Draft v1.0 prepared by NEER. Not adopted by the Government of Rajasthan or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 1Policy, Applicability and Adoption

These annexes support Chapter 1. They hold the lists and maps that define where the Manual applies, the model text of the Policy Supplement and of the legal instruments that would give the Manual effect, and the two forms an Applicant files under Chapter 1. The Manual is a draft; it is not adopted by any government or agency: model legal text is offered for consideration by a competent authority and is not in force, and the forms are draft forms. An annex marked "To be prepared" states the data it needs and the rule to use until it is published (Clause 1.11.5).


Annex 1A — List of Tier A authorities, with the boundaries of the Municipal Corporations and of the regions of the development authorities

Supports Clauses 1.6.1 to 1.6.5 of Chapter 1.

1A.1 Clause 1.6.1 defines Tier A by class of authority. Table 1A.1 sets out the classes, and the authorities named in the clause, as Chapter 1 defines them. Every authority not in Table 1A.1 is Tier B (Clause 1.6.2).

Table 1A.1 — Tier A authorities as defined in Clause 1.6.1

Item Tier A authority Clause
(a) Jaipur Municipal Corporation (JMC), and JDA and every other Approving Authority within the Jaipur Region of JDA 1.6.1(a)
(b) Every other Municipal Corporation constituted under the Rajasthan Municipalities Act, 2009 1.6.1(b)
(c) Every other development authority constituted by an Act of the State (JoDA, AjDA, KDA, UDA and the Bikaner and Bharatpur Development Authorities), with every Approving Authority within its region 1.6.1(c)
— A Tier B authority that opts into Tier A by council resolution, or that the Government notifies as Tier A 1.6.4

1A.2 Whatever the tier, the design-aid route and the alternatives of Clause 1.7 are not available in a flood-sensitive catchment (Clause 1.6.5; Annex 1B).

To be prepared. This annex will contain the full list, by name, of every Municipal Corporation and every development authority in the State, and of every Approving Authority within the region of each development authority, with the date from which each is Tier A, and the boundaries of those areas as a map and as a GIS layer. It needs the regions of the development authorities as notified under their Acts, and the bodies that approve building plans and layouts in each (UDH, JDA and the other development authorities, and the Urban Improvement Trusts); the current list and boundaries of the Municipal Corporations, Municipal Councils and Municipal Boards, after the reported re-merger of the twin corporations of Jaipur, Jodhpur and Kota in 2025 and the reported reversion of some municipalities to gram panchayats in 2026 (the Local Self Government Department; neither notification seen, and the number of Municipal Corporations not verified [TBC]); and the district and tehsil boundaries after the reorganisation of districts in 2023–24 (Revenue Department, Survey of India). Until it is published, the tier is decided by the classes in Clause 1.6.1 and recorded on Form 1-1, and the Authority confirms it at the pre-application stage (Clause 1.5.9).

Table 1A.2 — Register of Tier A authorities (layout)

No. Authority Class (Municipal Corporation / Municipal Council / Municipal Board / development authority / Urban Improvement Trust / other) District Basis (Clause 1.6.1(a), (b), (c) or 1.6.4) Tier A from (date) Notification or resolution reference
1            
2            
3            

1A.3 The Municipal Corporation and development-authority region boundary map shall be published as open data in a machine-readable format (Clause 10.17.4), with the date of the notification it shows.


Annex 1B — Maps of flood-sensitive catchments

Supports Clauses 1.4, 1.6.5 and 1.10.3(d) of Chapter 1, and Clauses 4.5.3 and 4.5.4 of Chapter 4.

1B.1 The flood-sensitive catchments are listed in Clause 4.5.3.2. Table 1B.1 repeats that list. The maps of this annex and the boundaries of Annex 4A are the same data set and shall be issued together.

