Bung 9 belhchianStructure-te Hydraulic Design
Heng belhchiante hian Bung 9 an ṭanpui. Belhchian 9A hian SI units-a FHWA HDS-5 inlet-control equation-te, inlet pangngai tana coefficient tlangzarh nen, leh culvert (kawng hnuaia tui kalna) entirna chhutna kim tak a pe. Belhchian 9B hian Bung 9 leh Bung 6-in an ruat tawh lenzawng chauh nei standard drawing-te a pe; lenzawng dang zawng zawng chu "design-ah finfiah tur" tia chhinchhiah a ni. Belhchian 9C hi Clause 9.9 aṭanga lak control philosophy pangngai nen pump station design checklist a ni. Form 9-1 hi draft form a ni: Clause 9.14-in a phut chu a tarlang a, a belhchah lo.
Belhchian 9A — HDS-5 inlet-control coefficient leh SI units-a culvert entirna chhutna
Bung 9-a Clause 9.4.1 aṭanga 9.4.7 thleng leh Bung 6-a Clause 6.12 a ṭanpui.
9A.1 Inlet-control equation
FHWA Hydraulic Design of Highway Culverts, HDS-5, 3rd edition (2012), Appendix A hian inlet-control equation pathum a pe. SI units-in:
Unsubmerged (tui hnuaia pil lo), Form 1: HWi/D = Hc/D + K · [Ku · Q / (A · D^0.5)]^M + Ks · S
Unsubmerged, Form 2: HWi/D = K · [Ku · Q / (A · D^0.5)]^M
Submerged (tui hnuaia pil): HWi/D = c · [Ku · Q / (A · D^0.5)]² + Y + Ks · S
chutah HWi chu inlet control hnuaia inlet invert (tui luanna hniam ber) chunga headwater (culvert luhna lama tui sang zawng) thuk zawng (m), D chu barrel chhung sang zawng (rise) (m), Hc chu critical depth-a specific head, dc + Vc²/2g (m), Q chu tui luang zat (m³/s), A chu barrel cross-section area kim (m²), S chu barrel slope (m/m), K, M, c leh Y chu Table 9A.1-a constant-te, Ku = 1.811 SI units-ah (US units-ah 1.0), leh Ks chu slope siam dikna: −0.5, emaw mitred inlet tan +0.7 a ni.
Equation khawi nge hman tur chu X = Ku · Q / (A · D^0.5) azirin a ni:
- X ≤ 3.5: unsubmerged equation (Table 9A.1-a tarlan angin Form 1 emaw Form 2);
- X ≥ 4.0: submerged equation;
- 3.5 < X < 4.0 (transition): HDS-5 transition hmang FHWA HY-8 hmang rawh. Kut hmanga chhutna hman a nih chuan, unsubmerged leh submerged result zinga sang zawk la rawh. Hei hi he belhchian-in a siam fimkhurna awlsam (conservative simplification) a ni a, HDS-5 dan a ni lo.
Table 9A.1 — Inlet pangngai tana HDS-5 inlet-control coefficient
| Barrel | Inlet kam | Form | K | M | c | Y |
|---|---|---|---|---|---|---|
| Concrete kual | Headwall nei, kam square | 1 | 0.0098 | 2.0 | 0.0398 | 0.67 |
| Concrete kual | Headwall nei, groove (socket) end | 1 | 0.0018 | 2.0 | 0.0292 | 0.74 |
| Concrete kual | Groove (socket) end, a chhuak (projecting) | 1 | 0.0045 | 2.0 | 0.0317 | 0.69 |
| Corrugated metal kual | Headwall | 1 | 0.0078 | 2.0 | 0.0379 | 0.69 |
| Corrugated metal kual | Slope ang zela tan (mitred) | 1 | 0.0210 | 1.33 | 0.0463 | 0.75 |
| Corrugated metal kual | A chhuak (projecting) | 1 | 0.0340 | 1.50 | 0.0553 | 0.54 |
| Rectangular box | Wingwall 30° aṭanga 75° thleng flare | 1 | 0.026 | 1.0 | 0.0347 | 0.81 |
| Rectangular box | Wingwall 90° leh 15° flare | 1 | 0.061 | 0.75 | 0.0400 | 0.80 |
| Rectangular box | Wingwall 0° (sir chhunzawm) | 1 | 0.061 | 0.75 | 0.0423 | 0.82 |
| Rectangular box | 19 mm (3/4 in) chamfer nei 90° headwall | 2 | 0.515 | 0.667 | 0.0375 | 0.79 |
| Rectangular box | 45° bevel nei 90° headwall | 2 | 0.495 | 0.667 | 0.0314 | 0.82 |
| Rectangular box | 33.7° bevel nei 90° headwall | 2 | 0.486 | 0.667 | 0.0252 | 0.865 |
Thu lakna: FHWA HDS-5 (2012), Appendix A, Table A.1 (coefficient-te hi dimension nei lo an ni a, Ku = 1.811 nen SI units-ah an huam). Value-te hi HIF-12-026, Table A.1 (chart leh scale number 1/1–1/3, 2/1–2/3, 8/1–8/3 leh 10/1–10/3) nen endik a ni. HDS-5 edition hnuhnung zawk a danglam chuan, table hnuhnung zawk chuan a thunun. Outlet control tana entrance loss coefficient-te chu Bung 9-a Table 9.1-ah a awm.
