Chapter 8Water Quality and Recharge


8.1 Purpose and scope

8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:

  • (a) the water quality volume (WQv) and the water quality design flow;
  • (b) the treatment train, and the selection and design of best management practices (BMPs);
  • (c) the criteria for infiltration and recharge;
  • (d) the exclusion of sewage and dry-weather flow from storm drains;
  • (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
  • (f) how rainwater harvesting (RWH) fits with retention and detention;
  • (g) erosion and sediment control during construction; and
  • (h) monitoring.

8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.

8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.

Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.


8.2 Definitions

Term Meaning in this Manual
Water quality volume (WQv) The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4).
Water quality rainfall depth (P_wq) The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A).
3-month ARI depth The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record.
Water quality design flow (Q_wq) The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5).
Runoff coefficient for WQv (Rv) The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I.
BMP A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume.
Treatment train Two or more BMPs in series, from source to site to regional scale (Clause 8.5).
Pretreatment A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP.
First flush The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil.
Gross pollutant trap (GPT) A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm.
Dry-weather flow (DWF) Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge.
Cross-connection Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain.
Infiltration facility A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells.
Seasonal high groundwater table As defined in Clause 3.10.2: the highest level in the monsoon season.
Hotspot A land use with a high risk of spills or contaminated runoff (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012).

8.3 Objectives and pollutants of concern

8.3.1 Stormwater treatment under this Manual shall aim to:

  • (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
  • (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
  • (c) keep sewage and sullage out of storm drains and waterbodies;
  • (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
  • (e) prevent erosion and sediment discharge during construction.

8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:

Table 8.1 — Pollutants of concern, sources and primary controls

Pollutant Main sources in Mizoram towns Primary control
Gross pollutants (plastics, litter, vegetation) Streets, markets, open dumping in drains Source collection; GPTs and screens (Clause 8.10)
Suspended sediment Construction sites, unpaved roads and verges, road wear, drain silt Erosion and sediment control (Clause 8.12); pretreatment; filtration
Oil, grease and fuel Roads, parking, fuel stations, workshops, bus depots Oil-grit separators at hotspots; bioretention
Pathogens and organic load (BOD) Sewage and sullage cross-connections, animal waste Exclusion and DWF interception (Clause 8.9)
Nutrients (N, P) Sewage, fertiliser, food waste, detergents Exclusion; bioretention; wetlands
Heavy metals Roads, roofs, industrial yards Filtration; sedimentation

Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Mizoram, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.


8.4 Water quality volume and design flow

8.4.1 Water quality rainfall depth. The water quality rainfall depth is:

P_wq = max (P_ret, P_3m)

where:

  • P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
  • P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.

8.4.2 Water quality volume. The WQv shall be computed as:

WQv = (P_wq / 1000) × Rv × A

where:

  • WQv is in m³;
  • A = the contributing area, m²;
  • Rv = 0.05 + 0.009·I; and
  • I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.

The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.

8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.

8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:

  • (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
  • (b) hotspot controls (Clause 8.8.8); and
  • (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.

8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:

  • (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
  • (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.

8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).

8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).

Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Mizoram value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).

The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.

Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train and pretreatment

8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:

  • (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
  • (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
  • (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.

8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).

8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.

8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.

Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Mizoram, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.

Stormwater treatment train: source, site and regional Treatment train: source → site → regional → receiving waterbody Runoff from roofs, roads, parking and open space: first flush carries most sediment, litter and oil 1. Source control on the plot, at the roof or kerb • Rooftop RWH: sump, recharge well • Rain garden, small bioretention • Permeable paving • Disconnect roofs onto lawns • Green roof, soil restoration • Silt trap / catch pit at inlets Retain first (Chapter 4) 2. Site control layout, campus, road corridor • Bioretention, swales, filter strips • Infiltration trench or basin • Oil-grit separator (hotspots) • Wet pond or extended detention • Sediment forebay pretreatment • Treat WQv, then detain Treat WQv (Clause 8.4) 3. Regional control basin or outfall, public land • Gross pollutant trap at outfall • Dry-weather flow interceptor • Constructed wetland at tank inlet (sedimentation zone) • Regional pond / restored tank (fee-in-lieu, Clause 7.11) Required at outfalls (8.10) Receiving waterbody tank, channel, marsh, estuary (Chapter 7) Each stage removes a different fraction. Coarse solids and litter are removed first so that filters and infiltration media do not clog. Flows above the WQ peak bypass treatment to detention (Chapter 4). Sewage and dry-weather flow are not stormwater No sewage or sullage connection to any storm drain (Clause 8.9). Dry-weather flow found at an outfall is intercepted and sent to the sewer or a treatment plant, not to the treatment train or the waterbody.

Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.


8.6 BMP selection: Level of Service and Value Rating

8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.

8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):

Table 8.2 — Required Level of Service for sites that are not redevelopment

ΔCN Impact Required LoS
17 or more High 8
7 to 16 Moderate 7
4 to 6 Low 6
1 to 3 Minimal 5

For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.

8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.

8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:

  • (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
  • (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
  • (c) it has pretreatment under Clause 8.5.3.

8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:

  • (a) retained on site under Chapter 4; or
  • (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.

Table 8.3 — BMP Value Ratings and suitability in Mizoram

BMP VR (MARC 2012) Main pollutants removed Volume reduction / recharge Valley alluvium and river terraces Laterite / hard rock Hill slopes over 10°, shale, colluvium and fill / high water table Mizoram notes
Native vegetation (preserved) 9.25 All High Suited Suited Suited Counts only for preserved, undisturbed area
Rain garden / infiltration 9.0 Sediment, metals, oil, nutrients High Suited if 1.0 m separation met Conditional (test) Not suited Mosquito control: drain within 48 h
Bioretention 8.5 Sediment, metals, oil, nutrients Medium–high (unlined); low (lined) Suited Suited, with underdrain Lined, with underdrain Media source and phosphorus content to be specified
Permeable pavement 7.5 Sediment, metals, oil Medium–high Suited Conditional Lined only Not where run-on carries heavy silt
Extended detention wetland 7.0 Sediment, nutrients, metals Low Conditional (water balance) Suited Suited Good at tank inlets (Clause 7.9.7)
Media / sand filter 6.0 Sediment, metals Low Suited Suited Suited (lined) Needs frequent cleaning
Extended wet detention (wet pond) 5.0 Sediment, metals, some nutrients Low Conditional (water balance) Suited Suited Dry-season water balance (Clause 8.7.8)
Vegetated filter strip 5.0 Sediment Low–medium Suited Suited Suited Mostly as pretreatment
Native vegetation swale 4.0 Sediment, oil Low–medium Suited Suited Suited Not where Q_wq velocity is high
Extended dry detention 4.0 Coarse sediment Low Suited Suited Suited Combine with detention (Chapter 4)
Proprietary / hydrodynamic devices 3.0–5.0 Coarse sediment, oil, litter None Suited Suited Suited VR from verified test data only
Signage (public education) +0.25 — — — — — Added to composite VR

The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.

Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Mizoram for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Mizoram stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.


8.7 BMP design summaries

8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).

8.7.2 Bioretention and rain gardens (Figure 8.2).

  • (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
  • (b) Surface ponding drained within 48 hours.
  • (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
  • (d) A transition (choker) layer and a gravel drainage layer below the media.
  • (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
  • (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
  • (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.

8.7.3 Vegetated swales.

  • (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
  • (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
  • (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
  • (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
  • (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.

8.7.4 Vegetated filter strips.

  • (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
  • (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
  • (c) Used mainly as pretreatment for bioretention, infiltration and swales.

8.7.5 Permeable pavement.

  • (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
  • (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
  • (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
  • (d) Structural design for the traffic loading by the road authority's standards.
  • (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.

8.7.6 Infiltration trenches and basins (Figure 8.3).

  • (a) Pretreatment under Clause 8.5.3 in every case.
  • (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
  • (c) An observation well to the base of each trench.
  • (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
  • (e) An overflow to the minor or major system at grade.
  • (f) Not brought into service until the contributing area is stabilised (Chapter 10).

8.7.7 Wet ponds (extended wet detention).

  • (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
  • (b) A sediment forebay at each inlet (Clause 8.5.3).
  • (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
  • (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
  • (e) A dry-season water balance (Clause 8.7.8).
  • (f) The detention storage of Chapter 4 may sit above the extended detention level.

8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.