Table 1B.1 — Flood-sensitive catchments listed in Clause 4.5.3.2

Item Catchment Extent as described in Chapter 4
(a) Jaipur on the Dravyavati The catchment of the Dravyavati river (the former Amanishah nala) and of the nalas that join it, among them the Naharika and Ambabari nalas, the walled-city Ganda nala, the Jawahar nala and the nalas of Sanganer town, with the low-lying colonies of the city that drain to them; JDA rebuilt about 47.5 km of the river as a channel to pass the 100-year flood (JDA EIA; design discharge not found [TBC]), and three people died in a flooded basement in the city in August 2024 (as reported)
(b) Jodhpur on the Jojari and the old city The catchments of the Jojari through the city and of the Bhairav and RTO nalas and the other city nalas that drain to it, and the old city, where the water table has risen since canal water arrived in 1997 to about 1–1.5 m below ground in places (as reported); more than 30 colonies flooded on 18–19 July 2022 (as reported), and the Jojari's corridor is being demarcated under the Supreme Court's orders (2026)
(c) Udaipur's lake chain The land that drains to the Pichola, Swaroop Sagar, Fateh Sagar, the Ayad (Ahar) and Udai Sagar, whose outfalls are held up when the lakes are full and their gates are open; the lake levels are kept on gauges in feet above an unknown zero (Pichola full at 11 ft, Fateh Sagar at 13 ft, Udai Sagar at 24 ft, as reported), and their levels in metres are to be confirmed [TBC]
(d) Ajmer on Ana Sagar and its escape channel The catchment of Ana Sagar and the land along its escape channel, which floods when the escape gates are opened to hold the lake at its full gauge of 13 ft (as reported; level in metres [TBC]), as on 11 September 2024 and 18–20 July 2025 (as reported)
(e) Kota on the Chambal The land that drains to the Chambal through the city, where the river is raised by releases from Gandhi Sagar, Rana Pratap Sagar, Jawahar Sagar and the Kota Barrage (full reservoir level 260.3 m); the CWC site at Kota City has a danger level of 242 m and a highest flood level of 248.68 m (16 September 2019) (CWC)
(f) Barmer and Balotra on the Luni Balotra town and the land that drains to the Luni there, where the highest flood level is 108.755 m (18 July 1979) (CWC list, as reported); and Barmer town and the low ground of its district, such as Kawas, where water stood for months after about 577 mm fell in three days in August 2006 (as reported)
(g) Notified catchments Any catchment notified under Clause 4.5.4

To be prepared. This annex will contain a map of each catchment in Table 1B.1 at a scale fit for deciding whether a plot lies inside it, and the same boundaries as a GIS layer. It needs catchment boundaries drawn from a digital elevation model and the drain network (the Municipal Corporations of Jaipur, Jodhpur, Udaipur, Ajmer and Kota, the Municipal Councils of Balotra and Barmer, the development authorities, Survey of India); the city drains with their outfalls and interception works and their levels on a stated datum (the local bodies, JDA and RUIDP); the full levels, maximum water levels and gate and escape-channel operating rules of Pichola, Fateh Sagar, Udai Sagar and Ana Sagar, on a datum in metres, and of the Kota Barrage (WRD, the Lakes Development Authority, the custodians of the lakes); the high flood lines and buffers being demarcated under the Supreme Court's order of 7 August 2026, beginning with the Jojari; the CWC levels on the Chambal at Kota City and on the Luni at Balotra; the depth to groundwater in the old city of Jodhpur (CGWB, the Ground Water Department); and the land flooded in 1981, 2006, 2019, 2022, 2024 and 2025 (the Collectors, RSDMA, the local bodies). Bharatpur, where the Gambhir and Banganga floods of 1981 endangered the Ajan bund; Tonk on the Banas; Sri Ganganagar and Hanumangarh on the Ghaggar; Bikaner; Alwar; and Mount Abu and Abu Road on the West Banas are candidates for notification under Clause 4.5.4 once their catchment boundaries and flood record are documented. The river corridors and the lake and wetland buffers set by the courts are governed by Chapter 7 and by the orders that bind there rather than by this list. Until it is published, the Authority decides at the pre-application stage whether a site lies in a listed catchment, from the best boundary available, and the decision and its basis are recorded on Form 1-1 and in the drainage report (Clauses 1.5.9 and 1.11.5).

