Draft v1.0 prepared by NEER. Not adopted by the Government of Mizoram, any District Council, Village Council, authority or local body, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Mizoram. Mizoram is landlocked and hilly: it has no coast, no tide and no Coastal Regulation Zone, and cyclones such as Remal (28 May 2024) reach it only as rainfall, which is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Mizoram: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel, stones and slide debris), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Mizoram the receiving water is one of six kinds: a steep hill stream (lui), into which most of the State's outfalls fall freely from a ridge or a slope; the lui of Aizawl, the Chite lui to the Tuirial and the Ser lui to the Tlawng, ungauged, turbulent in the monsoon and carrying the city's sullage; a river under which a valley floor or a terrace lies, such as the Tlawng at Sairang and Bairabi, the Tiau at Champhai and Zokhawthar and the Kau (Tuichawng) at Chawngte; the Khawthlangtuipui at Tlabung, the State's river-flood town; the reservoir of the Tuirial dam or of the Serlui B dam, the reach of river below one of them, or a dil (Mizo: a lake or pond); or a river that leaves the State, for Bangladesh, Myanmar or the Barak plain downstream; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a lui in flood, a river, a reservoir or a receiving drain, with the locks and closures of Clause 5.8.5(a) to (f) in place of the tidal lock windows.

Commentary. The drains of Mizoram's towns fail in places that site design does not see, and the failure that matters most is not a flood. Practically every town sits on a ridge or a slope: Aizawl's slopes run at "300 to 450" (30° to 45°, as printed in the master plan), and about 89% of Serchhip town is steeper than 30° (MIRSAC; NEER arithmetic). Water put into those slopes moves them: the Directorate of Geology and Mineral Resources ("Directorate of Geology and Mining" in the press) attributed two-thirds of the large landslides it investigated in 2022-23 to "improper drainage" (as reported), and the Corporation's own slope regulation names "disposing of sewerage and drainage onto slopes in a poorly controlled manner" among the human activities that "can greatly increase slope instability" (SD&SM, reg. 1). So the first question at most outfalls is not the level of the water below it but whether the water reaches a stable channel at all. Aizawl drains east to the Tuirial through the Chite lui, which takes "more than two-third of eastern portion" of the city, and west to the Tlawng through the Ser lui and its streamlets; the master plan calls seven of the eastern lui "turbulent with high velocities of currents during the monsoon season" and "very destructive", and four of the western ones "the worst destructive streams and nullahs" (Master Plan for Aizawl: Vision 2030). None of them is gauged, and there is no river tailwater for most of the city. The valley floors are different. Tlabung on the Khawthlangtuipui flooded in June 2017, when about 350 houses were reported submerged in the sub-division (district officials counted 9 fully and more than 60 partly), in July 2019, when about 400 houses, 150 of them in the town, were affected, and in August 2023, when 40 families were evacuated; Sairang's families were stranded by the Tlawng in June 2018 (all as reported). CWC has seven level-monitoring sites in the State, five of them inactive, no forecasting site, and no warning or danger level for any site; the only highest flood level printed is 149.0 m at Turial on the Tuirial, on 17 June 1995, with no datum stated (SANDRP, 2018, a copy of CWC data, as reported). Below the Tuirial dam the river is NEEPCO's, and a dam-break study is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (as reported). The outfalls also belong to one body while the drains above them belong to others: the street drains vest in the Aizawl Municipal Corporation, the drains of the State roads are PWD's in practice, the lui and their riverine reserves are EF&CC's and the Land Revenue and Settlement Department's, the dams NEEPCO's and the State's power department's, the village drains the Village Councils', and in the south the District Councils' (Chapter 6, Clause 6.9). The State told the National Green Tribunal that "Mizoram being a hilly state, there is no flood plain zone in the catchment area" (MPCB report in OA 593/2017 and OA 673/2018); that holds on the ridges and not on the valley floors. No document found during research sets a design level for any lui, river or reservoir outfall in the State, or a design standard for any town drain. A detention tank that meets every release rate in Chapter 4 still fails if its overflow runs onto an unprotected slope, if the lui below it cannot carry what it receives, or if the river at Tlabung stands above its outlet. This chapter makes these failure modes part of the design. Mizoram has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, IWRD canal, the Chite lui and its tributary lui through eastern Aizawl and the Ser lui and its streamlets through western Aizawl, the lui of Lunglei and the other ridge towns, every drain that discharges through a flap gate on the valley floors of Sairang, Bairabi, Vairengte, Tlabung, Chawngte or the Champhai flats, any drain built or held by the Aizawl Municipal Corporation, the Lunglei Municipal Council, a Village Council, a District Council, PWD, PHED or a national-highway agency with an internal width of 1.0 m or more, and every lui or other natural channel that drains 8 ha or more, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, dil or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or dil under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, the Aizawl Municipal Corporation, MSDMA or IWRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next dil or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Mizoram. In the ridge towns, where a colony's drain runs down a lui to a river far below, as Aizawl's drains run east by the Chite lui to the Tuirial and west by the Ser lui to the Tlawng, and the reservoirs of the Tuirial and Serlui B dams lie on the rivers of the north, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the valley floors of Mizoram whose outfalls lie below rivers held high for hours or days, and the ridge-top drains blocked by waste: at Tlabung the Khawthlangtuipui submerged about 350 houses in the sub-division in June 2017 (district officials counted 9 fully and more than 60 partly) and about 400 houses, 150 of them in the town, in July 2019, and 40 families were evacuated in August 2023 (all as reported), although how long the water stood was not found [TBC]; at Sairang families were stranded by the Tlawng in June 2018 (as reported); and in Aizawl W-I a third of the area was found water-logged "for several days or for hours", blamed on solid waste in the road-side drains (Master Plan for Aizawl: Vision 2030). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Mizoram, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, a planning authority or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Mizoram has no coast, and the surge term does not arise in the State, which cyclones such as Remal reach only as rainfall, and whose outfalls fall freely to steep lui or are held up by the rivers of the valley floors and by the Tuirial and Serlui B reservoirs, not by the sea (Clause 5.8.5).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Mizoram, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the lui of the ridge towns where an outfall's invert is below the lui's design level, among them those of Lunglei, Serchhip, Champhai, Kolasib, Siaha and Lawngtlai (Clause 5.8.5(a));
  • in Aizawl, the Chite lui and its tributaries to the Tuirial, with the Muthi and Tuipawl lui, and the Ser lui and its streamlets to the Tlawng (Clause 5.8.5(b));
  • the Tlawng at Sairang and Bairabi and at the CWC site at Keitum, the Tiau at Champhai and Zokhawthar, the Kau (Tuichawng) at Chawngte, the Tuipui at the CWC's Bailley Bridge site, and the Tuichang and Tuichawng at their CWC sites, with the valley floors and terraces of Vairengte and the Champhai flats (Clause 5.8.5(c));
  • the Khawthlangtuipui at Tlabung (Clause 5.8.5(d));
  • the reservoir of the Tuirial dam and the Tuirial below it, the reservoir of the Serlui B dam and the Serlui below it, and every dil that receives a town's drains, among them Palak Dil and Tam Dil (Clauses 5.8.3 and 5.8.5(e));
  • the Khawthlangtuipui (Karnaphuli) into Bangladesh, the Chhimtuipui (Kaladan) at the CWC's Sihthangpui site and into Myanmar, the Tiau on the Myanmar border, and the Tlawng, Tuirial and Tuivai where they run north to the Barak plain (Clause 5.8.5(f));
  • any drain or channel of the Aizawl Municipal Corporation, the Lunglei Municipal Council, a Village Council, PWD, PHED or a national-highway agency, and any village drain or lui held by a District Council or its Village Councils, that receives storm water (Clause 5.8.5(g)); and
  • elsewhere: any river or IWRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) IWRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Tuirial dam of NEEPCO on the Tuirial (Sonai) and the Serlui B dam on the Serlui, both in Kolasib district), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 Free outfalls to steep lui, Aizawl's Chite lui and Ser lui, valley floors with river tailwater, Tlabung, the Tuirial and Serlui B reservoirs and their release reaches, dils, transboundary outfalls, and consents and lines.

  • (a) Free outfalls to steep lui. For an outfall from a ridge or a slope to a hill stream (lui), directly or through a drain, down-drain or chute that ends in one, as in Lunglei, Serchhip, Champhai, Kolasib, Siaha, Lawngtlai, Mamit, Khawzawl, Saitual, Hnahthial and the other ridge towns, and in Aizawl under item (b):
    • No gauge, no level. No lui in the State has a gauge or a published flood level [TBC]. They are steep and short, rise within minutes of a burst of rain and fall within hours of its end, and carry stones, gravel, slide debris and, below the towns, sullage and garbage. Most outfalls in the State fall freely to them: there is no river tailwater on the ridges (NEER reading).
    • Free-outfall case. The design case is a free outfall with energy dissipation. The outfall shall end in an energy dissipator designed under Chapter 9, built into the bank of the lui, and shall be reached from the town drain by a lined drain, chute, stepped channel or down-drain, the "non-erosive downdrains" of SD&SM reg. 27, so that no flow of the minor or major system is discharged onto an unprotected slope, fill, retaining wall or the land of a building below (Clause 6.3.6(j)). Where no lui can be reached within the site or the public land beside it, the flow shall be carried in a closed conduit or lined drain to "the nearest practicable drainage way" (SD&SM reg. 27), through the land of another person where AMCBR reg. 37(i) or an easement allows it, and not left at the foot of the slope (set by this Manual).
    • Design level. The tailwater for the major-system and storage cases shall be the higher of: (i) the 1% AEP level at the outfall from a study of the lui, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area under Clause 2.3.6, the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(g) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, net of encroachment, silt, slide debris and solid waste, with the crossings downstream blocked as Clauses 6.3.6(h) and 6.3.6(m) require; and (ii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the storms of June 2018, May 2024 or May–June 2025 or a later storm, and from the records of the local body, the Local Council or Village Council, DM&R or the Deputy Commissioner, with its source stated. No outfall to a lui shall be designed without both items (set by this Manual).
    • The lui below the outfall. The designer shall also check the receiving lui from the outfall to the next confluence with a lui of at least equal catchment or with a river: that it carries the post-development 1% AEP flow of its whole catchment, with the bulking factor, within its banks and below the velocity limits of Chapter 9 for its bed and banks; that no bank or slope along that reach is in a High or Very High zone of the landslide hazard maps, or is undercut, without the geotechnical certificate of the hill rule of Clause 4.11; and that the increase in flow does not reach a road, a building, a tuikhur or a quarry face. Where the lui fails any of these checks, the project shall reduce its peak and volume under Chapter 4 or protect the reach under Chapter 9, with the consent of its owner under item (g) (set by this Manual). The landslide-hazard-map class of the outfall and of the reach shall be stated on Form 5-1 and in the drain register (Clause 6.9).
