7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (johad) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Delhi, with no coast and no tidal water, means the wetlands and depressions of the Yamuna floodplain, the Najafgarh jheel and the Sahibi, lakes and jheels such as Bhalswa Lake and Sanjay Lake, and the johads, talabs and other water bodies recorded by the Wetlands Authority of Delhi;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Wetlands (Conservation and Management) Rules, 2017, the Delhi Development Act, 1957 and MPD-2047 made under it, the Delhi Municipal Corporation Act, 1957, the Environment (Protection) Act, 1986, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (the Yamuna and the Sahibi), natural drain or nala, canal (nahar), lake or jheel (jhil), pond (johad, talab, pokhar), tank or reservoir (hauz), stepwell (baoli), marsh or low wet land (dabar, jhabar), floodplain wetland or depression, abandoned quarry or mine pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (johad) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the I&FC Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala or nahar) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, regulator or flap gate) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Delhi terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Johad | An earthen, unlined pond (Annex 7E), usually a village pond in the rural and urban villages of Delhi, with no surplus weir or sluice. A johad is a tank or pond under Clause 7.2. Where it has no surplus weir, its FTL is the level at which it spills to a street drain, a nala or low ground, found by survey. |
| Jheel (jhil) | A shallow lake, marsh or swamp (Annex 7E), as in the Najafgarh jheel and the Shahdara jheel. A jheel is a lake or a wetland for this chapter; where it is a wetland, Clause 7.12 also applies. |
| Baoli; hauz | A stepwell (baoli) or a masonry tank or reservoir (hauz), as at Hauz Khas (Annex 7E). Each is a waterbody for this chapter. Many are protected monuments or eco-cultural assets of MPD-2047, which proposes that Delhi's baolis be restored and "integrated into the city's groundwater recharge strategy"; no storage in a baoli or hauz is counted under Clause 7.7 without the custodian's concurrence (Clause 7.7.1(e)). |
| Recorded water body | A water body in the inventory of the Wetlands Authority of Delhi (1,045 listed and 322 identified from satellite imagery), or one entered in the revenue records under the Delhi High Court's directions of 8 April 2024. A recorded water body is a waterbody under Clause 7.3.3 whether or not it holds water at the time of survey, and an agency's request to delete it from the inventory does not remove it from this chapter until the Wetlands Authority has decided the request. |
| Natural drain; nala | A drain in the I&FC lists, including the 201 drains of the 1976 Drainage Master Plan (whether or not now traceable) and the 22 drains that outfall to the Yamuna, a drain in the list of major drains of MPD-2047 (Annexure 2), or any other nala, natural or cut, that drains 8 ha or more. Each is a natural channel under Clause 7.4.1(b). Its width in the 1976 plan, an I&FC record or a Zonal Development Plan is its recorded width for Clause 7.13.1. |
| Yamuna floodplain (khadar) | The low land along the Yamuna (khadar, Annex 7E). The National Green Tribunal directed that the floodplain be zoned "with reference to the flood of once in 25 years" and that DDA "prepare a map … and … physically demarcate the entire flood plain" (O.A. 6/2012, 13 January 2015); MPD-2047 makes the "active floodplain" a no-construction zone and restricts development outside it, identifying the river and floodplain from the records of the I&FC Department (para 3.1.2(i)(c)). For this Manual, the Tribunal's 1-in-25-year line is a statutory minimum, not the design extent: the 1% AEP extent of Clause 7.3.4 sets Zone 2 wherever it is wider. |
| Environmentally Sensitive Area | An area so listed in MPD-2047 (Annexure 3), including the Aravalli (Ridge), the River Yamuna and its floodplain, all natural drains, marshes and wetlands, and water bodies of 1 ha and above. It is a wider statutory line under Clause 7.4.5 for the uses MPD-2047 restricts in it. |
| River-locked outfall | A drain outfall through a Yamuna embankment, or to a drain whose own outfall is shut, that cannot discharge by gravity while the river is high, such as the outfalls of the Trans-Yamuna basin behind the Shahdara Marginal and Left Marginal Bunds (Figure 7.3). Its regulator or flap gate is a controllable outlet under Clause 7.8 only where it is operated to a written rule; its tailwater is the river stage (Chapter 5). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the I&FC Department and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (DDA, as a land-owning agency and as the owner of the Yamuna floodplain, the I&FC Department, MCD, NDMC, the Delhi Cantonment Board, PWD, the DJB, DSIIDC, the Department of Environment, Forests and Wildlife or the Delhi Parks and Gardens Society, the Revenue Department (through the District Magistrate), the Archaeological Survey of India (for a baoli or tank within a protected monument), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue Department, including the entries of water bodies that the Delhi High Court directed to be made in them (judgment of 8 April 2024); the inventory of the Wetlands Authority of Delhi (1,045 listed water bodies and 322 identified from satellite imagery, 1,367 in all); land shown as a water body, a natural drain, the River Yamuna and its floodplain (Zone 'O') or another Environmentally Sensitive Area in MPD-2047 and its Zonal Development Plans; the I&FC lists of drains, including the 201 drains of the 1976 Drainage Master Plan and the 44 of them listed as untraceable; and the floodplain map that the National Green Tribunal directed DDA to prepare (O.A. 6/2012, judgment of 13 January 2015);
