Draft v1.0 prepared by NEER. Not adopted by the Government of Rajasthan or any authority or local body, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Rajasthan. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration south-west monsoon storms of July–September, brought by monsoon depressions that reach the State late in their track, which can drop several days' rain on a desert town with no outfall, fill the lakes of Udaipur and Ajmer to their spill levels and raise the Chambal at Kota with the releases of the dams upstream, as well as for short-duration intensities;
  • (d) to design outfalls for the levels of the lakes into which city drains discharge, such as the Udaipur lake chain of Pichola, Fateh Sagar and Udai Sagar, Ana Sagar at Ajmer and Kailana and Takhat Sagar at Jodhpur, which spill through gates and escape channels; the stage of the rivers, the Chambal at Kota and Dholpur, raised by the releases of the dams upstream, the Luni at Balotra and the Banas at Tonk; the levels of the nalas and talabs into which local drains discharge; and, where a town has no outfall at all, the level of the depression in which its runoff collects, including the case where the outfall is closed;
  • (e) to protect tanks (talabs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building regulations that each urban local body and development authority brings into force, by publication in the Rajasthan Gazette, on the model issued by the Urban Development and Housing Department with its order of 12 May 2025 (the Model Rajasthan Building Regulations 2025), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Rajasthan's floods come from three sources, often together. The first is the long, heavy storm. On 18–20 July 1981 a low that formed over the State and stagnated gave Jaipur city 82 cm of rain in three days, 35 cm of it in the 24 hours of 19 July; the city was cut off, and downstream in Tonk the Dhund and the Morel flooded and the village of Hingonia was washed away (Gupta & Jindal, Mausam, 1987). IMD records 326.0 mm at Jaipur (Sanganer) that day, and 589.2 mm at Kanota and 550.0 mm at Dausa nearby (IMD). In the desert, where a town may have no outfall at all, the storm is measured against the year: on 19–22 August 2006 about 577 mm fell in three days in Barmer district, whose annual normal is 251.7 mm (IMD), and Kawas and the villages around it stood under water for months; reported deaths range from about 140 to more than 300 (as reported). In the same week every water body around Udaipur was reported to be overflowing and the Army was alerted (as reported). The second source is the rivers and lakes, and the gates that release them. In September 2019 the releases of the dams on the Chambal brought the river at Kota City to 248.68 m, its highest recorded level, against a danger level of 242 m (CWC), with the Kota Barrage reported to be releasing about 6.5–6.9 lakh cusecs and about 2,500 houses submerged (as reported); at Ajmer the escape channel of Ana Sagar, opened when the lake passes its full gauge, waterlogged Hathi Bhata, Brahmapuri and Shivpuri on 11 September 2024 and flooded the city again on 18–20 July 2025 (as reported). The third is the city drainage that fails in a fall that is not extreme. Jodhpur received about 118–119 mm in some five hours on 18–19 July 2022, its heaviest July rain since 1943, and more than 30 colonies were flooded (as reported); at Jaipur, after 173 mm on 31 July–1 August 2024, three members of one family died in a flooded basement in the Vishwakarma Industrial Area (as reported). The 2025 season was the State's second wettest since 1901, at 64% above normal (IMD).

