Chapter 7Waterbodies, Tanks (Talavs) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (talav) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, including the Mithi and Mahim Creek, Thane Creek and its flamingo wetlands, the creeks, mudflats and mangroves of the Konkan coast, Powai Lake and the lakes of Thane and Navi Mumbai, and Lonar Lake;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Maharashtra Regional and Town Planning Act, 1966 and the UDCPR 2020 and DCPR 2034 made under it, the Maharashtra Land Revenue Code, 1966, the Coastal Regulation Zone Notification, 2019 as applied through the approved CZMPs, the orders of the Bombay High Court on mangroves and wetlands, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river, stream or nallah (nālā, ōḍhā), canal, lake, tank or pond (talav), ex-malgujari tank, reservoir, tidal river or estuary, creek (khāḍī), khajan (bunded tidal land), salt pan, marsh, mudflat or mangrove, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (talav) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, waste weir or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel or nallah) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice gate; Marathi sāṇḍavā, see Annex 7E) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Maharashtra terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Water course; river; nallah | As defined in UDCPR 2020 (Regulation 1.3): a water course is "a natural channel meant for carrying storm water and includes an artificial one formed by training or diversion of a natural channel"; a major water course is a river and a minor water course a nallah. A nallah draining 8 ha or more is a natural channel under Clause 7.4.1(b), whether or not it is shown on the Development Plan or Regional Plan. |
| Trained nallah | A nallah canalised to a cross-section set by the Planning Authority, without changing its overall alignment or the position of its inlet and outlet (UDCPR 3.1.1(ii), proviso; DCPR 2034 Regulation 18(b)). The codes then measure marginal distances from the edge of the trained nallah. For this Manual, Zone 1 is measured from the boundary of Clause 7.13.1; the trained edge may be used only where the trained section keeps the full recorded width and passes the 1% AEP flow (Clauses 7.10.2 and 7.13.2). |
| Blue flood line; red flood line | The flood lines prepared by the WRD and adopted by UDCPR 2020 (Regulation 3.1.3). In WRD practice the blue line is the 25-year flood and the red line the 100-year flood; the regulation itself does not state the return periods. The land from the river bank to the blue line is the prohibited zone, and the land between the blue and red lines the restrictive zone, where construction may be permitted at a plinth 0.45 m above the red flood line. For this Manual the lines are statutory lines under Clause 7.4.5. The red line is not the 1% AEP flood extent of Clause 7.2 unless the Authority adopts it under Clause 7.3.4 and its design discharge includes the climate factor of Clause 2.8; otherwise the wider of the two governs. |
| Tentative blue line | Where no flood lines have been prepared, a blue line fixed from the maximum observed flood level and local inquiry and approved by the Chief Engineer of the Irrigation Department, with a no-construction zone 50 m wide on its landward side (UDCPR 3.1.3(ii)). |
| High flood level (HFL) | The level to which UDCPR 2020 (Regulation 9.1: plinth at least 45 cm above HFL in areas subject to flooding) and DCPR 2034 (Regulation 37(1): at least 60 cm above HFL, or 45 cm for stilt or covered parking) refer. For this Manual, floor levels are set by Clause 7.6.6 and Chapter 6 from the 1% AEP flood level; the statutory plinth rules continue to apply where higher. |
| Natural lake | A lake to which UDCPR 3.1.12 applies: in a Regional Plan area, no construction within 100 m of its high flood line. |
| Wetland line | The line 50 m from the mean high flood level of a wetland, calculated as in the Wetlands (Conservation and Management) Rules, 2017; UDCPR 3.1.1(xiv) makes a site lying wholly within it ineligible for building. |
| Mangrove; mangrove buffer | Mangroves and the 50 m around them, protected by the judgment of the Bombay High Court of 17 September 2018 in PIL 87 of 2006 and mapped as CRZ-IA on the approved CZMPs. Any work in them needs CRZ clearance, and cutting mangroves for a public project needs the leave of the High Court (paragraph 83(viii) of the judgment). |
| Ex-malgujari tank | A tank of east Vidarbha built by malguzars (revenue farmers) or earlier rulers and later taken over by the State. It is a tank under Clause 7.2. |