8.7.9 Constructed wetlands.

  • (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
  • (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
  • (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
  • (d) A high-flow bypass so that floods do not scour the macrophyte zone.
  • (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.

8.7.10 Gross pollutant traps.

  • (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
  • (b) Capture of gross pollutants down to about 5 mm.
  • (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
  • (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
  • (e) Vehicle access for cleaning by suction or grab.

8.7.11 Oil-grit separators.

  • (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
  • (b) Sized for Q_wq, with a high-flow bypass.
  • (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.

8.7.12 Silt traps and catch pits.

  • (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
  • (b) A sump at least 300 mm below the outlet invert.
  • (c) Silt traps are pretreatment only and earn no VR.

Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Mizoram. Three local issues drive changes from the source manuals:

  • Mosquitoes. Dengue is endemic in Mizoram. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
  • Dry seasons. Most of Mizoram's rain falls in the monsoon season of 1 April to 31 October: the CGWB records "heavy rainfall during May to late September" (Lunglei), August brings the largest share of the year's rain, 16.8%, and January the smallest, 0.4% (Lallawmzuali and Muniyan, 2024), so the months from November to March are nearly dry (NEER reading). In those months the springs still give "3,000 to 20,000 liters per day" in January to March (CGWB, Lunglei); 27.16% of the households of the Aizawl Urban Area use rain water and 1.01% spring water (master plan), so stored roof water and springs carry the towns through the dry months. In the towns the feed of a drain, lui or dil in the dry months is often sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; in the ridge towns, where Clause 4.11 bars infiltration on slopes and shale and there is little flat land, the practical forms are lined bioretention with an underdrain, swales on gentle ground, storage for use, and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage or spring water; dils, tuikhur, reservoirs and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
  • Litter and silt. GPTs and silt traps are treated as essential, not optional, because Mizoram drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.

The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.

Bioretention cell: cross-section Bioretention cell (rain garden): section, not to scale Paved area Pretreatment: grass strip or forebay to drain ponding ≤ 300 mm filter media 600–900 mm overflow crest = max ponding mulch 50–75 mm engineered sandy-loam media (low fines, low phosphorus) transition (choker) layer gravel drainage layer perforated underdrain (if needed) Seasonal high groundwater table (post-monsoon) ≥ 1.0 m if unlined (infiltrating) Lined version (no infiltration): impermeable liner below the gravel layer. Required at pollution hotspots and wherever the 1.0 m separation to seasonal high groundwater cannot be met. Dimensions as set in Clause 8.7.2.

Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.