9A.2 Entirna chhutna: collector kawng hnuaia pipe culvert
Entirna chauh — design value a ni lo. A hnuaia input-te hi kalphung lantir nan siam chawp an ni; result-te hi site reng reng tan design value an ni lo.
Input-te.
Table 9A.2 — Entirna chhutna tana input-te
| Thil | Value | Hnar |
|---|---|---|
| Kawng class | Collector; design AEP 4% (kum 25), check event (endikna atana ruahpui) 2% (kum 50), leh 1% AEP endikna | Table 6.1, Clause 6.12.2 |
| Design tui luang, 4% AEP | 1.80 m³/s (climate factor tiamin) | Entirna |
| Check tui luang, 2% AEP | 2.20 m³/s | Entirna |
| 1% AEP tui luang | 3.00 m³/s | Entirna |
| Barrel | Collar joint nei 1,200 mm RCC pipe pakhat, n = 0.015 | Table 6.6 |
| Inlet | Headwall nei, kam square: ke = 0.5; K = 0.0098, M = 2.0, c = 0.0398, Y = 0.67, Form 1 | Table 9.1 leh 9A.1 |
| Sei zawng leh slope | L = 20.0 m; S = 0.005 (inlet invert 20.00 m, outlet invert 19.90 m, local datum) | Entirna |
| Inlet-a kawng level | Shoulder kam 22.00 m; kawng chhip (crest) hniam ber 22.10 m | Entirna |
| Outlet invert chunga tailwater (outfall hnuailama tui sang zawng), TW | 1.80 m³/s-ah 0.60 m; 2.20 m³/s-ah 0.70 m; 3.00 m³/s-ah 0.85 m (luanna hnuailam channel-a normal depth) | Entirna; Clause 9.4.4 |
| Tui dawngtu channel | Lined lo sandy loam | Table 9.2 |
Size tlem ber: 1,200 mm ≥ 900 mm (Clause 6.12.5). Span chu 1.5 m aia a tlem avangin, tihtawp (blockage) endikna chuan inlet area 50% tihtawp a hmang (Clause 6.12.4(a)).
Step 1 — Barrel nihphung. A = π · 1.2² / 4 = 1.131 m²; barrel khat hydraulic radius R = D/4 = 0.300 m; D^0.5 = 1.095.
Step 2 — Critical depth. Tui luang tin tan, dc chu cross-section kual tana critical-flow dinhmun, Q² · T / (g · Ac³) = 1 aṭangin enchhin (trial)-in hmuh chhuah a ni, chutah Ac leh T chu thuk zawng dc-a tui luanna area leh chung zau zawng (top width) a ni.
Table 9A.3 — Critical depth leh specific head (D = 1.2 m)
| Q (m³/s) | dc (m) | Ac (m²) | T (m) | Vc = Q/Ac (m/s) | Hc = dc + Vc²/2g (m) | Hc/D |
|---|---|---|---|---|---|---|
| 1.80 | 0.737 | 0.728 | 1.168 | 2.471 | 1.048 | 0.873 |
| 2.20 | 0.817 | 0.820 | 1.119 | 2.683 | 1.184 | 0.987 |
| 3.00 | 0.952 | 0.962 | 0.972 | 3.118 | 1.447 | 1.206 |
Step 3 — Inlet control hnuaia headwater. X = 1.811 · Q / (1.131 × 1.095) = 1.462 · Q.
Table 9A.4 — Inlet-control headwater
| Q (m³/s) | X | Equation | HWi/D | HWi (m) |
|---|---|---|---|---|
| 1.80 | 2.631 | Unsubmerged, Form 1: 0.873 + 0.0098 × 2.631² − 0.5 × 0.005 = 0.873 + 0.068 − 0.003 | 0.939 | 1.127 |
| 2.20 | 3.216 | Unsubmerged, Form 1: 0.987 + 0.0098 × 3.216² − 0.003 = 0.987 + 0.101 − 0.003 | 1.085 | 1.302 |
| 3.00 | 4.385 | Submerged: 0.0398 × 4.385² + 0.67 − 0.003 = 0.765 + 0.67 − 0.003 | 1.433 | 1.719 |
Step 4 — Outlet control hnuaia headwater (Clause 9.4.3). Friction term chu 19.63 · n² · L / R^1.33 = 19.63 × 0.015² × 20.0 / 0.300^1.33 = 0.0883 / 0.2016 = 0.438 a ni a, chuvangin H = (1 + 0.5 + 0.438) · V²/2g = 1.938 · V²/2g. L · S = 20.0 × 0.005 = 0.100 m.
Table 9A.5 — Outlet-control headwater
| Q (m³/s) | V = Q/A (m/s) | V²/2g (m) | H (m) | (dc + D)/2 (m) | TW (m) | ho (m) | HWo = ho + H − L·S (m) |
|---|---|---|---|---|---|---|---|
| 1.80 | 1.592 | 0.129 | 0.250 | 0.969 | 0.60 | 0.969 | 1.119 |
| 2.20 | 1.945 | 0.193 | 0.374 | 1.009 | 0.70 | 1.009 | 1.283 |
| 3.00 | 2.653 | 0.359 | 0.695 | 1.076 | 0.85 | 1.076 | 1.671 |
Step 5 — Headwater thununtu (Clause 9.4.1): HWi leh HWo zinga lian zawk.