| Khajan (khājaṇ) | Coastal land along creeks and inlets exposed to tidal overflow, or recovered from the sea by an embankment (Molesworth, 1857). For this Manual a khajan is a tidal polder: unless a survey shows that it lies above the 1% AEP flood level, fill in a khajan is fill below that level and Clause 7.6 applies. Its storage may be counted only under Clauses 7.7 and 7.8. |
| Holding pond | A tidal storage pond with a gated outlet to a creek, as built by CIDCO in Navi Mumbai, whose gates close at high tide and open at low tide. Its storage may be counted only under Clauses 7.7 and 7.8. Where mangroves grow in or around it, the mangrove rules above apply to any work in it. |
| Tidal water body | A river, creek or backwater influenced by the tide, as defined in the CRZ Notification, 2019. Tailwater is taken from Chapter 5. In Mumbai the tidal reach of the Mithi is about 7 km long, from Mahim Bay to the airport (CWPRS, 2006, as cited by MMRDA, 2023). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the WRD and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the WRD, MCGM or another municipal corporation, a Municipal Council or Nagar Panchayat, MMRDA, CIDCO or another Special Planning Authority, the Gram Panchayat, the Revenue Department, the Forest Department (Mangrove Cell), a water users' association or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue village maps and the land records kept under the Maharashtra Land Revenue Code, 1966, including land recorded as tank, nallah or water course; the rivers, nallahs, water bodies and WRD blue and red flood lines shown on the Development Plan or Regional Plan under the MRTP Act, 1966; and, in the coastal districts, the mangroves, mangrove buffers and High Tide Line of the approved Coastal Zone Management Plan (CZMP) maps;
- (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Maharashtra city was found. The nearest statutory maps are the WRD blue and red flood lines, which UDCPR 3.1.3 adopts where they are marked on the Development Plan or Regional Plan or received from the Irrigation Department. Their coverage is incomplete and contested. In Pune, the lines drawn in 2011 and redrawn in 2016 were called unscientific in an affidavit of a WRD engineer, and the Bombay High Court ordered an expert committee on 30 June 2025, but the lines had not been finalised (as reported). The NGT (Western Zone) directed demarcation along rivers of Akola, Dhule, Nandurbar and Jalgaon in 2023 (as summarised). Where no lines exist, UDCPR asks for a tentative blue line drawn from the maximum observed flood and local inquiry. UDCPR 3.1.13 requires every agency that imposes a restriction to give the Planning Authority its map, so that applicants need not seek NOCs one by one; the waterbody layer and flood maps of Clause 7.3 are meant to be lodged in the same way. Mumbai's approved CZMP under the CRZ Notification, 2019 maps the mangroves and their 50 m buffer (Bombay High Court, judgment of 17 September 2026), and the CZMPs of Thane, Raigad, Palghar, Ratnagiri and Sindhudurg were approved by the NCZMA on 1 August 2023 (as reported). Wetland inventories disagree: in Mumbai, 57 of the 475 wetlands in the National Wetland Inventory and Assessment had been verified by January 2020 (as reported). Clause 7.3.4 lets the Authority adopt larger-scale flood maps once they are issued. Until then, the Applicant must produce the extent for larger and flood-sensitive sites. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m (6 m along a nallah), that is, the 15 m from a river and 6 m from a nallah that UDCPR 2020 (Regulation 3.1.1(ii)) and DCPR 2034 (Regulation 18(b)) keep between a building site and the edge of the water mark, measured here as in this clause; around a tank, lake, pond or marsh, for which those codes set no general distance, the 15 m is set by this Manual (see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or a WRD flood-line demarcation, an MCZMA recommendation or CRZ clearance, the leave of the Bombay High Court for work affecting mangroves, or a permission of the wetland authority sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m (6 m along a nallah) |
| Channel draining 65 ha to 20 km² | 40 m | 15 m (6 m along a nallah) |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m (6 m along a nallah) from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m (6 m along a nallah) |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (6 m along a nallah) (Clause 1.10.3(c)).
