Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Delhi. Delhi is landlocked: it has no coast, no tide and no Coastal Regulation Zone. No outfall in Delhi discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Delhi: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other editions. In Delhi the receiving water is the Yamuna, reached through a regulator or a pumping station; a drain of I&FC or of another drain-owning agency; a pumped sump behind the marginal bunds of the Trans-Yamuna area; or a johad, lake or other water body, and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by the Yamuna or by a receiving drain, with the river lock of Clause 5.8.5(a) in place of the tidal lock windows.

Commentary. Delhi's drains fail in places that site design does not see. Almost every drain in the city ends in the Yamuna, and the river decides. On 13 July 2023 the Yamuna reached 208.66 m at the Old Railway Bridge, the highest level recorded in Delhi, against a danger level of 205.33 m; the regulator of drain No. 12 near ITO collapsed, and the river ran back up the drain into ITO and Rajghat (press reports). Across the river, the Shahdara and Left Marginal bunds, built in 1955–56, prevent any direct outfall: only the Relief Drain discharges to the river, and the other drains of the Trans-Yamuna area run away from it and are pumped (IIT Delhi, 2018). Upstream, the Najafgarh drain brings water from Haryana into the largest of the city's basins. And the outfalls belong to one body while the drains above them belong to others: the regulators that stop backflow from the river are run by I&FC, but pumping at such times is managed by MCD (Delhi High Court, 8 April 2024). The only city-wide drainage model left out every regulator, gate and portable pump for lack of data (IIT Delhi, 2018), and no document found during research sets a design river level for any outfall. A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if the river it drains to stands above its outfall for days. This chapter makes both failure modes part of the design. Delhi has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, I&FC canal, the 22 drains that outfall to the Yamuna, the Najafgarh drain and the Supplementary drain, the Barapullah drain, the Relief Drain, the Shahdara Outfall Drain and the other trunk drains of the Trans-Yamuna area, the natural drains of the 1976 Drainage Master Plan, the Agra canal, any drain maintained by I&FC, PWD, MCD, NDMC, DDA, DSIIDC or the Delhi Cantonment Board with an internal width of 1.0 m or more, any irrigation canal that receives storm water, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, johad or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or johad under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, MCD, DDMA or I&FC; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next johad or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Delhi. In the Najafgarh basin, where the Najafgarh drain enters Delhi from Haryana and runs 57.5 km, past the Kakraula regulator, to the Yamuna below the Wazirabad barrage, with 28 drains joining it between Dhansa and Kakraula and about 74 below Kakraula (IIT Delhi, 2018), and in the Trans-Yamuna area, where most drains run away from the river to pumping stations behind the marginal bunds, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Delhi, where the Yamuna stays high for days and the drains behind its regulators can discharge only by pumping while it does: in September 2025 the river crossed the danger level of 205.33 m at the Old Railway Bridge on 2 September, peaked at 207.48 m on 4 September and was still at 205.22 m on 8 September, and in July 2023 it was reported still near the danger level on 24 July, eleven days after its record peak (press reports). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Delhi, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, DDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Delhi has no coast, and the surge term does not arise in Delhi.

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Delhi, which has no coast, and Annex 5A is not prepared for Delhi (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Yamuna through Delhi, including the 22 km between the Wazirabad and Okhla barrages with the ITO barrage between them, with the releases of Hathnikund (Clause 5.8.3), and the outfalls of the 22 drains that discharge to it, through regulators, along that reach (Clause 5.8.5(a) and (b));
  • the Najafgarh drain, from the Haryana boundary near Dhansa past the Kakraula regulator to its outfall below Wazirabad, and the Supplementary drain, which joins it just above that outfall, with the inflows from Haryana (Clause 5.8.5(c));
  • the Barapullah drain and the other drains that outfall to the Yamuna at and below ITO, including drain No. 12 and the drain from India Gate that becomes drain No. 14 at Pragati Maidan (Clause 5.8.5(a));
  • in the Trans-Yamuna area: the Relief Drain, which outfalls to the Yamuna, and the drains behind the Shahdara Marginal and Left Marginal bunds, with their pumping stations and the Shahdara Outfall Drain and its Chilla regulator (Clause 5.8.5(d));
  • the Agra canal, into which four storm drains of the Barapullah basin discharge, and any other irrigation canal or drain of I&FC that receives storm water (Clause 5.8.5(e)); and
  • elsewhere: any river or I&FC channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) I&FC design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Hathnikund barrage on the Yamuna in Haryana, whose releases are reported to take about 48–50 hours to reach Delhi, and the Wazirabad and ITO barrages above many of the city's outfalls), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 Yamuna-locked outfalls, the barrage reaches, the Najafgarh drain and its inflows from Haryana, the Trans-Yamuna area behind the marginal bunds, and discharges to I&FC drains and irrigation canals.

