Chapter 7Waterbodies, Talabs (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (talab) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Rajasthan, with no coast and no tidal water, means the four Ramsar sites (Keoladeo National Park, Sambhar Lake, Khichan and Menar), the wetlands that the Rajasthan State Wetland Authority notifies or lists under the 2017 Rules, the wetlands identified in the statewide survey ordered by the High Court in June 2026, the city lakes and sagars, the salt lakes and inland depressions, the floodplain wetlands of the rivers, and the talabs, johads and nadis recorded in the Revenue records;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Rajasthan Lakes (Protection and Development) Authority Act, 2015, the Rajasthan Municipalities Act, 2009 (sections 68, 202 and 213), the Rajasthan Tenancy Act, 1955 (section 16), the Rajasthan Land Revenue Act, 1956, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river or dry river bed (such as the Chambal, the Banas, the Luni, the Jojari, the Mahi, the Ghaggar and the Dravyavati), natural drain or nala, canal, lake, sagar or reservoir (such as Pichola, Fateh Sagar, Udai Sagar, Ana Sagar, Man Sagar, Kailana and the Ramgarh dam), talab or pond (talab, johad, nadi), baori or kund (step-well or small walled tank), taanka (walled cistern) that receives runoff, khadin (runoff-farming bund and its bed), salt lake, playa or inland depression with no outfall (such as Sambhar), marsh or low wet land, floodplain wetland or depression, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (talab) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow, escape or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala or canal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, sluice gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Rajasthan terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Talab (तालाब; johad, nadi) | A natural or excavated depression, usually with an earthen bund, that stores rainfall runoff from its own catchment: "Pond, pool, tank, reservoir of water" in Platts (Annex 7E). A johad is an earthen (unlined) talab, and a nadi is the village pond of Marwar and the west; both are talabs for this chapter. A talab is a tank or pond under Clause 7.2. Most talabs have no surplus weir or sluice, only a low point in the bund or the rim over which they spill; where a talab has none, its FTL is the level at which it spills to the next talab, a khadin, a nala or low ground, found by survey. A talab need not hold water to be a talab: one that is dry for years at a time keeps its bed, its bund, its agor and its flow paths. |
| Recorded talab | A talab, johad, nadi, sagar or lake shown in the Revenue records (including land recorded as gair mumkin talab), a Municipality's records, a master development plan, a record or notification under the Rajasthan Lakes (Protection and Development) Authority Act, 2015, a list of the Rajasthan State Wetland Authority, or a survey made under a court's directions. A recorded talab is part of the drainage system for this Manual. Where it is proposed to be filled or built on, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual, and do not override a court order or statute that forbids the filling. |
| Agor (catchment) and flow paths | The agor of a talab, johad or nadi is the land that drains to it, and its flow paths are the nalas, channels and depressions by which that runoff reaches it, recorded or not. ("Agor" is used in Rajasthan for the catchment of a tank; that sense was not confirmed in a dictionary or a revenue text, and Platts gives only the unrelated sense "watchman" (Annex 7E), so the word is always used here with its gloss.) Where the catchment of a recorded talab is recorded (in the Revenue records, a court-ordered survey, or as the flow area of a lake under the Lakes Act, 2015, s. 2(viii)), or can be delineated from the terrain under Chapter 3, it shall be shown on the Waterbody Sheet (Form 7-1), and in it: (a) every flow path draining 8 ha or more is a natural channel under Clause 7.4.1(b), with its setback, whether or not it is recorded as gair mumkin nala; (b) no flow path shall be blocked, filled, diverted or built across except by a crossing that meets Clause 7.10.3; (c) the runoff of a development that is not retained on site under Chapter 4 shall leave it, after treatment under Chapter 8, by the flow path it used before development, so that the talab keeps its inflow; and (d) the catchment boundary shall be marked on the approved layout plan. Where a court has barred allotment or construction in a recorded catchment, as for the Ramgarh dam, that order governs (Clause 7.4.5). This definition and items (a) to (d) are this Manual's proposal, built on the orders of the High Court on catchments (Commentary to Clause 7.1); they are not a statutory rule. |
| Gair mumkin nala, nadi or talab | The Revenue record class (गैर मुमकिन, uncultivable) for land that is a nala, a nadi or a talab. The High Court has held that land recorded as gair mumkin nala is a natural drainage channel that cannot be diverted, obstructed or altered for a non-conforming purpose, even a public one, and that adjoining land so recorded is to be kept to its recorded character (Ramji Lal Saini, 2026). Every such parcel within or next to a site is a waterbody under Clause 7.3, whatever its present state, and its recorded width is its least width under Clause 7.10.3(b). |
| Monsoon water line | The outer edge of a talab's, lake's or wetland's water in the monsoon: the largest of the edge shown by dated imagery of the monsoon and the month after it (July to October) in the years of record, which shall cover at least 20 years so as to include wet years, the edge recorded in the Revenue records, and the spill level (FTL) contour; where none is available, the MWL contour. The boundary of a talab or lake under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. A dry year's edge never sets the boundary. This definition, and the 20 years, are set by this Manual, because many of Rajasthan's talabs fill only in wet years. |
| Lake (Lakes Act, 2015) | A water body that meets the definition of the Rajasthan Lakes (Protection and Development) Authority Act, 2015 (s. 2(x); 3 ha or 10 ha of submerged area at any time in the fifty years before the Act, whether or not it holds water or is recorded); its flow area is "the area through which streams or feeders flow to the lake for its recharge" (s. 2(viii)). Such a lake is a tank under Clause 7.2, and its flow area is its agor. Where a lake boundary or protected area is notified (s. 4), the notified line governs where it is wider (Clause 7.4.5). |
| Sagar; city lake | A sagar or sarovar is a large tank or lake (Annex 7E), and in Rajasthan the name of many city lakes, such as Fateh Sagar and Udai Sagar at Udaipur, Ana Sagar at Ajmer and Man Sagar at Jaipur. A city lake is a lake or sagar within or next to a town whose level is held by a dam or bund with an overflow, escape channel or gates, such as Ana Sagar, which releases through the gates of its escape channel into the town. Each is a tank under Clause 7.2; where it is a Ramsar site or a notified or listed wetland, Clause 7.12 also applies. |