Table 1B.2 — Attributes of the flood-sensitive catchment layer (layout)

Field Content Unit or format
catchment_id Unique identifier text
name Catchment name text
basis Clause 4.5.3.2 item (a) to (f), or the notification under Clause 4.5.4 text
notification_ref Gazette notification number, where notified text
notified_on Date of notification date
applies_from Date from which the rule applies to applications (Clause 4.5.4.2, step 5) date
boundary_source Source and date of the boundary text
area_km2 Catchment area km²

Annex 1C — Policy Supplement: text of alternatives S-1 to S-5 and model council resolution

Supports Clauses 1.6.3, 1.6.5 and 1.7.1 to 1.7.3 of Chapter 1.

Model text for consideration by a competent authority. Not in force. The text below shows how the Policy Supplement of Clause 1.7 could be written. It has no effect unless and until it is issued by the Government and adopted by an Approving Authority under Clause 1.7.3.

Part 1 — General provisions

P1.1 Scope. This Supplement sets out alternatives S-1 to S-5 to the requirements of the Rajasthan Stormwater Design Manual (the Manual) named in each alternative. An alternative applies within the area of an Approving Authority (the Authority) only from the date on which the Authority adopts it under P1.3.

P1.2 No lower criterion. No alternative lowers any criterion of the Manual. S-1 and S-2 are simplified methods for meeting the same criterion (Clause 1.7.3(a)).

P1.3 Adoption.

  • (a) A Tier B authority adopts an alternative by council resolution in the form of Part 3, and sends a copy to the State Stormwater Technical Committee (the Committee) within 30 days of the resolution.
  • (b) A Tier A authority adopts an alternative only after the Committee has concurred in writing.
  • (c) The Authority publishes the alternatives it has adopted on its website and in the register of Clause 10.17.

P1.4 Retention. No alternative replaces the retention requirement (Annex 2E depth), except where fee-in-lieu under S-5 funds equivalent retention in the same basin (Clause 1.7.3(d)).

P1.5 Tables. The tables used by S-1, S-2 and S-3 are those issued by the Committee, and are reviewed with Chapter 2 of the Manual (Clauses 1.7.3(e) and 2.14). An alternative that depends on a table cannot be used until that table is issued.

P1.6 Record. An Applicant who uses an alternative states it on Form 1-1 and in the drainage report, with the resolution or concurrence under which it was adopted.

Part 2 — The alternatives

S-1 — Design-aid route for storage

S-1.1 Replaces: storage sized by a hydrograph method under Chapter 3.

S-1.2 Alternative: retention and detention volumes may be taken from the unit-storage tables issued for Annex 4B (m³ per ha, by rainfall zone, hydrologic soil group and impervious fraction) and the compliance calculator, by the method of Clause 4.14.2.

S-1.3 Eligibility: sites of 2 ha or less outside flood-sensitive catchments, and of 0.5 ha or less within them (Table 1.2; Clause 4.14.1).

S-1.4 Conditions: the post-development imperviousness used shall be that shown on the approved plans; the outlet, spillway, RWH accounting and safety provisions of Clause 4.14.2 apply; the compliance calculator may be the sole calculation (Table 1.1).

S-2 — Permissible site discharge (PSD)

S-2.1 Replaces: the release rate Q_post(T) ≤ 0.9 × Q_pre(T) computed for the site (Clause 2.11.2).

S-2.2 Alternative: the release rate for each AEP may be taken as the tabulated unit-area release rate for the site's zone and AEP, multiplied by the site area. The tabulated rates are derived from the 0.9 × Q_pre rule (Table 1.2).

S-2.3 Eligibility: any site outside a flood-sensitive catchment.

S-2.4 Conditions: storage is then sized to hold every duration of Clause 2.5.2 at the PSD; drawdown, minimum orifice and spillway rules of Chapter 4 apply unchanged.

S-3 — Fixed-width waterbody setback

S-3.1 Replaces: the waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7).

S-3.2 Alternative: where no 1% AEP extent is mapped, the setback shall be the fixed width for the class of waterbody in the table of Clause 7.4.6 (and Annex 7B), measured as in Clause 7.4.3.

S-3.3 Eligibility: waterbodies with no mapped 1% AEP extent.

