Draft v1.0 prepared by NEER. Not adopted by the Government of Jharkhand or any authority or local body, and has no legal force. About this draft

Chapter 7Waterbodies, Talabs (Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (talab) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Jharkhand, with no coast and no tidal water, means Udhwa Lake Bird Sanctuary in Sahebganj district, the State's only Ramsar site, any wetland notified under the 2017 Rules (none had been notified as of February 2025), the floodplain wetlands and depressions of the Ganga at Sahebganj and Rajmahal, the reservoirs and lakes of the cities, such as Kanke, Dhurwa and Getalsud at Ranchi and Dimna at Jamshedpur, mine pit lakes, and the talabs, bandhs and ahars recorded in the Revenue records;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Jharkhand Municipal Act, 2011 (sections 203, 219, 221, 235, 340 and 341), JBBL 2016 (byelaws 23, 30 and 48), the Ranchi Master Plan 2037 (condition 2.9) and the other master plans approved by the State, the Public Land Encroachment Act, 1956 as applied in Jharkhand, the Coal Mines Regulations, 2017, the Wild Life (Protection) Act, 1972 (for Udhwa Lake Bird Sanctuary), the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Jharkhand has no Act for the protection of lakes, tanks or ponds as such. Its talabs, bandhs, ahars and reservoirs are protected instead by municipal law, the building byelaws, a master plan condition, revenue law, the mining rules and the courts. In the towns, "All public tanks, reservoirs, cisterns, wells, tube-wells … and any adjacent land, not being private property, appertaining to any such water source, which are situated within the municipal area, shall vest in the municipality" (Jharkhand Municipal Act, 2011, s. 203), and all public drains, and all drains alongside or under a public street, vest in it as municipal drains (s. 221); storm water drains are an express municipal function (s. 70), and the municipality shall construct and maintain drains and provide "a safe and efficient outfall … for effectual drainage and proper discharge of storm-water and sewage" without nuisance "by flooding" (s. 219). The same Act keeps an older sanitary power that runs the other way: an owner may be required to "cleanse, repair, cover, re-excavate, fill up or drain off a private well, tank, reservoir, cistern, pool, depression of excavation" (s. 341). This Manual treats every recorded talab as drainage infrastructure. A talab is storage and conveyance in the drainage system, and filling one, under section 341 or otherwise, removes that storage; no design under this Manual shall assume or rely on the filling of a recorded talab unless a drainage assessment under Chapters 3 to 5 shows where its storage goes, and the lost storage is replaced under Clause 7.6.4 (see "Recorded talab" in the definitions after Clause 7.2). A pond that is a health risk is to be re-excavated and treated (desilting, inlet screening and exclusion of sewage, Clauses 7.9 and 8.9), not filled. JBBL 2016, notified by the Urban Development and Housing Department under section 434 of the Municipal Act and applied by every regional development authority, ULB, MADA and industrial area development authority, bars building within the boundary of a river and within 10–15 m of the riverfront of a river other than the Ganga (byelaw 23.2, whose list of rivers has never been notified), and refuses permission "In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan" (byelaw 30.1). In Ranchi, the approval of the Master Plan 2037 bars construction within 20 m of the FTL of the Kanke, Dhurwa and Rukka dams and within at least 10 m of rivers and natural nalas (condition 2.9). The Wetlands (Conservation and Management) Rules, 2017 are applied by the Jharkhand State Wetlands Authority, but no Jharkhand wetland had been notified under them as of February 2025; Udhwa Lake Bird Sanctuary, a wildlife sanctuary since 1991, is the State's only Ramsar site. No floodplain zoning law and no notified flood zone was found, and the Jharkhand High Court has become the working regulator of Ranchi's water bodies (Clause 7.4, Disclosure). Two features set Jharkhand apart from the other plateau States. The first is the coalfield: in the Damodar belt (Dhanbad, Jharia, Bokaro, Bermo, Ramgarh–Patratu and the Karanpura fields) mine voids and pit lakes are waterbodies, held by a lessee under the mining rules and the environmental clearance, and overburden dumps are among the heaviest sources of runoff and sediment in the State; this chapter brings them into the inventory and sets the conditions on which they may be treated as receiving water (definitions after Clause 7.2). The second is the dobha: the State's programme of small dug farm ponds, reported to have dug about 1.75 lakh by September 2017 (as reported), has added a very large number of small storages to the plateau's catchments. This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the municipal, planning, revenue, mining and wetland procedures that record and protect waterbodies in law, or the directions of the Jharkhand High Court and the National Green Tribunal.