    • Bed level, scour and aggradation. The designer shall survey the bed of the lui at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
    • Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, taken for this Manual as the land flooded once in 5 years (set by this Manual). It shall discharge in the direction of the stream's flow, with the bank protection that Chapter 9 requires, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the lui. No muck, spoil or excavated material from the works shall be placed in the lui or where a storm can carry it into one (SD&SM reg. 29; Clause 6.3.6(k)). No outfall shall discharge into or immediately above a tuikhur (Mizo: a spring or water point), within 15 m of one, or onto the protected catchment above it (the spring rule of Chapter 8), or onto or below a quarry face or spoil heap (Clause 6.3.6(m)) (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the duration of the design storm plus the lui's recession, computed under item (i) for the coincident cases of Clause 5.8.4 for as long as the lui stays above the invert, and not less than 24 hours; where the 48- and 72-hour storms of Clause 5.10.2 are run, the lock lasts for the whole storm (set by this Manual).
  • (b) Aizawl: the Chite lui and the Ser lui. For an outfall in Aizawl to a lui of the city, or to a drain that ends in one:
    • The lui. Aizawl drains east to the Tuirial through the Chite lui, which takes "more than two-third of eastern portion" of the city, with its tributaries the Chanmari, Ramthar, Mirawng, Tlak, Bangla, Taite, Bethlehem veng, Lawibual, Hmawngkawn, Zemabawktuikhur, Zuangtui and Kawmthlang lui, and through the Muthi and Tuipawl lui; and west to the Tlawng through the Ser lui and its streamlets, the Ramri, Tuikal, Vai and Zawngkawt lui. The master plan calls the "Chite-lui, Chanmari-lui, Theihai-lui, Bethlehem-lui, Tuikhurhlu-lui, Mirawng-lui, and Bangla-lui" "turbulent with high velocities of currents during the monsoon season" and "very destructive", and the "Khatla-lui, Tuikual-lui, Vaivakawn-lui, Chanmari west-lui" "the worst destructive streams and nullahs" (Master Plan for Aizawl: Vision 2030, 8.3.1). None of them has a gauge or a published flood level [TBC], and the master plan's map of proposed drains and their catchments (Map 8.3) was not extracted for this Manual [TBC]. There is no river tailwater for most of the city: the Tlawng and the Tuirial lie far below the ridges (NEER reading).
    • Design level and lock. Item (a) applies in full, with the rainfall of sub-area MZ-B under Clause 2.3.6(c)(i). The study of item (a)(i) shall cover the lui from the outfall to its confluence with the Chite lui or the Ser lui, or for 1 km, whichever is shorter (set by this Manual), and shall include every crossing, culvert and covered reach on it as surveyed.
    • Sewage and the polluted stretches. The Chite stream "near SIPMIU's STP to Armed Veng" and the Tuikual stream are in Priority II of the CPCB's list of polluted river stretches, and the Lawibual stream in Priority III (CPCB, 2025); whether the CPCB's Tuikual stream is the master plan's Tuikual lui is a NEER reading to be confirmed [TBC]. Every public drain that carries sewage and discharges to one of them is dealt with under Clauses 6.3.6(e) and 8.9, and an interception or screening work on a lui or its drains shall not raise the design level of item (a) or reduce the capacity of the drain or lui; it shall stand above that level or be designed to be overtopped without damage.
    • Check dams. The master plan proposes eight check dams "below Zuangtui, Sakawrtuichhun, Government Complex, Mission Vengthlang, Tlangnuam, Saikhamakawn, Melthum and Hlimen" (4.9.12). A check dam, a stone bund or a debris or waste trap built in a lui shall not raise its 1% AEP level at any outfall upstream, shall be designed to be overtopped without damage, and shall be included, with the sediment it holds, in the model of item (a)(i) (set by this Manual).
  • (c) Valley floors and terraces with river tailwater. For an outfall on a valley floor or river terrace whose river can rise above the outfall invert, such as Sairang and Bairabi on the Tlawng, Vairengte, the Champhai flats and Zokhawthar on the Tiau, and Chawngte on the Kau (Tuichawng), and for any other outfall on land below the 1% AEP flood level of a river ("valley-floor land", Annex 2A), directly, through a flap gate or through a pumping station, or into a drain that itself discharges in one of those ways:
    • No flood plain zone, but floods. MPCB told the National Green Tribunal that "Mizoram being a hilly state, there is no flood plain zone in the catchment area" (OA 593/2017 and OA 673/2018); that does not hold on these valley floors, where Sairang's families were stranded in June 2018 and Champhai was among the places worst hit in June 2025 (as reported). No flood plain zoning law, no flood zone and no "flood hazard areas as designated and defined by Aizawl Municipal Corporation", which SD&SM reg. 6 asks a site plan to show, was found during research (NEER reading), and no highest flood level is published for any town (Chapter 6, Clause 6.11) [TBC].
