Draft v1.0 prepared by NEER. Not adopted by the Government of Jharkhand or any authority or local body, and has no legal force. About this draft

Jharkhand · Draft v1.0

Jharkhand Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Jharkhand Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Jharkhand.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Jharkhand or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development and Housing Department (UD&HD), the Jharkhand Urban Infrastructure Development Company (JUIDCO), the Water Resources Department (WRD), the Ranchi Regional Development Authority (RRDA), the Mineral Area Development Authority (MADA), the Damodar Valley Corporation (DVC), any Municipal Corporation, Nagar Parishad, Nagar Panchayat, Notified Area Committee or other local body, or any other agency. Where it names a body, such as the State Urban Development Agency (SUDA), the Drinking Water and Sanitation Department, the Revenue, Registration and Land Reforms Department, the Forest, Environment and Climate Change Department, the Jharkhand State Wetlands Authority, the Jharkhand State Pollution Control Board (JSPCB), the Jharkhand State Disaster Management Authority (JSDMA), an industrial area development authority, the Ranchi Municipal Corporation (RMC), the industrial town committee at Jamshedpur or Tata Steel UISL, a coal company such as Central Coalfields Limited (CCL) or Bharat Coking Coal Limited (BCCL), a district administration, or a body of the Union, such as the Central Water Commission (CWC), the Directorate General of Mines Safety (DGMS) or the Damodar Valley Reservoir Regulation Committee (DVRRC), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Jharkhand Building Byelaws 2016 as amended, the master plans and their approval conditions, drainage schemes, the conditions of environmental clearances and mining plans, the Coal Mines Regulations, 2017, orders of courts and tribunals and approval conditions in force continue to apply.

Names. Some places, rivers and gauges have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Jharkhand was part of Bihar until November 2000, and older sources, including the CWC flood estimation reports and IMD's older tables, name its districts as districts of "Bihar". The district map has also changed. Before 1983 Ranchi district included today's Gumla, Simdega, Lohardaga and Khunti; the old Hazaribagh district included today's Chatra, Kodarma, Bokaro, Ramgarh and part of Giridih; Palamau included Latehar and Garhwa; Singhbhum is now East Singhbhum, West Singhbhum and Saraikela-Kharsawan; and the Santhal Parganas are now Dumka, Deoghar, Godda, Sahebganj, Pakur and Jamtara. IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
  • Medininagar is the town IMD's observatory and older sources call Daltonganj, and Palamu district is written Palamau. Sahebganj is written Sahibganj on the CWC gauge, the Subarnarekha Subernarekha or Swarnrekha, Hazaribagh Hazaribag and Kanke Kankey on IMD's raingauge;
  • where a shared clause names the State's main city or its municipal corporation, this Manual names Ranchi, the capital, and the Ranchi Municipal Corporation (RMC). RRDA, the development authority for the Ranchi region, plans and approves building outside RMC's limits; under the Municipal Act its operation ceases within them (s.615(3)). In November 2025 the High Court was reported to have held that, in panchayat areas, the Panchayati Raj Act prevails over the Regional Development Authority Act;
  • Jamshedpur has two IMD observatories: Jamshedpur (42799) in the town and Jamshedpur (A) (42798) at the aerodrome. The 338.1 mm of 18 June 2008 and the 184 mm in three hours of 5 August 1977 are Jamshedpur (A) records; this Manual names the station each figure comes from;
  • Jamshedpur also has two systems of river marks, which must not be mixed. CWC's flood forecasting site on the Subarnarekha at Jamshedpur has a warning level of 122.5 m, a danger level of 123.5 m and a highest flood level of 129.82 m (12 October 1973), as transcribed from CWC's lists. The district administration reports the rivers against its own danger marks: 121.50 m at Mango bridge on the Subarnarekha and 129 m at Adityapur bridge on the Kharkai. The two have not been reconciled; this Manual uses CWC's levels for design and treats the district marks as alert levels only. No source read states the datum of either set, and levels are quoted as reported [TBC];
  • the Kharkai rises in Mayurbhanj district of Odisha and joins the Subarnarekha at Jamshedpur. Dams on it in Odisha, and the Chandil dam on the Subarnarekha, release water that raises the rivers at Jamshedpur, as reported. Getalsud is the reservoir on the Subarnarekha above Ranchi, called the Rukka dam in the Ranchi Master Plan 2037; the Dhurwa dam is also called the Hatia dam; and the Bada Talab in Ranchi is also called Ranchi Lake;