Missing design makes all three worse. The only State rule found for the design of town drains is RUIDP Circular No. 8 of 2008, which asked for a 1–2-year storm and called 12–20 mm/h the usual design intensity, about a quarter to two-fifths of the 1-hour depth that the Jaipur gauge gives for a 5-year storm (Chapter 2); the only city design standard found is the 100-year flood for which JDA rebuilt the Dravyavati, whose design discharge was not found. Catchments, nalas and river corridors have been protected mainly by the courts, from the Ramgarh catchment in 2004 to the Supreme Court's order of 7 August 2026 on the Jojari, and the Model Rajasthan Building Regulations 2025 control rainwater harvesting, not runoff. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Model Rajasthan Building Regulations 2025 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Rajasthan, the top layer has a particular meaning. In a State where about 60% of the land drains inland and much of the west has no defined outfall (as reported), the storage that matters is in the talabs and the earthen johads and nadis of the villages, in the walled taankas and kunds that hold roof and courtyard water, in the baoris of the old towns, in the khadins of the Jaisalmer plains, and in the large sagars and lakes that the cities were built around: the Pichola–Fateh Sagar–Udai Sagar chain at Udaipur, Ana Sagar at Ajmer, Kailana and Takhat Sagar at Jodhpur and Man Sagar at Jaipur. The State has four Ramsar sites, Keoladeo (1981), Sambhar (1990) and Khichan and Menar (both 4 June 2025) (as reported). Losing that storage has a record: the High Court found the catchment of the Ramgarh dam, about 769.20 km² that once supplied Jaipur, so built over and mined that the dam ran dry, and the Supreme Court found it "still bone dry" in 2017 (National Institute of Medical Science University v. State of Rajasthan, 9 Nov 2017). The law protects some of this storage. Public tanks, streams and drains in a municipality vest in it as trustee (Rajasthan Municipalities Act, 2009, s.68); no khatedari rights accrue in pasture and tank-bed land (Rajasthan Tenancy Act, 1955, s.16); the High Court has barred allotment in the catchments of "Johar, Nala, Tank, River, Pond" (29 May 2012) and held that land recorded as gair mumkin nala is a natural channel that cannot be diverted even for a public purpose (Ramji Lal Saini, 7 May 2026); and the Lakes Act of 2015 protects the "flow area" of a lake, the area through which its feeders flow (s.2(viii), as read from the Bill text). The Rajasthani word agor, used for the catchment of a tank, has no dictionary or statutory source found for this Manual, so the statutory "flow area" is used instead. Losing that storage cannot be offset economically by pipes and pumps.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Rajasthan through:

  • (a) an amendment to the Model Rajasthan Building Regulations 2025 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Rajasthan the building rules are the Model Rajasthan Building Regulations, 2025 (मॉडल राजस्थान भवन विनियम, 2025), issued by the Urban Development and Housing Department (UDH) with its order No. P.11(5) नविवि/Building Regulations-2025/2025 dated 12 May 2025, which invokes the byelaw and regulation powers of the Rajasthan Municipalities Act, 2009 (s.337), the Rajasthan Urban Improvement Act, 1959 (s.104-A), and the Acts of the development authorities of Jaipur, Jodhpur, Ajmer, Kota, Udaipur, Bikaner and Bharatpur. Each urban local body or authority brings the regulations into force by its own publication in the Rajasthan Gazette (reg. 1.2), so the date from which they apply varies by city and is to be confirmed for each [TBC]; one secondary source gives 5 December 2025. On taking effect they repeal the earlier building regulations and their amendments (reg. 18.1). Their predecessors were the Model Building Regulations of 2020 and the versions each authority notified, such as JDA's (Jaipur Region) Building Regulations, 2020, published in the Gazette on 7 January 2021. An amendment of 2026 is reported to lift the caps on building height (as reported; text not read). This Manual cites the 2025 text as read from a third-party copy. The regulations require rainwater harvesting on plots of 225 m² and more (reg. 8.3; 300 m² under the 2020 regulations), a green area of 10–20% of larger plots with at least half of it on natural ground (reg. 8.1), and, for buildings of 5,000–20,000 m² built-up, that the inlet and outlet points of the natural drainage be kept as they are, with one recharge bore for each 5,000 m² and at least 20% of the open space unpaved (the environmental schedule, as read in JDA's 2020 text); they set the plinth at least 0.45 m above the road in front (reg. 6.6). They set no design storm, return period, release rate or detention volume, no "zero runoff" rule, and no setback from a nala, river or lake. The route of Clause 1.3.1(a) therefore runs through UDH, which would amend the model, and through each urban body and authority, which would publish the amendment for its area. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Municipal Corporation, Municipal Council or Municipal Board, the development authority or the Urban Improvement Trust that approves building plans and layouts in its area under the building regulations in force there, including approval through an empanelled architect where those regulations allow it (Model Rajasthan Building Regulations 2025, chapter 11); or RIICO in its industrial areas, under its own building regulations [TBC], or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Model Rajasthan Building Regulations 2025 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the Dravyavati and the nalas that join it through Jaipur, with the low-lying colonies of the city that drain to them; the catchments of the Jojari and of the Bhairav, RTO and other city nalas at Jodhpur, and the old city of Jodhpur, where the water table has risen close to the ground; the land that drains to the Udaipur lake chain of Pichola, Swaroop Sagar, Fateh Sagar, the Ayad (Ahar) and Udai Sagar; the catchment of Ana Sagar at Ajmer and the land along its escape channel; the land of Kota that drains to the Chambal, where the river is raised by the releases of the dams upstream; and Balotra and the land that drains to the Luni there, with Barmer town and the low ground of its district, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (talab), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Model Rajasthan Building Regulations 2025 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Rajasthan Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Model Rajasthan Building Regulations 2025;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Rajasthan, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under regulation 8.3 of the Building Regulations 2025 to every plot of 225 m² and more, by a rainwater harvesting unit or structure or a rooftop rainwater storage tank with a filter, secured by a refundable deposit of ₹50,000–₹5 lakh that is returned only after the Ground Water Department, WRD or an experienced engineer reports that the structure works, except in waterlogged areas once the local body has marked them; and under section 238 of the Rajasthan Municipalities Act, 2009, which bars a public water connection to a new building without the Municipality's certificate that the structure has been built (as read from a third-party copy), as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Rajasthan plots are small and the cumulative effect of many small plots is what fills Jaipur's drains. For small buildings in Rajasthan, regulation 8.3 of the Building Regulations 2025 requires a rainwater harvesting unit or structure, or a rooftop rainwater storage tank with a filter, on plots of 225 m² and more, secured by a refundable deposit of ₹50,000 on the smallest plots and returned after the Ground Water Department, WRD or an experienced engineer reports that the structure works (Schedule 2). None of this is sized to a runoff volume, none of it limits what leaves the plot, plots below 225 m² have no rule at all, and a plot in a waterlogged area that the local body has marked is exempt (reg. 8.3(iii)). The regulations set the plinth at least 0.45 m and at most 1.2 m above the road in front (reg. 6.6), and JDA's 2020 regulations kept the roof of a basement outside the building to 1.20 m above the road (reg. 11.6(v)); but neither height is related to any flood level, and no clause on keeping surface water out of a basement was found in the pages read. At the start of August 2024 three people died in a flooded basement in Jaipur (as reported). Clause 1.5.4(b) applies to every building whatever its size for this reason.

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Jaipur Municipal Corporation (JMC), and JDA and every other Approving Authority within the Jaipur Region of JDA;
  • (b) every other Municipal Corporation constituted under the Rajasthan Municipalities Act, 2009, as constituted from time to time; and
  • (c) every other development authority constituted by an Act of the State (JoDA, AjDA, KDA, UDA and the Bikaner and Bharatpur Development Authorities, and any constituted later), with every Approving Authority within its region.

