Draft v1.0 prepared by NEER. Not adopted by the Government of Madhya Pradesh or any authority or local body, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Madhya Pradesh. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration south-west monsoon storms of July–September, brought by monsoon depressions, which fall on black soils whose cracks have closed, on lakes and reservoirs already at their full levels and often on rivers raised by releases from the dams upstream, as well as for short-duration intensities;
  • (d) to design outfalls for the levels of the lakes and reservoirs into which the cities drain, such as the Upper and Lower Lakes, the Kaliasot and the Kerwa at Bhopal, which are held and released by gates, the stage of the rivers, the Narmada at Jabalpur, Narmadapuram and Mandla, raised by the releases of Bargi, Tawa and Indira Sagar, the Kshipra at Ujjain and the Kanh and the Saraswati at Indore, and the levels of the nalas and talabs into which local drains discharge, including the case where the outfall is closed;
  • (e) to protect tanks (talabs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the land development and building rules made by the State Government under section 85 of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (the Madhya Pradesh Bhumi Vikas Rules 2012), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Madhya Pradesh's floods come from three sources, often together. The first is the rivers and the dams on them. The Narmada set its highest recorded levels in the floods of 1972–1974: 301.33 m at Hoshangabad (now Narmadapuram) on 27 August 1972, against a danger level of 293.8 m, 331.32 m at Barmanghat on 21 August 1973, 157.29 m at Mandleshwar on 31 August 1973 and 439.405 m at Mandla in July 1974 (CWC, as given in search summaries of its bulletins). Since then Bargi, Tawa and Indira Sagar have been built upstream, and the river's floods now rise with their releases: on 28–30 August 2020 all 13 gates of Tawa, 22 of Indira Sagar and 17 of the 21 of Bargi were open, the Narmada at Sethani Ghat in Narmadapuram was reported at 297.75 m and the Army was called in (as reported), and the river at Handia set a new highest level, 274.9 m (CWC). The press called the 2020 level a 48-year record, which conflicts with the CWC level of 1972; the conflict is not resolved. In September 2019 Gandhi Sagar on the Chambal stood above its maximum water level for more than a day and more than 16,000 people were moved in Mandsaur and Neemuch districts (as reported). The second is the heavy storm: Bhopal recorded 275.7 mm on 22 July 1973 and 291.6 mm on 14 August 2006, and Sagar 475.6 mm on 4 July 2005, all station records (IMD); about 454.6 mm fell over Shivpuri district in 38 hours on 2–4 August 2021, and more than 1,100 villages were reported affected along the Sindh (as reported). The third is the city drainage that fails in a fall that is not extreme. Indore's floods of 1990–2009 came on days of 82–186 mm, about the 2- to 10-year day, and its vulnerability study found that "even 25mm of rainfall in 1–2 hours can cause water logging on most of the roads" and that only 20% of its roads had storm drains (TARU, ACCCRN). On 22 August 2022 about 165 mm in 14 hours left some 200 colonies of Bhopal waterlogged, while the gates of the Kaliasot, Bhadbhada and Kerwa dams were open together (as reported).