    • Gauges. CWC has seven level-monitoring sites in Mizoram, five of them inactive, and no forecasting site: Sairang on the Tlawng (listed as the Dhaleswari; an active hydrograph, no highest level printed), Turial on the Tuirial (highest level 149.0 m, 17 June 1995, the only one printed), Bailley Bridge Tuipui, Sihthangpui on the Chhimtuipui (Kolodyne), Keitum on the Tlawng, and Tuichang and Tuichawng; a list of June 2018 adds Pangkhuah (SANDRP, 2018, a copy of CWC data, as reported). No warning or danger level is printed for any site, and no datum is stated for any level [TBC]. CWC also runs rain gauges at Bairabi and Tlabung and other sites (IMD Meteorological Centre Aizawl, daily list, 2026). Every level used shall state its datum and its connection to the gauge datum of the named CWC gauge, or of the other gauge used, with its operator named, and to a Survey of India benchmark.
    • Design level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the highest of: (i) the 1% AEP river level at the outfall from a hydraulic model under Clause 5.8.2(b), with the river design flood from a site study under Chapter 3 calibrated to the CWC, NEEPCO or State gauge records where any exist, and the releases of item (e); (ii) the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall with the water-surface slope of the flood that set it, from the gauge record or from the model, where a level is published or obtained from CWC (none is printed for Sairang, Keitum, Bailley Bridge Tuipui, Tuichang or Tuichawng [TBC]); and (iii) the highest flood level surveyed at the outfall from flood marks of the floods of June 2017, June 2018, July 2019, August 2023 and June 2025 or a later flood, and from the records of the local body, the Village Council, DM&R or the Deputy Commissioner, with its source stated. No outfall on valley-floor land shall be designed without items (i) and (iii). The level of the nearest gauge downstream shall not be carried upstream (set by this Manual).
    • 10% AEP level. No CWC site in Mizoram has a warning or a danger level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or from a frequency analysis of the gauge record; until such an analysis is accepted, the 10% AEP case shall use the design river level of this item (set by this Manual).
    • Gates and owners. No flap-gated or pumped storm outfall was found in the State during research [TBC]. Every outfall whose invert is below the design level of this item shall have its own flap gate (Clause 5.11), and the designer shall name the body that will own, operate and maintain it, which is the owner of the drain in the drain register (Clause 6.9), and state its sill, the crest of any bank or wall it passes, and the river level at which it closes, all on the datum of this item.
    • Tailwater and lock. The tailwater at the outfall shall be the higher of the river level beyond the gate and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, the hill catchments above the valley floor included, its storage as surveyed in its present condition, net of silt, stones, debris, encroachment and solid waste, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump; portable pumps brought in for an event and capacity not commissioned shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for the whole of the 72-hour design storm of Clause 5.10.2, and not less than 72 hours, or longer where the river model or a stage record shows the river above the outfall invert for longer (set by this Manual). The lock covers every shorter storm, so that storage and pumping handle the full storm volume (Clause 5.9.4). Pumps (Clause 5.12) shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC gauge under Clause 5.10.6 shows it and the Authority approves it.
    • No Barak lock. The 7-day lock that the adjoining Barak-valley rule of this series sets on the Barak plain is not used: there is no Barak plain inside Mizoram, and Bairabi and Vairengte are terraces bounded by hills, on rivers that fall steeply to the State boundary (NEER reading).
    • Gate failure. Floor levels and pumped outfalls behind a flap gate shall also be checked for the gate jammed open by gravel, debris or waste, with the drain filled to the river level beyond it.
  • (d) Tlabung on the Khawthlangtuipui. For an outfall in Tlabung (sub-area MZ-D1), or on any other land below the 1% AEP flood level of the Khawthlangtuipui (Karnaphuli):
    • A river-flood town. Tlabung floods from its river: about 350 houses were reported submerged in the sub-division in June 2017, against 9 fully and more than 60 partly submerged by the count of district officials, with 8 to 10 dead and more than 1,500 families affected; 30 houses in June 2018; about 400 houses, 150 of them in the town, with more than 350 families evacuated, in July 2019; and 40 families evacuated in August 2023 (all as reported). No CWC level-monitoring site is listed at Tlabung (SANDRP, 2018, as reported); CWC and the Agriculture Department run rain gauges there (IMD Meteorological Centre Aizawl, daily list, 2026). How high and for how long the river stood in any of these floods was not found [TBC].
    • Design level. The drains of Tlabung shall be designed for the river at its flood level, with a flap gate on every outfall whose invert is below that level. The design level is the higher of: (i) the 1% AEP level at the outfall from a hydraulic model of the Khawthlangtuipui under Clause 5.8.2(b), with the river design flood from a site study under Chapter 3 and the rainfall of Clause 2.3.6 for its catchment; and (ii) the highest flood level surveyed at the outfall from the flood marks of June 2017, July 2019, August 2023 or a later flood, and from the records of the local body, DM&R or the Deputy Commissioner and the accounts of residents, with its source stated, tied to a Survey of India benchmark. No outfall in Tlabung shall be designed without item (ii) (set by this Manual).
    • Downstream boundary. The Khawthlangtuipui runs on into Bangladesh as the Karnaphuli, to the Kaptai reservoir downstream, which was not researched; no level of the river across the border is available to Indian designers, and there is no downstream Indian control on it (NEER reading). The model shall start far enough downstream that its boundary does not govern the level at Tlabung, and shall be run with that boundary at normal depth and at a raised level, the higher result governing and the difference reported on Form 5-1 (set by this Manual).
