NEER-in a buatsaih Draft v1.0 a ni. Mizoram sawrkar, District Council, Village Council, authority emaw local body emaw reng rengin pawm a ni lo a, dan anga thuneihna a nei lo. He draft chungchang

Bung 8Tui Ṭhatna leh Recharge


8.1 Tum leh a huam chin

8.1.1 He Bung hian site emaw vantlang tui luanna system emaw aṭanga chhuak ruahtui (stormwater) ṭhat zawng tur leh leihnuai tui recharge (leihnuai tui tihpun) tana phut turte a ruat. Heng hi a huam:

  • (a) tui ṭhatna tui zat (water quality volume, WQv) leh tui ṭhatna design tui luang zat (water quality design flow);
  • (b) treatment train (tihfaina kalphung indawt), leh best management practice (BMP, ruahtui tihfaina hmanrua leh kalphung) thlan dan leh design dan;
  • (c) infiltration (lei-a tui luh) leh recharge tana tehna (criteria);
  • (d) ruahtui drain (tui luanna)-ah ek tui leh ruah sur lohna hun tui luang (DWF) luh tir loh dan;
  • (e) gross pollutant trap (bawlhhlawh dawnna, GPT), first flush (ruah tlak hmasa ber tui bal) tihfaina leh tui awmna (waterbody) pana outfall (drain tui luan chhuahna)-a screen-te;
  • (f) ruahtui khawl khawm (RWH) hi retention (ruahtui khawl reng, hman nan emaw lei-a luh tir nan emaw) leh detention (ruahtui dah rihna, a luan chhuah zat tihhniam nan) nen a inrem dan;
  • (g) sak lai erosion (lei khawh bo) leh bal (sediment) thunun dan; leh
  • (h) enfiah reng (monitoring).

8.1.2 He Bung hi Bung 4 a huam hmasawnna hna (development) leh vantlang hnathawh (public work) zawng zawngah hman a ni (Bung 1). Clause 8.9 (ek tui) leh 8.12 (sak lai erosion leh bal thunun) hi building permit emaw layout phalna emaw mamawh hmasawnna hna zawng zawngah leh vantlang tui luanna hnathawh zawng zawngah, a lian leh tê eng pawh ni se, hman a ni.

8.1.3 Bung 4 hnuaia retention hi tui ṭhatna thununna kawng hmasa ber leh duh zawk ber a ni. Site-a khawl ruahtui luang (runoff) chu a zavaiin tihfai a ni. He Bung dang zawng hi WQv zinga khawl loh zawng chungah hman a ni.

Hrilhfiahna. CPHEEO (2019) hi ruahtui ṭhatna chipchiar taka sawi India manual awm chhun a ni. A Chapter 9 chuan US event mean concentration-te a tarlang chhawng a, mahse "India-ah chuan value-te hi a sang zawk hle ang" ("in an Indian context the values would be much higher") tiin a hrilh fimkhur a, drain-te hian mihring ek, zun leh chaw bal an dawn avangin; India tan numeric criteria a ruat lo (CPHEEO 2019, Part A §9.5). A Chapter 10 chuan water-sensitive urban design, LID leh SuDS treatment train-te a sawi (CPHEEO 2019, Part A Ch. 10). He Bung hian chu inkaihhruaina chu phut tur (requirement)-ah a chantir. MARC/APWA BMP Manual (2012), tunah APWA 5600 (2025.01)-a telh, tihfaina kalphung a zui a, Malaysia-a thla 3 ARI tui ṭhatna ruahpui (MSMA 2, 2012) leh Georgia tui ṭhatna tui zat (GSMM, 2016) chu tropical leh US tehkhinna atan a hmang.


8.2 Thumal awmzia

Thumal He Kaihhruaina Bu-a a awmzia
Tui ṭhatna tui zat (water quality volume, WQv) Tui ṭhatna ruahtui tlak zat (Clause 8.4) aṭanga, khawl emaw tihfai emaw ngei ngei tur ruahtui luang tui zat.
Tui ṭhatna ruahtui tlak zat (P_wq) Retention zat (Belhchian 2E, Clause 2.10) leh darkar 24 thla 3 ARI zat (Belhchian 8A) zinga a sang zawk.
Thla 3 ARI zat Ni khat record rei tak partial-duration series aṭanga, kum khatah a chawhrualin vawi li a tluk emaw a pel emaw darkar 24 ruahtui tlak zat.
Tui ṭhatna design tui luang zat (Q_wq) Thla 3 ARI ruahpui aṭanga tui luang zat sang ber, flow-through device (tui kal tlang hmanrua) leh diversion structure (tui peng tirna) lian zawng ruat nan hman (Clause 8.4.5).
WQv tana runoff coefficient (Rv) Ruahpui tê tana volumetric runoff coefficient, Rv = 0.05 + 0.009·I.
BMP Best management practice: bawlhhlawh zat (pollutant load) emaw ruahtui luang tui zat emaw tihtlemtu structure siam emaw structure ni lo hmanrua.
Treatment train BMP pahnih emaw a aia tam indawt, a bul (source) aṭanga site leh region huap thleng (Clause 8.5).
Pretreatment Ruahtui luang chu filter emaw infiltration BMP emaw a thlen hmaa bal lian, bawlhhlawh leh hriak la chhuaktu BMP.
First flush Ruahtui luang ṭan tirh lam, bal, bawlhhlawh leh hriak a tam ber ṭhinna.
Gross pollutant trap (GPT) Bawlhhlawh, plastic, thing leh hnim, leh bal lian, a tlangpuiin 5 mm vel aia lian, dawntu hmanrua.
Ruah sur lohna hun tui luang (DWF) Darkar 72 tal ruah a sur loh hnua ruahtui drain-a tui luang. Ruahtui system hranah chuan DWF hi ek tui, in chhunga tui bal (sullage), leihnuai tui luh emaw dan lova tui bal luan lut tir (illicit discharge) emaw finfiahna a ni.
Cross-connection Ek tui emaw sullage (chaw suangna, inbualna leh silfaina aṭanga tui bal) emaw ruahtui drain-a luh tirtu pipe, tui kawng emaw kawng kua reng reng.
Infiltration facility Ruahtui luang chu lei hnuaiah emaw hmun hniamah emaw khawl a, leiah a luh tir tura design hmanrua: infiltration trench leh basin, lined loh bioretention, a hnuai inhawng permeable pavement, soakaway, recharge pit leh recharge well.
Hun bik-a leihnuai tui sang ber Clause 3.10.2-a hrilhfiah angin: fûr hun chhunga a sang zawng sang ber.
Hotspot Thil leih chhuak emaw ruahtui luang bawlhhlawh emaw hlauhawmna sang nei ram hman dan (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) MARC/APWA BMP Manual (2012) aṭanga Clause 8.6-a mark pekna kalphung.

8.3 Tum leh pollutant pawimawhte

8.3.1 He Kaihhruaina Bu hnuaia ruahtui tihfaina hian heng hi a tum tur a ni:

  • (a) bawlhhlawh, plastic leh gross pollutant dangte chu tui awmna an thlen hmaa la chhuah;
  • (b) tui chhunga bal lang (suspended sediment) leh a chunga metal, nutrient leh hriak la chhuah;
  • (c) ek tui leh sullage chu ruahtui drain leh tui awmnaah luh tir loh;
  • (d) lei leh leihnuai tui thuk zawng a phal hmunah leihnuai tui recharge, tibawlhhlawh lovin; leh
  • (e) sak lai erosion leh bal luan chhuah veng.

8.3.2 Design chuan site tin tan heng pollutant-te hi a ngaihtuah tur a ni a, a huam hmunah Clause 8.8.8 hotspot pollutant-te pawh:

Table 8.1 — Pollutant pawimawhte, an hnar leh thununna ber

Pollutant Mizoram khawpuia a hnar ber Thununna ber
Gross pollutant (plastic, bawlhhlawh, thing leh hnim) Kawngte, bazar, drain-a bawlhhlawh paih A hnarah khawn khawm; GPT leh screen (Clause 8.10)
Tui chhunga bal lang Sakna site, kawng chhuah loh leh kawng sir, kawng chhiat, drain leidip Erosion leh bal thunun (Clause 8.12); pretreatment; filtration (tihthianghlimna)
Hriak, grease leh fuel Kawngte, motor dahna, fuel station, workshop, bus depot Hotspot-ah oil-grit separator; bioretention
Natna hrik (pathogen) leh organic load (BOD) Ek tui leh sullage cross-connection, ran ek Luh tir loh leh DWF interception (Clause 8.9)
Nutrient (N, P) Ek tui, lei thlo (fertiliser), chaw bal, detergent Luh tir loh; bioretention; wetland
Heavy metal Kawngte, in chung, industry hmun Filtration; sedimentation (bal tihtlak)

Hrilhfiahna. Gross pollutant leh ek tui hi Clause 8.3-ah a hmasa berah dah an ni, Mizoram khawpui tui awmna tihbawlhhlawhnaah an lian ber avang leh, la chhuah an nih loh chuan tihfaina BMP reng reng a rei thei loh avangin. CPHEEO (2019) chuan India drain-te hian mihring ek, zun leh chaw bal an hruai tih a tarlang (Part A §9.5). A WSUD kalphungah TSS, nitrogen zawng zawng, phosphorus zawng zawng leh gross pollutant-te chu pollutant pawimawh ber atan a tarlang (Part A Ch. 10). AMRUT 2.0 chuan "ruahtui drain hmangin tui awmna (ek tui/effluent dawng lo)-ah" ("through storm water drains into water body (which is not receiving sewage/effluent)") ruahtui khawl khawmna a ṭanpui (Lok Sabha unstarred question AU1419), chu chu ek tui chu drain-te aṭanga a hmaa dan chhuah a nih chauhin a hlawhtling.


8.4 Tui ṭhatna tui zat leh design tui luang zat

8.4.1 Tui ṭhatna ruahtui tlak zat. Tui ṭhatna ruahtui tlak zat chu:

P_wq = max (P_ret, P_3m)

chutah:

  • P_ret = site zone tana retention zat (Belhchian 2E, Clause 2.10), mm; leh
  • P_3m = site zone tana darkar 24 thla 3 ARI zat (Belhchian 8A), mm.

8.4.2 Tui ṭhatna tui zat. WQv chu heti hian chhut tur a ni:

WQv = (P_wq / 1000) × Rv × A

chutah:

  • WQv hi m³-in a ni;
  • A = tui luan khawm area, m²;
  • Rv = 0.05 + 0.009·I; leh
  • I = tui luan khawm area-a tui luh theih lohna hmun (impervious) percentage (0–100), Clause 3.9 connectivity dan hman hnua mi.

A chunga Rv chhutna hi ha 0.5 aia tê site-ah leh Tier B kalphung awlsam (Clause 4.14) hnuaiah chauh hman phal a ni. Hei hi retention tui zat (Clause 4.4.2) tana ri inang a ni. Site dang zawng zawng tan WQv chu retention tui zat ang bawkin SCS-CN kalphung hmangin chhut tur a ni: WQv (m³) = 10 × Q_wq × A, chutah Q_wq (mm) hi sub-area tin tana P_wq aṭanga SCS-CN ruahtui luang a ni a, A hi ha-in a ni.

8.4.3 Climate factor. Clause 2.8 climate factor chu P_wq-ah hman loh tur a ni. P_ret leh P_3m hi ruah pangngai frequency statistics an ni a, AEP design zat an ni lo.

8.4.4 Retention-in WQv a tihkim. Bung 4 hnuaia site-a khawl tui zat chu WQv-ah a zavaiin chhiar a ni. Khawl tui zat chu WQv a tluk emaw a pel emaw chuan, chu area tan tihfaina dang a ngai lo, heng bak chu:

  • (a) retention hmanrua tina luang lut tui pretreatment (Clause 8.5.3);
  • (b) hotspot thununna (Clause 8.8.8); leh
  • (c) site tui chu tui awmnaah a luan chhuah chuan, Clause 8.10 outfall phut turte.

8.4.5 Tui ṭhatna design tui luang zat. Flow-through device (swale, filter strip, oil-grit separator, GPT) leh off-line BMP tana diversion weir-te chu Q_wq tan lian zawng ruat tur a ni. Q_wq chu tui luan khawm area time of concentration-a thla 3 ARI intensity aṭanga chhut tur a ni:

  • (a) Rational Method hmangin, Bung 3-in a phalna hmunah (element pakhat, ha 16 aia tam lo tui luan chhuah tir); emaw
  • (b) thla 3 ARI darkar 24 zat, Clause 2.9.1 alternating-block pattern nen, hmanga hydrograph kalphung peak angin.

