Chapter 7Waterbodies, Talabs (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (talab) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Madhya Pradesh, with no coast and no tidal water, means the five Ramsar sites, such as the Bhoj Wetland (the Upper Lake and Lower Lake of Bhopal), the wetlands that the MP State Wetland Authority lists or notifies under the 2017 Rules, the city lakes, tals and sagars, the floodplain wetlands of the rivers, and the talabs recorded in the Revenue records;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Madhya Pradesh Land Revenue Code, 1959 (section 251), the Madhya Pradesh Municipal Corporation Act, 1956 (sections 82, 198 and 199), the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 and MPBVR 2012 made under it, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Narmada, the Chambal, the Betwa, the Sone, the Tapi, the Wainganga, the Kshipra, the Kaliasot and the Kanh), natural drain or nala, canal, lake, sagar or reservoir (such as the Upper Lake and Lower Lake of Bhopal, Yashwant Sagar and Sakhya Sagar), talab or pond (talab, tal, talaiya), bawdi or kund (step-well or small walled tank), marsh or low wet land, floodplain wetland or depression, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (talab) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala or canal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, sluice gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Madhya Pradesh terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Talab (तालाब; tal, talaiya) | A natural or excavated depression that stores rainfall runoff: "Pond, pool, tank, reservoir of water" in Platts (Annex 7E). Tal is a synonym, and a talaiya is a small tal. A talab is a tank or pond under Clause 7.2. Many talabs have no surplus weir or sluice; where a talab has none, its FTL is the level at which it spills to a nali, a nala or low ground, found by survey. A village tank vested in the State under section 251 of the Madhya Pradesh Land Revenue Code, 1959, and a public tank vested in a Municipal Corporation under section 82 of the Madhya Pradesh Municipal Corporation Act, 1956, are talabs for this chapter. |
| Recorded talab | A talab, tal, sagar or lake shown in the Revenue records, the Municipal Corporation's records, a Development Plan, a site plan under Rule 16(4)(j) of MPBVR 2012, or a list of the MP State Wetland Authority. A recorded talab is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, including under an order under section 202 of the Madhya Pradesh Municipal Corporation Act, 1956, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Monsoon water line | The outer edge of a talab's, lake's or wetland's water in the monsoon: the larger of the edge shown by dated imagery or survey of the monsoon (July to September) in recent years and the edge recorded in the Revenue records, and where neither is available, the MWL contour. The boundary of a talab or lake under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. This definition is set by this Manual. |
| Highest water level (Rule 50(b)) | MPBVR 2012 measures its 9 m from "the highest water level of a water body/ water course" but does not define the term. For this Manual, the highest water level of a talab, lake or wetland is taken to be no lower than the higher of its FTL and its monsoon water line, and that of a channel no lower than its top of bank. This reading is set by this Manual; it is not a statutory interpretation, and a court or the State Government may read the rule otherwise. |
| Sagar; city lake | A sagar is a large tank or lake (Annex 7E); in Madhya Pradesh the word is the name of many large bunded tanks and reservoirs, such as Yashwant Sagar and Sakhya Sagar. A city lake is a lake or sagar within or next to a town whose level is held by a dam or bund with a spillway or sluice gates, such as the Upper Lake of Bhopal (Bhojtal), which releases through the Bhadbhada sluice gates to the Kaliasot. Each is a tank under Clause 7.2; where it is a Ramsar site or a notified or listed wetland, Clause 7.12 also applies. |
| Lake-locked outfall | A drain or nala outfall into a city lake or reservoir, which cannot discharge freely while the lake is at or above its FTL (Figure 7.3). Its tailwater is the lake level: the lake's MWL, or its FTL plus the surcharge of the design flood, as the custodian records them (Chapter 5). The lake's sluice gates are a controllable outlet under Clause 7.8 only where they are operated to a written rule. |
| Jheel; bawdi; kund | A jheel is a shallow lake or marsh (Annex 7E); it is a lake or a wetland for this chapter, and where it is a wetland, Clause 7.12 also applies. A bawdi (baoli) is a step-well, and a kund a small walled or embanked tank, often sacred (Annex 7E); both are waterbodies for Clause 7.3, and a kund that receives runoff is a tank or pond. Their storage is counted only under Clause 7.7. |
| Nala; nali | A nala is a watercourse or drain, natural or cut (Annex 7E), such as the Patra nala of Bhopal; a nali is a small street or house drain. Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered. No rule dividing natural nalas from municipal drains was found; the definition, not the owner or the name, decides which clauses apply. |