1.6.2 Tier B authorities. All other Municipal Councils and Municipal Boards are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with UDH regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the region of a development authority (JDA, JoDA, AjDA, KDA, UDA or the Bikaner or Bharatpur Development Authority) as notified under its Act, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Jaipur Municipal Corporation, with its engineering wing and a city of nalas that drain to the Dravyavati, the 47.5 km channel that JDA rebuilt to pass the 100-year flood, and a small Municipal Board with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Jaipur.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Model Rajasthan Building Regulations, 2025 (UDH order No. P.11(5) नविवि/Building Regulations-2025/2025 of 12 May 2025; in force in each urban area from its publication in the Rajasthan Gazette by the local body or authority, a date to be confirmed for each [TBC]); their predecessors, the Model Building Regulations, 2020 and the authorities' versions, such as JDA's of 7 January 2021, repealed by reg. 18.1 Continue. They require rainwater harvesting on plots of 225 m² and more (reg. 8.3); a green area of 10–20% of non-commercial plots of more than 750 m², at least half of it on natural ground with no slab below (reg. 8.1); for buildings of 5,000–20,000 m² built-up, the natural drainage inlets and outlets kept as they are, with channels sized for unobstructed flow, one recharge bore for each 5,000 m² and at least 20% of the open space unpaved (environmental schedule; read in JDA's 2020 text); and a plinth at least 0.45 m above the road in front (reg. 6.6). Underground tanks, drains and catch chambers in the setbacks are not counted in ground coverage (reg. 4.13). Norms set for lake protected areas override the regulations (JDA 2020, reg. 10.4). They set no design storm, release rate or detention volume, and no setback from a nala, river or lake; the design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the regulations, a master plan, a statute or a court order are stricter, they govern (Clause 1.3.3).
Rainwater harvesting: Building Regulations 2025, reg. 8.3 and Schedule 2; Rajasthan Municipalities Act, 2009, s.238; Rajasthan Urban Improvement Act, 1959, s.73(c) Continue unchanged. Regulation 8.3 makes a rainwater harvesting unit or structure, or a rooftop rainwater storage tank with a filter, compulsory on plots of 225 m² and more, secured by a refundable deposit of ₹50,000–₹5 lakh that is returned only after the Ground Water Department, WRD or an experienced retired engineer reports that it works, and exempts waterlogged areas once the local body has marked them. Section 238 makes harvesting compulsory in government buildings and, as the byelaws prescribe, in every other building, with a fine of ₹10,000–20,000, and bars a public water connection to a new building without the Municipality's certificate that the structure has been built (as read from a third-party copy). The 2020 regulations cite s.73(c) of the 1959 Act, which was not read [TBC]. The Rajasthan Ground Water (Conservation and Management) Authority Act, 2024 (Act No. 20 of 2025) is in force only from a date to be notified, and no commencement notification was found [TBC]. The State drew 149.86% of its annual extractable groundwater in 2024, and 214 of its 302 assessment units were over-exploited (CGWB). None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge structures may count toward retention where they meet Chapters 4 and 8, which make recharge the first choice across the State, with pre-treatment, except in the old city of Jodhpur and the Ganganagar–Hanumangarh canal belt, where the water table is shallow and a groundwater check comes first.
Rajasthan Municipalities Act, 2009 (Act 18 of 2009), ss.45, 68, 200–215 and 238 (as read from a third-party copy; amendments not checked [TBC]) Continue. Drainage, sewerage and the drains, culverts, tanks and dams of the area are among the Municipality's duties (s.45); public tanks, streams, reservoirs and their adjacent public land, and the public drains, channels, culverts and watercourses in, alongside or under any street, vest in it as trustee (s.68); all drains within the Municipality are under its survey and control (s.200); no building may be built, rebuilt or occupied without a drain at the level and fall the Municipality requires, discharging to a municipal drain within 50 ft or else to a cess-pool (s.202); sewage and rain-water drains are to be distinct (s.204, by its title; text not obtained [TBC]); and no drain may be connected to a municipal drain, and no building built over one, without the Municipality's written consent (s.213). This Manual does not change those powers; Chapter 7 treats tanks as drainage assets and Chapter 8 keeps sewage out of storm drains.
Rajasthan Urban Improvement Act, 1959; the Jaipur Development Authority Act, 1982, the Jodhpur Development Authority Act, 2009, the Ajmer Development Authority Act, 2013, the Kota and Udaipur Development Authority Acts, 2023, and the Bikaner and Bharatpur Development Authority Acts, 2025 Continue. They constitute the Urban Improvement Trusts and the development authorities, which prepare master and zonal plans and approve schemes and layouts in their areas, and they are among the parent Acts of the Building Regulations 2025 (s.104-A of the 1959 Act, s.90 of the JDA Act, s.85 of the Jodhpur and Ajmer Acts and s.88 of the others, as cited in the order of 12 May 2025). Their texts were not read for this Manual [TBC]. The High Court has held that a master development plan cannot disturb hills, forests, rivers, lakes or catchments (Gulab Kothari, 12 Jan 2017). This Manual does not decide zoning; the drain reserves and regional facility sites of Chapters 4 and 7 are meant to be shown in those plans.
