Draft v1.0 prepared by NEER. Not adopted by the Government of Mizoram, any District Council, Village Council, authority or local body, and has no legal force. About this draft

Mizoram · Draft v1.0

Mizoram Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Mizoram Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Mizoram.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Mizoram, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development and Poverty Alleviation Department (UD&PA), the Aizawl Municipal Corporation, its Board of Councillors, its Local Councils or its Ward Committees, the Lunglei Municipal Council (LMC), the erstwhile Aizawl Development Authority (ADA), the Landslide Policy Committee for Aizawl City or Aizawl Smart City Ltd. Nor has it been adopted, notified or endorsed by the Lai, Mara or Chakma Autonomous District Councils, by any Village Council, by the Mizoram State Water Resources Council (MISWARC), the Water Resources Development and Management Authority (WARDMA) or any District, Village or Local Water Resources Committee, by the River Rejuvenation Committee, or by the Mizoram River Protection Authority, which has not been found to have been constituted. Where it names a body, such as the Public Works Department (PWD), the Public Health Engineering Department (PHED), the Irrigation and Water Resources Department (IWRD), the State Investment Programme Management and Implementation Unit (SIPMIU), the Disaster Management and Rehabilitation Department (DM&R), the Mizoram State Disaster Management Authority (MSDMA) or a District Disaster Management Authority, the Mizoram Pollution Control Board (MPCB), the Environment, Forest and Climate Change Department (EF&CC), the Land Revenue and Settlement Department, the Directorate of Geology and Mineral Resources, the Mizoram Remote Sensing Application Centre (MIRSAC), the Directorate of Science and Technology (DST), the Young Mizo Association (YMA), a Deputy Commissioner, the Gauhati High Court (Aizawl Bench), the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or another public body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the Comptroller and Auditor General of India (CAG), the National Institute of Hydrology (NIH), NEEPCO, the National Highways and Infrastructure Development Corporation Ltd (NHIDCL), the National Disaster Management Authority (NDMA) or the Ministry of Environment, Forest and Climate Change (MoEF&CC), or a research body, lender or adviser, such as Mizoram University (MZU), the Asian Development Bank (ADB) or GeoHazards International (GHI), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Aizawl Municipal Corporation Building Regulations, 2012 as amended (AMCBR); the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 (SD&SM); the Mizoram Municipalities Act, 2007 and the rules made under it; the Mizoram (Village Councils) Act, 2025; the Mizoram Water Resources (Management and Regulation) Act, 2024; the Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023, if and as enacted, their enactment not having been confirmed; the Master Plan for Aizawl: Vision 2030; the Corporation's landslide hazard maps; orders of courts and tribunals; and approval conditions in force continue to apply.

Mizoram, its Village Councils and the Sixth Schedule. The State has three legal geographies, and this Manual reaches them differently. The Mizoram Municipalities Act, 2007 "shall extend to the whole of the State of Mizoram except the area which has been or may hereafter be declared as, or included in, a Panchayat or a Village Council … but shall not extend to the Mizoram Tribal Areas, as referred to in PART III of the paragraph 20 of the Sixth Schedule" (section 1(2)); in practice it reaches two bodies, the Aizawl Municipal Corporation and the Lunglei Municipal Council. The Mizoram (Village Councils) Act, 2025 "shall extend to the whole of Mizoram except the areas under the jurisdiction of the Municipalities and the Lai, Mara and Chakma Autonomous District Councils" (section 1(2)); it reaches the villages and the notified towns that have no urban local body, 13 of them with 5,950 to 32,734 people, as the CAG found. The three Autonomous District Councils in the south, the Lai (Lawngtlai), the Mara (Siaha) and the Chakma (Kamalanagar/Chawngte), as reported, lie outside both Acts, and outside the Water Resources Act, 2024 ("except the Autonomous District Councils") and the Rivers Bill, 2023; the provisions of the 74th Amendment "are not applicable in the Sixth Schedule areas", as the CAG found. Only the Corporation has building and site-development regulations: AMCBR and SD&SM apply to "all the areas covered by the Aizawl Municipal Council" (AMCBR reg. 1(2)), no statewide building regulation was found, and no regulation of the LMC was found [TBC]. In a Village Council area the 2025 Act lets the Council "adopt and enforce the model building bye-laws as may be framed by the State Government" and, with the approval of the District Disaster Management Authority, "declare certain area … as unsafe site for house construction for mitigation of landslide" (section 13(6)); no model bye-laws were found. In the District Council areas no building or drainage regulation was found: notices of the Chakma District Council that require a permission and no-objection certificate of the Kamalanagar Town Planning Committee (2018) and prior approval for roadside buildings (20 November 2020), a provision of 2002 for the Chakma District Council's Village Councils that bars house construction "without the written permission from the Village Council", and the Lai District Council's Land Holding and Settlement Act, 2002 are known only from titles and search snippets [TBC], and nothing was found for the Mara District Council. Outside the Corporation's area, then, this Manual can reach the public works that the State's departments and agencies execute (roads, culverts, drains, water supply and river works, Clause 1.5.1(b)) and any body that adopts it; in a Village Council area it could also reach new buildings through the model building bye-laws once the State frames them; in a District Council area it reaches nothing unless the District Council adopts it. For a household outside the Corporation's area the Manual is guidance. UD&PA could carry it into amendments of AMCBR and SD&SM, which the Corporation's Board of Councillors makes under section 371 of the Municipalities Act "after previous publication" and UD&PA notifies, and into the model building bye-laws of the Village Councils Act as a drainage annex; the LMC could adopt the same through regulations of its own; WARDMA could direct rainwater harvesting under section 16(2)(ix) of the Water Resources Act, 2024, and the Village and Local Water Resources Committees could protect the catchments of tuikhur; MSDMA and the District Disaster Management Authorities could use it in landslide mitigation and in approving the Village Councils' unsafe-site declarations; and a District Council could adopt it for its area by an instrument of its own. None has done so. Land records and land use are with the Land Revenue and Settlement Department, even inside the Corporation's area, as the CAG found; Village Councils allot house sites under the 2025 Act; and in the District Council areas land is under the District Councils [TBC]. This Manual reserves drainage corridors and easements in a master plan or secures them by agreement; it does not assume that land can be taken. The paragraphs of the Sixth Schedule were not read for this Manual and are not quoted; the division is described by its effect, from the extent clauses of the State's Acts and the CAG's audit.