8.8 Infiltration and recharge criteria

8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Mizoram, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Mizoram needs the two rules of Clause 4.11 here, and the spring rule of this Manual, and Clause 8.8.1 applies with the following. (i) No infiltration on hill ground (Clause 4.11, hill rule). No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on natural ground sloping more than 10°; on the shale, siltstone or mudstone of the Surma group, at any slope; on colluvium, fill, cut-spoil or slide debris, whatever its slope; in a mapped Moderate, High or Very High landslide hazard zone; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope; and in a High or Very High landslide hazard zone not at all, whatever certificate is offered. The ridges of the Bokabil and Bhuban units are "characterized by low permeability and infiltration" and act as a "run off zone" (CGWB), and "Lithological units comprising shale and siltstone are more susceptible to landslide than the hard and compact sandstone unit" (MIRSAC). On such sites roof runoff goes to rainwater storage credited under Chapter 4, and its overflow and all other runoff go by a lined drain through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration is credited toward retention or the WQv. The hooks are the purpose clause of the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017, which names "increasing the amount of groundwater penetrating into slopes, and disposing of sewerage and drainage onto slopes in a poorly controlled manner" among the human activities that "can greatly increase slope instability", its regulation 27 (subsurface drainage "as necessary for stability") and regulation 26 (control of "subsurface water, such as springs"), and the Roadmap to Stability (2014), which asks that "all septic tanks, leach fields and soak pits within Aizawl City" be eliminated. Regulation 33 of the Aizawl Municipal Corporation Building Regulations, 2012 requires "a septic tank of appropriate capacity with soak pit" for every water closet, which on hazard slopes is the practice the Roadmap would eliminate: this Manual puts no stormwater into a soak pit and says so; it does not override regulation 33. (ii) Recharge only on tested valley alluvium and terraces (Clause 4.11, recharge rule). Recharge is not a design objective in Mizoram: the State drew 3.52% of its groundwater in 2011 (CGWB) and 3.95% in the assessment of 2024, with all 26 assessed units Safe (as cited), and the "Areas Notified for Regulation of ground water development" are "NIL" (CGWB). Deliberate recharge is allowed only on tested valley alluvium and river terraces (the Champhai flats, and the terraces at Tlabung, Bairabi and Vairengte and along the Tlawng), on flat ground of 10° or less away from slopes and above the 1% AEP flood level, with pretreatment, the field test of Clause 8.8.3, a seasonal high water table at least 2.0 m below ground and the separation of this Clause; never on valley-floor land below the 1% AEP flood level, in Zone 1 or Zone 2 of a dil (Chapter 7), within 15 m of a tuikhur, or where the water table is within 2.0 m of the ground, as it is in the small valley ponds where CGWB found water "within 2.0 m below ground level" (Lunglei). The Mizoram Water Resources (Management and Regulation) Act, 2024 has the IWRD "promote rain water harvesting to augment ground water recharge" (s.14(1)(b)(viii)) and lets WARDMA direct "water conservation and groundwater recharge, including rain water harvesting" (s.16(2)(ix)); on hill ground this Manual reads both as storage and reuse, not recharge, and says so. (iii) Springs (tuikhur): the spring rule. No storm outfall, soakaway or drain discharge lies within 15 m of a tuikhur; stormwater is not routed into a tuikhur or onto the slope immediately above it; no drain, cut or fill intercepts the flow to a spring, buries its outlet or is laid across it; and the catchment of a spring above a water point, as a hydrogeologist maps it, is a protected catchment, in which no paving is laid except for access, no road runoff is led into the ground, and no soak pit or septic tank is placed. The 15 m is set by this Manual on the 15 m that regulation 33 keeps between a septic tank or soak pit and "a water source"; the hooks are the Village and Local Water Resources Committees' duty to "Prevent pollution of identified water sources" under the 2024 Act, whose "community water resources" include springs (s.2(1)(i)), and the Village Councils' duty to "Conserve water resources within the village area" (Mizoram (Village Councils) Act, 2025, s.14(6)). (iv) Quality. No runoff from quarries, quarry spoil, industrial yards or roads with heavy traffic is led to any recharge structure, and a recharge well or shaft on the valley alluvium is used only for roof water or for runoff that has passed a filtering BMP, after a hydrogeologist's report confirming the depth to water, the receiving zone, and that no drinking-water well, spring or intake within 30 m will be harmed. The 10° trigger, the shale condition, the distance of twice the wall height, the 2.0 m limit, the spring rule and these conditions are set by this Manual; no Mizoram rule fixes a slope or a ground on which infiltration is barred (the 24° of the Site Development and Slope Modification Regulations, 2017 triggers engineered site development, not a limit on infiltration). The seasonal high groundwater table shall be determined under Clause 3.10.2.

8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.

8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:

  • (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
  • (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
  • (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
  • (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).

Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.

8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:

  • (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
  • (b) 3.0 otherwise.

8.8.5 Minimum rates.

  • (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
  • (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
  • (c) No infiltration credit where the design rate is below 3 mm/h.

8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:

  • (a) 3 m from building foundations, and 5 m from a basement;
  • (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
  • (c) 30 m from a drinking-water well or borewell;
  • (d) 15 m from a septic tank or soak pit; and
  • (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.

Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.

8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).

8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:

  • (a) fuel stations;
  • (b) vehicle workshops, washing bays, and bus and truck depots;
  • (c) industrial yards and loading areas where hazardous materials are handled or stored;
  • (d) solid waste transfer stations and landfill areas; and
  • (e) land known or suspected to be contaminated.

Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.

8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Mizoram has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The alluvium of the Champhai flats and the river terraces at Tlabung, Bairabi and Vairengte and along the Tlawng are not coastal sand areas: Clause 8.8.1 applies there in full, with the recharge rule of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:

  • (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
  • (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
  • (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
  • (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
  • (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.