8.4.6 Bypass. Q_wq aia tam tui luang chuan flow-through leh off-line tihfaina hmanrua-te chu an dawn tawh thil hruai chhuak lovin a kal pelh tur a ni. Bypass hi tui luanna system tenau (minor) emaw lian (major) emaw (Bung 6) zinga mi a ni tur a ni.

8.4.7 Drawdown. WQv hi extended-detention BMP (wet pond, constructed wetland emaw dry extended-detention basin)-ah khawl a nih chuan, darkar 24–48 chhungin chhuah tur a ni (Bung 4).

Hrilhfiahna. WQv zat hi thla 3 ARI ruahpui aṭanga ruahtui luang emaw retention zat emaw, a sang zawk zawk a ni. Thla 3 ARI hi Malaysia tui ṭhatna design ruahpui a ni (MSMA 2, 2012). Malaysia 2008 checklist chuan a zat chu 40 mm vel tiin a pe a, darkar 24 ruahpui ruahtui luang tui zat 90% emaw a aia tam a dawn tih a sawi (DID, 2008). Mizoram value chu chhut ngei ngei tur a ni (Belhchian 8A). Georgia chuan a WQv chu inch 1.2 (30 mm vel), kum pangngaia ruahpui 85% huamtu zat, aṭanga ruahtui luang angin a ruat a, hmasawnna hnu lam (post-development) TSS load kumtin chawhrual 80% la chhuah a phut (GSMM 2016, Vol 1, Standard #4). Kansas City tui ṭhatna ruahpui chu inch 1.37 (35 mm vel) thil thleng, kum khata darkar 24 ruahpui zawng zawng ruahtui luang 90% thleng siamtu a ni (MARC BMP Manual, 2012).

Rv formula hi MARC/APWA BMP Manual (2012) aṭanga lak a ni a, chu chuan WQv = P × Rv, Rv = 0.05 + 0.009·I nen, a chhut. SCS curve number aiah Rv hman a ni, CN kalphung hian tui luh theihna hmun (pervious) chunga ruahpui tê aṭanga ruahtui luang a tlem lutuk zawngin a chhut avangin. Climate factor hman loh (Clause 8.4.3) hi entirna hmasa chiang a awm lo; he Kaihhruaina Bu hian P_wq chu retention zat angin, ruah pangngai statistic angin a ngaih avangin a ti a ni. Tui luang lian zawk bypass leh darkar 24–48 drawdown hi Bung 4 a zui; MARC (2012) chuan WQv extended detention darkar 40 tal a phut.

Entirna chauh — design value a ni lo. Site ha 1.0, tui luh theih lohna hmun 80% leh P_wq 50 mm ngaih tan:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train leh pretreatment

8.5.1 Treatment train. Tui ṭhatna thununna chu treatment train angin, Milem 8.1-a lantir indawt dan angin design tur a ni:

  • (a) ram (plot) chunga a hnar thununna (source control): in chung ruahtui luang chu RWH-ah, rain garden, permeable paving, tui luh theih lohna hmun inzawmna tihchat (disconnection), leh inlet-a leidip dawnna (silt trap);
  • (b) site thununna: bioretention, swale, filter strip, infiltration, hotspot-a oil-grit separator, wet pond leh extended detention; leh
  • (c) vantlang tui luanna tan region thununna: outfall-a GPT leh DWF interceptor, dil (tank) luan lutna-a constructed wetland, leh region dil.

8.5.2 Hmasawnna hna chuan WQv chu site-ah, (a) leh (b) hmangin, a tihkim tur a ni. (c) hnuaia region thununna chu notify a nih basin plan (Clause 7.11) hnuaia ruahtui luang inang tihfaitu regional facility sak a nih tawh chauhin hmasawnna hna WQv-ah chhiar phal a ni.

8.5.3 Pretreatment. Bioretention cell, infiltration facility, run-on (hmun dang aṭanga luang lut tui) dawng permeable pavement, wet pond leh constructed wetland tinin luan lutna ṭhenkhawm (concentrated inflow) tinah pretreatment an nei tur a ni. Pretreatment chu sediment forebay (leidip dawnna dil tê), hnim filter strip, leidip dawnna emaw proprietary device (company hmanrua) emaw, a tui luan khawm area WQv 10% tal khawl thei, emaw flow-through device tan Q_wq tana lian zawng ruat a ni tur a ni.

8.5.4 Pretreatment chu BMP ber luh emaw tihbuai emaw ngai lovin tihfai theih turin hman theih a ni tur a ni.

Hrilhfiahna. Treatment train hian CPHEEO (2019, Part A §10.2.3, SuDS treatment train) leh CIRIA C753 The SuDS Manual (2015) a zui. He Kaihhruaina Bu thil pawimawh indawt dan pawh a ni: humhalh, khawl, dah rih, luan tir (Bung 1). Forebay tui zat 10% hi India entirna hmasa a awm lo; US manual-ah forebay lian zawng ruatna dan tlangpui a ni. Mizoram-ah kawng sir chhuah loh, sakna site leh drain leidip-in bal tam tak an thlen. Pretreatment nei lo bioretention leh infiltration facility-te chu an tawp ṭhin, kum khat emaw kum hnih chhungin.

Ruahtui treatment train: a hnar, site leh region Treatment train: a hnar → site → region → tui dawngtu tui awmna In chung, kawng, motor dahna, open space aṭanga ruahtui luang: first flush-in bal, bawlhhlawh, hriak a tam ber a phur 1. A hnar thununna ram chungah, in chung emaw kerb-ah • In chung RWH: sump, recharge well • Rain garden, bioretention tê • Permeable paving • In chung tui hnim chungah luan tir • Green roof, lei siam ṭhatna • Inlet-ah leidip dawnna / catch pit A hmasain khawl (Bung 4) 2. Site thununna layout, campus, kawng corridor • Bioretention, swale, filter strip • Infiltration trench emaw basin • Oil-grit separator (hotspot) • Wet pond emaw extended detention • Sediment forebay pretreatment • WQv tihfai, a hnuah dah rih WQv tihfai (Clause 8.4) 3. Region thununna basin emaw outfall, vantlang ram • Outfall-ah gross pollutant trap • DWF interceptor • Dil luan lutna-a constructed wetland (sedimentation zone) • Region dil / dil siam ṭhat (fee-in-lieu, Clause 7.11) Outfall-ah phut a ni (8.10) Tui dawngtu tui awmna dil, channel, hmun hnawng, estuary (Bung 7) Stage tinin thil ṭhen hrang hrang a la bo. Thil khal lian leh bawlhhlawh chu a hmasain lak a ni, filter leh infiltration media bal-in a khap loh nan. WQ peak chunga tui luang chu treatment pelin detention-ah a kal (Bung 4). Ek tui leh ruah sur lohna hun tui luang hi ruahtui a ni lo Ruahtui drain reng rengah ek tui emaw sullage zawm a ni lo (Clause 8.9). Outfall-a ruah sur lohna hun tui luang hmuh chu dan a ni a, sewer emaw tihfaina plant-ah thawn a ni; treatment train emaw tui awmna-ah a ni lo.

Milem 8.1 — Treatment train: tui dawngtu tui awmna hmaa a hnar, site leh region thununna, ek tui leh ruah sur lohna hun tui luang chu system-a luh tir lovin. He Kaihhruaina Bu tana milem siam thar, CIRIA, The SuDS Manual (C753), 2015, leh MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012 aṭanga siam danglam.


8.6 BMP thlan dan: Level of Service leh Value Rating

8.6.1 Kalphung. Tier A area-ah site tin tana BMP-te chu he Clause-a Level of Service (LoS) kalphung hmangin thlan tur a ni. Tier B area-ah Clause 8.6.5 kawng awlsam hman phal a ni.

8.6.2 Level of Service mamawh. Siam ṭhatna (redevelopment) ni lo site tan, LoS mamawh chu hmasawnna hma aṭanga hmasawnna hnu thlenga curve number inthlak zat (ΔCN) (Bung 3) a zir:

Table 8.2 — Siam ṭhatna ni lo site tana Level of Service mamawh

ΔCN Nghawng LoS mamawh
17 emaw a aia tam Sang 8
7 aṭanga 16 thleng Laihawl 7
4 aṭanga 6 thleng Hniam 6
1 aṭanga 3 thleng Tlem ber 5

Siam ṭhatna (site-a tui luh theih lohna hmun awm sa 20% emaw a aia tam) tan, LoS mamawh chu Belhchian 8B aṭanga lak tur a ni.

8.6.3 Value Rating. WQv tihfaitu BMP tinin Table 8.3 aṭangin Value Rating (VR) an nei. Site composite VR chu site hmun tin ṭanpuitu BMP-te VR area-weighted average (area zat anga chawhrual) a ni. Treatment train-te chuan Belhchian 8B hnuaiah composite VR an nei. Composite VR chu LoS mamawh a tluk emaw a pel emaw a ni tur a ni.

8.6.4 Value Rating hmuh theihna dinhmun. BMP chuan heng a tlin chauhin a VR a hmu:

  • (a) a tana chhiar area WQv (emaw flow-through device tan Q_wq) tan lian zawng ruat a ni;
  • (b) Clause 8.7 design phut turte, leh infiltration tan Clause 8.8, a tlin; leh
  • (c) Clause 8.5.3 hnuaiah pretreatment a nei.

8.6.5 Tier B kawng awlsam. Tier B area-ah, site WQv zawng zawng chu heng zinga pakhatin a nih chuan Clause 8.6.3 phut tur chu tlin angin ngaih a ni:

  • (a) Bung 4 hnuaiah site-a khawl; emaw
  • (b) Clause 8.7 leh 8.8 hnuaia design bioretention cell, rain garden emaw infiltration facility emaw, pretreatment nen, hmanga tihfai.

Table 8.3 — BMP Value Rating leh Mizoram-a a inhmeh dan

BMP VR (MARC 2012) Pollutant ber la chhuah Tui zat tihtlem / recharge Phai alluvium leh lui kam zawl Laterite / lung khauh Tlang pang 10° chung, shale, colluvium leh lei vur / leihnuai tui sang Mizoram hriat tur
Thing leh hnim pianphung (humhalh) 9.25 A zavai Sang A inhmeh A inhmeh A inhmeh Humhalh, tihbuai loh area chauh chhiar
Rain garden / infiltration 9.0 Bal, metal, hriak, nutrient Sang Inkar 1.0 m a tlin chuan a inhmeh Dinhmun azirin (test) A inhmeh lo Thosi thunun: darkar 48 chhungin tui tihkang
Bioretention 8.5 Bal, metal, hriak, nutrient Laihawl–sang (lined loh); hniam (lined) A inhmeh Underdrain nen a inhmeh Lined, underdrain nen Media hnar leh a phosphorus zat tarlan tur
Permeable pavement 7.5 Bal, metal, hriak Laihawl–sang A inhmeh Dinhmun azirin Lined chauh Run-on-in leidip tam a hruaina hmunah ni lo
Extended detention wetland 7.0 Bal, nutrient, metal Hniam Dinhmun azirin (tui balance) A inhmeh A inhmeh Dil luan lutnaah a ṭha (Clause 7.9.7)
Media / sand filter 6.0 Bal, metal Hniam A inhmeh A inhmeh A inhmeh (lined) Tihfai fo a ngai
Extended wet detention (wet pond) 5.0 Bal, metal, nutrient ṭhenkhat Hniam Dinhmun azirin (tui balance) A inhmeh A inhmeh Thal tui balance (Clause 8.7.8)
Hnim filter strip 5.0 Bal Hniam–laihawl A inhmeh A inhmeh A inhmeh Pretreatment atan ber
Hnim pianphung swale 4.0 Bal, hriak Hniam–laihawl A inhmeh A inhmeh A inhmeh Q_wq chakna sanna hmunah ni lo
Extended dry detention 4.0 Bal lian Hniam A inhmeh A inhmeh A inhmeh Detention nen kawp (Bung 4)
Proprietary / hydrodynamic device 3.0–5.0 Bal lian, hriak, bawlhhlawh A awm lo A inhmeh A inhmeh A inhmeh Test data finfiah aṭanga VR chauh
Signage (vantlang zirtirna) +0.25 — — — — — Composite VR-ah belh

VR column hi MARC/APWA BMP Manual (2012), Table 4.4 aṭanga lak a ni. A inhmeh dan column leh hriat turte hi entirna hmasa chiang a awm lo a, he Kaihhruaina Bu-in a ruat a ni.