Names. Some bodies, places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • the Aizawl Municipal Council became the Aizawl Municipal Corporation on 15 October 2015, by the fourth amendment of the Municipalities Act. The Act's preface gives the Council's establishment as 1 July 2008, and the CAG as 2010; the sources conflict. The building regulations kept "Council" in their title until the amendment of 2023 renamed them. The sources write the Corporation as "AMC"; this Manual writes it in full, "the Aizawl Municipal Corporation", and then "the Corporation", because AMC in this Manual means only the antecedent moisture condition of Chapters 2, 3 and 5. "AMC" appears as the Corporation's name only inside a quotation;
  • AMCBR is this Manual's short form for the Aizawl Municipal Corporation Building Regulations, 2012 as amended, and a provision is cited as "AMCBR reg. 33". SD&SM is the Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017, the short form that the amendment of 2025 itself uses, and a provision is cited as "SD&SM reg. 27". The shared chapters cite the two as a pair, AMCBR/SD&SM, because the drainage rules that bind a site are in the second. "MBBL 2016", in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not a Mizoram rule;
  • the Master Plan for Aizawl: Vision 2030 was prepared for the erstwhile Aizawl Development Authority, which is "now absorbed in AMC", as the CAG records. An "Aizawl Master Plan 2030" is this plan, not a separate document. No notification approving it was found; one source says the Government approved it in March 2013, which is unverified; and the amendment of AMCBR of 2023 makes the online permit system return any proposal that is not as per the regulations "and the Master Plan for Aizawl, Vision-2030". This Manual cites it as the plan in use, without a date of approval;
  • the Tlawng is the Dhaleswari of CWC's tables; the Tuirial is the Sonai, and CWC prints its site as "Turial"; the Khawthlangtuipui is the Karnaphuli, which flows to Bangladesh; and the Chhimtuipui is the Kaladan (Kolodyne in CWC's tables), which flows to Myanmar. The Tuipui of Champhai district is a different river from the Chhimtuipui. The subzone list of CWC's flood estimation report for subzone 2(b) names the Barak and the "Kalden" among the rivers of subzone 2(c); "Kalden" is the Kaladan, as this Manual reads it;
  • Siaha is also spelt Saiha, and Lawngtlai appears as "Lwangtlai" in IMD's list of gauges;
  • Hlimen and Melthum lie on Aizawl's southern edge. The stone-quarry collapse at South Hlimen on 9 August 1992 and the collapse of a disused quarry between Melthum and Hlimen in Cyclone Remal on 28 May 2024 are different events. The rockslide of 2013 was at Laipuitlang, not in 1992;
  • IMD's Meteorological Centre Aizawl keeps the State's IMD gauges; IMD's city pages list Aizawl (42726) and Aizawl-Lengpui (42727), the airport. IMD runs automatic weather stations (AWS) at most district towns, and most automatic rain gauges (ARGs) in its list are run by an operator printed as "Mz-SWIC", a name the source does not expand [TBC];
  • the Directorate of Geology and Mineral Resources (DG&MR) is the "Directorate of Geology and Mining" of press reports, the same body as this Manual reads it;
  • NH-6 through Aizawl is the old NH-54, and the press uses both numbers;
  • CWC's flood estimation reports place the whole State in subzone 2(c), "Barak and others", for which CWC never published a report. These subzones are not the four rainfall zones (MZ-Z1 to MZ-Z4) and seven hydrologic sub-areas (MZ-A, MZ-A1, MZ-B, MZ-C, MZ-C1, MZ-D and MZ-D1) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor the landslide hazard zones of the Corporation's maps, nor a River Conservation Zone under the Rivers Ordinance and Bill, 2023, of which none has been notified; and
  • in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, and the south-west monsoon comes later: in 2026 it reached Mizoram about 6 June, as reported, and IMD's normal dates of onset and withdrawal at Aizawl were not obtained [TBC]. The Manual's season begins on 1 April because the deadliest dated rain events of recent years, the Laipuitlang rockslide of 2013 and the slides of Cyclone Remal in 2024, both fell in May, before the onset, as did the 598 landslides of late May and early June 2025 (Chapter 2).