Commentary. The 15 m (6 m along a nallah) minimum is the statutory distance from a river and from a nallah under UDCPR 2020 (Regulation 3.1.1(ii)) and DCPR 2034 (Regulation 18(b)), applied here as a corridor along the whole waterbody rather than as a test of whether a site is eligible; the 15 m around tanks, lakes, ponds and marshes is set by this Manual (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Maharashtra flood maps are mostly coarser than US maps, the ground on the Konkan coast, along its creeks and in Mumbai's reclaimed land is very flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the statutory 15 m (river) and 6 m (nallah) minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Maharashtra's building codes set water-course distances, but they are narrower than the setbacks of this chapter and are framed as rules on where a building site may be, not as corridors. UDCPR 2020 makes a site ineligible for building where "the entire site" lies within 6 m of the edge of the water mark of a minor water course (a nallah or canal) or within 15 m of that of a major water course (a river) (Regulation 3.1.1(ii)); a plot only partly inside the strip is not barred by that rule. DCPR 2034 sets the same 6 m and 15 m for Greater Mumbai, without the "entire site" wording, but lets the Commissioner relax them where arrangements are made to drain the flow of the water course, and requires a 6 m marginal open space along a trained nallah (Regulation 18(b)). In Mumbai's urban renewal cluster schemes the margin along a trained nallah is 6 m, "or as required by SWD Department of MCGM, whichever is greater". The wider 15 m from a river and 9 m from a nallah in UDCPR apply only to swimming pools, club houses and recreational open space in the green belt (Regulations 3.4.5 and 4.12). Along rivers, UDCPR 3.1.3 adopts the WRD blue and red flood lines: no construction between the bank and the blue line except parking, gardens, open space, cremation grounds, sewage treatment plants, pipelines and public toilets, and construction between the blue and red lines only with the plinth 0.45 m above the red flood line; where no lines exist, a tentative blue line is to be fixed and the 50 m on its landward side is a no-construction zone. Around lakes, UDCPR bars construction within 100 m of the high flood line of a natural lake in Regional Plan areas, leaves the distance in Development Plan areas to the plan or the Irrigation Department, and applies a WRD circular of 8 March 2018 around dams (Regulation 3.1.12). A site lying wholly within 50 m of the mean high flood level of a wetland is not eligible (Regulation 3.1.1(xiv)), and mangroves carry a 50 m buffer under the High Court's judgment of 2018. Clause 7.4.7 makes the statutory 15 m from a river and 6 m from a nallah the floor of Zone 1 everywhere, measured along the whole waterbody, and adds 15 m around tanks, lakes, ponds and marshes.
Disclosure. The setbacks of this chapter start from the statutory distances and add a hydraulic corridor set by this Manual where it is wider. Zone 1 is never less than 15 m from a river and 6 m from a nallah, the distances of UDCPR 3.1.1(ii) and DCPR 2034 Regulation 18(b), and it extends to the floodway and, for a tank, to the MWL contour where these are wider; Zone 2 extends to the 1% AEP flood extent plus 10 m (Clauses 7.4.3, 7.4.4 and 7.4.7). The WRD blue and red flood lines of UDCPR 3.1.3 apply as statutory lines alongside them. This chapter is stricter than statute in the following respects:
- Corridor, not site test. UDCPR bars only a site lying entirely within the 6 m or 15 m strip. Here Zone 1 applies to the part of any site that lies within it, and to every natural channel draining 8 ha or more, recorded on the Development Plan or not (Clause 7.4.1(b)).
- Measurement. The codes measure from the edge of the water mark, or from the edge of a trained nallah. Here setbacks run from the larger of the Revenue record boundary and the surveyed FTL or top of bank (Clause 7.13.1), so a nallah narrowed by training or encroachment is measured at its recorded width.
- Floodway and flood fringe. Where the floodway of a nallah or river is wider than 6 m or 15 m, Zone 1 extends to it. Between the blue and red lines UDCPR allows building with the plinth 0.45 m above the red line; here no habitable building is placed in Zone 2, which runs to the 1% AEP extent with the climate factor plus 10 m, except in a developed-fringe area notified under Clause 7.6.6.
- Fixed widths. Where no flood extent is mapped, Table 7.1 sets a total setback of 25 m to 50 m along channels, of which only the statutory 6 m or 15 m (20 m for the largest channels) is Zone 1.
- Tanks and lakes. UDCPR leaves the distance from a natural lake in a Development Plan area to the plan or the Irrigation Department, and sets none for other tanks. Here every tank, lake or pond has Zone 1 to its MWL contour and not less than 15 m from FTL, a value set by this Manual that also applies to marshes, estuaries and backwaters, and a total setback of at least the MWL contour plus 25 m where no flood extent is mapped (Table 7.1).
