Draft v1.0 prepared by NEER. Not adopted by the Government of Rajasthan or any authority or local body, and has no legal force. About this draft

Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, talab and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Rajasthan's cities are spending on their drains and channels, but no city drainage master plan with a design standard has been published. The largest work is JDA's Dravyavati River Project in Jaipur, which rebuilt the Dravyavati, a river that had become a storm and sewage channel (the Amanishah nala), over 47.5 km, in two phases of 34.84 km and 12.66 km, from the Nahargarh hills to its outfall to the Dhund; it collects the Naharika, Ambabari, Ganda and Jawahar nalas, was designed "to make the river section capable of safely passing the hundred year flood", and includes treatment plants of 170 MLD (JDA EIA; Supreme Court, 2026). Its cost is given as ₹1,676 crore, including ten years of maintenance, by the contractor (Tata Projects) and as ₹1,490.85 crore for the two phases in the EIA, and it was inaugurated on 2 October 2018 (as reported); its design discharge was not found. JDA began a monsoon drainage upgrade of about ₹80 crore in May 2025 built on an integrated storm water model, the first in Jaipur (as reported), whose return period and consultant were not found. In Jodhpur RUIDP, with ADB finance, is building the 13.1 km Bhairav nala and the 7.0 km RTO nala and Mata ki Than drain to the Jojari (ADB, 2023), with no design return period stated; RUIDP's own guidance of 2008 allowed 1–2 years for town drains. Udaipur's lakes, Ajmer's Ana Sagar and Kota's outfalls to the Chambal are managed by gate operation and, at Udaipur and Ana Sagar, by court orders on their margins, not by a drainage plan; for Ana Sagar the State engaged NEERI and MNIT after the Supreme Court's orders (as reported). The drainage chapter of the Master Development Plan of the Jaipur Region was not found. No published document sets a design return period for the storm drain network of any Rajasthan city; the only design standard found for any urban channel is the 100-year flood of the Dravyavati. This chapter supplies the design storm, levels of service, storage and buffer criteria that such a plan needs, with the design storms of Chapter 2 and the levels of service of Clause 11.6; it has not been adopted by UDH, the LSG Department, any Municipal Corporation, development authority or Urban Improvement Trust, or any other body. A site-level manual cannot fix basin-level problems: lost tank storage, nalas and natural channels recorded as gair mumkin nala built over or diverted, city outfalls to lakes held at their full level by gates and escape channels and to the Chambal, which barrage releases can hold high for days, nalas that carry sewage and industrial effluent into the Dravyavati, the Jojari and the Udaipur lakes, catchments in the west with no outfall at all, single drains split between a Municipal Corporation, a development authority or Urban Improvement Trust, RIICO and WRD, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to Rajasthan: to city outfalls on lakes whose levels are held by gates and escape channels, as at Ana Sagar in Ajmer and in the chain of lakes at Udaipur, and on the Chambal at Kota, which releases from the Kota Barrage and the dams above it can hold high for days; to the west of the State, where about 60% of the land drains inland and many catchments have no outfall at all, so that storage, infiltration and evaporation take the place of an outfall; to nalas that carry sewage, industrial effluent and solid waste into the Dravyavati, the Jojari and the lakes; to drains and public tanks vested in the Municipalities, scheme drains of the development authorities and Urban Improvement Trusts, industrial drains of RIICO, rivers and dams held by WRD, natural channels recorded as gair mumkin nala that the High Court protects, and lakes under the Lakes Act 2015, without an order that divides the nalas between them; to a State where the courts, not a floodplain law, draw the lines along rivers and lakes, and the Supreme Court has ordered a High Flood Line for every river system; to a State with no published design return period for the drains of any city except the 100-year Dravyavati channel; to aquifers over-exploited across most of the State but rising beneath the old city of Jodhpur and the canal plains; and to a south-west monsoon whose recorded days far exceed the 50-year depths of the CWC plates, 326.0 mm at Jaipur on 19 July 1981 and 653.0 mm at Mount Abu on 8 September 1992 (IMD).


