Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Madhya Pradesh. Madhya Pradesh is landlocked: it has no coast, no tide and no Coastal Regulation Zone. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Madhya Pradesh: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Madhya Pradesh the receiving water is a lake, reservoir, sagar or talab, often with a gated outlet; a river, reached directly, through a gate in a bank or ghat wall or through a pumping station, whose level is often set by the releases of a dam upstream; a drain or canal of WRD or NVDA; or a nala of a Municipal Corporation, a development authority or another drain-owning body, and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a lake, a river or a receiving drain, with the lake or river lock of Clause 5.8.5(a) and (b) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Patra nala of Bhopal and the Islamnagar river and the Halali to which it drains, the Banganga nala and the other nalas that end in the Lower Lake, the Kolans and the other streams and nalas that end in the Upper Lake, the Kaliasot below the Bhadbhada gates, the Kanh (Khan) and the Saraswati at Indore and the nalas that drain to them, the Omti nala and the other nalas of Jabalpur, the Kshipra at Ujjain and the drains that outfall to it, the Swarnrekha at Gwalior, any drain or canal of WRD or NVDA, any drain maintained by a Municipal Corporation, a Nagar Palika Parishad, a Nagar Parishad or a development authority with an internal width of 1.0 m or more, any irrigation canal that receives storm water, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, talab or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or talab under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, BMC, MPSDMA or WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next talab or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Madhya Pradesh. In Bhopal, where the Patra nala drains almost the entire old city through a network of about 50 km to the Islamnagar river and the Halali, the Banganga nala ends in the Lower Lake, which overflows to the Patra nala, and the Kolans ends in the Upper Lake, whose outlet through the Bhadbhada gates and the Kaliasot joins the Betwa (TCE, Bhopal Storm Water Master Plan, as cited by NIDM, 2009), and in Indore, where the city drains to the Kanh (Khan) and the Saraswati and wastewater also reaches the Sirpur and Bilawali tanks (as reported), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the lake- and dam-controlled cities of Madhya Pradesh, whose outfalls lie below the full tank levels of the lakes they drain to, or on rivers held high for days by dam releases: in August 2022 about 200 colonies of Bhopal, among them Kolar, Shahpura and Misrod, were waterlogged while the gates of the Kaliasot (7 of 13), Bhadbhada (5 of 11) and Kerwa (5 of 8) dams were open (as reported), and in August 2020 the Narmada at Sethani Ghat, Narmadapuram, was reported at 297.75 m against a danger level of 293 m, with all 13 gates of the Tawa dam and 17 of the 21 gates of the Bargi dam open (as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Madhya Pradesh, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, BDA or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Madhya Pradesh has no coast, and the surge term does not arise in the State.
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Madhya Pradesh, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Narmada at Jabalpur (Gwarighat, Tilwara and Bhedaghat) below the Bargi dam, and the drains and nalas of the city that end in it (Clause 5.8.5(a) and (c));
- the Narmada at Narmadapuram (Hoshangabad and Sethani Ghat) below the Bargi and Tawa dams, at Mandla, Barmanghat and Sandia, and at Handia and Mandleshwar with the Indira Sagar and Omkareshwar dams (Clauses 5.8.3 and 5.8.5(a) and (c));
- the Upper Lake (Bhojtal) and the Lower Lake of Bhopal, Shahpura lake, the Kaliasot and Kerwa reservoirs, and the Sirpur and Bilawali tanks and Yashwant Sagar at Indore, with every nala that ends in them (Clause 5.8.5(b));
- the Kaliasot below the Bhadbhada gates and the Kaliasot dam, and the Patra nala and the Halali below the Lower Lake (Clause 5.8.5(b) and (c));
- the Kshipra at Ujjain below the Gambhir dam, the Kanh (Khan) and the Saraswati at Indore, the Chambal below the Gandhi Sagar dam, the Betwa, and the Sindh (Clause 5.8.5(a) and (c));
- any drain or canal of WRD or NVDA, and any irrigation canal that receives storm water (Clause 5.8.5(e)); and
- elsewhere: any river or WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Bargi, Tawa, Indira Sagar and Omkareshwar dams on the Narmada and its tributaries, the Bhadbhada gates of the Upper Lake and the Kaliasot and Kerwa dams at Bhopal, the Gambhir dam above Ujjain, and the Gandhi Sagar dam on the Chambal), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 River-locked outfalls, lake and reservoir outfalls, rivers driven by dam releases, the Narmada at Jabalpur and Narmadapuram, the Kshipra, the Kanh, the Chambal and the Betwa, and discharges to WRD and NVDA channels.
