2 | 14 | 20 | 84 | 34 | 961 | 79 | 1,911 | 32.1 |
| 3 | 19 | 22 | 104 | 37 | 981 | 139 | 1,999 | 32.8 |
| 6 | 32 | 25 | 150 | 41 | 1,010 | 194 | 2,154 | 34.2 |
| 12 | 127 | 30 | 302 | 46 | 1,074 | 276 | 2,512 | 39.0 |
| 24 | 149 | 32 | 327 | 49 | 1,081 | 320 | 2,766 | 45.3 |
| 48 | 173 | 34 | 349 | 82 | 1,087 | 343 | 2,913 | 44.8 |
| 72 | 180 | 34 | 356 | 84 | 1,089 | 343 | 2,911 | 44.7 |
How to read it:
- 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
- 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
- Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
- Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
- Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.
The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.
Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).
Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).
4.7 Drawdown
4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.
4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).
4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).
4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.
Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Mizoram storage must hold multi-day volumes. It is still short enough that a basin filled by one monsoon depression will have most of its volume back before the next, which in June 2018, when Aizawl's 148 mm in one day (probably 12 June; as reported) came about a week after the rains that set off landslides killing ten people on 5 June, within a fall of 677 mm over Serchhip district in 1–13 June (SANDRP, as reported), and late May and early June 2025, when the storm of 24 May–3 June brought 598 landslides (DM&R figures, as reported), followed within days.
4.8 Outlet structures
4.8.1 General. Primary outlets shall be:
- unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
- accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
- built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).
4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.
4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:
- have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
- have a clear open area at least 10 times the area of the opening it protects;
- be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
- be removable or hinged for cleaning; and
- for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.
4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).
4.8.5 Outlet barrels. Outlet barrels through embankments shall:
- be at least 300 mm in diameter (Chapter 6);
- have watertight joints;
- have a filter diaphragm or seepage collars over the length within the embankment; and
- have an energy-dissipating outfall (Chapter 9).
4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.
Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.
Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).
4.9 Emergency spillway, freeboard and embankment safety
4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:
- with the primary outlet assumed fully blocked;
- with the facility full to the spillway crest at the start of the storm; and
- with at least 0.3 m freeboard from the maximum water level to the embankment crest.
4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:
- endanger life;
- flood a habitable building or critical facility; or
- close an arterial road.
High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.
4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.
4.9.4 Spillway location. The spillway shall be:
- on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
- discharging to the 1% AEP overland flow path of Chapter 6; and
- placed so that its flow does not reach a building.
4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.
4.9.6 Embankments.
- (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
- (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
- (c) Embankments shall have:
- a crest width of at least 3 m;
- compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
- no trees or large shrubs.
- (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.
4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.
Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.
4.10 Facility types
4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.
4.10.2 Underground tanks and vaults.
- (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
- (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
- (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
- (d) The tank shall be ventilated.
- (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
- (f) Flotation and groundwater ingress shall be checked under Clause 4.12.
4.10.3 Rooftop detention.
- (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
- (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
- (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.
4.10.4 Podium and landscape-deck detention.
- (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
- (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.
4.10.5 Parking-lot detention.
- (a) It is permitted only on surface parking. Ponding depth shall not exceed:
- 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
- zero on accessible routes, ramps and pedestrian crossings; and
- zero in the 10% AEP storm on fire-tender access routes.
- (b) Signs shall warn that the area floods.
- (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).
4.10.6 Multi-use detention (parks, playfields, open space reservation).
- (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
- (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
- (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
- (d) The depth and slope limits of Clause 4.15 apply.
- (e) Play equipment and seating shall be placed above the 10% AEP level.
4.10.7 Ponds and wet basins.
- (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
- (b) Only storage above the permanent pool counts as detention.
Commentary.
- The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
- The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
- Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
- Open space is scarce on Mizoram's ridges, and most of it is slope. The AMCBR allow ground coverage of up to 71% on plots of less than 93 m², falling to 50% on plots of more than 1,000 m² (reg. 39), and set no soft-cover share; the 2025 amendment lists "Reduction of Hardscape" among the green-building measures that earn an incentive on plots above 100 m² (Chapter VIIIA), but does not require it. Multi-use detention under 4.10.6 is therefore possible only on level ground: a playground, a terrace or a building pad on a cut-and-fill site, or open space on a valley floor or terrace. On hill-rule ground, that is natural slopes of more than 10°, Surma-group shale at any slope, colluvium, fill, cut-spoil, slide debris, a mapped Moderate, High or Very High landslide hazard zone and land within twice the height of a cut or wall upslope of it, open space is not used for ponding, and detention is provided in lined, watertight tanks, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where the hill rule's geotechnical certificate covers it, and in a High or Very High hazard zone in lined tanks only (Clause 4.11). A detention area on a terrace or building pad keeps the 1 in 50 pad gradient of SD&SM reg. 27 towards its outlet, so that it drains completely (Clause 4.15.7), and its overflow goes to a lined drain, never onto the slope below. On valley-floor land, surface storage is the preferred form (Clause 4.12.4), but its floor is set above the design groundwater level of Clause 4.12.1 or it is lined. Three kinds of land are not open space for this purpose. A dil on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its outlet level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; a dil is never turned into a detention pond, and engineered storage is called a detention pond, never a dil or a tuikhur. The Manual's stream corridor of Chapter 7 along a lui, and the riverine reserve that SD&SM reg. 28 requires to be maintained, are not counted as detention for the development beside them. And the catchment of a spring (tuikhur) above a water point is not graded or ponded for detention, because no storm outfall, soakaway or drain discharge is made within 15 m of a tuikhur and its catchment is protected under the spring rule of Chapter 8.
- Signs and depth markers under Clause 4.15.5, and the flood-warning signs of 4.10.5(b), are in Mizo and English; in the areas of the Lai, Mara and Chakma Autonomous District Councils they are also in the language in local use where the District Council or the competent authority so directs (set by this Manual). The rule follows the Mizoram Official Language Act, 1974 (Act No. 3 of 1975), which made Mizo the official language of the State, in effect from 1 August 1977 under a notification of 6 May 1996 (No. H.12017/14/90-LJD, a number read from a poor scan); that English may also be used for official purposes is known only as quoted (the section was not read). Mizo is written in the Roman script. The languages in local use in the District Council areas were not researched for this Manual [TBC], and a sign must be readable by the people it warns.
4.11 Rainwater harvesting versus detention accounting
4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.