Table 9A.6 — Headwater thununtu leh endikna
| Ruahpui | Q (m³/s) | HWi (m) | HWo (m) | Control | HW (m) | HW level (m) | HW/D |
|---|---|---|---|---|---|---|---|
| Design, 4% AEP | 1.80 | 1.127 | 1.119 | Inlet | 1.127 | 21.13 | 0.94 |
| Check, 2% AEP | 2.20 | 1.302 | 1.283 | Inlet | 1.302 | 21.30 | 1.09 |
| 1% AEP | 3.00 | 1.719 | 1.671 | Inlet | 1.719 | 21.72 | 1.43 |
Step 6 — Design AEP-a headwater tehna (Clause 9.4.5):
- (a) HW/D = 0.94 ≤ 1.2. A zawm.
- (b) HW level 21.13 m ≤ shoulder kam 22.00 m − 0.30 m = 21.70 m. A zawm.
- (c) Luanna chunglama building leh ram ri-a tui sang zawng chu Clause 6.12.2(d) hnuaiah dinhmun awm mek nen khaikhin a ni. Hei hian luanna chunglam survey a mamawh a, hetah lantir a ni lo.
Step 7 — Kawng chunga tui kal (Clause 6.12.2, 6.12.3 leh 9.4.6). 1% AEP headwater level, 21.72 m, chu kawng chhip hniam ber, 22.10 m, aia a hniam avangin, check emaw 1% AEP ruahpui-ah kawng chungah tui a kal lo. Headwater chuan crest a pel ta se, kawng chunga tui luang Qr = Cd · L · h^1.5 (Cd ≤ 1.66) chu headwater inang-ah culvert tui luang nen inbuktlak a ni ang a, kawng chunga tui thuk zawng chu Clause 6.12.2(a) nen endik a ni ang.
Step 8 — Outlet velocity (Clause 9.4.7). Inlet control hnuaiah, outlet velocity chu barrel-a normal depth velocity a ni. Barrel khat theihna chu (1/n) · A · R^(2/3) · S^0.5 = (1/0.015) × 1.131 × 0.448 × 0.0707 = 2.39 m³/s a ni.
- 1.80 m³/s: normal depth 0.778 m, outlet velocity 2.32 m/s.
- 2.20 m³/s: normal depth 0.908 m, outlet velocity 2.40 m/s.
- 3.00 m³/s: barrel khat theihna aia a tam a, chuvangin outlet-ah barrel a khat; velocity = Q/A = 2.65 m/s.
Tui dawngtu channel chu lined lo sandy loam a ni a, velocity phal 0.53 m/s (Table 9.2) a nei, chuvangin outlet humhalhna a ngai (Clause 9.6.1). Barrel velocity zawng zawng hi 3.0 m/s aia an hniam (Clause 6.7.3(b)).
Step 9 — Riprap apron (Clause 9.6.3; Milem 9.2). D50 = 0.2 · D · [Q / (g^0.5 · D^2.5)]^(4/3) · (D/TW), g^0.5 · D^2.5 = 3.132 × 1.577 = 4.941 nen.
Table 9A.7 — Riprap apron size ruatna
| Q (m³/s) | TW (m) | Q / (g^0.5 · D^2.5) | [ ]^(4/3) | D50 (m) |
|---|---|---|---|---|
| 1.80 | 0.60 | 0.364 | 0.260 | 0.2 × 1.2 × 0.260 × 2.00 = 0.125 |
| 2.20 | 0.70 | 0.445 | 0.340 | 0.2 × 1.2 × 0.340 × 1.71 = 0.140 |
| 3.00 | 0.85 | 0.607 | 0.514 | 0.2 × 1.2 × 0.514 × 1.41 = 0.174 |
Clause 9.4.7 hian design AEP leh 1% AEP tan outlet humhalh a phut a, chuvangin hetah apron chu D50 lian ber, 0.174 m, tan size ruat a ni. Table 9.3 aṭangin, Class 2 (D50 = 150 mm) chu a tê lutuk a, chuvangin Class 3 (D50 = 250 mm) hman a ni:
- apron sei zawng 5D = 5 × 1.2 = 6.0 m;
- apron chah zawng 2.4 × D50 = 2.4 × 0.25 = 0.60 m;
- outlet-a apron zau zawng 3D = 3.6 m tal, luanna hnuailam channel thlenga zau chho;
- granular filter emaw geotextile chunga lung dah (Clause 9.6.4).
Step 10 — Tihtawp endikna (Clause 6.12.4(a)). 1% AEP tui luang tan inlet area 50% tihtawp nen Step 3 aṭanga 7 thleng nawn leh a ni a, result-te chuan Clause 6.12.2(a) leh (d) a zawm ngei ngei tur a ni. He Kaihhruaina Bu hian inlet tihtawp ṭhenkhat entir dan standard a la ruat lo, chuvangin he endikna hi HY-8-ah emaw Approving Authority (phalna petu Authority) nena inremna kalphung hmangin neih a ni. Hetah chhut a ni lo.