- (a) River-locked outfalls. For an outfall to a river directly, through a gate in a bank, ghat wall or embankment or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain the sill of each gate, the crest of the bank or wall, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or WRD gauge.
- Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 100-year level of a flood-frequency study or floodplain delineation that gives a level at the outfall, or a level from a hydraulic model under Clause 5.8.2(b), with the dam releases of item (c). The 25-year floodplain that the NGT has directed to be demarcated along the Narmada is not a 1% AEP level and does not replace it. The level shall in no case be less than the highest recorded level at the nearest CWC or WRD gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), all from search summaries of CWC bulletins and none read in a CWC document [TBC], are: the Narmada at Mandla 439.405 m (1974), at Barmanghat 331.32 m (21 August 1973), at Sandia 318.55 m (21 August 1973), at Hoshangabad (Narmadapuram) 301.33 m (27 August 1972), at Handia 274.9 m (30 August 2020) and at Mandleshwar 157.29 m (31 August 1973). At Narmadapuram a press report of August 2020 gives 297.75 m at Sethani Ghat as a "48-year record"; it is lower than the CWC value and may refer to another gauge, so 301.33 m applies until CWC confirms the level [TBC]. Where a later flood has exceeded the listed level, the later level governs. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and WRD gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river, with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual). No danger level or highest flood level was found for the Narmada at Gwarighat (Jabalpur), the Kshipra at Ujjain, the Kanh at Indore, or any gauge on the Chambal, the Betwa or the Sindh in the State [TBC]. On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks and from the records of the local body, WRD, NVDA or the Collector, with its source stated; an outfall shall not be designed on such a reach without one of them (set by this Manual). For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest gauge, transferred in the same way: 293.8 m at Hoshangabad (warning level 292.8 m) and 437.8 m at Mandla, the higher of two readings of the source, from search summaries of CWC bulletins [TBC], and 323 m at Barmanghat (as reported [TBC]) (all set by this Manual). Where no danger level has been found, as at Sandia, Handia and Mandleshwar, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (set by this Manual). The datum of every level is to be confirmed for each gauge [TBC].
- Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate, bank or wall, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
- River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC or WRD gauge in the flood that set the highest recorded level (1972 at Hoshangabad; 1973 at Barmanghat, Sandia and Mandleshwar; 1974 at Mandla; 2020 at Handia) or in a comparable flood, with the dam releases of item (c), and not less than 72 hours, covering the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6, including the releases of the dams above, shows it and the Authority approves it. Floor levels and pumped outfalls behind a gate, bank, ghat wall or embankment shall also be checked for the failure of the gate and for a breach of the bank or wall, with the land and drains behind it filled to the river level beyond it.
- (b) Lake and reservoir outfalls. For an outfall to a lake, reservoir, sagar or talab, directly or through a nala that ends in it, such as the Upper Lake (Bhojtal) and the Lower Lake of Bhopal, Shahpura lake, the Kaliasot and Kerwa reservoirs, and the Sirpur and Bilawali tanks and Yashwant Sagar at Indore:
- Consent. Storm water shall not be discharged to a lake or reservoir without the written consent of its custodian, the body that holds and operates it: WRD for its reservoirs, the Municipal Corporation for a tank vested in it under s.82 of the MP Municipal Corporation Act 1956, or another custodian the State names (the custodian of each Bhopal lake and gate was not confirmed during research [TBC]). Where the lake is a Ramsar site (the Bhoj Wetland, Sirpur, Yashwant Sagar, Sakhya Sagar and the Tawa Reservoir) or a notified wetland, any permission that the MP State Wetland Authority requires shall also be obtained (Chapter 7). An outfall that carries dry-weather flow is dealt with under Clause 8.9.
- Design lake level. The tailwater for the major-system and storage cases shall be the lake's maximum water level (MWL) as WRD or the custodian publishes it, or, where only the full tank level (FTL) is published, FTL plus the surcharge in the lake's design flood, computed from the rating of its spillway, weir and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, the tailwater is FTL + 0.5 m (set by this Manual) [TBC]. The minor-system tailwater is the FTL, or the level at which the custodian's rule opens the gates if that is higher. The project's discharge shall be included in the lake level (Clauses 5.3.2 and 5.12.3).
