Draft v1.0 prepared by NEER. Not adopted by the Government of Mizoram, any District Council, Village Council, authority or local body, and has no legal force. About this draft

Chapter 7Waterbodies, Dils (Lakes and Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (dil) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Mizoram, a landlocked State, means Palak Dil, the Pala wetland in Siaha district, the State's one Ramsar site (no. 2484, designated on 31 August 2021 according to its Ramsar Information Sheet, seen only as cited, and announced on 26 July 2022, as reported), Tam Dil near Saitual and the other dils, the Tuirial and Serlui B reservoirs with their drawdown zones, the seepage ground below springs (tuikhur), any marsh or waterlogged ground on the valley floors, such as the Champhai flats, where it holds water (none was surveyed for this Manual [TBC]), and any wetland notified under the 2017 Rules (none was found notified);
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Mizoram Municipalities Act, 2007 and the Aizawl Municipal Corporation Building Regulations, 2012 and Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 made under it, the Mizoram Water Resources (Management and Regulation) Act, 2024, the Mizoram (Village Councils) Act, 2025, the Mizo District (Forest) Act, 1955, the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed, if it is in force, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Mizoram has no Act for the protection of lakes, ponds, tanks or springs as such. Its waterbodies are protected, where they are protected at all, by a slope regulation, a building regulation and a municipal Act that reach only the municipal areas, by a water-resources Act and a Village Councils Act that reach the rest of the State outside the three Autonomous District Councils, by a Rivers Ordinance and Bill whose enactment was not confirmed, by the forest law of riverine reserves, by the wetland rules and by the courts. The Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 (No. B.13017/75/2016-UD&PA of 4 April 2017) require that for plots beside natural streams "the riverine reserve shall be maintained" (reg. 28), keep excavated material off "drainage courses or riverine reserves" (reg. 29), and ask site plans to show any "natural streams, riverine reserves or flood hazard areas as designated and defined by Aizawl Municipal Corporation" (reg. 6), but define neither the reserve nor a flood hazard area, and no flood hazard area has been designated (Clause 7.3, Commentary). The Aizawl Municipal Corporation Building Regulations, 2012, as amended, keep a septic tank and soak pit 15 m from "a water source" (reg. 33) and set no distance from a stream. Within the Corporation's area "all public tanks, streams, reservoirs, and wells" vest in the Municipality (Mizoram Municipalities Act, 2007, s.80(b)). The Mizoram Water Resources (Management and Regulation) Act, 2024 (Act No. 1 of 2024) defines "community water resources" as "customary common water resources such as springs, ponds, lakes, tanks, traditional water harvesting structures, wells, groundwater or local water bodies by whatever name" (s.2(1)(i)), and gives the Village and Local Water Resources Committees the duty to "Prevent pollution of identified water sources of the village / locality" (ss.9–12); it is the nearest thing in Mizoram to a waterbody Act, but it sets no distance from water and does not extend to the Autonomous District Councils. The Mizoram (Village Councils) Act, 2025 (Act No. 7 of 2025) makes "tuikhur" a word of the law, "any place wherein water supply is obtained" (s.2(29)), and asks every Village Council to "Conserve water resources within the village area" (s.14(6)). The Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed, provide for Protected Rivers and River Conservation Zones in which no construction, obstruction or diversion of a watercourse is allowed without the prior approval of a State Authority; no such Authority is known to have been constituted and no zone has been notified (Clause 7.4, Disclosure). Under the Mizo District (Forest) Act, 1955 the forest within half a mile of either side of 16 rivers was declared a riverine reserved forest in 1965; that notification was quashed by the Gauhati High Court on 27 January 2021 (as reported). Wetlands come under the Wetlands (Conservation and Management) Rules, 2017; no notification constituting a State Wetlands Authority for Mizoram was found [TBC], and the State's one Ramsar site, Palak Dil, lies in the Mara Autonomous District Council area (Clause 7.12, Commentary). In this chapter IWRD means the Irrigation and Water Resources Department, whose Chief Engineer is member secretary of WARDMA under the 2024 Act, and NEEPCO means the North Eastern Electric Power Corporation Ltd, which holds the Tuirial reservoir, the State's largest standing water, and is the only custodian in the State whose reservoir levels were found in writing (CERC); no tank register of the IWRD was found. Where this chapter speaks of NEEPCO's records, rules or freeboard, the same applies to the custodian of any other reservoir, dil or check-dam pool whose storage is counted: the Serlui B reservoir is taken to be the State power department's (NEER reading [TBC]), and the custodians of the dils and tuikhur are recorded one by one in the inventory (Annex 7A). Who regulates where in the municipalities, the Village Council areas and the Lai, Mara and Chakma Autonomous District Councils, and who is the competent authority for the area in each, is set out in Chapter 1.

This Manual treats every recorded waterbody as drainage infrastructure. Five features set Mizoram apart. The first is the stream (lui): every ridge town drains down its slopes into steep streams, such as the Chite lui, which takes "more than two-third of eastern portion" of Aizawl to the Tuirial, and the Ser lui, into which the western streamlets fall on their way to the Tlawng; the master plan calls the Chite, Chanmari, Theihai, Bethlehem, Tuikhurhlu, Mirawng and Bangla lui "turbulent with high velocities of currents during the monsoon season" and "very destructive", and the Khatla, Tuikual, Vaivakawn and Chanmari west lui "the worst destructive streams and nullahs"; these lui also carry the towns' sewage (Clause 8.9, Commentary). The second is the spring (tuikhur): "Mizoram is an abode of springs", whose water is "widely utilized by people for domestic needs" (CGWB), and in Aizawl "Urbanisation has led to drying up of traditional water sources, like tuikhur" (as reported). The third is the slope: in Mizoram the hazard that drainage starts is the landslide, and the bank of a lui is often the foot of a slope that a cut, a fill or a soak pit can bring down, so the corridor along an incised lui is measured from the crest of its bank slope (Clause 7.4). The fourth is the reservoir: the Tuirial reservoir of NEEPCO in Kolasib district (full reservoir level 90.5 m) and the Serlui B reservoir, with the reaches below their dams. The fifth is the valley floor: the few level places, the river terraces at Tlabung, Sairang, Bairabi and Vairengte and the Champhai flats, are the only places where a river can flood a town, and Tlabung was flooded by the Khawthlangtuipui in 2017, 2019 and 2023 (as reported). The dils, the lakes and ponds, are few: Palak Dil, a Ramsar site in Siaha district, and Tam Dil near Saitual, rebuilt as a fishery reservoir (as reported), are the best known. Mizoram has no irrigation tank cascades; the tank clauses of this chapter apply to dils, check-dam pools and reservoirs, and the master plan proposes eight check dams on Aizawl's streams, "below Zuangtui, Sakawrtuichhun, Government Complex, Mission Vengthlang, Tlangnuam, Saikhamakawn, Melthum and Hlimen" (Clause 7.7). This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the regulations and Acts above, the customary rules of the villages, the instruments of the District Councils, the wetland rules, or the directions of the Gauhati High Court (Aizawl Bench), the National Green Tribunal and the Supreme Court.