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or seasonal stream (such as the Subarnarekha, the Kharkai, the Damodar, the Barakar, the North Koel, the South Koel, the Ajay, the Mayurakshi and the Ganga at Sahebganj, and the city rivers of Ranchi, such as the Harmu, the Jumar and the Hinoo), natural drain or nala, canal, reservoir or dam lake (such as Kanke, Dhurwa (Hatia) and Getalsud (Rukka) at Ranchi, Dimna at Jamshedpur, and the reservoirs of the DVC and the State, such as Tilaiya, Konar, Maithon, Panchet, Tenughat and Chandil), talab or pond (talab, pokhar, such as Bada Talab at Ranchi), bandh (a tank held by an earthen bund), ahar (a reservoir that collects rainwater for irrigation), dobha (a small dug farm pond), chuan (a spring or seepage pit), marsh or low wet land, floodplain wetland or depression (such as Udhwa Lake on the Ganga floodplain), mine void or pit lake, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (talab) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (feeder channel, nala or canal) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, sluice gate or regulator) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Jharkhand terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Talab (तालाब; pokhar) A natural or excavated depression that stores rainfall runoff: "Pond, pool, tank, reservoir of water" in Platts (Annex 7E). Pokhar is a synonym, used more in the Santhal Parganas. A talab is a tank or pond under Clause 7.2. Many talabs have no surplus weir or sluice; where a talab has none, its FTL is the level at which it spills to a nali, a nala or low ground, found by survey. A public tank or reservoir vested in a municipality under section 203 of the Jharkhand Municipal Act, 2011, such as Bada Talab at Ranchi, is a talab for this chapter.
Recorded talab A talab, bandh, ahar, reservoir or lake shown in the Revenue records, the municipality's records, a Development Plan or master plan, a list filed before the Jharkhand High Court, or a list of the Jharkhand State Wetlands Authority. A recorded talab is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, including under a notice under section 341 of the Jharkhand Municipal Act, 2011, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual.
Monsoon water line The outer edge of a talab's, reservoir's or wetland's water in the monsoon: the larger of the edge shown by dated imagery or survey of the monsoon (July to September) in recent years and the edge recorded in the Revenue records, and where neither is available, the MWL contour. The boundary of a talab or reservoir under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. This definition is set by this Manual.
Bandh; city reservoir A bandh (बाँध) is an embankment or dam (Annex 7E); in this Manual it is also a tank held by an earthen bund across a slope or valley, a use reported in Jharkhand but not confirmed in a dictionary. A city reservoir is a reservoir within or next to a town whose level is held by a dam with a spillway or sluice gates, such as the Kanke, Dhurwa (Hatia) and Getalsud reservoirs of Ranchi and Dimna lake at Jamshedpur. Each is a tank under Clause 7.2; a bandh's bund is a tank bund (Clause 7.14.2). The "Rukka dam" of condition 2.9 of the Ranchi Master Plan 2037 is read in this Manual as the Getalsud reservoir at Rukka [TBC].
Reservoir-locked outfall A drain or nala outfall into a city reservoir or talab, which cannot discharge freely while the water is at or above its FTL (Figure 7.3). Its tailwater is the reservoir level: its MWL, or its FTL plus the surcharge of the design flood, as the custodian records them, or, where neither is recorded, FTL + 0.5 m, a value set by this Manual (Chapter 5). The reservoir's sluice gates are a controllable outlet under Clause 7.8 only where they are operated to a written rule.
