Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Madhya Pradesh soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Madhya Pradesh to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Madhya Pradesh Department of Agriculture (soil survey) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Water Resources Department, supplemented by piezometers in the floodplains of the Narmada, the Chambal, the Betwa, the Kshipra and their tributaries, the deep black-soil plains of the Narmada valley from Jabalpur to Narmadapuram and Harda, and the foreshores of the Upper Lake, the Lower Lake and the other lakes and talabs of Bhopal, Indore and the other cities. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of June–September record | Highest June–September level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Madhya Pradesh CN calibration and supplementary land covers (cracked black-soil fallow, talab and lake beds, Chambal ravines, sandstone, granite and laterite rock, Vindhyan and Satpura forest and scrub)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Madhya Pradesh catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the black-soil fallow of Malwa and the Narmada valley while it is still dry and cracked early in the monsoon; the beds of talabs and the foreshores of lakes and reservoirs, such as the Upper Lake at Bhopal, that are dry or cultivated at the start of a storm; the ravines of the Chambal and its tributaries in Sheopur, Morena and Bhind, bare or under scrub; the bare or nearly bare rock outcrop and laterite caps of the Vindhyan sandstone plateau and the Bundelkhand granite; and the forest, scrub and grassland of the Vindhyan, Satpura and Maikal hills. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Black-soil fallow, Malwa and the Narmada valley, dry and cracked at the start of the storm (before 15 July) | ||||||
| Talab bed or lake and reservoir foreshore, dry or cultivated at the start of the storm | ||||||
| Ravines of the Chambal and its tributaries, bare or under scrub | ||||||
| Bare or nearly bare rock outcrop and laterite caps, Vindhyan sandstone and Bundelkhand granite | ||||||
| Forest, scrub and grassland of the Vindhyan, Satpura and Maikal hills | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Madhya Pradesh. Madhya Pradesh is landlocked and has no flat coastal plain, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The black-soil plains of Malwa and the Narmada valley, the river floodplains and the lake foreshores are flat in places but are not coastal plain; their slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4), not by a lower peak rate factor. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzones 1(b), 1(c), 1(d), 3(a), 3(b), 3(c) and 3(f), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzones 1(b) (Chambal), 1(c) (Betwa), 1(d) (Sone), 3(a) (Mahi and Sabarmati), 3(b) (Lower Narmada and Tapi), 3(c) (Upper Narmada and Tapi) and 3(f) (Lower Godavari), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the seven CWC Flood Estimation Reports that cover Madhya Pradesh: the Chambal subzone 1(b) (C/16/1988), which covers Malwa and the Gird, including Indore, Ujjain, Dewas, Ratlam, Mandsaur, Neemuch, Guna, Sheopur, Morena, Bhind and Gwalior; the Betwa subzone 1(c) (B/17/1989), which covers the Bhopal plateau and Bundelkhand, including Bhopal, Vidisha, Sagar, Damoh, Tikamgarh, Chhatarpur, Panna and Shivpuri; the Sone subzone 1(d) (S/15/1987), which covers Baghelkhand, including Rewa, Satna, Sidhi, Singrauli, Shahdol and Umaria; the Upper Narmada and Tapi subzone 3(c) (revised, UNT-3(c)/R-6/46/2002), which covers the Narmada valley and the Satpura, including Jabalpur, Narsinghpur, Narmadapuram, Itarsi, Pachmarhi, Betul, Mandla and Khandwa; the Lower Narmada