Where a statutory line is wider, it governs (Clause 7.4.5): the prohibited zone to the blue line, and the 50 m no-construction zone beyond a tentative blue line; the red line, where it lies outside Zone 2, with its plinth rule; 100 m from the high flood line of a natural lake in a Regional Plan area; the distances around dams under the WRD circular of 8 March 2018; 50 m from the mean high flood level of a wetland; and every mangrove and its 50 m buffer, together with the other CRZ lines of the approved CZMPs. The reasons for the corridor and the stricter values are the floods of Mumbai in 2005, Pune in 2019 (on the encroached Ambil Odha) and 2024, and Nagpur in 2023, and the fact that blue and red lines are missing or disputed along most urban nallahs and many rivers. Until a statute or rule adopts them, the statutory distances and lines remain the legal minimum and this chapter's further values are the Manual's recommended standard. Approving authorities should state in each approval which of the two was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the statutory 15 m (river) and 6 m (nallah) minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the recreational open space required by UDCPR 2020 and DCPR 2034, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Maharashtra practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. Mumbai's reclaimed island city and the Konkan creek margins are flat, and parts of Mumbai lie below the level of high tide, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
The nearest Maharashtra rules to a foreshore are the lake and wetland lines of UDCPR 2020: in a Regional Plan area no construction is allowed within 100 m of the high flood line of a natural lake (Regulation 3.1.12), and no site lying wholly within 50 m of the mean high flood level of a wetland is eligible for building (Regulation 3.1.1(xiv)). Mumbai's lakes are part of its flood path: Tulsi Lake spills to Vihar Lake, and Vihar and Powai lakes spill to the Mithi (MMRDA, 2023), so the land between their full supply levels and their flood levels stores flood water that would otherwise reach the Mithi. In Nagpur, Ambazari Lake overflowed on 23 September 2023 after 109 mm of rain, and four people died (as reported). Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Mumbai's island city, parts of which lie below high tide at Sat Rasta, Lower Parel and Grant Road, the riverside areas of Pune and Pimpri-Chinchwad inside the Mula, Mutha and Indrayani flood lines, and the towns along the Panchganga and Krishna at Kolhapur and Sangli already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Maharashtra's impounded tanks with earthen bunds, waste weirs and sluices are mainly the ex-malgujari tanks of east Vidarbha: about 6,700 tanks, mostly in the Nagpur Division, with an irrigation potential of about 31,900 ha, of which the VIDC took over 128 tanks of more than 100 ha and 1,833 had been rejuvenated by 2023 (as reported). Clauses 7.7 and 7.8 apply to them as written. Elsewhere the storages that matter for urban drainage are lakes held by dams or bunds, such as Mumbai's Tulsi, Vihar and Powai lakes, the lakes of Thane and Nagpur's Ambazari; the talavs of towns and villages; the tidal holding ponds of Navi Mumbai, whose gates shut at high tide (as reported); and the khajans of the Konkan creeks. Clauses 7.7 and 7.8 apply to any of these whose storage is counted. A chain of lake, nallah and creek in which each drains into the next is a tank cascade for Clause 7.7.2. The WRD's dams and reservoirs, such as Koyna and Khadakwasla, and the gated weirs across rivers are not tanks for these clauses: their releases and levels enter a design as tailwater (Chapter 5).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including every lake, talav, nallah and tidal creek through which the outflow passes to the sea, as in the Mumbai system shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Maharashtra's largest floods have come in the middle of the south-west monsoon, when lakes are full and soils wet. Mumbai's storm of 26 July 2005 came with a high tide of 4.48 m at 15:30, within the most intense rain (Fact Finding Committee, 2006; MMRDA, 2023). Pune's flood of 25 July 2024 came while Khadakwasla dam was releasing 35,574 cusec, and the blue line was breached (as reported). The Kolhapur–Sangli flood of 2019 lasted about 20 days, from 25 July to 13 August (as reported). Once full, Vihar and Powai lakes spill into the Mithi, which then carries their surplus on top of the runoff of its own catchment. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — Mumbai's lake cascade to the sea, in long section (schematic, not to scale): Tulsi Lake spilling to Vihar Lake, Vihar Lake spilling to the Mithi at its origin, and Powai Lake spilling to the Mithi; the Mithi's upper reach (MCGM, 1-in-10-year design) and lower reach (MMRDA, 1-in-100-year design), as recommended by the Fact Finding Committee; its tidal reach; a storm drain outfall with a flap gate, a gross pollutant trap and dry-weather flow interception; and Mahim Creek with its mangroves and their 50 m buffer, where the tide sets the tailwater. Lake levels are on Town Hall Datum (THD), as given by MMRDA, and must be converted to the project datum (Clause 7.3.5). Original drawing for this Manual; levels, areas, reaches and the tide of 26 July 2005 from MMRDA (2023), the mangrove buffer from the approved CZMP as recorded by the Bombay High Court (2026), with setback zones adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 (MARC, 2025).