  • the Harmu river (Harmu nadi) is a tributary of the Subarnarekha in Ranchi, 17.8 km long, whose 10.4 km urban reach was rebuilt as a channel between 2014 and 2018 and carries sewage as well as rain. Like the Jumar, it is called a river, although in the city it serves as a trunk drain. Where this Manual names it, it means the river, not a municipal drain;
  • DVC operates the dams at Tilaiya, Konar, Maithon and Panchet; releases from Maithon and Panchet are advised by DVRRC, on which CWC, Jharkhand, West Bengal and DVC are represented, and the State's own dam at Tenughat on the Damodar lies outside it, as reported. Its releases, like most river flows in Jharkhand's sources, are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s) and lakh cusecs (100,000 cusecs). This Manual quotes them as given and adds the metric value where it matters for design;
  • the Chota Nagpur plateau covers most of the State. Kolhan is the region of Singhbhum and Saraikela-Kharsawan around Jamshedpur and Chaibasa, the Santhal Parganas the north-east towards the Ganga, and Palamu the north-west on the North Koel. The Damodar coalfields, Jharia, Bokaro, Ramgarh and Karanpura, run along the upper Damodar from Dhanbad westward. The names describe regions, not administrative units, except where a district bears the same name; and
  • in the coalfields a mine void is the pit left by opencast mining, a pit lake a void that has filled with water, and an overburden dump (OB dump) the terraced heap of rock and soil removed to reach the coal. CCL and BCCL are subsidiaries of Coal India that hold most of the State's coal mines; DGMS regulates mine safety, including the danger of inundation, under the Coal Mines Regulations, 2017.

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies need a word of explanation:

  • a Municipal Corporation, a Nagar Parishad (Municipal Council) and a Nagar Panchayat are urban local bodies (ULBs) under the Jharkhand Municipal Act, 2011, which makes storm water drains a municipal function (s.70), requires the municipality to provide "a safe and efficient outfall" for storm water and sewage (s.219), and vests public drains (s.221) and public tanks, with the adjacent land that is not private property (s.203), in the municipality. The State's Municipal Corporations are Ranchi, Dhanbad, Deoghar, Chas, Hazaribagh, Giridih, Adityapur, Mango and Medininagar. A Notified Area Committee governed Jamshedpur's leased area: the Jamshedpur Notified Area Committee (JNAC);
  • Jamshedpur's leased area has long been served by Tata Steel, through Tata Steel UISL (Tata Steel Utilities and Infrastructure Services Limited, formerly JUSCO). On 23 December 2023 the State was reported to have notified an industrial town under s.481 of the Municipal Act, merging JNAC with Tata Steel's facilities; the notification was challenged before the High Court in PIL 2636/2024, whose outcome was not found, and the notification itself was not read. The 2005 lease between the State and Tata Steel binds the company to maintain the standard of municipal services but does not mention drains or storm water. Mango, Jugsalai and Adityapur, which share the city's rivers, are separate local bodies;
  • UD&HD issues the Building Byelaws and approves master plans. JUIDCO is the State company that builds storm water drainage and AMRUT projects for it, such as the Harmu river works in Ranchi and the World Bank-funded drainage of Dhanbad, and SUDA supports the urban local bodies;
  • MADA is the Mineral Area Development Authority at Dhanbad, to which the Building Byelaws also apply. Official texts name its statute differently (an Act of 1986, 2000 or 2001), and the Municipal Act provides that its operations pass to the Dhanbad Municipal Corporation "to the extent notified" (s.615(4)); no such notification was found. Industrial area development authorities, such as the one at Adityapur, govern the industrial estates;
  • WRD holds the State's rivers, dams and flood works, including the Kanke, Dhurwa and Getalsud dams of Ranchi; the Building Byelaws take the boundary of a river "as prescribed by the Irrigation Department". The Drinking Water and Sanitation Department is named in this Manual as the State groundwater agency; in 2024 the State told the National Green Tribunal (NGT) that permissions to draw groundwater were being issued by the Central Ground Water Board (CGWB), not by a State body;
