Annexes to Chapter 2Design Rainfall and Design Storms
These annexes support Chapter 2. Annexes 2A to 2E will hold the statewide rainfall tables that Chapter 2 refers to: the benchmark checks and zone map, sub-daily ratios, grid-to-point factors, temporal patterns and retention depths. Each needs analysis of NIH-DHAARA and IMD records that has not yet been done for this Manual, so each is marked "To be prepared" and gives its intended layout and the rule to use until it is published (Clause 1.11.5). Form 2-1 is a draft form for the Design Rainfall Sheet that every hydrologic submittal must include (Clause 2.13). The Manual is a draft; it is not adopted by any government or agency.
Annex 2A — NIH-DHAARA vs IMD station and IMD gridded checks at benchmark points; zone map
Supports Clauses 2.3.1 to 2.3.5 of Chapter 2.
To be prepared. This annex will compare, at benchmark points across the State, the NIH-DHAARA design depths with frequency analyses of long IMD daily station records and of IMD gridded daily data (converted to point values with Annex 2C), for 24 hours and longer and for the AEPs of Table 2.1. It will also contain the map of rainfall zones used by Annexes 2B, 2C and 2E and by the Tier B tables of Chapter 4. It needs NIH-DHAARA values at the benchmark coordinates (NIH), IMD daily and recording-gauge station records and IMD gridded rainfall (IMD), State rain-gauge records (the district and tehsil rain gauges whose readings IMD and the State report, the gauges of WRD and NVDA, and any network of MPSDMA [TBC]), and district and basin boundaries (Survey of India, WRD). Until it is published, design depths are taken from NIH-DHAARA under Clause 2.3.1, the cross-checks of Clause 2.3.3 are reported on Form 2-1, and the zone of a site is the one agreed with the Authority and recorded on Form 2-1.
Table 2A.1 — Benchmark comparison of design depths (layout)
| Benchmark point | IMD station ID | Latitude, longitude | Years of record | Duration (h) | AEP | NIH-DHAARA (mm) | IMD station analysis (mm) | IMD gridded, point value (mm) | NIH-DHAARA / IMD station | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 24 | ||||||||||
| 48 | ||||||||||
| 72 |
2A.1 The zone names below are the working names used in the Tier B table template of Chapter 4 (Clause 4.14.2). Their boundaries, and whether further zones are needed, are to be set by the analysis of this annex.
Table 2A.2 — Rainfall zones (layout)
| Zone (working name) | Extent (districts, basins) | Representative stations | Notes |
|---|---|---|---|
| MP-Z1 Malwa and Gird | The north-west of the State: the Malwa plateau and the Gird and Chambal plains, mostly in CWC subzone 1(b), with the Gird districts of subzone 1(c) (Shivpuri, Datia, Guna east) and the Mahi catchment of subzone 3(a) in Dhar and Ratlam (Clause 2.3.6(b)); catchments that cross a zone line take the higher zone value | Indore (A) 42754 (daily record 1901–2012), Ujjain 42662 (from 1960), Ratlam 42661 (1948–2009), Nimach 42547 (1879–2008), Gwalior 42361 (from 1940), Guna 42559 (from 1931), Shivpuri 42459 (from 1961), Sheopur 42456 (from 1951) | Annual normals about 700–1,100 mm (Bhind 705.1, Gwalior 785.9, Neemuch 808.9, Ujjain 899.6, Indore 929.1, Guna 1,098.5 mm; IMD, 1901–1950). FER 50-yr 24-h about 240–320 mm (Indore about 280, on the contour; Ujjain and Ratlam 280–320; a closed cell of more than 360 mm near Nagda; Gwalior inside a