    • Lock. Every outfall whose invert is below the design level of this item is an outfall-closed case with a single lock of not less than 72 hours, covering the whole of the 72-hour storm of Clause 5.10.2, and longer where flood marks or residents' records show the river held up for longer, or where the model or a stage record shows it (set by this Manual). The tailwater, pumping and gate-failure rules of item (c) apply.
  • (e) The Tuirial reservoir and its release reach, Serlui B, and dils. For an outfall to the reservoir of the Tuirial dam (NEEPCO's Tuirial hydroelectric project on the Tuirial, also called the Sonai, in Kolasib district) or of the Serlui B dam on the Serlui (Kolasib district), directly or through a drain or lui that ends in one, or to a reach of river below either dam, or to a dil (Mizo: a lake or pond):
    • Consent. Storm water shall not be discharged to a reservoir, its drawdown zone or its release reach without the written consent of NEEPCO for the Tuirial dam, or of the State's power department for the Serlui B dam (NEER reading of the owner) [TBC] (set by this Manual).
    • Design level. The tailwater for the major-system and storage cases shall be the reservoir's maximum water level (MWL) as its operator publishes it, or, where only the full reservoir level (FRL) is published, FRL plus the surcharge in its design flood, computed from the rating of its spillway with any gates operated only as the operator's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FRL, the tailwater is FRL + 0.5 m (set by this Manual) [TBC]. In every case it shall be not less than the highest level recorded at the reservoir. The minor-system tailwater is the FRL. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
    • Tuirial. The CERC order on the project gives an FRL of 90.5 m, a minimum draw-down level (MDDL) of 68.0 m and a normal tailwater level at full load of 30.7 m, for a 75 m zoned earth-fill dam with an open chute spillway and two 30 MW units (CERC, Petition No. 125/MP/2021); no MWL, spillway rating or datum was found [TBC]. Until NEEPCO gives them in writing, the reservoir tailwater is 91.0 m (FRL + 0.5 m), on the datum of NEEPCO's levels, which is to be confirmed with NEEPCO before final design (set by this Manual) [TBC]. CWC's Turial gauge records a highest level of 149.0 m on 17 June 1995 (SANDRP, 2018, as reported); how that gauge and its level relate to the reservoir's levels is not stated in any source found [TBC], and the two shall not be compared, combined or converted until CWC and NEEPCO state the datum and location of each. The normal tailwater of 30.7 m is a level of normal generation below the power house, not a flood level, and shall not be used as the design level of an outfall on the release reach.
    • Serlui B. The Serlui B dam is reported as 51.3 m high and 293 m long, with three 4 MW units (as reported); no FRL, MWL, spillway rating or datum was found [TBC]. No outfall to the Serlui B reservoir or its shore shall be designed without the operator's FRL, MWL and spillway rating in writing, or, until it gives them, the higher of the highest water line surveyed on the shore and the crest of the spillway surveyed at the dam, each tied to a Survey of India benchmark, plus 0.5 m (set by this Manual).
    • Releases, not notices. No design shall rely on a notice or a warning of a release, on a reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual). No operating rule or release record of either dam, and no rule linking their operation to the drains above or below them, was found during research [TBC].
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole of the 72-hour storm of Clause 5.10.2 and of every shorter storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the operator's stage record shows the reservoir below the invert at the start of comparable storms and the Authority accepts it (set by this Manual). Every reservoir starts every design storm at its FRL (Clause 7.7.3); the drawdown zone between FRL and MDDL is part of the reservoir, and no outfall structure, pumping station or storage shall be built in it without the operator's consent.
    • Release reaches. For an outfall to the Tuirial below its dam, or to the Serlui below the Serlui B dam, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest recorded release of the dam, routed to the outfall, with the flow of the catchment below the dam as it occurred, and with the release placed before, during and after the site storm, and the lock of item (c) applies for not less than 72 hours (set by this Manual). No release record was obtained for either dam [TBC]. Until NEEPCO or the State's power department states the largest recorded release and its duration, the release is the spillway design capacity, and until that is given, the 1% AEP inflow to the reservoir from a site study under Chapter 3, passed with no attenuation by the reservoir (set by this Manual) [TBC]. No attenuation by the storage of either reservoir shall be credited to the river below unless the operator's written rule commits that storage to flood control. A dam-break study of the Tuirial dam, for PMF and 100-year inflow cases, is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (IAHR, 2025 abstract, as reported); that is a dam-break case, not a design release, and the designer shall record it on Form 5-1 and state whether the outfall lies in the inundation extent of that study, where NEEPCO makes it available [TBC]. The release reach below the Tuirial dam is a hazard-first site under Clause 2.3.6(i).
    • Dils. No level on a stated datum, and no outlet or overflow level, was found for any dil, among them Palak Dil (the Pala wetland, in Siaha district in the Mara Autonomous District Council area; Ramsar site no. 2484, designated on 31 August 2021 according to its Ramsar Information Sheet and announced on 26 July 2022, as reported) and Tam Dil near Saitual, rebuilt as a fishery reservoir by the Fisheries Department (as reported) [TBC]. Storm water shall not be discharged to a dil without the written consent of its custodian, and, in an Autonomous District Council area, of the District Council [TBC]. Until the custodian gives a level, the tailwater is the level at which the dil spills, from its outlet or overflow crest surveyed and tied to a Survey of India benchmark, plus the head over that crest needed to pass the 1% AEP inflow, and not less than the highest level recorded at it; the dil starts every design storm at its spill level, and an outfall below the tailwater is closed for the whole storm (Clause 5.9.4) (set by this Manual). Every drain that discharges to a dil shall pass a debris and solid-waste trap and a sediment trap (Clauses 6.3.6(f) and 6.3.6(m) and Chapter 8) before it reaches it, no drain that carries sewage shall discharge to one (Clauses 6.3.6(e) and 8.9), and no dil shall be used as a detention pond (Chapter 7).