and Tapi subzone 3(b) (revised, LNT/3(b)/R-7/47/2004), which covers Nimar, including Khargone, Barwani, Alirajpur, Mhow and the south of Dhar; the Lower Godavari subzone 3(f) (revised, LG-3(f)/R-2/24/1995), which covers the Wainganga side of the south-east, including Balaghat, Seoni and the south of Chhindwara; and the Mahi and Sabarmati subzone 3(a) (MS/13/1986, printed "M5/13/1986"), which covers the Mahi headwaters in Jhabua and the west of Dhar and Ratlam (see the References of Chapter 3); with the report for the Mahanadi subzone 3(d), which may cover a fringe of Anuppur and Dindori, still to be obtained, the printing conflicts listed in the note to Table 3E.1, the time-distribution and areal reduction tables, and the subzone boundaries within Madhya Pradesh, including those at Indore (1(b)/3(b)), Gwalior (1(b)/1(c)), Bhopal (1(c)/3(c)), Jabalpur (3(c)/1(c)/1(d)) and Khandwa (3(b)/3(c)), still to be confirmed on the reports' page images and index maps [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 1(b) relationship | Subzone 1(c) relationship | Subzone 1(d) relationship | Subzone 3(a) relationship |
|---|---|---|---|---|---|---|
| Time from centre of unit rainfall to peak | tp | h | tp = 0.339 (L/√S)^0.826 | tp = 2.195 qp^−0.944 | tp = 0.314 (L/√S)^1.012 (the exponent is printed 1.102 in the relationship table and 1.012 in the worked example and the design-storm formula; see the note) [TBC] | tp = 0.433 (L/√S)^0.704 |
| Peak discharge per unit area | qp | m³/s per km² | qp = 1.251 tp^−0.610 (relationship table; the step-by-step text prints 1.215 [TBC]) | qp = 1.331 (L/S)^−0.492, as printed; L/√S [TBC] | qp = 1.664 tp^−0.965 | qp = 1.161 / tp^0.635 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.215 qp^−1.034 | W50 = 2.04 qp^−1.026 | W50 = 2.534 qp^−0.976 | W50 = 2.284 / qp^1.00 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.191 qp^−1.057 | W75 = 1.25 qp^−0.864 | W75 = 1.478 qp^−0.860 | W75 = 1.331 / qp^0.991 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 0.834 qp^−1.077 | WR50 = 0.739 qp^−0.968 | WR50 = 1.091 qp^−0.750 | WR50 = 0.827 / qp^1.023 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.502 qp^−1.065 | WR75 = 0.500 qp^−0.813 | WR75 = 0.672 qp^−0.719 | WR75 = 0.561 / qp^1.037 |
| Base width of UH | TB | h | TB = 6.662 tp^0.613 | TB = 3.917 tp^0.990 | TB = 5.526 tp^0.866 | TB = 8.375 tp^0.512 |
| Unit duration | tr | h | 1 | 1 | 1 | 1 |
| Design storm duration | TD | h | TD = 1.1 tp, rounded to the nearest hour (the report also prints TD = 0.539 (L/√S)^0.724, read by optical character recognition only [TBC]) | TD = 1.1 tp, rounded to the nearest hour | TD = 1.1 tp = 0.345 (L/√S)^1.012, rounded to the nearest hour | TD = TB = 5.452 (L/√S)^0.360, rounded to the nearest whole hour |
| Design loss rate | — | mm/h | 1.7 (printed "0.17 cm/hr"; modal value) | 2.3 (printed "0.23 cm/hr"; modal value of about 102 events on 11 catchments) | 2.5 (printed "modal loss rate of 0.25 cm/hr"; one passage reads "0.45cm/hr" by optical character recognition [TBC]) | 4.5 (printed "0.45 cm/hr", modal value of 148 events); or, for average conditions, I = 0.56 R^0.66 / TD^0.59, with I in cm/h, TD in h and R the storm rainfall in cm as defined in the report [TBC] |
| Design base flow | — | m³/s per km² | qb = 0.207 A^−0.290, read by optical character recognition only [TBC] | 0.018 (30 of 102 events in the range 0.009–0.027) | Not located in the copy read; the worked example's 15.33 m³/s on 340.64 km² implies about 0.045 [TBC] | qb = 0.109 / A^0.126, A in km² |