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • AMCBR was published by UD&PA Notification No. B.13017/8/2012-UD&PA of 20 December 2012 (Mizoram Gazette Extraordinary Vol. XLII, Issue No. 4, 10 January 2013) and amended by the Amendment Regulations of 2019 (No. B.13017/8(2)/2018-UD&PA; only the draft published for objections was read, and the final gazette is to be checked [TBC]), of 2023 (No. B.13017/8/2021-UD&PA/Pt of 14 August 2023, in force on 28 August 2023) and of 2025 (No. B.13017/8/2021-UD&PA/Loose of 21 November 2025). SD&SM was published by No. B.13017/75/2016-UD&PA of 4 April 2017 (Gazette Extraordinary Vol. XLVI, Issue No. 161, 11 April 2017); whether it has been amended is not known [TBC]. The Corporation's Board of Councillors makes both under section 371 of the Municipalities Act, and UD&PA notifies them. SD&SM requires a site development permit "in addition to a building permit", ties its permit tracks to the Corporation's Landslide Hazard Maps "created in 2014 or later to the standards adopted by the Landslide Policy Committee for Aizawl City", and makes civil-engineer licensees competent for "Design of drainage structures, including hydrology and hydraulic calculations" (Schedule I). Building permits are applied for through the Corporation's online permit system (OBPAS), in use since June 2018;
  • the Aizawl Municipal Corporation has 15 of the 18 functions of the Twelfth Schedule; "Roads & Bridges, Water supply … and Fire Services were not devolved", and land use is still administered by the Land Revenue and Settlement Department, as the CAG found. Its Local Councils, one for each locality, give no-objection certificates and see that the regulations "are strictly observed" (AMCBR reg. 15). All public drains and all drains "in, alongside, or under any public street" vest in it (section 289(1) of the Municipalities Act). The LMC was established in November 2021 and first elected on 29 March 2023, as the CAG records;
  • UD&PA notifies the Corporation's regulations and holds the master plans of urban areas and town development plans under the Allocation of Business Rules of 2019, as the CAG quotes them. The Mizoram Urban and Regional Development Act, 1990 is known to this Manual by its title only [TBC];
  • PWD keeps the State's roads, which were never devolved to the Corporation, and so keeps their roadside drains in practice, although those drains vest in the Corporation by statute; this Manual states the overlap and does not resolve it. SIPMIU built the State's one sewage treatment plant, at Chite, and PHED holds sewerage and the bio-digesters; IWRD is the member secretary of WARDMA and is named in this Manual as the State groundwater agency, although no State network of observation wells was found, the only one found being CGWB's, in its North Eastern Region; EF&CC holds the riverine reserves and the wetlands;
  • the Water Resources Act, 2024 (Act No. 1 of 2024) sets up MISWARC, WARDMA, the District Water Resources Committees (DWRC) under the Deputy Commissioners and the Village and Local Water Resources Committees (VWRC and LWRC) under the Village Council Presidents and Local Council Chairmen, and counts springs, ponds, lakes and "traditional water harvesting structures" among "community water resources". The notifications constituting MISWARC and WARDMA were not found [TBC];
  • MSDMA is the State's disaster management authority; its notification was not found [TBC]. The counts of landslides and deaths quoted in this Manual are those of DM&R, as reported, or of the CAG. The District Disaster Management Authorities are written in full;
  • the Gauhati High Court (Aizawl Bench) and the NGT have taken up the State's slopes and waters: in July 2024 the High Court stopped new construction on either side of the Bawngkawn–Durtlang road, as reported (case number not found [TBC]); on 27 January 2021 it quashed the notification of 1965 on which the riverine reserved forests rested, as reported; and the State's reports to the NGT in OA 593 of 2017, OA 673 of 2018 and OA 606 of 2018 record the sewage in the State's drains. This Manual cites court and tribunal orders with their status; and
  • where a shared clause names a revenue subdivision, this Manual uses the sub-division. A district is headed by a Deputy Commissioner.

Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "Mizo". The Mizoram Official Language Act, 1974 (Act No. 3 of 1975) made Mizo the official language of the State, with effect from 1 August 1977, as fixed by a notification of 6 May 1996 (No. H.12017/14/90-LJD, the number read from a poor scan); that English may also be used for official purposes is known only as quoted, the section not having been read [TBC]; a direction of June 2021 to issue notifications in both English and Mizo is as reported; and the Corporation's Local Council Rules of 2010 are printed in both languages. English is the language of this Manual. So, as set by this Manual, signs and flood-depth markers are in Mizo and English; in the Lai, Mara and Chakma Autonomous District Council areas, also in the language in local use where the District Council or the competent authority so directs. The languages of those areas were not researched for this Manual [TBC], and a sign must be readable by the people it warns. Mizo is written in the Roman script, so where a shared clause says "Mizo script" it means Mizo in its standard Roman spelling. In Annexes 7A and 11 the GIS fields NAME_LUS and WB_NAME_LUS hold a name in Mizo; LUS is the code of this Manual for Mizo, after its ISO 639 code, lus. A Mizo edition of this Manual will follow.

Some Mizo words are used in the text, and are explained again where they first appear. The glosses follow Lorrain and Savidge's A Grammar and Dictionary of the Lushai Language (1898, abbreviated L&S below) and Pachuau's English–Mizo Dictionary (1997), and their spellings; modern Mizo writes most compounds closed, as in tuikhur and tuihawr.

  • a dil (Mizo: a lake or pond; dil té, a small pond or tank; plural dils) is this Manual's word for a lake, a pond or a tank, natural or dug: L&S gives dil "a lake" and dil té "a pond, a tank" (pp. 81–85), and Pachuau gives "lake: dil" and "pond: dil, tui tling reng". The State's best-known lakes carry the word, as in Palak Dil and Tam Dil. Mizo marks the plural with -te, which would be confused with té, "small", so the English plural "dils" is a convention of this Manual, to be confirmed by a Mizo editor before print. This Manual calls engineered storage a detention pond, never a dil or a tuikhur, and a natural lake keeps its own name;
  • a tuikhur (Mizo: a spring or water point) is a spring or a spring-fed water point: L&S gives "a well, a waterhole" (pp. 213–215), Pachuau "fountain: tuikhur", and the Village Councils Act, 2025 defines it as "any place wherein water supply is obtained" (section 2(29)). This Manual uses the word only for springs and spring-fed water points, protects them from stormwater, and never uses one as storage. A spring, as the source of a stream, is also hna (L&S, pp. 99–103) or tuihna (Pachuau);
  • a lui is a stream or river (L&S, pp. 137–139; Pachuau gives "stream: lui te"), as in the Chite lui and the Ser lui that drain Aizawl, and a lui-pui a river (L&S, pp. 137–139). This Manual writes "lui" for the hill streams and "river" for the larger rivers;
  • tui luankawr (Pachuau: "drain: tui luankawr") and tui-hawr (L&S: "a gutter, a ditch", pp. 213–215) are a drain or ditch. The text keeps the English "drain";
  • tui lian is a flood (Pachuau); L&S gives the older tui lét (pp. 215–217);
  • lei min is a landslide or landslip (L&S, English–Lushai part, pp. 289–291); and
  • a kor is a ravine (L&S, English–Lushai part, pp. 313–315).

The page numbers of L&S were inferred from the running heads of a scanned text, and Pachuau's pages were not recorded; both are to be checked [TBC]. Lorrain's Dictionary of the Lushai Language (1940) was not read. Some words given for Mizoram elsewhere, such as minpui, tuikawng and kawr (for a gully), were not found in either dictionary and are not used. A Mizo editor is to confirm these glosses before print.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2, 3 and 5; this Manual does not use it for the Aizawl Municipal Corporation, which it writes in full;
  • AMCBR and SD&SM are the Corporation's two regulations, cited as a pair in the shared chapters, and "MBBL 2016" is the national Model Building Bye-Laws 2016. None is the building rule of any other State;
  • ADC is an Autonomous District Council: the LADC, the MADC or the CADC. LMC is the Lunglei Municipal Council and VC a Village Council;
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level. The only HFL printed for a CWC site in the State is that of the Tuirial at "Turial", 149.0 m (17 June 1995), found only in a transcription, on no stated datum; no CWC site in the State has a warning or danger level; and
  • FRL (full reservoir level), MDDL (minimum draw-down level) and MWL (maximum water level) are used for the Tuirial and Serlui B reservoirs.