Table 9A.8 — Entirna chhutna tlangpui (Entirna chauh — design value a ni lo)
| Endikna | A chhuah | Clause |
|---|---|---|
| Size tlem ber | 1,200 mm ≥ 900 mm | 6.12.5 |
| Design HW/D | 0.94 ≤ 1.2 | 9.4.5(a) |
| Shoulder kam hnuaia design HW | 21.13 m ≤ 21.70 m | 9.4.5(b) |
| Check leh 1% ruahpui-a kawng chunga tui kal | A awm lo (21.72 m < 22.10 m) | 6.12.2, 9.4.6 |
| Outlet humhalhna | Class 3 riprap apron, 6.0 m sei, 0.60 m chah, outlet-ah 3.6 m zau | 9.6.1, 9.6.3 |
| Tihtawp endikna | HY-8-ah emaw kalphung inremna hmangin neih tur | 6.12.4 |
Belhchian 9B — Standard drawing: headwall, riprap apron, drop structure, trash rack, detention riser
Bung 9-a Clause 9.4, 9.6, 9.7 leh 9.8 a ṭanpui.
A hnuaia drawing-te hi schematic standard drawing an ni. Bung 9 leh Bung 6-in an ruat lenzawng leh dan chauh an lantir. Structural lenzawng, reinforcement, foundation leh fixing-te chu design-ah finfiah tur a ni (Clause 9.1.2). Riprap (lung lian phah) apron standard drawing chu Bung 9-a Milem 9.2 a ni a, Table 9.3 aṭanga lenzawng nen; hetah nawn a ni lo. Table 9B.1 hian lenzawng lantir leh an hnar clause-te a tarlang.
Milem 9B.1 — Standard drawing: culvert headwall, wingwall leh cut-off wall, plan leh long section-ah, headwater tehna, invert dan leh bal ruahmanna nen. He Kaihhruaina Bu tana milem siam thar, FHWA, Hydraulic Design of Highway Culverts, HDS-5 (3rd ed., 2012) aṭanga siam danglam.
Milem 9B.2 — Standard drawing: Rand (1955) pool geometry leh 1.5 m sang zawng tehna nen drop ding dik structure (straight vertical drop structure). He Kaihhruaina Bu tana milem siam thar, Chow, Open-Channel Hydraulics (1959), leh FHWA, HEC-14 (3rd ed., 2006) aṭanga siam danglam.
Milem 9B.3 — Standard drawing: conduit emaw culvert luhna-a trash rack (bal dangna), section leh hma lam view-ah, bar inkar, area, velocity, slope leh tui luan liamna mamawh nen. He Kaihhruaina Bu tana milem siam thar, CIRIA, Culvert, screen and outfall manual, C786 (2019), leh CPHEEO, Manual on Storm Water Drainage Systems (2019), §8.3.1.3 aṭanga siam danglam.
Milem 9B.4 — Standard drawing: low-flow orifice leh screen, stage chung lam, anti-vortex plate, embankment kal tlang outlet pipe, flap gate leh emergency spillway nei detention basin outlet riser. He Kaihhruaina Bu tana milem siam thar, Kansas City Metro APWA, Section 5600 (2006, 5608.4) aṭanga siam danglam.
Table 9B.1 — Standard drawing-a lenzawng leh dan-te leh an hnar clause
| Drawing | Thil | Lenzawng emaw dan | Clause |
|---|---|---|---|
| 9B.1 | Public kawng hnuaia culvert size tlem ber | Diameter 900 mm, emaw 900 mm × 900 mm box | 6.12.5 |
| 9B.1 | Design AEP-a headwater | HW/D ≤ 1.2; luanna chunglam hmai-a shoulder kam aia 0.3 m tal hniam | 9.4.5 |
| 9B.1 | Entrance loss coefficient | Inlet siam tan Table 9.1 aṭangin (entirnan 30°–75°-a wingwall nei box tan 0.4) | 9.4.3 |
| 9B.1 | Invert | Drain bed nen inmil; a chungah engtikah mah ni lo | 9.4.8(c) |
| 9B.1 | Multi-barrel culvert | Bal tam theihna drain-ah hman loh; hman a nih chuan, ruah sur lohna hun tui luang tan barrel pakhat leh debris fin emaw deflector | 9.4.8(a) |
| 9B.1 | Headwall, wingwall, cut-off wall | A ngai; lenzawng chu design-ah finfiah tur | 9.4.9 |
| 9B.1 | Kawng chunga tui kal | Qr = Cd · L · h^1.5, Cd ≤ 1.66 | 9.4.6 |
| Milem 9.2 | Riprap apron | Outlet-a zau zawng ≥ 3D, channel thlenga zau chho; sei zawng leh chah zawng Table 9.3 aṭangin; filter emaw geotextile | 9.6.3, 9.6.4 |
| 9B.2 | Public drain-a vertical drop pakhat | Sang zawng h ≤ 1.5 m; kam humhalhna | 9.6.6(c), 6.13.8 |
| 9B.2 | Pool geometry | D = q²/(g h³); Ld/h = 4.30 D^0.27; Yp/h = 1.00 D^0.22; y1/h = 0.54 D^0.425; y2/h = 1.66 D^0.27 | 9.6.6(a) |
| 9B.2 | Ld piah lama basin, end sill | Design-ah finfiah tur (HEC-14 emaw US Bureau of Reclamation) | 9.6.6(b) |
| 9B.3 | A ngaih hmun | Drain (tui luanna) khuh lo chu conduit, drain khuh emaw 30 m aia sei culvert-a a luh hmunah | 9.8.1(a) |