- (b) Delhi I&FC Department and DDA tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where Delhi I&FC Department records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of Delhi was found, and Delhi has no system of statutory flood lines apart from the Yamuna floodplain. For the Yamuna, the National Green Tribunal directed that "floodplain zoning should be taken with reference to the flood of once in 25 years" and that DDA "prepare a map in this regard and would physically demarcate the entire flood plain", calling the 25-year line an "interim prescription" (O.A. 6/2012, judgment of 13 January 2015); MPD-2047 says that the river and its floodplains "shall be identified based on the prevailing records and technical assessment" of the I&FC Department (para 3.1.2(i)(c)). The demarcated map was not obtained for this Manual, and "active floodplain" is not defined in the parts of MPD-2047 read. Away from the river, the IIT Delhi drainage master plan found that Delhi's agencies "neither follow the practice, nor are they mandated by legislation, to prepare formal records of the extent of inundation", relied on the 330 waterlogging points listed by the Traffic Police, and modelled 2-year and 5-year storms, not the 1% AEP event (IIT Delhi, 2018). Of the 201 drains of the 1976 plan, 44 are listed by the I&FC Department as "untraceable". MPD-2047 asks for GIS mapping and a database for drainage (para 3.7.1(c)(vii)). Clause 7.3.4 lets the Authority adopt flood maps once they are issued. Until then, the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and that extent governs Zone 2 wherever it has been mapped; along the Yamuna, the Tribunal's 1-in-25-year line, once demarcated, is a minimum that the 1% AEP extent may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (MPD-2047 requires a "minimum mandatory buffer" along natural drains and water bodies without stating its width there, and no Delhi statute or building rule read for this Manual sets a setback in metres; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval or NOC of the I&FC Department for a work on or next to one of its drains, embankments or regulators, the approval or NOC of DDA or another competent authority for a work in the Yamuna floodplain (MPD-2047), or a direction of the Delhi High Court or the National Green Tribunal sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. MPD-2047 (S.O. 4597(E), 20 August 2026) requires greenfield projects along natural drains and water bodies to keep a "minimum mandatory buffer" in which no construction or parking is permitted, but does not state its width in that clause (para 3.1.2(i)(f)); its development control norms for recreational use ask new projects along drains or water bodies (above 1.0 ha) for a buffer of 10 m "wherever feasible" (para 10.2.3(v)); and the Unified Building Bye-Laws for Delhi 2016 set no distance. This Manual's 15 m gives the buffer a width, is wider than the 10 m, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Delhi flood maps are mostly coarser than US maps, the Yamuna floodplain, the Trans-Yamuna area behind its embankments and the Najafgarh basin are very flat and low (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Delhi's plans protect drains and water bodies by name but give their buffers almost no width. MPD-2047 requires greenfield projects along natural drains and water bodies to "maintain a minimum mandatory buffer from the edge of the drain/water body", kept as active green areas, with "No construction or parking" in it (para 3.1.2(i)(f)); it gives no width there. Its development control norms for recreational use add that "All new projects located along drains or water bodies (above 1.0 ha) shall maintain a minimum mandatory buffer of 10m from the edge of the water bodies/drains wherever feasible" (para 10.2.3(v)); the scope of that sentence outside the recreational use premises was not established, and "wherever feasible" makes it a target, not a limit. MPD-2047 also asks the I&FC Department and other agencies to develop green buffers along drains as city-level greenways (para 3.1.2(ii)(b)), and a public greenway "75–100 m wide" along the Yamuna embankments "wherever feasible". Along the river, the active floodplain is a no-construction zone and development outside it is restricted (para 3.1.2(i)(c)). The Unified Building Bye-Laws for Delhi 2016 define a jhot, a "Strip of land permanently left open for drainage purposes", but set no distance from a drain or water body; their environmental conditions for large projects require that "No construction shall be allowed to obstruct the natural drainage through the site" and allow check dams, bio-swales and other SUDS "for maintaining the drainage pattern". The National Green Tribunal directed that "There shall be no construction and/or coverage of any of the drains in Delhi by any Authority or Municipal Corporation" and that, where covering was more than 85% complete, the cross-section must still carry the storm water of "the flood of once in 25 years" (O.A. 6/2012, judgment of 13 January 2015). Covering continues: 1,300 m of the 1,600 m Defence Colony main drain had been covered (Delhi High Court, order of 25 July 2024), the Chirag Delhi drain was covered at Khanpur and used for parking (IIT Delhi, 2018), and residents along the Tamoor Nagar drain "construct cement pathways on top of the drains" (Delhi High Court, W.P.