  • the Jharkhand State Wetlands Authority, constituted in 2017 and reconstituted in 2018 under the Wetlands (Conservation and Management) Rules, 2017, has not notified any wetland under those Rules; and
  • an anchal is a circle, the revenue subdivision of a district under a Circle Officer, to whom encroachment on public land, ponds and river banks is reported. The Chota Nagpur Tenancy Act, 1908 and the Santhal Parganas Tenancy (Supplementary Provisions) Act, 1949 restrict the transfer of raiyati land in most of the State, which limits how land for drainage reserves and detention can be obtained.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • RMC is the Ranchi Municipal Corporation, not ready-mixed concrete;
  • MC is written out in this Manual, because in Jharkhand it can mean a Municipal Corporation or a Municipal Council (Nagar Parishad);
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. The district danger marks at Jamshedpur are not CWC levels;
  • FTL (full tank level) is the term of the Ranchi Master Plan 2037 for its reservoirs; FRL (full reservoir level) is CWC's. For Maithon and Panchet, the level CWC lists as FRL is DVC's maximum flood level, not the conservation level, and every clause names the level it uses;
  • OB is overburden in the coalfields; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi terms used in the text, such as talab (तालाब, a pond or tank, as in the Bada Talab of Ranchi), bandh (बाँध, an earthen or masonry embankment that holds water back, and the tank or dam it forms), dobha (डोभा, a small dug farm pond, about 3 m square and deep, of the State's dobha programme; no dictionary source was found for the word), ahar (आहर, a reservoir that stores rain and flood water for irrigation), chuan (चुआँ, a spring, or a pit where seepage water is drawn), don (दोन, low land between hills), nala (natural drain or large storm drain) and nali (small street drain), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Jharkhand's cities flood for three reasons. Ranchi showed the first in June 2025, when 459 mm fell on the district in three weeks against a normal of 125.7 mm, as reported, on a city for whose drains no design storm has been published; Jamshedpur showed the second in June 2008, when the Subarnarekha and the Kharkai rose above their danger marks and more than 500 houses were inundated, as reported; and Dhanbad shows the third, where the drainage of a coal town has to be planned around mine voids, overburden dumps, subsiding ground and fires, and where, as in Jamshedpur, the aquifers under the town are drawn down.

  1. Intense storms on a rocky plateau, drained by works built for small storms. About 85% of the State lies on hard rock, where thin soils over granite and gneiss fill quickly and runoff comes fast. In the worked example of the CWC flood estimation report for subzone 1(g), a 390 km² catchment on the Saphi near Barkakana in Ramgarh district, 57% of a six-hour design storm falls in its first hour and the 50-year peak is 1,771 m³/s, about 4.5 m³/s from each square kilometre. Short bursts are larger than the CWC ratios allow: Mandar, near Ranchi, recorded 99 mm in one hour and 171 mm in three hours on 6 August 1971, and Jamshedpur (A) 184 mm in three hours on 5 August 1977, against about 84 mm and 124 mm for a 50-year storm at Ranchi or Jamshedpur read from the CWC maps and ratios. The works built against such storms were sized for far less. Dhanbad's World Bank-funded drainage project, 154 km of new drains, was designed for a storm expected once a year, because, in the words of JUIDCO's draft environmental assessment of 2017, a return period of 2 or 5 years "was resulting in increase in land beyond the available RoW". Ranchi's Harmu river was rebuilt as a channel designed for a 25-year flood, where the standard the Comptroller and Auditor General (CAG) applied, IS 12094, calls for 100 years for works that protect towns; after it was damaged in July 2016 and July 2017, reaches were redesigned for 50 years, and the runoff coefficient used for its catchment had been cut from 0.95 to 0.29 (CAG, Report No. 1 of 2023). Of the 207 km of storm drains in Ranchi's sewerage and drainage contract, 1.49 km were built, connected to no drain network, before the contract was terminated in October 2019. Days far larger than any design storm are on record: Jamshedpur (A) 338.1 mm on 18 June 2008, Kanke 332.6 mm on 5 July 1998, Mandar 382.0 mm on 11 July 1990, Giridih 403.0 mm on 27 August 1980, and the State's highest, 601.4 mm at Taljhari in Sahebganj district on 25 September 1999. In June 2025 Jamshedpur received 247.2 mm in a day, as reported. Roofs, roads, paving and basements now send more water to the drains, and faster.