Rajasthan Lakes (Protection and Development) Authority Act, 2015 (Act No. 5 of 2015; read from the authorised translation of the Bill, not the enacted text [TBC]) Continues. A "lake" is any inland water body, recorded or not and holding water or not, that had a submerged area of at least 3 ha (of socio-cultural, heritage or religious importance) or 10 ha (otherwise) at any time in the fifty years before the Act; its "flow area" is the area through which streams or feeders flow to it (s.2). The State may notify a lake's boundaries and a protected area around it; town planning authorities must consult the Rajasthan Lakes Development Authority, and a plan covering a lake needs its prior approval; no construction in a protected area is allowed without permission; and the Authority may remove an obstruction in the protected area or the flow area (ss.4–6). No notification of lake boundaries or protected areas under the Act was found [TBC]. Chapter 7 treats the flow area as the catchment it protects.
Rajasthan Tenancy Act, 1955, s.16, and the revenue records (land recorded as gair mumkin nala, nadi or talab) Continue. Khatedari rights do not accrue in pasture land, tank-bed land and the other classes listed (s.16, as quoted by the Supreme Court; the full list not read [TBC]). The High Court has barred allotment of land in the catchments of "Johar, Nala, Tank, River, Pond" and ordered cancellation of allotments made against s.16 (29 May 2012), and has held that land recorded as gair mumkin nala is a natural drainage channel that cannot be diverted, obstructed or altered even for a public purpose (Ramji Lal Saini, 7 May 2026). Chapter 7 uses the recorded extent of a nala, nadi or talab as the least extent of its corridor.
Wetlands (Conservation and Management) Rules, 2017; the Rajasthan State Wetland Authority; the four Ramsar sites of the State Continue. The Rules regulate activities within notified wetlands and their zone of influence. The State Wetland Authority was set up in 2019 and reconstituted in 2020, and 75 wetlands were reported notified by January 2026 (as reported). The Ramsar sites are Keoladeo (1981), Sambhar (1990), and Khichan and Menar (4 June 2025) (as reported). On 1 June 2026 the High Court ordered a district-wise survey of wetlands and barred encroachment, filling, construction and the discharge of untreated sewage into wetlands or their catchments, pending further orders (suo motu, Jodhpur). Where a notification or an order is wider than the setback of Chapter 7, it governs (Clause 1.3.3).
Orders of the Supreme Court, the High Court and the National Green Tribunal on catchments, channels, lakes and rivers Apply where they bind. Ramgarh dam: the High Court ordered the catchment of the dam, about 769.20 km², cleared of construction and mining (Abdul Rahman, DBCWP 1536/2003, 2 Aug 2004; suo motu SBCWP 11153/2011, orders of 23 Aug 2011 and 29 May 2012), and the Supreme Court confirmed the line and ordered demolition on encroached land in 2017 (NIMS University, 9 Nov 2017). Natural channels: Gulab Kothari (DBCWP 1554/2004, 12 Jan 2017) and Ramji Lal Saini (7 May 2026), above. Rivers: on 7 August 2026 the Supreme Court ordered the State to determine and demarcate the high flood line and an ecological buffer for all the river systems of the State, barred fresh permissions for industrial, commercial or residential development within the identified river corridors until then, and directed a River Commission or River Rejuvenation Authority under the Chief Secretary (In Re: 2 Million Lives at Risk, Contamination in Jojari River, Rajasthan, Suo Motu WP (C) 8 of 2025); an interim order of 24 August 2026 is reported to bar construction within 100 m of the edge of the Jojari (as reported). Wetlands: the High Court's order of 1 June 2026, above. Udaipur: a no-construction zone around Pichola and Fateh Sagar dates from a notification of 17 January 1997, and the High Court is reported to have held a project within 200 m of the high flood level of Udai Sagar void (as reported). Ajmer: the NGT ordered the removal of structures built on the Ana Sagar wetland, among them the Seven Wonders park, in 2023, the Supreme Court refused to interfere in 2023–2025, and demolition of the park began on 12 September 2025 (as reported). The hydraulic corridor and setbacks of Chapter 7, with a Zone 1 of at least 15 m, are this Manual's proposals; where a court's line binds and is wider, it governs.