closed cell of more than 280 mm; Shivpuri about 240); 1-h ratio 0.35 (1(b)), 0.32 (1(c)), 0.36 (3(a)). Records: Mohidpur (Ujjain) 434.3 mm (29 Jul 1950), Biaora (Rajgarh) 431.8 mm (7 Jul 1952), Sheopur 388.0 mm (15 Jul 1979), Guna 337.2 mm (23 Jun 2011), Dewas 334.3 mm (26 Sep 1961), Ratlam 319.0 mm (28 Jul 1996), Gwalior 316.2 mm (7 Sep 1891), Ujjain 301.0 mm (10 Aug 2006), Indore 293.4 mm (27 Jul 1913) (IMD; CWC FER 1(b)). NIH-DHAARA 50-yr 24-h low here (Gwalior 198, Shivpuri 209, Mandsaur 214, Indore 252 mm) |
| MP-Z1 Malwa and Gird: MP-A Malwa plateau | Indore (the city and the north of the district), Ujjain, Dewas, Ratlam, Mandsaur, Neemuch, Shajapur, Agar Malwa, Rajgarh, north Dhar and north Sehore (Ashta); boundaries [TBC] | Indore (A), Ujjain, Ratlam, Nimach; no long-record IMD station at Dewas or Mandsaur town | Deep black soils on the Deccan trap; hard-rock aquifers, with most of the State's over-exploited units (Ratlam district 134% in 2024; Ujjain, Ghatia and Badnagar blocks) (CGWB, as reported). The latest onset (Neemuch 25 June) and earliest withdrawal (Neemuch 26 September) in the State (IMD). Receiving waters: the Kanh (Khan) and the Saraswati at Indore, the Kshipra at Ujjain, the Gambhir dam and Gandhi Sagar on the Chambal (full reservoir level 399.9 m, maximum water level 401 m, as reported); no danger level or highest flood level found for the Kanh or the Kshipra [TBC] |
| MP-Z1 Malwa and Gird: MP-B Gird–Chambal | Gwalior, Morena, Bhind, Sheopur, Datia, Shivpuri and Guna; boundaries [TBC] | Gwalior, Guna, Shivpuri, Sheopur | Gird and Chambal alluvium with ravine clays, and Bundelkhand granite to the south; Gwalior district 4–29 m below ground before the monsoon (2012, CGWB, as reported). About 454.6 mm fell over Shivpuri district in 38 hours in August 2021 (as reported), nearly twice its plate value. Receiving waters: the Swarnrekha and the Morar at Gwalior, the Sank (Tighra dam), the Sindh and the Chambal; dam-release floods on the Sindh in 2021 (as reported); no flood level found for the Swarnrekha [TBC] |
| MP-Z2 Vindhyan plateau, Bundelkhand and Baghelkhand | The centre-north and north-east: the Bhopal plateau and Bundelkhand in CWC subzone 1(c), and Baghelkhand in subzone 1(d) (Clause 2.3.6(b)); catchments that cross a zone line take the higher zone value | Bhopal (Bairagarh) (A) 42667 (from 1951), Sagar 42671 (from 1875), Nowgong 42467 (from 1901), Satna 42571 (from 1879), Rewa 42574 (from 1965), Umaria 42679 (from 1931), Sidhi 42577 (from 1958) | Annual normals about 1,100–1,400 mm (Satna 1,129.8, Sagar 1,229.4, Bhopal 1,260.2, Sidhi 1,387.8 mm; IMD, 1901–1950). FER 50-yr 24-h about 240–320 mm (Bhopal 280–320, Sagar about 280, Damoh and Katni 240–280, Chhatarpur about 320, Rewa and Satna 240–280, Shahdol about 280, Sidhi inside a closed cell of more than 320 mm); 1-h ratio 0.32 (1(c)) and 0.37 (1(d)). Records: Sagar 475.6 mm (4 Jul 2005), Nowgong 462.8 mm (20 Jun 1897), Panna 378.3 mm (4 Sep 1978), Tikamgarh 370.0 mm (2 Aug 1984), Umaria 365.3 mm (19 Aug 1923), Bhopal 291.6 mm (14 Aug 2006), Rewa 278.5 mm (4 Sep 1990) (IMD). Satna 562.6 mm and Rewa 773.4 mm in 1882 are given by IMD and CWC sources that disagree on the month, and are not used until IMD confirms them [TBC]. NIH-DHAARA 50-yr 24-h close to the plates at Bhopal (280 mm) and Rewa (287 mm), high at Sagar (342 mm) |