Dobha; ahar; chuan A dobha (डोभा) is a small dug farm pond, reported as about 10 ft × 10 ft × 10 ft (about 3 m each way) under the State's dobha programme (as reported); the word was not found in Platts or the Shabdasagara (Annex 7E). A dobha is a waterbody for Clause 7.3 and a tank in a cascade for Clause 7.7.2, but its storage is never counted as design storage, because it is not surveyed, has no outlet and is usually full by the time of the peak storm. An ahar (आहर) is a reservoir that collects rainwater for irrigation (Annex 7E), as on the plains of Palamu and Chatra; it is a tank under Clause 7.2. A chuan (चुआँ, चुआन) is a spring or seepage pit, often dug in a stream bed; it is a waterbody for Clause 7.3 and is protected as a groundwater outlet.
Nala; nali A nala is a watercourse or drain, natural or cut (Annex 7E), such as the Argora nala at Ranchi or the Udhwa nala at Sahebganj; a nali is a small street or house drain. Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered. A "natural nala" (प्राकृतिक नाला) under condition 2.9 of the Ranchi Master Plan 2037 is a nala for this chapter. No rule dividing natural nalas from municipal drains was found; the definition, not the owner or the name, decides which clauses apply.
Outer boundary of a river (byelaw 23) JBBL 2016 measures its distances from "the outer boundary of the riverfront of any river (as prescribed by the Irrigation Department)" (byelaw 23.2) but does not define the boundary. For this Manual, the outer boundary of a river is taken to be no closer to the channel than its top of bank, and, where the WRD has prescribed none, no closer than the edge of the water at the 50% AEP (2-yr) flow. This reading is set by this Manual; it is not a statutory interpretation, and a court or the State Government may read the byelaw otherwise.
Mine void; pit lake A mine void is an opencast excavation left open in a coal or mineral lease, worked out or not; a pit lake is a void that holds water. A mine void or pit lake is a waterbody for Clause 7.3 and is recorded in the inventory with its lessee as custodian. It is not a design outfall, and its storage is never counted under Clause 7.7, unless the lessee and the DGMS consent in writing and its water level, spill level and spill path are surveyed; even then it is treated as a tank under Clauses 7.7, 7.8 and 7.14, with a stability check of its benches and highwalls and a water-quality plan. No development shall drain into an active mine or working (Coal Mines Regulations, 2017, reg. 149, as reported). A fenced pit lake to which the public has no access is not subject to Clause 7.9.4, but its fence and warning signs are maintained by the lessee. This definition and rule are set by this Manual.
Overburden dump; mine-disturbed ground An overburden dump is a heap of the rock and soil removed to reach a mineral. Mine-disturbed ground is overburden dumps, backfilled or reclaimed mine land, compacted mine benches and haul roads, subsidence ground and the fire areas of the Jharia coalfield. For this Manual it is HSG D for every storm, with no infiltration credit (Chapter 3); runoff from it passes a sediment basin and stable toe drains (garland drains) before it reaches any urban drain, talab or outfall (Clause 8.12); and no overburden, spoil or silt is placed in the setback of any waterbody (Clause 7.5.1).