  2. Rivers and dam releases that lock the outfalls. Jamshedpur lies where the Kharkai joins the Subarnarekha, and both rivers are raised by dams upstream, some of them in Odisha. In June 2008, after 338.1 mm fell at Jamshedpur (A) on 18 June, both rivers rose above their danger marks as the gates of a dam on the Kharkai in Odisha were opened; more than 500 houses were inundated and the army was called in, as reported, and the highest level that CWC lists for the Kharkai at Adityapur, 137.8 m, dates from that day, as transcribed. In Cyclone Yaas, in May 2021, it was the Kharkai, not the Subarnarekha, that crossed its danger mark: it stood at 132.40–132.87 m at Adityapur against the district mark of 129 m, while the Subarnarekha at Mango stood at 119.20 m, below its mark of 121.50 m, and about 14,000 people were evacuated in Kolhan, as reported. On 26 July 2025 the two rivers were reported at 134.90 m and 123.36 m, 5.90 m and 1.86 m above those marks. In the Damodar valley, combined peak releases from DVC's Maithon and Panchet dams reached 2.5 lakh cusecs (about 7,080 m³/s) on 17 September 2024, and Tenughat released 85,000 cusecs, as reported; that day CWC's daily report listed six sites in the State, on the Damodar, the Barakar, the North Koel and the Sone, at or above their danger levels. On the Ganga, the river's backwater governs Sahebganj and Rajmahal: its highest level at Sahibganj, 30.91 m in August 1998, stands 3.66 m above the danger level, and on 11 September 2026 it was reported at 28.72 m, its highest in four years.
  3. A landscape reshaped by mining, over aquifers drawn down in the industrial towns. The Damodar coalfields, from Jharia and Dhanbad through Bokaro and Bermo to Ramgarh–Patratu and Karanpura, are a land of mine voids and pit lakes, overburden dumps and ground that subsides and burns. Dhanbad's drainage project left out the coal-bearing area and the fire zone altogether, and in the rest found road-side drains along only 40 km of 243 km of road. Estimates of the Jharia fire area disagree: 2.18 km² in a remote-sensing survey reported to Parliament in 2014, about 1.8 km² in the press and 1.53 km² in the Ministry of Coal's report for 2025-26; satellite studies have measured subsidence from a few centimetres to more than 50 cm a year in places; and a revised Jharia Master Plan to resettle 15,080 families was approved on 25 June 2025. Overburden dumps shed sediment: the CAG found suspended solids of 104 to 12,628 mg/l, against a limit of 100 mg/l, in the effluent of four CCL mines, and overburden dumped on the bank of the Khudia river, where the clearance required a barrier of at least 60 m from water bodies (Report No. 12 of 2019). Voids also store water: a model of the Olidih watershed at Jharia found that its abandoned pits cut surface runoff by about half, as summarised. Underground, the State as a whole draws only about a third of its extractable groundwater (32.89% in 2025), but the industrial towns are stressed. In 2023 Jamshedpur Urban, Golmuri-cum-Jugsalai, Baliapur and Bermo were over-exploited, Dhanbad Urban and Topchanchi critical, and 501.6 km² of Ranchi district critical, where the water stood 33 m down before the monsoon of 2022. Water enters the hard rock through a weathered zone about 10–25 m thick, deeper under laterite, and fluoride, and in Sahebganj arsenic, limit what may be recharged.

Behind all three lies lost storage. In 2024 the Jharkhand High Court was told that Ranchi once had 71 ponds and that only four or five could now be seen, as reported. On 31 July 2025 it directed that encroachments be removed from Ranchi's water bodies and their surroundings be made "no-entry" zones, fenced with barbed wire, after "several acres" were found encroached near the Kanke and Dhurwa dams, as reported; its order of 7 January 2026 was not read. The Ranchi Master Plan 2037 bars construction within 20 m of the full tank level of the Kanke, Dhurwa and Rukka dams, but none was found in the approvals of the Jamshedpur and Dhanbad master plans, and the Municipal Act still lets a municipality require a private tank to be filled up (s.341). Dhanbad's drainage project sends 19 of its 94 outfalls to ponds and keeps ten large ponds as storage; Jamshedpur's master plan for 2027 shows less water area proposed (1,186.31 ha) than existing (1,280 ha). More than 1.7 lakh dobhas were reported dug on farms by September 2017. Udhwa Lake, a Ganga floodplain wetland of 935.5 ha in Sahebganj district, is the State's only Ramsar site, with a designation date of 8 January 2024 on its Ramsar information sheet (it was announced in February 2025); no wetland in the State has been notified under the Wetlands Rules, 2017.

Design for Jharkhand therefore has to cover a monsoon that arrives in mid-June and lingers into October, on a plateau of thin soils, laterite and rock, in cities that drain to rivers raised by dam releases, to reservoirs that supply their water, and in places to mine voids. The monsoon normally sets in over the State about 12 June, as IMD's Ranchi centre states, reaching Jamshedpur and Bokaro about 13 June, Ranchi 14 June and Daltonganj 17 June, and withdraws between 8 October at Daltonganj and 12 October at Jamshedpur. About 84% of the year's rain falls from June to September; annual normals run from 1,084.5 mm in Garhwa and 1,089.0 mm in Palamau to 1,307.7 mm in Ranchi, 1,336.7 mm in East Singhbhum and 1,500.3 mm in Pakur. More than half of the 450 storms and depressions that affected the State from 1891 to 2010 came in August and September, and 29 in October, and large storms fall outside the season: in Cyclone Yaas, on 26–27 May 2021, IMD recorded 21 cm at Chaibasa, 18 cm at Mandar and 15 cm at Ranchi in a day; Chaibasa recorded 241.0 mm on 7 October 2004, and Ranchi (A) 175.8 mm on 12 October 1973.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving nala, river or reservoir is high, when a dam upstream is releasing, or when the gate on its outfall is shut.