  • (a) Yamuna-locked outfalls. For an outfall to the Yamuna through a regulator, gate or pumping station (for example the 22 drains that outfall to the river, the Barapullah drain and drain No. 12 near ITO), or into a drain that itself discharges through one, the designer shall identify the body that operates each regulator, gate and pumping station, and obtain the sill of each gate, the crest of any embankment, the installed pumping capacity and the operating levels. Every level shall state its datum and its connection to the gauge datum of the Old Railway Bridge (ORB).
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP Yamuna level at the outfall from a hydraulic model under Clause 5.8.2(b) and item (b), and not less than the highest recorded level at the nearest CWC or I&FC gauge, transferred to the outfall: at the ORB gauge 208.66 m (13 July 2023). The recorded level shall be transferred along the river with the water-surface slope of the July 2023 flood from the CWC and I&FC gauge records, or from the model. Until either is available, 208.66 m applies unchanged at every outfall downstream of the ORB, and an outfall upstream of it, such as that of the Najafgarh drain, shall not be designed without one [TBC]. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the evacuation level of 206.00 m at the ORB, transferred in the same way (all set by this Manual).
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the regulator, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the regulator only while the river is lower than the level behind it.
    • River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, taken from the river model or from the stage record of the nearest CWC or I&FC gauge in comparable past events, and not less than 7 days (168 hours), covering the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6 shows it and the Authority approves it. Floor levels and pumped outfalls behind a regulator shall also be checked for the failure of the regulator, with the drain behind it filled to the river level beyond it.
  • (b) Barrage reaches. For an outfall to a reach of the Yamuna whose level is set by the Wazirabad, ITO or Okhla barrage, or by releases from Hathnikund, the river level of Clause 5.8.2 shall:
    • include the releases of Clause 5.8.3 from Hathnikund, routed to Delhi, and the flow of the catchment below it, combined as they occurred in the largest recorded event, unless an operating rule in force says otherwise; a release, or a release rule, alone shall not be taken to bound the river flow (set by this Manual);
    • take each barrage's gates as operated in the largest recorded event, and not assume that any gate opens fully unless the operator's records show it; a sensitivity run with the largest number of gates recorded out of action at that barrage (at ITO, five of 32 in July 2023, as reported) shall be reported (set by this Manual);
    • be computed with the downstream boundary of the river model at the recorded level in the largest recorded event, unless the model is carried far enough downstream that moving the boundary changes the level at the outfall by less than 10 mm; and
    • for the major-system cases, be not less than the transferred highest recorded level of item (a).
  • (c) The Najafgarh drain and its inflows from Haryana. For an outfall to the Najafgarh drain, the Supplementary drain or a drain that ends in either, the tailwater shall be the drain's level in the coincident case of Clause 5.8.4, computed with:
    • the inflow that enters Delhi from Haryana near Dhansa, from the Sahibi and the other drains across the boundary, taken as the largest recorded inflow, or from a hydrograph method for the catchment beyond the boundary (Chapter 3), whichever is greater, until I&FC publishes a design inflow [TBC];
    • the Kakraula regulator and any other regulator on the drain as operated in the largest recorded event, with no operation that lowers the level assumed unless the operator's records show it;
    • no storage credited in the Najafgarh jheel or any other depression along the drain, unless I&FC operating records show the storage available at the start of a storm; and
    • its downstream boundary at the Yamuna level of item (a) at the outfall below Wazirabad.
  • (d) The Trans-Yamuna area behind the marginal bunds. Behind the Shahdara Marginal and Left Marginal bunds, where only the Relief Drain discharges to the Yamuna, an outfall to a drain that is pumped to the river, or to another drain, shall have as tailwater the routed level of the drain and its sump under item (a), with the permanent pumps less the largest one and no portable pumps. Mobile pumping from one drain into another shall not be counted, and a project's pumped discharge into another drain shall be included in that drain's level (Clause 5.12.3). For the Shahdara Outfall Drain, the downstream boundary is the level at its outfall to the Yamuna in the largest recorded event; its course below Delhi, reported to pass through Noida in Uttar Pradesh, was not researched for this Manual [TBC]. Floor levels and pumped outfalls behind the bunds shall also be checked for a breach of the bund, with the land behind it filled to the river level beyond it.
  • (e) I&FC drains and irrigation canals. Storm water shall not be discharged to a drain maintained by I&FC, or to the Agra canal or another irrigation canal, without the consent of I&FC or of the channel's owner. Where consent is given:
    • the discharge shall not exceed the rate the consent allows;
    • the tailwater is the higher of the channel's design water level as I&FC or the owner states it and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other agencies and the inflows from Haryana and Uttar Pradesh, and with its downstream boundary at the Yamuna level of item (a); until I&FC publishes a design water level for a drain, the computed level governs [TBC];
    • the channel shall be taken in its present condition, net of silt, encroachment and obstruction by crossing services, and a widening or remodelling that has been proposed but not completed, including the works of a drainage master plan whose detailed project reports are not yet built, shall not be counted; and
    • the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.