| MP-Z2 Vindhyan plateau, Bundelkhand and Baghelkhand: MP-C Bhopal plateau and Bundelkhand | Bhopal, Vidisha, north Raisen, Sehore (except Ashta and the Narmada side), Sagar, Damoh, Tikamgarh, Niwari, Chhatarpur, Panna and Ashoknagar; boundaries [TBC] | Bhopal (Bairagarh) (A), Sagar, Nowgong | Vindhyan sandstone with black soils in the valleys (Bhopal), Bundelkhand granite (Tikamgarh, Chhatarpur) and mixed red and black soils; Bhopal district at 79% stage of extraction (2024, as reported). Receiving waters: the Upper Lake (Bhojtal) and the Lower Lake, whose outflow passes through the Bhadbhada sluice gates to the Kaliasot, the Kerwa and Kolar reservoirs, the Halali and the Betwa, the Dhasan and the Ken; gate-controlled lake outfalls, and the Upper Lake's full tank level given both as 1,666.80 ft (about 508.04 m) and as 508.65 m [TBC]; the Chandela tanks of Bundelkhand were not researched [TBC] |
| MP-Z2 Vindhyan plateau, Bundelkhand and Baghelkhand: MP-E Baghelkhand–Sone | Rewa, Satna, Maihar, Sidhi, Singrauli, Shahdol, Umaria, Anuppur and east Katni; boundaries [TBC] | Satna, Rewa, Umaria, Sidhi | Vindhyan sandstone and shale of the Kaimur and Rewa plateaus, red and yellow soils with patches of black soil (CWC FER 1(d)). The highest 1-h ratio in the State (0.37) and strong October storms (Satna 269.4 mm on 4 Oct 1978, Rewa 196.4 mm on 4 Oct 2001) (IMD). Receiving waters: the Bichhiya and the Beehar at Rewa, the Tons, the Johilla and the Sone, and the Bansagar reservoir; no CWC site found for a city outfall [TBC] |
| MP-Z3 Narmada valley, Satpura and the south | The south of the State: the Narmada valley and the Satpura in CWC subzone 3(c), Nimar in subzone 3(b), Jhabua in subzone 3(a) and the Wainganga basin in subzone 3(f) (Clause 2.3.6(b)); catchments that cross a zone line take the higher zone value | Jabalpur (A) 42675 (from 1867), Hoshangabad 42763 (from 1867), Pachmarhi 42767 (from 1875), Khandwa 42855 (from 1901), Mandla 42776 (from 1950), Betul 42860 (from 1948), Chhindwara 42768 (from 1949), Seoni 42771 (from 1901) | Annual normals about 730–1,600 mm and more than 2,000 mm at Pachmarhi (Manawar 72.9 cm, Khandwa 85.1, Jabalpur 138.0, Seoni 139.0, Mandla 149.9, Pachmarhi 207.5 cm; CWC FER annexes). FER 50-yr 24-h about 280–360 mm (Jabalpur about 320, at the edge of a closed cell; Narmadapuram 320–360; Mandla about 280; Khargone and Barwani inside a closed cell of more than 280 mm), more than 440 mm at Pachmarhi; 1-h ratio 0.34 (3(c)), 0.31 (3(b)), 0.32 (3(f)). Records: Mohpani (Narsinghpur) 460 mm (31 Aug 1976), Pachmarhi 458.7 mm (2 Aug 1913), Narsinghpur 422.1 mm (7 Sep 1891), Hoshangabad 380.0 mm (14 Aug 2006), Betul 375.4 mm (8 Jul 2007), Jabalpur 342.9 mm (30 Jul 1915) (IMD; CWC FER 1(c) and 3(c)). NIH-DHAARA 50-yr 24-h high here (Narmadapuram 379, Jabalpur 336 mm) |
| MP-Z3 Narmada valley, Satpura and the south: MP-D Narmada valley and Satpura | Jabalpur, Narsinghpur, Narmadapuram with Itarsi and Pachmarhi, Harda, Betul, Khandwa, Burhanpur, Mandla, Dindori, north Chhindwara, and the Narmada side of Sehore and Raisen; boundaries [TBC] | Jabalpur (A), Hoshangabad, Pachmarhi, Khandwa, Mandla, Betul | Deep black soils "from Sihora to Hardakhas" along the Narmada (the Haveli clays), medium black soils along the Tapi and shallow black soils from Betul to Multai (CWC FER 3(c)); the lowest loss rate of any subzone in the State (1 mm/h). Recording-gauge maxima at Jabalpur: 90 mm in 1 h (17 