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the WRD and the Revenue, Registration and Land Reforms Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Municipal Corporation, Municipal Council or Nagar Panchayat (in which public tanks and reservoirs, with the adjacent land, not being private property, appertaining to them, vest under section 203 of the Jharkhand Municipal Act, 2011, and public drains and drains alongside or under a public street under section 221), JUIDCO (for the drainage and river works it builds until they are handed over, such as the Harmu river works at Ranchi), the RRDA or another regional development authority, MADA or an industrial area development authority (for the drains of the layouts it approves outside municipal limits), the Jamshedpur civic body under the industrial-town notification of 23 December 2023, with Tata Steel UISL as service provider (for the leased area; the notification is under challenge), the WRD (for rivers, river boundaries, dams and reservoirs, such as Kanke, Dhurwa, Getalsud and Chandil), the DVC (for Tilaiya, Konar, Maithon and Panchet), Tata Steel (for Dimna lake), the Gram Panchayat (for village tanks), the Revenue, Registration and Land Reforms Department through the Deputy Commissioner and the Circle Officer (for public land recorded as tank, nala or water), a coal company or other mine lessee, such as BCCL or CCL (for a mine void, pit lake, settling pond or garland drain within its lease), the Jharkhand State Wetlands Authority (for a notified wetland, of which there was none as of February 2025) and the Forest, Environment and Climate Change Department (for Udhwa Lake Bird Sanctuary, the State's Ramsar site), a private owner, or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) Revenue records (khatiyan) and village maps of the Revenue, Registration and Land Reforms Department, in which talabs, bandhs, ahars, nalas and land covered by water are recorded, and public land is protected under the Public Land Encroachment Act, 1956 (Bihar Act XV of 1956, as applied in Jharkhand); the public tanks and reservoirs, with their adjacent land not being private property, vested in the municipality under section 203 of the Jharkhand Municipal Act, 2011, and the public drains vested in it under section 221; the natural waterways and drains shown in a Development Plan or drainage plan, on which JBBL 2016 bars permission (byelaw 30.1), and the river boundaries as the Irrigation Department prescribes them (byelaw 23); the 20 m line from the FTL of the Kanke, Dhurwa and Rukka dams and the 10 m strip along rivers and natural nalas of the Ranchi Master Plan 2037 (condition 2.9), and the water bodies of the Jamshedpur and Dhanbad master plans; the lists and details of water bodies filed before the Jharkhand High Court in W.P.(PIL) No. 1463 of 2020; the mining plans and mine closure plans of coal lessees, which show voids, water bodies, settling ponds and garland drains; the boundary of Udhwa Lake Bird Sanctuary, the Ramsar site, and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was notified as of February 2025); and the records of dobhas and other farm ponds dug under the State's programmes;
  • (b) WRD and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. No 1% AEP flood map of any Jharkhand city was found, and Jharkhand has no floodplain zoning law and no notified flood zone. The WRD has appointed a consultant to demarcate the floodplain of the Ganga in Sahebganj district, about 83 km of river, but the State reported that the hydrology needed for it would come from the National Hydrology Project "by march 2024" (State's quarterly progress report in NGT O.A. 200 of 2014, about 2020); no demarcation was found. For the Subarnarekha at Jamshedpur, the joint committee appointed by the National Green Tribunal in O.A. 145 of 2023 (EZ), on high-rise building on the riverbed, fell back on byelaw 23.2 of JBBL 2016 because "the flood plain zoning of the Subarnarekha River has not been designated" (report of 14 March 2024, as quoted in a filing before the Tribunal). The building byelaws bar basements "in low lying area" and "in flood prone areas" (byelaw 48.1) and refuse permission where structural plans in areas that get flooded do not take that into account (byelaw 30.5), but define neither term, and no agency maps them. The river lines of byelaw 23 are measured from "the outer boundary of the riverfront of any river (as prescribed by the Irrigation Department)", and no prescribed boundary or list of rivers was found. Waterbodies are recorded, but unevenly: the Ranchi Master Plan 2037 names the three dams around which its 20 m line applies; the Dhanbad Master Plan 2041 records 2,283.53 ha of water bodies in its planning area, and the Jamshedpur Master Plan 2027 1,280 ha existing against 1,186.31 ha proposed, about 94 ha less (approval notifications of 24 and 23 October 2017); and the Jharkhand High Court has asked the Ranchi Municipal Corporation for the number of water bodies in the capital and their condition, with historical data (W.P.