S-3.4 Conditions: no setback under this alternative is less than the Zone 1 minimum of Clause 7.4.7 (Clause 1.10.3(c)); the no-fill zone of Chapter 7 applies; where a 1% AEP extent is later mapped and adopted, the mapped setback applies to new applications.

S-4 — Downstream screening checklist

S-4.1 Replaces: downstream analysis by hydraulic model under Chapter 5.

S-4.2 Alternative: the Applicant completes a screening checklist of downstream capacity and known flooding, covering at least the conditions of Clause 5.3.4: that the receiving public drain has documented capacity for its minor-system design flow (Chapter 6), and that no flood-prone location is recorded within 500 m downstream. A hydraulic model under Chapter 5 is required only where the screen fails.

S-4.3 Eligibility: sites of less than 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall.

S-4.4 Conditions: the checklist is signed by the registered professional who signs the drainage report (Clause 10.6); flood-prone locations are those recorded by the local body, the Collector and the District Disaster Management Authority, RSDMA, the State and district control rooms, or WRD (Clause 5.3.3(d)).

S-5 — Fee-in-lieu toward regional storage

S-5.1 Replaces: on-site detention under Chapter 4.

S-5.2 Alternative: all or part of the detention requirement may be met by a fee-in-lieu toward a regional detention facility or restored talab or tank storage identified in the basin plan (Clause 4.13.1).

S-5.3 Eligibility: sites in a basin for which a basin plan has been notified (Table 1.2).

S-5.4 Conditions:

  • (a) the conditions of Clause 4.13.2 apply, including interim on-site detention until the regional facility or restored tank is operational, and retention and WQv treatment on site;
  • (b) the fee is computed under Clause 4.13.3 and held in the ring-fenced basin account;
  • (c) the volume credited and the fee are entered in the public ledger of Clause 4.13.4; and
  • (d) in a flood-sensitive catchment, fee-in-lieu is available only as allowed by Clause 1.10.3(d).

Part 3 — Model council resolution

Model text for consideration by a competent authority. Not in force.

Resolution No. ______ of ______ (name of Municipal Corporation (Nagar Nigam) / Municipal Council (Nagar Parishad) / Municipal Board (Nagar Palika)), dated ______

Subject: Adoption of alternatives under the Policy Supplement to the Rajasthan Stormwater Design Manual.

The Council, having considered the report of the Commissioner / Executive Officer dated ______, and noting that:

  • (i) the Rajasthan Stormwater Design Manual and its Policy Supplement have been given effect by ______ (instrument and date);
  • (ii) this local body is a Tier B / Tier A authority under Clause 1.6 of the Manual; and
  • (iii) for a Tier A authority, the State Stormwater Technical Committee concurred on ______ (reference ______),

resolves:

  1. to adopt the following alternatives of the Policy Supplement within its area, under the conditions of Clause 1.7.3 of the Manual:

Table 1C.1 — Alternatives adopted by this resolution

Alternative Adopted (Yes / No) Area to which it applies (whole area, or wards / zones) Applies from (date)
S-1 Design-aid route      
S-2 Permissible site discharge      
S-3 Fixed-width setback      
S-4 Downstream screening checklist      
S-5 Fee-in-lieu      
  1. that no adopted alternative shall apply within a flood-sensitive catchment except as the Manual allows (Clause 1.6.5);
  2. that a copy of this resolution be sent to the State Stormwater Technical Committee within 30 days;
  3. that the adopted alternatives be published on the local body's website and entered in the register of Clause 10.17; and
  4. that this resolution be reviewed when the tables of Clause 1.7.3(e) are revised.

Mayor / Chairperson: ______ Commissioner / Executive Officer: ______ Date: ______


Annex 1D — Model Building Regulations 2025 amendment and model ULB bye-law

Supports Clauses 1.3.1, 1.3.4, 1.11 and 1.12 of Chapter 1.

Model text for consideration by a competent authority. Not in force. The text shows one way the instruments of Clause 1.3.1 could be drafted. Rule and section numbers are left blank.