Missing design makes all three worse. A State order of September 2006 found that the "main cause of water logging in cities is the encroachment of Nala or construction work carried out on Nala land or on both sides of Nala", and the CAG found in 2025 that the 9 m and 15 m setbacks from water bodies and rivers were seldom imposed or kept, and that nalas had been piped, concreted and built over (CAG Report No. 5 of 2025). No published Madhya Pradesh document sets a design storm, return period or rainfall intensity for a city's drains, and the MPBVR 2012 control rainwater harvesting pits, not runoff. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Madhya Pradesh Bhumi Vikas Rules 2012 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Madhya Pradesh, the top layer has a particular meaning. Much of the State's flood storage lies in its talabs, tals and talaiyas, in the large tanks and reservoirs called sagars, in the bawdis and kunds of its old towns, and in the lakes that its cities were built around. Bhopal's Upper Lake (Bhojtal) has a catchment of about 361 km² and, with the Lower Lake, forms the Bhoj Wetland, a Ramsar site since 2002; its outflow passes through the Bhadbhada sluice gates to the Kaliasot (as reported). The State has five Ramsar sites, the Bhoj Wetland, Sirpur and Yashwant Sagar at Indore, Sakhya Sagar at Shivpuri and the Tawa Reservoir (as reported). The law protects some of this storage. The MPBVR 2012 bar a building within 9 m of the highest water level of a water body or watercourse and 15 m of a river, or the distance the development plan prescribes (Rule 50(b)); public tanks, streams and drains in a Municipal Corporation vest in the Corporation, and a vested tank "shall neither be used for any other purpose nor be permitted to use for any other purpose" (Madhya Pradesh Municipal Corporation Act, 1956, s.82); village tanks over which the community exercised rights of irrigation or nistar vest in the State, with those rights preserved (Madhya Pradesh Land Revenue Code, 1959, s.251); and the Colony Development Rules of 2021 deny civic works to unauthorised colonies built on the river, drain and water-body areas of a development plan (as cited by CAG). The same Corporation Act, however, still lets the Commissioner require a private tank to be filled up where it appears "injurious to health" (s.202). Beyond the statutes, the NGT has barred construction within 50 m of the full tank level of the Upper Lake in urban areas and 250 m in rural areas, and a 33 m green belt applies along the Kaliasot and the Kerwa under the Bhopal development plan (as reported; Chapter 7). Losing that storage cannot be offset economically by pipes and pumps.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Madhya Pradesh through:

  • (a) an amendment to the Madhya Pradesh Bhumi Vikas Rules 2012 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Madhya Pradesh the building rules are the Madhya Pradesh Bhumi Vikas Rules, 2012, made by the State Government under section 85(1) read with section 24(3) of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973, by notification No. F-3-131-2012-32 dated 30 May 2012, published in the Madhya Pradesh Gazette (Extraordinary) of 1 June 2012 after a draft of 13 April 2012; the pages read do not name the issuing department. This Manual cites that 2012 Gazette text. A consolidated text "updated up to 6th March 2025" exists but was not read, and later amendments are reported: green-building incentives (15 December 2025), small plots (28 August 2026) and a draft negative list of land uses (29 June 2026), none of them on drainage (as reported). The current consolidated text must be checked before any rule cited here is relied on [TBC]. The rules apply in planning areas, where the Director of Town and Country Planning grants development permission, and to building permission granted by the Municipal Corporations, Municipal Councils, Nagar Parishads and Gram Panchayats (Rule 2(5)). They set no design storm, return period, release rate or detention volume, and no "zero runoff" rule. They bar a building within 9 m of the highest water level of a water body or watercourse and 15 m of a river, or as the development plan prescribes, on a site that "is not drained properly or is incapable of being well drained", or where the building "adversely affects" a municipal drain (Rule 50(b), (f) and (j)); require land within the curtilage to be drained by surface water drains if the Authority so requires (Rule 51); require site plans to show water bodies, "flood affected areas" and 0.3 m contours where the slope is steeper than 1 in 20 (Rule 16(4)(j)), and layouts to show drains and, at 2 ha and more, rainwater harvesting (Rule 16(5)(d) and (h)); and require rainwater harvesting on plots of more than 140 m² (Rule 81(4)). The rules define drain, drainage and open space but not water body, watercourse, nala, highest water level or full tank level, so the definitions this Manual uses for them (Chapter 7) are its own. The route of Clause 1.3.1(a) therefore runs through the State Government, which would amend the 2012 rules under section 85 of the Adhiniyam. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Director of Town and Country Planning, or an officer authorised by the Director, who grants development permission for the development of land in a planning area; the Municipal Corporation, Nagar Palika Parishad or Nagar Parishad, or the Gram Panchayat, that grants building permission (MPBVR 2012, Rule 2(5)); or a development authority constituted under the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 in its development area, where it grants such permission (to be confirmed [TBC]), or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Madhya Pradesh Bhumi Vikas Rules 2012 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the drains of Bhopal that outfall to the Upper Lake (Bhojtal) and the Lower Lake, to the Kaliasot below the Bhadbhada sluice gates and to the Patra nala through the old city; the catchments of the Kanh (Khan) and the Saraswati through Indore, with the Sirpur and Bilawali tanks; the catchment of the Omti nala and the other city nalas of Jabalpur, and land draining to the Narmada at Gwarighat, Tilwara and Bhedaghat below Bargi dam; the town of Narmadapuram and the land that drains to the Narmada at Sethani Ghat, where the river is raised by releases from Tawa, Bargi and the other dams upstream; and land at Ujjain draining to the Kshipra, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (talab), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Madhya Pradesh Bhumi Vikas Rules 2012 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Madhya Pradesh Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Madhya Pradesh Bhumi Vikas Rules 2012;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Madhya Pradesh, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under Rule 81(4) of the MPBVR 2012 to buildings of every type on plots of more than 140 m², by one of the percolation pits, pebble bed or recharge well of Appendices H-1 to H-3, and under Rule 16(5)(h) to layouts of 2 ha and more, which must show rainwater harvesting measures, as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Madhya Pradesh plots are small and the cumulative effect of many small plots is what fills Bhopal's drains. For small buildings in Madhya Pradesh, Rule 81(4) of the MPBVR 2012 requires rainwater harvesting on plots of more than 140 m², by one of three fixed recipes: percolation pits 3 m deep and 30 cm across at 3 m intervals around the plinth (Appendix H-1), a pebble bed 1 m wide along the compound wall (H-2), or a recharge well 1.2 m across and 10 m deep (H-3). None is sized to a runoff volume, none limits what leaves the plot, and plots of 140 m² or less have no rule at all. In the deep black soils of Malwa and the Narmada valley, pits that take water while the soil is cracked in June may stand full once the cracks have closed. The rules require a plinth more than 45 cm above the surrounding ground "so that adequate drainage of the site is assured" (Rule 68), and 30 cm for housing of the economically weaker sections (Appendix J-3), but neither is related to any flood level; and they cap the plinth of a building with a basement at 0.45 m and ask only for "adequate arrangements" to keep surface drainage out of the basement (Rule 76(2)(b) and (4)(d)). Clause 1.5.4(b) applies to every building whatever its size for this reason.

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Bhopal Municipal Corporation (BMC);
  • (b) every Approving Authority within the planning area of Bhopal under the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973, as that area is notified from time to time, including the Directorate of Town and Country Planning where it grants development permission, BDA in its development area, and the Nagar Palika Parishads and Nagar Parishads in that area; and
  • (c) every other Municipal Corporation (Nagar Palika Nigam) constituted under the Madhya Pradesh Municipal Corporation Act, 1956, as constituted from time to time, and the Directorate of Town and Country Planning and every development authority constituted under the 1973 Adhiniyam where it grants development permission within the planning area of a Municipal Corporation.