| Ratio of t-hour to 24-hour rainfall | — | — | 50-yr: 1 h 0.35; 3 h 0.53; 6 h 0.67; 9 h 0.74; 12 h 0.80; 15 h 0.85; 18 h 0.90; 24 h 1.00 (independent of return period from 5 years) | 50-yr: 1 h 0.32; 3 h 0.50; 6 h 0.65; 9 h 0.72; 12 h 0.79; 15 h 0.84; 18 h 0.90; 24 h 1.00 (independent of return period from 5 years) | 50-yr: 1 h 0.37; 3 h 0.58; 6 h 0.70; 9 h 0.80; 12 h 0.89; 15 h 0.94; 18 h 0.98 (read by optical character recognition only [TBC]); 24 h 1.00 (independent of return period from 5 years) | 50-yr: 1 h 0.36; 3 h 0.57; 6 h 0.70; 9 h 0.78; 12 h 0.85; 15 h 0.89; 18 h 0.93; 24 h 1.00 |
| Time distribution of 24-hour rainfall | — | cumulative fraction | Fig. 12 of the report; not transcribed [TBC] | Fig. 12 of the report; not transcribed [TBC] | Average curves of Fig. 12(a)–(e) for storms of 2–3, 4–6, 7–12, 13–18 and 19–24 hours, and coefficients of Table A-2; not transcribed [TBC] | [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 | 1.15 | 1.15 |
| Areal reduction factor | ARF | — | ARF table of the report (p. 60), read by optical character recognition only: for 200 km², 66, 75, 81, 87 and 91%, and for 300 km², 60, 69, 76, 84 and 89%, with the durations of the columns not identified; to be read from the page image before use [TBC] | ARF table of the report, for areas up to 2,500 km², read by optical character recognition only [TBC] | Table 6 (p. 70), by optical character recognition: 50 km², 80% at 1 h, 88% at 3 h, 93% at 6 and 12 h and 97% at 24 h; 100 km², 73, 82, 88, 90 and 95%; 150 km², 68, 77, 84, 89 and 93%; 200 km², 64, 74, 82, 87 and 92%; from catchments with data up to 800 km², to be used with caution above that [TBC] | Table-6 of the report: 1 h, from 100% down to 60%; 3 h, to 68%; 6 h, to 74%, with increasing area, for areas up to 1,100 km² extrapolated to 2,500 km² [TBC] |
| 50-yr 24-hour point rainfall at Madhya Pradesh towns | — | mm | Plate 9: Indore about 280 (on the 1(b)/3(b) boundary); Ujjain about 280–320; Ratlam about 280–320; Gwalior about 280 (a closed ">280" cell, also on the 1(c) plate); Bhind about 240–280; a ">360" cell just north-east of Nagda | Plate 10: Bhopal about 280–320 (a ">320" cell immediately east); Sagar about 280; Damoh and Katni about 240–280; Chhatarpur and Tikamgarh about 280–320; Panna about 280–320; Shivpuri about 240; Guna about 280 | Plate 9: Rewa and Satna about 240–280; Shahdol about 280; Sidhi above 320; Katni about 240; Singrauli about 200–240 | Not read for the Madhya Pradesh part of the subzone [TBC] |
| Catchment area for which the relationships apply | A | km² | 25–2,500; up to 5,000 "based on sound judgement" | 25–2,500; up to 5,000 "judiciously" | Recommended for 25–1,500, usable to 5,000 with judgement | 25–1,500; up to 5,000 with judgement |
| Report reference | — | — | Relationship table (p. 20), pp. 21–23, §5.3 | Relationship table (p. 20), pp. 22–23 | Relationship table (p. 40), worked example (pp. 15–23), design storm (p. 49), rainfall ratios (p. 50), loss rate (pp. 84–88) | Table-4 (p. 29), §3.11 and §4.1 |
| Parameter | Symbol | Unit | Subzone 3(b) relationship | Subzone 3(c) relationship | Subzone 3(f) relationship |
|---|---|---|---|---|---|
| Time from centre of unit rainfall to peak | tp | h | tp = 0.583 (L·Lc/√S)^0.302 | tp = 0.995 (L·Lc/√S)^0.2654 | tp = 0.348 (L·Lc/√S)^0.454 (the table of the report prints L·Lc/S; see the note) [TBC] |
| Peak discharge per unit area | qp | m³/s per km² | qp = 1.914 tp^−0.763 | qp = 1.665 tp^−0.71678 | qp = 1.842 tp^−0.804 |
| Width of UH at 50% of peak | W50 | h | W50 = 1.849 qp^−0.976 | W50 = 1.9145 qp^−1.2582 | W50 = 2.353 qp^−1.005 |
| Width of UH at 75% of peak | W75 | h | W75 = 0.955 qp^−0.792 | W75 = 1.1102 qp^−1.2088 | W75 = 1.351 qp^−0.992 (exponent hand-corrected in the scan) [TBC] |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 0.738 qp^−0.781 | WR50 = 0.7060 qp^−1.3859 | WR50 = 0.936 qp^−1.047 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.438 qp^−0.641 | WR75 = 0.45314 qp^−1.3916 | WR75 = 0.579 qp^−1.004 |