4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.
4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:
- (a) the detention zone lies wholly above the RWH overflow level;
- (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
- (c) no pump, valve or user action can hold water in the detention zone; and
- (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.
Only the volume between the RWH overflow level and the detention overflow level counts as detention.
4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the monsoon season.
4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of regulations 5(6)(ix) and 33 of the Aizawl Municipal Corporation Building Regulations, 2012, the green norms of their Chapter VIIIA (2025) where an owner takes the incentive, any condition of a building permit or site development permit, any model building bye-laws that the State Government frames under section 13(6) of the Mizoram (Village Councils) Act, 2025 (none found [TBC]), any direction of WARDMA under section 16(2)(ix) of the Mizoram Water Resources (Management and Regulation) Act, 2024, the guidelines of the Central Ground Water Authority where they apply, or any rainwater harvesting rule or direction of an approving authority.
Commentary. Rainwater harvesting in Mizoram is required by one instrument, which does not size it. In the area of the Aizawl Municipal Corporation, regulation 33 of the Aizawl Municipal Corporation Building Regulations, 2012 (AMCBR) reads "A suitable rain water harvesting facility shall also be provided in all buildings", and the building plans "include provision for a suitable rain water harvesting facility" (reg. 5(6)(ix)). The 2025 amendment added a Chapter VIIIA, "Green Buildings and Sustainability", under which "all buildings on various plot sizes above 100 sq.m may comply with the green norms", with incentives, such as additional FAR or fee waivers, for "(a) Water Conservation and Management (i) Rain Water Harvesting … (iv) Reduction of Hardscape"; these are incentives, not conditions. The Master Plan for Aizawl: Vision 2030 recommends that RWH be made "mandatory … in all public buildings", a recommendation of the plan. None of these gives a storage volume, a roof-area rate, a drawdown or an infiltration test (NEER's reading), and the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 (SD&SM) set no rainwater-harvesting duty. Outside the Corporation's area no rainwater harvesting rule was found; the Mizoram Water Resources (Management and Regulation) Act, 2024, which does not extend to the Autonomous District Councils, has the Irrigation and Water Resources Department (IWRD) "promote rain water harvesting to augment ground water recharge" (s.14(1)(b)(viii)) and lets WARDMA direct "water conservation and groundwater recharge, including rain water harvesting" (s.16(2)(ix)). In Mizoram rainwater harvesting is storage and supply, not recharge. In the Aizawl Urban Area 27.16% of households use rain water and 1.01% spring water (master plan, Table 8.2); the public supply was reported at "44 lpcd", with 35% of the water unaccounted for (as reported; date not fixed); and in the dry months springs give only "3,000 to 20,000 liters per day" (CGWB, Lunglei district booklet). Groundwater is not short: the stage of extraction was 3.52% in 2011 (CGWB, Ground Water Scenario of Mizoram) and 3.95% in GWRA 2024, with all 26 assessed units Safe (as quoted), and the areas notified for regulation of groundwater development are "NIL" (CGWB). This Manual therefore sets two infiltration rules and one sizing rule for credit (all set by this Manual), and credits rainwater storage as follows:
- An RWH tank under AMCBR reg. 33 is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon season it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
- RWH credit rule. Because AMCBR reg. 33 sets no volume, RWH storage shall hold at least 25 L per m² of roof area (about 25 mm of rain over the roof) to earn credit under this Manual. The value is the North-East value of this series; the 20 L per m² of the mountain editions is the precedent, raised because Mizoram's households already store roof water for supply and, in the dry months of January to March, the springs give only 3,000 to 20,000 litres a day (CGWB, Lunglei). It counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3; watering a garden is not a continuous use in the monsoon season. The tank is then modelled under Clause 4.4.6 like any other retention practice; it is assumed full at the start of every monsoon design storm and never counted as detention. The rule makes the regulation's requirement measurable; it does not replace it, and a larger tank is always allowed. On hill-rule ground, which is nearly all of the State, storage and reuse is the way retention is provided, and the 25 L per m² is the first part of it.
- Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4 and the recharge rule below: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
- Hill rule. In every sub-area of Annex 2A, including the hill slopes inside sub-areas MZ-A1, MZ-C1 and MZ-D1, no deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on natural ground sloping more than 10°; on Surma-group shale, siltstone or mudstone, at any slope; on colluvium, fill, cut-spoil or slide debris, whatever its slope; in a mapped Moderate, High or Very High landslide hazard zone (the Landslide Hazard Maps of the Aizawl Municipal Corporation defined in the SD&SM Regulations, MIRSAC's Atlas of Micro-level Landslide Hazard Zonation of Aizawl City and Selected Towns, or the zonation of Serchhip town); or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope; and in a High or Very High landslide hazard zone not at all, whatever certificate is offered. On such sites roof runoff goes to rainwater storage under the credit rule above, with overflow to a lined drain that discharges through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope. The ground gives the reason. The Bokabil and Bhuban ridges are "characterized by low permeability and infiltration" and act as a "run off zone" (CGWB, Lunglei); "Lithological units comprising shale and siltstone are more susceptible to landslide than the hard and compact sandstone unit", with crumpled shale weighted highest (MIRSAC, Serchhip town); and "The soil in and around the city is young and in a loose state" (master plan). Water put into such a slope does not recharge an aquifer; it raises the pore pressure in the slope. The landslide record shows what follows: the Laipuitlang rockslide in Aizawl on 11 May 2013 (15 May in one paper), on the Middle Bhuban Formation, with 17 bodies exhumed (Science Vision paper) or 8 lives lost (another review; the counts conflict); the collapse of the disused quarry between Melthum and Hlimen in Cyclone Remal on 28 May 2024 (as reported); and the finding of the Directorate of Geology and Mineral Resources that "two-thirds of large-scale landslides" it investigated in 2022-23 "were due to improper drainage" (as reported). The hooks are the SD&SM Regulations, whose purpose clause names "increasing the amount of groundwater penetrating into slopes, and disposing of sewerage and drainage onto slopes in a poorly controlled manner" as causes of slope instability, which ask for subsurface drainage "as necessary for stability" and interceptor drains and down-drains (reg. 27), for fill toes "sloped for sheet overflow or a paved drain … with energy dissipaters" (reg. 25), and for "the control of both surface water and subsurface water, such as springs" behind fills (reg. 26), and which require engineered site development, with a geotechnical report, in every Moderate, High and Very High zone; AMCBR reg. 21(iv), under which a site must be "not an active hazard-prone area such as landslide, subsidences, mass movement"; and the Roadmap to Stability of the Landslide Policy Committee for Aizawl City (February 2014), which asks the Public Health Engineering Department (PHED) to "capture and transport rain and waste water away from exposed hillslopes and ejected at locations that will not saturate potentially unstable slopes" and calls to "eliminate all septic tanks, leach fields and soak pits within Aizawl City". On these sites retention is provided by storage and reuse, and detention by lined tanks, not by ponds or basins on the slope (Commentary to Clause 4.10). The 1.0 m groundwater separation of Clause 4.4.3 does not make an infiltration practice acceptable on a slope: perched water and pore pressure in a slope are the hazard, not the depth to the water table.