(PIL) No. 1463 of 2020, orders of 2022 and October 2024, as reported), after hearing that of "71 ponds" said to have existed in Ranchi "only four or five ponds are visible" (July 2024, as reported). Reservoir levels are not settled either: the CWC lists the FRL of Getalsud as 590.06 m (about 1,935.9 ft), while a secondary source gives about 1,954 ft; and the levels of Kanke and Dhurwa are quoted in the press in feet, as gauge depths and as elevations, to no stated datum (as reported). Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and the Ganga floodplain zone, once demarcated, and the master plan lines are minimums that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), because reservoir levels in Jharkhand are still quoted in feet as well as in metres. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual (the only statewide statutory distance read for this Manual, byelaw 23.2 of JBBL 2016, is 10–15 m from the outer boundary of a river other than the Ganga, but the list of rivers to which it applies has never been notified; the Ranchi Master Plan 2037 sets at least 10 m along rivers and natural nalas and 20 m from the FTL of the Kanke, Dhurwa and Rukka dams; this Manual applies 15 m to every waterbody; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of the WRD for a work on or next to one of its rivers, dams, reservoirs or canals, or within the boundary of a river as the Irrigation Department prescribes it under byelaw 23 of JBBL 2016, the approval of the DVC for a work on or next to one of its reservoirs, the consent of the mine lessee and of the DGMS for a work that drains to, or lies next to, a mine void, pit lake or working (Coal Mines Regulations, 2017, reg. 149, as reported), the permission of the Jharkhand State Wetlands Authority for a regulated activity in a notified wetland, or a direction of the Jharkhand High Court or the National Green Tribunal (such as the water-body orders listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual. Jharkhand's statutory distances from water are in the building byelaws and in one master plan. JBBL 2016 bars any building within the boundary of the Ganga, or within such higher distance from its outer boundary ("as prescribed by the Irrigation Department") as the State prescribes (byelaw 23.1), and, for other rivers, within "a strip of land of 10-15 metres (where area is open and not develop 15m. up to), or such distances as prescribed by the State Government, from the outer boundary of the riverfront of any river", adding that "The State Government shall notify a list of such rivers" (byelaw 23.2); no such list was found. In Ranchi, the approval of the Master Plan 2037 bars construction within 20 m of the full tank level of the Kanke, Dhurwa and Rukka dams, a distance that does not count as setback, and within 10–15 m of rivers and natural nalas as space allows, with a strip at least 10 m wide along their banks barred in every case (UD&HD notification of 30 November 2015, condition 2.9). Around a notified wetland no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)), but no Jharkhand wetland has been notified. No distance from a talab, bandh or ahar, or from a nala outside Ranchi, was found, and Jharkhand has no floodplain zoning law. This Manual's 15 m, the upper value of byelaw 23.2 applied to every talab, nala and watercourse, gives every waterbody a hydraulic corridor, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Jharkhand flood maps are mostly coarser than US maps, the valley floors (don lands) of the plateau, the foreshores of the city reservoirs and talabs, and the Ganga floodplain at Sahebganj, where towns are growing, are flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Jharkhand's building byelaws give the State's only general distance in metres from water. JBBL 2016 provides that no building shall be built or rebuilt "within a river boundary, or such other higher distance as may be prescribed from time to time by the State Government, from the outer boundary of the river of Ganges (as prescribed by the Irrigation Department)" (byelaw 23.1); that for other rivers "no construction or re-construction of any building shall be allowed, within a strip of land of 10-15 metres (where area is open and not develop 15m. up to), or such distances as prescribed by the State Government, from the outer boundary of the riverfront of any river (as prescribed by the Irrigation Department). The State Government shall notify a list of such rivers" (byelaw 23.2); and that "No construction shall be allowed within the boundary