The sense is clear from the context.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Mizoram's towns fail in storms for three reasons. Aizawl showed the first on 28 May 2024, when the rains of Cyclone Remal brought down a disused stone quarry between Melthum and Hlimen and set off slides across the city, as reported; the whole State shows the second, because no gauge record, CWC report or IDF relationship covers any part of it, while Aizawl had 148 mm in a day, probably in June 2018, and Serchhip district 677 mm in the first 13 days of June 2018, as reported; and Aizawl shows the third every day, because its storm drains carry its sewage: the State told the NGT that it produces 51.81 MLD of sewage, against 10 MLD of treatment capacity "only for Aizawl city".

  1. Towns on ridges, where water put into the slopes moves them. Practically every town in the State sits on a ridge or a slope, and Aizawl, the capital, is a ridge-top city with no valley floor of its own: its master plan gives its slopes as 30° to 45° (printed "300 to 450" in the copy read, the degree signs lost) and its soil as "young and in a loose state". MIRSAC's zonation of Serchhip town puts about 89% of the town on slopes steeper than 30°, by this Manual's sum of its slope classes. "More than 71 per cent of the total area is in Very High to Moderate Hazard Zone", the CAG found, and landslides from 2017-18 to 2021-22 affected 661 villages and killed 41 people. What starts them is often water: DG&MR found, after inspecting 55 locations in 2022-23, that "two-thirds of large-scale landslides … were due to improper drainage", as reported, and SD&SM opens by naming "increasing the amount of groundwater penetrating into slopes, and disposing of sewerage and drainage onto slopes in a poorly controlled manner" among the human activities that "can greatly increase slope instability". The record is long: the South Hlimen quarry collapse of 9 August 1992, which "claimed the lives of almost 100 people", as a MIRSAC paper of 2013 records from earlier work; the Laipuitlang rockslide in Aizawl, which destroyed 15 houses and killed 17 people, with 8 rescued, by one paper's count and 8 people by another review's, on 11 May 2013 by the press and on 15 May by one paper; the collapse of three of the 20 blocks of the Durtlang housing complex on 2 July 2019, with 3 dead and 11 injured, as the CAG records; and Cyclone Remal on 28 May 2024, whose toll in Aizawl district was reported as 29 dead with 7 missing on 29 May, as 15 at the quarry and 5 at Hlimen in another report, and as 34 in seven areas of Aizawl in a later one, the sources conflicting. From 24 May to 3 June 2025 the State recorded 598 landslides and five deaths, DM&R's figures as reported.
  2. Rainfall that no record, report or curve covers. No Mizoram station appears in IMD's tables of extremes, so no official 24-hour record exists for any town. The whole State is in CWC's subzone 2(c), for which no flood estimation report was ever published, so there is no CWC plate, ratio or synthetic unit hydrograph for any part of it. IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any Mizoram station, and no IDF relationship for any Mizoram gauge was found; the only peer-reviewed frequency study of the State's rainfall (Lallawmzuali and Muniyan, 2024) fits monthly and annual totals only. The reanalysis grids of NIH-DHAARA are the only spatial source: they give a 50-year day of 220 mm at Aizawl, 295 mm at Lunglei and Tlabung, 315 to 338 mm at Bairabi and Vairengte in the north, and 157 to 181 mm on the eastern uplands round Champhai, and no gauge record has tested them. The largest days found are press values: Aizawl's 148 mm, reported as "the highest in India" that day, probably on 12 June 2018 as this Manual reads the report; 104.6 mm at Serchhip and 97.4 mm at Aizawl on one day of the storm of late May and early June 2025; and 130 mm at Chawngte in October 2025, all as reported. No hourly maximum for any Mizoram gauge was found.
  3. Storm drains that are the sewers. Outside one sewered catchment in Aizawl, every building sends septic-tank effluent to a soak pit and its sullage to the nearest drain: "the sullage (i.e. kitchen and bathroom waste) is discharged into drains which ultimately pollutes the fresh water sources", the master plan records, and septic effluent finds "its way through drains and cross drains to the rivers, which are the sources of water supply". The State's 10 MLD plant at Chite, on trial run from 6 February 2021, serves one catchment of the capital, and the State reported in 2025 that "Due to peculiar topography of the hilly regions, treatment of Grey Water remains a huge challenge". CPCB lists the Chite stream, below the plant, and the Tuikual stream in Priority II, with a biochemical oxygen demand (BOD) of 29 and 29.1 mg/L, and the Lawibual stream in Priority III. In 67% of the Aizawl Urban Area the drains are kutcha, 18% has no drains at all, and only 15% has pucca drains, as the master plan found, and drains "silted up frequently due to insufficiency in the hydraulic design".

Over all three lie four more. A slope regulation with drainage geometry but no design storm: SD&SM reg. 27 sets terraces at least 2 m wide at not more than 10 m vertical intervals on every cut and fill slope, terrace swales of reinforced concrete at a gradient of at least 1 in 20, a limit of 400 m² on the area that one run of swale may drain before it discharges to a down-drain, paved interceptor drains along the top of every cut slope whose uphill drainage path exceeds 10 m, building pads graded at 1 in 50 to approved drainage, and a duty on every site developed downhill to carry the drainage of the site above it "in a safe manner to the nearest practicable drainage way"; it gives no design storm, return period or runoff coefficient, and leaves "hydrology and hydraulic calculations" to licensed civil engineers. A building regulation with an unsized duty: AMCBR reg. 33 says that "A suitable rain water harvesting facility shall also be provided in all buildings", and the same regulation requires "a septic tank of appropriate capacity with soak pit" for every latrine, while the Landslide Policy Committee's Roadmap to Stability (2014) would "eliminate all septic tanks, leach fields and soak pits within Aizawl City" because they wet the slopes. Three legal geographies, of which only one has a building rule: the Corporation's area, the Village Council areas, where the model building bye-laws that the 2025 Act provides for have not been found, and the three Autonomous District Council areas, outside the State's municipal, village-council, water-resources and rivers laws alike. And valley-floor towns that flood from rivers in a State officially said to have no flood plain: "Mizoram being a hilly state, there is no flood plain zone in the catchment area", MPCB told the NGT, yet the Khawthlangtuipui flooded Tlabung in June 2017, when about 350 houses were reported submerged in the sub-division, or 9 fully and more than 60 partly by the count of disaster officials, again in July 2019, when about 400 houses were reported flooded, and again in August 2023, as reported; families were stranded at Sairang on the Tlawng in June 2018, when houses at Tiperabagh and Serhuan were flooded, as reported; and Champhai was among the places worst hit by the landslides and floods of June 2025, as reported. No flood plain zoning law was found, and the "flood hazard areas as designated and defined by Aizawl Municipal Corporation" that SD&SM reg. 6 asks a site plan to show have not been found to be designated.