| Lake-locked outfall | A drain or nala outfall into a city lake or talab, which cannot discharge freely while the lake is at or above its FTL. Its tailwater is the lake level: the lake's MWL, or its FTL plus the surcharge of the design flood, as the custodian records them, and where neither is published, the level that Chapter 5 sets. The lake's gates are a controllable outlet under Clause 7.8 only where they are operated to a written rule. |
| Taanka; kund; baori, jhalra | A taanka is a small walled cistern, usually underground, that stores runoff from a roof, a courtyard or a prepared catchment; a kund is a small walled or embanked tank, and in the west the word (and kundi) is also used for a cistern fed by a saucer-shaped catchment; a baori (bawdi) or jhalra is a step-well (Annex 7E). Each is a waterbody for Clause 7.3. A taanka or kund is storage for use under Clause 8.11.2(a), and its storage is not counted as detention; a baori or jhalra is kept for recharge and heritage, and no runoff from roads or paved areas shall be led into it (Clause 8.11.3(b)). |
| Khadin | A long earthen bund built across the lower edge of a sloping catchment, behind which runoff stands in the monsoon and soaks in, and the bed is then farmed. A khadin is a talab for Clauses 7.3 and 7.10: its bund, its bed and its agor shall not be cut, built on or cut off from its flow paths, and its overflow is a surplus course. Its storage is counted only under Clause 7.7. No dictionary source was found for the word (Annex 7E). |
| Nala; nali | A nala is a watercourse or drain, natural or cut (Annex 7E), such as the nalas that drain to the Dravyavati at Jaipur; a nali is a small street or house drain. Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered. No rule dividing natural nalas from municipal drains was found; the definition, not the owner or the name, decides which clauses apply. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the WRD and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (a Municipal Corporation, Council or Board (in which public tanks, streams, reservoirs, cisterns and adjacent land, and the public drains and watercourses in, alongside or under any street, vest as trustee under section 68 of the Rajasthan Municipalities Act, 2009), a development authority (such as the JDA, JoDA, AjDA, KDA or UDA) or an Urban Improvement Trust, the WRD (for its dams, reservoirs, irrigation tanks and canals), the Lakes Development Authority (for a lake under the Rajasthan Lakes (Protection and Development) Authority Act, 2015), the State Government through the Collector and the Tehsildar (for land recorded as gair mumkin talab, nadi or nala, tank-bed land and other State land), the Gram Panchayat, the Rajasthan State Wetland Authority (for a notified wetland), RIICO (for drains and ponds in its industrial areas), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and khasra maps of the Revenue Department, in which talabs, johads, nadis, nalas and rivers, and the catchments of tanks and ponds where they are recorded, are entered as gair mumkin talab, nadi or nala or in other classes of land in which no khatedari rights accrue under section 16 of the Rajasthan Tenancy Act, 1955; the public tanks, streams, reservoirs, drains and watercourses vested in a Municipality under section 68 of the Rajasthan Municipalities Act, 2009; the record of lakes, with their boundaries and flow areas, and the lake boundaries and protected areas notified under the Rajasthan Lakes (Protection and Development) Authority Act, 2015 (none was found for this Manual); the waterbodies, nalas and catchments shown in master development plans; the catchment surveys made under the directions of the High Court, such as that of the Ramgarh dam; the High Flood Line and ecological buffer of each river, once demarcated under the Supreme Court's order of 7 August 2026; the boundary of every wetland notified under the Wetlands (Conservation and Management) Rules, 2017 and of the four Ramsar sites; and the wetland survey ordered by the High Court on 1 June 2026;
- (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Rajasthan city was found, and the only design standard found for a Rajasthan urban channel is the 100-year flood of the Dravyavati at Jaipur, which the JDA's project aims "to make … capable of safely passing" (EIA, Chapter 2; no design discharge was found). No State law, rule or WRD order zoning the floodplains of the rivers was found either. The flood lines that are coming are court-made: on 7 August 2026 the Supreme Court directed a "comprehensive scientific exercise for determination and demarcation of the High Flood Line and the requisite ecological buffer zone qua all the river systems in the State", and the State told the Court that "comprehensive river restoration blueprints based on the revenue records" had been prepared for the Luni and the Jojari, and that surveys to fix the High Flood Line and buffer zones near the Jojari were "presently under progress in consultation with the concerned District Environment Committees" (Suo Motu W.P. (C) 8 of 2025); the return period of the High Flood Line is not stated in the order read for this Manual. The Lakes Act, 2015 requires a survey and published record of lakes "including their boundaries, flow area" (s. 6(1)(a)), but no such record was found. The Revenue records are therefore the main map of Rajasthan's waterbodies: the High Court has made the record class gair mumkin nala decisive (Ramji Lal Saini, 2026), and every site plan under this Manual shall overlay the khasra map and show each gair mumkin nala, nadi and talab, and the catchments of the talabs, on the Waterbody Sheet (Form 7-1). Levels shall be stated to one datum (Clause 7.3.5), because the levels of the lakes of Udaipur and Ajmer are published only as gauge readings in feet above an unknown zero (for example, Pichola 11 ft, Fateh Sagar 13 ft, Udai Sagar 24 ft and Ana Sagar 13 ft, as reported), which cannot be used until they are tied to a surveyed datum [TBC]. Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and the High Flood Lines and buffers demarcated under the Supreme Court's order, once drawn, are minimums that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (no statute, rule or building regulation read for this Manual sets a distance in metres from a nala, talab, lake or river in Rajasthan; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of the WRD for a work on or next to one of its dams, reservoirs, canals or rivers, the prior approval or permission of the Lakes Development Authority for a plan covering a lake or a construction in a lake's protected area (Rajasthan Lakes (Protection and Development) Authority Act, 2015, s. 5), the permission of the Rajasthan State Wetland Authority for a regulated activity in a notified wetland, or a direction of the Supreme Court, the Rajasthan High Court or the National Green Tribunal (such as the river, lake, catchment and wetland lines listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. Rajasthan has no general statutory distance from water: neither the Model Rajasthan Building Regulations 2025 nor the 2020 regulations they replace set a setback from a nala, river, lake or talab, and the Rajasthan Municipalities Act, 2009 bars building only over a drain vested in the Municipality (s. 213(2)). The lines that exist are court-made or tied to one waterbody: land recorded as gair mumkin nala is a natural channel that cannot be diverted or built on (Ramji Lal Saini, High Court, 2026); land in the catchments of johads, nalas, tanks, rivers and ponds is not to be allotted (High Court, 2012); the High Flood Line and an ecological buffer are to be demarcated for every river system in the State, with no fresh permissions in identified river corridors until then (Supreme Court, 7 August 2026); and around a notified wetland no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). This Manual's 15 m gives every talab, nala and watercourse a hydraulic corridor where nothing wider binds, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Rajasthan flood maps are mostly coarser than US maps, the alluvial plains around Jaipur and Alwar, the black-soil plains of Hadoti and the inland basins of the arid west, where runoff spreads and stands, are flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Rajasthan's building regulations give no distance in metres from water. The Model Rajasthan Building Regulations 2025 and the 2020 regulations they replace were searched for nala, river, lake, talab, flow and flood terms, and set no setback from any of them; the 2020 regulations of the JDA let the norms of a "lake protected area" (झील संरक्षित क्षेत्र) set by the Centre or the State override them (reg. 10.4). The Rajasthan Municipalities Act, 2009 adds no width: it bars a new building over a sewer, drain, culvert or gutter vested in the Municipality without its written consent (s. 213(2)), and vests public tanks and the adjacent land that is not private property in the Municipality (s. 68(1)(c)), but sets no strip around them. Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). The other lines are court-made or tied to one waterbody: for every river system in the State, the High Flood Line and an ecological buffer, to be demarcated, with no fresh permissions for industrial, commercial or residential development in the identified river corridors meanwhile (Supreme Court, 7 August 2026); along the Jojari, no construction or development within 100 m of the river's edge, and no hazardous industry within 500 m of the flood line or flow path, pending demarcation (Supreme Court, interim order of 24 August 2026, as reported; the order was not read); on land recorded as gair mumkin nala, no diversion, obstruction or other non-conforming use, and the same for adjoining land so recorded (Ramji Lal Saini, 2026); in the catchments of johads, nalas, tanks, rivers and ponds, no allotment (High Court, 29 May 2012, as quoted), and in the catchment of the Ramgarh dam, no encroachment or construction (High Court, 2011); around the lakes of Udaipur, a no-construction zone under a notification of 17 January 1997, within which the High Court is reported to have held a hotel within 200 m of the high flood level of Udai Sagar void, and an order of November 2025 against construction and the dumping of soil in the catchment of Fateh Sagar (all as reported; the notification and its datum were not read); around a lake under the Lakes Act, 2015, the protected area, once notified (s. 4; no distance is set in the Act, and no notification was found); and around Ana Sagar at Ajmer, the removal of structures built in the lake's area, ordered by the National Green Tribunal in 2023 and upheld by the Supreme Court in 2025 (as reported; Clause 7.12, Commentary). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Rajasthan has no statutory setback in metres from a nala, talab, lake or river: no statute, rule or building regulation read for this Manual sets one, and no State floodplain zoning law or order was found. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, and so are the protection of each talab's agor and flow paths and the reading of the monsoon water line (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government has adopted them. The lines set by the Supreme Court, the High Court and the National Green Tribunal are not the design extent: the 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider. The setback is applied as the larger of the corridor and any statutory or court line, so the Manual is stricter than statute along talabs, nalas and watercourses, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- Rivers. The High Flood Line and ecological buffer of every river system in the State, to be demarcated, with no fresh permissions for development in the identified river corridors until then (Supreme Court, 7 August 2026); and on the Jojari, no construction within 100 m of the river's edge and no hazardous industry within 500 m of the flood line or flow path (Supreme Court, interim order of 24 August 2026, as reported).
- Natural channels and catchments. Land recorded as gair mumkin nala, nadi or talab kept to its recorded character, and not diverted or built on (Ramji Lal Saini, High Court, 2026); no allotment of land in the catchments of johads, nalas, tanks, rivers and ponds (High Court, 2012); and no encroachment or construction in the catchment of the Ramgarh dam (Abdul Rahman, 2004, and the orders of 2011 and 2012, confirmed in the Supreme Court's judgment of 2017).
- Lakes. The protected area and flow area of a lake under the Rajasthan Lakes (Protection and Development) Authority Act, 2015, once notified (none was found); the no-construction zone around the lakes of Udaipur (notification of 1997; 200 m from the high flood level, as reported); and the orders of the National Green Tribunal and the Supreme Court on Ana Sagar at Ajmer (2023 to 2025, as reported).
- Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); and no encroachment, filling, construction or untreated sewage in identified wetlands or their catchments (High Court, suo motu order of 1 June 2026).
- Public tanks, drains and watercourses. Public tanks, streams, drains and watercourses vest in the Municipality as trustee (Rajasthan Municipalities Act, 2009, s. 68), and no building may be put over a municipal drain without consent (s. 213(2)). These protect the waterbody, not a flood corridor; the whole recorded and monsoon extent is a waterbody for this chapter.
- WRD dams, reservoirs and canals. Works on or next to them need the custodian's approval.