- The Upper Lake. Its FTL is reported both as 1,666.80 ft (about 508.04 m) and as 508.65 m. Until WRD confirms the level and its datum [TBC], 508.65 m applies, and with it a lake tailwater of 509.15 m where no MWL is published; when the full tank level now being re-surveyed under the orders of the NGT is accepted, that level governs. The other levels found are those reported for the Kaliasot, FTL 1,659 ft (about 505.66 m; the reservoir was reported at its full level, 505.67 m, in August 2020), and the Kerwa, FTL 1,673 ft (about 509.93 m) (as reported, datum [TBC]); no FTL was found for the Lower Lake, Shahpura lake, the Sirpur and Bilawali tanks or Yashwant Sagar [TBC].
- Closed outfall. Where the outfall invert is below the design lake level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the lake below the invert at the start of comparable storms and the Authority accepts it. The lake starts every design storm at FTL (Clause 7.7.3). No lowering of the lake before a storm and no early or additional gate opening shall be assumed unless the custodian's written operating rule and records show it.
- Below the gates. An outfall to the channel below a lake's gates or spillway, such as the Kaliasot below the Bhadbhada gates and below the Kaliasot dam, shall take the river level of item (a) with the release of Clause 5.8.3 from the gates above it, at the largest gate opening on record as the custodian states it (as reported: 5, or 11, of the 11 Bhadbhada gates in August 2006; in August 2022, 5 of 11 at Bhadbhada, 7 of 13 at Kaliasot and 5 of 8 at Kerwa), coincident with the design storm on the city under item (c). Floor levels and pumped outfalls below a dam or gated lake shall also be checked for the release that results from a gate failing open.
- (c) Rivers driven by dam releases. For an outfall to a river below a dam or a gated lake, such as the Narmada at Jabalpur below the Bargi dam (full reservoir level 422.76 m, as reported) and at Narmadapuram below the Bargi and Tawa dams, the Kshipra below the Gambhir dam, the Chambal below the Gandhi Sagar dam and the Kaliasot below the Bhadbhada gates:
- in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dams above, with the flow of the catchment below them as it occurred in the same event (set by this Manual), until NVDA or WRD publishes an operating rule [TBC]. As reported, 17 of the 21 Bargi gates, all 13 Tawa gates, 22 gates of Indira Sagar and 21 of the 23 Omkareshwar gates were open in August 2020; Bargi released 3,988 m³/s through 13 gates on 21 August 2026; and Gandhi Sagar released about 4.93 lakh cusec through 19 gates in September 2019, above its full reservoir level of 399.9 m and its maximum water level of 401 m. The largest recorded release shall be obtained from NVDA or WRD and stated [TBC];
- the river level shall not be reduced on the ground that the flood comes from rain that falls outside the city or that the site storm is small, and the release shall be placed before, during and after the site storm;
- an outfall in Jabalpur to the Narmada, or to a river, nala or drain that ends in it, shall not be designed without a river level at the outfall under item (a), because no level was found for Gwarighat [TBC]; and
- an outfall in Narmadapuram shall take the level of item (a), not less than 301.33 m at Hoshangabad transferred to the outfall, with the releases of both Bargi and Tawa included.
- (d) NVDA and WRD consent; court lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of the Narmada, or of a river, reservoir or canal of WRD, without the consent of NVDA (for the Narmada and its project works) or WRD; the procedure for that consent was not found during research [TBC]. The designer shall also check the outfall against the lines that courts have set or are setting, as they stand at the time of design (Chapter 7): the 25-year floodplain of the Narmada that the NGT has directed to be demarcated as a no-development zone, and a reported 300 m line along the Narmada whose status is unclear; the interim 200 m line along the Kshipra at Ujjain (High Court, Indore bench, January 2026); the 50 m from the full tank level of the Upper Lake in urban areas (NGT); and the 33 m green belt along the Kaliasot and Kerwa reservoirs (Bhopal Development Plan 2005; NGT, 2014), on which a Supreme Court order of about March 2025 has been reported whose scope is unclear. Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].