Disaster Management Act, 2005; RSDMA; the State and district control rooms Continue. The State and district control rooms are reported to run round the clock from 15 June each monsoon (as reported). No urban flood plan or SOP of RSDMA was found, and the State Disaster Management Plan found is dated 2014 (as reported) [TBC]. Chapter 10 links its pre-monsoon checks to these dates.
RUIDP Circular No. 8, "General guide lines for Drainage Sector work to be taken under RUSDIP" (4 March 2008) Superseded for works designed under this Manual. The circular asked for a design return period of 1–2 years for the drains of the RUSDIP towns, 25 years for culverts and 50 years for bridges, and described design intensities as "usually in the range of 12mm/hr to 20mm/hr". It is cited as the history of practice; the return periods of Table 2.1 and the rainfall of Chapter 2 apply instead.
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Rajasthan is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July or August monsoon depression arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Rajasthan is spending on its nalas and city rivers. JDA rebuilt about 47.5 km of the Dravyavati (the Amanishah nala) through Jaipur as a channel to pass the 100-year flood, with sewage treatment plants of 170 MLD, at a reported cost of ₹1,490.85–1,676 crore (JDA EIA; the higher figure includes ten years of maintenance, as reported); it began a ₹80 crore drainage upgrade of the city with a storm water model in 2025 (as reported); and the ADB-funded RUIDP programme is building new drains at Jodhpur, the 13.1 km Bhairav nala and the 7.0 km RTO nala to the Jojari (ADB resettlement plan, 2023). Of these works only the Dravyavati has a stated design standard, and its design discharge and rainfall were not found. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law already holds many of the tools. Public tanks, streams, drains and watercourses vest in the Municipality as trustee (Rajasthan Municipalities Act, 2009, s.68); no building may be built or occupied without a drain "for the effectual drainage" of it, at the level and fall the Municipality requires (s.202), or built over a municipal drain without consent (s.213(2)); and sewage and rain-water drains are to be kept distinct (s.204, by its title). The Lakes Act of 2015 gives lakes and their flow areas to an Authority whose approval a plan covering a lake needs; revenue law and the High Court keep land recorded as gair mumkin nala, nadi or talab to its recorded use; and the Supreme Court has ordered the State to demarcate the high flood line and an ecological buffer for all its river systems (7 Aug 2026). What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how wide a nala's corridor must be, or how much storage a filled talab or a paved plot removes. This Manual's checks are framed as part of the building plan and layout approval of the local bodies, the development authorities and the Urban Improvement Trusts, and of the test behind the refund of the rainwater harvesting deposit, not as a separate NOC. This Manual is offered as a technical companion to these instruments, to the orders of the courts on catchments, channels, lakes and rivers, and to the drainage works of the cities: it supplies the design storm, detention and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the Urban Development and Housing Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Urban Development and Housing Department (UDH) Issues the Building Regulations 2025 (order of 12 May 2025) and oversees the development authorities, the Urban Improvement Trusts and the master plans, through the Chief Town Planner. Would prepare the amendment of Clause 1.3.1(a) as a model for the urban bodies to publish, give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7).