The Manual also sets how public drains, roads, nalas, talabs, bandhs, reservoirs and other water bodies, gated outfalls and basin-wide master plans are designed, and how runoff is handled where it meets a mine void or an overburden dump, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Jharkhand's south-west monsoon from mid-June to early October, with its plateau cloudbursts and the Bay depressions and cyclone remnants that set most of its river records; the Subarnarekha and the Kharkai, the Damodar and the Barakar under the DVC dams, the North Koel, the headwaters of the Brahmani and the Ganga at Sahebganj; the thin soils on granite and gneiss, the laterite cappings, the red loams of the uplands and the rice land of the valley floors, the coal measures and their mine-disturbed ground, and the Ganga alluvium, over hard-rock aquifers drawn down in the industrial towns; the talabs, bandhs, dobhas and city reservoirs; and cities whose new colonies, basements and roads lie across the natural lines of drainage.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Reports for the three subzones that divide the State by basin, as the interim source: subzone 1(g) Lower Ganga Plains, whose "hilly region" covers the Chota Nagpur plateau from Ranchi and Jamshedpur to Dhanbad, Giridih, Deoghar and Sahebganj; subzone 1(d) Sone, for Palamu, Latehar, Garhwa and Chatra; and subzone 3(d) Mahanadi, for Lohardaga, Gumla and Simdega. Floors are set for short storms where their ratios understate them, from the bursts recorded at Mandar and Jamshedpur (A). IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any station in Jharkhand and is not used; the only published intensity–duration–frequency (IDF) study for a Jharkhand city, for Ranchi (Upadhyaya et al., 2022), could not be obtained in full and its constants are not used; and frequency analysis of gridded rainfall by the National Institute of Hydrology (NIH), Roorkee, is used for comparison only.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Jharkhand Building Byelaws 2016, notified by UD&HD under s.434 of the Jharkhand Municipal Act, 2011 and applied by every regional development authority, urban local body, MADA and industrial area development authority; the Jharkhand Municipal Act, 2011; the approvals of the Ranchi Master Plan 2037, the Jamshedpur (UA) Master Plan 2027 and the Dhanbad Master Plan 2041; the Wetlands (Conservation and Management) Rules, 2017; the Coal Mines Regulations, 2017 and the conditions of environmental clearances for coal mines; the Chota Nagpur and Santhal Parganas tenancy Acts where land for drainage reserves is concerned; and the orders of the Jharkhand High Court and the NGT on water bodies, rivers and sewage. This Manual follows them or, where disclosed, makes them stricter. The Byelaws' amendments of 15 May 2017, 17 August 2017 (the second), 6 June 2019 (the fifth) and 2019 (the sixth) were read; the tenth (March 2024) and eleventh (27 April 2026) were seen only in summaries, and none of those read or summarised touches the clauses on rivers, basements or rainwater harvesting. The Regional Development Authority Act and the Town Planning and Improvement Trust Act under which the master plans were approved, the statute of MADA, the tenancy Acts, the industrial town notification for Jamshedpur and the rainwater harvesting regulations reported for Ranchi and the State were not read; the master plans are cited from their approval notifications only. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Jharkhand can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no panel for any station in Jharkhand. The CWC reports that cover the State date from 1987 (subzone 1(d)), 1994 (1(g)) and 1997 (3(d)); they take the 1-hour rain as 0.37, 0.35 and 0.39 of the 24-hour rain, and the report for 1(g) assumes a loss of 2.7 mm/h. Their maps are exceeded at many of the State's long-record gauges: Taljhari recorded 601.4 mm on 25 September 1999 where the map gives a 50-year day of about 240–280 mm, Jamshedpur (A) 338.1 mm on 18 June 2008 against a 100-year day of about 240–280 mm, and Giridih 403.0 mm on 27 August 1980 against about 280–320 mm. The reanalysis grids of NIH-DHAARA err both ways: they read 148 mm for a 50-year day at Hazaribagh and 196 mm at Ranchi, against about 240–280 mm and 240 mm on the maps, but 368 mm at Sahebganj and 306 mm at Jamshedpur.