Behind all of this lie the springs, the rain tanks, the dils and two reservoirs. "Mizoram is an abode of springs", CGWB notes, and the ridges are a "run off zone" of shale, siltstone and sandstone with "very low permeability and infiltration"; the State draws 3.95% of its extractable groundwater, as quoted from the assessment of 2024, and no area is notified for regulation. Water comes from the tuikhur and from roofs: 27.16% of households in the Aizawl Urban Area use rain water and 1.01% spring water, as the master plan records, while the city's piped supply is pumped up from the Tlawng. The Village Councils Act, 2025 makes the tuikhur a statutory word, and the Water Resources Act, 2024 counts springs among the community water resources that its Village and Local Water Resources Committees are to keep from pollution. Among the dils, the Pala Wetland (Palak Dil), in the Mara District Council's area, is Ramsar site no. 2484, designated on 31 August 2021 according to its information sheet and announced on 26 July 2022, as reported; Tam Dil, near Saitual, was rebuilt as a fishery reservoir, as reported. On the Tuirial, NEEPCO's dam holds a reservoir with a full reservoir level of 90.5 m and a minimum draw-down level of 68.0 m, and a study routed a dam-break flood of 3,035.34 m³/s near the confluence below it, as reported; the levels of the Serlui B reservoir were not found.

Design for Mizoram therefore has to cover a wet season that begins with the storms of April and May, before the south-west monsoon arrives (about 6 June in 2026, as reported), and runs to its end in October; it is this Manual's monsoon season, 1 April to 31 October. Storms on 27–28 April 2026 shut schools in five to nine districts, with 70.5 mm at Serchhip, as reported, and the Laipuitlang rockslide of 2013, the slides of Cyclone Remal in 2024 and the landslides of late May 2025 all came in May. Storms come outside the season too: "the cyclones of the Post Monsoon season (October to December) are more intense than those of Pre-Monsoon season (April & May)", as a State document of 2016 records, so design statistics use the annual maxima of every month. The sources give the State's mean annual rainfall as anything from about 2,057 mm to 2,794 mm; annual totals do not set the size of a drain, and this Manual picks none of them. There is no snow. Underground, the hill rock will not take water, and rainwater put into a slope can move it: rainwater is worth storing for use, not putting into the ground.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site, in tanks for use in the dry season, and never in the ground of a slope;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood, and carry them to a stable outfall without wetting the slope below; and
  • show that its outfall still works when a drain is choked with slide debris, silt or garbage, when the receiving lui is in spate, and, on the valley floors, when the river is high and its flap gate shut or a dam upstream is releasing.

The Manual also sets how public drains, roads and their drains, hill roads, terraces, swales, interceptor drains and down-drains, lui and rivers, outfalls on the valley floors, dils, springs and basin-wide master plans are designed, and how drains are protected against debris and silt, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Mizoram's wet season of April to October, with its pre-monsoon storms; to steep ridges of Surma-group shale, siltstone and sandstone where the water that drains into a slope can move it; to towns on ridges whose drains fall to steep lui, such as the Chite lui and the Ser lui of Aizawl; to the narrow valley floors and river terraces of the Tlawng, the Tuirial, the Khawthlangtuipui and the Tiau, at Sairang, Bairabi, Vairengte, Tlabung and the Champhai flats; to the reservoirs on the Tuirial and the Serlui; to springs that supply the villages and rain tanks that supply a quarter of the capital's households; and to storm drains that carry sewage.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. No station record, CWC report or published IDF covers any part of the State, so every design rainfall value in Mizoram is set by this Manual, in four rainfall zones and seven hydrologic sub-areas. In every sub-area the design day is the higher of NIH-DHAARA's value for the site and a statewide floor taken from NIH-DHAARA's cell for Aizawl (85 mm at 2 years to 250 mm at 100 years), so that a local dip in the grid never sets a depth below the capital's; on the eastern uplands, where NIH-DHAARA's cells are the lowest in the State and no gauge confirms them, the floor governs. In the northern hills and valley floors, which drain to the Barak plain, the design day is also not less than 320 mm at 2% AEP and 360 mm at 1% AEP, the values of the adjoining Barak-headwater edition of this series, which carry the floors of the adjoining Barak-valley rule, so that one storm reads alike on both sides of the State's border. Shorter durations use interim ratios that are never lower than those of the CWC report for subzone 2(a) and never give a depth below NIH-DHAARA's own for that duration at the site; the 72-hour depth is 1.70 times the 24-hour depth until a 3-day series is analysed. The design day is checked against the largest reliable days recorded within 25 km and within the same zone, but no record in or near the State yet qualifies, and obtaining the IMD and State daily series is the first data request of Chapter 2.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. AMCBR and its amendments of 2019, 2023 and 2025; SD&SM; the Mizoram Municipalities Act, 2007, with the Ward Committee and Local Council Rules, 2010; the Mizoram (Village Councils) Act, 2025; the Mizoram Water Resources (Management and Regulation) Act, 2024; the Mizoram (Protection of Rivers) Ordinance and Bill, 2023, whose enactment was not confirmed; the Master Plan for Aizawl: Vision 2030 and the draft zonal regulations of 2015; the Roadmap to Stability (2014); the Mizoram Official Language Act, 1974; the CAG's Report No. 1 of 2025; and the State's reports to the NGT. This Manual follows them or, where disclosed, makes them stricter. The final gazette of the amendment of 2019, any regulation of the LMC, the model building bye-laws of the Village Councils Act, any building or drainage instrument of the three District Councils, the notifications constituting MSDMA, MISWARC and WARDMA, the April 2021 notification on the river belts, the Mizoram Urban and Regional Development Act, 1990, the Mizoram Ground Water (Control and Regulation) Bill, 2023 beyond its title page, the State Action Plan on Climate Change and the paragraphs of the Sixth Schedule were not read. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Mizoram can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State Action Plan on Climate Change (SAPCC) was not read. A State document of 2016 for the National Adaptation Fund for Climate Change (NAFCC), citing a State remote sensing report, expects "nearly 25% increase in rainfall" in some districts and the number of extreme rainfall events to rise by "about 26%"; these are statements about totals and counts, not factors for intensity, and this Manual uses neither as a design value.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. Mizoram lies wholly in a CWC subzone for which no report was ever published; IMD's 2022 national set of rainfall intensity curves has no panel for any Mizoram station; and the reanalysis grids of NIH-DHAARA, the only source that covers the State, have not been tested against any Mizoram gauge.