8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the hard and compact sandstones of the Surma group and the Barail sandstones of the ridges, where groundwater is held in fractures, lineaments and weathered zones and comes out as springs (CGWB); on any slope in these areas the hill rule of Clause 4.11 applies first under Clause 8.8.1, so this Clause has effect only on flat, tested ground away from slopes):

  • (a) tests shall be made at the facility base, below any surface crust or hardpan;
  • (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
  • (c) infiltration on or above slopes shall be checked for slope stability.

8.8.11 Delta clays and black cotton soils. In the shales, siltstones and mudstones of the Bokabil and Bhuban units of the Surma group, which CGWB describes as of "very low permeability and infiltration", the silted beds of dils, the margins of reservoirs, and the clayey colluvium, fill, cut-spoil and slide debris of the hills, and in expansive black cotton soils:

  • (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
  • (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.

Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Mizoram precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Mizoram RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.

No map of hydrologic soil groups for Mizoram, no measured infiltration rate and no curve-number calibration anywhere in the State was found [TBC]. "Geologically, the State is underlain by sedimentary rocks of Tertiary age, which have been tightly folded in a series of anticlines and synclines" (CGWB, State profile): the shale, siltstone and sandstone of the Surma group, with the Barail sandstones in places. The "low linear ridges" of the Bokabil shale are "characterized by low permeability and infiltration. It acts as run off zone", and the "moderate linear ridges which occupy almost the entire district" of Lunglei, alternations of the Bhuban group, have "very low permeability and infiltration and acts as run off zone"; the hill soil is "colluvial soil, formed along the steep side slopes", and "Most of the rain water flows out as surface run-off" (CGWB, Lunglei booklet). Groundwater is drawn almost entirely from springs: "Mizoram is an abode of springs" (CGWB), which come from "weak zones such as fractures, lineaments and weathered residuum" and give "3,000 to 20,000 liters per day" in January to March (CGWB, Lunglei). The State drew 3.52% of its groundwater in 2011 (CGWB) and 3.95% in the assessment of 2024, with all 26 assessed units Safe (as cited), "Ground water is used for drinking purpose only" in Lunglei, and no water-level trend is available "due to lack of ground water abstraction" (CGWB, Lunglei). Water put into the ground is a hazard as well as a resource: on the ridges it raises the water pressure in soils and weathered shale on slopes of 30° to 45° in Aizawl (NEER reading), and about 89% of Serchhip town is steeper than 30° (MIRSAC, NEER arithmetic); the purpose clause of SD&SM 2017 names "increasing the amount of groundwater penetrating into slopes" among the causes of instability, and the Directorate of Geology and Mining attributed two-thirds of the large landslides it investigated in 2022-23 to "improper drainage" (as reported). This Manual's interim soil groups follow from these: the shale, siltstone and mudstone ridges D, the sandstone ridges C (D where unweathered), colluvium C in its hydraulics but unstable, the valley alluvium and terraces B to C, and urban fill and cut-spoil D (Chapter 3), each to be confirmed by site testing. The State therefore needs two rules and a spring rule, not one (Clause 4.11; Clause 8.8.1). On the tested valley alluvium and river terraces, recharge is allowed, with pretreatment, as a choice rather than a duty, because groundwater is not short. On hill ground, on shale, on colluvium and fill and in landslide hazard zones, no water is put into the ground on purpose, under the hill rule. Round every tuikhur and in its catchment, no storm water is discharged, under the spring rule. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Mizoram, which has no coast.

Infiltration trench: section with groundwater separation Infiltration trench: section, not to scale Seasonal high groundwater table (measured after the monsoon) Drinking-water well Sediment sump (pretreatment) Runoff in Observation well overflow clean washed aggregate (void ratio from test) geotextile on sides and top sand filter base ≥ 1.0 m Building foundation foundation setback well setback Test infiltration at the proposed base level. Design rate = measured rate ÷ safety factor. Empty within 72 h. Setback distances and test methods: Clauses 8.8.3 to 8.8.6. Road and parking runoff is never piped into a well. Sandy coastal soils: high rates, shallow groundwater. Laterite, hard rock: low rates. Delta clay: usually unsuitable.

Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.


8.9 Sewage cross-connections and dry-weather flow

8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.

8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.

8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Mizoram Pollution Control Board (MPCB) and the drain owner.