1.6.2 Tier B authorities. All other Nagar Palika Parishads and Nagar Parishads are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with T&CP regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the planning area of Bhopal under the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Bhopal Municipal Corporation, with its engineering wing and a city that drains to lakes and reservoirs held by gates, the Upper and Lower Lakes, the Kaliasot and the Kerwa, and to the Patra nala, and a small Nagar Parishad with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Bhopal.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Madhya Pradesh Bhumi Vikas Rules, 2012 (notification No. F-3-131-2012-32 of 30 May 2012, Madhya Pradesh Gazette (Extraordinary), 1 June 2012; cited from the 2012 Gazette text, with later amendments as reported [TBC]) Continue. They bar a building within 9 m of the highest water level of a water body or watercourse and 15 m of a river, or as prescribed in the development plan, on a site not properly drained or incapable of being well drained, and where it adversely affects a municipal drain (Rule 50(b), (f) and (j)); require surface water drains in the curtilage where the Authority so requires, and written approval to connect a sub-soil drain to a sewer (Rule 51); require site plans to show water bodies, flood-affected areas and 0.3 m contours on slopes steeper than 1 in 20, and layouts to show drains (Rule 16(4)(j) and (5)(d)); keep 10% of a layout as community open space (Rule 47(2)); leave the "minimum soft area" of group housing to a separate notification, which was not found [TBC] (Rule 60(1)); require one tree for every 100 m² of plot (Rule 67); and set a plinth more than 45 cm above the surrounding ground, a basement plinth of not more than 0.45 m and arrangements to keep surface drainage out of basements (Rules 68 and 76). They do not define the highest water level, and set no design storm, release rate or detention volume. The 9 m and 15 m distances are the only metre values they set for water; the design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the rules, a development plan or a statute are stricter, they govern (Clause 1.3.3).
Rainwater harvesting: MPBVR 2012, Rules 81 and 16(5)(h) Continue unchanged. Rule 81(4) makes rain or roof water harvesting compulsory on buildings on plots of more than 140 m², by percolation pits, a pebble bed or a recharge well (Appendices H-1 to H-3); Rule 16(5)(h) requires rainwater harvesting measures in layouts of 2 ha and more; and Rule 81(2) lets the Authority require rain-water pipes to be connected to a drain or sewer. The refundable deposit that Bhopal is reported to collect is not in the rules, and no groundwater regulation Act of the State was found [TBC]; 26 of the State's 317 assessment units were over-exploited in 2022, most of them in Malwa (CGWB, as reported to the NGT). None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge structures may count toward retention only where they meet Chapters 4 and 8, which give recharge priority in the over-exploited hard-rock aquifers of Malwa, with pre-treatment and a hydrogeologist's check in fractured basalt, and no surface infiltration credit on deep black soil once its cracks have closed.
Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 and Madhya Pradesh Nagar Tatha Gram Nivesh Niyam, 1975 The Adhiniyam provides for development plans and zoning plans, the Directorate of Town and Country Planning and development authorities, and is the parent Act of the MPBVR 2012; their sections were not read for this Manual [TBC]. The CAG found that Bhopal is still planned under its Development Plan 2005, the drafts for 2021 and 2031 having been returned and a plan for 2047 asked for; Gwalior and Ujjain are preparing plans to 2035 (CAG Report No. 5 of 2025). This Manual does not decide zoning; the drain reserves and regional facility sites of Chapters 4 and 7 are meant to be shown in those plans.
Madhya Pradesh Municipal Corporation Act, 1956, ss.66, 82 and 190–204; Madhya Pradesh Municipalities Act, 1961 Continue. Drains, sewers and culverts are among the Corporation's duties (s.66); public tanks, streams, rivers, drains and watercourses vest in it, and a vested tank, park or playground shall not be used for any other purpose (s.82); no building may be erected over a drain or watercourse vested in the Corporation without written permission (s.198); no drain or latrine may be kept within 100 ft of a tank or well used for public supply (s.199); a connection to a municipal drain needs permission (s.201); the Commissioner may require a private tank to be cleansed, covered, filled up or drained off where it is "injurious to health" (s.202); no building within 100 ft of a municipal drain may be erected or occupied without a drain "sufficient for the effectual drainage" of it (s.203); and the Commissioner may require separate drains for sewage and for rain water (s.204). The 1961 Act, which governs the Nagar Palika Parishads and Nagar Parishads, was not read for this Manual [TBC]. This Manual does not change those powers; Chapter 7 treats tanks as drainage assets.
Madhya Pradesh Land Revenue Code, 1959, s.251 Continues. Tanks on unoccupied land over which the village community exercised rights of irrigation or nistar vest absolutely in the State from 6 April 1959, after enquiry by the Collector, and the vesting "shall not affect the rights of irrigation and nistar" (s.251(1) and (7)). Chapter 7 relies on it, and on the land records of the tehsil, for the recorded extent of village talabs.