Mizoram has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UD&PA, the Aizawl Municipal Corporation, the LMC, PWD, PHED or IWRD that fixes a return period, a runoff coefficient or a design rainfall for town storm drains, and no IDF relationship for any station in the State. The master plan's chapter on drainage describes the drains and proposes eight check dams, but sets no design storm; no storm-drain project of Aizawl Smart City was found, and the documents found for the State's tranche of the ADB-assisted North Eastern Region Capital Cities Development Investment Program (NERCCDIP) deal with water supply, solid waste and sewerage, not storm drains. AMCBR and SD&SM regulate the site, the slope and the outfall, but neither says what storm a drain is sized for. This Manual is offered as a technical companion to AMCBR, SD&SM and the Municipalities Act, to the model building bye-laws that the Village Councils Act provides for, to the Water Resources Act, 2024, to the Rivers Ordinance and Bill, 2023 if enacted, and to the master plan: it supplies the design storm, detention, tailwater, setback and spring-protection values that they leave open. It has not been adopted by UD&PA, the Corporation, the LMC, any District Council, any Village Council or any other body. In particular:

  • The slope regulation fixes the geometry of the drains but not the water they carry. SD&SM reg. 27 sizes terraces, swales, interceptor drains and pads by their dimensions and limits each run of swale to 400 m², and its engineered track asks for "A map showing the drainage area and the estimated runoff of the area served by any drains"; but it names no design storm, return period, runoff coefficient or freeboard, and puts the "hydrology and hydraulic calculations" on the licensed civil engineer, with no method to follow;
  • The building regulation requires rainwater harvesting, but sizes nothing. AMCBR reg. 33 requires "A suitable rain water harvesting facility" in all buildings and reg. 5(6)(ix) asks plans to show it; the amendment of 2025 makes rainwater harvesting and the "Reduction of Hardscape" incentives for plots above 100 m²; and reg. 37(ii) asks for a drain or conduit "of adequate capacity to the nearest public drain". None gives a storage volume, a release rate or a design storm;
  • The rules put septic effluent into slopes. AMCBR reg. 33 requires a soak pit with every septic tank, and keeps it 15 m from a water source; on a landslide-prone slope that is the practice the Roadmap to Stability would end. This Manual states the conflict, puts no stormwater into a soak pit and no infiltration on a slope, and does not override the regulation;
  • The stream lines are recommendations, or have lost their basis. The master plan recommends "a 15 meters wide green buffer on both sides" of the major drainage channels and keeps an 800 m green belt on either side of the Tlawng under the Mizo District (Forest) Act, 1955; the notification of 1965 on which the riverine reserved forests rested was quashed by the High Court on 27 January 2021, as reported, and a notification of April 2021 that is reported to set an 800 m restricted zone was not read, so this Manual does not treat the 800 m belt as a statutory line. SD&SM reg. 28 says that "the riverine reserve shall be maintained" without defining it, and no River Conservation Zone has been notified. Neither regulation has a metric setback from a stream or a spring;
  • No flood line has been drawn. No flood plain zoning law, no designated flood hazard area and no published flood level for any Mizoram town was found, and the State's own statement is that it has no flood plain zone. This Manual offers a method for drawing a design flood line on the valley floors (Chapter 7) as an input to any future designation; it does not replace a line that is notified, that a plan draws or that a court orders, and where such a line binds and is wider, it governs; and
  • No document sets the river or reservoir level for which an outfall is designed. CWC has seven level-monitoring sites in the State, five of them inactive, no flood-forecasting site and no warning or danger level, as transcribed by SANDRP (2018); the only highest flood level printed is the Tuirial's at "Turial", 149.0 m (17 June 1995), on no stated datum, and how it relates to the reservoir's full level of 90.5 m is not stated. No inventory of flap gates on the valley floors, and no rule for releases from the Tuirial or Serlui B dams that a town could design for, was found.