Hrilhfiahna. LoS leh VR kalphung hi MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Table 4.2 leh 4.4 aṭanga lak a ni. VR-te hian International Stormwater BMP Database-a effluent TSS concentration innghat tui ṭhatna mark chu tui zat tihtlem, khawsik zawng (temperature), leh hriak leh tui chunga lang thil (floatables) mark-te nen a kawp. Kalphung hi chhan pahnih avangin Mizoram tan a inhmeh. Tui zat tihtlem leh humhalhna, recharge pawh ṭanpuitu, a fak. Tui ṭhatna model tel lovin endiktu (reviewer)-in a endik thei bawk. A chak lohna chu mark-te hi US data aṭanga lak an ni. Mizoram ruahtui hian mark-te innghahna US ruahtui luang aiin bawlhhlawh leh ek tui a tam zawk a keng a (CPHEEO 2019, §9.5), chuvangin he Kaihhruaina Bu hian GPT leh DWF luh tir loh chu hrang takin a phut a (Clause 8.9 leh 8.10), VR-in an aiah a ding a phal lo.


8.7 BMP design tawi

8.7.1 Tlangpui. BMP tin chu a hnuaia phut turte leh Belhchian 8D (BMP design sheet) angin design tur a ni. Zau zawng tarlante hi chhinchhiah a nih hmunah ṭanna value rawt an ni; designer chuan kalsan reng reng a chhan a sawi tur a ni. BMP tin chu Q_wq aia tam tui luang him taka a kal theihna turin design tur a ni a (Clause 8.4.6), enkawlna atan luh theihna (access) a nei tur a ni (Bung 10).

8.7.2 Bioretention leh rain garden (Milem 8.2).

  • (a) Chung lama tui tlin (ponding) thuk zawng chu mulch chungah 300 mm aia tam lo, tui tlin sang ber level-ah overflow (tui luan liamna) nen.
  • (b) Chung lama tui tlin chu darkar 48 chhungin tihkang.
  • (c) Filter media 600–900 mm thuk: fines leh phosphorus tlem engineered sandy loam (Belhchian 8D), 50–75 mm mulch nen.
  • (d) Media hnuaiah transition (choker) layer leh gravel drainage layer.
  • (e) Lei pianphung design infiltration rate (Clause 8.8.4) chu (b) tlin nana mamawh rate aia a hniam chuan, emaw cell chu lined a nih chuan, perforated underdrain (a hnuaia tui luanna pipe kua nei).
  • (f) Lined loh cell-te chuan Clause 8.8 infiltration tehna an tlin tur a ni. Tling thei lo cell-te leh hotspot-a cell-te chu lined tur a ni.
  • (g) Thlai: tui chiah leh thal rei tak pawh tuar thei, ram pianphung emaw ram chhunga ṭo nghet tawh chi.

8.7.3 Hnim swale.

  • (a) Trapezoidal emaw parabolic cross-section, a sir tlang pang chu 1V:3H aia chho lo.
  • (b) A dung lam awn zawng 0.5% aṭanga 4% thleng, a chhoh zawk hmunah check dam nen.
  • (c) Q_wq-a tui luang thuk zawng chu hnim sang zawng aia tam lo, Q_wq-a chakna (velocity) 0.3 m/s aia tam lo.
  • (d) 1% AEP tui luang (emaw bypass) chuan swale a khawh bo loh tur a ni (Bung 9 chakna phal).
  • (e) A dung lam awn zawng 1% aia a hniam hmunah emaw lei hnuai lam tui a luang chhuak ṭha lo hmunah emaw, filter media nen underdrained ("dry") swale.

8.7.4 Hnim filter strip.

  • (a) Sheet flow (lei chunga zau taka luang) chauh dawng, tui luang ṭhenkhawm a lo thlenna hmunah level spreader nen.
  • (b) Tui luan lam dung zawng 5 m tal, awn zawng 1% aṭanga 8% thleng.
  • (c) Bioretention, infiltration leh swale tan pretreatment atan ber hman.

8.7.5 Permeable pavement.

  • (a) Tui luh theih lohna hmun aṭanga run-on chu permeable area let hnih aia tam lo, chhuah loh emaw khawh bo mek emaw area aṭanga run-on reng reng awm lo.
  • (b) Lung tê fai, open-graded aggregate base reservoir, a kua chhungah WQv a chan khawl thei tura lian zawng ruat.
  • (c) Clause 8.8 a tlin hmunah chauh base inhawng (infiltrating); a nih loh chuan underdrain nen lined, chutichuan filtration angin chauh chhiar.
  • (d) Kawng authority standard angin traffic load tana structure design.
  • (e) Hotspot-ah ni lo, chung lam chu tui luh theih loh thil hmanga siam thar a nih tur hmunah ni lo.

8.7.6 Infiltration trench leh basin (Milem 8.3).

  • (a) Dinhmun tinah Clause 8.5.3 hnuaia pretreatment.
  • (b) Trench-te chu lung tê sil fai, test-in a finfiah void ratio nei, hmanga tihkhat, a sir leh a chungah geotextile-a tuam, sand base chungah.
  • (c) Trench tin hnuai thleng observation well.
  • (d) Khawl tui zat = kua chhunga WQv (emaw Bung 4 retention tui zat, a lian zawk chuan); design infiltration rate-ah darkar 72 chhungin tihruak.
  • (e) Lei chung level-ah tui luanna system tenau emaw lian emaw pana overflow.
  • (f) Tui luan khawm area chu tihnghet (stabilise) a nih hma chu hman ṭan loh (Bung 10).

8.7.7 Wet pond (extended wet detention).

  • (a) WQv tal permanent pool (tui reng dil), leh pool chunga WQv extended detention, darkar 24–48 chhunga chhuah.
  • (b) Inlet tinah sediment forebay (Clause 8.5.3).
  • (c) Tui luan kawng dung leh zau ratio 3:1 tal, short-circuiting (tui kal tlang thut) awm lo.
  • (d) Permanent pool thuk zawng 1.0–2.5 m, safety bench nen (Clause 7.9.4).
  • (e) Thal tui balance (Clause 8.7.8).
  • (f) Bung 4 detention khawlna chu extended detention level chungah a awm thei.

8.7.8 Permanent pool tana tui balance. Wet pond leh wetland-te chuan IMD ruahtui tlak leh pan evaporation (tui kang zat) hmanga thla tin tui balance-in, kum 10 zinga kum ro ber chhungin permanent pool tui zat 50% tal (emaw wetland thuk zawng hniam ber) an vawng thei tih lantir tur a ni. Leihnuai tui, in tur tui emaw ek tui emaw hmangin tihkhat belh loh tur a ni. Balance a hlawhchham chuan, a aiah dry extended-detention basin emaw permanent pool tê zawk nei constructed wetland emaw hman tur a ni.

8.7.9 Constructed wetland.

  • (a) Inlet sedimentation pond (forebay), a hnuaiah hnim tui hnuai lam macrophyte zone thuk lo nen.
  • (b) Tui level pangngai chunga WQv extended detention, darkar 24–48 chhunga chhuah, extended detention thuk zawng 0.5 m aia tam lo.
  • (c) Tui luan kawng dung leh zau ratio 3:1 tal, tui luang darh nan tui luan kawng kal tlanga hmun thuk nen.
  • (d) Tuilianin macrophyte zone a khawh loh nan high-flow bypass.
  • (e) Dil (tank) luan lutnaah sak a nih chuan, wetland chu dil setback (tui kam aṭanga hmun kalhlen tur) chhungah, mahse a tui zau zawng (waterspread) pawnah a awm tur a ni a, a khawlna chu dil khawlna angin chhiar loh tur a ni.

8.7.10 Gross pollutant trap.

  • (a) Q_wq tihfai tura lian zawng ruat, 1% AEP thleng tui luang zawng zawng chu dawn tawh thil hruai chhuak lova kal tlang thei.
  • (b) 5 mm vel thleng gross pollutant dawn.
  • (c) Drain hydraulic grade line (Bung 9)-ah head loss tel, screen chu 50% tihtawp (blockage) ngaih nen.
  • (d) Dawn thil khawlna chu O&M plan tihfai inkar hun tan lian zawng ruat, Bung 10-a thla 3 zela tihfaina aia tlem lo.
  • (e) Hip chhuah (suction) emaw grab emaw hmanga tihfai nan motor luh theihna.

8.7.11 Oil-grit separator.

  • (a) Fuel emaw hriak emaw tel Clause 8.8.8 hotspot-ah mamawh: fuel station, motor workshop leh silfaina hmun, bus leh truck depot, leh motor dahna 50 aia tam nei parking area.
  • (b) Q_wq tan lian zawng ruat, high-flow bypass nen.
  • (c) Tihfaina awm chhun atan hman loh tur: site-in VR 5 aia sang a mamawh chuan a hnuaiah filtering BMP a awm tur a ni.

8.7.12 Leidip dawnna leh catch pit.

  • (a) Lei chhuah loh aṭanga ruahtui luang dawng inlet tinah, leh BMP emaw tui awmna emaw-a luang chhuak drain tin inletah.
  • (b) Outlet invert (tui luanna hniam ber) hnuai lamah 300 mm tal thuk sump.
  • (c) Leidip dawnna hi pretreatment chauh a ni a, VR a hmu lo.

Hrilhfiahna. Design tawite hi MARC/APWA BMP Manual (2012), Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) leh PUB Singapore ABC Waters Design Guidelines aṭanga lak an ni. Zau zawngte hi chung manual-te tlangpui an ni a, mahse Mizoram-ah calibrate a la ni lo. Hmun chhunga thil pathumin thu hnar manual aṭanga danglamna an thlen:

  • Thosi. Mizoram-ah dengue a awm reng. Bioretention leh rain garden-a chung lama tui tlin chu darkar 48 chhungin a kang ngei ngei tur a ni (Clause 8.7.2(b)), thosi no (larvae) a lo puitlin hun chhung aia rang fe. Hei hi Clause 8.4.7-a darkar 24–48 WQv drawdown nen a inmil.
  • Thal. Mizoram ruah tam zawk hi April ni 1 aṭanga October ni 31 thleng fûr hunah a sur: CGWB chuan "May aṭanga September tawp lam thleng ruahpui" ("heavy rainfall during May to late September") a chhinchhiah a (Lunglei), kum ruah zinga hlawm lian ber, 16.8%, chu August-in a keng a, a tê ber, 0.4%, chu January-in (Lallawmzuali and Muniyan, 2024), chuvangin November aṭanga March thlenga thla-te hi an ro deuh vek (NEER chhiar dan). Chung thlaah tuikhur-te chuan January aṭanga March thleng "ni khatah liter 3,000 aṭanga 20,000 thleng" ("3,000 to 20,000 liters per day") an la pe (CGWB, Lunglei); Aizawl Urban Area chhungkaw 27.16% chuan ruahtui an hmang a, 1.01% chuan tuikhur tui (master plan), chuvangin in chunga ruahtui khawl leh tuikhur-te hian thal thlaah khawpuite an chawm. Khawpuiah thal thlaa drain, lui emaw dil emaw tui hi ek tui a ni fo, drain-te hian an hruai avangin (Clause 8.9, Hrilhfiahna). Wet pond emaw constructed wetland emaw, a tui balance (Clause 8.7.8)-in a catchment (ruahtui luan khawmna hmun) ngei ruahtui luang hmangin thal thlaah a permanent pool a vawng thei lo chu hman loh tur a ni; tlang chhip khawpuiah, Clause 4.11-in tlang pang leh shale-ah infiltration a khap a, ram zawl a tlem hmunah chuan, a hman theih dan chu underdrain nei lined bioretention, ram awn zawi hmuna swale, hman tura khawlna, leh lined extended dry detention a ni. Clause 8.7.8 hi BMP-te chungah hman a ni a, chungte chu ek tui emaw tuikhur tui emaw hmangin tihkhat belh loh tur a ni; dil, tuikhur, reservoir (tui khuah) leh wetland-te hi Bung 7 hnuaia tui awmna an ni a, hmasawnna hna tana tihfaina atan hman loh tur an ni. Wet pond ro chu tui ding bawlhhlawh dilah a chang emaw bawlhhlawh paihna atan hman a ni emaw ṭhin. Clause 8.7.8 chuan tui balance a phut a, ek tui hmanga tihkhat belh a khap, chu chu khawpui dil "khat" ("full") reng nana tih ṭhin a ni.
  • Bawlhhlawh leh leidip. GPT leh leidip dawnna hi ngai ngei tur angin ngaih an ni, duh thlan mai ni lovin, Mizoram drain-te hian bawlhhlawh leh leidip tam tak an hruai avangin. Screen tana 50% blockage factor hi Bung 6 grate clogging factor nen a inmil.