  • (f) Transboundary outfalls. For an outfall to a river that leaves the State, or to a drain or lui that ends in one:
    • Bangladesh and Myanmar. The Khawthlangtuipui runs into Bangladesh as the Karnaphuli; the Chhimtuipui runs into Myanmar as the Kaladan (towards Paletwa and Sittwe); and the Tiau, the boundary river on the east, flows on in Myanmar (NEER reading, to be confirmed). No downstream gauge or level on any of them is available to Indian designers, and there is no downstream Indian control (NEER reading). CWC's Sihthangpui site on the Chhimtuipui has no published level [TBC]. The model of an outfall on these rivers shall start far enough downstream that its boundary does not govern the level at the outfall, with the sensitivity run of item (d) (set by this Manual).
    • The Barak plain. The Tlawng, the Tuirial and the Tuivai run north to the Barak plain, and the Assam edition of this Manual governs those reaches. For an outfall in Mizoram on these rivers, a level at the State boundary from that edition, or from a CWC site downstream transferred upstream, is a lower bound on the downstream boundary of the model, not the level at the outfall.
  • (g) Consents and lines. No outfall structure, gate, pumping station or drain shall be built in the bed or bank of a lui or river, or in a flood-protection work, without the consent of its owner under the drain register (Clause 6.9), or in a reservoir, its drawdown zone or a release reach without the consent of NEEPCO or the State's power department under item (e). The Mizoram Water Resources (Management and Regulation) Act, 2024 makes WARDMA the "Competent Authority" for water resources outside the Autonomous District Councils, with IWRD's Chief Engineer as its member secretary, and lets it direct "water conservation and groundwater recharge, including rain water harvesting" (s.16(2)(ix)), but no procedure under it for consent to a storm outfall was found during research [TBC]; where WARDMA, a District Water Resources Committee or a Village or Local Water Resources Committee has identified a water source for protection, the outfall shall not discharge to it (set by this Manual). Storm water shall not be discharged to a drain of another body without the written consent of that body: within a municipality, the written permission of the Chairman for a drain into a municipal drain (Mizoram Municipalities Act, 2007, s.295), and the written consent of the municipality for a drain into a municipal drain or "any water-course" (s.296); no structure may be built over a municipal drain, culvert or storm-water channel (s.300); to a road drain or culvert, that of PWD or the national-highway agency, and on a State road within the Corporation's area that of both PWD and the Corporation until the overlap of Clause 6.9 is resolved; to a village drain outside the municipalities, that of the Village Council; and in a Lai, Mara or Chakma Autonomous District Council area, that of the District Council or the body it designates, for which no written procedure was found [TBC] (set by this Manual). Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (f); the channel shall be taken in its present condition, net of silt, stones, debris, encroachment and solid waste and with its narrowest section as surveyed, and a widening, lining or check dam that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the riverine reserve that SD&SM reg. 28 requires to be maintained for plots adjacent to natural streams, which no rule found defines, and the riverine reserves under the Mizo District (Forest) Act, 1955, held by EF&CC, whose extent after the High Court's judgment of 27 January 2021 is to be confirmed with EF&CC, including whether the General Administration Department notification of April 2021, which is reported to set an 800 m restricted zone from mid-river with development by prior approval and was not read, reaches a drain outfall (as reported) [TBC]; the master plan's recommended 15 m green buffer on both sides of major drainage channels; a River Conservation Zone under the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, whose enactment was not confirmed, only if the law is in force and a zone has been notified, neither of which was found, in which no construction or "obstruction or diversion of the water course or channel" may be undertaken without the State Authority's prior approval and whose listed exemptions ("bridges and culverts, check dams, waterholes") do not name a drain outfall; and the 15 m by which AMCBR reg. 33 keeps a septic tank or soak pit from "a water source". The 800 m green belt along the Tlawng in the master plan rests on a notification that was quashed, and this clause does not apply it as a statutory line.