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or stream (lui in Mizo; lui-pui, a river), such as the Tlawng (Dhaleswari) and the Tuirial (Sonai), which receive Aizawl's streams on the west and the east, the Chite lui, which drains more than two-thirds of eastern Aizawl to the Tuirial, the Ser lui, into which the city's western streamlets fall on their way to the Tlawng, the Tuivai, the Serlui and the Langkaih in the north, the Tiau on the eastern border, the Khawthlangtuipui (Karnaphuli) at Tlabung, the Chhimtuipui (Kaladan), the Tuichang, the Tuichawng and the Mat; drain or ditch (tui luankawr or tui-hawr in Mizo); dil (a lake or pond, natural or dug; dil té, a small pond or tank), such as Palak Dil, the Pala wetland in Siaha district, and Tam Dil near Saitual; reservoir, such as the Tuirial reservoir of NEEPCO and the Serlui B reservoir in Kolasib district, with its drawdown zone; the pool behind a check dam; spring or spring-fed water point (tuikhur in Mizo; hna or tuihna, the source of a stream) with its protected catchment; wetland, marsh or seepage ground; supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (dil) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the IWRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (stream (lui) or feeder channel) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, spillway gate or regulator) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Mizoram terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Dil A lake or pond, natural or dug: "(s.) a lake", with dil té "(s.) a pond, a tank", in Lorrain and Savidge's Grammar and Dictionary of the Lushai Language (1898), and "lake: dil" and "pond: dil, tui tling reng" in Pachuau's English–Mizo Dictionary (1997) (Annex 7E). First used in this Manual as "dil (Mizo: a lake or pond; dil té, a small pond or tank; plural dils)". The plural "dils" is this Manual's English form, to be confirmed by a Mizo editor: Mizo marks plurals with -te, which would be confused with té, "small". A dil with a controlled outlet is a tank under Clause 7.2: its outlet gate is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A dil with an uncontrolled outlet has its FTL at the crest of that outlet. Natural lakes keep their own names, such as Palak Dil and Tam Dil. Engineered storage built under this Manual is a "detention pond", never a dil and never a tuikhur.
Tuikhur A spring or spring-fed water point: "(s.) a well, a waterhole" (Lorrain and Savidge, 1898) and "fountain: tuikhur" (Pachuau, 1997); in law, "any place wherein water supply is obtained" (Mizoram (Village Councils) Act, 2025, s.2(29)). First used in this Manual as "tuikhur (Mizo: a spring or water point)", and used only for springs and the water points built on them. A tuikhur is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its tank or chamber. The spring rule of Clause 8.8.1 applies round it: no storm outfall, soakaway or drain discharge within 15 m; no stormwater routed into it or onto the slope immediately above it; no drain, cut or fill that intercepts its flow, buries its outlet or is laid across it; and its catchment above a water point, as a hydrogeologist maps it, is a protected catchment. A tuikhur is protected from stormwater and is never used as storage. These rules are set by this Manual.
Stream (lui); incised lui A stream or river is a lui in Mizo; a large river is a lui-pui (Annex 7E). Every lui that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, and whether it is lined, piped or covered. An incised lui is one whose channel runs at the foot of a bank slope steeper than 10°; for Clauses 7.4.3 and 7.13.1 its top of bank is the crest of that bank slope, the first marked break in slope above the channel at the top of the bank that the stream has cut, found by survey and shown on Form 7-1, and not the edge of the water or of the active bed. Where no such break can be identified, the top of bank is taken at the edge of the active bed, and the geotechnical report of an engineered site development (SD&SM reg. 26) states whether a wider line is needed. A lui carries boulders, slide debris and garbage in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6. This definition is set by this Manual.
Reference lines for setbacks Two lines are used, and the setback that reaches furthest from the water governs: (a) the top of bank of a channel (on an incised lui, the crest of its bank slope), the FTL of a dil or reservoir, or the outlet of a tuikhur, with Zone 1 of Clause 7.4.3 measured from it; and (b) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. Any wider line of a statute, regulation, plan, approval or court governs for the uses it restricts (Clause 7.4.5); the lines that exist, and their status, are in the Disclosure to Clause 7.4. This rule is set by this Manual.
Boundary of a dil or reservoir For this Manual, the boundary of a dil under Clauses 7.3.3 and 7.13.1 is the largest of its recorded boundary, its surveyed FTL and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years; and the boundary of a reservoir is the higher of its full reservoir level and the highest level its operator states, stated to the datum of Clause 7.3.5. For the Tuirial reservoir the full reservoir level is 90.5 m and the minimum drawdown level 68.0 m (CERC order in Petition 125/MP/2021), with the datum not stated [TBC]; for the Serlui B reservoir no level was found [TBC], and until its operator states one the boundary is fixed by survey of the highest water line. The drawdown land of a reservoir below that level is part of the reservoir. This reading is set by this Manual.
Floodplain clauses on the hills On the hills, which are most of Mizoram, Clauses 7.4 to 7.6 are read as a stream-corridor and debris-flow regime: the floodway of a lui is its channel, its bank slopes up to the crest and any debris fan or slide path that reaches it, Zone 1 is the corridor along it, and the hazard to be kept clear is the debris and slide material the lui carries as much as the water. Only on valley-floor land (Annex 2A: land below the 1% AEP flood level of a river, as in sub-areas MZ-A1, MZ-C1 and MZ-D1, at Sairang on the Tlawng and at Chawngte on the Kau) are they read as a floodplain regime, with the 1% AEP extent, the floodway and the flood fringe mapped from a river model. This reading is set by this Manual.
Check-dam pool The pool behind a check dam on a lui, such as the eight check dams the master plan proposes on Aizawl's streams. It is a tank for this chapter only where its storage is counted under Clause 7.7.1; otherwise it is modelled as an existing feature, assumed full of sediment and water at the start of every design storm, and kept clear under Clause 7.9.