Oil-grit separator tana motor dahna 50 threshold, GPT dawn lian zawng 5 mm, swale chakna 0.3 m/s leh he Clause-a zau zawng dangte hi entirna hmasa chiang a awm lo a, he Kaihhruaina Bu-in a ruat a ni.

Bioretention cell: cross-section Bioretention cell (rain garden): cross-section, scale ang a ni lo Hmun chhuah Pretreatment: hnim strip emaw forebay drain-ah tui tlin ≤ 300 mm filter media 600–900 mm overflow crest =tui tlin sang ber mulch 50–75 mm engineered sandy-loam media (fines leh phosphorus tlem) transition (choker) layer gravel drainage layer perforated underdrain (a ngai chuan) Hun bik-a leihnuai tui sang ber (fûr hnu) ≥ 1.0 m, lined loh chuan(infiltration nei) Lined version (infiltration a awm lo): gravel layer hnuaiah impermeable liner. Pollution hotspot-ah phut a ni a, fûr hun leihnuai tui sang ber thleng inkar 1.0 m tlin theih loh hmun apiangah pawh. Lenzawng chu Clause 8.7.2-a ruat angin.

Milem 8.2 — Bioretention cell (rain garden) cross-section: pretreatment, chung lama tui tlin, filter media, transition leh gravel layer, underdrain, overflow, leh lined loh cell tan hun bik-a leihnuai tui sang ber thleng inkar 1.0 m. He Kaihhruaina Bu tana milem siam thar, MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, leh CIRIA, The SuDS Manual (C753), 2015 aṭanga siam danglam.


8.8 Infiltration leh recharge tehna

8.8.1 Leihnuai tui inkar. Infiltration facility chu hun bik-a leihnuai tui sang ber chu facility hnuai aṭanga 1.0 m tal hnuaia a awm hmunah chauh phal a ni. Mizoram-ah hei hian bihlam (exception) a nei lo, tuifinriat kam sand area a awm loh avangin (Clause 8.8.9). He Clause tan hun bik-a leihnuai tui sang ber chu April aṭanga November thlenga level sang ber hmuh a ni a, chu chuan April ni 1 aṭanga October ni 31 thleng hun leh a hnu thla khat a huam (Clause 3.10.2). Mizoram-ah hetah Clause 4.11 dan pahnih leh he Kaihhruaina Bu tuikhur dan a ngai a, Clause 8.8.1 hi heng nen hman a ni. (i) Tlang ramah infiltration a awm lo (Clause 4.11, tlang dan: hill rule). Infiltration kalphung tum taka siam (soakaway, soak emaw percolation pit, recharge pit, shaft emaw well, infiltration trench, lined loh bioretention, emaw a hnuai tui chhuak thei permeable paving) reng reng hi 10° aia awn ram pianphung chungah; Surma group shale, siltstone emaw mudstone chungah, awn zawng eng pawh ni se; colluvium, lei vur, lei laih bal emaw leimin bal (slide debris) chungah, awn zawng eng pawh ni se; map-a lang Moderate, High emaw Very High leimin hlauhawm zone-ah; emaw lei laih pang (cut slope) emaw retaining wall emaw chung lamah, cut emaw wall emaw sang zawng let hnih chhungah sak emaw chhiar emaw loh tur a ni — thiamna nei geotechnical engineer emaw engineering geologist emaw geotechnical certificate-in tui belh chuan tlang pang a tihnghet lo loh tih a lantir loh chuan; High emaw Very High leimin hlauhawm zone-ah chuan certificate eng pawh pe se, engtikah mah phal a ni lo. Bokabil leh Bhuban unit tlang chhipte hi "tui luh theihna leh infiltration hniam" ("characterized by low permeability and infiltration") a, "ruahtui luang chhuahna zone" ("run off zone") angin an awm (CGWB), "shale leh siltstone awmna lithological unit-te hi sandstone unit khauh leh nghet aiin leimin a tlak theih zawk" ("Lithological units comprising shale and siltstone are more susceptible to landslide than the hard and compact sandstone unit") (MIRSAC). Chutiang site-ah chuan in chung ruahtui luang chu Bung 4 hnuaia chhiar ruahtui khawlnaah a kal a, a luan liam leh ruahtui luang dang zawng zawng chu lined drain hmangin, leidip dawnna leh energy dissipator (tui chakna tihnemna) kal tlangin, lui kawng pianphung nghetah a kal a, tlang pang veng loah engtikah mah a kal lo; Clause 8.11.3(c)-a in chung tui bihlam chu hetah hman a ni lo, retention emaw WQv emaw-ah infiltration reng reng chhiar a ni lo. A innghahna chu Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 tum sawina clause, "tlang panga leihnuai tui lut zat tihpun, leh sewerage leh tui luanna chu thunun ṭha lova tlang pangah paih" ("increasing the amount of groundwater penetrating into slopes, and disposing of sewerage and drainage onto slopes in a poorly controlled manner") chu "tlang pang nghet lohna a tipung nasa thei" ("can greatly increase slope instability") mihring thiltihte zinga a tarlanna, a regulation 27 (lei hnuai tui luanna "nghetna atana a ngai angin" ("as necessary for stability")) leh regulation 26 ("leihnuai tui, tuikhur ang chi" ("subsurface water, such as springs") thununna), leh Roadmap to Stability (2014), "Aizawl City chhunga septic tank, leach field leh soak pit zawng zawng" ("all septic tanks, leach fields and soak pits within Aizawl City") paih bo tura ngentu, an ni. Aizawl Municipal Corporation Building Regulations, 2012 regulation 33 chuan water closet tin tan "septic tank a tawk zawng soak pit nen" ("a septic tank of appropriate capacity with soak pit") a phut a, chu chu hlauhawm tlang pangah Roadmap-in paih bo a duh kalphung a ni: he Kaihhruaina Bu hian soak pit-ah ruahtui a dah lut lo a, chu chu a sawi chiang; regulation 33 chu a thlak lo. (ii) Phai alluvium leh lui kam zawl test tawhah chauh recharge (Clause 4.11, recharge dan: recharge rule). Mizoram-ah recharge hi design tum a ni lo: State hian 2011-ah a leihnuai tui 3.52% a hmang a (CGWB), 2024 chhutnaah 3.95%, unit 26 chhut zawng zawng Safe an ni (thu hnar ang), "leihnuai tui hmasawnna thunun tura notify area" ("Areas Notified for Regulation of ground water development") chu "a awm lo" ("NIL") a ni (CGWB). Recharge tum taka siam chu phai alluvium leh lui kam zawl test tawh (Champhai phai, leh Tlabung, Bairabi leh Vairengte-a leh Tlawng kama lui kam zawlte) chungah chauh, tlang pang aṭanga hla, 1% AEP tuilian sang zawng chunga 10° emaw a aia hniam ram zawlah, pretreatment, Clause 8.8.3 field test, lei chung aṭanga 2.0 m tal hnuaia hun bik-a leihnuai tui sang ber leh he Clause inkar nen phal a ni; 1% AEP tuilian sang zawng hnuaia phai ramah, dil Zone 1 emaw Zone 2 emaw-ah (Bung 7), tuikhur aṭanga 15 m chhungah, emaw leihnuai tui chu lei chung aṭanga 2.0 m chhunga a awmna hmunah engtikah mah phal a ni lo, CGWB-in tui "lei chung aṭanga 2.0 m hnuai chhungah" ("within 2.0 m below ground level") a hmuhna phai dil tê-ah ang hian (Lunglei). Mizoram Water Resources (Management and Regulation) Act, 2024 chuan IWRD chu "leihnuai tui recharge tihpun nan ruahtui khawl khawm tihchak" ("promote rain water harvesting to augment ground water recharge") tur a ti a (s.14(1)(b)(viii)), WARDMA chu "ruahtui khawl khawm telin tui humhalh leh leihnuai tui recharge" ("water conservation and groundwater recharge, including rain water harvesting") thupek turin a phal (s.16(2)(ix)); tlang ramah he Kaihhruaina Bu hian a pahnih hi recharge ni lovin khawl leh hman nawn angin a chhiar a, chu chu a sawi chiang. (iii) Tuikhur: tuikhur dan (spring rule). Ruahtui outfall, soakaway emaw drain tui chhuahna reng reng tuikhur aṭanga 15 m chhungah a awm lo; ruahtui chu tuikhur-ah emaw a chung lam tlang pang hnaih berah emaw kal tir a ni lo; drain, lei laih emaw lei vur emaw reng rengin tuihna lam tui luang a dang lo, a chhuahna a phum lo emaw a kal tlang lo; leh tui lakna hmun chunga tuihna catchment, hydrogeologist-in a map angin, chu humhalh catchment a ni a, chutah chuan kal nan chauh lo chu chhuah a awm lo, kawng ruahtui luang leiah luh tir a ni lo, soak pit emaw septic tank emaw dah a ni lo. 15 m hi regulation 33-in septic tank emaw soak pit emaw leh "tui hnar" ("a water source") inkara a vawn 15 m chungah he Kaihhruaina Bu-in a ruat a ni; a innghahna chu 2024 Act hnuaia Village leh Local Water Resources Committee-te mawhphurhna "tui hnar hriat tawhte bawlhhlawh laka veng" ("Prevent pollution of identified water sources"), a "khawtlang tui hnar" ("community water resources")-ah tuikhur a tel (s.2(1)(i)), leh Village Council-te mawhphurhna "khaw chhunga tui hnar humhalh" ("Conserve water resources within the village area") (Mizoram (Village Councils) Act, 2025, s.14(6)) an ni. (iv) Ṭhat zawng. Lung laihna (quarry), lung laihna bal, industry hmun emaw motor kal nasa kawng emaw aṭanga ruahtui luang reng reng recharge structure-ah luh tir a ni lo, phai alluvium chunga recharge well emaw shaft emaw chu in chung tui emaw filtering BMP kal tlang tawh ruahtui luang emaw tan chauh hman a ni, hydrogeologist report-in tui thuk zawng, tui dawngtu zone, leh m 30 chhunga in tur tui well, tuikhur emaw tui lakna emaw a tichhe lo tur tih a finfiah hnuah. 10° threshold, shale dinhmun, wall sang zawng let hnih hlat zawng, 2.0 m ri, tuikhur dan leh heng dinhmunte hi he Kaihhruaina Bu-in a ruat a ni; Mizoram dan reng rengin infiltration khapna awn zawng emaw lei emaw a ruat lo (Site Development and Slope Modification Regulations, 2017-a 24° chuan engineered site development a thlen tir a, infiltration ri a ni lo). Hun bik-a leihnuai tui sang ber chu Clause 3.10.2 hnuaiah ruat tur a ni.

8.8.2 Inkar dang. Infiltration facility hnuai chu lung bul (bedrock) emaw tui luh theih loh layer reng reng emaw chungah 1.0 m tal a ni bawk tur a ni, facility chu Clause 8.8.10 hnuaiah lung keh emaw lung tawih (fractured or weathered rock) aquifer recharge tura design a nih loh chuan.

8.8.3 Infiltration test. Infiltration rate chu facility hnuai level rawtah teh tur a ni:

  • (a) basin, bioretention leh permeable pavement tan double-ring infiltrometer test (ASTM D3385) hmangin;
  • (b) trench, soakaway, recharge pit leh recharge well tan falling-head borehole emaw trial-pit soakage test (entirnan BRE Digest 365) hmangin;
  • (c) facility tinah test 2 tal, leh infiltration hnuai area m² 100 tinah emaw trench dung m 50 tinah emaw test 1 tal; leh
  • (d) geotechnical test thiam mi-in, a rah chhuah chu Infiltration Test Record (Form 8-2)-ah report.

Thal laia test chu test hun laia leihnuai tui level leh Clause 8.8.1 fûr hun level sang ber nen report tur a ni.