| Nistar | The rights of common use of village land and water by the village community, recorded for each village in its nistar patrak, and preserved over vested tanks by section 251(7) of the Madhya Pradesh Land Revenue Code, 1959 (Annex 7E); the courts are reported to have held that nistar does not include the right to cultivate the bed of a tank or to grow singharas in it (as extracted). Nistar and irrigation rights in a talab are uses of it that Clause 7.8.2(d) protects. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the WRD and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Municipal Corporation (in which public tanks, streams, rivers, drains and watercourses vest under section 82 of the Madhya Pradesh Municipal Corporation Act, 1956), a Municipal Council or Nagar Parishad, a development authority under the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973, the WRD or the NVDA (for their dams, reservoirs, irrigation tanks and canals), the State Government through the Collector and the Tehsildar (for a tank vested in the State under section 251 of the Madhya Pradesh Land Revenue Code, 1959), the Gram Panchayat or Gram Sabha (to which the management of village tanks is reported to have been handed in 2001), the MP State Wetland Authority (for a notified wetland), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue Department, in which tanks, talabs, nalas and land covered by water are recorded, including the tanks vested in the State under section 251 of the Madhya Pradesh Land Revenue Code, 1959, with the rights of irrigation and nistar recorded over them; the public tanks, streams, drains and watercourses vested in a Municipal Corporation under section 82 of the Madhya Pradesh Municipal Corporation Act, 1956; the water bodies, rivers, drains and flood-affected areas shown in a Development Plan under the 1973 Adhiniyam, and on site plans under Rule 16(4)(j) of MPBVR 2012; the full tank level lines surveyed or fixed under the directions of the National Green Tribunal, such as that of the Upper Lake of Bhopal; the boundary of every wetland notified under the Wetlands (Conservation and Management) Rules, 2017 and of the five Ramsar sites; and the lists of wetlands of the MP State Wetland Authority;
- (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Madhya Pradesh city was found, and no design return period for urban drainage has been published for any Madhya Pradesh city. No State law, rule or WRD order zoning the floodplains of the rivers was found either. The only flood-based line in force is court-made and not yet drawn: the National Green Tribunal (Central Zone) is reported to have directed in 2025 that the floodplain of the Narmada be demarcated on a 25-year flood and treated as a no-development zone (Kirtikumar Sadashiv Bhatt v. Narmada Water Resources, as reported; the O.A. number and date were not found). The building rules ask for flood information but supply none: the site plan of a development under MPBVR 2012 shall show "the approximate location and size of any water body, flood affected areas and contours at an interval of 0.3 meters in case of the site which has a slope more than 1:20" (Rule 16(4)(j)), and the layout plan "the location of drains" (Rule 16(5)(d)), but "flood affected areas" are not mapped by any agency, and the rules do not define a water body, a watercourse or the highest water level of Rule 50(b). The CAG found that of 539 development permissions checked in Bhopal, Gwalior, Indore, Jabalpur and Ujjain, the 9 m / 15 m condition of Rule 50 applied to 60, and was imposed with the nala drawn on the plan in only 23 (Report No. 5 of 2025). Lake boundaries are also unsettled: the full tank level line of the Upper Lake of Bhopal is being demarcated again, for the seventh time, by a panel the National Green Tribunal appointed in O.A. 77/2020 and 12/2025 (as reported), and its FTL is given as 1,666.80 ft (about 508.04 m) in WRD and press usage and as 508.65 m in another source, a conflict of 0.61 m that the custodian must resolve before any line is fixed on it. Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and the Narmada 25-year line, once demarcated, and the lake lines are minimums that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), because lake levels in Madhya Pradesh are still quoted in feet as well as in metres. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (the only general statutory distance read for this Manual, Rule 50(b) of MPBVR 2012, is 9 m from the highest water level of a water body or watercourse and 15 m from a river; this Manual applies 15 m to every waterbody; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of the WRD (or of the NVDA on its Narmada works) for a work on or next to one of its dams, reservoirs, canals or rivers, the permission of the MP State Wetland Authority for a regulated activity in a notified wetland, or a direction of the Madhya Pradesh High Court or the National Green Tribunal (such as the lake and river lines listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. Madhya Pradesh's only general statutory distance from water is Rule 50(b) of MPBVR 2012, under which no land shall be used as a building site if it "is within a distance of 9 meters of the highest water level of a water body/ water course and 15 mtrs in case of river or as prescribed in the development plan" (the 2012 Gazette text; the rule number is inferred from its position); the rules do not define the highest water level, a water body or a watercourse. Around a wetland notified under the Wetlands (Conservation and Management) Rules, 2017, no permanent construction is permitted within 50 m of the mean high flood level (rule 4(2)(vi)), and in Bhopal the National Green Tribunal and the Development Plan 2005 set wider lines around the Upper Lake and the Kaliasot and Kerwa reservoirs. This Manual's 15 m, the river distance of Rule 50(b) applied to every talab, nala and watercourse, gives every waterbody a hydraulic corridor, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Madhya Pradesh flood maps are mostly coarser than US maps, the foreshores of the city lakes and talabs, the black-soil plains of the Malwa plateau and the floor of the Narmada valley, where towns are growing, are flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Madhya Pradesh's building rules give one distance in metres from water. MPBVR 2012 bars the use of land as a building site where the "site is within a distance of 9 meters of the highest water level of a water body/ water course