(C) 13190/2024, order of 28 July 2025). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Delhi has no statutory setback in metres from natural drains, johads, lakes or wetlands in the Acts and rules read for this Manual. MPD-2047 requires a "minimum mandatory buffer" along natural drains and water bodies but does not state its width (para 3.1.2(i)(f)); its only figure, 10 m "wherever feasible" for new projects along drains or water bodies (above 1.0 ha), sits in its development control norms for recreational use (para 10.2.3(v)). The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give that buffer a width. It is this Manual's proposal, not a statutory width, and no government has adopted it. Because Delhi has no statutory flood lines away from the Yamuna, the 1% AEP extent of this Manual, where it has been mapped (Clause 7.3.4), is the only flood-based line there, and it governs Zone 2. Along the Yamuna, the National Green Tribunal's 1-in-25-year floodplain is a statutory minimum, not the design extent: the 1% AEP extent governs Zone 2 wherever it is wider. The setback is applied as the larger of the corridor and any statutory line, so the Manual is stricter than statute almost everywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The Yamuna floodplain. The NGT's 1-in-25-year floodplain, to be mapped and demarcated by DDA, in which no development or construction is permitted except as the Tribunal allowed (O.A. 6/2012, 13 January 2015); and MPD-2047's active floodplain, a no-construction zone with only recreational uses, and the restricted area outside it (para 3.1.2(i)(c)).
- No covering of drains. The Tribunal's direction that there "shall be no construction and/or coverage of any of the drains in Delhi" applies in addition to Clause 7.10.2.
- Environmentally Sensitive Areas. The River Yamuna and its floodplain, all natural drains, marshes and wetlands, water bodies of 1 ha and above, and the Ridge, with "zero tolerance" for unauthorised construction or encroachment (MPD-2047, Annexure 3 and para 3.1.2(iv)(b)); land pooling excludes "natural drains and water bodies, areas notified by the Wetland Authority of Delhi" (para 4.1.1).
- The MPD-2047 buffers. The "minimum mandatory buffer" of para 3.1.2(i)(f), with no construction or parking, and the 10 m of para 10.2.3(v) where it applies. Zone 1, not less than 15 m, is wider than the 10 m; where a Zonal Development Plan or layout shows a wider buffer, the wider buffer governs.
- Wetlands and water bodies. Any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was notified as of 2024), and the bar in the environmental conditions of the Unified Building Bye-Laws for Delhi 2016 that "No construction is allowed on wetland and water bodies". That protects the waterbody, not a strip around it; the whole recorded extent is a waterbody for this chapter.
- I&FC embankments, drains and regulators. Works near them need the I&FC Department's permission; a formal NOC regime for development next to its drains was not found.
This Manual sets 15 m as the floor because it is wider than the 10 m that MPD-2047 asks for "wherever feasible"; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that Delhi's drains need. The reasons for the corridor are the courts' findings: that Delhi's 3,740 km of major storm drains are split among eight owners, so that "a consistent slope/level of the drain is not maintained" (Delhi High Court, judgment of 8 April 2024); that drains continue to be covered, encroached and built over (see above); that 44 of the 201 drains of the 1976 plan can no longer be traced; and that "several water bodies, out of 1045 listed water bodies, do not exist on ground" (Delhi High Court, 2024). Until a statute, rule, notification or Master Plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Unified Building Bye-Laws for Delhi 2016, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to Delhi practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Yamuna floodplain, the Trans-Yamuna area behind its embankments and the Najafgarh basin are flat and low, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