No pump, gate or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a reservoir before a storm, closing a gate late or opening dam gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the reservoir or the river (Clause 5.12.3). Pumping shall not be used to move water into a dil, a reservoir or another catchment without the consent of its custodian, or onto a slope.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Mizoram's lui and rivers break that assumption, because their catchments are small and steep and the storms that fill them fall on the towns at the same time and for days. In June 2018 Aizawl recorded 148 mm in one day, reported as "the highest in India" that day (as reported; probably 12 June 2018, NEER reading), while Serchhip district had 677 mm in 1–13 June (SANDRP, as reported), houses were submerged at Tiperabagh, Serhuan and Tlabung and families were stranded at Sairang (as reported). Over 24 May–3 June 2025 the same storm brought 598 landslides across the State and floods in the valleys (DM&R figures, as reported). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the two dams on the rivers of the northern hills, both in Kolasib district. The Tuirial hydroelectric project of NEEPCO, on the Tuirial (the Sonai, "a tributary of river Barak"), has a 75 m zoned earth-fill dam with an open chute spillway and two units of 30 MW, a full reservoir level of 90.5 m, a minimum draw-down level of 68.0 m and a normal tailwater level at full load of 30.7 m (CERC, order in Petition No. 125/MP/2021); a dam-break study for PMF and 100-year inflow cases is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (IAHR, 2025 abstract, as reported). The Serlui B dam on the Serlui is reported as 51.3 m high and 293 m long, with three units of 4 MW (as reported); its FRL and MWL were not found. CWC's Turial gauge on the Tuirial records a highest level of 149.0 m on 17 June 1995, the only highest level printed for any site in the State (SANDRP, 2018, a copy of CWC data, as reported); no source found states where that gauge lies relative to the dam or how its datum relates to NEEPCO's levels, and this Manual does not infer either [TBC]. No MWL, spillway rating, operating rule, release record or datum was obtained for either dam, and no rule linking their operation to the drains above or below them was found during research [TBC]. Until they are available, the spillway design capacity, or failing that the unattenuated 1% AEP inflow, applies as the release, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(e)). The river levels used in this Manual come from SANDRP's copies of CWC data; their datum and gauge zero are to be confirmed with CWC [TBC].

Clause 5.8.5 is set by this Manual. In Mizoram the tailwater at a town outfall is set not by the tide but by a lui that no one gauges and whose bed moves, by a valley-floor river held high by a storm that lasts for days, by the Khawthlangtuipui at Tlabung, or by a reservoir at its full level and the releases below its dam, and no document found during research gives a design level for any of them. No design standard for any town drain in the State was found: the Corporation's regulations set drainage geometry but no design storm, return period or runoff coefficient (Chapter 4), the master plan's drainage chapter is descriptive, and no storm-drainage component was found in the Smart City or ADB programmes for Aizawl (Chapter 6). The State has no floodplain zoning law, and no flood level has been published for any reach (Chapter 7).

The first case is the free outfall. Most of the State's outfalls fall from a ridge or a slope to a lui, so item (a) is the general rule and the others are exceptions. Its design case is a free outfall because there is no river tailwater on the ridges, but it does not stop at the outfall: the energy dissipator, the lined path to the lui and the check of the lui to the next confluence are what keep the water off the slopes. The master plan finds Aizawl's drains "silted up frequently due to insufficiency in the hydraulic design" and its lui "very destructive" in the monsoon (Master Plan for Aizawl: Vision 2030), and a drain that empties onto a slope, or into a lui that cannot take it, starts the landslides that two-thirds of the large ones investigated in 2022-23 were attributed to (as reported). The check reach ends at the next confluence because a lui of at least equal catchment, or a river, is the first place where the project's flow is a small part of the whole; it is a check of capacity and stability, not of level. The design level, where the lui can rise above the invert, comes from a study and from flood marks, as for the ungauged hill streams of the mountain editions of this series, with the bulking and blockage of Clause 6.3.6; and the invert stands 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a stony bed can show in a single flood. The lock is the storm and the lui's recession, and not less than 24 hours, because the lui are small and fall within hours of the rain stopping, but the State's landslide storms run for days (Chapter 2), and where the longer storms of Clause 5.10.2 are run the lock lasts for all of them. Item (a) also keeps outfalls away from springs (tuikhur), which "are widely utilized by people for domestic needs" (CGWB), and from quarry faces, which failed at South Hlimen on 9 August 1992 and at Melthum–Hlimen in Cyclone Remal on 28 May 2024 (Chapter 1).

The second is Aizawl. Item (b) names the Chite lui and the Ser lui because the capital drains into them, because the master plan lists their tributaries and singles out the most destructive of them, and because the Chite and Tuikual streams carry the city's sewage onto the CPCB's list of polluted stretches (CPCB, 2025). The rule is that of item (a), with a study long enough to reach the main lui; the master plan's eight proposed check dams are admitted only if they do not raise the lui at the outfalls they are meant to protect.

The third is the valley floor. Item (c) follows the interim river rule of the mountain editions: the design level is the 1% AEP level, never below a level recorded at a CWC gauge where one is published, and never below the surveyed flood marks, because only one highest level is printed for the whole State, 149.0 m at Turial (SANDRP, 2018, as reported), and no warning or danger level exists for any site; so the 10% AEP case uses the design level until a frequency analysis exists. The lock is the whole 72-hour storm, and not less than 72 hours, because the rivers that fill the valley floors are fed by the multi-day storms that also bring the landslides: 677 mm fell in Serchhip district in 1–13 June 2018, and 598 landslides came over 24 May–3 June 2025 (both as reported). The adjoining Barak-valley rule of this series locks outfalls on the Barak plain for at least seven days; Mizoram has no Barak plain inside it, and its valley floors are terraces between hills on rivers that fall steeply, so the seven-day lock is not carried and the 72-hour lock is used instead. Flap gates are required wherever a river can close an outfall, and the owner of the gate is named because no gated storm outfall was found in the State and nobody yet holds one. The State's statement to the National Green Tribunal that it has no flood plain zone is recorded beside the floods of Sairang, Champhai and Tlabung, because it holds on the ridges and not there.