| 9B.3 | Bar inkar fim b | 75 mm aia tlem lo leh conduit chhung lenzawng tê ber chanve aia tam lo | 9.8.2(a) |
| 9B.3 | Rack gross area | Conduit area let 4 tal | 9.8.2(b) |
| 9B.3 | Rack kal tlang velocity | 50% tihtawp nen design tui luang-ah 1.0 m/s aia sang lo | 9.8.2(c) |
| 9B.3 | Inclination | Kut hmanga hual a nih chuan 1V:2H aia chhuk lo; hnathawhna platform leh handrail | 9.8.2(d) |
| 9B.3 | Head loss leh tihtawp endikna | Kirschmer equation; 50% tihtawp nen HGL leh headwater endik | 9.8.3 |
| 9B.3 | Tui luan liamna leh himna | Rack tawp vek tan tui luan liamna kawng; hydrostatic load kim tan design | 9.8.4, 9.8.7 |
| 9B.4 | Low-flow orifice | 50 mm aia tê lo; orifice aia kua tê zawk leh orifice area let 10 tal area hawng nei trash screen | 9.7.1(c), 9.8.5 |
| 9B.4 | Orifice leh weir tui luang | Q = Cd · A · (2gh)^0.5, kam hriam tan Cd = 0.60; Clause 9.7.3-a weir coefficient | 9.7.2, 9.7.3 |
| 9B.4 | Stage–discharge rating | Stage tinah control awm thei zawng zawng zinga tui luang zat tlem ber | 9.7.4 |
| 9B.4 | Anti-vortex plate | Riser crest chunga design head chu riser diameter aia a lian chuan | 9.7.8 |
| 9B.4 | Embankment kal tlang outlet pipe | Filter diaphragm emaw seepage collar; flare emaw headwall nei inlet | 9.7.7 |
| 9B.4 | Flap gate emaw non-return valve | Tui dawngtu chu outlet aia a sang thei chuan | 9.7.5, 9.10 |
| 9B.4 | Emergency spillway | Outlet bulpui tihtawp leh basin khat nen 1% AEP tui lut a kal tlang tir, embankment crest thlengin freeboard 0.3 m nen; hlauhawmna sang basin tan 0.2% AEP endikna | 9.7.6 |
| Zawng zawng | Structural lenzawng, reinforcement, foundation, bar size, orifice size leh stage level | Design-ah finfiah tur | 9.1.2 |
Belhchian 9C — Pump station design checklist leh control philosophy pangngai
Bung 9-a Clause 9.8.6, 9.9 leh 9.10 a ṭanpui, Bung 6-a Clause 6.10.5 leh Bung 5-a outfall khar endikna nen.
9C.1 Design checklist
He checklist hi Clause 9.14, item 6-a pump station design report nen thehlut rawh.
Table 9C.1 — Pump station design checklist
| No. | Thil | Mamawh | Clause | Pek (Aw / Aih / NA) |
|---|---|---|---|---|
| 1 | Pump mamawh | Gravity drainage-in Bung 5 leh 6 a phak thei lo; a chhan sawi | 9.9.1 | |
| 2 | Tui lut | Catchment (ruahtui luan khawmna hmun) leh luanna chunglama khawlna reng reng kal tlanga route inflow hydrograph | 9.9.2 | |
| 3 | Design standard | Element rawngbawl design AEP; underpass tan, 1% AEP endikna nen 2% AEP | 9.9.2(a), 6.10.5(a) | |
| 4 | Tidal outfall | Tidal-lock rei zawng chhung outfall tihzim nen khawlna leh pump-in 48 h design tui zat a dawm (default 6 h zel tide sang pahnih) | 9.9.2(b), Bung 5 | |
| 5 | Head range | Tailwater hniam ber laia sump level hniam ber aṭanga tailwater sang ber (HAT + surge + 0.3 m) thleng pump thlan; pump leh system curve thehluh | 9.9.2(c), 9.14 | |
| 6 | Wet-well tui zat | Heng zinga lian ber: tui lut tlem ber 5 min (variable speed leh automatic control); tui lut sang ber 10 aṭanga 15 min thleng, emaw manufacturer cycle tui zat tlem ber; constant-speed pump tin tan V = Θ · q / 4 | 9.9.3 | |
| 7 | Duty pump | Tih theih chinah size inang | 9.9.4(a) | |
| 8 | Standby | Duty pump lian ber nen a inang tal, leh duty pump zat 50% aia tlem lo | 9.9.4(b) | |
| 9 | Inthlak chhawk | Duty leh standby hna automatic-in an inthlak chhawk | 9.9.4(c) | |
| 10 | Pump chi | Solids-handling (non-clog); axial-flow chu Clause 9.8.6 zawm screen hnungah chauh | 9.9.5 | |
| 11 | Sump leh intake | Manufacturer mamawh leh ANSI/HI 9.8; inkar fim 0.6 m (tê leh lai) emaw 1.0 m (unit lian) | 9.9.6 | |
| 12 | Model study | Pump reng reng 1 m³/s aia a lian emaw sump chu ANSI/HI 9.8 geometry aṭanga a kal bo chuan physical model | 9.9.6 | |
| 13 | Leidip dawnna leh screen | Wet well luanna chunglamah; pump-te solids size aia screen inkar tê zawk; module paih theih; tui lut 1 m³/s aia a tam chuan mechanical raking | 9.9.7, 9.8.6 | |
| 14 | Screen tui luan liamna | Screen a tawp vek laia tui luan liamna kawng | 9.8.4 | |