8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:

  • (a) the outfalls with DWF;
  • (b) the estimated DWF rate; and
  • (c) the upstream sources found by tracing, CCTV, dye or smoke testing.

The results shall be published in the register of Clause 10.17.

8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:

  • (a) diverts the DWF to a sewer or a treatment plant;
  • (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
  • (c) has a screen ahead of the diversion; and
  • (d) is not a substitute for removing the source connections.

8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.

Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Mizoram. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.

In Mizoram the storm drains are the sewers. "In absence of sewerage system, people are using septic tanks and soak pits. In most of the places sewage is discharged into open drains without any treatment, which ultimately gets discharged to rivers"; "the sullage (i.e. kitchen and bathroom waste) is discharged into drains which ultimately pollutes the fresh water sources"; and septic effluent finds its way "through drains and cross drains to the rivers, which are the sources of water supply" (Master Plan for Aizawl: Vision 2030). The State put its sewage at 51.81 MLD (31.37 MLD urban and 20.44 MLD rural), 16.34 MLD of it urban sewage in Aizawl district, against "Existing Treatment Facilities" of 10 MLD "only for Aizawl city" (Government of Mizoram's report to the National Green Tribunal in O.A. 606/2018, table as on 31 August 2025): one sequencing batch reactor plant of 10 MLD at Chite (Bethlehem Vengthlang), built by SIPMIU, whose trial run began on 6 February 2021 with 3,033 households connected (MPCB's report in O.A. 593/2017 and 673/2018). The plant serves one catchment: 5,207 household connections and 45.95 km of sewers are reported (as cited from the 2025 report); PHED's bio-digesters (3.35 MLD) and community soak pits (3.2 MLD) take some of the rest; 23 sewage treatment plants (27 MLD) and 23 faecal sludge treatment plants (0.33 MLD) are planned under SBM-U, and an AMRUT 2.0 sewerage and septage project of ₹39.22 crore (as read) is reported; and "Due to peculiar topography of the hilly regions, treatment of Grey Water remains a huge challenge" (O.A. 606/2018 report). The CPCB's list of 2025 names four Mizoram stretches among the polluted rivers: the Chite stream "near SIPMIU's STP to Armed Veng" in Priority II, with a BOD of 29 mg/L; the Tuikual stream at Reiek Kai in Priority II, with 29.1 mg/L upstream and 5.5 mg/L downstream near the PHE water-treatment plant; the Lawibual stream in Priority III (14.3 mg/L); and the Tuipui in Priority V (5.6 mg/L); the Tlawng, Tiau, Tuivawl, Mat, Saikah and Tuirial stretches of the 2018 list were dropped (CPCB, 2025). Whether the CPCB's "Tuikual stream" is the Tuikual lui that the master plan counts among Aizawl's "worst destructive streams" is a NEER reading to be confirmed. The site rules keep sewage and storm water together: regulation 27 of the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 asks for drainage plans "that provide for control of surface runoff, sewage, sullage and seepage from septic systems", and a site developed downhill "shall convey drainage, sewage or seepage from the adjacent site uphill"; this Manual separates them. The statutory hook is section 298 of the Mizoram Municipalities Act, 2007, under which the Municipality may "require separate provisions to be made for drainage or sewage and other offensive matters as distinct from rain-water and other unpolluted sub-soil water". In Mizoram, therefore: (i) every storm-drain outfall to a stream (lui) on the CPCB list (the Chite, Tuikual and Lawibual streams and the Tuipui), to a dil, or within the catchment of a tuikhur is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the water, and before any detention or infiltration device; (ii) on every site approved under this Manual, storm water and sullage are collected separately, each with its own last inspection chamber at the boundary, so that the site can be connected to a separate storm drain without rework when one is built, and no septic tank overflow, soak-pit overflow or sullage pipe is connected to a storm drain (Clauses 6.3.6(a), 8.9.1 and 8.9.2), with section 298 of the Act as the hook; (iii) no sullage or roof water is put into the ground on Moderate, High or Very High landslide hazard ground, on a slope steeper than 10° or on shale (Clause 4.11, hill rule), and no storm outfall, soakaway or drain discharge lies within 15 m of a tuikhur (the spring rule, Clause 8.8.1); and (iv) until sewers exist, a drain or lui that receives the drains of a settlement is designed as a combined channel: for velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning along it, and with covers or screens where it passes homes, because of the smell and the risk to health (Clause 6.3.6(d)). Every interceptor is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)), and passes the storm flow above its capacity on down the drain; on a steep lui that carries boulders and slide debris in flood, it and its chamber are placed above the stream's 1% AEP level or protected against the scour and debris of that flood (Chapter 9). These conditions are set by this Manual.