So each agency and each local body interprets the central manual its own way. The Corporation and its Local Councils, the LMC, UD&PA, PWD and the national-highway agencies, PHED and SIPMIU, IWRD, EF&CC, the Land Revenue and Settlement Department, the Village Councils and the three District Councils, Aizawl Smart City Ltd, their consultants and funding agencies fill the gaps differently. No notification divides the drains among them. A drain in Aizawl may be the Corporation's street drain by statute and a PWD roadside drain in practice, carry the sullage of the houses above it, cross a cut slope that a private owner must keep drained under SD&SM, and fall to a lui in a riverine reserve that EF&CC holds and that runs to a CPCB-listed stretch. Outside the Corporation's area no building rule applies at all. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in four rainfall zones and seven hydrologic sub-areas: NIH-DHAARA with a statewide floor everywhere, the Barak-valley values in the northern hills and valley floors, interim ratios for short storms, 72-hour depths for the multi-day storms that start landslides, and a check of the design day against the largest reliable days recorded nearby that never crosses a zone line or a main ridge (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites, with the rainwater stores of AMCBR reg. 33 sized and credited (Chapter 4);
  • a required check of every outfall: on the hills, a free outfall to a lui with energy dissipation and a check of the lui's capacity and stability to the next confluence; on the valley floors and terraces, a check against a design river level, with the outfall treated as closed for the whole of the 72-hour design storm, and longer at Tlabung where flood marks show the river held up for longer; and below the Tuirial and Serlui B dams, a check against a release (Chapter 5);
  • a design flood line on the valley floors, and corridors and setbacks along every lui and river and round every dil and tuikhur, proposed by this Manual for use where nothing wider binds: a corridor at least 15 m from the top of bank on each side of every natural channel draining 8 ha or more, measured on an incised lui whose bank is a slope steeper than 10° from the crest of that slope, or to the 1% AEP flood extent plus 10 m on the valley floors, whichever is wider; no storm outfall, soakaway or drain discharge within 15 m of a tuikhur; and the master plan's buffers and any notified River Conservation Zone wherever those are wider (Chapters 7 and 8);
  • no deliberate infiltration on slopes steeper than 10°, on Surma-group shale, siltstone or mudstone at any slope, on colluvium, fill or slide debris, in a mapped Moderate, High or Very High landslide hazard zone or close above a cut or retaining wall, without a geotechnical certificate, and none at all in High and Very High hazard zones; recharge only on tested valley alluvium and river terraces above the 1% AEP flood level; roof runoff to storage, with its overflow to lined drains; and the interception and screening of dry-weather flow before every outfall to a CPCB-listed lui, a dil or a tuikhur's catchment, where drains carry sewage (Chapters 4 and 8);
  • the hydrology that SD&SM leaves to the engineer, for its terraces, swales, interceptor drains and down-drains; debris racks, allowances for sediment, bulking and blockage, and lined, stepped and baffled drains for steep streets and hill roads (Chapters 6 and 9), with drains, swales, interceptor drains, weep holes, racks and gates cleared, inspected and certified ready by 31 March, before the April storms, cleared again by 30 April, before the May storms that brought the Laipuitlang and Remal slides, and by 15 November after the season, with a survey of cut slopes and retaining walls, and standby kept from 1 April to 31 October (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a lui's catchment, from the ridge-top town to the river below, plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). The Corporation in its regulations, UD&PA in the model building bye-laws for the Village Councils, the LMC in its own regulations, or a District Council by an instrument of its own can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Aizawl Municipal Council (now Corporation) Building Regulations, 2012, UD&PA Notification No. B.13017/8/2012-UD&PA of 20 December 2012 (Mizoram Gazette Extraordinary Vol. XLII, Issue No. 4, 10 January 2013), regs. 1, 5, 15, 21, 26, 33 and 37, with the Amendment Regulations of 2019 (public notification No. B.13017/8(2)/2018-UD&PA of 10 April 2019, draft), 2023 (No. B.13017/8/2021-UD&PA/Pt of 14 August 2023; Gazette Extraordinary Vol. LII, Issue No. 459, 28 August 2023) and 2025 (No. B.13017/8/2021-UD&PA/Loose of 21 November 2025); Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017, No. B.13017/75/2016-UD&PA of 4 April 2017 (Gazette Extraordinary Vol. XLVI, Issue No. 161, 11 April 2017), regs. 1, 4–6, 14 and 24–29 and Schedule I; Mizoram Municipalities Act, 2007 (Act No. 6 of 2007), ss. 1, 80, 288–300 and 371, and the Mizoram Municipalities (Ward Committee and Local Council) Rules, 2010; Mizoram (Village Councils) Act, 2025 (Act No. 7 of 2025; Gazette Extraordinary Vol. LIV, Issue No. 178, 20 March 2025), ss. 1, 2, 13–15; Mizoram Water Resources (Management and Regulation) Act, 2024 (Act No. 1 of 2024), ss. 1–6, 9–12, 14, 16 and 24; Mizoram (Protection of Rivers) Ordinance, 2023 (Ordinance No. 1 of 2023) and Bill, 2023; Mizoram Official Language Act, 1974 (Act No. 3 of 1975) and notification No. H.12017/14/90-LJD of 6 May 1996; Master Plan for Aizawl: Vision 2030 (Aizawl Development Authority; Chief Minister's message of 11 September 2012; approval notification not found), chapters 4, 8 and 12; Draft AMC (Master Plan and Strategic Zonal/Ward Development Plan) Regulations, 2015; Landslide Policy Committee for Aizawl City, Roadmap to Stability: Actions to Reduce the Landslide Risk in Aizawl (February 2014); CAG, Report No. 1 of 2025 (Government of Mizoram), Chapters I and V and Appendix 5.3; NGT, OA 593/2017 and OA 673/2018, report of the Mizoram Pollution Control Board (February 2021), and OA 606/2018, Government of Mizoram, six-monthly report (January–June 2025); CPCB, Polluted River Stretches for Restoration of Water Quality (2025); CGWB, Ground Water Scenario of Mizoram (State profile) and Ground Water Information Booklets, Lunglei and Serchhip districts; MIRSAC, micro-level landslide hazard zonation of Serchhip town, Science Vision 13(1) (2013); Lallawmzuali and Muniyan (2024), MAUSAM 75(3); Mizoram Agriculture Department, DPR for the NAFCC (February 2016); CERC, Petition 125/MP/2021 (NEEPCO, Tuirial HEP); CWC, Flood Estimation Report for South Brahmaputra subzone 2(b) (Revised), Annexure 1.1, and Flood Estimation Report for North Brahmaputra subzone 2(a) (NB/18/1991); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012), and the Meteorological Centre Aizawl's list of rain gauges (14 November 2026); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); J. H. Lorrain and F. W. Savidge, A Grammar and Dictionary of the Lushai Language (1898); L. Pachuau, English–Mizo Dictionary (1997); CWC levels as transcribed by SANDRP (2018); reports of the landslides of 1992, 2013, 2019, 2024 and 2025, of the floods at Tlabung, Sairang and Champhai, of the storms of 2018, 2025 and 2026, of the High Court's orders and of the Pala Wetland (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Dils (Lakes and Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Mizoram