Drafting note D1D.1. The rule numbers of the Model Rajasthan Building Regulations 2025 at which the new rule and the conditions would be inserted, and the enabling sections of the Rajasthan Urban Improvement Act, 1959, the Acts of the development authorities (Jaipur 1982, Jodhpur 2009, Ajmer 2013, Kota and Udaipur 2023, Bikaner and Bharatpur 2025) and the municipal and panchayat Acts, are to be confirmed by the Government's legal advisers. None is stated here.

Part A — Model amendment to the Model Rajasthan Building Regulations 2025

A.1 Short title and commencement.

  • (1) These rules may be called the Rajasthan Building (Stormwater Management) Amendment Regulations, ______.
  • (2) They shall come into force on the date six months after their publication in the Rajasthan Gazette (Clause 1.11.1).

A.2 Insertion of a new rule. After rule [______] of the building regulations that each urban local body and development authority brings into force, by publication in the Rajasthan Gazette, on the model issued by the Urban Development and Housing Department with its order of 12 May 2025, the following rule shall be inserted:

Rule [______]. Stormwater management.

(1) Definitions. In this rule, "the Manual" means the Rajasthan Stormwater Design Manual as notified by the Government, with its annexes and amendments; other words have the meanings given in Clause 1.4 of the Manual.

(2) Application. This rule applies to every development for which planning permission, building permit or layout approval is required under these rules.

(3) Runoff control. Where a development, over its common plan of development, involves land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, the development shall comply with Chapters 4 and 5 of the Manual (retention, detention, downstream and tailwater analysis).

(4) Provisions for every development. Every development, whatever its size, shall comply with Clause 1.5.4 of the Manual: no sewage connection to a storm drain; floor levels; waterbody setbacks and the no-fill zone; and no obstruction of a drainage path.

(5) Exemptions. A single dwelling on its own plot below the thresholds of sub-rule (3), and linear road resurfacing that adds no impervious area, are exempt from sub-rule (3) but not from sub-rule (4) or the rainwater harvesting provisions of these rules.

(6) Conditions of approval. The competent authority shall not grant:

  • (a) planning permission or layout approval, unless a preliminary drainage report under the Manual has been accepted;
  • (b) a building permit, or permission to commence, unless the final drainage design has been accepted; or
  • (c) a completion certificate, unless the as-built certificate has been accepted and the maintenance declaration has been registered, or the public assets have been handed over,

for a development to which sub-rule (3) applies (Manual, Clause 10.3).

(7) Certification. Drainage reports and designs shall be signed by a registered professional, and, where Clause 10.6.1 of the Manual so requires, by an empanelled Stormwater Design Professional.

(8) Rainwater harvesting. Nothing in this rule alters the rainwater harvesting provisions of these rules.

(9) Variances and waivers. The competent authority may grant a variance or waiver only on the grounds and by the procedure of Clause 1.10 of the Manual, and shall publish each decision.

(10) Transition. Applications filed complete before the commencement of this rule, and Tier B authorities, are governed by Clause 1.11 of the Manual.

Part B — Model ULB bye-law

B.1 Title and commencement. These bye-laws may be called the ______ (name of local body) Stormwater Management Bye-laws, ______. They come into force on ______.

B.2 Adoption of the Manual. The Rajasthan Stormwater Design Manual, as notified by the Government, applies to:

  • (a) every development approved by the local body; and
  • (b) every drainage, road, culvert, waterbody and flood-mitigation work executed by the local body, including its own drains and roads (Clause 1.3.1(b)).

B.3 Public works. Every detailed project report and contract for a work under B.2(b) shall require compliance with the Manual, from the dates in Clause 1.11 (Clause 1.3.4).

B.4 Tier and alternatives. The local body is a Tier ______ authority under Clause 1.6 of the Manual. The alternatives of the Policy Supplement adopted by the local body are listed in the Schedule, with the resolution under which each was adopted.

B.5 Submittals and review. Submittals shall be made in the stages of Clause 10.3 of the Manual and reviewed within the periods of Clause 10.7.

B.6 Maintenance, inspection and enforcement. Maintenance declarations, inspections, handover of public assets and enforcement shall follow Clauses 10.10 to 10.15 of the Manual.

B.7 Publication. The local body shall publish the registers and reports of Clause 10.17 of the Manual.