No Delhi rule protecting the land between a pond's full level and its flood level was found. MPD-2047 comes closest: parks "identified as flood sink areas shall not have any permanent construction" (para 10.2.3(ix)(f)), and its Yamuna restoration projects are to restore wetlands "for catchment of floodwaters" and create new ones "by developing and deepening the existing depressions into storage basins" (para 3.1.2(i)(c)). The IIT Delhi plan modelled 171 water bodies in the Trans-Yamuna basin and 140 in the Najafgarh basin as flood storage, each with an assumed depth of 2 m, and routed runoff into them before the drains (IIT Delhi, 2018). The Najafgarh jheel, "a natural depression" that "receives the spill from Delhi, as well as from Haryana and Rajasthan", "earlier used to be a big water body" (IIT Delhi, 2018): the land around it that still floods is the basin's foreshore, and is flood storage for this chapter. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the Trans-Yamuna colonies behind the Shahdara and Left Marginal Bunds, an area that "was originally a part of the Yamuna flood plain" and drains only by pumping when the river is high (IIT Delhi, 2018), the low ground around ITO and Rajghat that the Yamuna flooded in July 2023, and the low-lying colonies of the Najafgarh basin already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Delhi has no tank Act, and few of its water bodies have the full set of an earthen bund, a surplus weir and irrigation sluices. The storages that matter for urban drainage are of five kinds. The first is the johad or talab of the rural and urban villages, usually with no outlet structure, and the other recorded water bodies of the Wetlands Authority's inventory (1,367 in all). The second is the lake or jheel: the IIT Delhi plan names Sanjay Lake and the Shahdara jheel in the Trans-Yamuna basin, and Bhalswa Lake, Swarna Jayanti Lake, Sardar Patel Lake and the Najafgarh jheel in the Najafgarh basin (IIT Delhi, 2018). The third is the heritage baoli and hauz, whose storage is small and whose custodians are often heritage bodies. The fourth is the embanked Trans-Yamuna basin, behind the Shahdara Marginal and Left Marginal Bunds, which drains by gravity when the river is low and must store or pump when it is high, as a polder does (IIT Delhi, 2018; Figure 7.3). The fifth is the Najafgarh drain, the Sahibi, which enters Delhi from Haryana, passes the regulators at Dhansa and Kakraula and the jheel depression, and receives 28 drains above Kakraula and about 74 below it before joining the Yamuna below Wazirabad barrage (IIT Delhi, 2018); this chain, not any single pond, is the cascade for Clause 7.7.2 in the Najafgarh basin. Clauses 7.7 and 7.8 apply to any of these whose storage is counted. The Yamuna barrages (Wazirabad, ITO and Okhla) and the Hathnikund barrage in Haryana are not tanks for these clauses: their releases and pond levels enter a design as inflow and tailwater (Chapter 5).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. Delhi I&FC Department, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in the Trans-Yamuna basin, every colony drain, drain, regulator or flap gate through the Shahdara Marginal or Left Marginal Bund and pumping station by which the flow reaches the Yamuna, with the river stage as tailwater, as shown in Figure 7.3, and, in the Najafgarh basin, the Najafgarh drain with its regulators at Dhansa and Kakraula down to its outfall to the Yamuna below Wazirabad barrage.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than Delhi I&FC Department's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Delhi's worst floods have come when the Yamuna was already high. The river peaked at 208.66 m at the Old Railway Bridge on 13 July 2023, above the 207.49 m of 1978, and again reached 207.48 m on 4 September 2025, against a danger level of 205.33 m (as reported); releases from Hathnikund take about 48 to 50 hours to reach Delhi (as reported), and in July 2023 the river was still near the danger mark eleven days after its peak (as reported). While the river is high, the outfall regulators are closed and the city's drains, ponds and low ground hold whatever rain falls, so storage downstream that is already full gives no relief. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A Trans-Yamuna pumped outfall (schematic, not to scale). A: with the Yamuna low, the colony drains feed a drain that flows by gravity through a regulator in the marginal embankment (bandh) and out through a flap gate, and the pumps are off. B: with the Yamuna high, the river holds the flap gate shut and the regulator is closed against backflow; the colonies' runoff is held in the drains, ponds and low ground and is pumped over or through the embankment until the river falls, so the river stage is the tailwater of the whole chain (Chapter 5) and the drains, regulator, pumps and storage are modelled together (Clause 7.7.2). The Shahdara Marginal Bund (11.95 km) and Left Marginal Bund (6.7 km) were built in 1955–56; they keep the river out but prevent direct outfall, so that only the Relief Drain discharges to the river and elsewhere "the natural flow direction is reversed and collected runoff is pumped to river Yamuna or other nearby drains" (IIT Delhi, 2018). The river stages shown are those reported at the Old Railway Bridge (warning 204.50 m, danger 205.33 m, record 208.66 m on 13 July 2023, as reported); they are not levels at any particular outfall. No sill level, gate operating rule, pump capacity or design river level for any Delhi outfall was published, and the IIT Delhi model left out regulators, gates and portable pumps. Original drawing for this Manual; concept from the IIT Delhi Drainage Master Plan for NCT of Delhi (Final Report, 2018, section 3.1) and the Delhi High Court's account of the regulators (I&FC Department) and pumping (MCD) at the Yamuna outfalls (judgment of 8 April 2024).