State Stormwater Technical Committee (Clause 1.3.2) Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Local Self Government Department and the Directorate of Local Bodies (LSG/DLB) Oversee the Municipal Corporations, Councils and Boards under the Rajasthan Municipalities Act, 2009; the Department is the executing agency of RUIDP (as reported). Would issue the model ULB bye-law of Clause 1.3.1(b) and require this Manual in the drainage works of the local bodies.
Jaipur Municipal Corporation (JMC) and the other Municipal Corporations; Municipal Councils and Municipal Boards Hold the public drains, watercourses and tanks of their areas in trust (Rajasthan Municipalities Act, 2009, s.68), keep all drains under their survey and control (s.200), require a drain for every building (s.202), and approve building plans. The twin corporations of Jaipur, Jodhpur and Kota are reported to have been merged again in 2025 (as reported; notifications not seen [TBC]). Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15).
Development authorities (JDA, JoDA, AjDA, KDA, UDA and the Bikaner and Bharatpur Development Authorities) and the Urban Improvement Trusts Prepare master and zonal plans and approve schemes, layouts and building plans in their regions; JDA rebuilt the Dravyavati and acts against encroachment of catchment land (as recorded by the Supreme Court, 2017). Their drainage functions under their Acts were not researched for this Manual [TBC]. Would apply this Manual to their schemes, show drain reserves and regional facility sites in their plans, and hand over drains and storage to the local body under Clause 10.14.
Rajasthan Urban Infrastructure Development Project (RUIDP) Executes ADB-funded urban works, including storm-water drains at Jodhpur (as reported); its Circular No. 8 of 2008 set the drainage design rules for the RUSDIP towns. Would apply this Manual in its DPRs and designs.
WRD Holds the dams, reservoirs and irrigation tanks of the State and their gates, and, with the District Environment Committees, is surveying the high flood lines and buffers on the Jojari under the Supreme Court's orders (2026). Would provide design river and reservoir levels, maximum water levels, gate-operation rules and release schedules for Chapter 5, consent to outfalls into its works, and certify rainwater harvesting for the refund of the deposit where asked (reg. 8.3(ii)).
Public Health Engineering Department (PHED) Supplies drinking water, and is reported to give water connections to buildings on plots of 225 m² and more only after the recharge structure is built (as reported). Would apply Chapter 8 to the protection of supply sources from storm runoff.
Ground Water Department Certifies rainwater harvesting structures for the refund of the deposit (reg. 8.3(ii)). Would supply groundwater levels and quality with CGWB for Chapters 4 and 8, and advise on the groundwater check in the old city of Jodhpur and the canal belt.
Rajasthan Lakes Development Authority Constituted under the Lakes Act of 2015; consulted on plans covering a lake, and gives permission for construction in a notified protected area (ss.5–6). Would certify the boundary, full level and flow area of a notified lake for Chapter 7.
Rajasthan State Wetland Authority Set up under the Wetlands Rules 2017; keeps the list of notified wetlands, 75 by January 2026 (as reported), and is a respondent in the High Court's wetlands case (2026). Would permit regulated activities in notified wetlands (Chapter 7).
RSDMA and the District Disaster Management Authorities Approve the State and district disaster management plans; the control rooms are reported to run round the clock from 15 June (as reported); its urban flood work was not researched [TBC]. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the Collectors, and lead the post-event review (Clause 10.16).
Rajasthan State Pollution Control Board (RSPCB) Grants consents to industries and monitors rivers, lakes and drains, including the Jojari under the Supreme Court's supervision. Supports the removal of sewage and effluent from storm drains (Chapter 8).
Rajasthan State Industrial Development and Investment Corporation (RIICO) Develops and regulates industrial areas under its own building regulations (as reported); its drains at Jodhpur are reported by the Supreme Court to discharge into municipal drains. Would apply this Manual in its industrial areas.
Revenue Department: the Collectors and the tehsil offices Keep the revenue records in which tanks, nalas, nadis and their catchments are recorded as gair mumkin land, act against encroachment of public land, and lead flood relief. Would certify the recorded extent of a nala, nadi or talab for Chapter 7.