| 15 | Level control | A hrang float-switch back-up nen primary level sensor (ultrasonic, radar emaw pressure) | 9.9.8(a) | |
| 16 | Alarm | High-level leh pump-fault alarm telemetry hmangin local body control room-ah | 9.9.8(b) | |
| 17 | Record | Sump level, pump run hours leh power dinhmun ziak leh kum 5 tal vawn | 9.9.8(c) | |
| 18 | Power hnar | Grid supply leh duty pump zawng zawng vawikhatah tlan tir thei standby generator emaw feeder hrang pahnihna | 9.9.9(a) | |
| 19 | Fuel | Duty pump zawng zawng tan 72 h tal, Clause 9.9.10-a tuilian level chunga khawl | 9.9.9(b) | |
| 20 | Inthlak | Standby power-a automatic inthlak | 9.9.9(c) | |
| 21 | Tuilian laka humhalhna | Electrical leh control room chhuat, generator leh transformer chu 1% AEP tuilian level aia 0.5 m tal sang; 1% AEP ruahpui-ah motor luhna kawng hman theih | 9.9.10 | |
| 22 | Tui chhuahna | Rising main hrang, emaw main an inzawmnaah non-return leh isolating valve; flap gate emaw non-return valve nei delivery chamber emaw outfall; friction formula hriat lar hmanga main size ruat | 9.9.11 | |
| 23 | Gate | 1% AEP still-water level hnuaia outfall-ah flap emaw tide gate; 900 mm emaw a aia lian outfall leh pump hmang outfall tin tan luanna chunglamah penstock emaw stop-log slot; enchhin data aṭanga head loss | 9.10.1, 9.10.3, 9.10.4 | |
| 24 | Outfall-a sand leh bal | Beach, estuary leh creek outfall-ah lei chung aṭanga luh theih chamber-a gate, emaw elastomeric check valve | 9.10.5 | |
| 25 | Emergency inzawmna | Delivery chamber-a mobile pump tan hard-standing leh quick-coupling inzawmna | 9.9.12 | |
| 26 | Siamna thil | Clause 9.13-a exposure class; tuifinriat kam aṭanga 5 km chhungah stainless steel grade 316, galvanised leh coated steel, emaw metal ni lo fixing | 9.13 | |
| 27 | Design life | Civil hnathawh tan kum 50 tal leh mechanical leh electrical hmanrua tan kum 25 tal | 9.2.4 | |
| 28 | Underpass station | Carriageway-a 150 mm thuk zawngah thuk zawng chhinchhiahna leh automatic hriattirna emaw kal theih loh signal | 6.10.5(d) | |
| 29 | Certification | Empanelled professional-in design leh empanelled professional hrang-in endik | 10.6.1(d), 10.6.4 |
9C.2 Control philosophy pangngai
Hei hi Clause 9.9 hnuaia design ruahtui pump station tana control philosophy pangngai a ni. Designer (design siamtu) chuan station ang zelin a siam rem a, design report nen a thehlut ang. "Thurawn" ("recommended") tia chhinchhiah item-te hi Bung 9-in a phut loh hmanna ṭha an ni; a dang zawng zawng hian clause an sawi nawn.
Table 9C.2 — Control level (value-te chu design-ah ruat tur)
| Level | A ruat dan | Clause |
|---|---|---|
| Pump stop | Pump manufacturer leh ANSI/HI 9.8-in a phut submergence tlem ber aia hniam lo | 9.9.6 |
| Duty pump 1 start | Pump-stop level chungah Clause 9.9.3-a wet-well tui zat hman theih tal | 9.9.3 |
| Duty pump 2, 3 … start | Duty pump 1 start chungah stage-in; inkar chu design-ah finfiah tur | 9.9.2 |
| High-level alarm | Duty-pump start level sang ber chungah; design-ah finfiah tur | 9.9.8(b) |
| Float back-up high | Float hrang; duty pump-te a ṭan tir | 9.9.8(a) |
| Float back-up low | Float hrang; pump-te a tichawl | 9.9.8(a) |
- Hman dan pangngai (automatic). Wet-well level chu duty pump 1 start level a thlen chuan, lead pump a ṭan. Level a la san zel chuan, duty pump dang tin chu an start level-ah an ṭan. Level chu pump-stop level a thlen chuan pump-te an chawl. Primary level sensor-in he indawtna hi a thunun (Clause 9.9.8(a)).
- Duty inthlak chhawk. Lead pump chu pump-down cycle tin hnuah emaw design-a ruat run hours azirin automatic-in a inthlak a, duty leh standby hna an inthlak chhawk a, a chhiatna an insem (Clause 9.9.4(c)).
- Pump fault. Pump trip emaw ṭan thei lo chu lock out a ni. Pump dawt hman theih, standby pump tiamin, chuan a hmun a luah a, pump-fault alarm telemetry hmangin thawn a ni (Clause 9.9.4(b) leh 9.9.8(b)).