Landholder The holder of the land of a waterbody or its setback where it is not public land: a private owner, the holder of a land pass or settlement from the Land Revenue and Settlement Department, the holder of a site allotted by a Village Council, or, in the Lai, Mara and Chakma Autonomous District Council areas, the holder under the District Council's land law [TBC]. Zone 1 land that is not public land is reserved in the master plan or secured for this Manual by a written agreement with the landholder, and is not taken; in an Autonomous District Council area this is done only through the District Council [TBC]. This rule is set by this Manual.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the IWRD and the Land Revenue and Settlement Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Aizawl Municipal Corporation (for the public tanks, streams, reservoirs and wells and the public drains within its area, which vest in it under sections 80 and 289 of the Mizoram Municipalities Act, 2007), the Lunglei Municipal Council (in its area), PWD or a national-highway agency (for the drains and culverts of their roads), the IWRD (for rivers, minor irrigation and flood works), PHED (for water-supply sources and intakes), NEEPCO (for the Tuirial reservoir and the reach below its dam), the State's power department (for the Serlui B reservoir and the reach below its dam [TBC]), the Fisheries Department (for Tam Dil, as reported), EF&CC (for forest land, riverine reserves and wetlands), the Land Revenue and Settlement Department (for land records and land passes), a Village Council with its Village or Local Water Resources Committee under the Mizoram Water Resources (Management and Regulation) Act, 2024 (for the tuikhur, drains and water bodies of a village or notified town outside the municipalities), in the Lai, Mara and Chakma Autonomous District Council areas the District Council and its Village Councils (for Palak Dil, which coincides with the Pala Wetland Reserve Forest in the Mara Autonomous District Council area, the forest authority and the District Council [TBC]), a private owner or land-pass holder, a developer (for the drains of a layout until they are handed over), the State Wetlands Authority (for a notified wetland; none was found), or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) land records and maps of the Land Revenue and Settlement Department, which keeps the land records and still administers land use inside the Aizawl Municipal Corporation's area (CAG, 2025), with the land passes and settlement records it issues (none of them was read for this Manual [TBC]); the allotments of house sites and other land made by Village Councils under the Mizoram (Village Councils) Act, 2025; in the Lai, Mara and Chakma Autonomous District Council areas, the land records of the District Councils, which hold and settle the land there (the Lai Autonomous District Council (Land Holding and Settlement) Act, 2002 is known only from a snippet, and none of these records was read [TBC]); the public tanks, streams, reservoirs, wells and drains that vest in the Aizawl Municipal Corporation under sections 80 and 289 of the Mizoram Municipalities Act, 2007; the land use maps of the Master Plan for Aizawl: Vision 2030, with its "W" use zone of rivers, streams, springs, ponds, lakes, wetland and water catchment area, its streams, which the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 take as the definition of a "Stream", and its map of drains and catchments (Map 8.3, not extracted for this Manual [TBC]); the Corporation's Landslide Hazard Maps and MIRSAC's landslide hazard zonation atlas for Aizawl and selected towns; the water-resources mapping that the Mizoram Water Resources (Management and Regulation) Act, 2024 requires within five years (s.17), when it is done; NEEPCO's records of the Tuirial reservoir's levels and land; any inventory of springs (tuikhur), of which none was found for Aizawl [TBC]; and each town's drain register (Chapter 6);
  • (b) NEEPCO and Village Council tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where NEEPCO records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. Mizoram has no flood map, no flood line and no flood plain law. The State told the National Green Tribunal that "Mizoram being a hilly state, there is no flood plain zone in the catchment area and hence actions pertaining to such flood plain zones is irrelevant" (MPCB's report in O.A. 593/2017 and 673/2018). That holds for the ridges, but not at the valley floors: the Khawthlangtuipui flooded Tlabung in June 2017, when about 350 houses in the sub-division were reported submerged (another report counts 9 fully and more than 60 partly submerged), in July 2019, when about 400 houses, 150 of them in the town, were reported flooded, and in August 2023, when 40 families were evacuated; in June 2018 families were stranded at Sairang on the Tlawng; the Tlawng at Bairabi and the Tiau at Champhai also flood (all as reported). No flood plain zoning law was found, and the "flood hazard areas as designated and defined by Aizawl Municipal Corporation" that SD&SM reg. 6 asks site plans to show have not been designated (none was found); the master plan leaves "Regulations for land use zoning for natural hazard prone areas", shown as "no development zone", to the Zonal Development Plans, whose regulations were sent to the Government on 17 May 2023 and had not been approved by September 2023 (CAG, 2025). What exists is a landslide map, not a flood map: the Corporation's Landslide Hazard Maps, "created in 2014 or later to the standards adopted by the Landslide Policy Committee for Aizawl City", decide the track of every site development permit, and MIRSAC's atlas of landslide hazard zonation covers Aizawl and selected towns. The rivers are hardly gauged: CWC has seven level-monitoring sites in Mizoram, five of them inactive, no forecasting site, and no warning or danger level for any of them; the only highest flood level printed is 149.0 m for the Tuirial at "Turial", set on 17 June 1995 (SANDRP's transcription of CWC tables, as reported). No source read for this Manual states the datum of that level, and how it relates to the Tuirial reservoir's full level of 90.5 m (CERC) is not stated [TBC]; neither is inferred here. No highest flood level has been published for any Mizoram town [TBC], and the only floor rule in the regulations is a plinth "preferably … not less than 0.45 metre" above ground or road level "so that adequate drainage of site is assured" (AMCBR reg. 26(2)(a)). The best evidence of flood extent on the valley floors is therefore on the ground: the flood marks at Tlabung, Sairang and Bairabi and the evidence of residents. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant produces the 1% AEP extent for valley-floor land and for larger and flood-sensitive sites, with the bulking of Clause 6.3.6 on the lui and the surveyed flood marks and tailwater of Clause 5.8.5(c) and (d). This Manual maps the 1% AEP extent on valley-floor land and offers it as an input to any future designation, not as a zone; on the hills its corridor is a stream corridor measured from the crest of the bank slope (definitions after Clause 7.2). Levels shall be stated to one datum (Clause 7.3.5), and the gauge and datum named for every level used. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more and round every dil, reservoir and spring (tuikhur), measured from the top of bank or, on an incised stream (lui) whose bank is a slope steeper than 10°, from the crest of that bank slope (wider lines govern under Clause 7.4.5 where they bind: neither the Aizawl Municipal Corporation Building Regulations, 2012 nor the Site Development and Slope Modification Regulations, 2017 set a distance from a stream, and the second requires only that "the riverine reserve shall be maintained" (reg. 28), without defining it; the master plan's 15 m green buffer along major drainage channels is a recommendation; the 800 m belt along the Tlawng lost its legal basis when the Riverine Reserved Forest notification of 1965 was quashed in 2021 (as reported) and is not used; no River Conservation Zone has been notified under the Rivers Ordinance and Bill of 2023, whose enactment was not confirmed; and no flood plain zone or flood hazard area has been designated; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the prior approval of the State Authority for construction, obstruction or diversion of a watercourse in a River Conservation Zone under the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed (no Mizoram River Protection Authority is known to have been constituted and no zone has been notified); a direction of WARDMA or of a District, Village or Local Water Resources Committee for a community water resource, such as a spring or pond, under the Mizoram Water Resources (Management and Regulation) Act, 2024 (outside the Autonomous District Councils); the written permission of the Aizawl Municipal Corporation for a drain into one of its drains or into any water-course (sections 295 and 296 of the Mizoram Municipalities Act, 2007); a condition of the Corporation's site development permit, including the riverine reserve of SD&SM reg. 28 and the setbacks of reg. 26; a declaration by a Village Council, with the District Disaster Management Authority's approval, of an unsafe site for house construction (s.13(6) of the Mizoram (Village Councils) Act, 2025); the consent of NEEPCO or of the State's power department for a work that drains to, or lies next to, the Tuirial or Serlui B reservoir or the reach below its dam; the consent of EF&CC for a work in a riverine reserve, reserve forest or wetland; a condition of a District Council in its area (none was found [TBC]); or a direction of the Gauhati High Court (Aizawl Bench), the National Green Tribunal or the Supreme Court sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Mizoram has no metric distance from a stream or spring in its building or site-development regulations; the lines that exist are a recommendation, an undefined reserve, a belt whose basis was quashed and a Bill. The Master Plan for Aizawl: Vision 2030 recommends "a 15 meters wide green buffer on both sides" of the major drainage channels; the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 require that "the riverine reserve shall be maintained" for plots beside natural streams (reg. 28) but do not define it; the master plan's 800 m green belt on either side of the Tlawng rested on the Riverine Reserved Forest notification of 1965, which the Gauhati High Court quashed on 27 January 2021 (as reported), and is not used in this Manual; and the River Conservation Zones of the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed, have not been notified. The only distance from water in the regulations is the 15 m that a septic tank and soak pit keep from "a water source" (AMCBR reg. 33). The 15 m floor takes the master plan's figure for major channels and extends it to every natural channel draining 8 ha or more and round every dil and spring. On an incised stream (lui) whose bank is a slope steeper than 10°, the threshold of the hill rule of Clause 4.11, it is measured from the crest of that bank slope, not from the edge of the water, because a slide of the bank starts at its crest and a cut, a fill or a soak pit near the crest can bring it down (set by this Manual). It applies to new development and redevelopment approved under this Manual, not to existing buildings; and where Zone 1 land is private or held under a land pass, it is reserved in the master plan or secured by agreement with the holder, not taken (in an Autonomous District Council area, only through the District Council [TBC]). It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Mizoram flood maps are mostly coarser than US maps, where they exist at all (none was found for any Mizoram town), and the only level land in a Mizoram town is usually a river terrace or valley floor, such as those at Tlabung, Sairang, Bairabi and Vairengte, the paddy flats of the Champhai valley, or the margin of a dil or reservoir (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Mizoram's lines along water are a plan recommendation, an undefined reserve, a forest belt whose basis was quashed, a Bill, a septic-tank distance and a set of slope lines; neither of its regulations sets a metric distance from a stream (NEER reading). Each binds only where it applies, and its status is stated here as this Manual uses it. (a) The master plan's 15 m. "All along the major drainage channels, a 15 meters wide green buffer on both sides have also been recommended" (Master Plan for Aizawl: Vision 2030). It is a recommendation of the plan. No approval notification of the plan was found (one source says it was approved in March 2013; unverified), but since the amendment of 2023 the Corporation's online permit system returns any proposal "not as per the provisions of the AMC Building Regulations, 2012 and the Master Plan for Aizawl, Vision-2030", so the plan is checked against in practice; which channels are "major" is not defined. (b) The 800 m belt along the Tlawng. "All along the river Tlawng an 800 m green belt on either side from the centre of the river has been kept reserved as per the Mizo District (Forest) Act, 1955, section 14 read with section 21" (master plan). Its legal basis, the notification of 28 January 1965 that declared the forest within half a mile of either side of 16 rivers a reserved forest, was quashed by the Gauhati High Court (Aizawl Bench) on 27 January 2021 on petitions by land-pass holders; an executive notification of April 2021 is reported to have set an 800 m restricted zone from mid-river with development by prior approval (its text was not read); the State's writ appeal was dismissed as withdrawn on 9 November 2022; a special leave petition was filed, with its outcome not found; and the Supreme Court issued notice to the State and NHIDCL in April 2024 over works in riverine reserved forests (all as reported). The 800 m is never a statutory buffer in this Manual and is not used to set Zone 1; an Applicant states on Form 7-1 whether any restriction from the April 2021 notification applies to the site. (c) The riverine reserve. "For plots adjacent to or including natural streams, the riverine reserve shall be maintained, and measures shall be taken to prevent erosion of materials or sediment from the site into the stream or riverine reserve" (SD&SM reg. 28); excavated material is kept off "drainage courses or riverine reserves" (reg. 29). "Riverine reserve" is not defined in the regulations (NEER reading), and no width was found. (d) River Conservation Zones. The Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed, would bar any person from constructing or undertaking "any developmental activity … including obstruction or diversion of the water course or channel, or issue or obtain land pass of any kind in the protected river or river conservation zone" without the State Authority's prior approval, with exemptions that include "bridges and culverts, check dams, waterholes" (s.15(1)(a) of the Bill), and would let the State regulate catchments beyond the zone "for the prevention of landslips or of the formation of ravines and torrents" and "for the maintenance of water supply in springs, streams and rivers" (s.16); they do not extend to the Autonomous District Councils. No Protected River or River Conservation Zone is known to have been notified. (e) The septic-tank distance. A septic tank and soak pit "shall not be located within a radius of 15 metres from a water source" (AMCBR reg. 33). It is the only metric distance from water in the regulations, and it governs septic systems, not buildings or drains. (f) The slope lines. No site development permit is issued "for a project located in an area with slopes greater than 60 degrees" (SD&SM reg. 14); site development is engineered, with a geotechnical report, in Moderate, High and Very High landslide hazard zones, where the plot is unmapped and its slope is 24° or more, and for large or high cuts and works that support a structure, and no exemption is allowed "within three meters of any slope of 24 degrees or more" (SD&SM reg. 4); and the master plan's "SL" zone covers "areas with slope higher than 36°, areas adjacent to major drainage lines", with "development on slope more than 36 degree should be strongly discouraged", words the High Court quoted in July 2024 (as reported). Outside the Corporation's area none of these regulations applies: no Lunglei Municipal Council regulation was found [TBC], the model building bye-laws of the Village Councils Act have not been framed (none was found), and no instrument of the Lai, Mara or Chakma Autonomous District Council on building or drainage was found. Clause 7.4.7 makes 15 m the floor of Zone 1 wherever this Manual applies.