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, MSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No operating rule for a Maharashtra talav, ex-malgujari tank or urban lake that keeps a flood cushion was found, and the WRD circular of 8 March 2018 on distances around dams, cited in UDCPR 3.1.12, was not read. Dam releases are the largest controlled flows reaching the State's towns. In Pune, releases from Khadakwasla of about 38,000 to 43,000 cusec on 31 July 2026 flooded Ekta Nagar, and in 2019 the blue line was breached at a release of 45,474 cusec (as reported). In Kolhapur and Sangli, floods are driven by upstream dam releases and the backwater of the Krishna: the Wadnere Committee (2020) found that the backwater of the Almatti dam was not responsible for the 2019 flood, a finding contested by one of its members, while the CAG (2006) had linked Almatti backwater to the 2005 floods at Sangli. In Navi Mumbai, the gates of the holding ponds are shut at high tide and opened at low tide; fishermen petitioned the High Court against two ponds in 2018, and CIDCO was reportedly ordered to keep sluice gates open (as reported), which shows that a gate rule affects fisheries and mangroves as well as drainage. Without an agreed rule with dates, levels and a named operator, storage behind a gate cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by June and July rain gives no protection in a July or August monsoon storm. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Irrigation, water supply and fisheries remain the primary purposes of most of these waterbodies; the restoration of the ex-malgujari tanks has been tied to their maintenance by water users' associations (Kimmatkar committee, 2012, as reported). A flood cushion has a cost in yield or in the crop calendar, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Maharashtra Pollution Control Board directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. Desilting is the main pre-monsoon drainage work in Maharashtra's cities. In Mumbai, MCGM set 31 May 2026 as its deadline, with a target of 80% of the year's nallah desilting by 31 May and 10% each during and after the monsoon (as reported); an older norm was 75%, 10% and 15%. Desilting is also hard to verify: before the 2006 monsoon MMRDA reported desilting 7,57,257 m³ from the Mithi, but the CAG could not verify the Rs 39.96 crore spent on it (CAG, Floods in Maharashtra, 2006). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Maharashtra precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. Maharashtra's codes let an owner train or canalise a nallah that crosses low-lying land, without changing its overall alignment or its inlet and outlet (UDCPR 3.1.1(ii), proviso; DCPR 2034 Regulation 18(b)), and DCPR 2034 treats a nallah as continuous where the Development Plan shows it broken by a covered portion (DP note 7). In Pune, 26 people died when the encroached Ambil Odha flooded on 25 September 2019 (as reported). In Nagpur, a slab over the Nag river for a skating rink and weed growth were among the causes cited for the flood of 23 September 2023, and an earthmover stuck under a bridge was found to have affected the flow (as reported). In Mumbai, the BRIMSTOWAD works were delayed by encroachments, traffic, shortage of funds and the difficulty of acquiring saltpan land, and some works stopped because encroachments had not been removed (MCGM, 2008; CAG, Report No. 6 of 2014). Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored talav or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Maharashtra the nearest existing form of regional storage is the network of 11 tidal holding ponds that CIDCO built for Navi Mumbai (as reported), and the ex-malgujari tanks of east Vidarbha could serve the same purpose where their storage is restored and controlled. UDCPR lets the FSI of land in the prohibited zone of a flood line be used on the rest of the plot (Regulation 3.1.3(i)(c)) but bars the use of TDR in that zone (Regulation 11.2.8(b)); neither sets a technical standard for storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Maharashtra Wetlands Authority;
- (b) Lonar Lake (reported to be a Ramsar site), Powai Lake (reported to be the only major notified wetland in Mumbai), and the other wetlands of the National Wetland Inventory and Assessment verified under the directions of the Bombay High Court;
- (c) the Mithi from Vihar Lake to Mahim Creek, the Mahim, Mahul, Thane and Malad creeks, the tidal creeks, mudflats and estuaries of the Konkan coast, such as those of the Vashishti and the Savitri, the khajans behind their bunds, and every mangrove area with its 50 m buffer;
- (d) the lakes of Thane and Navi Mumbai whose wetland status is under inquiry, including the NRI and TS Chanakya lakes (as reported), and the holding ponds of Navi Mumbai; and