B.8 Review. These bye-laws shall be reviewed whenever the Manual is amended under Clause 1.12.

Table 1D.1 — Schedule: alternatives adopted (layout)

Alternative Resolution number and date Committee concurrence (Tier A only) Applies from Area
         
         

Form 1-1 — Applicability Determination

Supports Clauses 1.5.1 to 1.5.9 and 1.6 of Chapter 1, and Clause 10.3 of Chapter 10.

Draft form — Rajasthan Stormwater Design Manual, Draft v1.0. Lodged at the pre-application meeting (Stage 0) or with the preliminary drainage report (Stage 1), as Clause 10.3.2 requires.

Table 1F.1 — Form 1-1: Applicability Determination

No. Item (clause) Entry
A. Applicant and site
A1 Applicant (owner, developer or department) ______
A2 Site address and survey numbers ______
A3 Site coordinates (latitude, longitude) ______
A4 Approving Authority (Clause 1.4) ______
A5 Tier of the Authority: A / B (Clause 1.6; Annex 1A) ______
A6 Approval sought: planning permission / building permit / layout approval / public work (DPR) ______
A7 Type of development: building / layout / sub-division / road / paving / land-use change / other (Clause 1.4) ______
A8 Stage at which this form is lodged: Stage 0 / Stage 1 (Clause 10.3) ______
B. Coverage (Clause 1.5.1)
B1 Development requiring approval under the Model Rajasthan Building Regulations 2025 — 1.5.1(a): Yes / No ______
B2 Public work by a ULB, State department, board or State undertaking — 1.5.1(b): Yes / No ______
B3 Work by a Central agency needing the Authority's approval or no-objection — 1.5.1(c): Yes / No ______
C. Areas over the common plan of development (Clauses 1.4, 1.5.5)
C1 Phases, plots and sub-divisions included (one layout approval or one ownership) ______
C2 Total site area (ha) ______
C3 Land disturbance (ha) ______
C4 Existing impervious area (m²) ______
C5 New impervious area (m²) ______
C6 Replaced impervious area, removed to subgrade and rebuilt (m²) ______
C7 New plus replaced impervious area, C5 + C6 (m²) ______
C8 Plot area for the RWH mandate (m²) (Clause 1.5.3) ______
D. Thresholds and exemptions
D1 Land disturbance 0.1 ha or more — 1.5.2(a): Yes / No ______
D2 New or replaced impervious area 500 m² or more — 1.5.2(b): Yes / No ______
D3 Redevelopment (existing impervious cover on the site) — 1.5.6: Yes / No ______
D4 Constrained redevelopment route of Clause 4.5.6 proposed: Yes / No ______
D5 Linear public work: added impervious area per drainage catchment crossed given in Table 1F.2 — 1.5.7: Yes / No / not applicable ______
D6 Exemption claimed — 1.5.8(a) single dwelling below the thresholds / 1.5.8(b) resurfacing with no added impervious area / none ______
D7 RWH mandate applies (Building Regulations 2025, reg. 8.3: plot of 225 m² and more, except in a waterlogged area marked by the local body; RIICO industrial plots: its own regulations [TBC]) — 1.5.3: Yes / No ______
E. Site conditions
E1 Site in a flood-sensitive catchment (Annex 1B; Clause 4.5.3): No / Yes — name ______
E2 Source of the catchment boundary used ______
E3 1% AEP level mapped or determinable for the site (Clause 1.5.4(b)): Yes / No; source ______
E4 Waterbody on or adjoining the site (Clause 1.5.4(c); Chapter 7): No / Yes — name ______
E5 Natural drainage path or major-system flow path crossing the site (Clause 1.5.4(d)): No / Yes ______
E6 Site drains to a tidal outfall (Clause 10.3.2(d)): Yes / No ______
E7 Variance, waiver, regional facility or fee-in-lieu proposed (Clause 10.3.2(c)): No / Yes — Form 1-2 attached ______
F. Determination
F1 Result: (i) Chapters 4 and 5 apply, with Clause 1.5.4 and the RWH mandate; (ii) Clause 1.5.4 and the RWH mandate only (below thresholds); (iii) exempt under 1.5.8, Clause 1.5.4 and the RWH mandate still apply ______
F2 Stage 0 mandatory under Clause 10.3.2: Yes (state item (a) to (d)) / No ______
F3 Storage method: hydrograph method (Chapter 3) / design-aid route S-1 (Clause 1.7, where adopted and eligible) ______
F4 Other Policy Supplement alternatives relied on (S-2 to S-5), with the adopting resolution ______
F5 Tier B phased start applies (Clause 1.11.3): Yes / No ______
G. Declaration
G1 I declare that the information above is correct and covers the whole common plan of development. Applicant: name, signature, date ______
G2 Prepared by (registered professional, Clause 1.4): name, registration number, signature, date ______
H. For the Authority (Clause 1.5.9)
H1 Determination confirmed / corrected ______
H2 Corrections and reasons ______
H3 Officer: name, designation, signature, date ______