Disclosure. Mizoram has no metric distance from a stream, dil or spring in any statute or regulation found: its building and site-development regulations set none (the second asks only that "the riverine reserve shall be maintained", without a width); the master plan's 15 m along major drainage channels is a recommendation; the 800 m belt along the Tlawng lost its legal basis when the riverine reserved forest notification of 1965 was quashed in 2021 (as reported); no River Conservation Zone has been notified under the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed; and no flood plain zone or flood hazard area has been designated anywhere in the State. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, round every dil, reservoir and spring (tuikhur), and, on an incised lui whose bank is a slope steeper than 10°, measured from the crest of that bank slope. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's two reference lines, its reading of the boundary of a dil or reservoir and of the core's floodplain clauses on the hills as a stream-corridor and debris-flow regime, and the spring rule (definitions after Clause 7.2; Clause 8.8.1). They are this Manual's proposal, not a statutory width or rule, and no government body, municipal body, Village Council or District Council has adopted or endorsed them. The 15 m is the master plan's figure for major channels, extended to every channel the Manual covers and to dils and springs. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; and where Zone 1 land is private or held under a land pass, it is reserved in the master plan or secured by agreement with the holder, not taken (in an Autonomous District Council area, only through the District Council [TBC]). The setback is applied as whichever of the two reference lines and its setback reaches furthest, so the Manual is stricter than statute along every stream, dil and spring, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • The regulations of the Aizawl Municipal Corporation. The riverine reserve of SD&SM reg. 28, wherever the Corporation fixes its width for a site; the setbacks of SD&SM reg. 26 from the top of a cut and the toe of a fill, which "may need to be increased for any required interceptor drains"; the permit tracks of SD&SM regs. 4 and 14 (engineered development in Moderate, High and Very High landslide hazard zones and on unmapped slopes of 24° or more; no permit above 60°); and the 15 m between a septic tank or soak pit and "a water source" (AMCBR reg. 33), which this Manual's spring rule also takes as its distance for storm outfalls. They apply only in the Corporation's area.
  • The master plan. The 15 m green buffer along major drainage channels, the "SL" zone of slopes above 36° and of "areas adjacent to major drainage lines", and the "W" use zone of rivers, streams, springs, ponds, lakes, wetland and water catchment area (Master Plan for Aizawl: Vision 2030): recommendations of the plan, checked against by the Corporation's online permit system since 2023; the Applicant states them on Form 7-1. The 800 m belt along the Tlawng is not used: its legal basis was quashed in 2021, and any restricted zone under the executive notification of April 2021 (text not read [TBC]) is stated on Form 7-1 if it applies to the site, never as a statutory buffer.
  • The Rivers law, if it is in force. A River Conservation Zone, with the State Authority's prior approval for construction, obstruction or diversion of a watercourse in it, governs as a statutory line under Clause 7.4.5 only once the law is confirmed in force and a zone is notified; neither has been confirmed.
  • The water-resources and village laws. The duties of the Village and Local Water Resources Committees to "Prevent pollution of identified water sources" and to protect catchments under the Mizoram Water Resources (Management and Regulation) Act, 2024, and any declaration by a Village Council, with the District Disaster Management Authority's approval, of an "unsafe site for house construction for mitigation of landslide" (Mizoram (Village Councils) Act, 2025, s.13(6)); neither sets a distance, and neither extends to the Autonomous District Councils.
  • Wetlands, forests, courts and custodians. Any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found) and the Pala wetland, a Ramsar site (Clause 7.12); reserve forest and forest land under EF&CC; the orders of the Gauhati High Court (Aizawl Bench), the National Green Tribunal and the Supreme Court as they stand; NEEPCO's lines at the Tuirial reservoir and the State power department's at Serlui B; and any line of a District Council (none was found [TBC]).

This Manual sets 15 m as the floor because Mizoram's regulations give its streams no distance at all, because a lui in a ridge town is the end of every drain above it and carries their water, sewage and slide debris in the same channel (Clause 8.9, Commentary), because 15 m is the master plan's own figure for major channels and the regulations' own distance from a water source, and because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled. The crest of the bank slope is the line on an incised lui because a slope that fails into a stream fails from its crest: the Directorate of Geology and Mining attributed two-thirds of the large landslides it investigated in 2022-23 to "improper drainage" (as reported), and the purpose clause of SD&SM 2017 names "disposing of sewerage and drainage onto slopes in a poorly controlled manner" among the activities that "can greatly increase slope instability". Until a statute, rule, notification, master plan, District Council instrument or court adopts it, the 15 m minimum is this Manual's recommended standard, and the instruments above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-sections with Mizoram's lines Waterbody setback: Zone 1 and Zone 2, with Mizoram's lines (sections, not to scale) A — Incised stream (lui) on the hills: Zone 1 measured from the crest of the bank slope Zone 1 Zone 2 Developable land (outside wider lines that bind) 1% AEP level, with climate factor (stays in the gorge) edge of water or active bed: not the reference line here Crest of bank slope = top of bank where the bank slope is steeper than 10° bank slope > 10° path ≥ 15 m (set by this Manual) 10 m Zone 2 is 10 m wide where the 1% AEP extent lies inside Zone 1 (Clause 7.4.4) On the hills the corridor is a stream-corridor and debris-flow zone, not a floodplain B — River on a valley floor (river terraces, as at Tlabung, Sairang or Bairabi): Zone 2 to the 1% AEP extent + 10 m Zone 1 Zone 2 1% AEP level, with climate factor (river model; flood marks) top of bank 1% extent flap-gated outfall park, path floor ≥ 1% level + 0.5 m ≥ 15 m to the mapped 1% AEP extent + 10 m C — Lines that exist in Mizoram, with their status (each binds only where it applies; drawn to the 15 m scale) 15 m: master plan green buffer on both sides of major drainage channels (recommendation) ? SD&SM reg. 28: "the riverine reserve shall be maintained" (width undefined) 800 m Tlawng belt — legal basis quashed 2021; not used (never a statutory buffer) River Conservation Zones (Rivers Ordinance and Bill, 2023): enactment not confirmed; none notified 15 m: septic tank or soak pit ≥ 15 m from a water source (AMCBR reg. 33) Slope lines: no site development permit above 60° (SD&SM reg. 14); engineered development from 24° where unmapped and in Moderate to Very High hazard zones; master plan "SL" zone above 36° 15 m tuikhur Zone 1: no buildings, fill, paving, retaining walls or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Spring rule (this Manual): no storm outfall, soakaway or drain discharge within 15 m of a tuikhur; its catchment protected. Whichever is wider governs: Zone 1 from top of bank (the crest of the bank slope on an incised lui) or the 1% AEP extent + 10 m, and any wider line that binds. New development and redevelopment only; private or land-pass land reserved or secured by agreement, not taken. The 15 m minimum is this Manual's proposal, not a statutory width.