Draft v1.0 prepared by NEER. Not adopted by the Government of Madhya Pradesh or any authority or local body, and has no legal force. About this draft

Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, talab and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Madhya Pradesh's cities are spending on their drains and lakes, but no city drainage master plan with a design standard has been published. Bhopal's storm water master plan, prepared by Tata Consulting Engineers, described the Patra nala, which drains almost the whole of the old city through a network of about 50 km to the Halali, the Banganga nala, which drains to the Lower Lake, the Saket Nagar (Anna Nagar) nala, which drains to the Hathaikheda reservoir and the Betwa, and the Kolans, which feeds the Upper Lake, and found most of the drains adequate except three (Sachdeva 2009, citing TCE); its design return period and intensities were not found. A drainage master plan and DPR for Bhopal is also listed by a consultant (Meinhardt; not read), and the city's storm drain coverage was put at 24.57% in its Smart City self-assessment (as reported). Bhopal's AMRUT 2.0 project, reported at ₹213.75 crore, would add 10 sewage treatment plants of 171 MLD, among them one of 60 MLD at Bhanpur on the Patra nala, to keep sewage out of the Upper Lake and the Halali (as reported). The city has no development plan newer than 2005: the State returned the drafts for 2021 and 2031 and asked for a plan to 2047, which had not been published by February 2025 (CAG Report No. 5 of 2025); Gwalior and Ujjain are moving to development plans for 2035, and Indore and Jabalpur have development plans to 2021 (CAG). No published document sets a design return period for the drains of any Madhya Pradesh city. This chapter supplies the design storm, levels of service, storage and buffer criteria that such a plan needs, with the design storms of Chapter 2 and the levels of service of Clause 11.6; it has not been adopted by UDHD, T&CP, any Municipal Corporation or any other body. A site-level manual cannot fix basin-level problems: lost tank storage, city outfalls to lakes and reservoirs whose levels are held by gates and to the Narmada, which dam releases can hold high for days, nalas that carry sewage and solid waste into the lakes and to interception works at their outfalls, talabs and nalas narrowed, piped or built over in spite of the setbacks of the MPBVR 2012, single drains split between a Municipal Corporation, a development authority and WRD, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to Madhya Pradesh: to city outfalls on lakes and reservoirs whose levels are held by gates, as at Bhopal, where the Upper Lake discharges through the Bhadbhada sluices to the Kaliasot, and on the Narmada at Jabalpur and Narmadapuram, which releases from Bargi, Tawa and Indira Sagar can hold high for days; to nalas that carry sewage and solid waste into the lakes and rivers; to drains and public tanks vested in the Municipal Corporations, rivers and dams held by WRD and NVDA, and lakes whose margins the Tribunal protects, without an order that divides the nalas between them; to talabs and sagars that the law protects but encroachment has reduced; to development plans that are out of date, Bhopal's since 2005; to a State with no published design return period for the drains of any city; to over-exploited hard-rock aquifers in Malwa and black soils that seal once wet; and to a south-west monsoon whose recorded days exceed the 50-year depths of the CWC plates at Sagar (475.6 mm, 2005) and Hoshangabad (380.0 mm, 2006).


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 No basin delineation has been published for any Madhya Pradesh city. For the urban areas where the evidence identifies them, the basins are at least the following:

  • Bhopal, Upper Lake: the catchment of the Upper Lake (Bhojtal), reported as 361 km², which the Kolans feeds, with the lake level of Chapter 5 as the boundary condition of every drain that enters it, and the Bhadbhada sluices, through which it discharges to the Kaliasot, as a gated link between basins (Clause 11.3.2);
  • Bhopal, Kaliasot and Kerwa: the catchments of the Kaliasot and Kerwa reservoirs and of the Kaliasot below them, with the releases from Bhadbhada, Kaliasot and Kerwa as inflows, the outfall-closed case at full tank level a design case, and the 33 m green belt of the Bhopal Development Plan 2005 shown;
  • Bhopal, Patra nala and Lower Lake: the catchment of the Patra nala, which drains almost the whole of the old city to the Halali, with the Lower Lake, fed by the Banganga nala and overflowing to the Patra nala, as storage within it, and the interception works and treatment plant at Bhanpur mapped (Clause 8.9.5);
  • Bhopal, Hathaikheda: the catchment of the Saket Nagar (Anna Nagar) nala, which drains to the Hathaikheda reservoir and on to the Betwa;
  • Indore, Kanh and Saraswati: the catchments that drain to the Kanh (Khan) and the Saraswati, about 132 km² to their confluence (ACCCRN), with the Sirpur and Bilawali tanks as storage and the drain-tapping works on the nalas mapped (Clause 8.9.5);
  • Jabalpur, Narmada: the catchments of the Omti nala and the other nalas of the city that drain to the Narmada and its tributaries, with the Narmada level, which releases from Bargi govern, as the boundary condition and the outfall-closed case a design case;
  • Narmadapuram, Narmada: the catchments that outfall to the Narmada, with its level at the CWC Hoshangabad site as the boundary condition and the outfall-closed case under releases from Tawa and Bargi a design case; and
  • Ujjain, Kshipra: the catchments that drain to the Kshipra, with the river level as the boundary condition and the submergence of Ram Ghat used as the flood marker until a gauge level is published.