8.8.4 Design infiltration rate. Design infiltration rate chu teh rate chu safety factor-a ṭhen a ni:

  • (a) test-te chuan Clause 8.8.3(c) an tlin a, a rah chhuahte chu factor 2 aia an danglam loh chuan 2.0; leh
  • (b) a nih loh chuan 3.0.

8.8.5 Rate hniam ber.

  • (a) Design rate chu 13 mm/h tal a nih chauhin infiltration kim (underdrain tel lo).
  • (b) Design rate chu 3 mm/h aṭanga 13 mm/h thleng a nih chuan, underdrain nen, infiltration ṭhenkhat. Darkar 72 chhunga lei-a lut tui zat chauh retention angin chhiar a ni.
  • (c) Design rate chu 3 mm/h aia a hniam chuan infiltration chhiar a ni lo.

8.8.6 Infiltration facility tana setback. Kawng, motor dahna emaw hmun chhuah dang aṭanga ruahtui luang dawng infiltration facility-te chu heng tal an ni tur a ni:

  • (a) in bul (foundation) aṭanga 3 m, leh basement aṭanga 5 m;
  • (b) ram ri aṭanga 1.5 m, a ṭhenawm-in ziaka a remtih loh chuan;
  • (c) in tur tui well emaw borewell aṭanga 30 m;
  • (d) septic tank emaw soak pit aṭanga 15 m; leh
  • (e) 1V:3H aia chho tlang pang chhip aṭanga 6 m, geotechnical report-in tlang pang a nghet reng tih a lantir loh chuan.

In chung ruahtui luang chauh recharge structure-a kal chu (a) leh (b) chauh leh Clause 8.11.3 hnuaiah a awm.

8.8.7 Drawdown leh finfiahna. Infiltration facility tin chu design rate-ah darkar 72 chhungin a ruak tur a ni (Bung 4), sak zawh hnuah test tur a ni (Clause 10.9.3).

8.8.8 Hotspot. Heng aṭanga ruahtui luang hi tihfai lovin lei-a luh tir loh tur a ni a, (d) emaw (e) emaw a huam hmunah engtikah mah lei-a luh tir loh tur a ni:

  • (a) fuel station;
  • (b) motor workshop, silfaina hmun, leh bus leh truck depot;
  • (c) thil hlauhawm hman emaw dahna industry hmun leh thil phurh chhuahna hmun;
  • (d) bawlhhlawh sawn chhuahna station leh landfill area; leh
  • (e) tihbawlhhlawh tawh nia hriat emaw rinhlelh emaw ram.

(a) aṭanga (c) thleng tana tihfaina chuan infiltration reng reng hmaah oil-grit separator leh lined filtering BMP a tel tur a ni.

8.8.9 Tuifinriat kam sand aquifer. He Clause hi tuifinriat kam sand aquifer chungah chauh hman a ni. Mizoram-ah pakhat mah a awm lo, chuvangin State-ah he Clause hian nghawng a nei lo; Clause number-te a danglam loh nan chauh vawn a ni. Champhai phai alluvium leh Tlabung, Bairabi leh Vairengte-a leh Tlawng kama lui kam zawlte hi tuifinriat kam sand area an ni lo: chutah chuan Clause 8.8.1 hi a zavaiin, Clause 4.11 recharge dan nen, hman a ni a, item (d)-a inkar tihtlem chu hman a ni lo. Tuifinriat kam sand area-ah:

  • (a) Clause 8.8.1 a tlin hmun apiangah infiltration hi retention leh WQv tihkimna kawng duh zawk ber a ni;
  • (b) ruahtui drain-te hi leihnuai tui sang zawng tihhniam tura design loh tur a ni: hun bik-a leihnuai tui sang ber hnuaia invert-te chu tui put chhuak thei lo (watertight) an ni tur a ni, leihnuai tui outfall-a chhuahtu weep hole emaw subsoil drain emaw nei lovin, hydrogeological report-in tui thianghlim aquifer a tichhe lo tih a lantir loh chuan;
  • (c) leihnuai tui ruahtui drain-a hun rei tak pump luh (entirnan basement tui pump chhuah) reng reng phalna pek loh tur a ni; leh
  • (d) notify a nih tuifinriat kam sand area-ah, in chung ruahtui luang chauh chu hun bik-a leihnuai tui sang ber thleng 0.5 m aia tlem lo inkar nen lei-a luh tir phal a ni, groundwater mounding check-in mound chu facility hnuai aṭanga 0.3 m tal hnuaiah a awm reng a, a bula in bul emaw basement emaw a thleng lo tih a lantir chuan. Ruahtui luang dang reng reng hian he inkar tihtlem hi hman phal a ni lo;
  • (e) inkar 1.0 m emaw clause (d) emaw tlin theih a nih loh chuan, site chuan lei hnuaia lut lo leilung chung retention (entirnan hnim nei hmun hniam thuk lo, in chung tui hnim chunga luan tir, leh hman nawn) leh Bung 4 hnuaia detention a hmang tur a ni.

8.8.10 Laterite leh lung khauh area. Laterite leh lung khauh ramah (entirnan Surma group sandstone khauh leh nghet leh tlang chhipte Barail sandstone, leihnuai tui chu lung keh, lineament leh lung tawih zone-ah awm a, tuikhur angin a chhuahna (CGWB); heng area-a tlang pang reng rengah Clause 8.8.1 hnuaiah Clause 4.11 tlang dan hi a hmasain hman a ni, chuvangin he Clause hian tlang pang aṭanga hla, test tawh ram zawlah chauh nghawng a nei):

  • (a) test-te chu facility hnuaiah, chung lama lei khauh (crust emaw hardpan) hnuaiah tih tur a ni;
  • (b) lung tawih emaw lung keh-a recharge chu in chung ruahtui luang emaw filtering BMP kal tlang tawh ruahtui luang emaw tan chauh phal a ni, lung keh hian tihfaina tlem te chauh a pek avangin; leh
  • (c) tlang pang chunga emaw a chung lama infiltration chu tlang pang nghet dan endik tur a ni.

8.8.11 Delta clay leh black cotton soil. Surma group Bokabil leh Bhuban unit-te shale, siltstone leh mudstone-ah, CGWB-in "tui luh theihna leh infiltration hniam lutuk" ("very low permeability and infiltration") nei a tih, dil leidip khat chhungte, reservoir kamte, leh tlang ram colluvium, lei vur, lei laih bal leh leimin bal leidip tamte-ah, leh black cotton soil pawng thei (expansive)-ah:

  • (a) infiltration facility-te hi Clause 8.8.5 an tling lo fo ang a, soil survey (Bung 3)-in HSG D a lantir hmunah test a ngai lo; leh
  • (b) lei pawng thei chunga in bula infiltration hman a nih chuan, Clause 8.8.6(a) setback chu let hnih a ni tur a ni.

Hrilhfiahna. Leihnuai tui inkar 1.0 m hi he Kaihhruaina Bu phut tur bul ber a ni. He Clause-a value dangte (lung bul inkar 1.0 m, test zat, safety factor, rate hniam ber leh setback) hi US leh UK hmanna tlangpui an ni a, Mizoram entirna hmasa an nei lo. Clause 8.8.6(c)-a well setback hi hmun chhuah aṭanga ruahtui luang chungah hman a ni a, in chung tui chungah a ni lo. Mizoram RWH hmanna chuan in chung tui chu well inhawng leh recharge well-ah a luan tir a, Clause 8.11 chuan chu hmanna chu a vawng.

Mizoram tan hydrologic soil group map, infiltration rate teh, emaw State hmun reng renga curve-number calibration emaw hmuh a ni lo [TBC]. "Geology lamah chuan, State hi Tertiary hun lai sedimentary lung, anticline leh syncline inzawm zela tihkawi nghet tawh chungah a innghat" ("Geologically, the State is underlain by sedimentary rocks of Tertiary age, which have been tightly folded in a series of anticlines and synclines") (CGWB, State profile): Surma group shale, siltstone leh sandstone, hmun ṭhenkhatah Barail sandstone nen. Bokabil shale "tlang chhip hniam dung" ("low linear ridges") hi "tui luh theihna leh infiltration hniam an ni. Ruahtui luang chhuahna zone angin a awm" ("characterized by low permeability and infiltration. It acts as run off zone"), leh Lunglei "district deuh zawng zawng luahtu tlang chhip sang laihawl dung" ("moderate linear ridges which occupy almost the entire district"), Bhuban group inthlak chhawngte, hian "tui luh theihna leh infiltration hniam lutuk an nei a, ruahtui luang chhuahna zone angin a awm" ("very low permeability and infiltration and acts as run off zone"); tlang lei chu "tlang pang chhoh tak zawha colluvial lei" ("colluvial soil, formed along the steep side slopes") a ni a, "ruahtui tam ber chu lei chunga ruahtui luang angin a luang chhuak" ("Most of the rain water flows out as surface run-off") (CGWB, Lunglei booklet). Leihnuai tui hi tuikhur aṭanga lak a ni deuh vek: "Mizoram hi tuikhur awmna a ni" ("Mizoram is an abode of springs") (CGWB), chungte chu "lung ṭhenna, lineament leh lung chhe bal ang zone chak lo" ("weak zones such as fractures, lineaments and weathered residuum") aṭanga lo chhuak a, January aṭanga March thleng "ni khatah liter 3,000 aṭanga 20,000 thleng" ("3,000 to 20,000 liters per day") an pe (CGWB, Lunglei). State hian 2011-ah a leihnuai tui 3.52% a hmang a (CGWB), 2024 chhutnaah 3.95%, unit 26 chhut zawng zawng Safe an ni (thu hnar ang), Lunglei-ah "leihnuai tui hi in tur atan chauh hman a ni" ("Ground water is used for drinking purpose only"), "leihnuai tui lak chhuah a tlem avangin" ("due to lack of ground water abstraction") tui level inthlak dan hmuh theih a ni lo (CGWB, Lunglei). Lei-a dah lut tui hi hlauhawmna a ni a, thil ṭangkai a ni bawk: tlang chhipah Aizawl-a 30° aṭanga 45° thleng tlang pangah lei leh shale tawih chhunga tui nekna a tisang a (NEER chhiar dan), Serchhip khawpui 89% vel hi 30° aiin a chho zawk (MIRSAC, NEER chhutna); SD&SM 2017 tum sawina clause chuan "tlang panga leihnuai tui lut zat tihpun" ("increasing the amount of groundwater penetrating into slopes") hi nghet lohna chhan zingah a tarlang a, Directorate of Geology and Mining chuan 2022-23-a leimin lian a zirchian ṭhena thum ṭhena hnih chu "tui luanna ṭha lo" ("improper drainage") avangin a ti (chanchin tlangzarh angin). He Kaihhruaina Bu soil group hman rih turte hi heng aṭanga lo chhuak an ni: shale, siltstone leh mudstone tlang chhip D, sandstone tlang chhip C (tawih loh hmunah D), colluvium a hydraulics-ah C mahse a nghet lo, phai alluvium leh lui kam zawl B aṭanga C thleng, leh khawpui lei vur leh lei laih bal D (Bung 3), a pakhat zelin site test hmanga finfiah tur. Chuvangin State hian dan pakhat ni lovin dan pahnih leh tuikhur dan a mamawh (Clause 4.11; Clause 8.8.1). Phai alluvium leh lui kam zawl test tawhah chuan, pretreatment nen, recharge phal a ni, mawhphurhna ni lovin duh thlan angin, leihnuai tui a tlakchham loh avangin. Tlang ramah, shale-ah, colluvium leh lei vur-ah leh leimin hlauhawm zone-ah chuan, tlang dan hnuaiah, tum takin lei-a tui dah lut a ni lo. Tuikhur tin vel leh a catchment-ah, tuikhur dan hnuaiah, ruahtui chhuah a ni lo. Hmun tinah, kawng leh ram ruak aṭanga ruahtui luang chu leilung chung system-ah a kal a, recharge well, borewell emaw shaft emaw-ah direct-in engtikah mah a kal lo (Clause 8.11.3(b)). Clause 8.8.9 hian Mizoram-ah nghawng a nei lo, tuifinriat kam a awm loh avangin.