River Commission or River Rejuvenation Authority (directed by the Supreme Court, 7 Aug 2026) To be constituted under the Chief Secretary, with a mandate that includes the high flood lines and catchments of the State's rivers; its constitution was not found [TBC]. Would supply the high flood lines and buffers that Chapter 7 applies where they bind.
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Reports for subzones 1(a), 1(b), 1(e) and 3(a) used in Chapters 2 and 3, and the river levels at its flood forecasting sites, such as Kota City and Dholpur on the Chambal. Would supply river stage records and forecasts for Chapter 5.
Central Ground Water Board (CGWB), a body of the Union Assesses the groundwater units of the State and their categories. Would supply groundwater levels and quality with the Ground Water Department.
National Institute of Hydrology (NIH), Roorkee Runs NIH-DHAARA (Chapter 2).
IMD (Meteorological Centre Jaipur), and road and rail owners (the Public Works Department, NHAI, Indian Railways) IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Rajasthan is split between UDH, through the building regulations, the master plans and the development authorities and Urban Improvement Trusts; the Local Self Government Department, through the Municipal Corporations, Councils and Boards and the drains vested in them; WRD, through the dams, reservoirs and irrigation tanks and their gates; the Lakes Development Authority, through the notified lakes and their flow areas; the Revenue Department, through the revenue records of nalas, nadis and talabs; and the State Wetland Authority, with the courts setting the catchment, channel, lake and river lines. Ajmer shows why the split matters. The city floods when the escape channel of Ana Sagar is opened in heavy rain (as reported), but the lake, its gates, the escape channel and the colonies along it fall to different bodies, and no order found says who sets the level at which the gates open [TBC]. The Municipalities Act vests public drains, streams and tanks in the Municipality (s.68), but no rule or order found divides the natural nalas from the municipal drains, or the lakes from the dams and channels below them, between the local bodies, the development authorities and the State's departments [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Rivers and their floodplains, dams and reservoirs with their gates (such as the Kota Barrage, Ramgarh and Bisalpur), and irrigation tanks WRD, with the River Commission or River Rejuvenation Authority for high flood lines once constituted
Lakes within a city (such as Pichola and Fateh Sagar at Udaipur, Ana Sagar at Ajmer and Kailana and Takhat Sagar at Jodhpur), with their gates and escape channels The Lakes Development Authority for a notified lake, and otherwise the local body for the lake and WRD for the gates, until an order assigns them otherwise [TBC]
Natural nalas and city rivers within a Municipal Corporation or a development-authority region (such as the Dravyavati at Jaipur and the Bhairav and RTO nalas at Jodhpur), with their reserves The Municipal Corporation (s.68), or the development authority for a channel it has built until it hands it over
Land recorded as gair mumkin nala, nadi or talab outside municipal limits, and village tanks The Revenue Department (Collector), with the Panchayat that manages the tank
Road-side and lane drains and public tanks within the limits of a local body The Municipal Corporation, Municipal Council or Municipal Board
Drains and storage within a scheme of a development authority or Urban Improvement Trust, until handed over The development authority or Trust
Drains within an industrial area RIICO
Sewers, interceptors and the interception and diversion of nalas, and sewage treatment plants The local body or the body executing the work for it
Drains of State and national highways The Public Works Department or NHAI
Notified wetlands and Ramsar sites The Rajasthan State Wetland Authority, with the owner of the land

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Rajasthan has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a lake held by gates or an escape channel, as at Udaipur and Ajmer, to a river raised by dam releases, as the Chambal at Kota, or to a depression with no outfall, as in much of the west, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Rajasthan the High Court found the catchment of the Ramgarh dam, which once supplied Jaipur, so built over and mined that the dam ran dry, and the Supreme Court recorded in 2017 that "nothing substantive appears to have been achieved on the ground over the years" (National Institute of Medical Science University v. State of Rajasthan, 9 Nov 2017).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Municipal Corporations and of the regions of the development authorities
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model Building Regulations 2025 amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request