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Aizawl Municipal Corporation Building Regulations 2012 and the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations 2017, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. Mizoram's valley floors, the river terraces at Tlabung, Sairang, Bairabi and Vairengte and the Champhai flats, are flat, unlike the slopes around them, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Mizoram no high water level has been mapped for any dil, and no statute measures a setback from one, so the line from which a dil's or reservoir's setback is measured must come from this Manual. The difference matters most at the reservoirs, whose levels move through the year: the Tuirial reservoir is operated between a full reservoir level of 90.5 m and a minimum drawdown level of 68.0 m (CERC order in Petition 125/MP/2021; datum not stated [TBC]), so a line drawn from the edge of the water at a low level would leave up to 22.5 m of the reservoir's own drawdown land open to building, and no level at all was found for the Serlui B reservoir [TBC]. The same is true, on a smaller scale, of a dil that shrinks in the dry months from November to March. This Manual gives every dil and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the edge of a dil in the season and the full or highest stated level of a reservoir are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the valley-floor towns, whose houses stand on river terraces that the rivers have flooded, though no flood extent has been mapped for any of them (NEER reading), such as Tlabung on the Khawthlangtuipui, where about 350 houses in the sub-division were reported submerged in June 2017 (another report counts 9 fully and more than 60 partly submerged) and about 400 houses, 150 of them in the town, in July 2019 (as reported), Sairang on the Tlawng, Bairabi and Vairengte in the north, and the Champhai flats, already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Mizoram has no tank Act and no irrigation tank cascades, and its standing waters range from the small tanks of spring water points to the Tuirial reservoir. The storages that matter for urban drainage are of five kinds. The first is the reservoirs, the State's largest waterbodies: the Tuirial reservoir of NEEPCO's Tuirial hydro-electric project on the Tuirial (Sonai) in Kolasib district, held by a zoned earth-fill dam 75 m high with an open chute spillway, with a full reservoir level of 90.5 m, a minimum drawdown level of 68.0 m and a normal tailwater level at full load of 30.7 m (CERC order in Petition 125/MP/2021; datum not stated [TBC]); and the Serlui B reservoir on the Serlui in Kolasib district, behind a dam reported to be 51.3 m high and 293 m long (as reported), for which no full or maximum level was found [TBC]. Their releases enter a design as inflow and tailwater (Clause 5.8.5(e)), and they are not tanks for these clauses unless their storage is counted. The second is the dils: Palak Dil, the Pala wetland in Siaha district, a Ramsar site of about 1,850 ha with a water body of about 135 ha and an average depth of about 20 m (as cited from its Ramsar Information Sheet and as reported), and Tam Dil, about 6 km from Saitual, rebuilt as a fishery reservoir by the Fisheries Department (as reported; area not found [TBC]); no levels, outlet records or areas at FTL were found for either [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met, and Palak Dil, a Ramsar site, is never used as storage for a development. The third is the check-dam pools: the master plan proposes eight check dams on Aizawl's streams, "below Zuangtui, Sakawrtuichhun, Government Complex, Mission Vengthlang, Tlangnuam, Saikhamakawn, Melthum and Hlimen", and the Rivers Bill would exempt "check dams" from its ban on works in a River Conservation Zone; no design, height or storage was found for any of them [TBC], and on a steep lui a check-dam pool fills with sediment and debris, so it is modelled as full and is not counted as flood storage unless Clause 7.7.1 is met. The fourth is the village and town ponds and tanks (dil té), which are modelled as existing features where they intercept runoff but are never counted as storage, because they are not surveyed, have no controlled outlet and are full by the time of the peak storm. The fifth is the springs (tuikhur) and the tanks built on them, which are protected for their water and never counted as storage. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a ridge town every drain ends in a lui and every lui in a river, a reservoir or a valley floor. Any dil, check-dam pool or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with its custodian (NEEPCO, the State's power department, the IWRD, the Fisheries Department or another), and the custodian of each dil shall be confirmed for the inventory (Annex 7A) [TBC].

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. NEEPCO, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a ridge town, every drain, terrace swale and down-drain that falls from the ridge and its slopes to the stream (lui) below, any dil or check-dam pool with its inlets and outlet, the springs (tuikhur) on the slope with their protected catchments, and the stream itself down to the river, reservoir or valley floor whose level sets its tailwater (Clause 5.8.5), as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than NEEPCO's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. In Mizoram a dil, check-dam pool or reservoir may be full at any time in the Manual's season of 1 April to 31 October, and the storms that matter come in runs of days. The deadliest dated rain events fell in May, before or at the monsoon's onset (the Laipuitlang rockslide in Aizawl, 11 May 2013 in the press and 15 May 2013 in one paper; Cyclone Remal, 28 May 2024; and the storm of 24 May to 3 June 2025, with 598 landslides in eleven days, as reported); Serchhip district had 677 mm in 1–13 June 2018 (SANDRP, as reported); and the cyclones of October to December "are more intense than those of Pre-Monsoon season (April & May)" (NAFCC DPR, 2016). No record of how long Palak Dil, Tam Dil or any village dil stays at or above its outlet level in a wet spell was found, and NEEPCO's operating levels for the Tuirial reservoir through the season were not obtained [TBC]. While a dil or reservoir is full, it stores nothing more below FTL, the lui that flow into it discharge against its level, and its release adds to the flow in the stream below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A ridge town, its terraces, swales, spring and stream: a section across a ridge town with roof water to storage tanks, an interceptor drain at the crest of a cut, terraces with lined swales to a stepped down-drain and an energy dissipator at the stream, a downhill plot carrying the uphill plot's drainage in a closed conduit and a landslide-hazard band with no infiltration; and a plan of the slope below with a spring (tuikhur), its protected catchment and 15 m no-discharge circle, the stream's 15 m corridor from the crest of its bank slope, a dry-weather-flow interceptor on the outfall, a disused quarry face with a cut-off drain, and a valley-floor river with a terrace settlement behind a flap-gated outfall A ridge town: its terraces, swales, spring and stream (schematic, not to scale) A — Section across a ridge town and the slope below it stream (lui) ridge-top road with lined drain roof gutters → storage tank; overflow → lined drain (no soakaway on slopes over 10° or on shale) retaining wall with weep holes closed conduit: the downhill plot carries the uphill plot's drainage to the nearest drainage way paved interceptor drain at the crest of the cut (drainage path above it longer than 10 m) terraces ≥ 2 m wide at ≤ 10 m vertical intervals; lined RCC swales ≥ 1:20, ≤ 400 m² per run, discharging to a stepped down-drain energy dissipator where the down-drain meets the lui High / Very High landslide hazard: no infiltration (Clause 4.11) B — Plan of the slope below the town ↑ upslope, towards the ridge town river on the valley floor Zone 1 ≥ 15 m from the crest of the bank slope bank slopes (brown) up to their crest protected catchment of the tuikhur: no paving, no road runoff into the ground, no drain across it tuikhur (spring) and water point 15 m: no storm outfall, soakaway or drain discharge lined town drain from the ridge screen and dry-weather-flow interceptor before the outfall DWF → sewer or treatment (the drains carry sullage) disused quarry face with a cut-off drain along its crest; spoil kept out of the lui and its Zone 1 settlement on the river terrace: flap-gated outfall the river can close Zone 1 protected spring catchment 15 m no-discharge circle no infiltration DWF interceptor no soakaway on slopes or shale The 15 m corridor from the crest of the bank slope and the spring, interception and infiltration rules are this Manual's proposals; the regulations, the Acts, the District Councils' instruments and the courts' orders govern where they say more. No real place is shown. Original drawing for this Manual.