- (e) any other marsh, estuary or creek that the Authority notifies.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Maharashtra's wetlands are protected mainly through the courts. In September 2020 a committee under the Konkan Divisional Commissioner directed the re-verification of every wetland in the National Wetland Inventory and Assessment; the Bombay High Court took up a suo motu case on wetland conservation in January 2025; and in May 2026 the Chief Minister ordered an inquiry into the refusal of the Thane district wetland committee to recognise eight lakes, including Navi Mumbai's NRI and TS Chanakya flamingo lakes, as wetlands (all as reported). The mangroves are protected by the High Court's judgment of 17 September 2018 in PIL 87 of 2006, which froze their destruction across the State and stopped construction within 50 m of them (as summarised; the judgment text was not read), and which allows a public project to cut mangroves only with the leave of the Court (paragraph 83(viii)). The Court applied that paragraph on 17 September 2026, when it allowed MCGM to cut 1,237 mangroves on 2.75 ha for the Versova–Madh bridge over Malad Creek, in an area mapped on Mumbai's approved CZMP as CRZ-IA mangroves and 50 m buffer. A drain outfall, nallah widening, holding pond or pumping station in a mangrove belt therefore needs CRZ clearance and, where mangroves are cut, the High Court's leave, as well as compliance with this chapter. The Mithi, 17.84 km from Vihar Lake to Mahim Creek with a catchment of 7,295 ha, was widened and deepened after 2005 under the Mithi River Development and Protection Authority, formed on 19 August 2005; MCGM's reach was designed for a 1-in-10-year flood and MMRDA's for a 1-in-100-year flood, following the Fact Finding Committee (MMRDA, 2023). Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches the Mithi and Mumbai's creeks through the storm drains: BRIMSTOWAD recommended diverting the dry-weather flow of the drains to the sewage pumping system, section 239 of the MMC Act, 1888 lets the Commissioner require separate drains for sullage and for rain water (MCGM, 2008), and MMRDA lists a study of pollution in the Mithi by the Maharashtra Pollution Control Board (MMRDA, 2023). The rules on outfalls and treatment in Clause 7.12.3 respond to these.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Maharashtra's main controls on building in waterbodies are the site rules of UDCPR and DCPR and the orders of the courts. Under UDCPR 2020, a site within the river and blue flood line (the prohibitive zone) is not eligible for building (Regulation 3.1.1(xi)); 36 bungalows built inside the blue line of the Indrayani at Chikhali, in Pimpri-Chinchwad, were demolished (as reported). The Mithi project removed about 10,000 encroachments and rehabilitated more than 5,000 project-affected persons (MMRDA, 2023). In Nagpur, the Nagpur Bench of the High Court directed a committee under the Divisional Commissioner to deepen the Nag river and remove encroachments (17 January 2024, as reported). The sections of the municipal Acts and the Land Revenue Code under which encroachments on nallahs are removed were not reviewed for this Manual, and no statewide count of encroached waterbodies was found. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The bunds of most ex-malgujari tanks and village talavs are low earthen banks and are not expected to be specified dams, but each shall be screened under Clause 7.14.1. The WRD's dams, such as Koyna and Khadakwasla, and the dams that hold Mumbai's lakes, enter this Manual only as sources of inflow and tailwater (Chapter 5). Where the storage of a holding pond or a khajan is counted under Clause 7.7, its outer bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Dam releases have flooded Maharashtra's towns: Khadakwasla releases flooded parts of Pune in 2019, 2024 and 2026, and residents blamed releases from Kolkewadi and Koyna for the Chiplun flood of 22 July 2021 (as reported). In Nagpur, the Nagpur Bench of the High Court has given directions on the Ambazari dam since March 2018, and in April 2025 criticised the handling of its spillway gates (as reported). The CAG found warning systems out of order in 2005, and VHF sets still not working in Nanded, Sangli and three talukas of Kolhapur in 2006 (CAG, Floods in Maharashtra, 2006). No release protocol for these dams was read for this Manual. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Urban Development Department, Government of Maharashtra (2020). Unified Development Control and Promotion Regulations for Maharashtra State (UDCPR), as sanctioned in December 2020 (Regulations 1.1, 1.3, 2.2, 3.1.1, 3.1.3, 3.1.12, 3.1.13, 3.4.5, 4.11, 4.12, 9.1, 11.2.8 and 13.3 with its Schedule). Copy at https://www.grihaindia.org/sites/default/files/pdf/Griha-incentives/udcpr-sanctioned.pdf
- Urban Development Department, Government of Maharashtra (2018). Development Control and Promotion Regulations for Greater Mumbai, 2034, with sanction notification No. TPB-4317/629/CR-118/2017/DP/UD-11 of 8 May 2018 (Regulations 18(b), 37(1), 59, 62 and 68; DP note 7; urban renewal cluster regulation). https://data.opencity.in/dataset/mumbai-dcpr-development-control-and-promotion-regulation-2034
- Government of Maharashtra. The Maharashtra Regional and Town Planning Act, 1966; the Maharashtra Land Revenue Code, 1966.