Madhya Pradesh Nagarpalika (Colony Development) Rules, 2021 Continue (cited as quoted by CAG; text not read [TBC]). Civic works are not extended to an unauthorised colony built on areas that the development plan designates as roads, parks, "areas of river/ drains" or water bodies (r.23). Chapter 7 relies on this to keep drain and tank reserves out of regularisation.
Wetlands (Conservation and Management) Rules, 2017; the Madhya Pradesh State Wetland Authority; the five Ramsar sites of the State Continue. The Rules bar construction of a permanent nature, except boat jetties, "within fifty metres from the mean high flood level" of a notified wetland. The State Wetland Authority was constituted in January 2018, with EPCO as its secretariat; no wetland had been notified under the Rules by January 2023, and the current status is not known (as reported) [TBC]. The Ramsar sites are the Bhoj Wetland (2002), Sirpur, Yashwant Sagar and Sakhya Sagar (2022) and the Tawa Reservoir (2024) (as reported). Where a notification or an order is wider than the setback of Chapter 7, it governs (Clause 1.3.3).
Orders of the National Green Tribunal (Central Zone) and the courts on lakes and rivers Apply where they bind. The NGT has barred construction within 50 m of the full tank level of the Upper Lake in urban areas and 250 m in rural areas, and ordered the full tank level line re-surveyed (O.A. 77/2020 and 12/2025, as reported); a State order of 2023 said to reduce the 50 m to 33 m was not verified [TBC]. A 33 m green belt applies along the Kaliasot and the Kerwa under the Bhopal Development Plan 2005, which the NGT enforced in 2014 (Subhash C. Pandey v. State of Madhya Pradesh); a Supreme Court order of about March 2025 set aside a related bar, and what remains in force is unclear [TBC]. On the Narmada the NGT is reported to have directed in 2025 that the 25-year floodplain be demarcated as a no-development zone; a 300 m ban by the High Court is reported, but its status is unclear, and the State told Parliament there was "no proposal" for such a ban. The High Court at Indore is reported to have stopped construction permission within 200 m of the Kshipra at Ujjain in January 2026, as an interim order. No State floodplain zoning law or order was found [TBC]. Where the 1% AEP extent of Chapter 7 is mapped and wider, it governs.
Disaster Management Act, 2005; MPSDMA; the district flood control rooms Continue. A State instruction of 2017 is reported to have asked flood-prone districts to open flood control rooms on 15 June or at the onset of the monsoon. No urban flood plan or SOP of MPSDMA was found [TBC]. Chapter 10 links its pre-monsoon checks to these dates.
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Madhya Pradesh is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon depression arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Madhya Pradesh is spending on its nalas and lakes. Bhopal's AMRUT 2.0 project of about ₹213.75 crore is reported to add 10 sewage treatment plants of 171 MLD, among them 60 MLD at Bhanpur on the Patra nala, to keep sewage out of the Upper Lake and the Halali; Indore is reported to have sanctioned about ₹511.15 crore for cleaning the Kanh and the Saraswati; and MPUDC has executed drainage works in two towns under an ADB-funded programme (all as reported). These are mainly works against sewage, and none of the storm-drainage works found has a published design return period: the design basis of the Bhopal Storm Water Master Plan, cited in 2009, was not found. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law already holds many of the tools. It bars building within 9 m of a water body or watercourse and 15 m of a river, on undrained sites and over municipal drains (MPBVR 2012, Rule 50); vests public tanks, streams and drains in the Municipal Corporation and forbids any other use of a vested tank (Madhya Pradesh Municipal Corporation Act, 1956, s.82); lets the Commissioner require separate drains for sewage and for rain water (s.204); vests village tanks in the State with the nistar rights preserved (Land Revenue Code, s.251); and keeps unauthorised colonies on drain and water-body land out of regularisation (Colony Development Rules, 2021). What it lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how the highest water level of a nala or a talab is to be fixed, or how much storage a filled pond or a paved plot removes; and the CAG found that even the 9 m and 15 m setbacks were imposed and drawn in only 23 of the 60 development permissions to which they applied, among 539 checked in Bhopal, Gwalior, Indore, Jabalpur and Ujjain (CAG Report No. 5 of 2025). This Manual's checks are framed as part of the development permission of the Directorate of Town and Country Planning and the building and colony permissions of the local bodies, not as a separate NOC. This Manual is offered as a technical companion to these instruments, to the orders of the NGT on the lakes and rivers and to the drainage works of the Municipal Corporations: it supplies the design storm, detention and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the Urban Development and Housing Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Development and Housing Department (UDHD) Oversees the Directorate of Town and Country Planning, the urban local bodies and the development authorities, and is reported to issue the amendments to the MPBVR 2012. Would prepare the amendment of Clause 1.3.1(a) for the State Government, issue the model ULB bye-law of Clause 1.3.1(b), and, through T&CP, give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7).