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 No basin delineation has been published for any Rajasthan city. For the urban areas where the evidence identifies them, the basins are at least the following:

  • Jaipur, Dravyavati: the catchment of the Dravyavati from the Nahargarh hills to its outfall to the Dhund, with the Naharika, Ambabari, Ganda (walled city) and Jawahar nalas and the Sanganer area as sub-basins, the rebuilt channel and its fall structures in the 1D network, and its interception works and treatment plants mapped (Clause 8.9.5);
  • Jaipur, Man Sagar: the catchment of Man Sagar (Jal Mahal), reported as 23.5 km², with the Brahmapuri and Nagtalai nalas, and the lake level as the boundary condition of every drain that enters it;
  • Jaipur, Ramgarh: the catchment of the Ramgarh dam, about 769.20 km² over four tehsils, in the parts that the city and the JDA region reach, with the catchment line drawn under the High Court's orders shown;
  • Jodhpur, Jojari: the catchments that drain south and south-east to the Jojari, among them the Bhairav nala and the RTO nala, with Kailana (full reservoir level 273.7 m) and Takhat Sagar (269.75 m) as storage linked by gated conduits, the rising water table of the old city as a design condition, and the High Flood Line and buffer of the Jojari, once demarcated, shown;
  • Udaipur, lakes: the catchments of Pichola and Fateh Sagar, fed by Bada Madar, and of the Ayad below them to Udai Sagar, with the gated link between Pichola and Fateh Sagar and the lake spills to the Ayad as gated links between basins (Clause 11.3.2), and each lake's level as the boundary condition of the drains that enter it;
  • Ajmer, Ana Sagar: the catchment of Ana Sagar, with the lake held at its full gauge as the boundary condition, the outfall-closed case a design case, and the escape channel and the colonies along it as a gated link to the basin below;
  • Kota, Chambal: the catchments of the city that outfall to the Chambal, with the river level at the CWC Kota City site, which releases from the Kota Barrage and the dams above it govern, as the boundary condition and the outfall-closed case a design case; and
  • No-outfall towns of the west: for Bikaner and the other towns whose catchments end inland, each terminal depression or basin with the land draining to it, tested with the 72-hour design volume of Clause 4.12.7 and no outflow other than infiltration and evaporation.

Other Tier A bodies, including Alwar, Bharatpur, Bhilwara, Sikar, Pali, Sri Ganganagar and Tonk, shall define their basins in the first BSMP that covers them. Where WRD, CWC, the custodian of a lake or a court has a high flood level, a full tank level or maximum water level, a High Flood Line or buffer, a lake protected area, or an operating rule for a dam, a barrage, a lake gate or escape channel or a pumping station, the BSMP shall take its boundary conditions from it and show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, river levels, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, river, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. In Rajasthan a single nala can pass through several hands on its way to a lake, a river or a depression. The Rajasthan Municipalities Act 2009 vests in the Municipality, as trustee, the public tanks and streams and the drains and watercourses in, alongside or under any street (s.68), and puts all drains within it under its survey and control (s.200); the development authorities and Urban Improvement Trusts build the drains of their schemes; RIICO runs the drains of its industrial areas, which the Supreme Court found discharging into municipal drains at Jodhpur (2026); the rivers, dams and their High Flood Lines are with WRD; natural channels recorded as gair mumkin nala are State land that the High Court has held may not be diverted or built on (Ramji Lal Saini, 2026); and the lakes fall under the Lakes Act 2015, though no lake boundary or protected area was found notified. No rule divides the natural nalas from the municipal drains (as this Manual reads the record), and the Supreme Court has found the Rajasthan River Basin and Water Resources Planning Authority, meant to plan by river basin, "largely defunct" (7 August 2026). The drains carry sewage across these boundaries: Jaipur's nalas reach the Dravyavati, whose project treats 170 MLD, and Jodhpur's sewage, put at about 230 MLD against treatment of about 175 MLD in 2026, and industrial effluent reach the Jojari (Supreme Court, 2025–26). This clause makes the basin the planning unit, so that one model carries each drain from its head to the lake, river or depression whoever owns each reach, and so that the interception structures are tested against the capacity of the drains they tap (Chapter 8, Clause 8.9.5).