Other Tier A bodies, including Gwalior, Sagar, Rewa, Satna, Ratlam and Dewas, shall define their basins in the first BSMP that covers them. Where WRD, NVDA, CWC or the custodian of a lake has a high flood level, a full tank level or maximum water level, a floodplain line under a court order, or an operating rule for a dam, a lake sluice or a pumping station, the BSMP shall take its boundary conditions from it and show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, river levels, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, river, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. In Madhya Pradesh a single nala can pass through several hands on its way to a lake or river. The MP Municipal Corporation Act 1956 vests the public drains, watercourses, streams and tanks in the Corporation (s.82) and lets its drains empty into any place within or outside its limits unless the State Government prohibits it (s.191); the rivers, dams and reservoirs that receive them are with WRD and NVDA; the lakes are protected through the Tribunal's orders, with EPCO as the secretariat of the State Wetland Authority; the development authorities build the drains of their schemes; and no rule divides the natural nalas from the municipal drains (as this Manual reads the record). The drains carry sewage across these boundaries: Bhopal's Lower Lake is reported to receive drainage from 28 sewage-filled nalas and to overflow to the Patra nala (as reported), and Indore's corporation reports 1,746 public and 5,624 domestic sewer outfalls tapped in 25 nalas (as reported). This clause makes the basin the planning unit, so that one model carries each drain from its head to the lake or river whoever owns each reach, and so that the interception structures are tested against the capacity of the drains they tap (Chapter 8, Clause 8.9.5).


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For the basins of a city with a Municipal Corporation: the Municipal Corporation (in Bhopal, BMC), in which the MP Municipal Corporation Act 1956 vests the public drains, watercourses and tanks (s.82) and which must provide and maintain drains (s.66), jointly with T&CP, which prepares the development plan into which the BSMP is carried (Clause 11.9); either may prepare the plan as UDHD directs. Where a basin extends beyond the Corporation, the other local bodies and the development authority in the basin are partners, and one BSMP covers the whole basin (Clause 11.3.1).
  • No order dividing the natural nalas from the municipal drains, or the drains of the local bodies from the rivers and reservoirs of WRD, was found; until one is made, this Manual assigns the reaches within each BSMP as follows, each body being Lead Authority for the reaches and works it owns or runs and for the parts of the CIP on them: WRD for the rivers, dams, reservoirs and their gates and releases, and NVDA for the Narmada and its projects; EPCO, as secretariat of the MP State Wetland Authority, with the custodian of each lake that WRD or the Municipal Corporation names, for the lakes and wetlands, their full tank level lines and their buffers; the Municipal Corporation, Nagar Palika Parishad or Nagar Parishad for the municipal nalas, road drains and public tanks vested in it (s.82); the development authorities (in Bhopal, BDA) for the drains of their schemes until they are handed over; the Collector for the tanks vested in the State under s.251 of the MP Land Revenue Code 1959 in the parts of a basin outside municipal limits; and PWD and NHAI for the drains of their roads.
  • In Tier B bodies: the Lead Authority is named by UDHD. Basins draining to a common river reach or lake may be grouped into one district-level plan.

The MP State Wetland Authority shall be consulted on every BSMP whose basin drains to a notified wetland or a Ramsar site (Bhoj Wetland, Sirpur, Yashwant Sagar, Sakhya Sagar or the Tawa Reservoir); MPSDMA and the district administration on every BSMP; and the MP Pollution Control Board on every BSMP that proposes works on a drain that carries sewage to a lake or river.