Jharkhand has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UD&HD, JUIDCO, WRD, RMC, any other Municipal Corporation or Tata Steel UISL that fixes a return period or a design rainfall for city storm drains. What exists are project choices, recorded as problems: a storm expected once a year for Dhanbad's drainage project, chosen to keep the drains within the road (JUIDCO, 2017); 25 years, later 50 years, for the Harmu river channel in Ranchi, against the 100 years the CAG expected, with a 25-year design flow at chainage 10.4 km of 64.11 m³/s, against 177 m³/s by JUIDCO's own figures (CAG, 2023); and, in the coal mines, garland drains designed with "at least 50% safety margin over and above the peak sudden rainfall and maximum discharge", a standard clearance condition that names no return period. This Manual is offered as a technical companion to the Building Byelaws, the Municipal Act and the master plans: it supplies the design storm, detention, water-level and buffer values that they leave open. It has not been adopted by UD&HD or any other body. In particular:

  • The building rules require rainwater harvesting, but not detention. The Byelaws make rainwater harvesting mandatory on plots of 300 m² and more, with recharge pits or trenches of at least 6 m³ for every 100 m² of roof (Byelaw 51.1), about 60 mm of roof runoff; filtering terrace water into a sump is optional. Multi-storeyed buildings need a recharge well "as per NBC norms" (58.6.6) and soft, permeable paving for at least half of the paving around them (58.6.15), cut to 40% by the amendment of 2017. A Rain Water Harvesting Regulation of RMC (2016) and a State regulation (2017) have been reported, with the same 300 m² threshold and, in Ranchi, a penalty of 1.5 times the annual holding tax, but their texts were not found. The Municipal Act requires every building to have a drain "of such size … and with such fall" as the Commissioner requires, discharging to a municipal drain within 30 m (s.227). No rule requires on-site detention, limits peak runoff or sets "zero runoff";
  • The river line was never made usable. The Byelaws bar construction within 10–15 m of the outer boundary of any river other than the Ganga, as the Irrigation Department prescribes it, and add that "The State Government shall notify a list of such rivers" (Byelaw 23.2); no such list was found. On the Ganga the line is the river boundary or a larger distance the State prescribes (23.1), and riverfront development on reclaimed land is allowed with the Government's approval (23.4). The Ranchi Master Plan 2037 bars construction within 20 m of the full tank level of the Kanke, Dhurwa and Rukka dams and within at least 10 m of rivers and natural nalas (condition 2.9), but the approvals of the Jamshedpur and Dhanbad master plans read for this Manual contain no such clause. At Jamshedpur, in 2024, a joint committee of the NGT fell back on the Byelaws' 10–15 m because "the flood plain zoning of the Subarnarekha River has not been designated", as quoted;
  • Basements are barred in flood-prone areas that no rule defines. "Basements/cellars shall not be permitted in low lying area and without adequate drainage facilities … Basement shall not be allowed in flood prone areas" (Byelaw 48.1), and "surface drainage does not enter the basement" (48.6.4). Neither "low lying" nor "flood prone" is defined, no level is set for the crest of a basement ramp, and the plinth must be at least 450 mm above the surrounding ground (42.1.1), with no maximum;
  • No floodplain is zoned. Jharkhand has no floodplain zoning law and no notified flood zone. WRD has appointed a consultant to demarcate the floodplain of the Ganga, about 83 km long in Sahebganj district, which was waiting in 2020 for river hydrology expected by March 2024; no demarcation of the Subarnarekha, the Kharkai, the Damodar or any city river was found. Apart from the Harmu's 25 and 50 years, no design return period was found for any river or nala corridor in the State. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies or a court draws, and where such a line binds and is wider, it governs; and
  • No document sets the river or reservoir level for which an outfall is designed. At Jamshedpur, CWC's levels and the district's danger marks disagree and have not been reconciled; the rivers are raised by releases from the Chandil dam and from dams in Odisha, and the Damodar by releases from DVC's dams and Tenughat; CWC's danger levels and highest flood levels are flood-warning levels and records, not design levels; and the levels of Ranchi's reservoirs were not found on a stated datum.