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Directorate of Town and Country Planning (T&CP) Prepares the regional and development plans under the 1973 Adhiniyam and grants development permission for layouts in planning areas (Rule 2(5)(a)), the stage at which the 9 m and 15 m conditions of Rule 50 are imposed; works through district offices. Would show flood-sensitive catchments, drain reserves and regional facility sites in development plans, and require the drainage report of Chapter 10 with each layout.
Bhopal Municipal Corporation (BMC) and the other Municipal Corporations; Nagar Palika Parishads and Nagar Parishads Hold the public drains, watercourses and tanks of their areas by statute (Municipal Corporation Act, 1956, s.82), clean and maintain them, and grant building and colony development permission. Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15).
Development authorities (BDA and the authorities of Indore, Jabalpur, Gwalior and Ujjain, as named in practice [TBC]) Constituted under the 1973 Adhiniyam; develop schemes and colonies in their development areas. Their drainage functions were not researched for this Manual [TBC]. Would apply this Manual to their schemes and hand over drains and storage to the local body under Clause 10.14.
Madhya Pradesh Urban Development Company (MPUDC) Executes urban infrastructure projects, including an ADB-funded programme with drainage in some towns (as reported); its role under AMRUT was not confirmed [TBC]. Would apply this Manual in its DPRs and designs.
WRD Holds the rivers, the dams and reservoirs of the State and their gates, and the irrigation tanks; its role at the Bhopal lakes and dams was not confirmed [TBC]. Also the State's groundwater agency for this Manual. Would provide design river and reservoir levels, maximum water levels and gate-operation rules for Chapter 5, consent to outfalls into its works, and supply groundwater levels for Chapters 4 and 8 with CGWB.
Narmada Valley Development Authority (NVDA) Builds and operates the State's Narmada projects; its operating role at Bargi, Tawa and Indira Sagar was not researched for this Manual [TBC]. Would supply release schedules and downstream levels for Narmada outfalls (Chapter 5).
Public Health Engineering Department (PHED) Water supply outside the cities; its role in urban drainage was not researched [TBC]. Would apply Chapter 8 to the protection of supply sources from storm runoff.
Environmental Planning and Coordination Organisation (EPCO) and the Madhya Pradesh State Wetland Authority EPCO is the State nodal agency for wetlands and lakes and the secretariat of the Authority, constituted in January 2018 under the Wetlands Rules 2017 (as reported). Would keep the list of notified wetlands and Ramsar sites and permit regulated activities in their zones (Chapter 7).
MPSDMA and the District Disaster Management Authorities Approve the State and district disaster management plans; its urban flood work was not researched [TBC]. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the Collectors, and lead the post-event review (Clause 10.16).