- AMCBR reg. 33 and the soak pit: a conflict, stated. Regulation 33 requires "A septic tank of appropriate capacity with soak pit" for every water closet. On a hazard slope that soak pit is the practice that the Roadmap to Stability would eliminate and that the hill rule forbids for storm water. This Manual does not override regulation 33, which governs sewage, not storm water. It states the conflict plainly: no storm water, roof water or sullage is put into a soak pit under this Manual, and a soak pit earns no infiltration credit; where a soak pit falls on hill-rule ground, the conflict is recorded on the site submission (Chapter 8).
- Recharge rule. Recharge is not a design objective in Mizoram. Deliberate recharge is allowed only on tested valley alluvium and river terraces, the Champhai flats (sub-area MZ-C1) and the terraces at Tlabung (MZ-D1), Bairabi and Vairengte (MZ-A1) and along the Tlawng, HSG B or C by texture, on flat ground of 10° or less, away from slopes and above the 1% AEP flood level; there it needs a silt trap, a filter and a first-flush diverter ahead of the structure, a field infiltration test, a seasonal high water table at least 2.0 m below ground and the separation of Clauses 4.11.4 and 4.12. It is never allowed on valley-floor land below the 1% AEP flood level, on the margins of a dil (its Zone 1 and Zone 2 under Chapter 7), within 15 m of a tuikhur (the spring rule of Chapter 8), or wherever the water table stands within 2.0 m of ground: in small valley ponds of Lunglei district water stands "within 2.0 m below ground level" (CGWB, Lunglei). Everywhere else rainwater harvesting is storage and reuse.
- The Water Resources Act and recharge: a conflict, stated. Sections 14(1)(b)(viii) and 16(2)(ix) of the 2024 Act speak of rainwater harvesting "to augment ground water recharge" and of "groundwater recharge, including rain water harvesting". On hill ground this Manual reads both as rainwater storage and reuse, which the Act's "water conservation" covers, not as recharge into slopes, and says so; it does not override the Act, and any direction of WARDMA governs where it is issued. On tested valley ground the recharge rule applies.
- Springs (tuikhur). A tuikhur (Mizo: a spring or water point; in law, "any place wherein water supply is obtained", Mizoram (Village Councils) Act, 2025, s.2(29)) is protected under the spring rule of Chapter 8: no storm outfall, soakaway or drain discharge within 15 m of it, no storm water routed into or immediately above it, no drain or fill that intercepts, buries or crosses a spring outlet, and no paving and no infiltration of road runoff in its mapped catchment above a water point (set by this Manual). "Mizoram is an abode of springs" (CGWB, State profile), springs are among the "community water resources" of the 2024 Act (s.2(1)(i)), and "Urbanisation has led to drying up of traditional water sources, like tuikhur" (Senhri Journal, as reported). A tuikhur is never used as storage.
- Polluted runoff. Runoff from fuel stations, workshops, quarries and the like, and from any drain that carries sewage or sullage, as most of the drains of Aizawl do (Commentary to Clause 4.1), shall not be recharged; road and parking runoff shall be recharged, where the recharge rule allows it at all, only through a surface practice with a filter, such as a vegetated basin or trench, never directly into a pit, bore or well (Chapter 8).
On the ridges, water put into the ground goes into the slope, and on the valley floors it meets a water table that the river raises. In the monsoon season an RWH tank is full after the first heavy rain. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The 25 L per m² credit rule, the hill rule, the recharge rule, the treatment of the AMCBR reg. 33 and 2024 Act conflicts and the polluted-runoff rule are set by this Manual. No Mizoram source sets a slope threshold for infiltration: the 24° of the SD&SM Regulations is the slope above which unmapped ground needs engineered site development, and their 60° and the master plan's 36° are limits on building. The 10° limit is set by this Manual, as in the mountain editions of this series, well below those slopes, because a slope that can carry a building can still be destabilised by water put into it; the shale condition applies at any slope because the CGWB and MIRSAC describe the shale as both impermeable and the most landslide-prone unit; the exclusion of High and Very High zones, with no certificate, is set because those are the zones where the SD&SM Regulations already require engineered site development and where the maps place the slides; and the distance of twice the height of a cut or wall is set by this Manual as a precaution, pending guidance from a geotechnical study for the State [TBC].
4.12 High-groundwater and sandy coastal sites
4.12.1 Design groundwater level. Each site in the valley floors and river terraces at Sairang, Bairabi and Vairengte, at Tlabung on the Khawthlangtuipui and at Chawngte on the Kau, the Champhai flats, the margins of the dils and of the Tuirial and Serlui B reservoirs, and hill sites with perched water, springs (tuikhur) or seepage, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the monsoon, from:
- (a) site piezometer readings over at least one full April–November season; or
- (b) where (a) is not available, the higher of the CGWB or IWRD record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, stream (lui), dil or reservoir.
For the flotation check of 4.12.3 at sites in the valley floors and river terraces of the Tlawng, Tuirial and Khawthlangtuipui (at Sairang, Bairabi, Vairengte and Tlabung), the Champhai flats, the margins of dils and reservoirs, and the seepage zones below springs (tuikhur) on slopes, where (a) is not available, the DGWL shall be taken as existing ground level.
4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:
- (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
- (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.
4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:
- with the facility empty;
- with groundwater at the DGWL; and
- for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.
The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.
4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.
4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.
4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.