- Level-sensor chhiat. Primary sensor a chhiat emaw float switch nen a inmil loh chuan, control chu float back-up hrang hnenah a kal: float-high level-ah duty pump-te an tlan a, float-low level-ah an chawl. Alarm thawn a ni (Clause 9.9.8(a), (b)).
- Power tlakchham. Supply chu standby generator emaw feeder pahnihna-ah automatic-in a inthlak (Clause 9.9.9(c)). Thurawn: inthlak hnuah generator chunga ṭanna load tihtlem nan pump-te pakhat zelin ṭan leh se.
- Level sang. High-level alarm level-ah telemetry hmangin local body control room-ah alarm thawn a ni (Clause 9.9.8(b)). Underpass-ah, carriageway-a 150 mm thuk zawngah hriattirna emaw kal theih loh signal-te an hna a thawk (Clause 6.10.5(d)).
- Outfall leh gate. Rising main-te chu flap gate emaw non-return valve nei delivery chamber emaw outfall (drain tui luan chhuahna)-ah an luang chhuak (Clause 9.9.11). Flap gate-te chu control hmalakna awm lovin head danglamna hnuaiah an hawng leh an hup. Luanna chunglama penstock emaw stop log chu enkawl nan chauh, emaw flap gate a hawng tlat chauhin hup a ni (Clause 9.10.3). Thurawn: penstock dinhmun chu control panel-ah lantir leh ziak se.
- Tide-lock hnathawh. Outfall chu tide-lock a nih chuan, tidal-lock rei zawng chhung khawlna leh pump-in 48 h design tui zat an dawm (Clause 9.9.2(b) leh Bung 5). Station-in gravity outfall a neih bawk chuan, tide a hniam hunah flap gate kal tlangin gravity tui luang a ṭan leh.
- Screen. Mechanically raked screen (tui lut 1 m³/s aia a tam chuan a ngai, Clause 9.8.6) chu automatic-in tlan tir a ni. Thurawn: timer leh screen kal tlang level danglamna hmangin hual ṭan tir se, danglamna a sang reng chuan alarm nen.
- Kut hmanga hman. Thurawn: pump tin chuan panel-ah hand–off–auto selector a nei se, hand mode-ah float back-up high-level start a hna a thawk reng se.
- Mobile pump. Pump nghet hman theih loh emaw an tuar zo loh hunah, mobile pump-te chu quick-coupling inzawmna kal tlangin delivery chamber-ah an luang chhuak (Clause 9.9.12).
- Record. Sump level, pump run hours leh power dinhmun chu ziak leh kum 5 tal vawn a ni (Clause 9.9.8(c)). Thurawn: alarm, pump ṭan leh chawl, leh inthlak-te pawh ziak se.
- Enchhinna. Control, float, alarm, telemetry, inthlak leh generator chu Bung 10-a fûr hma endikna (Clause 10.12)-ah enchhin a ni a, a result-te chu Kumtin Enkawlna Puanchhuahna (Form 10-7; Clause 10.10.3)-ah report a ni.
Form 9-1 — Hydraulic Structure Report checklist
Bung 9-a Clause 9.14 a ṭanpui.
Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0. Dan anga hman tur a ni lo.
He checklist hi Hydraulic Structure Report hmaah belh rawh. Thil tin tan, Aw, Aih emaw A huam lo ziak la, a lanna drawing emaw phêk ziak rawh.
Section A — Project
Table 9F.1 — Form 9-1, Section A: project
| Field | Ziah luh tur |
|---|---|
| Project hming leh hmun | ______ |
| Local body, leh Tier A emaw Tier B (Bung 1) | ______ |
| Dilna thehluhtu (applicant) | ______ |
| Designer (hming leh registration) | ______ |
| Structure huam (culvert, channel, dissipator, outlet, screen, pump, gate, inlet, manhole) | ______ |
| Tailwater dinhmun hman: MHWS, HAT + surge, sea-level allowance, joint case (Clause 9.2.1) | ______ |
| Ni leh revision | ______ |
Section B — Clause 9.14-in a phut chhunga thu
Table 9F.2 — Form 9-1, Section B: Clause 9.14-in a phut chhunga thu
| No. | Thil | Clause | Pek (Aw / Aih / NA) | Drawing emaw phêk |
|---|---|---|---|---|
| 1 | Culvert chhutna (HDS-5 emaw HY-8 output) HWi, HWo, outlet velocity, tailwater, kawng chunga tui kal leh tihtawp endikna nen | 9.4, 6.12 | ||
| 2 | Channel tui chung profile, velocity, Froude number leh freeboard | 9.5 | ||
| 3 | Outlet humhalhna leh dissipator design, riprap size ruatna nen | 9.6 | ||
| 4 | Detention outlet stage–discharge table leh emergency spillway endikna | 9.7 | ||
| 5 | 50% tihtawp endikna nen screen leh rack design | 9.8 | ||