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, DDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under Delhi I&FC Department control, the operating rule shall be Delhi I&FC Department's rule. This Manual does not authorise any other body to operate a Delhi I&FC Department tank.
Commentary. No operating rule for a Delhi johad, lake or jheel that keeps a flood cushion was found, and most have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in Delhi are on the drains. The I&FC Department closes the regulators at the Yamuna outfalls "to stop backflow in case of increase of water in river Yamuna", while "pumping of sewage at such times is managed by MCD" (Delhi High Court, judgment of 8 April 2024); it also operates the regulators at Dhansa and Kakraula on the Najafgarh drain and the Chilla regulator on the Shahdara Outfall Drain, and issues a flood control order every year before the monsoon (I&FC Department; the order for 2025 or 2026 was not obtained). The IIT Delhi plan left regulators, gates and portable pumps out of its model (IIT Delhi, 2018), and on 13 July 2023 the regulator of drain No. 12 near ITO failed and the river flowed back into the city (as reported). Without an agreed rule with dates, levels and a named operator, storage behind a gate cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July or August monsoon burst. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Some of Delhi's water bodies have other uses and keepers: baolis and hauz are heritage structures, many of them in the care of heritage bodies, and MPD-2047 proposes that baolis be revived for groundwater recharge. Drawing such a water body down before a storm has a cost to those who use or keep it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Delhi Pollution Control Committee (DPCC) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. The I&FC Department desilts "all the Trunk Drains" before each monsoon (I&FC Department, flood control mechanism). The Delhi High Court set deadlines for desilting the city's drains, by 31 December 2024 and for the Najafgarh drain by 30 June 2025, and for the works on water bodies by 31 December 2024 (judgment of 8 April 2024); in 2025 the National Green Tribunal took up a report that MCD had met only 21% of its desilting target by the end of April (O.A. 230/2025, as reported in the title of the filing). MPD-2047's floodplain projects include the "de-silting of existing wetlands" and the deepening of depressions into storage basins (para 3.1.2(i)(c)), which Clause 7.9.3 governs. No published deadline for completing desilting before the monsoon was found for any Delhi agency. The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Delhi precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. Delhi's major storm drains total 3,740.31 km and are split among eight owners: PWD 2,064.08 km, MCD 521.87 km, the I&FC Department 426.55 km, NDMC 335.29 km, DDA 251.30 km, DSIIDC 98.12 km, the Delhi Cantonment Board 39.68 km and others 3.42 km (Delhi High Court, judgment of 8 April 2024, para 9). One drain, from India Gate to the Yamuna, passes through six jurisdictions of four authorities, and "due to control of multiple authorities, a consistent slope/level of the drain is not maintained" (paras 10 and 13). The Court directed that the 22 open drains outfalling to the Yamuna go to one agency, and an office order of 29 April 2024 assigned them to the I&FC Department (order of 25 July 2024; the office order was not read). In 2025 another bench still found "enormous confusion" between agencies (W.P.(C) 13190/2024, order of 28 July 2025). Of the 201 drains of the 1976 plan, 44 are now "untraceable" (I&FC Department). Drains have been covered for roads and parking (Clause 7.4, Commentary), and the IIT Delhi plan recommended that "No construction should be allowed inside any storm drains", including utilities and the pillars of metro and elevated roads (IIT Delhi, 2018). A width rule for drain ownership by MCD ("drains under 4 ft") is reported but its source and meaning were not confirmed. None of these keeps a drain at its recorded width once it has been narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored johad or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Delhi the nearest existing forms of shared storage are MPD-2047's requirements that the drainage networks of new developments discharge to "identified groundwater recharge sites" (para 3.7.1(c)(iii)), that parks in flood-prone areas serve as "flood sinks", and that "Large-scale storm water capture projects in the Yamuna floodplain" be undertaken; the IIT Delhi plan's proposal to connect water bodies and parks to flooded drain junctions as detention and recharge basins (IIT Delhi, 2018); and the High Court's direction to explore rainwater harvesting pits in low-lying areas (judgment of 8 April 2024). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Wetlands Authority of Delhi;