Commentary. Mizoram is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3 and the saline exposure of 4.12.5, do not apply in the State, and no saline groundwater was reported in the sources read for this Manual; the springs sampled in Lunglei district had an electrical conductivity of 31–249 µS/cm and a pH of 6.9–8.3 (CGWB, Lunglei district booklet). On the ridges groundwater lies deep or in fractures, but storage on a slope is still kept out of the ground: a deep tank is not preferred on a hill site even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name. Storage on a slope shall be lined and watertight, its leakage and overflow taken to a lined drain, and a tank cut into the slope or built against a retaining wall carries the geotechnical certificate of the hill rule of Clause 4.11. The wet cases are the few low places. On the valley floors and river terraces at Sairang, Bairabi, Vairengte, Tlabung and Chawngte and on the Champhai flats the water table may stand within 2 m of ground (in small valley ponds of Lunglei district water stands "within 2.0 m below ground level", CGWB, Lunglei), and when the river is high it rises with it; at the margins of a dil or of the Tuirial and Serlui B reservoirs the ground stands at the water's level; and below a spring (tuikhur) on a slope the ground can be wet all year. There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river in flood, a dil at its outlet level or the reservoir near its full level raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, lui, dil or reservoir where that is higher than the well record, and on the valley floors and terraces, the dil and reservoir margins and the seepage zones below springs it is taken as existing ground level for the flotation check unless piezometers show otherwise. Storage there is preferably above ground, on roofs, podiums and landscape (4.12.4), and storage below ground is lined, anchored and checked for flotation empty. The April–November monitoring season of 4.12.1(a) is set by this Manual to cover the Manual's monsoon season of 1 April to 31 October and the high water after it, because the post-monsoon cyclones of October to December (Mizoram Agriculture Department, NAFCC project report, 2016) can raise the rivers after the season ends. The State's observation wells are those of the CGWB, North Eastern Region: no State observation-well network was found, so the IWRD record that 4.12.1(b) refers to does not yet exist [TBC]; the CGWB reports that in Lunglei district "Water level trend is also not available due to lack of ground water abstraction", and no water-table depths for individual town sites were obtained [TBC]. The factor of 1.2, the 0.5 m allowance and the "ground level" default for the valley floors, the waterbody margins and the seepage zones below springs have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Mizoram were found during research.
4.13 Regional detention and fee-in-lieu
4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:
- (a) a regional detention facility identified in the plan; or
- (b) a fee-in-lieu paid toward restoration of dil or tank storage identified in the plan.
4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:
- (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
- (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
- (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the monsoon. Storage below FTL that is held for irrigation or supply through April to October shall not be credited.
- (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
- (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
- (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.
4.13.3 Fee. The fee-in-lieu shall be computed as:
Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)
The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.
4.13.4 Ledger. The Authority shall keep a public ledger of:
- detention volume credited to each regional facility;
- volume delivered; and
- fees received and spent.
Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.
Mizoram has no tank Act and no tank cascade, and no dil in its towns was found to be operated for flood control under a documented rule (NEER's reading). Its regional storage is of three kinds, and none of it is yet a regional detention facility: the dils, among them Tam Dil, about 6 km from Saitual, which the Fisheries Department has rebuilt as a fishery reservoir (as reported; area not found [TBC]), and Palak Dil, the Pala Wetland in Siaha district, in the area of the Mara Autonomous District Council, a Ramsar site (no. 2484) designated on 31 August 2021 by its Ramsar Information Sheet (as quoted) and announced on 26 July 2022 (as reported), of about 1,850 ha with a water body of about 135 ha; the reservoirs of the Tuirial and Serlui B hydroelectric projects in Kolasib district; and the eight check dams that the Master Plan for Aizawl: Vision 2030 proposes "below Zuangtui, Sakawrtuichhun, Government Complex, Mission Vengthlang, Tlangnuam, Saikhamakawn, Melthum and Hlimen", whose design and status were not found (the plan's drainage map, Map 8.3, was not extracted [TBC]). No State Wetland Authority notification was found [TBC]. Four points follow:
- A dil on the record may not be a working store, and a dil is not a detention pond. A dil is credited only after a survey shows its bed, rim and outlet, and only for the storage above its outlet level; a natural dil keeps its own name and is never turned into a detention pond, and engineered storage is called a detention pond, never a dil or a tuikhur.
- A check dam in a lui is first a debris and sediment structure. On the steep, destructive lui of Aizawl a check dam fills with silt and slide debris, so its storage is credited to a development only under a Basin Stormwater Master Plan (Chapter 11), with a design, a stage–storage relation, a cleaning schedule under Chapter 10 and the written agreement of its owner, and only for the volume that the plan shows will be empty when the storm arrives; and no check dam may hold water against a slope that the hill rule of Clause 4.11 protects.
- The reservoirs are not spare capacity. The Tuirial reservoir is held for power by NEEPCO between a full reservoir level of 90.5 m and a minimum drawdown level of 68.0 m (CERC order in Petition 125/MP/2021), its storage below the full reservoir level is not credited (Clause 4.13.2(c)), its level is the tailwater of the land that drains to it and its releases are the tailwater of the reach below (Clause 5.8.5(e)); no level was found for the Serlui B reservoir [TBC]. Storm water spilled to either reservoir can be relied on only with the written agreement of its operator for a stated volume and level (set by this Manual).
- A spring is not a store for storm water. A tuikhur is protected under the spring rule of Chapter 8, and the "community water resources" of the Mizoram Water Resources (Management and Regulation) Act, 2024, which include "springs, ponds, lakes, tanks, traditional water harvesting structures, wells" (s.2(1)(i)), are protected by Village and Local Water Resources Committees that "Prevent pollution of identified water sources" (outside the Autonomous District Councils); none of them is credited as regional detention.
No notification divides the drains of any Mizoram town among their owners (NEER's reading). Until the State issues a rule [TBC], this Manual follows the working assignment of Chapter 1: public drains and drains along public streets in the Corporation's area as the Aizawl Municipal Corporation's, which "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient outfall" (Mizoram Municipalities Act, 2007, ss.80(d), 288, 289(1) and 290–291), with its Local Councils; the roadside drains of State roads and highways as the Public Works Department's in practice, because roads were not devolved to the Corporation (CAG, Report No. 1 of 2025), although on the statute the same drains vest in the Corporation (s.289(1)), an overlap this Manual states and does not resolve; national-highway drains as the national-highway agencies'; the natural lui and the riverine reserves as the Environment, Forest and Climate Change Department's and the Land Revenue and Settlement Department's; sewers and the Chite sewage treatment plant as PHED's and SIPMIU's (s.289(3) allows the hand-over); the dams and their release reaches as NEEPCO's (Tuirial) and the State's power department's (Serlui B); the drains of Lunglei as the Lunglei Municipal Council's under the Municipalities Act (no regulation found [TBC]); village drains outside the municipalities as the Village Council's ("Sanitation and drainages", an assignable duty under s.15(1)(q) of the Mizoram (Village Councils) Act, 2025); and, in the areas of the Autonomous District Councils, the District Council's and its Village Councils' [TBC]. Each town keeps a drain register giving every reach its owner, the lui it reaches, its landslide hazard map class and its outfall. This is the Manual's working assignment, not a statutory one; where land is private or held under a land pass, a drainage corridor or easement is reserved in the master plan or secured by agreement, not taken.