WRD, or NVDA on the Narmada, shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, talab, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls, rivers and lakes The datum of every level named, with levels published in feet converted; outfall invert levels against the warning, danger and high flood levels of the receiving river at the nearest CWC or WRD gauge and its recorded peaks; for outfalls to lakes and reservoirs, the full tank level, maximum water level and dead-storage level from WRD, NVDA or the custodian, the gate-opening rule and any conflict between published values (for the Upper Lake, 508.04 m against 508.65 m); the lines drawn under court orders where they bind, such as the 25-year floodplain of the Narmada once demarcated; the sluices, flap gates, interception structures, check dams and pumping stations on the outfalls, with their capacities and operating rules; and releases from any dam upstream
Rainfall and levels All available rain gauges (IMD, including the Bhopal (Bairagarh), Indore, Jabalpur, Gwalior, Ujjain, Sagar, Satna, Rewa, Ratlam, Hoshangabad (Narmadapuram), Khandwa and Guna stations and the automatic weather stations and rain gauges reported by the Meteorological Centre Bhopal; the district and tehsil rain gauges; the rain and river gauges of CWC and of WRD and NVDA, including those at the dams and lakes; and any gauges kept by the Municipal Corporations and the Smart City companies) and water-level records, including those for the August 2006 (Bhopal), September 2019 (Mandsaur and Neemuch), August 2020 (the Narmada at Narmadapuram), August 2021 (Shivpuri) and August 2022 (Bhopal) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the floodplains of the Narmada at Jabalpur and Narmadapuram, on the gentle black-soil slopes of the Malwa plateau around Indore and Ujjain, and around the margins of the lakes of Bhopal, where the line of the full tank level decides what may be built, a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The August 2006 (Bhopal), September 2019 (Mandsaur and Neemuch), August 2020 (the Narmada at Narmadapuram), August 2021 (Shivpuri) and August 2022 (Bhopal) events are the best calibration data Madhya Pradesh has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and talab storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been reported but not measured. In law the tanks of Madhya Pradesh are public: village tanks with rights of irrigation or nistar vested in the State on 6 April 1959, those rights surviving the vesting (MP Land Revenue Code 1959, s.251(1) and (7)); within a Corporation the public tanks, streams and watercourses vest in it, a vested tank may not be used for any other purpose (MP Municipal Corporation Act 1956, s.82), and no drain or latrine may be kept within 100 ft of a public tank or well (s.199); and the MP Bhumi Vikas Rules 2012 bar building within 9 m of the highest water level of a water body (Rule 50(b)), a level the Rules do not define and for which this Manual proposes its own definition (Chapter 7). The same Municipal Act lets the Commissioner require a private tank or pool to be filled up or drained off if it appears injurious to health (s.202). Bhoj Wetland, the Upper and Lower Lakes of Bhopal, has been a Ramsar site since 2002, Sirpur, Yashwant Sagar and Sakhya Sagar since 2022 and the Tawa Reservoir since 2024 (as reported); the Lower Lake is reported to receive drainage from 28 sewage-filled nalas (as reported), and the full tank level of the Upper Lake, on which its buffer depends, is published as both 508.04 m and 508.65 m. No inventory of the talabs inside any Municipal Corporation, and no survey of the storage of any of them, was found.


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8, used unchanged: no projection of heavy rainfall for Madhya Pradesh with a design factor was found, and the reported significant increase in extreme and very heavy monsoon rainfall over the State in 1971–2020 (Muppa et al. 2025, abstract) is a reason to keep them, not to reduce them.