Jun 1980) and 146 mm in 3 h (Aug 1972); at Mandla 90 mm in 1 h and 151 mm in 3 h (7 Aug 1974) (CWC FER 3(c)). The earliest onset in the State (Khandwa 16 June, Jabalpur 19 June) (IMD). Receiving waters: the Narmada at Hoshangabad (danger 293.8 m, highest level 301.33 m, 1972), Barmanghat (331.32 m, 1973) and Mandla (439.405 m, 1974) (CWC, as given in search summaries), below Bargi (full reservoir level 422.76 m), Tawa and Indira Sagar, whose releases set the river level; the Omti nala at Jabalpur; the Tapi at Burhanpur; no level found for Gwarighat [TBC] |
| MP-Z3 Narmada valley, Satpura and the south: MP-F Nimar and the south-west | Khargone, Barwani, Alirajpur, Jhabua, south Dhar and the south of Indore district (Mhow); the Mahi catchment of Jhabua lies in subzone 3(a); boundaries [TBC] | Khandwa (nearest long record), and the shorter records of Khargone, Dhar and Alirajpur | Black soils on basalt; Pansemal (Barwani) over-exploited (CGWB, as reported). The lowest annual normals of the south (Manawar 72.9 cm, Jhabua 77.0 cm, Khargone 79.5 cm; CWC FER 3(b)) and the highest loss rate of any subzone in the State (5 mm/h, 3(b)). Records: Khargone 400.3 mm (20 Jun 1938) and Alirajpur 331.2 mm (21 Jul 1971) (IMD); 84 mm in 1 h at Thikri (7 Aug 1973). Receiving waters: the Narmada at Mandleshwar (highest level 157.29 m, 1973, CWC, as given in search summaries), below Omkareshwar and Maheshwar; the Mahi |
| MP-Z3 Narmada valley, Satpura and the south: MP-G Wainganga (south-east) | Balaghat, Seoni, Pandhurna and south Chhindwara (the Wainganga, Pench and Kanhan basins); boundaries [TBC] | Seoni, Chhindwara | Red and yellow soils with black soils in the valleys; the wettest part of the east, with about 1,857 mm a year near Lanji (Balaghat) (CWC FER 3(f)); the 3(f) plates were not read for this Manual [TBC]. Receiving waters: the Wainganga, the Pench and the Kanhan, draining to the Godavari |
Annex 2B — Sub-daily ratios P(t)/P(24h) by zone: NIH-DHAARA (hourly-based) vs the one-third rule
Supports Clauses 2.6.1 to 2.6.4 of Chapter 2.
To be prepared. This annex will tabulate, for each zone of Annex 2A, the ratios of the t-hour to the 24-hour design depth from NIH-DHAARA, which are derived from hourly records, against the ratios implied by IMD Das et al. (2022) and by the one-third rule. It needs NIH-DHAARA depths for each duration at representative points in each zone (NIH), IMD recording-gauge data and the IDF values of Das et al. (2022) (IMD). Until it is published, sub-daily depths are read directly from NIH-DHAARA or an approved station IDF (Clause 2.6.1). Where only daily depths are available, the ratios used are those agreed with the Authority, which in Madhya Pradesh are those of Clause 2.3.6: the CWC Flood Estimation Report ratios for the site's subzone in Table 2B.1, used as they stand at every AEP, with no absolute floor, and checked at 3 hours or less against the IMD Jabalpur panel within 10 km of Jabalpur (A) (Clause 2.6.2), and are recorded on Form 2-1. The one-third rule is not used (Clause 2.6.4).
2B.1 The first row of Table 2B.1 gives the ratios of the one-third rule P(t) = P(24)·(t/24)^(1/3), for comparison only. The 1, 3, 6 and 12 h values are those stated in the commentary to Clause 2.6; the 2 h value is computed from the same formula. The rule shall not be used for design unless this annex confirms it for the zone concerned (Clause 2.6.4).