This Manual sets 15 m as the floor because no width exists in Rajasthan for nalas or talabs; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the nalas need. The reasons for the corridor and the agor rule are the record: the Ramgarh dam, Jaipur's old water supply, has had little or no inflow while its catchment was built over and mined (as the High Court and its Technical Committee recorded), and the Supreme Court found nothing substantive achieved on the ground over the years (2017); the Dravyavati, "the active river of Jaipur", turned into a nala (JDA, EIA); and on the Jojari, units of the Kakani industrial area stand "merely 30 to 60 metres" from the riverine area, with about 12.805 ha of the area within the "apparent High Flood Area" (Supreme Court, 7 August 2026). Until a statute, rule, notification or master plan adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory and court controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the green area or open space required by the Model Rajasthan Building Regulations 2025, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Rajasthan practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The alluvial plains around Jaipur and Alwar, the black-soil plains of Hadoti and the inland basins and pans of the arid west, where runoff has no outfall and spreads, are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Rajasthan the lines around lakes are measured from a high level, not from the dry-season water line: the Udaipur no-construction zone is reported to run from the high flood level, and the Wetlands Rules, 2017 measure their 50 m from the mean high flood level. The Lakes Act, 2015 goes further, defining a lake by the largest area it has submerged at any time in fifty years, "whether it contains water or not" (s. 2(x)). The difference matters more in Rajasthan than elsewhere, because many talabs, nadis and lakes fill only in wet years and stand dry, or nearly dry, in between: Jaisalmer's normal annual rainfall is 172.9 mm, and Barmer and Jaisalmer each had fourteen years of 125% or more of normal between 1951 and 2000 (IMD, Climate of Rajasthan, 2010). A line drawn from the edge of a dry year would leave the foreshore that a wet year floods, and that the talab needs to store it, open to building. This Manual gives the same rule a level for every talab, johad, nadi and lake: its monsoon water line, read over at least 20 years, and its FTL are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the riverside and lakeside wards of Rajasthan's cities, such as Nayapura and Balita on the Chambal at Kota, below the Kota Barrage (evacuated in September 2019), Hathi Bhata, Brahmapuri and Shivpuri along the Ana Sagar escape channel at Ajmer (waterlogged in September 2024), and the Udaipur colonies flooded by lake and river water in 2006 and since (all as reported), already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Rajasthan has no tank Act, and its storages range from the taanka of a single house to city lakes held by gated escape channels. The storages that matter for urban drainage are of six kinds. The first is the village and urban talab, johad or nadi, usually with no outlet structure, recorded in the Revenue records as gair mumkin talab or, inside a town, vested in the Municipality (Rajasthan Municipalities Act, 2009, s. 68), and fed by its agor through flow paths that are often unrecorded. The second is the city lake or sagar with a dam or bund and an overflow, escape channel or gates, which takes the town's nalas and releases to a downstream channel: Ana Sagar at Ajmer, whose escape-channel gates are opened into the town when it is full (as reported); the lakes of Udaipur, Pichola, Fateh Sagar and Udai Sagar, linked by the Ayad, which carries the spill of the upper lakes to Udai Sagar (as reported); Kailana and Takhat Sagar at Jodhpur, with reported full reservoir levels of 273.7 m and 269.75 m; and Man Sagar at Jaipur. These are the tanks for which Clauses 7.7 and 7.8 matter most, and no operating rule for any of them was published. The third is the WRD's reservoirs and barrages, such as the Kota Barrage on the Chambal, Bisalpur on the Banas and Mahi Bajaj Sagar, and the Ramgarh dam; they are not tanks for these clauses, and their releases enter a design as inflow and tailwater (Chapter 5). The fourth is the khadin, whose bed is farmed after the water has soaked in; its storage is counted only under Clause 7.7, and never while the bed is under a crop that the custodian will not flood. The fifth is the taankas, kunds, kundis, baoris and jhalras of the old towns and villages, small storages that are better kept for use, recharge and heritage than counted as detention. The sixth is the salt lakes and inland depressions of the arid west with no outfall, such as the Sambhar Lake, a Ramsar site, which are the terminal storage of their catchments and are wetlands under Clause 7.12. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any city lake or sagar whose storage is to be counted is subject to Clause 7.7.1 in full, with the WRD, the Municipality, the Lakes Development Authority or other custodian, and the custodian of each city lake shall be confirmed for the inventory (Annex 7A), because it was not established for this Manual.
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including the agor (catchment) of each talab, johad or nadi and the flow paths that feed it, and the talab with its FTL and its overflow or escape to the next talab, khadin or nala, as shown in Figure 7.3, and, for a city lake with escape gates, such as Ana Sagar at Ajmer, the gates and the downstream channel, with the lake level as the tailwater of the inflowing drains (Chapter 5).
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Rajasthan's talabs are often dry, but its worst urban floods have come when the lakes and reservoirs were full and releasing. At Ajmer, the gates of the Ana Sagar escape channel were opened in September 2024, and Hathi Bhata, Brahmapuri and Shivpuri were waterlogged; in July 2025, after a reported 8 to 9 inches of rain in a day, the lake overflowed, the gates were opened 30 inches, and the area around the JLN Hospital was flooded (all as reported). At Udaipur in August 2006 "all water bodies in the region" were reported to be overflowing, and colonies were submerged by lake and river water (as reported). At Kota in September 2019, 18 of the 19 gates of the Kota Barrage released about 6.5 to 6.9 lakh cusecs (reported figures conflict), and low-lying wards were evacuated (as reported); the CWC's highest recorded level of the Chambal at Kota City is 248.68 m (2019), against a danger level of 242 m. At Jaipur in July 1981, 82 cm of rain fell on the city in three days, with 35 cm in 24 hours on 19 July (Gupta and Jindal, Mausam, 1987), and downstream in Tonk district the Dhund and Morel rivers flooded. No record of how long Rajasthan's lakes stay at or above FTL in a wet spell was obtained for this Manual. A dry talab at the start of the season is not a design assumption: in a wet spell the talab fills, and while it is full it stores nothing more below FTL, its inflowing nalas discharge against a high level, and every release adds to the flow below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A talab with its agor (catchment) and the traditional systems around it (schematic, not to scale; no particular talab is shown). A: in plan, the agor drains along its flow paths (bahav) to the talab; the talab spills at its FTL over its overflow (escape) to a khadin or the next talab and on to a nala; a taanka stores the runoff of its own small prepared catchment for use. The catchment boundary, the flow paths and the talab are one waterbody system for this Manual (definitions after Clause 7.2): a development in the agor keeps its flow paths open, with the setback of Clause 7.4 on every path draining 8 ha or more, and sends the runoff it does not retain on site, after treatment (Chapter 8), down the path it used before. B: in section, the talab holds water up to its FTL and the foreshore up to MWL is its flood storage; water soaks from its bed and from the khadin into the ground (recharge, subject to Clause 8.8.1); the setback is measured from the largest of the Revenue boundary, the FTL and the monsoon water line. The agor rule, the monsoon water line and the 15 m minimum are this Manual's proposals, built on the High Court's orders on catchments and natural channels (Clause 7.1, Commentary); a court line, the flow area or protected area of a lake under the Lakes Act, 2015, or a notified wetland boundary governs where it is wider. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, RSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No operating rule for a Rajasthan talab or city lake that keeps a flood cushion was found, and most talabs, johads and nadis have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the towns are the releases of the gated lakes and the reservoirs: the gates of the Ana Sagar escape channel at Ajmer are reported to be opened when the lake is full and to flood the colonies along the channel (2024 and 2025, as reported), and the releases of the Kota Barrage, driven by the releases of the Chambal dams upstream in Madhya Pradesh, flooded the low-lying wards of Kota in September 2019 (as reported). The State's disaster control rooms have opened from 15 June in recent monsoons (as reported for 2025), but no warning protocol tied to a lake release was found. Without an agreed rule with dates, levels, release rates and a named operator, storage in a lake cannot be relied on, and a release made without warning to the colonies downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July or August monsoon depression. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Many talabs and lakes have other users. Kailana and Takhat Sagar store water for Jodhpur, the Ramgarh dam supplied Jaipur until it went dry, the lakes of Udaipur and Pushkar Sarovar are places of worship, and the beds of khadins are farmed after the water soaks in. Drawing a talab or a lake down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Rajasthan State Pollution Control Board (RSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 15 June each year (Chapter 10).