The first point is the basis of condition 4.13.2(c) in Mizoram. A dil gives flood storage only above its outlet level, unless a notified operating rule commits it to be lowered before the monsoon season. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.
4.14 Simplified methods for small sites
4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.
4.14.2 Method.
- Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
- Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
- Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
- Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
- Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
- Complete Form 4-2 (Tier B site sheet).
Table 4.3 — Tier B permissible site discharge and site storage requirement (template)
| Zone (Annex 2A) | HSG | Imperviousness | PSD 2-yr (L/s/ha) | PSD 100-yr (L/s/ha), standard | PSD 100-yr (L/s/ha), flood-sensitive | SSR (m³/ha), standard | SSR (m³/ha), flood-sensitive |
|---|---|---|---|---|---|---|---|
| MZ-Z1 Northern hills: MZ-A Northern hills (Kolasib–Kawnpui–Bilkhawthlir), at the depths of Clause 2.3.6(c)(ii); where the site's NIH-DHAARA cell is higher, Clause 4.6 applies | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MZ-Z1 Northern hills: MZ-A1 Northern valley floors (Bairabi–Vairengte), at the depths of Clause 2.3.6(c)(ii); where the site's NIH-DHAARA cell is higher, as at Vairengte, Clause 4.6 applies | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MZ-Z2 Central ridges: MZ-B Central ridges (Aizawl–Sairang–Serchhip–Thenzawl–Hnahthial–Mamit), at the floor of Clause 2.3.6(c)(i); where the site's NIH-DHAARA cell is higher, as at Thenzawl and Hnahthial, Clause 4.6 applies | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MZ-Z3 Eastern uplands: MZ-C Eastern uplands (Champhai–Khawzawl–Saitual–Ngopa–Zokhawthar), at the floor of Clause 2.3.6(c)(i) and (c)(iii) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MZ-Z3 Eastern uplands: MZ-C1 Champhai flats, at the floor of Clause 2.3.6(c)(i) and (c)(iii) | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MZ-Z4 Southern hills: MZ-D Southern hills (Lunglei–Lawngtlai–Siaha–Chawngte–Tuipang) | — | — | Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(i)) | — | — | — | — |
| MZ-Z4 Southern hills: MZ-D1 Tlabung valley floor (Tlabung) | — | — | Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(i)) | — | — | — | — |
Worked example (illustrative — not design values).
A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:
- PSD 100-yr = 356 / 2.0 = 178 L/s/ha
- SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
- PSD 2-yr ≈ 17 L/s/ha
Then:
- Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
- 100-yr release: 178 × 0.4 = 71 L/s.
- 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
- Layout options:
- a 400 m² underground tank 1.5 m deep; or
- 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
- Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
- RWH sumps are additional, and are assumed full (Clause 4.11).
Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.
4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:
- (a) the site counts tank or waterbody storage in its design (Chapter 7);
- (b) any part of the site lies within a waterbody setback (Chapter 7); or
- (c) the site drains to a tank cascade whose storage is counted in a downstream design.
The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.
4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:
Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A
where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.
Table 4.3A — Fixed release coefficients (provisional)
| Hydrologic soil group | C_10 | C_2 |
|---|---|---|
| A (sandy, well drained) | 0.05 | 0.02 |
| B | 0.08 | 0.03 |
| C | 0.15 | 0.08 |
| D (clay, poorly drained) | 0.25 | 0.15 |
Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).
4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):
V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]
V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]
where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).
4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.
4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.
Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).
Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Aizawl ridges, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.
The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.
4.15 Safety, fencing and multi-use
4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):
- (a) maximum depth in the 10% AEP storm: 0.45 m;
- (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
- (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
- (d) no vertical drop greater than 0.3 m within the storage area or at its edge.
4.15.2 Wet basins. Permanent pools shall have:
- a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
- an emergent planting fringe that deters entry.
4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:
- has a vertical wall or headwall drop greater than 0.6 m;
- exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
- contains an outlet structure with an opening larger than 300 mm that is not grated.
4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.
4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Mizo and English stating that the area floods during rain, and a depth marker at the deepest point.
4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.
4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.
Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.
4.16 Basis: why peak matching alone fails
Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.
- Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
- Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
- Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
- Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
- Closed outfalls. In Mizoram most outfalls fall freely to a steep stream (lui), and they close in two ways. On the ridges an outfall is closed by what the storm carries: the master plan finds the city's drains "silted up frequently due to insufficiency in the hydraulic design", and blames the water-logging of 33% of the area of Aizawl W-I, "for several days or for hours", on solid waste in the roadside drains (Master Plan for Aizawl: Vision 2030); slide debris and boulders bury culvert inlets and lui crossings, and NH-6 at Hunthar is reported to block in most storms, as in June 2018 and in Cyclone Remal in May 2024 (as reported). A drain whose outlet is buried in this way stops discharging at the height of the storm, and the water it carries leaves the drain and runs onto the slope below, which is how a blocked drain starts a landslide. On the valley floors an outfall is closed by the river: Tlabung on the Khawthlangtuipui flooded in June 2017, June 2018, July 2019 and August 2023 (as reported), Sairang families were stranded by the Tlawng in June 2018 (as reported), and Bairabi and Vairengte stand on river terraces of the north; there the river can stand above the drains for the length of a multi-day storm, and no downstream Indian control exists on the Khawthlangtuipui (the Karnaphuli, which flows on to Bangladesh), the Chhimtuipui (the Kaladan, which flows on to Myanmar) or the Tiau. Below the Tuirial and Serlui B dams an outfall can be held up by the release itself. What fills behind a closed outlet is storm water mixed with sewage and sullage, because the drains carry them (Commentary to Clause 4.1). No inventory of flap gates or pumps on any Mizoram outfall, no record of how long any outfall stays closed and no operating rule were found [TBC]; Chapter 5 sets the river and reservoir levels and the closure to be assumed (Clause 5.8.5(a) to (e)): not less than 24 hours on a hill lui, not less than 72 hours on the valley floors, at Tlabung and below the dams. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.