Table 2B.1 — Ratios P(t)/P(24h) by zone (layout)
| Zone | Source | 1 h | 2 h | 3 h | 6 h | 12 h | 24 h |
|---|---|---|---|---|---|---|---|
| All (reference only, not for design) | One-third rule | 0.35 | 0.44 | 0.50 | 0.63 | 0.79 | 1.00 |
| MP-Z1 (MP-A; MP-B in subzone 1(b): Gwalior, Morena, Bhind, Sheopur, Guna west) | CWC FER 1(b), 50-yr (interim design ratios, Clause 2.3.6(f)) | 0.35 | 0.53 | 0.67 | 0.80 | 1.00 | |
| MP-Z1 and MP-Z3 (the Mahi catchment, subzone 3(a): Jhabua, Petlawad, north-west Dhar and south-west Ratlam) | CWC FER 3(a), 50-yr (interim design ratios, Clause 2.3.6(f)) | 0.36 | 0.57 | 0.70 | 0.85 | 1.00 | |
| MP-Z2 (MP-C) and MP-Z1 (MP-B in subzone 1(c): Shivpuri, Datia, Guna east) | CWC FER 1(c), 50-yr (interim design ratios, Clause 2.3.6(f)) | 0.32 | 0.50 | 0.65 | 0.79 | 1.00 | |
| MP-Z2 (MP-E) | CWC FER 1(d), 50-yr (interim design ratios, Clause 2.3.6(f)) | 0.37 | 0.58 | 0.70 | 0.89 | 1.00 | |
| MP-Z3 (MP-D) | CWC FER 3(c), 10-yr basis (interim design ratios, Clause 2.3.6(f)) | 0.34 | 0.50 | 0.63 | 0.79 | 1.00 | |
| MP-Z3 (MP-F, except the Mahi catchment) | CWC FER 3(b), 10-yr basis (interim design ratios, Clause 2.3.6(f)) | 0.31 | 0.49 | 0.63 | 0.81 | 1.00 | |
| MP-Z3 (MP-G) | CWC FER 3(f), 10-yr basis (interim design ratios, Clause 2.3.6(f)) | 0.32 | 0.52 | 0.65 | 0.79 | 1.00 | |
| MP-Z3 (MP-D): Jabalpur | IMD Das et al. (2022), Jabalpur panel, 50-yr, digitised to about ±2 mm/h (check at 3 hours or less within 10 km of Jabalpur (A), Clause 2.3.6(g); its 24-hour end is about 40% below the 3(c) plate, so these ratios are not used) | 0.51 | 0.65 | 0.86 | 0.92 | 1.00 | |
| MP-Z3 (MP-D): Jabalpur | CWC FER 3(c), Annexure 4.2: the recording-gauge maxima of 1972 and 1980 as ratios to the 24-h maximum of the same record (single events, comparison only) | 0.34 | 0.54 | 0.74 | 0.82 | 1.00 | |
| MP-Z2 (MP-C): Bhopal | NIH-DHAARA, 50-yr, Bhopal cell (comparison only; 3- and 6-hour values not queried) | 0.22 | 0.36 | 0.84 | 1.00 | ||
| MP-Z2 (MP-C): Sagar | NIH-DHAARA, 50-yr, Sagar cell (comparison only; 3- and 6-hour values not queried) | 0.23 | 0.38 | 0.79 | 1.00 | ||
| MP-Z1 (MP-A): Indore | NIH-DHAARA, 50-yr, Indore cell (comparison only; 3- and 6-hour values not queried) | 0.23 | 0.36 | 0.81 | 1.00 | ||
| MP-Z1 (MP-B): Gwalior | NIH-DHAARA, 50-yr, Gwalior cell (comparison only; 3- and 6-hour values not queried) | 0.25 | 0.40 | 0.79 | 1.00 | ||
| MP-Z3 (MP-D): Jabalpur | NIH-DHAARA, 50-yr, Jabalpur cell (comparison only; 3- and 6-hour values not queried) | 0.21 | 0.34 | 0.77 | 1.00 | ||
| MP-Z3 (MP-D): Narmadapuram | NIH-DHAARA, 50-yr, Narmadapuram cell (comparison only; 3- and 6-hour values not queried) | 0.24 | 0.38 | 0.82 | 1.00 |
2B.2 Depths from fixed observation windows are converted to true-interval depths with the factors of Clause 2.6.3, repeated in Table 2B.2. They are the standard WMO (Hershfield) values and are not provisional.