Table 1F.2 — Form 1-1: added impervious area by drainage catchment, linear works (Clause 1.5.7)

Drainage catchment crossed Chainage from – to Added impervious area (m²) 500 m² or more (Yes / No) Storage location: right of way / regional facility
         
         
         

Form 1-2 — Variance / Waiver Request

Supports Clause 1.10 of Chapter 1.

Draft form — Rajasthan Stormwater Design Manual, Draft v1.0. Lodged with the preliminary drainage report (Clause 1.10.4(a)), with one form for each requirement concerned.

Table 1F.3 — Form 1-2: Variance / Waiver Request

No. Item (clause) Entry
A. Applicant and site
A1 Applicant ______
A2 Site address and coordinates ______
A3 Form 1-1 reference and date ______
A4 Tier of the Authority: A / B ______
A5 Site area (ha) ______
A6 Site in a flood-sensitive catchment: Yes / No ______
B. Request
B1 Type: variance from a numeric requirement (1.10.1) / waiver of Chapter 4 detention (1.10.2) ______
B2 Clause of the Manual concerned ______
B3 Value required by the Manual ______
B4 Value or arrangement proposed ______
C. Matters that cannot be varied or waived (Clause 1.10.3) — confirm that the request does not concern any of them
C1 (a) a sewage connection to a storm drain Not concerned: ______
C2 (b) the lowest habitable floor level of Chapter 6 Not concerned: ______
C3 (c) a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or fill or construction in the no-fill zone of Chapter 7 Not concerned: ______
C4 (d) retention in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7 Not concerned: ______
D. Variance: grounds (Clause 1.10.1(a))
D1 Site condition: high groundwater table / contaminated soil / rock / site too small for the required facility / other ______
D2 Evidence (tests, surveys, plans), with references ______
D3 Options assessed and why each is impracticable ______
E. Variance: equal performance or make-up (Clause 1.10.1(b))
E1 Downstream point used (Chapter 5) ______
E2 Performance at that point with full compliance and with the variance (peak flows, water levels) ______
E3 Or: shortfall made up by fee-in-lieu or off-site works in the same catchment — volume (m³), works or fee ______
F. Waiver of detention: grounds (Clause 1.10.2)
F1 Site discharges directly to the sea / to a tidal reach with no flood-prone property downstream ______
F2 Analysis showing that undetained flow does not worsen the outfall-closed condition of Chapter 5 — reference ______
F3 Retention still provided in full: Yes ______
G. Attachments (Clause 1.10.4(a))
G1 Report certified under Clause 10.6 ______
G2 Preliminary drainage report ______
H. Certification and declaration
H1 Certified by (registered professional; empanelled professional where Clause 10.6.1 applies): name, registration or empanelment number, signature, date ______
H2 Applicant: name, signature, date ______
I. For the Authority (Clause 1.10.4)
I1 Referred to the State Stormwater Technical Committee (Tier B, site 1 ha or more): Yes / No; date ______
I2 Decision: granted / granted with conditions / refused ______
I3 Reasons and conditions ______
I4 Entry number in the public register (Clause 10.17) ______
I5 Note: a variance runs with the approval and lapses if the approval lapses (Clause 1.10.4(d)) —
I6 Officer: name, designation, signature, date ______