- (b) the wetlands, marshes and depressions of the Yamuna floodplain within Delhi, including those of the restoration projects of MPD-2047 (the river channel itself is a waterbody under the rest of this chapter);
- (c) the Najafgarh jheel depression and the Sahibi (Najafgarh drain);
- (d) the marshes, wetlands and water bodies of 1 ha and above listed as Environmentally Sensitive Areas in MPD-2047 (Annexure 3), and lakes and jheels such as Bhalswa Lake, Sanjay Lake, the Shahdara jheel, Swarna Jayanti Lake and Sardar Patel Lake; and
- (e) any other marsh, wetland or jheel that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. No Ramsar site in Delhi was found (the MoEF&CC list was not checked for this Manual), and no wetland in Delhi had been notified under the Wetlands (Conservation and Management) Rules, 2017 as of 2024 (news item quoted in the National Green Tribunal's order of 29 May 2024, O.A. 633/2024); whether any has been notified since was not established. Delhi's wetlands are therefore mainly the Yamuna floodplain, the Najafgarh jheel and the lakes and jheels of its inventory. MPD-2047 commits to 13 restoration projects over about 1,700 ha of the Yamuna floodplain, "restoring wetlands, natural depressions, floodplain ecosystems", to a green buffer "along the edge of the river, wherever possible", and to "Large-scale storm water capture projects in the Yamuna floodplain" (paras 3.1.2(i)(c) and 3.7.2(iii)(b)). It proposes that the Sahibi (Najafgarh drain) be developed "into an eco-tourism hub with a navigable waterway, as per feasibility" (para 3.1.2(ii)(f)). The Najafgarh jheel is a natural depression that receives spill from Delhi, Haryana and Rajasthan (IIT Delhi, 2018); its legal status, and the court orders on the Najafgarh jheel, Sanjay Lake, Hauz Khas lake and Bhalswa Lake, were not read for this Manual, and Bhalswa Lake's revival is reported to be part of the 2025 drainage plan (as reported). A drain outfall, drain widening, regulator or pumping station in the Yamuna floodplain therefore needs the approval of the competent authority for the floodplain (MPD-2047) as well as compliance with this chapter, and any work in a wetland notified under the 2017 Rules is subject to their restrictions. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. In Delhi the law already assumes a separate system (Clause 8.9, Commentary), but sewage still reaches the drains, the lakes and the Yamuna: the CAG found that 212.59 MGD of sewage from 1,080 unauthorised colonies went into storm drains untreated (CAG, Report No. 3 of 2025), and the BOD of the Najafgarh drain was 80 mg/l in January 2022 and 53 mg/l in January 2023 (DPCC, as quoted by the Delhi High Court, 2024). MPD-2047 bars the "outfall of sewage/wastewater from surrounding development" into Environmentally Sensitive Areas and their buffers (para 3.1.2(i)(f)) and commits to intercepting and treating all 22 drains that discharge to the river. Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Delhi they apply in full to every new outfall, and every existing outfall to the Yamuna, a lake, jheel or johad, or the Najafgarh drain that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Delhi's main controls on filling and building in waterbodies are the Master Plan, the land records and the orders of the Delhi High Court and the National Green Tribunal. DDA is "the designated owner of the Yamuna Flood plains" (Delhi High Court, judgment of 8 April 2024, para 26); the Court recorded 44 pending encroachment cases in the floodplain and directed DDA to name nodal officers for each stretch and to remove debris, and for water bodies it directed ground-truthing, geo-tagging, entry in the revenue records and a named officer for each water body (paras 15–31). The National Green Tribunal set environmental compensation of ₹50,000 for dumping debris in the Yamuna floodplain (O.A. 6/2012, judgment of 13 January 2015). After three students drowned in a basement at Old Rajinder Nagar on 27 July 2024, the High Court was reported to have ordered the removal of encroachments, including those on drains, in the area (as reported). MPD-2047 sets "zero tolerance" for unauthorised construction or encroachment in Environmentally Sensitive Areas (para 3.1.2(iv)(b)). The encroachment and drainage sections of the Delhi Municipal Corporation Act, 1957, the New Delhi Municipal Council Act, 1994 and the Cantonments Act, 2006 were not read for this Manual. The counts of recorded water bodies, and the 232 deletion requests, are in the Commentary to Clause 7.1. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most johads and ponds are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The Shahdara Marginal and Left Marginal Bunds along the Yamuna (1955–56) and the other river embankments of the I&FC Department are flood embankments, which the Act excludes. The Wazirabad, ITO and Okhla barrages and the Hathnikund barrage in Haryana enter this Manual only as sources of inflow and tailwater (Chapter 5). Where the storage of a johad, lake or jheel is counted under Clause 7.7, its bank or bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Delhi's embankment failures have come at the river front. On the evening of 13 July 2023, with the Yamuna at a record level, the regulator of drain No. 12 near ITO collapsed and river water flowed back into ITO, Rajghat and the Ring Road and reached the entrance of the Supreme Court; the Army sealed the breach, and at the ITO barrage 5 of 32 gates had jammed with silt (as reported). No breach map or emergency action plan for a Delhi embankment, regulator or pond was found. A failed regulator floods the colonies it was meant to protect, which is why Clause 7.14.3 asks for breach mapping of high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Ministry of Housing and Urban Affairs (Delhi Division). Master Plan for Delhi with the perspective for the year 2047 (MPD-2047), notification S.O. 4597(E) of 20 August 2026, Gazette of India Extraordinary, Part II, Section 3(ii), No. 4417, made under section 11-A(2) of the Delhi Development Act, 1957 (paras 3.1.2, 3.7.1, 3.7.2, 4.1.1 and 10.2.3, Annexures 2 and 3). https://dda.gov.in/sites/default/files/notice/275618.pdf ; DDA, FAQs on MPD-2047, https://dda.gov.in/sites/default/files/notice/faqs_on_mpd-2047.pdf
- Delhi Development Authority. Unified Building Bye-Laws for Delhi 2016, S.O. 1191(E) of 22 March 2016, compendium incorporating amendments up to 12 February 2020 (definitions 1.4.30 and 1.4.62; environmental conditions for building projects). https://dda.gov.in/sites/default/files/public-notice/COMPENDIUM_OF_UBBL_201605082020.pdf
- National Green Tribunal. O.A. 6/2012, Manoj Misra v. Union of India, judgment of 13 January 2015 (third-party copy). https://thebastion.co.in/writereaddata/fileupload/ngtmatters/NGT%20judgement%2013.01.15.pdf
- National Green Tribunal. O.A. 633/2024 (news item "The curious case of Delhi's disappearing water bodies"): report of the DPCC of 11 September 2024, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20DPCC%20IN%20OA%20NO.%20633%20of%202024%20NEWS%20ITEM%20TITLED%20THE%20CURIOUS%20CASE%20OF%20DELHI,S%20DISAPPEARING%20WATER%20BODIES%20APPEARING%20IN%20THE%20HINDU%20DATED%2025.04.2024.pdf ; report of the Wetlands Authority of Delhi of 14 September 2024, annexing the Department of Environment, Forests and Wildlife, GNCTD, notification No. F.1(07)/DPGS/C.Case/2017-18/9397-9429 of 23 April 2019 constituting the Authority, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20R-1%20WETLAND%20AUTHORITY%20OF%20DELHI%20IN%20OA%20NO.%20633%20of%202024%20NEWS%20ITEM%20TITLED%20THE%20CURIOUS%20CASE%20OF%20DELHI,S%20DISAPPEARING%20WATER%20BODIES.pdf
- National Green Tribunal. O.A. 230/2025 (news item on MCD's desilting target), document filed by DDA on 23 March 2026, which includes the Delhi High Court's judgment of 8 April 2024 and order of 25 July 2024. https://www.greentribunal.gov.in/sites/default/files/news_updates/Document%20filed%20by%20R%206%20in%20OA%20No%20230%20of%202025%20NEWS%20ITEM%20TITLED%20DEADLINE%20LOOMING%20MCD%20MET%20JUST%2021%20OF%20DESILTING%20TARGET%20BY%20END%20OF%20APRIL%20APPEARING%20IN%20THE%20TIMES%20OF%20INDIA%20DATED%2005-05-2025.pdf
- Delhi High Court. W.P.(C) 7594/2018 and W.P.(C) 9617/2022, Court on its own motion v. Union of India, judgment of 8 April 2024 and order of 25 July 2024 (as filed in NGT O.A. 230/2025, above), and order of 25 September 2026, https://delhihighcourt.nic.in/app/showFileJudgment/PMS25092026CW75942018_151554.pdf ; W.P.(C) 13190/2024, Maharani Bagh CHBS v. Union of India, order of 28 July 2025, https://delhihighcourt.nic.in/app/showFileJudgment/PMS28072025CW131902024_201344.pdf
- IIT Delhi (2018). Drainage Master Plan for NCT of Delhi, Final Report, July 2018, prepared for the Department of Irrigation and Flood Control, GNCTD (sections 1.3, 1.4, 3.1–3.3 and recommendations). https://ifc.delhi.gov.in/sites/default/files/inline-files/main_report_dmp_version51.pdf
- Department of Irrigation and Flood Control, GNCTD. List of 201 drains as per Master Plan Drainage 1976; List of 44 untraceable drains; Flood control mechanism. https://ifc.delhi.gov.in/sites/default/files/ifc/generic_multiple_files/201_drains_mpd.pdf ; https://ifc.delhi.gov.in/sites/default/files/ifc/generic_multiple_files/44_drains.pdf ; https://ifc.delhi.gov.in/ifc/flood-control-mechanism