| Base width of UH | TB | h | TB = 7.042 tp^0.559 | TB = 5.04537 tp^0.71637 | TB = 4.589 tp^0.894 |
| Unit duration | tr | h | 1 | 1 | 1 |
| Design storm duration | TD | h | TD = 1.1 tp | TD = 1.1 tp, rounded to the hour (5 h in the worked example) | TD = 1.1 tp |
| Design loss rate | — | mm/h | 5 (printed "5 mm/hr", from a range of 2 to 8 mm/h) | 1 (printed "1 mm/hr"; the worked example uses 0.10 cm/h) | 2 (printed "0.2 cm/hr") |
| Design base flow | — | m³/s per km² | 0.05 | 0.05 | 0.05 |
| Ratio of t-hour to 24-hour rainfall | — | — | 10-yr: 1 h 0.31; 3 h 0.49; 6 h 0.63; 9 h 0.73; 12 h 0.81; 15 h 0.87; 18 h 0.92; 24 h 1.00 | 10-yr: 1 h 0.34; 3 h 0.50; 6 h 0.63; 9 h 0.72; 12 h 0.79; 15 h 0.86; 18 h 0.91; 24 h 1.00 (the worked example reads 0.59 at 5 h) | 10-yr: 1 h 0.32; 3 h 0.52; 6 h 0.65; 9 h 0.73; 12 h 0.79; 15 h 0.85; 18 h 0.91; 24 h 1.00 |
| Time distribution of 24-hour rainfall | — | cumulative fraction | [TBC] | Annexure 4.3 of the report; not transcribed [TBC] | [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 | 1.15 |
| Areal reduction factor | ARF | — | [TBC] | Annexure 4.4 and Fig. 12(a) of the report; not transcribed, but the worked example interpolates 0.8754 for 223.77 km² and TD = 5 h [TBC] | [TBC] |
| 50-yr 24-hour point rainfall at Madhya Pradesh towns | — | mm | Plate 9: Khargone and Barwani (Thikri) about 280 (a ">280" cell); about 240–280 towards the 3(c) boundary | Plate 9: Jabalpur about 320 (the edge of a ">320" cell); Narmadapuram (Hoshangabad) about 320–360; Mandla about 280; Pachmarhi above 440; Itarsi about 360–400 | Not read for Balaghat, Seoni or Chhindwara [TBC] |
| Catchment area for which the relationships apply | A | km² | [TBC] | [TBC] | 25–1,000, with judgement above that |
| Report reference | — | — | [TBC] | Worked example for Railway Bridge No. 930; Plates 9 and 10 | [TBC] |
Note: relationships as printed in the seven CWC reports that cover Madhya Pradesh (References of Chapter 3), read from scanned copies and checked against the page images except where marked as read by optical character recognition only; L is the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km, S the equivalent slope in m/km and A the catchment area in km². The 50-yr point rainfalls were read by eye from the isopluvial plates and are good to about one contour. The reports for subzones 3(b) and 3(c) print both the relationships of their 1983 editions and revised ones; the revised relationships are given here. Several printing problems are to be resolved before use [TBC]. In subzone 1(b) the relationship table gives qp = 1.251 tp^−0.610, but the step-by-step procedure in the text prints 1.215 (p. 21); the two differ by about 3% in qp, and this Manual uses the table. In subzone 1(c) the peak equation is printed with "(L/S)", without the root sign that the other subzones use; whether L/√S was meant is to be checked against the axis of Fig. 3 of the report. In subzone 1(d) the relationship table prints tp = 0.314 (L/√S)^1.102, but the worked example computes "0.314 (34.94/√3.70)^1.012 = 5.90 hrs" and the design-storm formula is TD = 0.345 (L/√S)^1.012; the example's arithmetic matches 1.012, while 1.102 would give about 7.7 h, so this Manual uses 1.012 and treats 1.102 as a misprint. In subzone 3(f) the table of the report prints the tp term as L·Lc/S, while its text uses L·Lc/√S, which is the form given here. The 3(a) report number is printed "M5/13/1986", probably a misprint for MS/13/1986. Two of the worked examples are Madhya Pradesh catchments. The 1(d) example is Railway Bridge No. 1198 on the Itarsi–Allahabad line, on the Simrawal Nadi in Satna district (340.64 km², S = 3.70 m/km); the report gives a 50-yr peak of 1,157.06 m³/s by the detailed method and 1,160.04 m³/s by its simplified formula, which