and 15 mtrs in case of river or as prescribed in the development plan" (Rule 50(b), as notified in 2012; the rule number is inferred from its position in the Gazette text, and the current consolidated text was not read). The rule replaced a wording of the Madhya Pradesh Bhumi Vikas Rules, 1984 that set "9 metres from average high flood mark or 15 metres from the defined boundary of water course, whichever is more" (as extracted). The rules do not define the highest water level, a water body or a watercourse, so the line has no fixed starting point; this Manual takes it to be no lower than the FTL and the monsoon water line (definitions after Clause 7.2). The State Government told the CAG that the condition is imposed at development permission "under the provisions of the development plan and MPBVN", but the CAG found that builders "did not maintain the required 9/15 m free space", and that in three colonies the "Nala was covered by laying Hume pipes, encroached upon and concreted" (Report No. 5 of 2025). The Madhya Pradesh Municipal Corporation Act, 1956 adds no width: it lets the Commissioner have a building over a drain or watercourse vested in the Corporation pulled down if it was built without written permission (s. 198), keeps drains and latrines a hundred feet from a tank or reservoir used for public water supply (s. 199), and bars the occupation of a building within a hundred feet of a municipal drain until it is effectually drained (s. 203). Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). The wider lines are court-made: around the Upper Lake of Bhopal, no construction within 50 m of the FTL in urban areas and 250 m in rural areas (National Green Tribunal, O.A. 77/2020 and 12/2025, as reported; a State order of 2023 reported to cut the urban line to 33 m was not verified); along the Kaliasot and around the Kaliasot and Kerwa reservoirs, a 33 m green belt that the Tribunal treats as a requirement of the Bhopal Development Plan 2005 (Subhash C. Pandey v. State of Madhya Pradesh, orders of 2014, as listed), on which a Supreme Court judgment of about March 2025 is reported to have set aside a related bar on construction, with a scope not established for this Manual; on the Narmada, the 25-year floodplain the Tribunal ordered demarcated (2025, as reported) and a ban within 300 m reported from the High Court, whose status is unclear, the WRD having told Parliament that there is "no proposal" for such a ban; and on the Kshipra at Ujjain, no construction permission within 200 m, an interim order of the High Court at Indore (January 2026, as reported). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Madhya Pradesh has one statutory setback in metres from water: 9 m from the highest water level of a water body or watercourse, and 15 m from a river, under Rule 50(b) of MPBVR 2012, which does not define the highest water level. No statute, rule or order read for this Manual sets a distance from a nala wider than that, and no State floodplain zoning law or order was found. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give every talab, nala and watercourse the width that Rule 50(b) gives a river. It is this Manual's proposal, not a statutory width, and no government has adopted it. So is this Manual's reading of the "highest water level" of Rule 50(b) as no lower than the FTL and the monsoon water line (definitions after Clause 7.2). The lake and river lines set by the courts are not the design extent: the 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider. The setback is applied as the larger of the corridor and any statutory or court line, so the Manual is stricter than statute along talabs, nalas and watercourses, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- Rule 50(b) of MPBVR 2012. No building site within 9 m of the highest water level of a water body or watercourse, 15 m of a river, "or as prescribed in the development plan". The 9 m is narrower than Zone 1 and never governs alone; a wider distance in a development plan governs where it applies.
- The lakes of Bhopal. No construction within 50 m of the FTL of the Upper Lake in urban areas and 250 m in rural areas, with the FTL line being demarcated again (National Green Tribunal, O.A. 77/2020 and 12/2025, as reported; a reported State order of 2023 cutting the line to 33 m is unverified); and a 33 m green belt from the edge of the Kaliasot and Kerwa reservoirs and along the Kaliasot (Bhopal Development Plan 2005, as applied by the Tribunal in Subhash C. Pandey, 2014; the effect of a Supreme Court judgment of about March 2025 is unclear).
- The Narmada and the Kshipra. The Narmada floodplain on a 25-year flood, to be demarcated and kept free of development (National Green Tribunal, 2025, as reported), and a 300 m ban reported from the High Court whose status is unclear; on the Kshipra at Ujjain, no construction permission within 200 m (High Court, Indore bench, interim order of January 2026, as reported; the datum of measurement is not known).
- Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); no Madhya Pradesh wetland was reported notified as of January 2023, and the five Ramsar sites are protected through the Tribunal's orders.
- Public tanks, drains and watercourses. Public tanks, streams, drains and watercourses vest in the Municipal Corporation, and a vested tank shall not be used "for any other purpose" (Madhya Pradesh Municipal Corporation Act, 1956, s. 82); village tanks with rights of irrigation or nistar vest in the State (Madhya Pradesh Land Revenue Code, 1959, s. 251); and no drain or latrine within a hundred feet of a tank or reservoir used for public water supply (s. 199). These protect the waterbody and its water, not a flood corridor; the whole recorded and monsoon extent is a waterbody for this chapter.
- WRD and NVDA dams, reservoirs and canals. Works on or next to them need the custodian's approval.