- Delhi Development Authority. Master Plan for Delhi 2021 (incorporating modifications up to 31 August 2022), para 9.2.2 (Regional Park and Ridge; superseded by MPD-2047). https://dda.gov.in/sites/default/files/planning%20files/Master_Plan_for_Delhi_2021_%28Incorporating_modifications_upto_31.08.2022%29.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Comptroller and Auditor General of India. Report No. 3 of 2025, Performance Audit on Functioning of Delhi Jal Board (laid on 23 March 2026), paras 4.1 and 4.2.1; press release and executive summary. https://cag.gov.in/uploads/PressRelease/PR-Press-Release-on-Report-No-3-of-2025-069c383c1c5b4d3-75064279.pdf ; https://cag.gov.in/uploads/download_audit_report/2025/Executive-Summary-069c28684277b53.34142481.pdf
- Reports of the Yamuna floods of 2023 and 2025 (secondary): PTI via The Week on the Old Railway Bridge levels and the barrages (23 July 2025), https://www.theweek.in/wire-updates/national/2025/07/23/des48-dl-ito-barrage.html , and on the warning and danger levels (1 September 2025), https://www.theweek.in/wire-updates/national/2025/09/01/des22-dl-yamuna-level.html ; The Tribune on the ITO barrage gates, https://www.tribuneindia.com/news/delhi/how-army-cut-open-gates-of-barrage-under-ito-bridge-526095 ; Dawn/Reuters on the drain No. 12 regulator, https://www.dawn.com/news/1764686 ; Deccan Herald on the regulator and on the September 2025 flood, https://www.deccanherald.com/india/delhi/yamuna-level-in-delhi-continues-to-rise-evacuation-underway-3709564 ; Business Standard/PTI on the river level on 24 July 2023, https://business-standard.com/amp/india-news/yamuna-s-water-level-in-delhi-declines-marginally-old-railway-bridge-shut-123072400776_1.html
- Reports of Delhi's drainage plans and of Old Rajinder Nagar (secondary): Haskoning on the 2025 drainage master plan and Bhalswa Lake, https://www.haskoning.com/en/newsroom/news/2025/securing-the-sustainable-future-of-delhi-drainage-system ; Devdiscourse on the High Court's order on encroachments in Rajinder Nagar (2024), https://www.devdiscourse.com/article/Newsalert/3039732-coaching-centre-deaths-delhi-hc-orders-removal-of-encroachments-unauthorised-constructions-including-on-drains-in-rajinder
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 8 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Urdu waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. No Delhi Act for the protection of tanks, ponds or water bodies as such was found during research for this Manual. Delhi's water bodies are protected instead through the Wetlands (Conservation and Management) Rules, 2017, the Master Plan, the land records and the courts. The Lieutenant Governor constituted the Wetlands Authority of Delhi under rules 5 and 7 of the 2017 Rules on 23 April 2019, with the Chief Secretary as Chairperson and the CEO of the Delhi Parks and Gardens Society as Member Secretary; its ex officio members include DDA, the I&FC Department, the DJB, the Revenue Department, the DPCC and the head of the CGWB in Delhi (Department of Environment, Forests and Wildlife, notification of 23 April 2019). Its inventory holds 1,367 water bodies: 1,045 listed and 322 identified by the Geospatial Delhi Ltd from satellite imagery. By September 2024 ground-truthing had covered 674 of them, all visible (DPCC, report to the National Green Tribunal in O.A. 633/2024). Agencies had asked for the "deletion" of 232 listed water bodies, and "not a single wetland has been 'notified' in Delhi" under the 2017 Rules (news item quoted in the Tribunal's order of 29 May 2024); whether any has been notified since was not established. The Delhi High Court found that "several water bodies, out of 1045 listed water bodies, do not exist on ground", recorded 272 as restored and 72 in progress, and directed that water bodies be entered in the revenue records, each assigned to a specific officer "who shall visit such water body every fortnight" (judgment of 8 April 2024). MPD-2047 lists the River Yamuna and its floodplain, all natural drains, marshes and wetlands, and water bodies of 1 ha and above as Environmentally Sensitive Areas, and the buffers of natural drains and water bodies, and baolis, wells and tanks, as eco-cultural assets (Annexure 3), with "zero tolerance for unauthorised construction or encroachment" in Environmentally Sensitive Areas (para 3.1.2(iv)(b)). The Unified Building Bye-Laws for Delhi 2016 add, in their environmental conditions for large building projects, that "No construction is allowed on wetland and water bodies". This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the wetland, planning, land-record and floodplain procedures that record and protect waterbodies in law, or the directions of the Delhi High Court, the National Green Tribunal and the Supreme Court.