Infiltration trench: leihnuai tui inkar nena cross-section Infiltration trench: cross-section, scale ang a ni lo Hun bik-a leihnuai tui sang ber (fûr hnuah teh) In tur tui well Sediment sump (pretreatment) Ruahtui luang lut Observation well overflow aggregate sil fai (void ratio test aṭangin) a sir leh a chungah geotextile sand filter base ≥ 1.0 m In in bul in bul setback well setback Hnuai level rawtah infiltration test rawh. Design rate = teh rate ÷ safety factor. Darkar 72 chhungin a ruak tur a ni. Setback hlat zawng leh test kalphung: Clause 8.8.3–8.8.6. Kawng leh motor dahna ruahtui luang chu well-ah engtikah mah pipe a ni lo. Tuifinriat kam sand lei: rate sang, leihnuai tui hnai. Laterite, lung khauh: rate hniam. Delta clay: a tlangpuiin a inhmeh lo.

Milem 8.3 — Infiltration trench cross-section: pretreatment sump, geotextile-a tuam aggregate-a tihkhat trench, observation well, overflow, hun bik-a leihnuai tui sang ber thleng inkar hniam ber 1.0 m, leh well leh in bul aṭanga setback. He Kaihhruaina Bu tana milem siam thar, Georgia Stormwater Management Manual, 2016 (Vol 2), leh CIRIA, The SuDS Manual (C753), 2015 aṭanga siam danglam.


8.9 Ek tui cross-connection leh ruah sur lohna hun tui luang

8.9.1 Ruahtui drain-ah ek tui a awm lo. Ek tui emaw sullage (chaw suangna, inbualna leh silfaina aṭanga tui bal) emaw, septic tank tui chhuak emaw, sumdawnna tui bal (trade effluent) emaw chu pipe, tui kawng emaw kawng kua reng reng hmangin ruahtui drain reng rengah zawm emaw luan tir emaw loh tur a ni.

8.9.2 Phalna dinhmun. Completion certificate hmaah, dilna thehluhtu (applicant) chuan Authority emaw sewerage agency emaw-in an hmuh laia dye emaw meikhu emaw test hmangin, site-a ek tui leh sullage chhuahna tin chu sewer emaw site-a system phalna pek emaw-ah a luang a, pakhat mah ruahtui drain-ah a luang lo tih a lantir tur a ni. Site-a cross-connection awm sa reng reng chu phalna dinhmun angin paih tur a ni, siam ṭhatna leh in awm sa belhnaah pawh.

8.9.3 Sewer a awm lohna hmunah. Sewer a awm loh chuan, ek tui leh sullage chu site-a emaw decentralised emaw tihfaina system phalna pekah a kal tur a ni. Chutiang system tihfai tawh tui chhuak chu Mizoram Pollution Control Board (MPCB) leh drain neitu ziaka remtihna nen chauh ruahtui drain-ah luan tir phal a ni.

8.9.4 Vantlang drain: DWF survey. Tier A area-a ULB tinin tui awmna pana an ruahtui drain outfall-te chu kumtin vawi khat tal, fûr hma (pre-monsoon)-ah, ruah sur lohna hun tui luang tan survey tur a ni a, heng hi chhinchhiah tur a ni:

  • (a) DWF nei outfall-te;
  • (b) DWF rate chhut; leh
  • (c) tracing, CCTV, dye emaw meikhu test hmanga chung lama hnar hmuhte.

A rah chhuahte chu Clause 10.17 register-ah tlangzarh tur a ni.

8.9.5 DWF interception. Hnarte paih an nih hma chu, DWF hruai tui awmna pana outfall tinin heng DWF interceptor hi an nei tur a ni:

  • (a) DWF chu sewer emaw tihfaina plant emaw-ah a peng tir;
  • (b) thil thleng tenau emaw lian emaw (Bung 6) tan ruahtui drain tui luan tir theihna a tihtlem lo, a weir emaw diversion head loss-te chu hydraulic design (Bung 9)-ah tel;
  • (c) diversion hmaah screen a nei; leh
  • (d) hnar zawmnate paih aiah a ding lo.

8.9.6 Ek tui luan liam (overflow). Ek tui overflow thar, emergency bypass emaw pumping station overflow emaw reng reng ruahtui drain emaw tui awmna emaw-a luang chhuak tura design loh tur a ni, sewerage agency-in kawng dang a awm lo tih a lantir loh chuan, chutichuan screening nen leh overflow lo thlen fo zat tarlan nen chauh.

Hrilhfiahna. Ek tui zawmna khapna leh phalna dinhmun anga cross-connection awm sa paihna hi he Kaihhruaina Bu phut tur bul an ni a, Clause 1.10.3 chuan variance a phal lo. Ruahtui drain-a ek tui hi Mizoram khawpui tui luanna tui ṭhatna harsatna lian ber a ni. He Bung-a hmalakna dang zawng zawng a tihlawhchham: ruahtui tana design BMP-te an phur rit lutuk a, GPT-te bal hnawngin an khat a, tui dawngtu dil leh tui kawngte ek tui dil an chang. CPHEEO (2019) chuan India drain-te hian mihring ek leh zun an hruai tih a tarlang (Part A §9.5). DWF interception (Clause 8.9.5) hi hmalakna hman rih tur a ni. Hnarte zawn chhuah leh paih an nih laiin tui awmna a veng a, mahse hnar hna tih a nih loh chuan a nghet reng thei a, chu vang chuan Clause 8.9.4 kumtin survey leh tlangzarhna phut a ni. Kumtin survey hi he Kaihhruaina Bu-in a ruat a ni.

Mizoram-ah ruahtui drain-te hi sewer an ni. "Sewerage system a awm loh avangin, mipuiin septic tank leh soak pit an hmang. Hmun tam takah ek tui chu tihfai lovin drain khuh lo-ah luan tir a ni a, a tawpah luipui-ah a luang lut" ("In absence of sewerage system, people are using septic tanks and soak pits. In most of the places sewage is discharged into open drains without any treatment, which ultimately gets discharged to rivers"); "sullage (chaw suangna leh inbualna tui bal) chu drain-ah luan tir a ni a, chu chuan a tawpah tui thianghlim hnarte a tibawlhhlawh" ("the sullage (i.e. kitchen and bathroom waste) is discharged into drains which ultimately pollutes the fresh water sources"); leh septic tui chhuak chu "drain leh cross drain hmangin tui pekna hnar luipuiah" ("through drains and cross drains to the rivers, which are the sources of water supply") a thleng (Master Plan for Aizawl: Vision 2030). State hian a ek tui chu 51.81 MLD (khawpui 31.37 MLD leh khaw lam 20.44 MLD) a ti a, chu zinga 16.34 MLD chu Aizawl district khawpui ek tui a ni a, "Tihfaina hmanrua awm sa" ("Existing Treatment Facilities") 10 MLD "Aizawl khawpui tan chauh" ("only for Aizawl city") nen khaikhin chuan (O.A. 606/2018-ah National Green Tribunal hnena Mizoram sawrkar report, August ni 31, 2025 dinhmun anga table): Chite (Bethlehem Vengthlang)-a 10 MLD sequencing batch reactor plant pakhat, SIPMIU-in a sak, a trial run February ni 6, 2021-a ṭan, chhungkua 3,033 zawm nen (O.A. 593/2017 leh 673/2018-a MPCB report). Plant hian catchment pakhat a ṭanpui: chhungkaw zawmna 5,207 leh sewer km 45.95 report a ni (2025 report aṭanga thu hnar ang); PHED bio-digester (3.35 MLD) leh khawtlang soak pit (3.2 MLD)-in a dang ṭhenkhat an la; SBM-U hnuaiah sewage treatment plant 23 (27 MLD) leh faecal sludge treatment plant 23 (0.33 MLD) ruahman a ni a, AMRUT 2.0 sewerage leh septage project ₹39.22 vbc (chhiar a ni) report a ni; leh "tlang ram topography danglam avangin, Grey Water tihfai hi harsatna lian tak a la ni" ("Due to peculiar topography of the hilly regions, treatment of Grey Water remains a huge challenge") (O.A. 606/2018 report). CPCB 2025 list chuan Mizoram lui chhung pali chu tihbawlhhlawh luipui zingah a tarlang: Chite lui "SIPMIU STP bul aṭanga Armed Veng thleng" ("near SIPMIU's STP to Armed Veng") Priority II-ah, BOD 29 mg/L nen; Reiek Kai-a Tuikual lui Priority II-ah, chunglamah 29.1 mg/L leh PHE water-treatment plant bula hnuailamah 5.5 mg/L nen; Lawibual lui Priority III-ah (14.3 mg/L); leh Tuipui Priority V-ah (5.6 mg/L); 2018 list-a Tlawng, Tiau, Tuivawl, Mat, Saikah leh Tuirial lui chhungte chu paih an ni (CPCB, 2025). CPCB "Tuikual stream" hi master plan-in Aizawl "lui tichhe nasa ber" ("worst destructive streams") zinga a chhiar Tuikual lui a ni em tih hi NEER chhiar dan, finfiah tur a ni. Site dan-te chuan ek tui leh ruahtui an kawp tlang: Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations, 2017 regulation 27 chuan "lei chunga ruahtui luang, ek tui, in chhunga tui bal leh septic system aṭanga tui zuang thunun theihna" ("that provide for control of surface runoff, sewage, sullage and seepage from septic systems") drainage plan a phut a, hnuai lama site siam chuan "chung lama site bul aṭanga tui luanna, ek tui emaw tui chiar emaw a luan tir tur a ni" ("shall convey drainage, sewage or seepage from the adjacent site uphill"); he Kaihhruaina Bu hian a ṭhen hrang. Dan anga innghahna chu Mizoram Municipalities Act, 2007 section 298 a ni a, chu hnuaiah Municipality chuan "ruahtui leh lei hnuaia tui bawlhhlawh lo dang aṭanga hran takin drainage emaw ek tui leh thil bawlhhlawh dang tan ruahmanna hran siam" ("require separate provisions to be made for drainage or sewage and other offensive matters as distinct from rain-water and other unpolluted sub-soil water") a phut thei. Chuvangin Mizoram-ah: (i) CPCB list-a lui (Chite, Tuikual leh Lawibual lui leh Tuipui) pana, dil pana, emaw tuikhur catchment chhunga ruahtui drain outfall tin chu Clause 8.9.4 survey-in a hruai lo tih a lantir hma chu ruah sur lohna hun tui luang hruai angin ngaih a ni a, tui a thlen hmaah, leh detention emaw infiltration emaw hmanrua reng reng hmaah, Clause 8.9.5 hnuaia DWF interceptor leh screen a nei; (ii) he Kaihhruaina Bu hnuaia phalna pek site tinah ruahtui leh sullage chu hrang takin khawn khawm a ni a, a pakhat zelin ram riah an inspection chamber hnuhnung ber an nei, chutichuan ruahtui drain hran sak a nih hunah hna nawn lovin site chu zawm theih a ni a, septic tank overflow, soak-pit overflow emaw sullage pipe emaw reng reng ruahtui drain-ah zawm a ni lo (Clause 6.3.6(a), 8.9.1 leh 8.9.2), Act section 298 innghahna nen; (iii) Moderate, High emaw Very High leimin hlauhawm ramah, 10° aia chho tlang pangah emaw shale-ah emaw sullage emaw in chung tui emaw lei-a dah lut a ni lo (Clause 4.11, tlang dan), ruahtui outfall, soakaway emaw drain tui chhuahna reng reng tuikhur aṭanga 15 m chhungah a awm lo (tuikhur dan, Clause 8.8.1); leh (iv) sewer a awm hma chu, khaw pakhat drain-te drain dawngtu emaw lui emaw chu tui kawng kawp (combined channel) angin design a ni: ruahtui luang tan ang bawkin thal hunah bal hnawng a che reng theihna chakna tan, a zawh zelah tihfai nan luh theihna nen, leh in bula a kal tlanna hmunah khuhna emaw screen emaw nen, rim leh hriselna hlauhawmna avangin (Clause 6.3.6(d)). Interceptor tin chu a drain ruah sur lohna hun tui luang teh aṭangin lian zawng ruat a ni a, thil thleng tenau leh lian tana drain tui luan tir theihna a tihtlem lo (Clause 8.9.5(b)), a theihna chunga ruahtui luang chu drain-ah a luan tir zel; tuilian laia lungpui leh leimin bal hruai lui chhuk takah chuan, amah leh a chamber chu lui 1% AEP level chungah dah a ni emaw, chu tuilian khawhna leh bal laka veng a ni emaw (Bung 9). Heng dinhmunte hi he Kaihhruaina Bu-in a ruat a ni.


