Draft v1.0 prepared by NEER. Not adopted by the Government of NCT of Delhi, DDA or any local body, and has no legal force. About this draft

Delhi · Draft v1.0

Delhi Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Delhi Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for the National Capital Territory of Delhi.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of the National Capital Territory of Delhi (GNCTD) or by any of its departments, local bodies or agencies. Nor has it been adopted, notified or endorsed by the Delhi Development Authority (DDA), the Municipal Corporation of Delhi (MCD), the New Delhi Municipal Council (NDMC), the Delhi Cantonment Board (DCB), the Ministry of Housing and Urban Affairs or any other department, local body or agency. Where it names a body, such as the Irrigation and Flood Control Department (I&FC), the Public Works Department (PWD), the Urban Development Department (UDD), the Revenue Department, the Delhi Jal Board (DJB), the Delhi Pollution Control Committee (DPCC), the Delhi Disaster Management Authority (DDMA), the Wetlands Authority of Delhi, DDA, MCD, NDMC, DCB or DSIIDC, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Master Plan, the building bye-laws, the drainage standards and the approval conditions in force continue to apply.

Delhi is a Union Territory. The National Capital Territory of Delhi is a Union Territory with a Legislative Assembly, not a State. The chapters of this Manual are shared with the editions written for States, and they use the word "State" throughout. In this Manual, "State" means the National Capital Territory of Delhi, and "State Government" means the Government of the National Capital Territory of Delhi (GNCTD), consistent with section 3(58)(b) of the General Clauses Act, 1897, under which "State" includes a Union territory. The usage is one of convenience. It does not change who holds any power. Some of the bodies this Manual names are Union bodies rather than bodies of GNCTD: DDA, under the Ministry of Housing and Urban Affairs, which approves the Master Plan and the building bye-laws; NDMC; DCB; the Central Water Commission (CWC); and the Central Ground Water Authority (CGWA). Chapter 1 repeats the definition.

Names. Older sources, including the Unified Building Bye-Laws for Delhi 2016 (UBBL), the IIT Delhi drainage master plan of 2018 and the 2019 notification constituting the Wetlands Authority of Delhi, name three municipal corporations: South Delhi, North Delhi and East Delhi. The Delhi High Court's orders from 2024 name a single Municipal Corporation of Delhi. This Manual uses MCD for the single corporation and cites earlier documents by the names they use. The statute and date of the unification were not confirmed in the sources read for this Manual [TBC]. Some names have more than one form in sources and on gauges:

  • the Yamuna's reference gauge in Delhi is the Old Railway Bridge (ORB), also called Loha Pul;
  • the IMD observatories are New Delhi/Safdarjung and New Delhi/Palam, called Safdarjung and Palam in this Manual; Safdarjung is also spelt Safdarjang, and the Lodi Road observatory is also spelt Lodhi Road;
  • Barapullah is also spelt Barapulla, and Shahdara Shahadra; and
  • the Najafgarh drain carries the Sahibi from Haryana, and the Najafgarh jheel is also written jhil.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • DDMA is the Delhi Disaster Management Authority; the District Disaster Management Authorities of Delhi's districts are written in full;
  • NDMC is the New Delhi Municipal Council. The IIT Delhi plan of 2018 also writes "NDMC" for the former North Delhi Municipal Corporation; this Manual writes that body in full;
  • UDD is the Urban Development Department of GNCTD, not a development authority; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi and Urdu terms used in the text, such as nala (natural drain or large storm drain), johad (earthen pond), talab (tank or pond), baoli (stepwell), bund (embankment), khadar (the low floodplain of the river) and bangar (the older upland alluvium above it), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Delhi floods for three reasons. The night of 28 June 2024 showed the first, when a burst of rain fell on drains built for a fraction of it; 13 July 2023 showed the second, when the Yamuna rose higher than ever recorded and a regulator at ITO gave way; and the Delhi High Court described the third in April 2024, a single drain that passes through six jurisdictions on its way to the river.