The response in this Manual is layered:
- release below pre-development (Clause 4.5);
- retain the frequent storms (Clause 4.4);
- route long monsoon storms (Clause 4.6.3);
- prefer regional storage in the dil system (Clause 4.13); and
- check downstream and at the outfall (Chapter 5).
Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.
4.17 Submittal requirements
Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:
- the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
- the evidence for the order of measures under Clause 4.3.1;
- the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
- the retention credit computation (Clause 4.4.6);
- the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
- a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
- stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
- the drawdown calculation (Clause 4.7);
- outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
- the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
- the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
- the design groundwater level and flotation check (Clause 4.12);
- the downstream and tailwater report (Chapter 5, Form 5-1); and
- the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).
Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.
References (chapter)
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01 (approved 10 Dec 2025). https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
- Mid-America Regional Council (2025). APWA 5600 Stormwater Standards Policy Supplement (7 Nov 2025); APWA 5600 Manual factsheet. https://www.marc.org/document/apwa-stormwater-standards-supplement ; https://www.marc.org/document/apwa-5600-manual-factsheet
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- MARC / APWA (2012). Manual of Best Management Practices for Stormwater Quality. https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- MARC. The Evolution of Regional Stormwater Design Standards (presentation; McEnroe 2005 results). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Volume 1. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Urban Drainage and Flood Control District (now MHFD) (2012). Full Spectrum Detention Release Rate Memorandum. https://mhfd.specialdistrict.org/files/23cb85ce8/UDFCD_Full_Spectrum_Detention_Release_Rate_Memorandum.pdf
- Mile High Flood District. Urban Storm Drainage Criteria Manual, Volume 2 (Storage).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
- PUB Singapore (2024). On-site Detention Tank Technical Guide, Rev. 3; Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3 (16 Apr 2025). https://www.pub.gov.sg/-/media/PUB/PDF/detentionTank.pdf
- Sydney Water (2020). On-site Stormwater Detention Guide (SW201). https://www.sydneywater.com.au/content/dam/sydneywater/documents/on-site-stormwater-detention-guide.pdf
- Upper Parramatta River Catchment Trust (2005). On-site Stormwater Detention Handbook, 4th ed.
- "On-site stormwater detention for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Ramsar Convention. Ramsar Information Sheet, Pala Wetland, India (site no. 2484; designation date 31 August 2021, as quoted), with reports of the announcement of 26 July 2022 (as reported).
- Aizawl Development Authority. Master Plan for Aizawl: Vision 2030 (approval notification not found [TBC]): §4.9.12, the eight proposed check dams; §8.3, drainage; Map 8.3 not extracted [TBC]. https://amcmizoram.com/uploads/files/Master%20Plan%20For%20Aizawl%20Vision%20-%202030_18032019040050.pdf
- Central Electricity Regulatory Commission. Order in Petition No. 125/MP/2021 (NEEPCO, Tuirial hydroelectric project). https://www.cercind.gov.in/2023/orders/125-MP-2021.pdf
- Mizoram Water Resources (Management and Regulation) Act, 2024 (Act No. 1 of 2024; No. H.12018/273/2023-LJD (IWR) of 15 March 2024; Gazette Extraordinary Issue No. 197): ss. 1(2), 2(1)(i), 9–12, 14(1)(b)(viii) and 16(2)(ix). https://prsindia.org/files/bills_acts/acts_states/mizoram/2024/Act1of2024MZ.pdf
- Reports on Tam Dil and its rebuilding as a fishery reservoir, and on the Serlui B dam (as reported).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A (§8.5).
- Aizawl Municipal Corporation Building Regulations, 2012 (published as the Aizawl Municipal Council Building Regulations, 2012; UD&PA Notification No. B.13017/8/2012-UD&PA of 20 December 2012; Mizoram Gazette Extraordinary Vol. XLII, Issue No. 4, 10 January 2013), made by the Board of Councillors under section 371 of the Mizoram Municipalities Act, 2007: regulations 1(2), 3(11)(iii), 3(17), 5(5)(v), 5(6)(iv), (viii) and (ix), 21, 26(2), 33, 37 and 39. https://amcmizoram.com/uploads/files/amc-building-regulations_21042017023756.pdf ; as amended by the Amendment Regulations of 2019 (No. B.13017/8(2)/2018-UD&PA; draft notice of 10 April 2019 read, final gazette not read [TBC]) https://amcmizoram.com/uploads/files/Public%20Notification_10042019051319.pdf , 2023 (No. B.13017/8/2021-UD&PA/Pt of 14 August 2023; Gazette Extraordinary Vol. LII, Issue No. 459, 28 August 2023) https://amcmizoram.com/uploads/files/Building%20Regulation%20Amendment%202023_31102023011032.pdf and 2025 (No. B.13017/8/2021-UD&PA/Loose of 21 November 2025: Chapter VIIIA and Annexure B-I) https://amcmizoram.com/uploads/files/Notification-%20AMC%20Building%20(Amendment)%20Regulations,%202025_20012026031957.pdf ; and the Corporation's circular No. P.11011/1/2025-AMC(BW) of 20 January 2026. https://amcmizoram.com/uploads/files/Building%20(Amendment)%20Regulations,%202025_21012026111317.pdf
- Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 (No. B.13017/75/2016-UD&PA of 4 April 2017; Gazette Extraordinary Vol. XLVI, Issue No. 161, 11 April 2017): regulation 1 (purpose), the definitions, regulations 4, 5(1), 6, 14, 24–29 and Schedule I. https://amcmizoram.com/uploads/files/Site%20Development_27062019101258.pdf
- Mizoram Municipalities Act, 2007 (Act No. 6 of 2007), the Corporation's consolidated edition to the Fourth Amendment (2015): ss. 1(2), 80, 288–300 and 371. https://amcmizoram.com/uploads/files/THE%20MIZORAM%20MUNICIPALITIES%20ACT,%202007_11062018034305.pdf
- Mizoram (Village Councils) Act, 2025 (Act No. 7 of 2025; Gazette Extraordinary Vol. LIV, Issue No. 178, 20 March 2025): ss. 1(2), 2(29), 13(6) and 15(1). https://prsindia.org/files/bills_acts/acts_states/mizoram/2025/Act7of2025MZ.pdf
- Mizoram Water Resources (Management and Regulation) Act, 2024 (Act No. 1 of 2024): ss. 1(2), 2(1)(i), 14(1)(b)(viii) and 16(2)(ix). https://prsindia.org/files/bills_acts/acts_states/mizoram/2024/Act1of2024MZ.pdf
- Mizoram Official Language Act, 1974 (Act No. 3 of 1975), with the notification of 6 May 1996 (No. H.12017/14/90-LJD, number read from a poor scan; Gazette Vol. XXV, Issue No. 237, 31 May 1996) fixing 1 August 1977 as its effective date. https://mizoramassembly.in/storage/Assembly/Gazette/EO/GZEO25_ISS237.pdf