Table 2B.2 — Fixed-interval adjustment factors (Clause 2.6.3)
| Number of fixed observation intervals in the duration | Factor |
|---|---|
| 1 | 1.13 |
| 2 | 1.04 |
| 3–4 | 1.02 |
Annex 2C — Grid-to-point factors
Supports Clauses 2.7.1 and 2.7.4 of Chapter 2.
To be prepared. This annex will give the factors that convert grid-average design depths (for example from 0.25° cells) to point depths, by zone, duration and AEP. It needs paired frequency analyses of IMD gridded rainfall and of the IMD and State gauges inside each cell (IMD, WRD and NVDA, and the district and tehsil rain gauges of the State [TBC]), the benchmark points of Annex 2A, and a stated method for deriving the factors. Until it is published, design depths are taken as point values from NIH-DHAARA or an approved station IDF (Clauses 2.3.1 and 2.3.2). Grid-average values are not used as design depths unless a conversion agreed with the Authority is recorded on Form 2-1 (Clause 1.11.5).
2C.1 The commentary to Clause 2.7 shows why the factors matter, and in Madhya Pradesh the reanalysis cells err both ways. At Gwalior the IMDAA cell of NIH-DHAARA (about 12 km) gives a 50-year 24-hour depth of about 198 mm and a 100-year depth of about 224 mm, while the Gwalior gauge recorded 316.2 mm on 7 September 1891 and the CWC plate gives about 280 mm; at Shivpuri the cell's 50-year value, about 209 mm, is below the station's record of 244.0 mm (9 July 1968), and about 454.6 mm fell over the district in 38 hours in August 2021 (as reported). At Narmadapuram the cell's value, about 379 mm, is above the plate value of about 320–360 mm, and at Sagar its value of about 342 mm is above the plate value of about 280 mm, though below the station's record of 475.6 mm (4 July 2005). The cells' 50-year 1-hour depths, about 50–91 mm, are 0.20–0.31 of their 24-hour depths, and at Bhopal 61.6 mm against about 90–102 mm from the 1(c) plates and ratios (NIH-DHAARA, queried 6 Nov 2026; IMD; CWC). Values of this kind are grid-average values and need these factors before any use as point depths; under Clause 2.3.6 they are not used as design depths in Madhya Pradesh until this annex and Annex 2A are published.
Table 2C.1 — Grid-to-point factors (layout)
| Zone | Grid product and cell size | Duration (h) | AEP | Factor (point / grid) | Stations used | Years of record |
|---|---|---|---|---|---|---|
| 24 | ||||||
| 48 | ||||||
| 72 |
Annex 2D — Madhya Pradesh temporal patterns (Huff curves)
Supports Clauses 2.9.3 and 2.9.4 of Chapter 2, and Clause 11.7.3 of Chapter 11.
To be prepared. This annex will give dimensionless time-distribution (mass) curves of Madhya Pradesh storms, in the form introduced by Huff (1967), by zone, storm-duration class and quartile, at stated probability levels. It needs storm hyetographs from recording gauges and automatic weather stations (IMD, its automatic weather stations and automatic rain gauges in the State, under the Meteorological Centre Bhopal, and any recording gauges of WRD and NVDA [TBC]), separated into independent storms by a stated rule, and the Bhopal storm of 22 July 1973, the Sagar storm of 4 July 2005, the Bhopal storm of 13–14 August 2006, the storm over the Narmada catchment of 28–29 August 2020, the Shivpuri storm of 2–4 August 2021, the Bhopal storm of 22 August 2022 and the Indore storm of September 2023 among them. Until it is published, design storms use the alternating-block pattern of Clause 2.9.1 and the 48- and 72-hour pattern of Clause 2.9.2; for catchments of 25–5,000 km², the CWC Flood Estimation Report curves may be used with a sensitivity run under Clause 2.9.1 (Clause 2.9.4). SCS Type distributions are not used (Clause 2.9.3). For the disaggregation of daily records in continuous simulation (Clause 11.7.3), the method is agreed with the Authority and recorded (Clause 1.11.5).