No pump, regulator, gate or barrage operation that helps drainage, such as pumping a drain down before a storm, closing a regulator late or opening barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain or the river (Clause 5.12.3).

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Delhi's river breaks that assumption. The Yamuna's flood at Delhi comes largely from rain above the Hathnikund barrage in Haryana, whose releases take about 48–50 hours to reach the city (press reports), but the same monsoon spells fall on Delhi, and the river stays high for days. In July 2023, 153 mm fell in Delhi in 24 hours on 8–9 July, and the river peaked at 208.66 m at the Old Railway Bridge on 13 July and was reported still near the danger level on 24 July (press reports): a second storm in that fortnight would have fallen on a city whose outfalls were shut. In 2025 the monsoon rainfall at Safdarjung was 41% above normal (IMD), and the river stood above its danger level from 2 to about 8 September (press reports). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the Yamuna. The river reaches Delhi below the Hathnikund barrage in Haryana, and Delhi's flood plan is reported to issue its first warning when Hathnikund passes more than 1 lakh cusecs (about 2,830 m³/s); the 2023 release was reported at 3.59 lakh cusecs (about 10,200 m³/s), and releases take about 48–50 hours to reach Delhi (press reports). Within the city the river passes three barrages, which three governments are reported to control: Wazirabad by Delhi, ITO by Haryana and Okhla by Uttar Pradesh (press report, July 2025). In July 2023 five of the 32 gates of the ITO barrage were reported jammed by silt, and the Army and Navy worked to open them while Haryana ordered an inquiry (press reports). No published operating rule or release hydrograph for Hathnikund, Wazirabad, ITO or Okhla was found during research, and the CWC hourly stage record at the Old Railway Bridge and the Delhi Flood Control Order were not obtained [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below Hathnikund as it occurred in the same event (Clause 5.8.5(b)), and the warning, danger and evacuation levels used in this Manual (204.50 m, 205.33 m and 206.00 m at the Old Railway Bridge) are those reported in the press and are to be confirmed from CWC [TBC].

Clause 5.8.5 is set by this Manual. In Delhi the tailwater at an outfall is set not by the tide but by the Yamuna, by a barrage that another government may operate, by a drain that carries water from Haryana, or by a pump behind an embankment, and no document found during research gives a design river level for any of them.

The first is the river lock. The drains that outfall to the Yamuna do so through regulators, which I&FC closes against backflow when the river rises (Delhi High Court, 8 April 2024). The river's reported warning, danger and evacuation levels at the Old Railway Bridge are 204.50 m, 205.33 m and 206.00 m; it reached 207.49 m in 1978, a record 208.66 m on 13 July 2023 and 207.48 m on 4 September 2025 (press reports). The IIT Delhi drainage plan, the only city-wide model, excluded regulators, gates and portable pumps "in the absence of any details of operations, dimensions and locations" (IIT Delhi, 2018), so it says nothing about the level at an outfall. Clause 5.8.5(a) therefore asks for a modelled 1% AEP level and, until one exists, uses the highest recorded level as a floor. A record set in 2023, in a river that has passed 207.4 m at least three times since 1978, is a floor and not an estimate of the 1% AEP level, which may be higher. Carrying the ORB level unchanged downstream is conservative there, because the river falls downstream; upstream of the ORB it would not be, so an outfall upstream of the gauge needs a profile. The 206.00 m floor for the 10% AEP river level is set because the river has passed 207.4 m at least three times since 1978, so a level reached about once in ten years is unlikely to lie below the evacuation level; it is to be replaced by a frequency analysis of the CWC record [TBC]. A Yamuna flood also lasts. In September 2025 the river crossed the danger level on 2 September and was still at 205.22 m on 8 September and 204.49 m on 11 September, and in July 2023 it was reported near the danger level eleven days after its peak (press reports). A tide lock opens again within hours; a river lock lasts as long as the flood. The single lock of at least 7 days covers the six days that the river stood above its danger level in 2025, and longer where an outfall lies lower than the danger level. It also covers the whole design storm, so that a site behind a regulator stores or pumps its whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. It counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump; portable pumps brought in for an event are not a design capacity. The regulator-failure check follows drain No. 12 in July 2023.