8.10 Tui awmna pana outfall: first flush, gross pollutant trap leh screen

8.10.1 Phut tur. Tui awmna pana ruahtui drain outfall thar tin, leh drain siam thar, tihzau emaw tihsei emaw chunga outfall awm sa tin chuan heng hi an nei tur a ni:

  • (a) Clause 8.7.10 hnuaia design GPT; leh
  • (b) first-flush tihfaina: tui luan khawm catchment WQv (emaw Q_wq) chu Clause 8.7 BMP-te hmangin, tui luan khawm site-ah emaw outfall-ah emaw tihfai.

8.10.2 Outfall-a tihfai theih loh hmunah. Vantlang outfall-ah ram a awm loh chuan, first-flush tihfaina chu heng hmangin pek phal a ni:

  • (a) Q_wq tana lian zawng ruat proprietary first-flush emaw hydrodynamic device; emaw
  • (b) tui awmna setback (Clause 7.5.1(b)) chhunga, tui zau zawng (waterspread) pawna treatment wetland emaw forebay.

8.10.3 Screen leh trash rack. Outfall, culvert inlet leh pump sump-a screen-te chu:

  • (a) hydraulic theihna tan 50% tihtawp nen design tur a ni;
  • (b) screen tawp vek chuan ram (property)-ah tuilian a thlen loh nan overflow emaw bypass kawng emaw an nei tur a ni;
  • (c) hlauhawmna azira bar inkar thlan an nei tur a ni: bawlhhlawh dawn nan inkar zim zawk, tihtawpna-in tuilian a thlen theihna hmunah inkar zau zawk; leh
  • (d) platform him tak aṭanga tihfai theih an ni tur a ni, motor luh theihna nen.

8.10.4 Outfall awm sa. ULB tinin tui awmna pana an outfall awm sa-te chu GPT leh DWF interceptor bun tur ruahmanna (programme) an siam tur a ni a, in tur tui pekna atana hman dil leh notify a nih wetland (Clause 7.12) pana outfall aṭanga ṭanin, Clause 10.17 register-ah hmasawnna an report tur a ni.

Hrilhfiahna. He Kaihhruaina Bu hian tui awmna pana outfall-ah first-flush tihfaina leh gross pollutant trap a phut. Gross pollutant hi Mizoram tui awmna tihbawlhhlawhna hmuh theih ber a ni a, plastic-in drain leh culvert a tawp tir bawk a, chu chuan tui ṭhatna leh tuilian a inzawm tir. Screen 50% tihtawp hi Bung 6 grate clogging factor nen a inmil. Clause 8.10.3(c) chuan drain lian chunga screen zim a hrilh fimkhur a, chungte chu ruahpui darkar hmasa berah an tawp a, an tum ang tuilian chu an thlen tir ṭhin.


8.11 Ruahtui khawl khawm inrem dan

8.11.1 RWH phut hman zel. Aizawl Municipal Corporation Building Regulations 2012 leh Aizawl Municipal Corporation (Site Development and Slope Modification) Regulations 2017-in a phut ruahtui khawl khawm (2012 Regulations regulation 33, chu hnuaiah "in zawng zawngah ruahtui khawl khawmna facility ṭha tak siam bawk tur a ni" ("A suitable rain water harvesting facility shall also be provided in all buildings"), leh regulation 5(6)(ix), chu hnuaiah plan-te chuan "ruahtui khawl khawmna facility ṭha tak siam tur a tel tur a ni" ("include provision for a suitable rain water harvesting facility"); 2025-a dah lut green building leh sustainability bung (Chapter VIIIA) chuan m² 100 aia lian ram (plot) tan ruahtui khawl khawm leh "hardscape tihtlem" ("Reduction of Hardscape") chu incentive (fakna) atan a siam a, phut tur atan a ni lo; pakhatin mah tui zat a ruat lo, 2017 Regulations chuan khawl khawm a phut lo) chu hman zel a ni, Clause 8.8.1 ri hnuaiah: Mizoram-ah 10° aia chho tlang pang tinah leh shale-ah khawl khawm hi recharge ni lovin hman tura khawl a ni (Clause 4.11, tlang dan), leh Mizoram Water Resources (Management and Regulation) Act, 2024 section 14(1)(b)(viii) emaw 16(2)(ix) emaw-in leihnuai tui recharge tana ruahtui khawl khawm a sawi hmunah, he Kaihhruaina Bu hian tlang ramah khawl leh hman nawn angin a chhiar a, an inkalhna a sawi a, Act chu a thlak lo (Bung 1). He Clause hian he Kaihhruaina Bu hnuaia RWH structure-te chhiar dan a ruat.

8.11.2 Hna hrang pathum. Designer chuan drawing leh chhutnaah heng hi a ṭhen hrang tur a ni:

  • (a) khawl khawm (harvesting): hman tura khawlna (sump leh tank);
  • (b) recharge: lei-a tui dah luttu recharge pit, trench, shaft leh well; leh
  • (c) detention: ruahpui ṭan laia ruak, orifice outlet nei khawlna (Bung 4).

8.11.3 Recharge structure.

  • (a) In chung ruahtui luang chu filter emaw settling chamber emaw hnuah recharge well, well inhawng, recharge pit leh shaft-ah luan tir phal a ni.
  • (b) Kawng, motor dahna leh hmun chhuah dang aṭanga ruahtui luang chu well, borewell emaw recharge shaft emaw reng rengah direct-in luan tir loh tur a ni. Clause 8.8 tling infiltration facility, pretreatment nen, kal tlangin chauh recharge phal a ni.
  • (c) Recharge structure-te chuan pit hnuai emaw filter media hnuai ber emaw aṭanga teh Clause 8.8.1 leihnuai tui inkar an tlin tur a ni, in chung tui tihfai tawh chauh dawng recharge well chu a bang.

8.11.4 Retention leh WQv-a chhiar. Recharge structure chu heng a tlin chauhin Bung 4 retention tui zat leh WQv-ah chhiar a ni:

  • (a) a infiltration rate chu Clause 8.8.3 hnuaiah test a ni tawh;
  • (b) design rate-ah darkar 72 chhungin a ruak; leh
  • (c) pretreatment a nei.

Khawl khawmna sump chu a chhunga tui chu darkar 72 chhungin, drainage report-a tarlan mamawh angin, hman a nih chauhin retention-ah chhiar a ni (Bung 4).

8.11.5 Detention angin chhiar a ni lo. RWH khawlna hi ruahpui a lo thlen laia ruak, outlet nei, a tana bik tui zat a nih loh chuan detention angin chhiar a ni lo. RWH sump-te hi fûr (April–October) design ruahpui tin ṭan lai-ah khat angin ngaih a ni (Bung 4).

8.11.6 Overflow. RWH structure tinin site tui luanna-ah lei chung level-a luang chhuak overflow an nei tur a ni, ṭhenawm ram chungah emaw sewer-ah emaw engtikah mah ni lovin.

8.11.7 Vantlang hmuna leilung chung ruahtui luang recharge. Kawng, median, park leh vantlang hmun dang-a recharge trench, shaft leh percolation pit-te chuan Clause 8.8 chu a zavaiin, motor kal nasa kawng tana hotspot dan tiamin, an tlin tur a ni a, inlet tinah GPT emaw leidip dawnna emaw an nei tur a ni.

Hrilhfiahna. RWH khawlna hi detention angin chhiar a ni lo tih dan hi Bung 4-ah ruat a ni. Mizoram-ah ruahtui khawl khawm hi tui pekna a hmasa ber a ni. Aizawl Urban Area-ah chhungkaw 27.16% chuan ruahtui an hmang a, 1.01% chuan tuikhur tui (master plan, Table 8.2); PHED tui pek chu "44 lpcd" tia report a ni a, tui 35% chhiar theih loh nen (chanchin tlangzarh angin; ni ruat a ni lo); CGWB chuan in chung ruahtui khawl khawmna structure 300 leh tuikhur siam ṭhatna 200 chu State-a recharge leh humhalhna hna tih theihte zingah a tarlang. Regulation-te chuan khawl khawm an phut ngei a, mahse tui zat emaw detention dan emaw an ruat lo: "in zawng zawngah ruahtui khawl khawmna facility ṭha tak siam bawk tur a ni" ("A suitable rain water harvesting facility shall also be provided in all buildings") (AMCBR reg. 33), leh plan-te chuan "ruahtui khawl khawmna facility ṭha tak siam tur a tel tur a ni" ("include provision for a suitable rain water harvesting facility") (reg. 5(6)(ix)); 2025 aṭang khan ruahtui khawl khawm leh "hardscape tihtlem" ("Reduction of Hardscape") hi m² 100 aia lian ram, "green norms zawm thei" ("may comply with the green norms") tan incentive an ni a, floor area belh emaw fee ngaihdam emaw hmangin fak a ni (Chapter VIIIA); leh master plan chuan khawl khawm hi "vantlang in zawng zawngah … phut ngei ngei" ("mandatory … in all public buildings") a rawt a, rawtna a ni. Site Development and Slope Modification Regulations, 2017 chuan pakhat mah a phut lo. Mizoram Water Resources (Management and Regulation) Act, 2024 chuan IWRD chu "leihnuai tui recharge tihpun nan ruahtui khawl khawm tihchak" ("promote rain water harvesting to augment ground water recharge") tur a ti a (s.14(1)(b)(viii)), WARDMA chu "ruahtui khawl khawm telin tui humhalh leh leihnuai tui recharge" ("water conservation and groundwater recharge, including rain water harvesting") thupek turin a phal (s.16(2)(ix)); tlang ramah he Kaihhruaina Bu hian a pahnih hi recharge ni lovin khawl leh hman nawn angin a chhiar a, chu chu a sawi chiang. Heng zinga pakhatin mah in chung m² tin tana liter, tank tui zat, recharge rate, recharge pit test emaw tlang panga soak pit ri emaw an pe lo a, sak tawh endikna (audit) hmuh a ni lo. He Kaihhruaina Bu hian in chung m² tin tan liter 25 tal khawlna (Clause 4.11), he series-a North-East edition-te value, chu hman nawn kal tlangin chauh retention angin a chhiar a, fûr design ruahpui tin ṭan lai-ah khat angin a ngai a, detention angin engtikah mah a chhiar lo. Phai alluvium leh lui kam zawl test tawhah chuan, Clause 8.8.1-in a phalna hmunah, recharge hi khawl khawm hna pakhat a ni thei (Clause 8.11.2(b)); tlang ramah, shale-ah, colluvium leh lei vur-ah leh leimin hlauhawm zone-ah chuan khawl khawm hi khawl leh hman tan chauh a ni a, a luan liam chu lined drain-ah a kal. RWH hian tui pekna leh recharge a ṭanpui. June 2018 laihawl ruahpui ang chi June aṭanga August thleng fûr ruahpui chu kar tam tak ruah sur hnua a lo thlen hunah, a tlangpuiin a khat tawh emaw a lei a hnawng vek tawh emaw ṭhin, chu vang chuan detention angin chhiar theih a ni lo.

Clause 8.11.3(b) hi entirna hmasa chiang a awm lo; kawng ruahtui luang hian hriak, metal leh natna hrik a hruai avangin he Kaihhruaina Bu hian a ruat a ni. Recharge shaft emaw borewell emaw chuan a tihthianghlim tur lei chu a kal pelh a, a bula well-te tui petu aquifer-ah direct-in a thlen. CGWB Manual on Artificial Recharge of Ground Water (2007) chuan recharge structure chi leh filter design a pe a; he Kaihhruaina Bu hian tui hnar khapna a belh.


8.12 Sak lai erosion leh bal thunun

8.12.1 ESC plan. Ha 0.1 emaw a aia tam lei tihbuai (land disturbance) nei hmasawnna hna tin leh vantlang tui luanna emaw kawng hnathawh tin chuan Erosion and Sediment Control (ESC) plan, drainage report nena phalna pek, an nei tur a ni. Heng hi a lantir tur a ni:

  • (a) hmun tihfai, lei hnathawh leh tihnghet indawt dan;
  • (b) stage tina area inhawng;
  • (c) Clause 8.12.3 hmalaknate, an awmna leh lian zawng nen;
  • (d) infiltration leh retention area venna (Bung 10);
  • (e) thil chhawp khawmna, concrete silna leh fuel dahna hmunte; leh
  • (f) endikna leh enkawlna hun ruat.