Table 2D.1 — Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
| Fraction of storm time | 0 | 0.1 | 0.2 | 0.3 | 0.4 | 0.5 | 0.6 | 0.7 | 0.8 | 0.9 | 1.0 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 10% probability curve | 0 | 1.0 | |||||||||
| 50% probability curve | 0 | 1.0 | |||||||||
| 90% probability curve | 0 | 1.0 |
2D.1 Each table shall state the zone, the duration class, the quartile (the quarter of the storm in which most rain fell), the number of storms analysed and the period of record.
Reference: Huff, F.A. (1967). Time distribution of rainfall in heavy storms. Water Resources Research 3(4), 1007–1019.
Annex 2E — Retention percentile depths by zone
Supports Clauses 2.8.3 and 2.10.1 to 2.10.2 of Chapter 2, Clause 4.4 of Chapter 4 and Chapter 8.
To be prepared. This annex will give, for each zone of Annex 2A, the retention design depth P_R: the 24-hour rainfall depth not exceeded on 90% of days with rain (≥ 2.5 mm) in the long-term record (Clause 2.10.1). It needs long daily records at stations in each zone (IMD, WRD and NVDA, and the district and tehsil rain gauges of the State [TBC]) and IMD gridded data with the factors of Annex 2C where stations are sparse. Until it is published, P_R is computed by the definition of Clause 2.10.1 from the long-term daily record of a station agreed with the Authority, by the steps in 2E.1, and recorded on Form 2-1 (Clause 1.11.5).
2E.1 Computing P_R from a daily record.
- Take the daily (24-hour) rainfall series of the station for its full record.
- Keep only the days with rain of 2.5 mm or more (wet days).
- Rank the wet-day depths and take the depth not exceeded on 90% of them (the 90th percentile).
- Do not apply the climate factor (Clause 2.8.3) or the fixed-interval factor; P_R is a statistic of everyday rainfall, not an AEP design depth.
- Record the station, the period of record, the number of wet days and P_R on Form 2-1.
Table 2E.1 — Retention depth P_R by zone (layout)
| Zone | Stations or grid cells used | Period of record | Number of wet days (≥ 2.5 mm) | P_R, 90th percentile (mm) | Issued on |
|---|---|---|---|---|---|
| MP-Z1 Malwa and Gird | |||||
| MP-Z2 Vindhyan plateau, Bundelkhand and Baghelkhand | |||||
| MP-Z3 Narmada valley, Satpura and the south |
Form 2-1 — Design Rainfall Sheet
Supports Clauses 2.3 to 2.13 of Chapter 2, and Clause 10.4.1(d) of Chapter 10.
Draft form — Madhya Pradesh Stormwater Design Manual, Draft v1.0. One sheet for each hydrologic submittal. The steps follow Figure 2.3 of Chapter 2.
Table 2F.1 — Form 2-1: site, source and storms
| No. | Item (clause) | Entry |
|---|---|---|
| A. Site (Clause 2.13, item 1) | ||
| A1 | Project and site | ______ |
| A2 | Site coordinates (latitude, longitude, decimal degrees) | ______ |
| A3 | Rainfall zone (Annex 2A, or as agreed with the Authority) | ______ |
| A4 | Contributing catchment area (km²) (Clause 2.7) | ______ |
| A5 | Design life: more than 25 years / temporary works, 5 years or less (Clause 2.8.2) | ______ |
| A6 | Outfall under tidal or river backwater influence: Yes / No (Clauses 2.5.3, 2.12) | ______ |
| B. Source (Clauses 2.3, 2.3.5; item 2) | ||
| B1 | NIH-DHAARA: version or access date | ______ |
| B2 | Coordinates queried | ______ |
| B3 | Screenshot or export of the values extracted attached: reference | ______ |
| B4 | Station IDF used (Clause 2.3.2): No / Yes — station, ID, distance from site (km) | ______ |
| B5 | Station IDF: years of recording-gauge data (30 or more); published or approved by | ______ |
| B6 | Station IDF: change of terrain or coastal exposure between gauge and site: None / describe | ______ |
| C. AEPs and durations (Clauses 2.4, 2.5) | ||