Figure 7.3 — A ridge town: its terraces, swales, spring and stream (schematic, not to scale; no particular town, stream, spring or landmark is shown). A: in section, the town stands on a ridge, the catchment divide, with its road along the crest and plots stepping down the slope. The road drain is lined. Roof water goes by gutters to a storage tank on each plot (Chapter 4), and the tank's overflow goes to a lined drain, because no soakaway is placed on a slope steeper than 10° or on shale (Clause 4.11, hill rule). A cut slope has a paved interceptor drain along its crest where the drainage path above it is longer than 10 m, and the cut and fill slopes have terraces at least 2 m wide at vertical intervals of not more than 10 m, with lined swales at a gradient of at least 1:20, no single run draining more than 400 m², discharging to a stepped down-drain (SD&SM reg. 27). Retaining walls have weep holes. A downhill plot carries the drainage of the plot above it in a closed conduit to the nearest drainage way (SD&SM reg. 27; AMCBR reg. 37). The down-drain ends in an energy dissipator where it meets the stream (lui), because every outfall onto a slope or into a steep lui needs one (Clause 6.3.6). Ground in a High or Very High landslide hazard zone receives no infiltration at all. B: in plan, below the town a spring (tuikhur) supplies a water point; its catchment above, as a hydrogeologist maps it, is protected, with no paving and no road runoff led into it, no drain is laid across it, and no storm outfall, soakaway or drain discharge lies within 15 m of it (Clause 8.8.1). The lui has Zone 1 of at least 15 m measured from the crest of its bank slope (Clause 7.4). The outfall to the lui carries a dry-weather-flow interceptor and a screen, because the drains carry sullage (Clause 8.9). A disused quarry face above the stream has a cut-off drain along its crest, and its spoil is kept out of the lui. The lui runs down to a river on a valley floor, where a settlement on the river terrace drains through a flap-gated outfall that the river can close (Clause 5.8.5(c)). The 15 m corridor from the crest of the bank slope, the spring, interception and infiltration rules are this Manual's proposals; the regulations, the Acts, the District Councils' instruments and the courts' orders govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, MSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under NEEPCO control, the operating rule shall be NEEPCO's rule. This Manual does not authorise any other body to operate a NEEPCO tank.

Commentary. No dil in Mizoram was found with a written operating rule, and most dils have no gates to operate. NEEPCO's operating rules for the Tuirial reservoir and the State power department's for Serlui B were not obtained [TBC]; the only levels found are the Tuirial reservoir's full and minimum drawdown levels (CERC). A dam-break study of the Tuirial dam is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (IAHR abstract of 2025, as reported); no release schedule or warning procedure for either dam was read. Without an agreed rule with dates, levels, release rates and a named operator, storage in a dil or reservoir cannot be relied on, and a release made without warning to the settlements downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a June to August monsoon storm, such as that of mid-June 2018, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

For a natural dil, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the dil routes the storm through it from its outlet level, and the outflow over the outlet is limited by the lui below it, which shall be shown to carry it with the debris of Clause 6.3.6. For a reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.5(e)), not a drawdown the operator has not agreed to in writing. Palak Dil is a Ramsar site and is not drawn down for flood storage; Tam Dil is a fishery reservoir, whose drawdown would need the Fisheries Department's acceptance under Clause 7.8.2(d); and the tanks of springs (tuikhur) are water supply, never flood storage. That is why no detention pond built under this Manual is called a dil or a tuikhur.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Mizoram Pollution Control Board (MPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).

Commentary. No Mizoram order fixing a date for the pre-monsoon cleaning of drains, lui or dils was found; the master plan says only that "drains need to be cleaned every year before the onset of monsoon", finds that Aizawl's drains are "silted up frequently due to insufficiency in the hydraulic design", and records that only "8% of the villages have open drains with regular maintenance and 40% with periodic maintenance" while 52% have none. In the ridge towns the material to be removed is slide debris and garbage as much as silt: the master plan blames the water-logging of 33% of Aizawl's ward W-I "for several days or for hours" on solid waste in the road-side drains. The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because Mizoram's deadliest dated rain events came in May and storms that shut schools in five to nine districts came on 27–28 April 2026 (as reported); because the earliest of the May events, the Laipuitlang rockslide, came on 11 May 2013, the drains, racks, inlets and check-dam pools are cleared again by 30 April, and after the season by 15 November, before most of the October to December cyclone window (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a dil fed by springs in its bed, deepening can cut the springs off or break the silt and clay that hold the water; this Manual allows no spring-fed dil and no tuikhur tank to be deepened below its original bed or its bed to be lined or cemented, and no work in Palak Dil, a Ramsar site, under this clause except as the wetland authority and the District Council permit. The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Mizoram precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Mizoram the drains and streams within the Corporation's area vest in it: "all public tanks, streams, reservoirs, and wells" and "all public sewers and drains channels, tunnels, culverts and watercourses in, alongside, or under, any street" (Mizoram Municipalities Act, 2007, s.80(b) and (d)), and "All public drains, and all drains in, alongside, or under any public street, whether made out of Municipal Fund or otherwise" (s.289(1)). The Municipality "shall provide and maintain a system of drainage or sewerage as well as a safe and sufficient outfall" (s.288); all drains, private or public, are "under the survey and control of the Board of Councillors" (s.290); no drain may enter a municipal drain or "any water-course" without written consent (s.296); and no building, wall, fence or other structure may be built "over any municipal drain, culvert or gutter or bed, bank or embankment of any sewage works or storm water channel" vested in the Municipality (s.300). Roads were never devolved to the Corporation (CAG, 2025), so PWD builds and keeps the drains of State roads in practice, though on the statute the same drains vest in the Corporation; this Manual states the overlap and does not resolve it. Outside the municipalities "Sanitation and drainages" is a duty that may be assigned to a Village Council (Mizoram (Village Councils) Act, 2025, s.15(1)(q)); in the Autonomous District Council areas the drains are the District Councils' and their Village Councils' [TBC]. No rule or order dividing streams (lui) from municipal drains was found; Chapter 6 gives this Manual's working split and each town's drain register. The record of Aizawl shows a network that is mostly unbuilt and that runs into the lui: "67% of Aizawl Urban Area is having kutcha drains and 18% are without any drainage system at all. Only 15% of the area is provided with pucca drains" (master plan), and the plan proposes that the "existing drainage alignment within urban area be made permanent and also the natural drainage system be improved and protected with treatment facilities at the outfall points". None of these keeps a lui at its recorded width once it has been lined, piped, covered, built over or filled with debris or garbage, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored dil or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Mizoram no shared form of storage is required by the regulations: regulation 33 of the 2012 Building Regulations requires "a suitable rain water harvesting facility" in all buildings but sets no volume, the green-building chapter of 2025 makes rainwater harvesting an incentive, and neither regulation has a detention, peak-flow or design-storm rule (Chapter 4). The plans for Aizawl's streams are for conveyance and check dams, not regional storage: the master plan proposes permanent drain alignments, "treatment facilities at the outfall points" and eight check dams, and no storm-drain project of the Smart City, AMRUT or the ADB programme for Aizawl was found. In the ridge towns there is little flat land on which a regional pond could be built, and none may be built on a slope where Clause 4.11 bars infiltration; a regional facility there is a lined tank or a lined detention structure, not a pond, and it is never called a dil. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the State Wetlands Authority that those Rules provide for (no notification constituting one for Mizoram was found [TBC]);