So each agency and each local body interprets the central manual its own way. RMC and the other Municipal Corporations, the Nagar Parishads and Nagar Panchayats, RRDA, MADA, the industrial area development authorities, JUIDCO, Tata Steel UISL, WRD, DVC, the coal companies, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same road, built by different agencies, can be sized for different storms from different rainfall sources. In Ranchi a nala may be a municipal drain, a river held by WRD, such as the Harmu or the Jumar, or the asset of a JUIDCO project, and no rule divides natural nalas from municipal drains; in Jamshedpur the leased area, Mango and Adityapur each answer for their own drains, which empty into the same two rivers. The drains also carry sewage: of 14 major inlets to the Harmu, nine were connected to sewers but still overflowed into the river in the dry season, five discharged directly and 56 minor inlets carried sewage (CAG, 2023), and in nine urban local bodies the CAG found 60% of drains uncovered, with household wastewater flowing in drains that also served as storm drains (CAG, 2017). And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in three rainfall zones and seven hydrologic sub-areas, with a checked station analysis to govern where one exists, and floors where the CWC ratios understate short storms, set from the bursts recorded at Mandar and Jamshedpur (A) (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to nalas, rivers and reservoirs, gated, flap-gated or free, against a design river or reservoir level, using CWC's levels rather than the district marks and allowing for releases from dams upstream (Chapter 5);
  • a design flood line, and corridors and setbacks along rivers and nalas and around talabs, bandhs and reservoirs, which no rule now sizes, proposed by this Manual for use with the Byelaws' river line and the Ranchi Master Plan's buffers wherever those are wider (Chapter 7);
  • recharge first where the water table is drawn down, as in Jamshedpur, Dhanbad and Ranchi, through the weathered rock below the laterite, but none on floodplains or in ground disturbed by mining, and treatment where drains carry sewage (Chapter 8);
  • rules for runoff that meets a mine void or an overburden dump: a void is not a design outfall unless the mine's lessee and DGMS consent and its level and spill are surveyed, and a dump is treated as land that sheds water and sediment fast (Chapters 3, 5 and 8); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a development authority or UD&HD can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Government of Jharkhand, Urban Development and Housing Department, Jharkhand Building Bye Laws, 2016, notification No. 7/न0वि0/अधि0/स0सो0/102/2013-2006 dated 5 April 2016 (Gazette number not seen [TBC]), byelaws 1.2, 23, 30, 31, 41.12, 42.1, 48, 51 and 58.6; Jharkhand Building (Amendment) Bye-laws, 2017, No. 7/…/102/2013-3141 of 15 May 2017, Annexure 'A' item 44, and the second (No. …-5326 of 17 August 2017), fifth (No. …-2269 of 6 June 2019) and sixth (2019) amendments; the tenth (2024) and eleventh (27 April 2026) amendments (summaries only; not read); Jharkhand Municipal Act, 2011 (Jharkhand Act 07 of 2012), ss.2(41), 70, 203, 219, 221, 224, 227, 235, 341, 434, 481 and 615; UD&HD notification No. 02/न0वि0/मास्टर प्लान-104/2008-4371 of 30 November 2015 (approval of the Ranchi Master Plan 2037), condition 2.9; UD&HD notifications No. 02/न0वि0/मास्टर प्लान-102/2008-6622 of 23 October 2017 (Jamshedpur (UA) Master Plan 2027) and No. 06/न0वि0(TCPO)/मा0 प्लान-22/2016-6648 of 24 October 2017 (Dhanbad Master Plan 2041), first pages only; Indenture of lease between the Government of Jharkhand and Tata Steel, 20 August 2005 (third-party copy); Forest, Environment and Climate Change Department, notification of 22 May 2018 reconstituting the Jharkhand State Wetlands Authority; Ramsar Information Sheet, site 2559, Udhwa Lake Bird Sanctuary; Rajya Sabha reply of 13 February 2025 on notified wetlands; JUIDCO, Jharkhand Municipal Development Project, Draft ESIA, Storm Water Drainage, Dhanbad, Vol. I (November 2017); CAG, Report No. 1 of 2023, Government of Jharkhand, Chapters 3 (sewerage and drainage in Ranchi) and 4 (Harmu river); CAG, Annual Technical Inspection Report on Local Bodies for the year ended 31 March 2016 (2017), Chapter 4; CAG, Report No. 12 of 2019 (environmental impact of mining in Coal India), paras 5.7.2–5.7.3; Ministry of Environment, Forest and Climate Change, standard environmental clearance conditions for coal mines, as in EC No. J-11015/72/2016-IA.II(M) of 13 August 2024 (a mine outside the State); Coal Mines Regulations, 2017, reg. 149 (as seen in extracts); Ministry of Coal, Annual Report 2025-26, Chapter 3, and PIB release on the revised Jharkhand Master Plan for Jharia (June 2025); Jharkhand High Court, W.P.