- (e) WRD and NVDA channels, irrigation canals and the nalas of other bodies. Storm water shall not be discharged to a drain or canal of WRD or NVDA, or to another irrigation canal, without the consent of WRD, NVDA or the channel's owner. Where consent is given:
- the discharge shall not exceed the rate the consent allows;
- the tailwater is the higher of the channel's design water level as WRD, NVDA or the owner states it and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the nalas of other bodies, and with its downstream boundary at the river or lake level of items (a) and (b); until a design water level is published for a channel, the computed level governs [TBC];
- the channel shall be taken in its present condition, net of silt, encroachment and obstruction by crossing services, and a widening, lining, remodelling or diversion that has been proposed but not completed shall not be counted; and
- the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
No pump, gate, sluice or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a lake before a storm, closing a gate late or opening dam gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the lake or the river (Clause 5.12.3).
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Madhya Pradesh's rivers break that assumption, because a dam stores the first rain of a monsoon spell and spills when it is already full, at the time the same spell is falling on the city below. The Narmada flood of August 2020 followed 24-hour falls of 41 cm at Chaurai, 23 cm at Pachmarhi and 20 cm at Hoshangabad (IMD, as reported), with the Tawa and Bargi gates open at the same time; the Bhopal storm of August 2022 came with the Kaliasot, Bhadbhada and Kerwa gates open together; and the Gandhi Sagar releases of September 2019 coincided with about 218–243 mm in 24 hours at Mandsaur and Manasa (as reported). Hoshangabad's highest 24-hour rainfall, 380.0 mm, fell on 14 August 2006, the same day as Bhopal's, 291.6 mm (IMD). The two cannot be treated as independent, and a local storm can fall before, during or after the release. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the dams above the State's cities. The Narmada reaches Jabalpur below the Bargi dam, whose full reservoir level is reported as 422.76 m, and Narmadapuram below Bargi and the Tawa dam; downstream are the Indira Sagar and Omkareshwar dams. In August 2020, 17 of the 21 Bargi gates, all 13 Tawa gates, 22 gates of Indira Sagar and 21 of the 23 Omkareshwar gates were reported open, and on 21 August 2026 Bargi was reported releasing 3,988 m³/s through 13 gates, with alerts at Gwarighat, Tilwara and Bhedaghat (as reported). At Bhopal, the Upper Lake spills through the Bhadbhada gates to the Kaliasot, whose own dam has 13 gates, and the Kerwa dam has 8 (as reported). On the Chambal, the Gandhi Sagar dam was reported above its full reservoir level of 399.9 m and its maximum water level of 401 m for at least 24 hours in September 2019, releasing about 4.93 lakh cusec through 19 gates, when more than 16,000 people were shifted in Mandsaur and Neemuch (SANDRP, 2019); dam operation was also questioned in the Sindh flood of August 2021 (SANDRP, 2023). No operating rule or release record for any of these dams was obtained during research, and the CWC hourly stage records for the Narmada gauges were not obtained [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(c)). The danger and highest flood levels used in this Manual come from search summaries of CWC bulletins, which could not be downloaded during research, and their datum and gauge zero are to be confirmed from CWC [TBC].
Clause 5.8.5 is set by this Manual. In Madhya Pradesh the tailwater at a city outfall is set not by the tide but by a lake held at its full tank level by gates, by a river held high by the releases of the dams above it, or by a gate or pump in a river bank, and no document found during research gives a design level for any of them. The MP Municipal Corporation Act 1956 lets the drains of the Corporation empty "into any place, whether within or without the limits of the Corporation" (s.191), but it does not say against which level. No State floodplain-zoning law or order was found, and no design return period has been published for the drainage of any city in the State.
The first is the lake. Several of the State's cities stand around tanks: Bhopal around the Upper and Lower Lakes, which make up the Bhoj Wetland, and Indore with the Sirpur and Bilawali tanks and Yashwant Sagar. A lake at its full tank level does not fall for the rest of the monsoon; it passes its inflow over a weir or through its gates, and its level rises above FTL by whatever head the flood needs. The Upper Lake reached FTL and the Bhadbhada gates were opened in 2003, 2006, 2012, 2013 and 2016, nine times in the 2020 season, and again in 2022, 2025 and 2026 (as reported). Item (b) therefore takes the MWL, or FTL plus the design-flood surcharge, as the tailwater, and treats an outfall below it as closed for the whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. No MWL and no surcharge was found for any of the lakes, so FTL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge, which depends on the gates and the flood [TBC]. The Upper Lake's FTL is itself uncertain: it is reported as 1,666.80 ft (about 508.04 m) in WRD and press usage and as 508.65 m in the literature, 0.61 m apart, and the NGT has ordered a seventh demarcation of the full tank level (as reported). Until WRD settles it, item (b) takes the higher value, for the same reason that the river items take the higher of two reported levels. The custodian's consent is required because a storm drain added to a lake raises its level for every other outfall, and because the lakes also carry the city's sewage: the NGT has ordered every drain outfall into the Upper and Lower Lakes to be mapped and intercepted (as reported), which is the subject of Clause 8.9.