8.12.2 Fûr hun hun ruat. Lei hnathawh chu heti hian ruahman tur a ni:

  • (a) fûr hun (April aṭanga October) chhunga area inhawng chu a theih chin chinin a tê ber;
  • (b) lei hnathawh zawh zawng zawng chu March ni 31 hmaah thing leh hnim, mulch, matting emaw chhuahna emaw hmangin tihnghet; leh
  • (c) April ni 1 leh October ni 31 inkara area inhawng reng reng chu tihfai a nih hmaah bal thununna a nei tawh.

8.12.3 Hmalakna.

  • (a) Sheet flow dawng area tihbuai hnuai lam kamah silt fence (leidip dangna), fence tin pana tui luang area chu Belhchian 8E-a ruat angin tihtlem.
  • (b) Ha 2 thleng area tihbuai aṭanga tui luang ṭhenkhawm tan sediment trap.
  • (c) Ha 2 aia lian area tihbuai tan sediment basin. Outlet hnuaia khawl tui zat chu 50% AEP (kum 2) darkar 24 ruahpui ruahtui luang leh tui luan khawm area hectare khatah m³ 250 zinga a lian zawk tal a ni tur a ni, chung lam aṭanga tui la chhuak dewatering outlet nen.
  • (d) Site aṭanga ruahtui luang dawng drain inlet awm sa tinah inlet venna.
  • (e) Construction exit tihnghet, motor-in vantlang kawng a luhna hmunah wheel silna nen.
  • (f) Tui awmna setback (Bung 7) Zone 1 pawnah, drain reng reng aṭanga 10 m tal hla, fûr hunah khuh thil chhawp khawm (stockpile).
  • (g) Dewatering tui chhuak chu sediment basin, settling tank emaw filter bag emaw kal tlang, drain emaw tui awmna emaw-ah direct-in pump luh engtikah mah ni lo.
  • (h) Concrete silna chu lined pit-ah, drain-ah engtikah mah ni lo.

8.12.4 Hnathawh hman rih tana design ruahpui. ESC hmalakna hman rih turte chuan Bung 2 ruahtui tlak chu climate factor 1.0 (Clause 2.8.2) nen an hmang.

8.12.5 Endikna. ESC hmalaknate chu kar tin leh ruahpui thil thleng (Bung 10-a hrilhfiah angin) tin hnua darkar 24 chhungin endik tur a ni a, darkar 48 chhungin siam ṭhat tur a ni a, bal-in a chanve a khat hunah tihfai tur a ni.

8.12.6 Paih. Hmalakna hman rih turte chu an pana tui luang area tihnghet a nih hnuah chauh paih tur a ni. Bal thununna atana hman facility nghet reng rengah, a as-built survey (Bung 10) hmaah bal la chhuah tur a ni.

Hrilhfiahna. Ha 0.1 threshold hi Bung 1 huam chin threshold a ni. Sediment basin tui zat 250 m³/ha hi US EPA Construction General Permit-a tui luan khawm acre khatah ft³ 3,600 hniam ber, SI-a thlak a ni (US EPA, 2022 CGP); CGP chuan kum 2, darkar 24 ruahtui luang chu thlan dang angin a phal. He Kaihhruaina Bu hian a pahnih zinga a lian zawk a phut, Mizoram kum 2 darkar 24 zat a sang a, sakna site-te chu fûr hun chhungin inhawng renga dah a ni fo avangin. Trap leh basin inṭhenna ha 2, March ni 31 tihnghet ni, thil chhawp khawm hlat zawng 10 m leh endik fo zat hi entirna hmasa chiang a awm lo a, he Kaihhruaina Bu-in a ruat a ni. March ni 31 hi Bung 10-a fûr hma hnathawh tawp ni nen a inmil. Sakna bal hi pollutant a ni a, tuilian hlauhawmna direct a ni bawk: drain, culvert leh dil a tikhat a, Mizoram-ah leimin bal, lung laihna bal leh bawlhhlawh hi bal nen an luang tlang: master plan chuan Aizawl drain-te hi "hydraulic design a tlachham avangin leidipin a khat fo" ("silted up frequently due to insufficiency in the hydraulic design") a ti a, ward W-I ṭhena thum ṭhena khat tui chiahna chu kawng sir drain-a bawlhhlawh avangin a ti, leh May ni 28, 2024-a Cyclone Remal-a Melthum leh Hlimen inkara lung laihna hman tawh loh chim leh August ni 9, 1992-a South Hlimen lung laihna chim chuan heng tlang pangah lung laihna hmai leh bal-in eng nge an tih theih a lantir (a hmasa chu chanchin tlangzarh angin, a pahnihna chu Senhri Journal-ah; Bung 1). Regulation-te hian a ṭhenkhat an phut tawh. Lei vur chu benching tel lovin 2:1 aia chho tlang pang pianphung chungah dah a ni lo, "lei vur ke pawn lam area chu sheet overflow tan awn tir tur a ni emaw drain chhuah siam tur a ni. Chutiang drain chu energy dissipater nen sak tur a ni a, area phalna pekah a luang chhuak tur a ni" ("The area beyond the toe of the fill shall be sloped for sheet overflow or a paved drain shall be provided. Such drains shall be constructed with energy dissipaters and shall discharge into an approved area") (SD&SM reg. 25); lui pianphung bula ram tan "site aṭanga thil emaw bal emaw lui emaw riverine reserve-a a khawh luh loh nan hmalakna lak tur a ni" ("measures shall be taken to prevent erosion of materials or sediment from the site into the stream or riverine reserve") (reg. 28); laih chhuah thil chu "tui luan kawng emaw riverine reserve" ("drainage courses or riverine reserves") aṭanga hla takah dah a ni a, Corporation-in phalna a pek hmunah paih a ni (reg. 29); leh 2025 aṭang khan vantlang kawng aṭanga thil tam lutuk paih a nih a, vantlang thil chhiat siam ṭhat a nih hnuah chauh Occupancy Certificate pek a ni (AMCBR, 2025-a siam ṭhat angin). Lian zawng, ni emaw endikna emaw an pe lo a, chu chu Clause 8.12-in a pe. March ni 31 tihnghet ni hi he Kaihhruaina Bu-in a ruat a ni, a hun April ni 1-a a ṭan hmaah, Mizoram ruah thil thleng ni tarlan nei hlauhawm berte chu May thlaah an lo thlen a, ruahpui-te April tawp lamah an lo thlen avangin (Bung 2). Basin tui zat lian zawk tana chhan a chunga sawi, kum 2 darkar 24 zat a sang tih hi Mizoram-ah a dik: kum 2 darkar 24 design zat hi floor hman rih tur 85 mm (Clause 2.3.6(c)) aiin a hniam ngai lo, NIH-DHAARA chuan hmar leh chhim lamah (Kolasib, Bairabi, Vairengte, Lunglei, Tlabung, Siaha) 107 aṭanga 131 mm thleng a pe a, sub-area MZ-A leh MZ-A1-ah 130 mm hi floor a ni; group D tlang lei chunga sakna site ruakah May ni 1 aṭanga hman AMC III (Bung 3) nen, 85 mm chuan ruahtui luang 70 mm vel, hectare khatah m³ 700 vel a pe a, chuvangin kum 2 ruahtui luang hian hectare khatah m³ 250 chungah thu a nei (NEER chhutna), Clause 8.12.3(c) dan chu thlak lovin vawn a ni. Mizoram-ah Clause 8.12 hnuaia sediment basin emaw trap emaw outlet chu lined drain emaw energy dissipator nei tui kawng nghet emaw-ah a luang chhuak a, tlang pang veng loah engtikah mah a luang lo; Clause 4.11-in infiltration a khapna hmunah, 10° aia chho tlang pang tin leh shale zawng zawng tiamin, sediment basin emaw trap emaw lei-a tui luh tir tura design a ni lo; site aṭanga lei laih bal, bal emaw bawlhhlawh emaw, lung laihna aṭanga lei laih bal emaw reng reng lui emaw dil emaw-ah, a Zone 1 chhungah, site hnuai lama tlang pangah emaw tuikhur catchment-ah emaw dah a ni lo, lui chunga lung laihna hmai chuan a chhip zawhah cut-off drain a nei; leh dil emaw tuikhur emaw catchment-a sakna site chuan tui thlengtu drain zawng zawng aṭangin a bal a dang.


8.13 Enfiah reng

8.13.1 Outfall enfiah reng. Tier A authority tinin tui awmna pana an outfall entirna set-ah tui ṭhatna an enfiah reng tur a ni, in tur tui dil emaw notify a nih wetland emaw pana outfall tin tiamin. Enfiah renna chuan heng a tel tur a ni:

  • (a) ruah sur lohna hun sample lak (Clause 8.9.4), kumtin vawi khat tal fûr hmaah; leh
  • (b) index outfall set-ah fûr tinah thil thleng pathum tal ruah sur lai sample lak.

8.13.2 Parameter. A tlem berah: TSS, BOD, COD, faecal coliform, nitrogen zawng zawng, phosphorus zawng zawng, hriak leh grease, leh industry catchment tan heavy metal. A rah chhuahte chu tui dawngtu tui awmna hman ṭhat ber ruat (designated best use) tana CPCB tui ṭhatna tehna nen khaikhin tur a ni.

8.13.3 Gross pollutant record. Tihfai tinah GPT leh screen tin aṭanga thil la chhuah rit zawng emaw tui zat emaw chu O&M record (Bung 10)-ah chhinchhiah tur a ni.

8.13.4 BMP hnathawh ṭhat zawng enfiah reng. State Stormwater Technical Committee chuan BMP hnathawh ṭhat zawng calibration programme a kalpui tur a ni a, a rah chhuah aṭangin Table 8.3 leh Belhchian 8C a siam ṭha tur a ni.

8.13.5 Tlangzarhna. Enfiah renna rah chhuahte chu Clause 10.17 register-ah tlangzarh tur a ni.

Hrilhfiahna. He Kaihhruaina Bu zirchianna hunah Mizoram ruahtui ṭhatna enfiah renna programme hmuh a ni lo, CPHEEO (2019) pawhin India tan target a ruat lo. Clause 8.13-a enfiah renna hi Table 8.3 calibrate nan leh DWF interception leh hnar paihna a hlawhtling em tih lantir nana mamawh tlem ber a ni. Parameter list hian CPHEEO WSUD kalphung-a pollutant pawimawh tarlante (TSS, nitrogen, phosphorus leh gross pollutant) a zui a, ek tui tihbawlhhlawhna avangin BOD leh faecal coliform belh a ni. Enfiah reng fo zat hi he Kaihhruaina Bu-in a ruat a ni.


8.14 Thehluh tur

He Bung hnuaia drainage report tin chuan heng hi a tel tur a ni:

  1. Tui Ṭhatna Sheet (Form 8-1): P_ret, P_3m leh P_wq; tui luanna area tin tana WQv leh Q_wq; Bung 4 hnuaia khawl tui zat; leh area tin ṭanpuitu BMP;
  2. Tier A tan: LoS chhutna (ΔCN, LoS mamawh) leh composite VR (Clause 8.6);
  3. Clause 8.7 leh Belhchian 8D anga BMP tin design, pretreatment nen;
  4. infiltration leh recharge tan: Infiltration Test Record (Form 8-2), fûr hun leihnuai tui level sang ber leh a hnar, design rate, drawdown hun, leh Clause 8.8.6 setback-te;
  5. ek tui leh sullage zawmna plan leh Clause 8.9.2 dye emaw meikhu test record;
  6. tui awmna pana outfall reng reng tana GPT leh first-flush design (Clause 8.10);
  7. khawl khawm, recharge leh detention ṭhen hrang RWH layout (Clause 8.11); leh
  8. ESC plan (Clause 8.12).

8.15 Endikna leh siam thar

8.15.1 He Bung hi Kaihhruaina Bu dang zawng nen endik tur a ni (Bung 1). Clause 8.13.4 calibration programme-in a report hunah pawh Table 8.3 endik tur a ni a, engpawh ni se notification (Gazette-a tarlan) hnu kum 5 chhungin.


Thu hnar (bung)

Belhchian leh Form

Belhchian / Form A chhunga thu
8A Zone zela thla 3 ARI darkar 24 zat leh IDF
8B Siam ṭhatna LoS table leh treatment-train composite VR
8C Mizoram BMP hnathawh ṭhat zawng calibration
8D BMP design sheet, media specification, thlai list
8E Erosion leh bal thununna standard detail
Form 8-1 Tui Ṭhatna Sheet
Form 8-2 Infiltration Test Record