This Manual sets 15 m as the floor because no width exists for nalas beyond the 9 m of Rule 50(b); because 15 m is the distance the State already applies to rivers; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the nalas need. The reasons for the corridor are the record: the State Government itself recorded in September 2006 that the "main cause of water logging in cities is the encroachment of Nala or construction work carried out on Nala land or on both sides of Nala" (as cited by the CAG); the CAG found the 9 m / 15 m condition imposed and drawn in only 23 of 60 cases where it applied, and nalas piped, concreted and built over (Report No. 5 of 2025); and the Tribunal has fined the Bhopal Municipal Corporation over construction near the Upper Lake (as reported). Until a statute, rule, notification or development plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory and court controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Madhya Pradesh Bhumi Vikas Rules 2012, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Madhya Pradesh practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The foreshores of Madhya Pradesh's city lakes and talabs, the black-soil plains of the Malwa plateau and the floor of the Narmada valley are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Madhya Pradesh the statutory and court lines around lakes are measured from a high level, not from the dry-season water line: Rule 50(b) of MPBVR 2012 measures its 9 m from "the highest water level of a water body", the Tribunal's Upper Lake line is measured from the full tank level, and the Wetlands Rules, 2017 measure their 50 m from the mean high flood level. The difference matters: the waterspread of the Upper Lake at FTL is given as 30.72 km² in one source and about 36 to 37 km² in others (as reported), so a line drawn from the smaller edge would leave several square kilometres of the lake's own storage open to building. This Manual gives the same rule a level for every talab, tal and lake: its monsoon water line, and its FTL, are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Bhopal, such as the colonies of Kolar along the Kaliasot, which flood when the Kaliasot gates are opened (as reported), and of the riverside wards of Narmadapuram (Hoshangabad) on the Narmada already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Madhya Pradesh has no tank Act, and its tanks range from village talabs with no outlet to city lakes held by gated dams. The storages that matter for urban drainage are of five kinds. The first is the village and urban talab, tal or talaiya, usually with no outlet structure, recorded in the Revenue records and vested in the State (Madhya Pradesh Land Revenue Code, 1959, s. 251) or, inside a Municipal Corporation, in the Corporation (Madhya Pradesh Municipal Corporation Act, 1956, s. 82). The second is the city lake or sagar with a dam, spillway or sluice gates, which takes the city's nalas and releases to a downstream nala or river: the Upper Lake of Bhopal, with a catchment of about 361 km², releases through the eleven gates of the Bhadbhada dam (1965) to the Kaliasot, and the Lower Lake drains to the Patra nala (as reported); Indore's Sirpur and Bilawali tanks and Yashwant Sagar, and Ujjain's Gambhir dam, are others (as reported). These are the tanks for which Figure 7.3 and Clauses 7.7 and 7.8 matter most, and no operating rule for any of them was published. The third is the WRD's and NVDA's reservoirs, such as Bargi, Tawa, Indira Sagar and Gandhi Sagar, whose releases drive the floods of the Narmada and the Chambal; they are not tanks for these clauses, and their releases enter a design as inflow and tailwater (Chapter 5). The fourth is the old bunded tanks of Bundelkhand, such as the tanks of the Chandela and Bundela periods in Tikamgarh and Chhatarpur, which were not researched for this Manual. The fifth is the bawdis (step-wells) and kunds of the old towns, small storages that are better kept for recharge and heritage than counted as detention. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any city lake, sagar or Bundelkhand tank whose storage is to be counted is subject to Clause 7.7.1 in full, with the WRD, the Municipal Corporation or other custodian, and the custodian of each city lake shall be confirmed for the inventory (Annex 7A), because it was not established for this Manual.
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in a city whose drains discharge to a gated lake or reservoir, such as Bhopal, every colony drain and inflow nala, the lake with its full tank level, maximum water level and buffer, and the sluice gates by which it releases to the downstream nala or river, with the lake level as the tailwater of the inflowing drains, as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Madhya Pradesh's worst urban floods have come when the lakes and reservoirs were already full and their gates were open. On 14 August 2006 Bhopal received 291.6 mm in 24 hours (IMD), the Upper Lake reached its FTL and the Bhadbhada gates were opened (five, or eleven, in conflicting reports); in August 2022, after about 165 mm in 14 hours on 22 August, 7 of the 13 Kaliasot gates, 5 of the 11 Bhadbhada gates and 5 of the 8 Kerwa gates were open together and about 200 colonies were reported waterlogged (as reported); and the Upper Lake was full in August 2019, in a season of 1,694 mm (as reported). On the Narmada, the releases of the Tawa and Bargi dams raised the river at Sethani Ghat, Narmadapuram, to a reported 297.75 m in August 2020, against a CWC danger level at Hoshangabad of 293.8 m, while the CWC's recorded highest level at Hoshangabad is reported as 301.33 m (27 August 1972); the two figures conflict and await CWC confirmation. At Gandhi Sagar on the Chambal the level stayed above the full reservoir level of 399.9 m and the maximum water level of 401 m for at least a day in September 2019 (as reported). No hydrograph showing how long Madhya Pradesh's lakes stay at or above FTL in a wet spell was obtained for this Manual. While a city lake is full, it stores nothing more below FTL, its inflowing nalas discharge against a high lake level, and every release adds to the flow in the nala or river below the dam. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A city lake and sluice-gate outfall (schematic, not to scale; no particular lake is shown). A: with the lake below its FTL and the gates shut, the colony drains (nali) and inflow nalas discharge freely into the lake, which stores the runoff, and nothing is released downstream. B: with the lake at its FTL and rising toward its MWL, the gates are opened; the release adds to the flow of the downstream nala or river and can flood the colonies along it, and the inflow nalas discharge against the lake level, which is their tailwater (Chapter 5). The drains, the inflow nalas, the lake, the gates and the downstream nala are therefore modelled together (Clause 7.7.2); the lake's FTL and monsoon water line are part of its boundary, from which the buffer and the setback are measured (definitions after Clause 7.2). C: the levels to be fixed for each city lake, with the levels reported for the Upper Lake of Bhopal and for the Kaliasot and Kerwa reservoirs (press and literature, not official values; datum to be confirmed). The Upper Lake's FTL is reported as 1,666.80 ft (about 508.04 m) and as 508.65 m, and the Bhadbhada gates are reported to open at the FTL; no gate operating rule, maximum water level, gate capacity or design release for any Madhya Pradesh city lake was published. Where the custodian has published no MWL, the tailwater of a lake outfall is taken under Chapter 5. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, MPSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No operating rule for a Madhya Pradesh talab or city lake that keeps a flood cushion was found, and most talabs have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the cities are the releases of the gated lakes and reservoirs. The Bhadbhada gates of the Upper Lake are reported to be opened when the lake reaches its FTL, of 1,666.80 ft, and to release to the Kaliasot dam (as reported), that is, with no cushion below FTL; they are reported to have been opened in 2003, 2006, 2012, 2013 and 2016, and "for the ninth time" in the 2020 season, and the Kaliasot, Bhadbhada and Kerwa gates were open together in August 2022 (all as reported). Opening the Kaliasot gates is reported to flood the Kolar localities below the dam (as reported). Flood-prone districts were asked in 2017 to open flood control rooms on 15 June or at the onset of the monsoon (as reported). Without an agreed rule with dates, levels, release rates and a named operator, storage in a lake cannot be relied on, and a release made without warning to the colonies downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Many talabs and lakes have other users. The vesting of a village tank in the State "shall not affect the rights of irrigation and nistar in such tank" (Madhya Pradesh Land Revenue Code, 1959, s. 251(7)), and the Code provides for the regulation of fishing in Government tanks (s. 249). Drawing a talab or a lake down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Madhya Pradesh Pollution Control Board (MPPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No statewide order of the Urban Development and Housing Department or of the Urban Administration and Development Directorate for the pre-monsoon desilting of nalas or talabs was found. In Bhopal, the Municipal Corporation's drain and nala cleaning drive of 2026 ran from 1 May to the first week of June (as reported); Jabalpur's desilting was under way in late April 2025 (as reported); and Ratlam's Municipal Corporation ordered all drains cleaned "before the rains", with no date (press note of 29 May 2021). The date of 31 May in this Manual is set by this Manual, before the monsoon's normal onset in the State (16 June at Khandwa, 20 June at Bhopal and Indore, 25 June at Neemuch; IMD, new normal dates, 2020). Excavation to "increase capacity" is governed by Clause 7.9.3. The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Madhya Pradesh precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Madhya Pradesh the city nalas vest in the Municipal Corporation, but the split between natural nalas and municipal drains has not been written down. The Madhya Pradesh Municipal Corporation Act, 1956 vests in the Corporation "all public stream, rivers, springs" and "all public sewers and drains, and all sewers, drains, culverts and water courses in or under any public street or constructed by or for the Corporation" (s. 82(1)(b) and (c)), lets the Commissioner "enlarge, arch over, discontinue or close up" drains, with a substitute for lawful users (s. 193), and lets the Commissioner have a building over a drain or watercourse vested in the Corporation pulled down if it was built without written permission (s. 198). No rule or order dividing natural nalas from municipal drains, or the Municipal Corporations' drains from the WRD's rivers and canals, was found for this Manual. In practice the rivers, dams, reservoirs and canals lie with the WRD (and the Narmada works with the NVDA); the nalas and drains within a city with the Municipal Corporation; the drains of a development authority's or a developer's layout with that body until they are handed over; and the village tanks and nalas with the Revenue Department and the Gram Panchayat. This Manual uses that division as its working assignment, not as a statement of law. The State Government recorded in September 2006 that the "main cause of water logging in cities is the encroachment of Nala or construction work carried out on Nala land or on both sides of Nala, legally or illegally" (as cited by the CAG). The CAG found nalas "covered by laying Hume pipes, encroached upon and concreted" in three colonies, a colony in Gwalior where "Nala land had been covered", and a garden built over a nala at a Gwalior resort (Report No. 5 of 2025); in Indore, the Municipal Corporation is reported to have surveyed encroachments on the Kanh and the Saraswati by drone and to plan to map those within 30 m of their highest flood level (as reported). Rule 50(b) of MPBVR 2012 keeps buildings 9 m from a watercourse, and Rule 50(j) bars a building that "adversely affects any public utility like a Municipal drain"; neither keeps a nala at its recorded width once it has been piped, narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored talab or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Madhya Pradesh no shared form of storage is required by the building rules: the rainwater harvesting of MPBVR 2012 is plot-level (Rule 81(4)) or layout-level for layouts of 2 ha or more (Rule 16(5)(h)), and MPBVR 2012 has no detention, peak-flow or "zero runoff" rule. The city lakes and talabs, and the lake works funded under AMRUT 2.0 in Bhopal (as reported), are the nearest existing forms of shared storage. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the MP State Wetland Authority;