The second is the river below a dam. The rivers of the State rise and fall faster than the rivers of the Ganga plain: the worked example of the CWC Flood Estimation Report for subzone 3(c) has a time to peak of 4.5 hours for a catchment of 224 km² (CWC, 2002), against 27 hours for the example of the Gangetic subzone 1(f). On their own they would lock an outfall for hours, not days. But a dam spills only when it is full, and it goes on spilling while the inflow lasts and while its level is brought back to its full reservoir level: in September 2019 Gandhi Sagar stood above its maximum water level for at least 24 hours (SANDRP, 2019), and in August 2020 the gates of Tawa, Bargi, Indira Sagar and Omkareshwar were open together at the end of August (as reported). No hourly stage record for any gauge on the Narmada was obtained during research [TBC]. The single lock of at least 72 hours therefore covers the whole of the longest design storm of Clause 2.5.2, so that the site does not rely on the river falling during the storm, which a dam release does not allow; it is shorter than the lock of at least 7 days that this Manual sets for the embanked rivers of the Ganga plain, which stand high for weeks, and it is to be lengthened from the gauge record of the flood that set the highest recorded level on each river. The CWC levels listed in item (a) come from search summaries of CWC bulletins, which could not be downloaded; their datum and gauge zero are to be confirmed [TBC]. Most were set in 1972–1974, before Tawa (1978), Bargi (1990) and Indira Sagar (2005) regulated the river, so a regulated river can stay below them; but the record at Handia was set in 2020, after all three, and Bhopal's and Narmadapuram's highest daily rainfalls both fell on 14 August 2006 (IMD), so the floor is kept. At Narmadapuram the press "record" of 2020 (297.75 m at Sethani Ghat) is 3.58 m below the CWC level of 1972 (301.33 m), and another report gives the danger level there as 967 ft; item (a) uses the CWC values until CWC Narmada Division confirms them. The danger level is used as the floor of the 10% AEP level because the river has crossed it in recent floods, by about 4.75 m at Narmadapuram in 2020 and about 2.35 m at Barmanghat (as reported), so a level reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the CWC record [TBC]. It counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump.
The third is the coincidence of the release and the storm. Item (c) runs the design storm on the city with the river at the largest recorded release because the rain that fills a reservoir and the rain on the city come from the same monsoon spell (see the Commentary to Clause 5.8.4): the Bhopal storm of August 2022 came with the gates of the Kaliasot, Bhadbhada and Kerwa dams open together, and colonies in Kolar below them were waterlogged (as reported). For Jabalpur no level was found at all: Bargi's releases are reported to raise the river at Gwarighat, Tilwara and Bhedaghat "by 8 to 10 feet" (as reported), but neither the danger level nor the highest flood level at Gwarighat was found, nor anything on the levels of the Omti nala [TBC]. For the Kshipra at Ujjain, the submergence of Ram Ghat is the flood marker in press reports (2023 and 2024); for the Kanh at Indore, the municipal corporation is reported to be mapping encroachments within 30 m of a highest flood level whose value was not found (as reported). That is why item (a) requires a modelled or surveyed level on those reaches and does not let an outfall be designed without one.