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Mizoram locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and springs
7E.2Streams, drains and floods
7E.3Land and works
7E.4Terms and forms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A ridge town: its terraces, swales, spring and stream. A section across a ridge town with a lined road drain, roof water to storage tanks, a cut slope with an interceptor drain, terraces with lined swales to a stepped down-drain and an energy dissipator at the stream, a downhill plot carrying the uphill plot's drainage in a closed conduit, and a landslide-hazard band with no infiltration; and a plan of the slope below with a spring (tuikhur), its protected catchment and its 15 m no-discharge circle, the stream with the Manual's 15 m corridor from the crest of its bank slope, a dry-weather-flow interceptor on the outfall, a disused quarry face with a cut-off drain, and the stream running down to a valley-floor river with a terrace settlement behind a flap-gated outfall
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
ABC Waters Active, Beautiful, Clean Waters (PUB Singapore's design guidelines)
ADA Aizawl Development Authority (erstwhile; "now absorbed in AMC", as the CAG records)
ADB Asian Development Bank
ADC Autonomous District Council (the LADC, MADC or CADC, under the Sixth Schedule)
AEP Annual exceedance probability
AIDR Australian Institute for Disaster Resilience
AMC Antecedent moisture condition only (this Manual writes the Aizawl Municipal Corporation in full)
AMCBR Aizawl Municipal Corporation Building Regulations, 2012, as amended
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
ARG Automatic rain gauge
ASABE American Society of Agricultural and Biological Engineers
ASTM ASTM International (standards)
AWS Automatic weather station
BOD Biochemical oxygen demand
BRE Building Research Establishment (UK)
BSMP Basin Stormwater Master Plan
BSUP Basic Services to the Urban Poor (as in the Durtlang BSUP complex)
CADC Chakma Autonomous District Council
CAG Comptroller and Auditor General of India
CGP Construction General Permit (US EPA)
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
COD Chemical oxygen demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DG&MR Directorate of Geology and Mineral Resources (the "Directorate of Geology and Mining" of press reports)
DM&R Disaster Management and Rehabilitation Department
DPR Detailed project report
DST Directorate of Science and Technology (its State Meteorological Centre keeps a rainfall series)
DWF Dry-weather flow
DWRC District Water Resources Committee (Water Resources Act, 2024)
EF&CC Environment, Forest and Climate Change Department
EN European Standard (Norme Européenne)
EPD Environmental Protection Division (Georgia, United States)
ESC Erosion and sediment control
EV1 Extreme value type I (Gumbel) distribution
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL / MWL / MDDL Full reservoir level / maximum water level / minimum draw-down level
FRP Fibre-reinforced plastic
GHI GeoHazards International
GWRA Ground water resource assessment (CGWB)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Mizoram)
HEP Hydro-electric project
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
HY-8 FHWA's culvert hydraulic analysis program
IDF Intensity–duration–frequency
IIT Indian Institute of Technology
IMD India Meteorological Department
IMDAA Indian Monsoon Data Assimilation and Analysis (a regional reanalysis)
IRC Indian Roads Congress
ISO International Organization for Standardization
IST Indian Standard Time
IWRD Irrigation and Water Resources Department
KC Kansas City (Kansas City Metro APWA Section 5600)
LADC Lai Autonomous District Council
LiDAR Light detection and ranging (laser survey)
LMC Lunglei Municipal Council
LWRC Local Water Resources Committee (Water Resources Act, 2024; in a locality with a Local Council)
MADC Mara Autonomous District Council
MBBL 2016 Model Building Bye-Laws 2016 (MoHUA; not the State's rule)
MIRSAC Mizoram Remote Sensing Application Centre
MISWARC Mizoram State Water Resources Council (Water Resources Act, 2024)
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
MPCB Mizoram Pollution Control Board
MSDMA Mizoram State Disaster Management Authority
Mz-SWIC The operator of most automatic rain gauges in IMD's Mizoram list (name not expanded in the source)
MZU Mizoram University
NAFCC National Adaptation Fund for Climate Change
NDMA National Disaster Management Authority
NEEPCO North Eastern Electric Power Corporation Ltd (operator of the Tuirial HEP)
NERCCDIP North Eastern Region Capital Cities Development Investment Program (ADB)
NGT National Green Tribunal
NH National highway
NHIDCL National Highways and Infrastructure Development Corporation Ltd
NIH National Institute of Hydrology, Roorkee
NIT National Institute of Technology
NOC No-objection certificate
NPDES National Pollutant Discharge Elimination System (United States)
NRSC National Remote Sensing Centre
NWIA National Wetland Inventory and Assessment (ISRO)
OA Original Application (NGT)
OBPAS Online building permission system of the Aizawl Municipal Corporation
OGC Open Geospatial Consortium
ORG Ordinary rain gauge
PHED Public Health Engineering Department
PIL Public interest litigation
PSD Permissible site discharge
PWD Public Works Department, Mizoram
RDSO Research Designs and Standards Organisation (Railways)
RMSE Root-mean-square error
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SAPCC State Action Plan on Climate Change
SBM-U Swachh Bharat Mission (Urban)
SD&SM Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017
SH State highway
SIPMIU State Investment Programme Management and Implementation Unit
SLA Sea-level allowance (coastal term; not applicable in Mizoram)
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
TBC To be confirmed: a fact or value not yet found in a source
TCPO Town and Country Planning Organisation (MoHUA)
TR-55 Technical Release 55 (USDA SCS/NRCS)
TWL Tailwater level
UD&PA Urban Development and Poverty Alleviation Department
UH Unit hydrograph
ULB Urban local body (in Mizoram, the Aizawl Municipal Corporation and the LMC)
USACE US Army Corps of Engineers
UT Union Territory
UTM Universal Transverse Mercator
VC Village Council (Mizoram (Village Councils) Act, 2025; or, in an ADC area, under the District Council)
VR Value rating (of a BMP treating the WQv)
VWRC Village Water Resources Committee (Water Resources Act, 2024)
WARDMA Water Resources Development and Management Authority (Water Resources Act, 2024)
WQv Water quality volume
WSUD Water-sensitive urban design
YMA Young Mizo Association