- (b) the five Ramsar sites of Madhya Pradesh (the Bhoj Wetland of Bhopal, the Upper Lake and the Lower Lake, designated in 2002; Sirpur Wetland and Yashwant Sagar in Indore and Sakhya Sagar in Shivpuri, designated in 2022; and Tawa Reservoir, designated in 2024), each to its boundary as designated or as the National Green Tribunal directs it to be demarcated, and any wetland notified under the 2017 Rules;
- (c) the city lakes, tals and sagars, and the marshy low land and depressions of the river floodplains, such as those of the Narmada, the Chambal and the Betwa, within the 1% AEP extent of Clause 7.3.4 or the Narmada floodplain once demarcated, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
- (d) any other marsh, wetland, tal or jheel that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Madhya Pradesh's wetlands are the concern of the MP State Wetland Authority, reported to have been constituted in January 2018 under rule 5(1) of the 2017 Rules, with EPCO (the Environmental Planning and Coordination Organisation), the State's nodal agency for wetland and lake conservation, as its secretariat (as reported; the Authority's own pages did not load). The State has five Ramsar sites (dates and areas as reported from the national list; the Ramsar Information Sheets were not read): the Bhoj Wetland of Bhopal, the Upper Lake (Bhojtal) and the Lower Lake, designated on 19 August 2002 over 3,201 ha; Sirpur Wetland (about 161 ha) and Yashwant Sagar (about 823 ha) in Indore, and Sakhya Sagar in Shivpuri (248 ha), designated on 7 January 2022 (a later date is also reported for Yashwant Sagar); and Tawa Reservoir, designated on 8 January 2024 over 20,050 ha. No wetland had been notified under rule 7 of the 2017 Rules as of January 2023, six lakes having been proposed for notification a year earlier (Mongabay, January 2023); the position in 2026 was not established. A State Wetland Authority action-taken report of 16 March 2026 in O.A. 54/2025 with district-wise tables of ground-truthing and demarcation was seen only by its title, and the National Green Tribunal has asked the Authority to report on water bodies smaller than 2.25 ha (as reported). The Tribunal is the working regulator of the Bhoj Wetland: it has ordered the removal of illegal structures in the wetland, its buffer and its zone of influence, the seventh demarcation of the Upper Lake FTL, and the mapping of every sewage outfall into the Upper and Lower Lakes (O.A. 77/2020 and 12/2025, and the petition of Nitin Saxena, as reported). A drain outfall, desilting, diversion or gate operation in or near a Ramsar site or a notified wetland therefore needs the Wetland Authority's permission where the notification or the Rules regulate it, and compliance with the Tribunal's directions, as well as compliance with this chapter; for the lakes and talabs that are not notified, this chapter and the revenue and municipal law are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Madhya Pradesh's lakes and rivers through the nalas (Clause 8.9, Commentary). The Lower Lake of Bhopal is reported to receive the drainage of 28 sewage-filled nalas, with dissolved oxygen below 2 mg/L near the Patra nala (as reported); the National Green Tribunal has ordered every drain outfall into the Upper and Lower Lakes to be identified and intercepted, with a plan for zero untreated discharge (as reported); and of about 200 MLD of sewage from 14 Narmada towns, 51 MLD is reported to reach the river untreated (MPPCB, as reported before the Tribunal in 2025). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Madhya Pradesh they apply in full to every new outfall, and every existing outfall to a lake, talab, wetland or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Madhya Pradesh's main controls on filling and building in tanks are revenue law, municipal law and the courts. Village tanks vest in the State, with rights of irrigation and nistar preserved (Madhya Pradesh Land Revenue Code, 1959, s. 251), and the Code penalises the unauthorised taking of possession of land (s. 248; its text was not read); a full bench is reported to have held that a tank can vest under section 251 despite an earlier proprietary settlement, and a petition on the encroachment of the Govardhan Sagar talab at Ujjain was seen only in a search extract. In the cities, public tanks vest in the Corporation and may not be used for any other purpose (Madhya Pradesh Municipal Corporation Act, 1956, s. 82(2)), and the Colony Development Rules of 2021 withhold civic works from unauthorised colonies developed on drains and water bodies shown in the development plan (rule 23, as cited by the CAG). The courts have been more active than the agencies. Around the Upper Lake, the National Green Tribunal has ordered illegal structures within the wetland, its buffer and its zone of influence removed within three months (O.A. 77/2020 and 12/2025, as reported); the Bhopal Municipal Corporation and the district administration demolished structures within 50 m of the FTL in April 2026, and the Tribunal is reported to have fined the Corporation ₹1 crore over construction near the lake (as reported). Along the Kaliasot, a joint committee found buildings of a housing project "in the green belt within 33 meter radius of Kaliyasot river" (O.A. 92/2024, as reported), and