| 6 | Pump station design report: inflow hydrograph, khawlna, pump leh system curve, wet-well tui zat, control, power supply leh Bung 5 outfall khar endikna (Belhchian 9C nen) | 9.9 | ||
| 7 | Head-loss data nen gate leh valve thlan | 9.10 | ||
| 8 | Inlet, grate leh khuh load class | 9.11 | ||
| 9 | Exposure class leh siamna thil statement | 9.13 |
Section C — Dan zawm endikna
Table 9F.3 — Form 9-1, Section C: dan zawm endikna
| No. | Endikna | Tehna | Clause | A zawm (Aw / Aih / NA) |
|---|---|---|---|---|
| C1 | Design tui luang-ah climate factor telh | Clause 2.8 | 9.2.2 | |
| C2 | Bal-in a tihtawp theihna hmunah tihtawp dinhmun endik; tui luan liamna kawng him | — | 9.2.5 | |
| C3 | Pipe leh box drain: design n (box drain ≥ 0.015); supercritical pipe: jump structure-a awm, air venting | — | 9.3.1, 9.3.4 | |
| C4 | Pipe size luanna hnuailam panah a tlem lo; manhole emaw junction chamber-ah chauh inzawm; 90° aia tam kawng thlak danglamna awm lo | — | 9.3.5 | |
| C5 | Culvert design headwater = HWi leh HWo zinga lian zawk | — | 9.4.1 | |
| C6 | Design AEP-a culvert headwater | HW/D ≤ 1.2; shoulder kam aia ≥ 0.3 m hniam | 9.4.5 | |
| C7 | Kawng chunga tui kal weir coefficient | Cd ≤ 1.66 | 9.4.6 | |
| C8 | Culvert invert drain bed nen inmil; headwall, wingwall leh cut-off wall | — | 9.4.8(c), 9.4.9 | |
| C9 | Design tui luang-a channel Froude number | ≤ 0.8; 0.8 leh 1.2 inkar awm lo | 9.5.2 | |
| C10 | Channel velocity | Table 9.2 | 9.5.3 | |
| C11 | Engineered channel-a channel slope | ≤ 0.4% natural, ≤ 0.2% concrete, emaw drop / chute | 9.5.4 | |
| C12 | Sir slope; bed zau zawng ≥ 3 m-ah low-flow channel; uplift emaw weep hole | — | 9.5.6, 9.5.7, 9.5.9 | |
| C13 | Outlet velocity chu Table 9.2 aia a san hmuna outlet humhalhna | Table 9.3 apron, emaw basin | 9.6.1, 9.6.3 | |
| C14 | Vertical drop pakhat sang zawng | ≤ 1.5 m | 9.6.6(c) | |
| C15 | Detention outlet bulpui: hmanrua che awm lo; orifice tlem ber | Screen nen ≥ 50 mm | 9.7.1 | |
| C16 | Emergency spillway | 1% AEP, outlet tihtawp, basin khat, freeboard 0.3 m; hlauhawmna sang basin tan 0.2% AEP | 9.7.6 | |
| C17 | Embankment kal tlang outlet pipe; a ngaih hmunah anti-vortex plate | — | 9.7.7, 9.7.8 | |
| C18 | Conduit luhna rack | Inkar 75 mm aṭanga conduit lenzawng tê ber chanve thleng; area ≥ 4×; 50% tihtawp-ah ≤ 1.0 m/s | 9.8.2 | |
| C19 | Detention orifice screen | Orifice aia kua tê zawk; area hawng ≥ 10× | 9.8.5 | |
| C20 | Pump station | Belhchian 9C checklist kim | 9.9 | |
| C21 | 1% AEP still-water level hnuaia outfall-a gate; hupna pahnihna; thir ei do thei fitting | — | 9.10 | |
| C22 | Grate load class, parallel kua ≤ 25 mm, kerb kua ≥ 100 mm × 1.0 m, khuh lock | — | 9.11 | |
| C23 | Manhole size (Table 9.4), luhna kua 600 mm, drop, benching, surcharge khuh | — | 9.12 | |
| C24 | Exposure class (Table 9.5); coastal leh delta hmunah chloride leh sulphate test; sulphide humhalhna; tuifinriat kam aṭanga 5 km chhunga thir hnathawh | — | 9.13 |
Section D — Variance
Table 9F.4 — Form 9-1, Section D: variance
| Clause | Mamawh zawm loh | A chhan leh thlan dang rawt | Phalna petu leh ni |
|---|---|---|---|
| ______ | ______ | ______ | ______ |
Section E — Hmingziak
Report hi registered professional-in a buatsaih a, a hming a ziak tur a ni a, Professional Design Certificate (Form 10-3) belh tur a ni (Bung 10-a Clause 10.6.1 leh 10.6.3). Embankment nei facility, hlauhawmna sang basin, pump hmang facility, tide gate emaw regional facility tan, hming ziaktu chu empanelled Stormwater Design Professional a ni tur a ni a, empanelled professional hrang pahnihna-in endiktu angin hming a ziak tur a ni (Clause 10.6.1(c), (d) leh 10.6.4).
Table 9F.5 — Form 9-1, Section E: hmingziak
| Mawhphurhna | Hming | Registration emaw empanelment no. | Hmingziak | Ni |
|---|---|---|---|---|
| Designer | ______ | ______ | ______ | ______ |
| Endiktu hrang (Clause 10.6.4, a huam chuan) | ______ | ______ | ______ | ______ |
Draft form — Mizoram Ruahtui Luanna Design Kaihhruaina Bu, Draft v1.0.