  1. Short, intense bursts beyond what the drains were built for. The city's first Drainage Master Plan, of 1976, is reported to have designed for 25 mm of rain an hour. IIT Delhi, in its drainage master plan of 2018, fitted the 15-minute rainfall of the two long-record IMD observatories and found a 2-year intensity of 87.2 mm/h at Safdarjung and 79.5 mm/h at Palam, and 112.2 mm/h and 95.8 mm/h at 5 years; the largest 15-minute fall in its record was 41 mm, at Safdarjung in 1999. Recent bursts are larger still. On 28 June 2024 Safdarjung recorded 228.1 mm in the 24 hours to 08:30, the second-highest June day in its record since 1901, and 148.5 mm of it was reported to have fallen in three hours before dawn; other gauges in the city recorded from 5 mm to 193 mm the same night. On 31 July 2024 the automatic weather station at Pragati Maidan was reported to have recorded 112.5 mm in one hour. The all-time daily records are older: 266.2 mm at Safdarjung on 21 July 1958 and 265.8 mm at Palam on 9 July 1972. Roofs, roads and paving now send more water to the drains, and faster.
  2. The Yamuna locks the outfalls. Delhi's drains end at a river that, in flood, stands above them. At the Old Railway Bridge the Yamuna was reported to have reached 208.66 m on 13 July 2023, the highest level recorded in Delhi, against a danger level of 205.33 m and a previous record of 207.49 m in 1978; it reached 207.48 m on 4 September 2025, when about 10,000 people were reported displaced. Releases from Hathnikund barrage in Haryana are reported to take about 48–50 hours to reach Delhi, but a local burst gives no warning, and in July 2023 the two came within a week of each other: 153 mm fell at Safdarjung in the 24 hours to 9 July, and the river peaked on 13 July. That evening the regulator on drain No. 12 near ITO was reported to have collapsed, and river water flowed back through the drain into ITO and Rajghat and up to the approach to the Supreme Court. East of the river the city cannot drain by gravity at all: the Shahdara and Left Marginal bunds, built in 1955–56, prevent direct outfall to the Yamuna, only the Relief Drain discharges to the river, and the rest of the runoff of the Trans-Yamuna basin is turned away from the river, collected and pumped. When the pumps fail, the drains back up.
  3. A drain network split among seven agencies, built to no approved standard, and carrying sewage. The Delhi High Court recorded in April 2024 that Delhi's 3,740 km of major storm drains are held by seven agencies and a remainder: PWD 2,064 km, MCD 522 km, I&FC 427 km, NDMC 335 km, DDA 251 km, DSIIDC 98 km and DCB 40 km. One drain, from India Gate to the Yamuna, passes through six jurisdictions of four authorities, and "due to control of multiple authorities, a consistent slope/level of the drain is not maintained"; in the 2023 monsoon it flooded Purana Qila Road and the new tunnel to Bharat Mandapam. Regulators that stop backflow from the river are run by I&FC, and the pumping of sewage when they are shut by MCD. None of the city's three drainage master plans is an approved design standard (see Why this Manual is needed). In law the systems are separate: the Delhi Water Board Act, 1998 defines DJB's drains as "not designed to carry rain water or sub-soil water". In practice the storm drains carry sewage. The Comptroller and Auditor General (CAG) reported in 2026 that 212.59 million gallons a day (MGD) of sewage from 1,080 unauthorised colonies "was dumped into storm water drains in untreated form", and in 2024 the High Court ordered 191 points where sewage enters storm drains, and 121 points where storm water enters sewers, to be tapped. DJB is building interceptor sewers along the Najafgarh, Supplementary and Shahdara drains to take the sewage out of them.

Behind all three lies lost storage. Of the 201 drains of the 1976 plan, I&FC lists 44 as "untraceable". Delhi has 1,367 recorded water bodies, 1,045 on the list and 322 more found from satellite imagery; by September 2024 ground-truthing had covered 674, all of them visible. Agencies had asked for 232 listed water bodies to be deleted, and no wetland in Delhi had been notified under the Wetlands (Conservation and Management) Rules, 2017 as of 2024. The johads, talabs and baolis that once held rain are being revived one at a time: 272 water bodies had been restored by April 2024, under the supervision of the High Court.