a Supreme Court judgment of about March 2025 is reported to have set aside a related bar, leaving what remains in force unclear. Against these, section 202 of the 1956 Act still allows a private tank to be ordered filled where it is "injurious to health"; this Manual treats a recorded talab as drainage infrastructure (definitions after Clause 7.2). The Madhya Pradesh Municipalities Act, 1961, which governs the smaller towns, and the encroachment sections of the Land Revenue Code beyond section 251 were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most talabs are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The dams of the city lakes and reservoirs, such as Bhadbhada, Kaliasot and Kerwa at Bhopal, and the bunds of the large sagars and of the old Bundelkhand tanks, are of heights that were not found for this Manual; each shall be screened, and the larger of them may be specified dams. Where the storage of a talab, sagar or city lake is counted under Clause 7.7, its bund or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Madhya Pradesh the dams that matter to the cities are the gated dams of the city lakes and the large river reservoirs. In September 2019 Gandhi Sagar on the Chambal stayed above its maximum water level of 401 m for at least a day while 19 gates released about 4.93 lakh cusec, and more than 16,000 people were shifted in Mandsaur and Neemuch (as reported); in August 2020 the releases of the Tawa and Bargi dams raised the Narmada at Narmadapuram well above its danger level, and about 3,000 people were rescued (as reported). No breach map or emergency action plan for a city lake dam, a talab bund or a Bundelkhand tank was found. A failed or overtopped lake bund floods the colonies below it, and an unannounced release floods them too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Madhya Pradesh. Madhya Pradesh Bhumi Vikas Rules, 2012, notification No. F-3-131-2012-32 of 30 May 2012, made under section 85(1) read with section 24(3) of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973, Madhya Pradesh Gazette (Extraordinary) of 1 June 2012, English translation (Rules 2, 16, 47, 50, 51, 67, 68, 76 and 81, and Appendices H-1 to H-3; the 2012 text as notified, read from the scanned Gazette; rule numbers 50 and 51 inferred from their position; the consolidated text "updated up to 6th March 2025" was not read, and the current text must be checked before any rule is applied). https://web.archive.org/web/20220702030356/http://mptownplan.gov.in/act%20&%20Rules/2012-06-01-258-English.pdf ; consolidated text: https://mptownplan.gov.in/act%20&%20Rules/bvn06032025E.pdf
- Government of Madhya Pradesh. Madhya Pradesh Bhumi Vikas Rules, 1984 (repealed; rule on sites near watercourses, read only through a legal-database extract). https://www.legitquest.com/act/madhya-pradesh-bhumi-vikas-rules-1984/D2B8
- Government of Madhya Pradesh. Madhya Pradesh Municipal Corporation Act, 1956 (Act 23 of 1956) (ss. 2, 66, 82, 190–204), PRS copy with amendments. https://prsindia.org/files/bills_acts/acts_states/madhya-pradesh/1956/1956MP23.pdf
- Government of Madhya Pradesh. Madhya Pradesh Land Revenue Code, 1959 (Act 20 of 1959) (s. 251), PRS copy with amendments. https://prsindia.org/files/bills_acts/acts_states/madhya-pradesh/1959/1959MP20.pdf
- Government of Madhya Pradesh. Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973; Madhya Pradesh Nagarpalika (Colony Development) Rules, 2021 (rule 23); and the order of September 2006 on the encroachment of nalas (all as described or quoted by the CAG; texts not read).
- Comptroller and Auditor General of India. Report on Management of Town and Country Planning, Government of Madhya Pradesh, Report No. 5 of 2025 (Performance Audit, April 2018 to March 2023; paras 3.3.1 and 3.5.10 and Appendix 3.5; date of tabling not confirmed). https://cag.gov.in/webroot/uploads/download_audit_report/2025/Report-No-05-MP-Town-Planning-English_15-11-2025-signed-(1)-069985b0813fdf7.38091434.pdf
- National Green Tribunal (Central Zone). Dr. Subhash C. Pandey v. State of Madhya Pradesh (Kaliasot, orders of 27 May, 11 July, 22 July and 24 November 2014; titles as listed on India Environment Portal); O.A. 92/2024 (Kaliasot green belt, as reported); O.A. 77/2020 and O.A. 12/2025 (Upper Lake, 50 m and 250 m from FTL; FTL demarcation; as reported by The Hitavada, 2 September 2026); O.A. 54/2025 (MP State Wetland Authority action-taken report of 16 March 2026, title only); and the Narmada judgment in Kirtikumar Sadashiv Bhatt v. Narmada Water Resources (2025, as reported). https://supremetoday.ai/ngt-issues-sweeping-directives-to-stop-narmada-river-pollution-mandates-demarcation-of-no-development-floodplain-zones-INDNGT00000029736
- Supreme Court of India. Judgment of about March 2025 setting aside a bar on construction in Bhopal (as reported by the Free Press Journal; the order was not read). https://www.freepressjournal.in/bhopal/supreme-court-quashes-ngt-bar-on-construction-bhopal-residents-may-get-relief
- Madhya Pradesh High Court (Indore bench). Interim orders of 14 November 2025 and January 2026 on construction within 200 m of the Kshipra at Ujjain (as reported by the Free Press Journal, 7 January 2026); and the reported orders on construction within 300 m of the Narmada (news clippings only). Lok Sabha, reply on a ban on construction along the Narmada (seen only in a search extract; date unknown). https://eparlib.nic.in/bitstream/123456789/955784/1/AU5300.pdf
- MP State Wetland Authority and EPCO. Pages on the Authority's constitution (seen only in search extracts). https://epco.mp.gov.in/state-wetland-authority ; https://swa.mp.gov.in/about-us
- Ramsar sites of India (list as reported). https://indianwetlands.in/wetlands-overview/indias-wetlands-of-international-importance/ ; Free Press Journal on Tawa Reservoir as a Ramsar site. https://www.freepressjournal.in/bhopal/madhya-pradeshs-tawa-reservoir-now-a-ramsar-site