- Municipal Corporation of Greater Mumbai, Chief Engineer (Storm Water Drains) (2008). RTI manual, Chapter 1 (MMC Act, 1888, sections 61(a) and 220–239; BRIMSTOWAD). https://portal.mcgm.gov.in/irj/go/km/docs/documents/MCGM%20Department%20List/Chief%20Engineer%20(Storm%20Water%20Drains)/RTI%20Manuals/Ch%20Engineer_SWD_RTI_E01.pdf
- Comptroller and Auditor General of India (2014). Audit Report (Local Bodies) for the year ended March 2013, Government of Maharashtra, Report No. 6 of 2014, Chapter IV, para 4.1: Implementation of Brihanmumbai Storm Water Drain Project by MCGM. https://cag.gov.in/uploads/download_audit_report/2014/Maharashtra_Report_6_2014_Chap_4.pdf
- Comptroller and Auditor General of India (2006). Audit Report (Civil), Government of Maharashtra, for the year ended 31 March 2006: Floods in Maharashtra, Chapters I and VI. https://cag.gov.in/uploads/old_reports/state/Maharashtra/2006/Civil_Performance/civilper_chap_1.pdf ; https://cag.gov.in/uploads/old_reports/state/Maharashtra/2006/Civil_Performance/civilper_chap_6.pdf
- MMRDA (2023). Deshpande, S., Mithi River Development Project, presentation, 30 May 2023 (lakes, levels on THD, reaches, return periods). https://mumbaifirst.org/wp-content/uploads/2023/04/Session-4_Shankar-Deshpande-MMRDA.pdf
- Fact Finding Committee on Mumbai Floods (chair M. Chitale) (2006). Final Report, Vol. I (as summarised at https://questionofcities.org/fact-finding-committee-on-mumbai-floods-final-report).
- High Court of Bombay. Brihanmumbai Municipal Corporation v Union of India, WP (L) No. 17795 of 2026, judgment of 17 September 2026 (applying paragraph 83(viii) of the judgment of 17 September 2018 in PIL No. 87 of 2006, Bombay Environmental Action Group v State of Maharashtra). https://www.livelaw.in/pdf_upload/2026/09/17/brihanmumbai-municipal-corporation-vs-union-of-india-700815.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- SANDRP (30 August 2024), Flood lines, riverfront development and citizen heroes: story of Pune floods. https://sandrp.in/2024/08/30/flood-lines-riverfront-development-and-citizen-heroes-story-of-pune-floods/ ; (11 August 2026), Corruption in flood lines regulation in Pune. https://sandrp.in/2026/08/11/corruption-in-flood-lines-regulation-in-pune/ ; (5 January 2021), Maharashtra wetlands overview 2020. https://sandrp.in/2021/01/05/maharashtra-wetlands-overview-2020 ; (6 June 2020), Upper Krishna basin flood 2019: Vadnere Committee 2. https://sandrp.in/2020/06/06/maharashtra-upper-krishna-basin-flood-2019-vadnere-committee-2-a-report-with-difference/
- National Green Tribunal (Western Zone). Sarang Yadvadkar and others v State of Maharashtra, order of 15 September 2023 (summary). https://indiaenvironmentportal.org.in/in-court/order-of-the-national-green-tribunal-regarding-demarcation-of-red-line-and-blue-lines-for-rivers-in-maharashtra-15092023
- Reports of wetlands and mangrove cases (secondary): All India Radio (January 2025), https://newsonair.gov.in/bombay-high-court-initiates-suo-motu-pil-to-monitor-conservation-preservation-of-wetlands-in-maharashtra ; Free Press Journal (12 May 2026, Thane lakes), https://www.freepressjournal.in/mumbai/maharashtra-cm-devendra-fadnavis-orders-inquiry-into-denial-of-wetland-status-to-eight-thane-lakes-including-flamingo-habitats ; Casemine commentary on the 2018 mangrove judgment, https://www.casemine.com/commentary/in/bombay-high-court-establishes-robust-legal-framework-for-mangrove-preservation-under-article-21/view