Commentary. No statewide order of the Urban Development and Housing Department or of the Local Self Government Department for the pre-monsoon desilting of nalas or talabs was found; in July 2026 the Chief Minister was reported to have directed that all drains be cleaned (as reported). The date of 15 June in this Manual is set by this Manual: it is the date from which the State's disaster control rooms have opened in recent monsoons (as reported), and it comes before the monsoon's normal onset in the State, from about 24 June at Jhalawar to about 6 July at Bikaner and Pokaran (IMD, new normal dates, 2020). Village johads, nadis and talabs are also desilted and deepened under State and national programmes, such as the Mukhya Mantri Jal Swavlamban Abhiyan, which is reported to have built more than 3.8 lakh structures in three phases, and the Amrit Sarovar mission (as reported); no published measure of their effect on recharge was found. Excavation to "increase capacity" is governed by Clause 7.9.3. The 15 June deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Rajasthan precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Rajasthan the drains and watercourses of the streets vest in the Municipality, but the natural nalas outside the streets are State land in the Revenue records, and the split between them has not been written down. The Rajasthan Municipalities Act, 2009 vests in the Municipality "all public sewers and drains, channels, tunnels, culverts and watercourses in, alongside, or under, any street" (s. 68(1)(d)), puts all drains within the Municipality "under the survey and control of the Municipality" (s. 200), and bars a new building over any sewer, drain, culvert or gutter vested in it without its written consent, with power to have one pulled down (s. 213(2)). A nala outside a street is usually recorded as gair mumkin nala, and the High Court has held that such land cannot be diverted or used for any non-conforming purpose, and ordered a road and a crematorium built on it removed (Ramji Lal Saini, 2026). No rule or order dividing natural nalas from municipal drains, or the Municipalities' drains from the WRD's rivers and canals, was found for this Manual. In practice the rivers, dams, reservoirs and canals lie with the WRD (and the High Flood Lines of the rivers, under the Supreme Court's order of 2026, with the State and a River Commission or River Rejuvenation Authority it is to constitute); the drains of the streets with the Municipality; the drains of a development authority's or an Urban Improvement Trust's scheme with that body until they are handed over; the drains of an industrial area with RIICO; the nalas recorded as gair mumkin nala, and the village tanks, with the Revenue Department and the Gram Panchayat; and the lakes of 3 or 10 ha and more with the Lakes Development Authority once notified. This Manual uses that division as its working assignment, not as a statement of law. Jaipur's main channel shows what is lost when a nala is treated as a drain: the JDA describes the Dravyavati as "the active river of Jaipur which, over the time turned into a Nallah (Amanisha Nallah)", and rebuilt it as a 47.5 km channel for the 100-year flood (EIA, Chapter 2); the High Court has asked the JDA why it has not built the concrete channels near Ambawadi that a NEERI report recommended (Alok Gupta v. State, order of 25 July 2026, as reported). On the Jojari at Jodhpur, the Supreme Court found units of the Kakani industrial area "merely 30 to 60 metres" from the riverine area, with about 12.805 ha within the "apparent High Flood Area" (7 August 2026). The Model Rajasthan Building Regulations 2025 keep no width along a nala, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored talab or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Rajasthan no shared form of storage is required by the building regulations: the rainwater harvesting of the Model Rajasthan Building Regulations 2025 is plot-level (reg. 8.3, plots of 225 m² or more), the large-project conditions ask for recharge bores and unpaved open space, and the regulations have no detention, peak-flow or "zero runoff" rule. The talabs, johads and nadis renewed under the Mukhya Mantri Jal Swavlamban Abhiyan and the Amrit Sarovar mission, and the Dravyavati channel at Jaipur, are the nearest existing forms of shared storage or conveyance. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Rajasthan State Wetland Authority;
- (b) the four Ramsar sites of Rajasthan (Keoladeo National Park, designated in 1981; Sambhar Lake, designated in 1990; and Khichan and Menar, designated in 2025), each to its boundary as designated, and any wetland notified under the 2017 Rules or identified in the statewide survey ordered by the High Court on 1 June 2026;
- (c) the city lakes and sagars, the salt lakes, playas and inland depressions of the arid west, and the marshy low land and depressions of the river floodplains, such as those of the Chambal, the Banas and the Luni, within the 1% AEP extent of Clause 7.3.4 or the High Flood Line and buffer once demarcated under the Supreme Court's order of 7 August 2026, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