- Japan International Cooperation Agency (2007). Ex-post evaluation of a Japanese ODA loan project for the lakes of Bhopal (Upper Lake catchment, waterspread and the Bhadbhada gates; title as indexed). https://www.jica.go.jp/english/our_work/evaluation/oda_loan/post/2007/pdf/project32_full.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall up to 2012 (Bhopal, 14 August 2006). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf ; IMD (2020), new normal dates of onset and withdrawal of the southwest monsoon (Table 2). https://internal.imd.gov.in/press_release/20200515_pr_804.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of floods, lakes and gate operations (secondary): OneIndia on Bhopal, 14 August 2006, https://www.oneindia.com/2006/08/14/city-of-lakes-deluged-denizens-dead-or-missing-1155573266.html ; The Week on the Bhopal season of 2019 (18 September 2019), https://www.theweek.in/news/india/2019/09/18/Bhopal-breaches-all-time-rain-record-as-showers-continue-to-batter-MP.amp.html ; Free Press Journal on Bhopal in August 2022, https://www.freepressjournal.in/bhopal/bhopal-flood-of-misery-165-cm-rain-brings-city-to-knees-flooded-roads-uprooted-trees-water-logging-and-power-outage ; Free Press Journal on the Narmada at Hoshangabad (2020), https://www.freepressjournal.in/bhopal/narmada-swells-48-year-record-breached-river-flows-18-feet-above-danger-mark ; The Week on Hoshangabad (29 August 2020), https://www.theweek.in/news/india/2020/08/29/heavy-rain-creates-flood-like-situation-in-mp-army-called-in-hoshangabad.amp.html ; The Hitavada on dam gate openings (7 September 2026), https://www.thehitavada.com//Encyc/2026/9/7/rivers-in-spate-dam-gates-opened-warning-in-15-distts-monsoon-turns-ferocious-in-state-as-narmada-kaliasot-swe.html ; SANDRP on Gandhi Sagar in September 2019, https://sandrp.in/2019/09/24/man-made-national-crisis-that-gandhi-sagar-dam-faced-in-sept-2019/
- Reports of wetlands, lakes and drains (secondary): Mongabay on the notification of wetlands (January 2023), https://india.mongabay.com/2023/01/madhya-pradesh-fails-to-notify-a-single-wetland-a-hurdle-in-conservation/ ; The Hitavada on the AMRUT 2.0 lake project in Bhopal (21 March 2026), https://www.thehitavada.com/Encyc/2026/3/21/rs-213-crore-amrut-20-project-to-revive-upper-lake-and-halali-dam-with-10-new-stps.html ; Down To Earth on Indore's nalas and the Kanh, https://www.downtoearth.org.in/water/indores-clean-image-masks-a-liquid-waste-crisis ; National Green Tribunal, compliance report in O.A. 45/2024 (Bhopal lakes), https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20%20in%20compliance%20OA%2045-2024..pdf
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 6 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Urdu waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Madhya Pradesh has no Act for the protection of lakes or tanks as such. Its talabs, tals and sagars are protected instead by revenue law, municipal law, the building rules, the courts and the wetland rules. In the villages, every tank on unoccupied land over which the village community was "exercising rights of irrigation or nistar" vested "absolutely in the State Government with effect from the 6th April, 1959", and the vesting "shall not affect the rights of irrigation and nistar in such tank" (Madhya Pradesh Land Revenue Code, 1959, s. 251(1) and (7)); the State is reported to have handed the management of village ponds and tanks to the Gram Sabhas in 2001 (as stated by the State in a court case). In the cities, public tanks, streams, rivers, drains and watercourses vest in the Municipal Corporation, and "All property such as tank, playground, park, garden and other places meant for public utility vested in the Corporation shall neither be used for any other purpose nor be permitted to use for any other purpose by the Corporation" (Madhya Pradesh Municipal Corporation Act, 1956, s. 82(1) and (2)); no drain or latrine may be kept within a hundred feet of a tank or reservoir from which water is or may be derived for public use (s. 199). The same Act keeps an older sanitary power that runs the other way: the Commissioner may require an owner "to cleanse, repair, cover fill up or drain off any private well, tank, reservoir, pool, depression or excavation" that appears "to be injurious to health or offensive to the neighborhood" (s. 202). This Manual treats every recorded talab as drainage infrastructure. A talab is storage and conveyance in the drainage system, and filling one, under section 202 or otherwise, removes that storage; no design under this Manual shall assume or rely on the filling of a recorded talab unless a drainage assessment under Chapters 3 to 5 shows where its storage goes, and the lost storage is replaced under Clause 7.6.4 (see "Recorded talab" in the definitions after Clause 7.2). A pond that is a health risk is to be treated (desilting, inlet screening and exclusion of sewage, Clauses 7.9 and 8.9), not filled. MPBVR 2012 bars a building site "within a distance of 9 meters of the highest water level of a water body/ water course and 15 mtrs in case of river or as prescribed in the development plan", or where the "site is not drained properly or is incapable of being well drained", or where the building "adversely affects any public utility like a Municipal drain" (Rule 50(b), (f) and (j)), and the Madhya Pradesh Nagarpalika (Colony Development) Rules, 2021 withhold civic works from unauthorised colonies built on "areas of river/ drains" and "water bodies" in the development plan (rule 23, as cited by the CAG). Wetlands notified under the Wetlands (Conservation and Management) Rules, 2017, and the State's five Ramsar sites, are the concern of the MP State Wetland Authority, whose secretariat is EPCO; no wetland was reported notified under the Rules as of January 2023. No State law or order zoning the floodplains of the rivers was found for this Manual; the lines that exist along the Narmada and the Kshipra, and around the lakes of Bhopal, have been set by the National Green Tribunal (Central Zone) and the Madhya Pradesh High Court (Clause 7.4, Disclosure). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, municipal, planning and wetland procedures that record and protect waterbodies in law, or the directions of the High Court and the National Green Tribunal.