The fourth is the body that owns the receiving water. The dams and reservoirs are WRD's or NVDA's, the lakes and nalas inside a city vest in the Municipal Corporation (MP Municipal Corporation Act 1956, s.82), and no rule dividing the natural nalas from the municipal drains was found (Chapter 6, Clause 6.9). Items (d) and (e) ask for the owner's consent and design level because a design that discharges to a channel or a lake cannot be checked without them. The court lines of item (d) are listed because they decide where an outfall can be built, not its level; none of them gives a flood level, and their status is set out in Chapter 7.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Madhya Pradesh requirement in this Manual. In Madhya Pradesh it applies where an outfall is shut not by the tide but by a lake held at its full tank level or by a river held high by the releases of a dam. In August 2022, after about 165 mm of rain in 14 hours, the gates of the Kaliasot, Bhadbhada and Kerwa dams at Bhopal were open together and about 200 colonies of the city were waterlogged (as reported). In August 2020 the gates of the Tawa and Bargi dams were open and the Narmada at Narmadapuram was reported 4.75 m above its danger level (as reported). A lake at its full tank level stays there for the rest of the monsoon, and a river below a spilling dam stays high for as long as the dam spills, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a closure for the whole storm at a lake outfall and a single river lock of at least 72 hours. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 15 June each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Madhya Pradesh the outfalls do not cross a beach, but many of them end in a lake or a reservoir whose level is held by gates, or in a river whose level is set by the gates of a dam upstream. The Upper Lake of Bhopal spills through the 11 gates of the Bhadbhada dam (built 1965) to the Kaliasot (JICA, 2007), and when the Kaliasot, Bhadbhada and Kerwa gates were opened together in August 2022, colonies in Kolar and other parts of the city were waterlogged (as reported). A gate that is opened late, or not at all, raises the lake and every outfall that drains to it; a gate opened in a hurry raises the river below. The lakes, dams and gates are held by WRD, NVDA or the Municipal Corporation, while the drains that reach them belong to the Municipal Corporation, a development authority or a colony developer, and no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 15 June inspection date is set ahead of the SW monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Madhya Pradesh: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Madhya Pradesh has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the gated outlets of its lakes and the silt that its rivers leave at an outfall. A lake whose gates are not opened when it reaches full tank level rises above it and holds every drain that ends in it, and silt left by a river in flood can hold a flap gate shut or open. No written gate-operation rule for the Bhadbhada gates or any other lake outlet was found during research [TBC]. Clause 5.8.5 deals with both by giving no credit for a gate operation or a storage that the custodian's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Central Water Commission. Flood forecast bulletins for the Narmada (warning, danger and highest flood levels at Hoshangabad, Barmanghat, Sandia, Mandla, Handia and Mandleshwar), seen only as search summaries; the bulletins could not be downloaded during research, and the datum and gauge zero of each gauge are to be confirmed. https://cwc.gov.in/
- Central Water Commission (2002). Flood Estimation Report for Upper Narmada and Tapi Subzone 3(c) (revised), UNT-3(c)/R-6/46/2002 (worked example: catchment 223.77 km², time to peak 4.5 h).
- Sachdeva (2009). Urban Floods: Case Study of Bhopal. Disaster & Development (NIDM) 3(1), 66–68 (citing the Bhopal Storm Water Master Plan of Tata Consulting Engineers: the Patra, Banganga and Kolans systems; the Upper and Lower Lakes). https://nidm.gov.in/journal/PDF/Journal/Journal20091/Journal20091c.pdf
- Japan International Cooperation Agency (2007). Ex-post evaluation, Lake Bhopal Conservation and Management Project (the Upper Lake; the 11 gates of the Bhadbhada dam, 1965; releases to the Kaliasot). https://www.jica.go.jp/english/our_work/evaluation/oda_loan/post/2007/pdf/project32_full.pdf
- Comptroller and Auditor General of India. Report on Management of Town and Country Planning, Government of Madhya Pradesh, Report No. 5 of 2025 (Bhopal Development Plan 2005; nala setbacks). https://cag.gov.in/webroot/uploads/download_audit_report/2025/Report-No-05-MP-Town-Planning-English_15-11-2025-signed-(1)-069985b0813fdf7.38091434.pdf
- Madhya Pradesh Municipal Corporation Act, 1956 (Act 23 of 1956), ss.82 and 191. https://prsindia.org/files/bills_acts/acts_states/madhya-pradesh/1956/1956MP23.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), Madhya Pradesh pages (Hoshangabad and Bhopal (Bairagarh), 14 August 2006). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Ramsar sites of Madhya Pradesh: Bhoj Wetland (2002); Sirpur, Yashwant Sagar and Sakhya Sagar (2022); Tawa Reservoir (2024), as listed on the Indian wetlands portal. https://indianwetlands.in/wetlands-overview/indias-wetlands-of-international-importance/
- SANDRP (2019). Man-made national crisis that Gandhi Sagar dam faced in Sept 2019 (full reservoir level 399.9 m; maximum water level 401 m; releases through 19 gates). https://sandrp.in/2019/09/24/man-made-national-crisis-that-gandhi-sagar-dam-faced-in-sept-2019/ ; and SANDRP (2023). Role of dams in the 2021 flood management in MP's Sindh river. https://sandrp.in/2023/05/13/role-of-dams-2021-flood-management-in-mps-sindh-river/
- National Green Tribunal, Central Zone. O.A. 77/2020 and O.A. 12/2025 (the Upper Lake: no construction within 50 m of the full tank level in urban areas and 250 m in rural areas; a seventh demarcation of the full tank level), and the order on the drain outfalls into the Upper and Lower Lakes, as reported (The Hitavada, 2 September 2026; Free Press Journal, 1 September 2026); Kirtikumar Sadashiv Bhatt v. Narmada Water Resources (the 25-year floodplain of the Narmada), as reported (2025), https://supremetoday.ai/ngt-issues-sweeping-directives-to-stop-narmada-river-pollution-mandates-demarcation-of-no-development-floodplain-zones-INDNGT00000029736 ; and Dr. Subhash C. Pandey v. State of Madhya Pradesh (the Kaliasot; order of 27 May 2014), seen only as titles and extracts.