- (d) any other marsh, wetland, talab or lake that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Rajasthan's wetlands are the concern of the Rajasthan State Wetland Authority, reported to have been constituted in 2019 and reconstituted in 2020 (as reported). A draft notification of 44 wetlands in 19 districts was reported in July 2023, 67 wetlands by August 2023, and 75 notified wetlands by January 2026 (as reported; the notifications were not read). The State has four Ramsar sites (dates and areas as reported from the national list; the Ramsar Information Sheets were not read): Keoladeo National Park at Bharatpur, designated in 1981 over about 2,873 ha; Sambhar Lake, the salt lake, designated in 1990 over about 24,000 ha; and Khichan (Phalodi) and Menar (Udaipur), designated on 4 June 2025, whose reported areas conflict. The High Court is the working regulator: acting of its own motion, it ordered on 1 June 2026 a district-wise survey of the State's wetlands, of which about 46,748 units are reported (as cited by the Court), and directed that there be "no further encroachment, reclamation, dumping, filling, construction activity or alteration of the physical boundaries of identified wetlands", and that no untreated sewage, municipal waste, industrial effluent or construction debris be discharged "into wetlands or their catchment areas"; and in a case on the lakes of Udaipur in 2026 (C.W. 12630/2026) it is reported to have barred filling, dumping and construction in identified lake, canal and catchment areas (as reported). At Ajmer, the National Green Tribunal found in 2023 that a park and other works built on the bed and edge of Ana Sagar violated the Wetlands Rules, 2017, and ordered them removed; the Supreme Court refused a stay, rejected a plan to remodel them in March 2025, and demolition began on 12 September 2025, with the State committing to seek the lake's notification as a wetland (all as reported). A drain outfall, desilting, diversion or gate operation in or near a Ramsar site or a notified wetland therefore needs the Wetland Authority's permission where the notification or the Rules regulate it, and compliance with the High Court's and the Tribunal's directions, as well as compliance with this chapter; for the talabs and lakes that are not notified, this chapter, the Lakes Act, 2015 and the revenue and municipal law are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Rajasthan's lakes, rivers and wetlands through the nalas (Clause 8.9, Commentary). At Jodhpur, the Supreme Court recorded in November 2025 that the city produced about 230 MLD of sewage against an existing treatment capacity of about 120 MLD, and that "Treated and untreated sewage is discharged" to the Jojari, and in March 2026 that treatment was limited to about 175 MLD, a gap of about 55 MLD, with effluent reaching the river through concealed pipelines and storm water drains; downstream of Jaipur, samples at the Morel dam in 2026 "indicated the possible presence of sewage and/or industrial effluents" (Supreme Court, 7 August 2026). The High Court has directed that no untreated sewage reach the State's wetlands or their catchments (1 June 2026) or the lakes of Udaipur (2026, as reported). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Rajasthan they apply in full to every new outfall, and every existing outfall to a lake, talab, wetland or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Rajasthan's main controls on filling and building in talabs, nalas and their catchments are revenue law and the courts. Khatedari rights do not accrue in pasture land and, as reported, in tank and river beds (Rajasthan Tenancy Act, 1955, s. 16), and the High Court directed in 2012 that allotments of land in the catchments of "Johar, Nala, Tank, River, Pond" made in defiance of section 16 be cancelled (as quoted). In the Ramgarh catchment the High Court ordered in 2011 that encroachments be removed "so as to restore the position as was existing on 15.08.1947"; the Supreme Court, finding that "nothing substantive appears to have been achieved on the ground over the years", imposed costs of ₹10 lakh on each of two petitions by a university that had encroached on 8,125 m² of catchment land and directed the JDA to demolish the encroachment (National Institute of Medical Science University, 9 November 2017). In 2026 the High Court ordered a road and a crematorium built on land recorded as gair mumkin nala to be removed and the land restored (Ramji Lal Saini). The Supreme Court is reported to have read the High Court's catchment orders in 2022 as aimed at protecting genuine catchments, not at perpetuating wrong entries in the Revenue records (State of Rajasthan v. Ultratech Cement, as summarised; the judgment was not read). The Lakes Act, 2015 empowers the Lakes Development Authority to remove any building or obstruction in a lake's protected area or flow area (s. 6(2)), and at Ajmer the works built on Ana Sagar have been demolished under the orders of the National Green Tribunal and the Supreme Court (2023 to 2025, as reported). In the towns, public tanks vest in the Municipality as trustee (Rajasthan Municipalities Act, 2009, s. 68), but no express bar on their change of use was seen; this Manual treats a recorded talab, and its agor and flow paths, as drainage infrastructure (definitions after Clause 7.2). The Rajasthan Land Revenue Act, 1956, its rules on tank-bed lands and on conversion, and the encroachment sections of the development authority Acts were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 15 June) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The bunds of most talabs, johads, nadis and khadins are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The dams and bunds of the city lakes and town reservoirs, such as those of Pichola, Fateh Sagar and Udai Sagar at Udaipur, Ana Sagar at Ajmer, Kailana and Takhat Sagar at Jodhpur and the Ramgarh dam, are of heights that were not found for this Manual; each shall be screened, and