8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens

8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:

  • (a) a GPT designed under Clause 8.7.10; and
  • (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.

8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:

  • (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
  • (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.

8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:

  • (a) be designed with 50% blockage for hydraulic capacity;
  • (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
  • (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
  • (d) be cleanable from a safe platform, with vehicle access.

8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.

Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Mizoram waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.


8.11 Rainwater harvesting integration

8.11.1 RWH mandate continues. The rainwater harvesting required by the Aizawl Municipal Corporation Building Regulations 2012 and the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations 2017 (regulation 33 of the 2012 Regulations, under which "A suitable rain water harvesting facility shall also be provided in all buildings", and regulation 5(6)(ix), under which the plans "include provision for a suitable rain water harvesting facility"; the chapter on green buildings and sustainability (Chapter VIIIA) inserted in 2025 makes rainwater harvesting and "Reduction of Hardscape" incentives for plots above 100 m², not conditions; neither sets a volume, and the 2017 Regulations require no harvesting) continues to apply, subject to the limits of Clause 8.8.1: in Mizoram harvesting is storage for use, not recharge, on every slope steeper than 10° and on shale (Clause 4.11, hill rule), and where section 14(1)(b)(viii) or 16(2)(ix) of the Mizoram Water Resources (Management and Regulation) Act, 2024 speaks of rainwater harvesting for groundwater recharge, this Manual reads it on hill ground as storage and reuse, states the conflict and does not override the Act (Chapter 1). This Clause sets how RWH structures are counted under this Manual.

8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:

  • (a) harvesting: storage for use (sumps and tanks);
  • (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
  • (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).

8.11.3 Recharge structures.

  • (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
  • (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
  • (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.

8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:

  • (a) its infiltration rate has been tested under Clause 8.8.3;
  • (b) it empties within 72 hours at the design rate; and
  • (c) it has pretreatment.

A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).

8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).

8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.

8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.

Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. In Mizoram rainwater harvesting is water supply first. In the Aizawl Urban Area 27.16% of households use rain water and 1.01% spring water (master plan, Table 8.2); the PHED supply was reported at "44 lpcd" with 35% of the water unaccounted for (as reported; date not fixed); and the CGWB lists 300 roof-top rainwater-harvesting structures and 200 spring developments among the recharge and conservation works feasible in the State. The regulations make harvesting compulsory but set no volume and no detention rule: "A suitable rain water harvesting facility shall also be provided in all buildings" (AMCBR reg. 33), and the plans "include provision for a suitable rain water harvesting facility" (reg. 5(6)(ix)); since 2025, rainwater harvesting and "Reduction of Hardscape" are incentives, rewarded with additional floor area or fee waivers, for plots above 100 m² that "may comply with the green norms" (Chapter VIIIA); and the master plan recommends harvesting "mandatory … in all public buildings", a recommendation. The Site Development and Slope Modification Regulations, 2017 require none. The Mizoram Water Resources (Management and Regulation) Act, 2024 has the IWRD "promote rain water harvesting to augment ground water recharge" (s.14(1)(b)(viii)) and lets WARDMA direct "water conservation and groundwater recharge, including rain water harvesting" (s.16(2)(ix)); on hill ground this Manual reads both as storage and reuse, not recharge, and says so. None of these gives litres per m² of roof, a tank volume, a recharge rate, a test of a recharge pit or a limit on soak pits on slopes, and no audit of what has been built was found. This Manual credits storage of at least 25 L per m² of roof (Clause 4.11), the value of the North-East editions of this series, as retention only through reuse, and assumes it full at the start of every monsoon design storm, never counting it as detention. On the tested valley alluvium and river terraces, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); on hill ground, on shale, on colluvium and fill and in landslide hazard zones, harvesting is for storage and use only, and its overflow goes to a lined drain. RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a June to August monsoon storm, such as that of mid-June 2018, arrives after weeks of rain, which is why it cannot be counted as detention.

Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.


8.12 Construction-stage erosion and sediment control

8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:

  • (a) the sequence of clearing, earthworks and stabilisation;
  • (b) the area exposed at each stage;
  • (c) the measures of Clause 8.12.3, with their locations and sizes;
  • (d) the protection of infiltration and retention areas (Chapter 10);
  • (e) stockpile, concrete washout and fuel storage locations; and
  • (f) the inspection and maintenance schedule.

8.12.2 Monsoon timing. Earthworks shall be planned so that:

  • (a) the area exposed during the monsoon (April to October) is as small as practicable;
  • (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
  • (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.

8.12.3 Measures.

  • (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
  • (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
  • (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
  • (d) Inlet protection at every existing drain inlet that receives runoff from the site.
  • (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
  • (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
  • (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
  • (h) Concrete washout in a lined pit, never into a drain.

8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).

8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.

8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).

Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Mizoram's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Mizoram slide debris, quarry spoil and garbage travel with the sediment: the master plan finds Aizawl's drains "silted up frequently due to insufficiency in the hydraulic design" and blames the water-logging of a third of ward W-I on solid waste in the road-side drains, and the collapse of a disused stone quarry between Melthum and Hlimen in Cyclone Remal on 28 May 2024 and of the South Hlimen quarry on 9 August 1992 show what quarry faces and spoil do on these slopes (the first as reported, the second in the Senhri Journal; Chapter 1). The regulations already ask for part of this. Fills are not placed on natural slopes steeper than 2:1 without benching, and "The area beyond the toe of the fill shall be sloped for sheet overflow or a paved drain shall be provided. Such drains shall be constructed with energy dissipaters and shall discharge into an approved area" (SD&SM reg. 25); for plots beside natural streams "measures shall be taken to prevent erosion of materials or sediment from the site into the stream or riverine reserve" (reg. 28); excavated material is kept off "drainage courses or riverine reserves" and disposed of at a place the Corporation approves (reg. 29); and since 2025 an Occupancy Certificate is issued only after excess materials have been removed from the public roads and damage to public property restored (AMCBR, as amended in 2025). They give no size, date or inspection, which Clause 8.12 supplies. The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April, because Mizoram's deadliest dated rain events came in May and storms came in late April (Chapter 2). The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds in Mizoram: the 2-year 24-hour design depth is never below the interim floor of 85 mm (Clause 2.3.6(c)), and NIH-DHAARA gives 107 to 131 mm in the north and south (Kolasib, Bairabi, Vairengte, Lunglei, Tlabung, Siaha) and 130 mm is the floor in sub-areas MZ-A and MZ-A1; on a bare construction site on hill soils of group D with AMC III, which applies from 1 May (Chapter 3), 85 mm gives a runoff of the order of 70 mm, or about 700 m³ per hectare, so the 2-year runoff governs over the 250 m³ per hectare (NEER arithmetic), and the rule of Clause 8.12.3(c) is kept unchanged. In Mizoram the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel with an energy dissipator and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes every slope steeper than 10° and all shale; no spoil, debris or garbage from a site, and no spoil from a quarry, is placed in a lui or dil, within its Zone 1, on a slope below the site, or in the catchment of a tuikhur, and a quarry face above a lui has a cut-off drain along its crest; and a construction site in the catchment of a dil or tuikhur keeps its sediment out of every drain that reaches the water.


8.13 Monitoring

8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:

  • (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
  • (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.

8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.

8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).

8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.

8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.

Commentary. No Mizoram programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.


8.14 Submittal requirements

Every drainage report under this chapter shall include:

  1. the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
  2. for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
  3. the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
  4. for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
  5. the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
  6. the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
  7. the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
  8. the ESC plan (Clause 8.12).

8.15 Review and update

8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.


References (chapter)

Annexes and forms

Annex / Form Content
8A 3-month ARI 24-hour depth and IDF by zone
8B Redevelopment LoS table and treatment-train composite VR
8C Mizoram BMP performance calibration
8D BMP design sheets, media specification, plant lists
8E Erosion and sediment control standard details
Form 8-1 Water Quality Sheet
Form 8-2 Infiltration Test Record