- Press reports on the Narmada flood of August 2020 at Narmadapuram and Barmanghat (Free Press Journal), https://www.freepressjournal.in/bhopal/narmada-swells-48-year-record-breached-river-flows-18-feet-above-danger-mark , and on the rainfall and dam gates of 28–29 August 2020 (The Week), https://www.theweek.in/news/india/2020/08/29/heavy-rain-creates-flood-like-situation-in-mp-army-called-in-hoshangabad.amp.html ; on the Bargi releases of 21 August 2026 (Free Press Journal), https://www.freepressjournal.in/bhopal/13-gates-of-bargi-dam-open-amid-heavy-rain-in-catchment-areas-bhedaghat-flooded-narmada-water-level-to-rise-by-8-to-10-feet-video ; on the Bhopal flood of August 2022 and the Kaliasot, Bhadbhada and Kerwa gates (Free Press Journal), https://www.freepressjournal.in/bhopal/bhopal-flood-of-misery-165-cm-rain-brings-city-to-knees-flooded-roads-uprooted-trees-water-logging-and-power-outage ; on the Bhopal flood of 14 August 2006 and the Bhadbhada gates (OneIndia), https://www.oneindia.com/2006/08/14/city-of-lakes-deluged-denizens-dead-or-missing-1155573266.html ; on the dam gates opened in September 2026 (The Hitavada), https://www.thehitavada.com//Encyc/2026/9/7/rivers-in-spate-dam-gates-opened-warning-in-15-distts-monsoon-turns-ferocious-in-state-as-narmada-kaliasot-swe.html ; on the Kshipra at Ram Ghat, Ujjain, in September 2023 (India TV), https://www.indiatvnews.com/madhya-pradesh/madhya-pradesh-temples-ram-ghat-submerge-as-shipra-river-overflows-in-ujjain-latest-updates-2023-09-17-893199 ; on the interim order of the High Court of Madhya Pradesh, Indore bench, on the Kshipra (Free Press Journal, 7 January 2026); on the Supreme Court order of about March 2025 on construction near the Kaliasot (Free Press Journal), https://www.freepressjournal.in/bhopal/supreme-court-quashes-ngt-bar-on-construction-bhopal-residents-may-get-relief ; and on the Upper Lake, Kaliasot and Kerwa full tank levels.
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site in the Patra nala catchment of old Bhopal |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. The drains of Madhya Pradesh's large cities fail in places that site design does not see, because many of them end in a lake or a reservoir held at its full tank level by gates, or in a river whose level is set by the dams above it. Bhopal's nalas end in the Upper and Lower Lakes, which make up the Bhoj Wetland, or in the Patra nala, which also takes the Lower Lake's overflow; the Upper Lake spills through the Bhadbhada gates to the Kaliasot (TCE, as cited by NIDM, 2009; JICA, 2007). Indore drains to the Kanh (Khan) and the Saraswati, and wastewater also reaches the Sirpur and Bilawali tanks (as reported). Jabalpur and Narmadapuram stand on the Narmada below the Bargi and Tawa dams, and in August 2020 the river at Narmadapuram was reported 4.75 m above its danger level with the gates of both dams open (as reported). The outfalls also belong to one body while the drains above them belong to others: the dams and their gates are held by WRD or NVDA, the lakes and nalas within a city by the Municipal Corporation, and the drains of new colonies by the development authority or the colony developer, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any lake or river outfall, and no design return period has been published for the drainage of any city in the State. A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if the lake or river it drains to stands above its outfall for days. This chapter makes both failure modes part of the design. Madhya Pradesh has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.