the larger of them may be specified dams. Where the storage of a talab, sagar or city lake is counted under Clause 7.7, its bund or dam is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Rajasthan the dams and bunds that matter to the towns are those of the city lakes, such as Ana Sagar and the lakes of Udaipur, the reservoirs that supply the towns, such as Kailana and Takhat Sagar at Jodhpur, and the barrages and reservoirs upstream of them, such as the Kota Barrage. In September 2019 the Kota Barrage released about 6.5 to 6.9 lakh cusecs through 18 of its 19 gates and more than 5,000 people were rescued at Kota (as reported); at Ajmer the opening of the Ana Sagar escape-channel gates has flooded the colonies along the channel (2024 and 2025, as reported). No breach map or emergency action plan for a city lake bund or a talab bund was found. A failed or overtopped lake bund floods the colonies below it, and an unannounced release floods them too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Rajasthan, Urban Development and Housing Department. Model Rajasthan Building Regulations, 2025 (मॉडल राजस्थान भवन विनियम, 2025), with the order No. P.11(5) नविवि/Building Regulations-2025/2025 of 12 May 2025 (regulations 6.6, 8.1, 8.3 and 18, and Schedule 2; brought into force by each urban body by its own publication in the Gazette, on a date that varies by city [TBC]; read from a third-party copy). https://frontdesk.co.in/wp-content/uploads/2025/05/Order-Modal-Building-Bye-Laws-2025.pdf
- Jaipur Development Authority. Jaipur Region Building Regulations, 2020, Rajasthan Gazette (Extraordinary) Part 6(ख), 7 January 2021 (regulations 10.4 and 10.11 and Annexure 4; the predecessor text). http://web.archive.org/web/2023id_/https://urban.rajasthan.gov.in/content/dam/raj/udh/lsgs/lsg-jaipur/onlineservices/BUILDING%20BYE%20LAWS%202020.pdf
- Government of Rajasthan. Rajasthan Municipalities Act, 2009 (Act 18 of 2009) (ss. 45, 68, 200, 202, 204 (title only), 213 and 238), read from a third-party copy; amendments not checked. https://lawgist.in/states/rajasthan/rajasthan-municipalities-act-2009
- Government of Rajasthan. Rajasthan Lakes (Protection and Development) Authority Bill, 2015 (Bill No. 11 of 2015, authorised English translation) (ss. 1–6 and 27); the enacted Act, deemed in force from 25 January 2015, was not read, and no notification under it was found. https://www.ielrc.org/Content/e1501.pdf
- Government of Rajasthan. Rajasthan Tenancy Act, 1955 (s. 16, as quoted by the Supreme Court in 2017 and as summarised in secondary sources); Rajasthan Land Revenue Act, 1956 and the Rajasthan Land Revenue (Allotment of Tank-bed Lands for Cultivation) Rules, 1961 (titles only; not read).
- Rajasthan High Court. Abdul Rahman v. State of Rajasthan, D.B. C.W.P. 1536/2003, judgment of 2 August 2004; Suo Motu v. State of Rajasthan, S.B.C.W.P. 11153/2011, orders of 23 August 2011 and 29 May 2012; Gulab Kothari v. State of Rajasthan, D.B. C.W.P. 1554/2004, order of 12 January 2017 (all as quoted or summarised in the judgments below; not read in full).
- Rajasthan High Court. Ramji Lal Saini v. State of Rajasthan, D.B. C.W.P. (PIL) 6614/2021, order of 7 May 2026 [2026:RJ-JP:19286-DB]. https://www.livelaw.in/pdf_upload/2026/05/22/ramji-lal-675710.pdf
- Rajasthan High Court (Jodhpur). Suo motu, In re: Protection, Conservation and Notification of Wetlands in the State of Rajasthan, order of 1 June 2026. https://www.livelaw.in/pdf_upload/2026/06/05/suot-motu-wetlands-uploaded-678250.pdf
- Supreme Court of India. National Institute of Medical Science University v. State of Rajasthan, S.L.P. (C) 38040-38041 of 2012, judgment of 9 November 2017. https://hcraj.nic.in/sci/2012/1-38041-2012_2017-11-09.pdf
- Supreme Court of India. In Re: 2 Million Lives at Risk, Contamination in Jojari River, Rajasthan, Suo Motu W.P. (C) 8 of 2025: judgments of 21 November 2025 (2025 INSC 1341), https://api.sci.gov.in/supremecourt/2025/53967/53967_2025_3_50_66079_Judgement_21-Nov-2025.pdf ; 18 March 2026 (2026 INSC 316), https://www.verdictum.in/pdf_upload/2026/04/07/53967202523569419judgement18-mar-2026watermark-1775389.pdf ; and 7 August 2026 (2026 INSC 812), https://api.sci.gov.in/supremecourt/2025/53967/53967_2025_2_58_72891_Judgement_07-Aug-2026.pdf ; interim order of 24 August 2026 (as reported; not read).
- Jaipur Development Authority. Dravyavati River Rejuvenation Project, EIA/EMP, Chapter 2 (Phase II). https://environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/170520176S4VOAIDChapter-2.pdf
- Gupta, H. N. and Jindal, O. P. (1987). Unprecedented heavy rainfall in Jaipur (Rajasthan) during 18–20 July 1981. Mausam 38(3): 362–364. https://mausamjournal.imd.gov.in/index.php/MAUSAM/article/view/3120
- India Meteorological Department (2020). New normal dates of onset and withdrawal of the southwest monsoon. https://internal.imd.gov.in/press_release/20200515_pr_804.pdf ; India Meteorological Department (2010). Climate of Rajasthan (Series No. 16; district normals of 1951–2000 and excess years). https://imdpune.gov.in/library/public/Climate%20of%20Rajashtan.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of floods, lakes and gate operations (secondary): Down To Earth, Dawn and The Daily Star on Barmer (August 2006); OneIndia and the Udaipur Times on Udaipur (August 2006 and later); reports of the Kota Barrage releases (September 2019) and of the CWC flood bulletin of 14 September 2019; ANI and the Free Press Journal on the Ana Sagar escape channel at Ajmer (September 2024 and July 2025); ThePrint on the State's monsoon control rooms (2025).