The fourth is Tlabung. Item (d) treats the town as a case of its own because it is the one Mizoram town that floods from its river every few years, in 2017, 2018, 2019 and 2023 (as reported), and because its river runs on into Bangladesh with no level available across the border. Its drains are designed for the river at flood level with flap gates, and the lock is not less than 72 hours and longer where the flood marks or residents show the river held up for longer, because no gauge record of how long the floods lasted was found [TBC].

The fifth is the reservoir and its release reach. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, and its level rises above FRL by whatever head the flood needs. Item (e) therefore takes the MWL, or FRL plus the design-flood surcharge, and treats an outfall below it as closed for the whole of the 72-hour storm. The Tuirial's MWL was not found, so FRL + 0.5 m, 91.0 m, is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge [TBC]. The Turial gauge's highest level of 149.0 m and the reservoir's FRL of 90.5 m are not compared, because no source states how the gauge and its datum relate to NEEPCO's levels, and a relation inferred between them could put a design level badly wrong. No release record was obtained for either dam, so the spillway capacity, and failing that the unattenuated 1% AEP inflow, stands in for the largest release; that is conservative by design: a tailwater set too low floods a reach, while one set too high only costs storage. The dam-break peak reported for the Tuirial is recorded on Form 5-1 but not used as a design release, because it is the result of a failure, not of operation. Dils have no published levels, so item (e) uses their surveyed spill level, as the mountain editions do for their lakes, keeps sewage out of them and does not let one be used as a detention pond.

The sixth is the river that leaves the State, and the seventh is the consents and lines. Item (f) makes the model start far enough downstream that a boundary nobody can measure, in Bangladesh or Myanmar, does not decide the answer, and leaves the Barak plain to the edition that governs it. Item (g) asks for the owner's consent and design level because a design that discharges to a channel or a reservoir cannot be checked without them, and because the drains belong to several bodies, among them PWD and the Corporation for the same State-road drains (Chapter 6, Clause 6.9). The lines of item (g) decide where an outfall can be built, not its level: the master plan's 15 m buffer is a recommendation, the 800 m Tlawng belt rests on a quashed notification, the riverine reserve of SD&SM reg. 28 is undefined, and a River Conservation Zone exists only if the Rivers law is in force and a zone is notified, and none of these was confirmed; the Manual's own corridor (Clause 7.4) is wider than any line that binds.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Mizoram requirement in this Manual. In Mizoram it applies where an outfall is shut not by the tide but by a lui that has risen over the outlet or buried it in stones, slide debris and waste, by a valley-floor river held high by a multi-day storm, by the Khawthlangtuipui at Tlabung, or by the Tuirial or Serlui B reservoir at its full level or the releases below either dam. The storms that raise the rivers last for days: Serchhip district had 677 mm in 1–13 June 2018 (SANDRP, as reported), and the landslide storm of 24 May–3 June 2025 brought 598 landslides (DM&R figures, as reported); and Tlabung's houses were reported submerged in June 2017 and July 2019, with families evacuated again in August 2023 (as reported), although how long the water stood was not found [TBC]. The lui of the ridge towns rise within minutes and fall within hours, but they can block an outlet with stones and waste in a single storm. That is why Clause 5.8.5 replaces the two 6-hour windows described below with a lock of the storm and the lui's recession, and not less than 24 hours, at a hill outfall below its design level; the whole 72-hour storm, and not less than 72 hours, on the valley floors; not less than 72 hours at Tlabung, and longer where the flood marks show it; and not less than 72 hours on a release reach, with a closure for the whole storm below the design level of a reservoir. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 31 March each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Mizoram the outfalls do not cross a beach. Most fall freely to a lui, and no flap-gated or pumped storm outfall was found in the State during research [TBC]; but the outfalls of the valley floors at Sairang, Bairabi, Vairengte, Chawngte, the Champhai flats and Tlabung need flap gates under Clause 5.8.5(c) and (d), and there a gate jammed open by gravel, slide debris or waste lets the river into the town's drains, and a gate buried by a rising bed turns the outfall into a dead end. Two outfall reaches lie below dams: the Tuirial below NEEPCO's dam, for which a dam-break study is reported to have routed a peak of 3,035.34 m³/s "near the confluence" (as reported), and the Serlui below the Serlui B dam; no operating rule or release record of either was found, and no rule linking the operation of any dam to the levels of the drains above or below it [TBC]. The dams are held by NEEPCO and by the State's power department, while the drains that reach the rivers below them belong to the Aizawl Municipal Corporation, PWD, the national-highway agencies, the Village Councils and, in the south, the District Councils, and no notification divides them (Clause 6.9). A gate and the drains behind it can therefore belong to different bodies, and the drain register of Clause 6.9 names the owner of each gate. The 31 March inspection date is set ahead of the monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Mizoram: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless the IWRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the IWRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Mizoram has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the stones, slide debris, silt and garbage that the lui leave at an outfall or a gate. The master plan finds Aizawl's drains "silted up frequently due to insufficiency in the hydraulic design", and a third of the area of Aizawl W-I water-logged "for several days or for hours" because solid waste blocked its road-side drains (Master Plan for Aizawl: Vision 2030); the lui below the city carry the debris of every slide upstream. A flap gate held open or shut by gravel, debris or waste, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No rule linking the operation of any gate or dam in the State to the levels of the drains above or below it was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting IWRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a hillside colony in Lunglei town draining to a hill stream (lui)
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)