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For the basins of a city with a Municipal Corporation: the Municipal Corporation (in Jaipur, JMC), in which the Rajasthan Municipalities Act 2009 vests the public tanks, streams and street drains (s.68) and which must provide drainage (s.45), jointly with the development authority or Urban Improvement Trust for the city (in Jaipur, JDA), which prepares the master development plan into which the BSMP is carried (Clause 11.9) and builds the drains of its schemes; either may prepare the plan as UDH directs. Where a basin extends beyond the Corporation, the other local bodies and the development authority or trust in the basin are partners, and one BSMP covers the whole basin (Clause 11.3.1). The twin corporations of Jaipur, Jodhpur and Kota were reported merged again into one corporation each in 2025 (as reported); the Lead Authority is the corporation as it stands when the BSMP is prepared.
  • No order dividing the natural nalas from the municipal drains, or the drains of the local bodies from the rivers and dams of WRD, was found; until one is made, this Manual assigns the reaches within each BSMP as follows, each body being Lead Authority for the reaches and works it owns or runs and for the parts of the CIP on them: WRD for the rivers, dams, barrages and reservoirs, their gates and releases, and their high flood levels, with the River Commission or River Rejuvenation Authority that the Supreme Court has directed (7 August 2026), once constituted, for the High Flood Lines and ecological buffers of the rivers; the Rajasthan Lakes Development Authority, with the custodian of each lake, for the lakes under the Lakes Act 2015, their full tank level lines, gates and escape channels, protected areas and flow areas; the Rajasthan State Wetland Authority for notified wetlands; the Municipal Corporation, Municipal Council or Municipal Board for the municipal nalas, street drains and public tanks vested in it (s.68); the development authorities and Urban Improvement Trusts for the drains of their schemes until they are handed over; RIICO for the drains of its industrial areas; the Collector for the nalas, nadis and talabs recorded as gair mumkin in the revenue records in the parts of a basin outside municipal limits; and PWD and NHAI for the drains of their roads.
  • In Tier B bodies: the Lead Authority is named by UDH with the LSG Department. Basins draining to a common river reach, lake or depression may be grouped into one district-level plan.

The Rajasthan Lakes Development Authority shall be consulted on every BSMP whose basin includes a lake, since the land-use plan into which it is carried needs that Authority's prior approval (Lakes Act 2015, s.5); the Rajasthan State Wetland Authority shall be consulted on every BSMP whose basin drains to a notified wetland or a Ramsar site (Keoladeo, Sambhar, Khichan or Menar); RSDMA and the district administration on every BSMP; and the Rajasthan State Pollution Control Board on every BSMP that proposes works on a drain that carries sewage or effluent to a lake or river.

WRD shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, talab, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls, rivers, lakes and terminal depressions The datum of every level named, with lake gauge readings in feet above a local zero converted to metres once the zero has been surveyed; outfall invert levels against the warning, danger and high flood levels of the receiving river at the nearest CWC or WRD gauge and its recorded peaks (for the Chambal at Kota City, a danger level of 242 m and a high flood level of 248.68 m in 2019); for outfalls to lakes and reservoirs, the full tank level, maximum water level and dead-storage level from WRD or the custodian, the gate and escape-channel operating rule and any conflict between published values (for Fateh Sagar, a full gauge of 13 ft against 14 ft); for a catchment with no outfall, the stage–storage, infiltration and evaporation of the terminal depression or basin; the lines drawn under court orders where they bind, such as the High Flood Line and ecological buffer that the Supreme Court has directed for the rivers of the State, once demarcated; the sluices, flap gates, escape channels, interception structures, anicuts, check dams and pumping stations on the outfalls, with their capacities and operating rules; and releases from any dam or barrage upstream
Rainfall and levels All available rain gauges (IMD, including its observatories at Jaipur (Sanganer), Jodhpur, Bikaner, Jaisalmer, Barmer, Ajmer, Kota, Udaipur and Mount Abu and the automatic weather stations and rain gauges reported by the Meteorological Centre Jaipur; the district and tehsil rain gauges of the State; the rain and river gauges of CWC and of WRD, including those at the dams, barrages and lakes; and any gauges kept by the Municipal Corporations, the development authorities and the Smart City companies) and water-level records, including those for the July 1981 (Jaipur), August 2006 (Barmer and Udaipur), September 2019 (Kota and the Chambal), July 2022 (Jodhpur) and July–August 2024 (Jaipur) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the flat interdune and canal plains of the west, around the terminal depressions in which catchments with no outfall end, on the Jaipur plain, along the Chambal at Kota, and around the margins of the lakes of Udaipur and Ajmer, where the line of the full tank level decides what may be built, a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The July 1981 (Jaipur), August 2006 (Barmer and Udaipur), September 2019 (Kota and the Chambal), July 2022 (Jodhpur) and July–August 2024 (Jaipur) events are the best calibration data Rajasthan has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and talab storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been reported but not measured. In law the State's lakes and tanks are protected in several layers: the Lakes Act 2015 treats as a lake any water body that had a submerged area of at least 3 ha (heritage or religious) or 10 ha (others) at any time in the fifty years before the Act, "whether it contains water or not and whether it has been recorded as such … or not", defines its "flow area" as the area through which its feeders flow, and lets the Lakes Development Authority remove obstructions in the protected area or the flow area (ss.2 and 6, as read from the Bill), though no lake boundary or protected area was found notified; within a Municipality the public tanks, and the adjacent land that is not private property, vest in it as trustee (Municipalities Act 2009, s.68); no khatedari rights accrue in tank and river beds (Rajasthan Tenancy Act 1955, s.16), and the High Court has barred allotments in the catchments of "Johar, Nala, Tank, River, Pond" (2012) and held that land recorded as gair mumkin nala keeps that character (Ramji Lal Saini, 2026). The losses are visible all the same: the Supreme Court found the Ramgarh dam, once Jaipur's water supply, "still bone dry" after years of orders on its 769.20 km² catchment (2017); at Fateh Sagar in Udaipur the freeboard at the main bund has been put at about 0.75 m, with water held above the design full tank level by sandbags (as reported); and Ana Sagar is still awaiting notification as a wetland after the Tribunal's orders (as reported). Keoladeo (1981), Sambhar (1990) and Khichan and Menar (2025) are Ramsar sites, and 75 wetlands were reported notified under the Wetlands Rules 2017 by January 2026 (as reported). No inventory of the talabs inside any Municipal Corporation, and no survey of the storage of any of them, was found.