The second is the barrage reach. Releases from Hathnikund take about 48–50 hours to reach Delhi (press reports), which gives warning to close regulators and move pumps but does not lower the river. Within the city, Wazirabad, ITO and Okhla are reported to be controlled by Delhi, Haryana and Uttar Pradesh respectively, and in July 2023 five of the 32 ITO gates were reported jammed by silt (press reports). Clause 5.8.5(b) therefore gives no credit for gate operation that the records do not show and asks for a run with gates out of action.

The third is the Najafgarh drain, which enters Delhi from Haryana and runs 57.5 km to the Yamuna below Wazirabad. In its upper reach it "carries flood water, wastewater from Haryana and surface runoff", and the Najafgarh jheel, once a large water body, "receives the spill from Delhi, as well as from Haryana and Rajasthan" (IIT Delhi, 2018). The catchment beyond the boundary is larger than the 2,500 km² limit of the CWC flood estimation report for subzone 1(e) (CWC, 1984), so Clause 5.8.5(c) takes the larger of the recorded inflow and a hydrograph method, and gives no storage credit in the jheel unless I&FC records show it.

The fourth is the Trans-Yamuna area. The Shahdara Marginal Bund (11.95 km) and the Left Marginal Bund (6.7 km), built in 1955–56, prevent any direct outfall, so "the natural flow direction is reversed and collected runoff is pumped to river Yamuna or other nearby drains" (IIT Delhi, 2018). The land behind the bunds lies low on the old floodplain, with a shallow water table, and drains by pumping alone while the river is high. Clause 5.8.5(d) treats it as a polder, with a bund that can breach, and counts no mobile pump.

The fifth is the drain that another body owns. Delhi's 3,740 km of major storm drains belong mainly to seven bodies, and the 22 drains that outfall to the Yamuna were assigned to I&FC by an office order of 29 April 2024, which was not read for this Manual (Delhi High Court, orders of 8 April and 25 July 2024). Four storm drains of the Barapullah basin discharge to the Agra canal (IIT Delhi, 2018). No I&FC design water level was found for any drain, and the PWD drainage master plan unveiled in September 2025 had not been approved (press reports). Clause 5.8.5(e) asks for the owner's consent and design water level and, until the level is published, computes it from the drain's present condition, without counting works that are not built. The Hindon, and the drains of Noida and Ghaziabad that meet Delhi's at the eastern boundary, were not researched [TBC].


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Delhi requirement in this Manual. In Delhi it applies where an outfall is shut not by the tide but by the Yamuna. The drains that outfall to the river do so through regulators that are closed when the river rises, and behind the marginal bunds of the Trans-Yamuna area the drains can discharge only by pumping; the IIT Delhi plan records that "the failure of these pumps leads to drainage congestion" and that mobile pumping into nearby drains "often causes flooding in the downstream areas" (IIT Delhi, 2018). When the regulator of drain No. 12 failed on 13 July 2023, the river flowed back into ITO and Rajghat (press reports). A Yamuna flood lasts for days, not hours: in September 2025 the river stood above its danger level for about six days (press reports), which is why Clause 5.8.5(a) replaces the two 6-hour windows described below with a single lock of at least 7 days. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 15 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Delhi the outfalls do not cross a beach, but the regulators on the drains that outfall to the Yamuna are the city's line of defence against the river, and the river carries silt. On 13 July 2023, with the Yamuna at a record 208.66 m at the Old Railway Bridge, the regulator of drain No. 12 near the WHO building at ITO collapsed and river water flowed back through the drain into ITO, Rajghat and up to the approach of the Supreme Court, and five of the 32 gates of the ITO barrage were reported jammed by silt the same week (press reports). The regulators are operated by I&FC, but pumping at such times is managed by MCD (Delhi High Court, 8 April 2024), so a gate and the pumps behind it can belong to different bodies. The 15 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Delhi: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless the I&FC Department certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the I&FC Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Delhi has no coast and no river mouth, so Clause 5.13 does not apply in Delhi (Clause 5.1.4). Its nearest inland counterpart is silt: silt deposited in the Yamuna bed at a drain's outfall, or in a barrage, can hold a gate shut or open, as five of the 32 gates of the ITO barrage were reported jammed by silt in July 2023 (press reports), and the High Court has observed that "because of the high riverbed, every monsoon sees an overflow of the river water" (Delhi High Court, 8 April 2024). Clause 5.8.5 deals with that case by giving no credit for a gate operation that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting I&FC certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site behind a Yamuna regulator
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)