- Reports of Nagpur (secondary): The Hitavada (18 January 2024; 24 April 2025), https://thehitavada.com/Encyc/2024/1/18/SafeguardingAmbazari-lake-Naag-river-HC-directs-committee-to-remove-encroachments.html ; https://www.thehitavada.com/Encyc/2025/4/24/Ambazari-Flood-PIL-High-Court-blasts-Irrigation-Deptt-NMC.html ; 2023 Nagpur flood, https://en.wikipedia.org/wiki/2023_Nagpur_flood
- Reports of ex-malgujari tanks (secondary): The Hitavada (20 October 2023), https://thehitavada.com/Encyc/2023/10/20/Malgujari-tanks-1-833-water-bodies-out-of-6-700-in-Division-rejuvenated.html ; Down To Earth, https://www.downtoearth.org.in/amp/story/environment/restore-malgujari-tanks-to-irrigate-eastern-vidarbha-study-38405
- Reports of Navi Mumbai holding ponds and Mumbai desilting (secondary): SACON for NMMC (2024), https://www.sacon.in/wp-content/uploads/2024/04/2024-PR268-NMMC-Holding-Pond_GQ_04.03.2024.pdf ; Swarajya (2026, desilting deadline), https://swarajyamag.com/amp/story/infrastructure/bmc-sets-31-may-deadline-for-100-per-cent-drain-cleaning-across-flood-prone-areas-in-mumbai ; Housing.com (CZMP of five districts), https://housing.com/news/centre-approves-czmp-for-five-districts
- Reports of the Chiplun flood (secondary): Al Jazeera (30 July 2021), https://www.aljazeera.com/news/2021/7/30/maharashtra-deadly-floods-chiplun-konkan-region
- Molesworth, J. T. (1857). A Dictionary, Marathi and English, 2nd edition. Bombay. Digital Dictionaries of South Asia. https://dsal.uchicago.edu/dictionaries/molesworth/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Marathi waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. No statewide Act for the protection of tanks or lakes was found in Maharashtra during research for this Manual. Waterbodies are protected instead by the building codes and the courts. UDCPR 2020 and DCPR 2034 keep building sites away from rivers, nallahs, natural lakes and wetlands, and tie construction near rivers to the blue and red flood lines drawn by the WRD (Clause 7.4, Disclosure). The Bombay High Court froze the destruction of mangroves statewide in 2018 and took up a suo motu case on wetlands in January 2025 (as reported). The National Green Tribunal (Western Zone) has directed the demarcation of flood lines in Akola, Dhule, Nandurbar and Jalgaon (order of 15 September 2023, as summarised). The audits that exist concern Mumbai. The CAG found that 94.4 cm of rain fell on the city within 18 hours on 26 July 2005 and, "coupled with high tide crippled the city" (CAG, Floods in Maharashtra, 2006). It later found that the Brihanmumbai Storm Water Drain (BRIMSTOWAD) works had cost Rs 1,764.55 crore by September 2013, against Rs 1,200 crore sanctioned, and that the master plan update was still incomplete (CAG, Report No. 6 of 2014). Wetland counts disagree by a factor of about three: 44,714 to 46,460 wetlands in the National Wetland Inventory and Assessment, against about 15,865 in a State affidavit of 2020 (as reported). No audit of the loss of tanks, nallahs or lakes outside Mumbai was found. This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the MRTP, Revenue, WRD, coastal and wetland procedures that record and protect waterbodies in law.