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8, used unchanged: no projection of heavy rainfall for Rajasthan with a design factor was found, and the reported increases in monsoon and heavy rainfall over west Rajasthan (Mehta and Yadav 2022; an IMD analysis as reported) are a reason to keep them, not to reduce them, although the Jaipur station extremes show no significant trend over 1970–2013 (Ghate and Timbadiya 2022).

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the July 1981 (Jaipur), August 2006 (Barmer and Udaipur), September 2019 (Kota and the Chambal), July 2022 (Jodhpur) and July–August 2024 (Jaipur) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two tanks in cascade with surplus course; a 1D drain network linked to a 2D surface grid; a river or canal reach with an inter-basin link; an outfall with a flap gate and pumps; and a river or lake level boundary. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) River / receiving water 1 S1 S2 S3 2 Upper tank Lower tank start level start level 3 2D surface 5 4 River / canal (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Tanks and ponds Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Rivers and canals (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Sluices, flap gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary River (CWC or WRD gauge) or lake level (MWL or FTL + surcharge), per Ch. 5 Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and talabs with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: talabs, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: sluices and flap gates on the outfalls to the rivers and lakes, pumping stations and the storage behind them where an outfall can be closed, the escape channels and gates of the city lakes, interception structures that keep the storm capacity of the drain, storage and infiltration basins at the end of catchments with no outfall, and the operating rules of the lake, dam and barrage gates that set the receiving levels, agreed with WRD or the custodian;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example IMD district rainfall warnings issued by the Meteorological Centre Jaipur, CWC flood forecasts and river stages at its sites on the Chambal, the Banas and other rivers against their warning and danger levels, warnings to the localities downstream before the gates of the Kota Barrage and other dams, the escape-channel gates of Ana Sagar or the gates of the Udaipur lakes are opened, and the State and district control rooms that run round the clock from 15 June), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on groundwater recharge in the over-exploited aquifers that underlie most of the State, the rising water table and waterlogging in the old city of Jodhpur and the Ganganagar–Hanumangarh canal belt, and the quality of the groundwater, in which fluoride, nitrate and salinity are common, and of the lakes that the drains reach (Chapter 8);
  • effect on downstream basins and the receiving river or lake; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring storage comes first because many of the outfalls of Rajasthan's cities are lakes that are often full in the wettest weeks, and many catchments have no outfall at all. Ajmer's Ana Sagar is held at its full gauge by opening its escape-channel gates, so faster conveyance into the lake only floods the colonies along the channel sooner; the Udaipur lakes spill from Pichola and Fateh Sagar to the Ayad and Udai Sagar; and at Kota the Chambal's high flood level stands about 6.7 m above its danger level (CWC), with barrage releases holding it high for days. About 60% of the State drains inland (as reported), where the drained water has nowhere to go but into storage, the ground and the air. The State's tanks are old and public: no khatedari rights accrue in tank beds (Rajasthan Tenancy Act 1955, s.16), and within a Municipality the public tanks vest in it as trustee (Municipalities Act 2009, s.68). The storms are large for drains with no stated design basis: IMD has recorded 326.0 mm in a day at Jaipur (19 July 1981), 412.3 mm at Ajmer (10 June 2002) and 653.0 mm at Mount Abu (8 September 1992), far above the 50-year 24-hour depths of the CWC plates there (IMD; this Manual's reading), and about 577 mm was reported in three days around Kawas in Barmer district in August 2006, more than twice the district's annual normal (as reported). Conveyance upgrades on their own move water faster to an outfall that the Chambal in flood or a lake held at its full level by its gates may close, or that is limited by