  • (b) any wetland notified under the 2017 Rules, to its notified boundary (none was found notified in Mizoram), and Palak Dil, the Pala wetland in Siaha district, a Ramsar site (no. 2484), to the boundary of the Ramsar site;
  • (c) Tam Dil and the other dils, the Tuirial and Serlui B reservoirs with their drawdown zones, the seepage ground below springs (tuikhur), and any marsh or waterlogged ground on the valley floors, such as the Champhai flats, where it holds water, within the 1% AEP extent of Clause 7.3.4 (a river, stream or reservoir itself is a waterbody under the rest of this chapter); and
  • (d) any other dil, marsh or wetland that the Authority notifies, that the wetland authority lists, or that the Gauhati High Court, the National Green Tribunal or the Supreme Court directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Mizoram's one Ramsar site is Palak Dil, the Pala wetland in Siaha district, in the Mara Autonomous District Council area: Ramsar site no. 2484, designated on 31 August 2021 according to its Ramsar Information Sheet (seen only as cited) and announced on 26 July 2022 (as reported), a site of about 1,850 ha that coincides with the Pala Wetland Reserve Forest of 1998, with a water body of about 135 ha and an average depth of about 20 m (as cited and as reported). The full Information Sheet was not read [TBC]. Tam Dil, about 6 km from Saitual, was rebuilt as a fishery reservoir by the Fisheries Department (as reported); its area and status were not found [TBC]. No notification constituting a State Wetlands Authority for Mizoram, and no wetland notified under rule 4 of the Wetlands (Conservation and Management) Rules, 2017, was found [TBC]. The master plan puts rivers, streams, springs, ponds, lakes, wetland and "Water catchment area" in its "W" use zone and recommends stopping the dumping and earth filling of water bodies; it gives rivers, streams and water bodies 585 ha, 3.83% of the plan area. The springs are the State's most used waterbodies, and spring-shed work has begun: a study of 20 springs supported by GIZ, with the Forest Department as nodal agency for a pilot of 100 springs and technical partners for the hydrogeology, and the revival of six springs in Serchhip and Lunglei districts by a non-government programme (all as reported); no count of Aizawl's tuikhur was found [TBC]. A drain outfall, desilting, diversion or gate operation in or next to Palak Dil, a notified wetland or forest land therefore needs the views or permission of the wetland authority, EF&CC or the District Council where they reach it, as well as compliance with this chapter; for the dils, springs and marshes that no rule reaches, this chapter and the duties of the Water Resources Committees under the 2024 Act are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Mizoram's lui and rivers through the drains (Clause 8.9, Commentary). The State has 10 MLD of treatment, "only for Aizawl city", against 51.81 MLD of sewage, and the CPCB's list of 2025 names the Chite and Tuikual streams in Priority II, the Lawibual stream in Priority III and the Tuipui in Priority V. Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Aizawl. In Mizoram they apply in full to every new outfall, and every existing outfall to a lui on the CPCB list, to a dil or within the catchment of a tuikhur is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. In the catchment of a dil, every drain that enters the water also passes a sediment trap and a solid-waste trap first (Figure 7.3; Clause 6.3.6), because the dil is the end of the slope's drainage and has no other way to lose the silt and garbage; and no drain discharges within 15 m of a tuikhur at all (Clause 8.8.1).


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Mizoram's controls on building beside its streams and on its slopes have come partly from the courts. In a suo motu public interest litigation on a letter from the INTACH Mizoram Chapter, the Gauhati High Court (Aizawl Bench) directed in July 2024 that "no new construction activity shall henceforth be allowed on either side of the Bawngkawn – Durtlang (Leitan) road", kept in abeyance the Corporation's approvals beyond the first floor, exempted retaining walls built to prevent landslides, and quoted the master plan's "development on slope more than 36 degree should be strongly discouraged"; a single-bench order of 23 November 2023 in a petition of 2020 had asked UD&PA, the Revenue Department and the Corporation to consider whether construction should be allowed on that road (all as reported; case numbers not found [TBC]). On the rivers, the High Court quashed the riverine reserved forest notification of 1965 on 27 January 2021 on petitions by land-pass holders, the State's writ appeal (W.A. 8 of 2021) was dismissed as withdrawn on 9 November 2022, and the Supreme Court issued notice to the State and NHIDCL in April 2024 over works in riverine reserved forests (all as reported). Before the National Green Tribunal, in O.A. 593/2017 and O.A. 673/2018, MPCB reported a River Rejuvenation Committee constituted on 5 December 2018 and reconstituted on 12 May 2020, a State Level Monitoring Committee under the Chief Secretary (No. C.18013/2/2020-I&WR/243 of 21 July 2020), an action plan for the State's polluted rivers, and a compensation regime adopted on 5 May 2020 under which "no compensation has been levied till date" (MPCB report, February 2021). In the Corporation's area no structure may be built over a municipal drain or storm-water channel (Mizoram Municipalities Act, 2007, s.300), and the Ward Committees are to detect "illegal construction, encroachments on municipal and public properties" (Ward Committee and Local Council Rules, 2010); the master plan recommends stopping the dumping and earth filling of water bodies. No record of encroachment on any lui, dil or tuikhur was found [TBC]. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. No dil in Mizoram was found to be held by a bund high enough to be a specified dam, though the bunds and outlets of Tam Dil and the other dils were not surveyed for this Manual [TBC]; each outlet work, bund and check dam shall be screened under Clause 7.14.1, and none of the eight check dams that the master plan proposes for Aizawl has a known height [TBC]. The dams of the Tuirial and Serlui B reservoirs are dams across rivers under the Act: the Tuirial dam, a zoned earth-fill dam 75 m high (CERC), and the Serlui B dam, reported to be 51.3 m high (as reported), are both above the 15 m of Clause 7.14.1(a). Where the storage of a dil, check-dam pool or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Mizoram the embankments that matter to the towns and villages are the dams of the Tuirial and Serlui B reservoirs, and the hazard below them is the release and the breach. A dam-break study of the Tuirial dam is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (IAHR abstract of 2025, as reported); its inundation map, NEEPCO's emergency action plan, and any release schedule or warning procedure for either dam were not read for this Manual [TBC]. A failed or overtopped bund floods the land below it, and a release made without warning floods it too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments, why the release reach below the Tuirial dam is a flood-sensitive catchment (Chapter 1), and why Chapter 5 treats every release reach as a flood-sensitive outfall (Clause 5.8.5(e)). The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Mizo waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)