Design for Delhi therefore has to cover a short, late monsoon and the river behind it. About 83% of the year's rain falls from June to September, on a normal of 640.4 mm at Safdarjung and 598.2 mm at Palam for June to September (1971–2020). The monsoon's normal onset over Delhi is 27 June, but it has arrived as early as 15 June (2008), and the record June days of 1936, 1981 and 2024 all fell in the last week of June; its normal withdrawal is 25 September, but it has stayed as late as 17 October (2013). Heavy-rain days are few, one or two a year on average, so drains, gates and pumps sit unused for months before they are needed. Rain outside the monsoon can be heavy too: Safdarjung recorded 134.0 mm on 16 April 1983.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the Yamuna or the receiving drain is high and the flap gate or regulator is shut, or when the pumps that serve it are running at full capacity.

The Manual also sets how public drains, roads, nalas, johads and other water bodies, gated and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Delhi's short south-west monsoon from late June to September and the bursts that come with it; the Yamuna, its embanked floodplain and the regulated and pumped outfalls of the drains that reach it; the three drainage basins of Najafgarh, Barapullah and Trans-Yamuna, and the Sahibi that brings flood water into the Najafgarh drain from Haryana; the sandy alluvium and shallow water table of the khadar, the older alluvium and kankar of the plains, the quartzite of the Ridge with a water table more than 65 m deep beneath it, and the low-lying Najafgarh basin; the johads, talabs and baolis; and a city where basements, underpasses and covered drains turn ordinary storms into floods.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for subzone 1(e) Upper Indo-Ganga Plains, which covers Delhi, as the interim source; the 15-minute station frequency analyses for Safdarjung and Palam in the IIT Delhi drainage master plan (2018), the only published station rainfall-frequency relationships for Delhi; and frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for comparison only.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Delhi Development Act, 1957 and the Master Plan for Delhi with the perspective for the year 2047 (MPD-2047) made under it; the Unified Building Bye-Laws for Delhi 2016, as amended; the Delhi Municipal Corporation Act, 1957, the New Delhi Municipal Council Act, 1994 and the Cantonments Act, 2006; the Delhi Water Board Act, 1998; the Wetlands (Conservation and Management) Rules, 2017 and the Wetlands Authority of Delhi; and the orders of the National Green Tribunal on the Yamuna floodplain and of the Delhi High Court on drains, water bodies and rainwater harvesting. This Manual follows them or, where disclosed, makes them stricter. Amendments to the building bye-laws after February 2020 could not be checked for this Manual [TBC], and the drainage sections of the three municipal Acts were not read [TBC].

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Delhi can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has a panel for Safdarjung, but it repeats the curve drawn for many other stations and is not an analysis of Safdarjung's record. The CWC report for subzone 1(e) dates from 1984; its maps put the 50-year day at Delhi at about 220–240 mm, and its ratios give a 50-year hour of about 75–82 mm and three hours of about 123–134 mm, both below the bursts reported in 2024. The reanalysis grids of NIH-DHAARA read lower still: a 50-year day of 204 mm and a 50-year hour of 54 mm at Safdarjung. In Delhi, unlike the coastal States, the published ratios understate the short storms.

Delhi has no drainage design standard of its own. Research for this Manual found no design standard, rainfall intensity–duration–frequency (IDF) relationship or circular of I&FC, PWD, MCD, NDMC or DCB that fixes return periods or design rainfall for storm drains. In particular:

  • The Master Plan sets policy but almost no numbers. The Master Plan for Delhi with the perspective for the year 2047 (MPD-2047), notified on 20 August 2026 (S.O. 4597(E)), replaces MPD-2021; the draft that preceded it was published as MPD-2041. It requires a "minimum mandatory buffer" along natural drains and water bodies, with "No construction or parking" in it; makes the active floodplain of the Yamuna a "no construction zone"; calls for water-sensitive design, for parks in flood-prone areas to serve as "flood sinks", and for the drainage of new developments to discharge to "identified groundwater recharge sites"; and directs that "The Drainage Master Plan of the I&FC Department shall be implemented through multi-agency coordination". Its general buffer clause (3.1.2(i)(f)) gives no width; the only width found is in the controls for recreational use (10.2.3(v)), which ask new projects of more than 1.0 ha along drains or water bodies for "a minimum mandatory buffer of 10m … wherever feasible". It gives no design storm and no limit on runoff. This Manual supplies them as its own proposals; they are not statutory values;
  • The building bye-laws require recharge but not detention. UBBL makes rainwater harvesting by recharge mandatory on plots of more than 105 m², sized to capture at least the runoff of the peak month's rainfall from roof and non-roof areas, and the Delhi High Court restated the rule in April 2024. A central notification of 2001 and DJB's practice apply a threshold of 100 m², with a penalty on the water bill where a society or institution has no system. No rule requires on-site detention, limits peak runoff or sets "zero run-off" for storm water; "zero discharge" in MPD-2047 refers to wastewater;
  • Basements are guarded against surface water, not floods. UBBL requires only that surface drainage not enter a basement and that its walls and floor be watertight; neither UBBL nor MPD-2047 restricts basements in low-lying or flood-prone areas, and no later amendment doing so was found [TBC]. On 27 July 2024 three students drowned in a basement library in Old Rajinder Nagar after a storm reported at 31.5 mm in three hours, less than a 2-year storm;
  • There are three drainage master plans, and none is an approved design standard. The 1976 plan listed 201 drains, 44 of them now untraceable, and is reported to have designed for 25 mm/h. IIT Delhi's plan for I&FC (Final Report, July 2018) modelled the city for 2-year and 5-year storms from the 15-minute rainfall of Safdarjung and Palam. It treated the whole city as one hydrologic soil group, and it left out the regulators, gates and portable pumps because no details of them were available. Its approval was reported pending in 2019, and in April 2024 the High Court found that it "was not acted upon by GNCTD". A new plan prepared under PWD, of about ₹57,363 crore, was unveiled on 19 September 2025 and was reported to await approval of its project reports. Its consultant states that capacity rises from 25 mm/h to 70 mm/h with an allowance of 11% for climate change, but the return period and storm duration behind 70 mm/h have not been published. MPD-2047 still describes the plan as under preparation;
  • No document sets the river level for which an outfall is designed [TBC]. The warning, danger and evacuation levels at the Old Railway Bridge (204.50 m, 205.33 m and 206.00 m, as reported) are flood-warning levels, not design levels;
  • There are no setbacks in metres from drains or water bodies. The National Green Tribunal held in 2015 (Manoj Misra v. Union of India) that the floodplain of the Yamuna is to be zoned by the flood of once in 25 years, mapped and demarcated by DDA, and that no drain in Delhi is to be covered. MPD-2047 makes water bodies of 1 ha and more Environmentally Sensitive Areas, with "zero tolerance" for encroachment, but sets no width; and
  • Water bodies are listed but not notified. The Wetlands Authority of Delhi was constituted on 23 April 2019. Of the 1,367 recorded water bodies, 674 had been ground-truthed by September 2024, and none had been notified as a wetland as of 2024. The High Court has ordered each water body to be entered in the revenue records and put in the charge of a named officer.