is for preliminary design only. The 3(c) example is Railway Bridge No. 930 on the Itarsi–Jabalpur section, on the Umar river in Jabalpur district (223.77 km², L = 33.60 km, Lc = 19.32 km, S = 2.69 m/km); the report adopts tp = 4.5 h, qp = 0.57 m³/s per km², TB = 15 h and a unit-graph peak of 127.55 m³/s, and with a 50-yr 24-hour point rainfall of 28.0 cm from Plate 9, a 5-hour ratio of 0.59, an ARF of 0.8754 and a loss of 0.10 cm/h it builds the design storm of TD = 5 h. The 3(c) relationship gives tp of about 4.9 h from those parameters, against the 4.5 h adopted, and the difference is to be checked in the report [TBC]. The design loss rates, 1.7 mm/h in 1(b), 2.3 in 1(c), 2.5 in 1(d), 4.5 in 3(a), 5 in 3(b), 1 in 3(c) and 2 in 3(f), differ fivefold between neighbouring subzones on the same black-soil terrain of the Narmada valley. They are φ-indices fitted to the floods of whole rural catchments, not soil infiltration capacities, and they are not used to assign HSG (Clause 3.7) or to size infiltration practices (Chapter 4). Each rate shall be used only within its own subzone. The reports were derived from gauged rural catchments at railway and road bridges, none of them urban. In Madhya Pradesh they apply to the rural nalas and streams that enter city limits, such as the Kaliasot and the Kolar above Bhopal, the Kanh above Indore and the Pariyat and the Gaur near Jabalpur; they are not a model of city catchments. Where a city catchment lies within 25–5,000 km², the SUH is computed only as the benchmark of its natural condition (Clause 3.11.4), and the catchment itself is designed by the methods of Clause 3.4 with the design rainfall of Chapter 2. The Narmada, the Chambal, the Betwa and the Sone at the cities are far larger than the catchments of any report and are outside Clause 3.11.4 (Clause 3.4.5). Subzone boundaries, to be confirmed on the index maps of the reports [TBC]: Indore city lies on the 1(b)/3(b) boundary and drains north by the Kanh and the Saraswati to the Kshipra, so its catchments are in 1(b), while Mhow and the Choral side are in 3(b); Gwalior appears on both the 1(b) and the 1(c) plates; Bhopal is in 1(c), on the 3(c) boundary, while the Kolar and the south of the city towards the Narmada are in 3(c) by watershed; Jabalpur is in 3(c), at the corner of 1(c) and 1(d); Katni lies on the 1(c)/1(d) line; and Khandwa is listed in both 3(b) and 3(c), and is taken here as 3(c), to be checked by watershed. Whether any of the State lies in the Mahanadi subzone 3(d), whose report was not obtained, is to be checked [TBC]. The subzone is chosen by the catchment's outfall, not by its district. Where a catchment drains across the boundary between two subzones, or its outfall lies within 5 km of one, as at Indore and Gwalior, this Manual requires the SUH to be computed with the parameters of each subzone and the higher 1% AEP peak to be adopted, unless calibration under Clause 3.15 supports the other. In Madhya Pradesh, unlike the Gangetic plain to the north, the hourly maxima recorded by the self-recording gauges of the reports, 51–90 mm in 1 hour (90 mm at Jabalpur on 17 June 1980 and at Mandla on 7 August 1974), lie below the 50-yr 1-hour depths that the plates and the ratios give, about 87–122 mm, so Chapter 2 uses the plates and the ratios for every duration until a checked station record of 25 years or more is available (Clause 2.3.6).
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Madhya Pradesh Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Madhya Pradesh Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Madhya Pradesh Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Madhya Pradesh Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Madhya Pradesh Stormwater Design Manual, Draft v1.0.