- Reports of lakes, courts and wetlands (secondary): Down To Earth on the Udaipur lakes and the no-construction zone; the Udaipur Times on the Fateh Sagar catchment (November 2025); Verdictum on the Udaipur lakes suo motu case, C.W. 12630/2026 (10 June 2026); ThePrint, The Week and LawChakra on Ana Sagar (2023–2025); LiveLaw on Alok Gupta v. State (27 July 2026); PTI and ThePrint on the Jojari interim order of 24 August 2026; SANDRP on wetlands notified in Rajasthan (January 2026); Business Standard on the passing of the Lakes Bill (21 March 2015), https://www.business-standard.com/article/news-ians/bill-to-conserve-rajasthan-s-lakes-passed-115032100616_1.html
- Ramsar sites of India (list as reported). https://indianwetlands.in/wetlands-overview/indias-wetlands-of-international-importance/
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 7 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Rajasthani waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Rajasthan has a lake Act but no tank Act, and most of its talabs, johads and nadis are protected not by a statute of their own but by revenue law, municipal law and the courts. The Rajasthan Lakes (Protection and Development) Authority Act, 2015 (as read from the Bill of 2015, the enacted text not having been read) vests the protection and development of all lakes in the State Government. It defines a "lake" as an inland water body, natural or man-made, "whether it contains water or not and whether it has been recorded as such in any revenue or other official record or not", that has had at any time in the fifty years before the Act a submerged area of at least 3 ha (where it has socio-cultural, heritage or religious importance) or 10 ha (in other cases) (s. 2(x)); it defines the "flow area" as "the area through which streams or feeders flow to the lake for its recharge" (s. 2(viii)); it lets the State notify lake boundaries and a protected area around a lake (s. 4); it requires every town planning authority to consult the Lakes Development Authority, and to have its prior approval for any spatial or development plan of an area with a lake, and bars construction in a protected area without permission (s. 5); and it empowers the Authority to remove any obstruction within the protected area or the flow area (s. 6(2)). No notification of a lake boundary or protected area under the Act was found for this Manual. In the towns, all public tanks, streams, reservoirs and cisterns, with the adjacent land that is not private property, and all public drains, channels, culverts and watercourses in, alongside or under any street, vest in the Municipality, "held and applied by it as trustee" (Rajasthan Municipalities Act, 2009, s. 68(1)(c) and (d)); no express bar on putting a vested tank to another use was seen in that section. In the villages and on the urban fringe, khatedari rights do not accrue in pasture land and, as reported, in river and tank beds (Rajasthan Tenancy Act, 1955, s. 16), and talabs, nadis and nalas are recorded in the Revenue records as gair mumkin talab, nadi or nala (land that cannot be cultivated).
The High Court has carried this protection from the waterbody to its catchment. In Abdul Rahman v. State of Rajasthan (D.B. C.W.P. 1536/2003, 2 August 2004) it gave directions "to ensure free flow of water in the catchment areas of Ramgarh Dam", the reservoir of 1903 that supplied Jaipur, with a catchment of about 769.20 km² over four tehsils (as summarised by the Supreme Court in 2017); in a case it took up of its own motion (S.B.C.W.P. 11153/2011) it directed the departments in 2011 "to stop encroachment and illegal construction in the drainages, channels, nalas, river etc." of those tehsils and to plan the removal of encroachments "so as to restore the position as was existing on 15.08.1947", and on 29 May 2012 it restrained "allotment of the land falling in catchment areas of water reservoirs like Johar, Nala, Tank, River, Pond etc." (as quoted by the High Court in 2026). The Supreme Court found in 2017 that the Ramgarh lake was "still bone dry" (National Institute of Medical Science University v. State of Rajasthan, 9 November 2017). In Gulab Kothari v. State of Rajasthan (D.B. C.W.P. 1554/2004, 12 January 2017) the State conceded that natural resources such as rivers and lakes "cannot be disturbed while preparing the Master Development Plan or modifying the same", and in Ramji Lal Saini v. State of Rajasthan (D.B. C.W.P. 6614/2021, 7 May 2026) the High Court held that "a 'Gair Mumkin Nala' constitutes a natural drainage and water flow channel forming an integral part of the ecological framework and hydrological system", which cannot be diverted "for any non-conforming purpose merely on the ground that the utilisation is for a public purpose", and that "preservation of water bodies, natural drains, catchment areas and traditional water channels assumes even greater significance in a State like Rajasthan". On 7 August 2026 the Supreme Court directed the State to demarcate "the High Flood Line and the requisite ecological buffer zone qua all the river systems in the State", and until then to grant no fresh permissions for development within the identified river corridors (In Re: 2 Million Lives at Risk, Contamination in Jojari River, Suo Motu W.P. (C) 8 of 2025). Wetlands notified under the Wetlands (Conservation and Management) Rules, 2017, and the State's four Ramsar sites, are the concern of the Rajasthan State Wetland Authority, under the High Court's suo motu order of 1 June 2026 (Clause 7.12, Commentary).
This Manual treats every recorded talab, johad and nadi, with its recorded catchment (agor) and the flow paths that feed it, as drainage infrastructure. Rajasthan's traditional systems were built to catch the runoff of a catchment and hold it: the talab, johad and nadi of the villages and towns, the baori and jhalra (step-wells), the kund and the taanka (walled cisterns), and the khadin (a bund across a slope behind which runoff stands and is then farmed). A talab is only as good as its agor: the Ramgarh dam had "Less/no inflow … Despite Average and Above Average Rainfall" (Technical Committee report of 9 January 2013), after the High Court had ordered a survey of the parts of its catchment "misused for construction and mining purposes" (order of 18 July 2003; both as summarised by the Supreme Court in 2017). No design under this Manual shall assume or rely on the filling of a recorded talab, or on the blocking or diversion of a flow path that feeds it, unless a drainage assessment under Chapters 3 to 5 shows where the storage and the flow go, and the lost storage is replaced under Clause 7.6.4 (see "Recorded talab" and "Agor" in the definitions after Clause 7.2). The protection of the agor and its flow paths is this Manual's proposal, built on the court orders above; it is not a statutory rule, and where a court order or the Lakes Act gives wider protection, that governs. Neither the Model Rajasthan Building Regulations 2025 nor the 2020 regulations they replace set a setback from water; the nearest provision is the environmental condition for buildings of 5,000 to 20,000 m² built-up area that "the inlet and outlet points of the natural drainage system shall be kept as they are" and channels sized for unobstructed flow (Annexure 4 of the JDA regulations of 2020, in translation; Schedule 4 of the 2025 regulations is reported to carry the same text). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, municipal, planning, lake and wetland procedures that record and protect waterbodies in law, or the directions of the Supreme Court, the High Court and the National Green Tribunal.