Madhya Pradesh Pollution Control Board (MPPCB) Monitors the rivers, lakes and drains; directed by the NGT to report on sewage in the Narmada and on the outfalls into the Bhopal lakes (as reported). Supports the removal of sewage from storm drains (Chapter 8).
Revenue Department: the Collectors and the tehsil offices Keep the land records in which tanks, nalas and their nistar rights are recorded; decide the vesting of village tanks (Land Revenue Code, s.251) and act against encroachment of public land; lead flood relief. Would certify the recorded extent of a talab for Chapter 7.
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Reports for subzones 1(b), 1(c), 1(d), 3(a), 3(b), 3(c) and 3(f) used in Chapters 2 and 3, and the river levels at its flood forecasting sites, such as Hoshangabad, Barmanghat and Mandla on the Narmada. Would supply river stage records and forecasts for Chapter 5.
Central Ground Water Board (CGWB), a body of the Union Assesses the groundwater units of the State and their categories. Would supply groundwater levels and quality with WRD.
National Institute of Hydrology (NIH), Roorkee Runs NIH-DHAARA (Chapter 2).
IMD (Meteorological Centre Bhopal), and road and rail owners (the Public Works Department, NHAI, Indian Railways) IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Madhya Pradesh is split between T&CP, through development plans and layout permission, the Municipal Corporations and other local bodies, through building permission and the drains vested in them, and the development authorities; WRD and NVDA, through the rivers, dams and reservoirs and their gates; the Revenue Department, through the village tanks and land records; and EPCO and the State Wetland Authority, with the NGT setting the lake and river buffers. Bhopal shows why the split matters. The city drains to lakes and reservoirs whose levels are set by gates, the Upper Lake through the Bhadbhada sluice gates to the Kaliasot, and to the Patra nala, which also carries sewage; the Municipal Corporation Act vests public drains, streams and tanks in the Corporation (s.82), but no rule or order found divides the natural nalas from the municipal drains, or the lakes from the dams below them, between the Corporation and the State's departments [TBC], and the CAG found that the Corporations did not monitor construction after granting permission (CAG Report No. 5 of 2025). Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Rivers and their floodplains, dams and reservoirs with their gates (such as Kaliasot, Kerwa, Kolar, Bargi and Tawa), and irrigation tanks WRD, or NVDA for its Narmada projects
Lakes within a city (such as the Upper and Lower Lakes at Bhopal) and their outlet gates The Municipal Corporation for the lake and WRD for the gates, until an order assigns them otherwise [TBC]
Natural nalas and watercourses within a Municipal Corporation (such as the Patra nala, the Kanh, the Saraswati and the Omti nala), with their reserves The Municipal Corporation (s.82)
Road-side and lane drains and public tanks within the limits of a local body The Municipal Corporation, Nagar Palika Parishad or Nagar Parishad
Drains and storage within a scheme of a development authority, until handed over The development authority
Village tanks with irrigation or nistar rights outside municipal limits The Revenue Department (Collector), with the Gram Sabha that manages the tank
Sewers, interceptors and the interception and diversion of nalas, and sewage treatment plants The Municipal Corporation or the body executing the work for it
Drains of State and national highways The Public Works Department or NHAI
Notified wetlands and Ramsar sites The Madhya Pradesh State Wetland Authority, with the owner of the land

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Madhya Pradesh has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a lake or reservoir whose level is held up by gates, as at Bhopal, or to a river raised by dam releases, as the Narmada at Jabalpur and Narmadapuram, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Madhya Pradesh the CAG found that of 539 development permissions checked in Bhopal, Gwalior, Indore, Jabalpur and Ujjain, the 9 m and 15 m setback from water bodies and rivers applied to 60 and was imposed, with the nala drawn on the plan, in only 23, and that on site nalas had been covered with pipes, encroached upon and concreted (CAG Report No. 5 of 2025).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Municipal Corporations, of the planning area of Bhopal and of the development areas of the development authorities
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model MPBVR 2012 amendment and model ULB bye-law
Form 1-1 Applicability Determination