- Landslide Policy Committee for Aizawl City (February 2014). Roadmap to Stability: Actions to Reduce the Landslide Risk in Aizawl (technical support GeoHazards International). https://amcmizoram.com/uploads/files/AMC%20Roadmap%20to%20Stability_15012019035648.pdf
- Aizawl Development Authority. Master Plan for Aizawl: Vision 2030, prepared by the Department of Architecture and Regional Planning, IIT Kharagpur (Chief Minister's message dated 11 September 2012; approval notification not found [TBC]; the 2023 amendment of the AMCBR has OBPAS check proposals against it): §8.3 and Table 8.2. https://amcmizoram.com/uploads/files/Master%20Plan%20For%20Aizawl%20Vision%20-%202030_18032019040050.pdf
- Comptroller and Auditor General of India. Report No. 1 of 2025 (Government of Mizoram, year ended 31 March 2023; tabled 27 August 2025): the performance audits of disaster preparedness and management and of the 74th Amendment. https://cag.gov.in/ag/aizawl/en/audit-report/details/122595
- Central Ground Water Board, North Eastern Region. Ground Water Scenario of Mizoram (State profile) and the Ground Water Information Booklet for Lunglei district; GWRA 2024 (as quoted).
- Government of Mizoram. Six-monthly progress report in NGT OA 606/2018, January–June 2025 (liquid-waste table as on 31 August 2025); and the report of the Mizoram Pollution Control Board in NGT OA 593/2017 and OA 673/2018 (February 2021). https://www.greentribunal.gov.in/sites/default/files/news_updates/Report%20by%20Mizoram%20PCB%20in%20OA%20No.%20593%20of%202017%20(Paryavaran%20Suraksha%20Samiti%20&%20Anr%20Vs.%20UOI%20&Ors).pdf
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (the Chite, Tuikual, Lawibual and Tuipui stretches). https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Lallianthanga and Lalbiakmawia (2013). "Micro-level landslide hazard zonation of Serchhip town", Science Vision 13(1) (MIRSAC); and the Laipuitlang landslide paper in Science Vision (abstract only read). https://sciencevision.org/issue/23/article/146
- Asian Development Bank. North Eastern Region Capital Cities Development Investment Program, Aizawl tranche documents (water supply and sewerage; as seen in search summaries).
- Reports on the landslides of Laipuitlang (May 2013), Cyclone Remal (28 May 2024) and 24 May–3 June 2025, on the finding of the Directorate of Geology and Mineral Resources of 2022-23 (EastMojo, 31 July 2023), on the Tlabung floods of 2017, 2018, 2019 and 2023, on the Gauhati High Court's order on the Bawngkawn–Durtlang road (July 2024), on the public water supply of Aizawl and on Aizawl's springs (Senhri Journal; Down To Earth) (as reported).
- Bureau of Indian Standards. IS 456:2000 Plain and Reinforced Concrete — Code of Practice.
- Government of India. Dam Safety Act, 2021.
- Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (AMC conversion).
Annexes and forms
| Annex / Form | Content |
|---|---|
| 4A | Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map |
| 4B | Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A) |
| 4C | Worked example (Tier A) with full routing tables |
| Form 4-1 | Site Runoff Control Report |
| Form 4-2 | Tier B Site Sheet |
| Form 4-3 | Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7) |
Commentary. No Indian national rule or Mizoram rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or a storage volume sized to a storm. No Mizoram document found sets a design storm, a return period, a runoff coefficient or a time of concentration for any town drain: the Master Plan for Aizawl: Vision 2030 describes the city's drains, "67% of Aizawl Urban Area is having kutcha drains and 18% are without any drainage system at all. Only 15% of the area is provided with pucca drains", and finds them "silted up frequently due to insufficiency in the hydraulic design", but gives no design basis; no storm-drain project of Aizawl Smart City Ltd was found; and the Aizawl documents of the ADB's North Eastern Region Capital Cities Development Investment Program found are for water supply and sewerage only (ADB project documents, as seen in search summaries). The building rules are two, and they apply only in the area of the Aizawl Municipal Corporation. The first is the Aizawl Municipal Corporation Building Regulations, 2012 (AMCBR; UD&PA Notification No. B.13017/8/2012-UD&PA of 20 December 2012; Mizoram Gazette Extraordinary Vol. XLII, Issue No. 4, 10 January 2013), as amended by the Amendment Regulations of 2019 (No. B.13017/8(2)/2018-UD&PA; final gazette not read [TBC]), 2023 (No. B.13017/8/2021-UD&PA/Pt of 14 August 2023, in force 28 August 2023, which renamed "Council" to "Corporation") and 2025 (No. B.13017/8/2021-UD&PA/Loose of 21 November 2025). The second is the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 (SD&SM; No. B.13017/75/2016-UD&PA of 4 April 2017; Gazette Extraordinary Vol. XLVI, Issue No. 161, 11 April 2017); whether it has been amended is not known [TBC]. Both are made by the Corporation's Board of Councillors under section 371 of the Mizoram Municipalities Act, 2007 and notified by the Urban Development and Poverty Alleviation Department (UD&PA), and both apply only to "all the areas covered by the Aizawl Municipal Council" (AMCBR reg. 1(2)). No statewide building regulation was found, no regulation of the Lunglei Municipal Council was found [TBC], no model building bye-laws under section 13(6) of the Mizoram (Village Councils) Act, 2025 were found, and no building or drainage regulation of the Lai, Mara or Chakma Autonomous District Council was found (Chakma District Council notices on town-planning no-objection certificates at Kamalanagar and on roadside construction are known only from titles and snippets). The AMCBR's drainage hooks protect the building and the plot; none sizes anything to a storm. A "Drain" includes an "open channel used for conveying surface water" (reg. 3(17)); the site plan shows "sewerage and surface drains, position and sizes of septic tank and soak pit" (5(5)(v)), and the building plans a roof plan "indicating drainage and roof slope", "site development and permanent structures like retaining wall, surface drain" and "provision for a suitable rain water harvesting facility" (5(6)(iv), (viii) and (ix)); the site must be "properly drained or capable of being drained" and "not an active hazard-prone area such as landslide, subsidences, mass movement" (21); the plinth is raised "so that adequate drainage of site is assured", "preferably … not less than 0.45 metre" (26(2)(a)); roof water is carried by "rain gutters and closed conduits … discharged at ground level by pipe … and no spout should be allowed to drain into the road or public area or within the adjacent