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the August 2006 (Bhopal), September 2019 (Mandsaur and Neemuch), August 2020 (the Narmada at Narmadapuram), August 2021 (Shivpuri) and August 2022 (Bhopal) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two tanks in cascade with surplus course; a 1D drain network linked to a 2D surface grid; a river or canal reach with an inter-basin link; an outfall with a flap gate and pumps; and a river or lake level boundary. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) River / receiving water 1 S1 S2 S3 2 Upper tank Lower tank start level start level 3 2D surface 5 4 River / canal (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Tanks and ponds Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Rivers and canals (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Sluices, flap gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary River (CWC or WRD gauge) or lake level (MWL or FTL + surcharge), per Ch. 5 Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and talabs with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: talabs, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: sluices and flap gates on the outfalls to the rivers and lakes, pumping stations and the storage behind them where an outfall can be closed, interception structures that keep the storm capacity of the drain, and the operating rules of the lake and dam gates that set the receiving levels, agreed with WRD, NVDA or the custodian;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example IMD district rainfall warnings issued by the Meteorological Centre Bhopal, CWC flood forecasts and river stages at its sites on the Narmada and other rivers against their warning and danger levels, the alerts issued downstream before the gates of Bargi, Tawa, Bhadbhada, Kaliasot, Kerwa and other dams and lakes are opened, and the district flood control rooms opened from 15 June or the onset), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on groundwater recharge in the over-exploited hard-rock aquifers of Malwa, waterlogging on deep black soils once their cracks close, and the quality of the groundwater and of the lakes that the drains reach (Chapter 8);
  • effect on downstream basins and the receiving river or lake; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring storage comes first because many of the outfalls of Madhya Pradesh's cities are lakes and reservoirs that are often full in the wettest weeks. Bhopal's drains reach the Upper and Lower Lakes, the Hathaikheda reservoir and the Kaliasot, and when the Upper Lake reaches its full tank level the Bhadbhada gates are opened into the Kaliasot (as reported), so faster conveyance only raises the lakes sooner and passes the water to the colonies downstream; on the Narmada, releases from the dams can hold the river high at Jabalpur and Narmadapuram for days, and the recorded high flood level at Narmadapuram stands about 7.5 m above the danger level (CWC, via search summary). The State's tanks are old and public: tanks over which the village community exercised rights of irrigation or nistar vested in the State from 6 April 1959 (MP Land Revenue Code 1959, s.251), and within a Corporation the public tanks vest in it and may not be put to any other use (MP Municipal Corporation Act 1956, s.82(2)). The storms are large for drains with no stated design basis: IMD has recorded 475.6 mm in a day at Sagar (4 July 2005) and 380.0 mm at Hoshangabad (14 August 2006), above the 50-year 24-hour depths of the CWC plates there (IMD; this Manual's reading), and Shivpuri district was reported to receive 454.6 mm in 38 hours in August 2021 (as reported). Conveyance upgrades on their own move water faster to an outfall that a river in flood or a lake held at its full tank level may close, or that is limited by the capacity of its sluice, interception structure or pumping station. Groundwater in Madhya Pradesh invites recharge in the west and limits infiltration where black soils seal. The State's stage of extraction was 59.1% in 2022, with 26 of 317 assessment units over-exploited, 5 critical and 60 semi-critical (DGWR 2022, as filed before the National Green Tribunal), and over-exploitation is concentrated in Malwa, where Ratlam district stood at about 134% in 2024 (as reported); the aquifers are hard rock, in basalt and granite, where recharge reaches fractures rather than a sand aquifer. Deep black soils crack when dry and take water early in the season, but once wet their infiltration falls to about 0.2 mm/h (review, as reported). The law asks for recharge without regard to either: the MP Bhumi Vikas Rules 2012 require rain or roof water harvesting on plots of more than 140 m², by percolation pits, a pebble bed or a recharge well of fixed dimensions (Rule 81(4) and Appendices H-1 to H-3), and rainwater harvesting measures in layouts of 2 ha or more (Rule 16(5)(h)), with no sizing or pre-treatment rule. This is why recharge, waterlogging and groundwater quality are all assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the development plans and zoning plans made under the MP Nagar Tatha Gram Nivesh Adhiniyam 1973, among them the Bhopal Development Plan 2005 and the plan that replaces it, and the layouts given development permission under them and under the MP Bhumi Vikas Rules 2012. In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. Madhya Pradesh draws its water lines by rule at the bank and by court order beyond it. The MP Bhumi Vikas Rules 2012 bar building within 9 m of the highest water level of a water body or watercourse and 15 m of a river, or as the development plan prescribes (Rule 50(b)), but do not define the highest water level, and require the site plan to show flood-affected areas (Rule 16(4)(j)) without saying how they are drawn. The wider lines come from the Tribunal and the courts: the 33 m green belt of the Kaliasot and Kerwa in the Bhopal Development Plan 2005, enforced by the Tribunal since 2014 (Subhash C. Pandey), whose scope after a Supreme Court order of about March 2025 is unclear; 50 m from the full tank level of the Upper Lake in urban areas and 250 m in rural areas (O.A. 77/2020 and 12/2025, as reported), with the full tank level itself being re-surveyed; a 25-year floodplain of the Narmada to be demarcated as a no-development zone (as reported); and 200 m from the Kshipra at Ujjain, under an interim order of January 2026 (as reported). A 300 m ban along the Narmada reported from the High Court is of unclear status, and WRD has said in a parliamentary reply that there is "no proposal" for such a ban. Notified wetlands carry a 50 m line from the mean high flood level (Wetlands Rules 2017), but no wetland had been notified in the State as of January 2023 (as reported). No State floodplain zoning law or order was found. These are river, lake and waterbody lines, not drainage-flood lines. A BSMP gives the land-use plans the 1% AEP drainage-flood map, and the buffer widths of Chapter 7, that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the MP Bhumi Vikas Rules 2012 already require at least 10% of the area of a layout to be kept as community open space (Rule 47(2)), rainwater harvesting measures in layouts of 2 ha or more (Rule 16(5)(h)), one tree for every 100 m² of a plot (Rule 67) and a "minimum soft area" in group housing, whose value is left to a separate notification (Rule 60(1)), but set no detention or pervious-area rule; storage placed in a layout's open space builds on these duties, and because that land still serves as open space, the storage must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 31 May). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for Madhya Pradesh building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report