So each agency and each local body interprets the central manual its own way. PWD, MCD, I&FC, NDMC, DDA, DSIIDC, DCB and DJB, their consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A drain can pass from NDMC to PWD to MCD to I&FC on its way to the Yamuna, with no common slope, level or capacity, and end at a regulator that one agency shuts while another runs the pumps. Since April 2024 the 22 drains that outfall to the Yamuna have been assigned to I&FC, by an office order not read for this Manual [TBC], but in July 2025 another bench of the High Court still found "enormous confusion" between the agencies. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one standard for Delhi:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to the Yamuna and its drains, gated, regulated or pumped (Chapter 5);
  • widths for the buffers along natural drains and water bodies that MPD-2047 requires but does not generally size, proposed by this Manual (Chapter 7); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). MCD, NDMC, DCB or DDA can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); General Clauses Act, 1897, s.3(58); Master Plan for Delhi with the perspective for the year 2047, MoHUA notification S.O. 4597(E), 20 August 2026, paras 1.8, 3.1.2, 3.7.1, 3.7.2 and 13.1.3 and Annexure 3, and DDA, FAQs on MPD-2047; Unified Building Bye-Laws for Delhi 2016, S.O. 1191(E), 22 March 2016, compendium incorporating amendments up to 12 February 2020, clauses 1.4.10 and 7.4, Table 10.1 and Annexure X; DPCC report in NGT E.A. 34/2023 in O.A. 526/2019 (February 2024), on the MoUD notification of 28 July 2001 and DJB's rainwater harvesting penalty; Delhi Water Board Act, 1998, s.2(m) (text as reproduced by IELRC); Delhi High Court, W.P.(C) 7594/2018 and W.P.(C) 9617/2022, judgment of 8 April 2024, paras 4, 9–13, 15–19 and 34, and orders of 25 July 2024 and 25 September 2026; Delhi High Court, W.P.(C) 13190/2024, order of 28 July 2025; NGT, O.A. 6/2012, Manoj Misra v. Union of India, judgment of 13 January 2015; GNCTD notification constituting the Wetlands Authority of Delhi, 23 April 2019; DPCC response in NGT O.A. 633/2024 (11 September 2024); CAG, Performance Audit on Functioning of Delhi Jal Board, Report No. 3 of 2025, paras 4.1 and 4.2.1; Supreme Court, W.P.(C) 725/1994, order of 20 February 2017; I&FC, lists of the 201 drains of the 1976 Drainage Master Plan and of the 44 untraceable drains; IIT Delhi, Drainage Master Plan for NCT of Delhi, Final Report (July 2018), §§1.3, 4.3–4.4 and the Trans-Yamuna basin description; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD press release on the heavy rainfall of 28 June 2024; IMD RMC New Delhi, Southwest Monsoon Report 2025; Guhathakurta, P. et al. (2020), Observed Rainfall Variability and Changes over Delhi State, IMD Met Monograph; Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC, Flood Estimation Report for Upper Indo-Ganga Plains Subzone 1(e) (approved July 1984; report number not on the copy read [TBC]); reports of the 1976 design basis and of the 2025 drainage master plan (PWD and consultant), of the 2018 plan's approval (2019), of the bursts of 28 June and 31 July 2024 and of 8–9 July 2023, of the Yamuna levels and warning levels at the Old Railway Bridge in 1978, 2023 and 2025 and the travel time from Hathnikund, of the drain No. 12 regulator failure (July 2023) and of the Old Rajinder Nagar basement deaths (July 2024) (press).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Ponds (Johads) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Major storm drains in Delhi by owning agency (Delhi High Court, 8 April 2024)
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Delhi
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Delhi locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and land
7E.2Channels, drains and parts of the system
7E.3Floods and statutory terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Trans-Yamuna pumped outfall: colony drains, drain, regulator through the embankment, pumps
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DCB Delhi Cantonment Board
DDA Delhi Development Authority
DDMA Delhi Disaster Management Authority (District Disaster Management Authorities are written in full)
DJB Delhi Jal Board, constituted under the Delhi Water Board Act, 1998
DMC Act Delhi Municipal Corporation Act, 1957
DPCC Delhi Pollution Control Committee
DPGS Delhi Parks and Gardens Society (secretariat of the Wetlands Authority of Delhi)
DSIIDC Delhi State Industrial and Infrastructure Development Corporation
DWF Dry-weather flow
EIA Environmental impact assessment
ESA Environmentally Sensitive Area (MPD-2047)
ESC Erosion and sediment control
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FTL / MWL Full tank level / maximum water level
GNCTD Government of the National Capital Territory of Delhi
GSDL Geospatial Delhi Limited
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Delhi)
HFL High flood level
HGL Hydraulic grade line
HSG Hydrologic soil group
I&FC Irrigation and Flood Control Department, GNCTD
IDF Intensity–duration–frequency
IDMC Integrated Drainage Management Cell
IMD India Meteorological Department
IRC Indian Roads Congress
MCD Municipal Corporation of Delhi
MGD Million gallons a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
MPD-2047 Master Plan for Delhi with the perspective for the year 2047 (S.O. 4597(E), 20 August 2026)
NCT National Capital Territory
NDMA National Disaster Management Authority
NDMC New Delhi Municipal Council (the former North Delhi Municipal Corporation is written in full)
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
ORB Old Railway Bridge (Loha Pul), the reference gauge on the Yamuna in Delhi
PSD Permissible site discharge
PWD Public Works Department, GNCTD
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance (coastal term; not applicable in Delhi)
SoI Survey of India
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
UBBL Unified Building Bye-Laws for Delhi 2016
UDD Urban Development Department, GNCTD
ULB Urban local body (in Delhi, MCD, NDMC or DCB)
UTM Universal Transverse Mercator
WQv Water quality volume
WSUD Water-sensitive urban design