| C1 | Elements designed and their AEPs (Table 2.1) | ______ |
| C2 | Conveyance: Tc and design duration (not less than 10 min) (Clause 2.5.1) | ______ |
| C3 | Storage: durations checked from {1, 2, 3, 6, 12, 24, 48, 72 h}; 24, 48 and 72 h included (Clause 2.5.2) | ______ |
| C4 | Critical duration found for each storage element | ______ |
| D. Conversions | ||
| D1 | Sub-daily depths: read directly / from Annex 2B ratios / from ratios agreed with the Authority (Clauses 2.6.1, 2.6.2) | ______ |
| D2 | Fixed-interval factor applied: none (true-interval source) / 1.13 / 1.04 / 1.02 (Clause 2.6.3) | ______ |
| D3 | Grid-to-point factor: not needed (point source) / Annex 2C / agreed value (Clause 2.7.1) | ______ |
| D4 | ARF: 1.0 (10 km² or less; single-site storage) / CWC curve / interpolated (Clauses 2.7.2–2.7.4) | ______ |
| D5 | Climate factor: 1.20 (≤ 6 h) and 1.10 (> 6–72 h) / 1.0 temporary works / projected depths under Clause 2.8.4 | ______ |
| E. Cross-checks (Clause 2.3.3; item 4) | ||
| E1 | IMD Das et al. (2022) values for 1–24 h: reported in Table 2F.2 | ______ |
| E2 | CWC subzone 1(b) / 1(c) / 1(d) / 3(a) / 3(b) / 3(c) / 3(f) 24-hour point value, catchments of 25–5,000 km²: subzone used | ______ |
| E3 | CWC floor governs for any AEP: No / Yes — AEPs | ______ |
| F. Retention depth (Clause 2.10) | ||
| F1 | P_R (mm) and source: Annex 2E zone value / computed under Annex 2E, 2E.1 — station and period | ______ |
| F2 | No climate factor applied to P_R (Clause 2.8.3): confirmed | ______ |
| G. Design storms (Clauses 2.9, 2.11, 2.12; items 5 and 6) | ||
| G1 | Storms up to 24 h: alternating block, peak at 50%; time step (≤ Tc/3 and ≤ 15 min) | ______ |
| G2 | 48 and 72 h storms: built under Clause 2.9.2 (Table 2F.3) | ______ |
| G3 | Other pattern used: none / Annex 2D / CWC FER with sensitivity run (Clauses 2.9.3, 2.9.4) | ______ |
| G4 | Hyetographs attached as a table and a plot for each design storm: reference | ______ |
| G5 | AMC: III for every design storm of 15 July–30 September in MP-A, MP-C and MP-D, and of July–August in MP-B, MP-E, MP-F and MP-G, whatever its duration; at any other time, III for a storm that follows or contains a 5-day total of more than 53 mm; II otherwise (Clause 2.11.4) | ______ |
| G6 | Pre-development condition: greenfield, open land in good condition for the mapped HSG (Clause 2.11.5) | ______ |
| G7 | Release criterion: standard, Q_post ≤ 0.9 × Q_pre (Clause 2.11.2) / flood-sensitive, mixed-frequency rule (Clause 2.11.3) | ______ |
| G8 | Tailwater joint cases run (Clause 2.12): case (a) MHWS + sea-level allowance; case (b) 10% AEP 48 h storm with 1% AEP still-water level + sea-level allowance; governing case | ______ |
| H. Prepared by | ||
| H1 | I confirm that the values above are those extracted and used in the submittal. Name, registration number, signature, date | ______ |
Design depth = source depth × fixed-interval factor × grid-to-point factor × ARF × climate factor. Where the design depth is lower than the CWC floor for the same AEP, the floor is adopted (Clause 2.3.3).
Table 2F.2 — Form 2-1: depth table (Clause 2.13, item 3)
| AEP (T-yr) | Duration | Source depth (mm) | Fixed-interval factor | Grid-to-point factor | ARF | Climate factor | Design depth (mm) | IMD Das et al. (2022) (mm) | CWC floor (mm) | Adopted depth (mm) |
|---|---|---|---|---|---|---|---|---|---|---|
Table 2F.3 — Form 2-1: 48- and 72-hour storm construction (Clause 2.9.2)
| AEP (T-yr) | Duration (h) | Total design depth (mm) | 24 h design depth, final 24 h (mm) | Remainder (mm) | Hours before the final 24 h | Uniform intensity before the final 24 h (mm/h) |
|---|---|---|---|---|---|---|
| 48 | 24 | |||||
| 72 | 48 |