(PIL) 1325/2011, order of 16 April 2013, and reports of orders in W.P.(PIL) 1463/2020 (2022–2025; order of 7 January 2026 not read) and in PIL 2636/2024; NGT (Eastern Zone), State affidavit and I.A. 56/2024 in O.A. 145/2023 (quoting the joint committee report of 14 March 2024); State of Jharkhand, quarterly progress reports in NGT O.A. 200/2014 (Ganga); State of Jharkhand status report in NGT O.A. 694/2023 (September 2024; groundwater); CWC, Flood Estimation Reports for Lower Ganga Plains subzone 1(g) (LG-1(g)/R-1/23/94, November 1994), Sone subzone 1(d) (S/15/1987) and Mahanadi subzone 3(d) (M-3(d)/R-3/25/1996), plates read by eye; CWC, Daily Flood Situation Report of 17 September 2024; CWC flood forecasting site lists (as transcribed by SANDRP, 2018 and 2022); IMD, Climate of Jharkhand (Climatological Summaries of States Series No. 17, 2011); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; IMD Meteorological Centre Ranchi, monsoon reports 2023, 2025 and 2026; IMD RSMC New Delhi, press release on Cyclone Yaas (27 May 2021); Das et al. (2022), MAUSAM 73(4); Upadhyaya et al. (2022), Indian Journal of Environmental Protection 42(2) (abstract only); NIH-DHAARA (accessed 7 November 2026); Shinde et al. (2017), Environmental Processes 4(3) (as summarised); CGWB and the State, Dynamic Ground Water Resources of Jharkhand, 2023, and PIB (December 2025) on the 2025 assessment; CGWB, Ground Water Year Book, Jharkhand, 2019-20; Government of Jharkhand, Jharkhand Action Plan on Climate Change (2014); reports of the floods at Jamshedpur (2008, 2021, 2025), Ranchi (2025) and Sahebganj (2026), of the DVC releases of September 2024, of the Ranchi rainwater harvesting regulation and of the dobha programme (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Talabs (Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Jharkhand
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Jharkhand locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Channels, embankments, land and parts of the system
7E.3Statutory and official terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A plateau talab or city reservoir with a dobha cascade and a mine pit lake: dobhas stepping down a laterite slope to a talab or reservoir with its FTL, MWL and sluice, and, beside it, a fenced mine pit lake and an overburden dump with a sediment basin
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BAU Birsa Agricultural University, Kanke (Ranchi)
BCCL Bharat Coking Coal Limited, a subsidiary of Coal India
BOD Biochemical oxygen demand
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CCL Central Coalfields Limited, a subsidiary of Coal India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CNT Act Chota Nagpur Tenancy Act, 1908
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DGMS Directorate General of Mines Safety
DPR Detailed project report
DVC Damodar Valley Corporation
DVRRC Damodar Valley Reservoir Regulation Committee
DWF Dry-weather flow
EC Environmental clearance (of a mine or project)
EIA Environmental impact assessment
ESC Erosion and sediment control
ESIA Environmental and social impact assessment
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL / FTL / MWL Full reservoir level / full tank level / maximum water level
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Jharkhand)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
IDF Intensity–duration–frequency
IMD India Meteorological Department
IRC Indian Roads Congress
JBBL 2016 The Jharkhand Building Byelaws 2016, as amended
JNAC Jamshedpur Notified Area Committee
JSDMA Jharkhand State Disaster Management Authority
JSPCB Jharkhand State Pollution Control Board
JUIDCO Jharkhand Urban Infrastructure Development Company
JUSCO Jamshedpur Utilities and Services Company (now Tata Steel UISL)
MADA Mineral Area Development Authority, Dhanbad
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
NOC No-objection certificate
OB Overburden (the rock and soil removed to reach coal)
PSD Permissible site discharge
RMC Ranchi Municipal Corporation
RRDA Ranchi Regional Development Authority
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SLA Sea-level allowance (coastal term; not applicable in Jharkhand)
SoI Survey of India
SPT Act Santhal Parganas Tenancy (Supplementary Provisions) Act, 1949
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUDA State Urban Development Agency, Jharkhand
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
Tata Steel UISL Tata Steel Utilities and Infrastructure Services Limited, Jamshedpur
UD&HD Urban Development and Housing Department, Jharkhand
ULB Urban local body (a Municipal Corporation, Nagar Parishad or Nagar Panchayat)
UTM Universal Transverse Mercator
WQv Water quality volume
WRD Water Resources Department, Jharkhand
WSUD Water-sensitive urban design