the capacity of its sluice, escape channel, interception structure or pumping station, and, where a catchment has no outfall, to the lowest ground of the terminal depression. Groundwater in Rajasthan calls for recharge almost everywhere and forbids it in a few places. The State's stage of extraction was 149.86% in 2024, with 214 of 302 assessment units over-exploited and 27 critical (CGWB), so recharge is the default. But the water table under the old city of Jodhpur has risen since canal water arrived in 1997, to within about 1–1.5 m of the surface in places, with basements pumped daily (as reported; NIH, 2025), and the Ganganagar–Hanumangarh canal plains have pockets within 2 m of the surface (CGWB); there, recharge adds to waterlogging. Quality limits recharge too: of CGWB's samples in 2024, 43.2% exceeded 1.5 mg/L of fluoride, 49.5% exceeded 45 mg/L of nitrate and 48.6% exceeded 3,000 µS/cm of electrical conductivity. The law asks for recharge without regard to either: the Building Regulations 2025 require a rainwater harvesting structure or rooftop storage tank on plots of 225 m² or more (reg. 8.3), with no sizing or pre-treatment rule, and exempt only waterlogged areas once the local body has marked them. This is why recharge, waterlogging and groundwater quality are all assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the master development plans and zonal development plans of the development authorities, made under their Acts (JDA 1982, JoDA 2009, AjDA 2013, KDA 2023, UDA 2023 and the Bikaner and Bharatpur Development Authority Acts 2025), among them the Master Development Plan of the Jaipur Region, the master plans of the other towns prepared through UDH and the Urban Improvement Trusts under the Rajasthan Urban Improvement Act 1959, and the layouts and schemes approved under them; and, for a plan that covers a lake, with the prior approval of the Lakes Development Authority (Lakes Act 2015, s.5). In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. Rajasthan draws its water lines by court order rather than by rule. The Building Regulations 2025 set no setback from a nala, river or lake, and keep only the natural drainage inlets and outlets of large projects. The lines come from the courts: the Supreme Court has directed a High Flood Line and ecological buffer for every river system in the State, with no fresh permissions in the identified river corridors meanwhile (7 August 2026), and on the Jojari has barred construction within 100 m of the river's edge and hazardous industry within 500 m of the flood line or flow path (24 August 2026, as reported); the High Court has held that master plans may not disturb rivers, lakes, nalas or their catchments (Gulab Kothari, 2017) and that land recorded as gair mumkin nala may not be diverted or built on (Ramji Lal Saini, 2026), and has barred construction in wetlands and their catchments (2026) and in the catchment of Fateh Sagar (November 2025, as reported); and Udaipur's lakes have a no-construction zone under a notification of 1997, and a project within 200 m of the high flood level of Udai Sagar was held void (as reported). The Lakes Act 2015 provides for a protected area around each lake, by notification, but none was found notified. Notified wetlands carry a 50 m line from the mean high flood level (Wetlands Rules 2017). No State floodplain zoning law or order was found. These are river, lake and waterbody lines, not drainage-flood lines; the hydraulic corridor and setback zones of Chapter 7 are this Manual's proposal, and where a court line binds and is wider, it applies. A BSMP gives the land-use plans the 1% AEP drainage-flood map, and the buffer widths of Chapter 7, that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the Building Regulations 2025 already require a green area of 10–20% on non-commercial plots of more than 750 m², at least half of it on natural ground with no slab below (reg. 8.1), and for projects of 5,000–20,000 m² built-up require that the natural drainage inlet and outlet points be kept as they are and that at least 20% of the open space be left unpaved (environmental conditions of the regulations' schedule, as in Annexure 4 of the JDA Building Regulations 2020), but set no detention or pervious-area rule; storage placed in a layout's open space builds on these duties, and because that land still serves as open space, the storage must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 15 June). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for Rajasthan building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report