compound or building" (26(2)(b)); every water closet has "A septic tank of appropriate capacity with soak pit", not "within a radius of 15 metres from a water source", and "A suitable rain water harvesting facility shall also be provided in all buildings" (33); and where "in the interest of public safety" rain and waste water must cross another person's land, the owner "shall allow construction of a closed conduit", with a "surface drain/closed conduit of adequate capacity to the nearest public drain" (37(i) and (ii)). The SD&SM Regulations go further than any building rule in the series on drainage geometry, and still set no design storm. Their purpose clause warns that "slope cutting, filling, increasing the amount of groundwater penetrating into slopes, and disposing of sewerage and drainage onto slopes in a poorly controlled manner can greatly increase slope instability". A site development permit is needed "in addition to a building permit" (5(1)), on a regular track only in zones of Low landslide hazard and on an engineered track in Moderate, High and Very High zones, on unmapped slopes of 24° or more, for cuts of 3 m or more, works of more than 200 m³ or works that support a structure; no permit is issued where slopes exceed 60° (14). The engineered plans include "A map showing the drainage area and the estimated runoff of the area served by any drains" and "A drainage plan, including elevations of floors with respect to finish site grade" (6). Regulation 27 sets terraces at least 2 m wide at not more than 10 m vertical intervals on cut and fill slopes; terrace swales at a gradient of at least 1 in 20, paved with reinforced concrete at least 75 mm thick, at least 300 mm deep, with at least 0.7 m² of paved area, and no single run collecting from more than 400 m² (projected horizontally) "without discharging into a down drain"; paved interceptor drains along the top of every cut slope whose uphill drainage path exceeds 10 m, at least 300 mm deep and 800 mm wide; building pads at a gradient of at least 1 in 50 "toward approved drainage facilities"; "non-erosive downdrains"; and a duty on a site developed downhill of another to "convey drainage, sewage or seepage from the adjacent site uphill … in a safe manner to the nearest practicable drainage way". Fill toes are "sloped for sheet overflow or a paved drain" with "energy dissipaters" (25), setbacks may grow "for any required interceptor drains" (26), and the owner maintains the drainage the permit installs (27). Schedule I makes civil-engineer licensees competent for "Design of drainage structures, including hydrology and hydraulic calculations", but nothing in the regulations says what storm those calculations use. This chapter supplies it: the design storm of Chapter 2, the release rates and storage of this chapter, and the capacity, freeboard and debris checks of Chapters 6 and 9; regulation 27's geometry is the minimum conveyance layer, which the design may enlarge but not reduce. The 2025 amendment lets empanelled technical personnel self-certify "ordinary buildings … on plots measuring less than 93 square meters and located within low and moderate geo-hazard zones—as identified by Geo Hazard International and referenced in the AMC SD&SM Regulations, 2017" (Annexure B-I), with a declaration of compliance with "the Aizawl Landslide Hazard Map" (form C-IV). Such a plot is below the threshold of this chapter unless it is part of a larger development; for it this Manual is guidance, the hill rule and the RWH storage of Clause 4.11 with the SD&SM geometry as the practical minimum, and a site of 1 ha or less that this chapter does cover may use the fixed-coefficient route of Clause 4.14.3. The Mizoram Municipalities Act, 2007 vests "all public drains, and all drains in, alongside, or under any public street" in the Municipality (s.289(1)), which "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient outfall" (s.288); a private drain may empty into a municipal drain only "after obtaining the written permission of the Chairman" (s.295), and no drain into a municipal drain or "any water-course" without consent (s.296); the Municipality may "require separate provisions to be made for drainage or sewage and other offensive matters as distinct from rain-water" (s.298); and no structure may be built over a municipal drain, culvert or storm-water channel (s.300). None of these sets a design storm, a release rate, a detention volume or an overflow path. Basements are not limited for flooding in the regulations read (NEER's reading); on a slope a building has "multiple ground floor levels" (AMCBR reg. 3(11)(iii)), so its lower floors are cut into the hill. This Manual therefore adds its own requirements for every basement and every lower floor cut into a slope: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); no basement in Zone 2 (Clause 7.5.2); on valley-floor land below the 1% AEP flood level, a basement only where it meets the rules of this chapter for flood-sensitive catchments, is watertight and is checked for flotation with groundwater at ground level (Clause 4.12.1); and, wherever a floor is cut into a slope, the geotechnical certificate of the hill rule of Clause 4.11, with the water behind its walls carried to a lined drain through weep holes and subsurface drains and not left in the ground. For a sloping site, this chapter also supplies what the regulations leave open: runoff from the slope above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel through an energy dissipator, never onto an unprotected slope or into fill. These are the Manual's proposals, not rules of the regulations. This chapter is written so that it can supply, as a technical companion to the AMCBR, the SD&SM Regulations and the Municipalities Act, the design storm, release rates and storage volumes that they leave open; a competent authority could adopt it for that purpose, but none has. Outside the Corporation's area the chapter reaches public works and any body that adopts the Manual, and for a household it is guidance. In practice the storm drains are the sewers: "In absence of sewerage system, people are using septic tanks and soak pits. In most of the places sewage is discharged into open drains without any treatment, which ultimately gets discharged to rivers" (Master Plan for Aizawl: Vision 2030); the State's sewage was 51.81 MLD, against "Existing Treatment Facilities … 10 [MLD] only for Aizawl city" (State report in NGT OA 606/2018, table as on 31 August 2025); and the CPCB lists the Chite stream and the Tuikual stream in Aizawl at Priority II (CPCB, 2025) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage and that discharges onto slopes and into the lui below the town. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.