of the river" (byelaw 23.3). No list of rivers under byelaw 23.2 was found, so the line binds no named river, and its 10 m or 15 m depends on whether the area is "open". Byelaw 23.4 lets a planning authority or government body undertake "development and beautification work of riverfront, ghats or any other planned development on reclaimed lands" with the Government's approval, which can take floodplain storage. The byelaws also refuse permission "In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan" (byelaw 30.1) and over a municipal drain (byelaw 30.3), and the Municipal Act bars any building, wall, fence or other structure on a municipal drain without the Commissioner's permission (s. 235); none of these sets a width. The wider lines are in a master plan and in practice: in Ranchi, no construction within 20 m of the FTL of the Kanke, Dhurwa and Rukka dams, a distance that does not count as setback, and none within 10–15 m (as space allows) of rivers and natural nalas, with a strip at least 10 m wide barred in every case (Ranchi Master Plan 2037, approval notification of 30 November 2015, condition 2.9); no such clause was found in the approvals of the Jamshedpur and Dhanbad master plans (only their first pages were read). At Jamshedpur the Circle Officers of Jamshedpur and Mango are reported to have ordered the demolition of 56 structures within 15 m of the Subarnarekha under the Public Land Encroachment Act in May 2025, following the Tribunal's directions (as reported). Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)), but no Jharkhand wetland has been notified. Around Ranchi's water bodies the High Court has ordered the surroundings made a "no-entry zone" with barbed-wire fencing and encroachments removed from the catchments (W.P.(PIL) No. 1463 of 2020, order of 31 July 2025, as reported), with no distance reported. Mining leases carry their own lines: an environmental clearance of BCCL is reported to require that no overburden be dumped near water bodies and rivers, with "a safety barrier of at least 60 metres" (CAG Report No. 12 of 2019), and the appraisal record of a coal-mine clearance of 2024 for a mine outside the State notes a DGMS distance of 15 m from a river bank against a 100 m buffer required by the appraisal committee. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Jharkhand has one statewide statutory setback in metres from water: 10–15 m from the outer boundary of a river other than the Ganga, under byelaw 23.2 of JBBL 2016, which applies to the rivers on a list that the State has never notified, from a boundary that the Irrigation Department is to prescribe. Ranchi has one master plan line: 20 m from the FTL of the Kanke, Dhurwa and Rukka dams, and at least 10 m along rivers and natural nalas (Ranchi Master Plan 2037, condition 2.9). No floodplain zoning law and no notified flood zone was found, and no distance from a talab, bandh or ahar, or from a nala outside Ranchi. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give every talab, nala and watercourse the upper width that byelaw 23.2 gives a river. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's readings of the "outer boundary" of a river and of the monsoon water line, and the conditions on mine voids and pit lakes (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory, master plan or court line, so the Manual is stricter than statute along talabs, nalas and watercourses, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • Rivers (JBBL 2016, byelaw 23). No building within the boundary of any river (23.3); within the boundary of the Ganga, or a higher distance the State prescribes from its outer boundary (23.1); and within 10–15 m, or a distance the State prescribes, of the outer boundary of any other river on the list to be notified (23.2). Where the list is notified, or the WRD prescribes a boundary or a distance, it governs where wider. At Jamshedpur, the Tribunal's joint committee applied byelaws 23.2 and 23.3 to the Subarnarekha because its floodplain had not been designated (NGT O.A. 145 of 2023 (EZ), report of 14 March 2024, as quoted), and 15 m from the river was used in demolition orders in 2025 (as reported).
  • Ranchi (Master Plan 2037, condition 2.9). No construction within 20 m of the FTL around the Kanke, Dhurwa and Rukka dams, a distance not counted as setback, and none within 10–15 m of rivers and natural nalas as space allows, with a strip at least 10 m wide along their banks barred in every case. The 20 m is wider than Zone 1's floor and governs around the three dams wherever Zone 1 is narrower; the 10 m is narrower and never governs alone.
  • Natural waterways and municipal drains. No permission in areas of natural waterways or drains shown in the Development Plan or drainage plan, or over a municipal drain (JBBL 2016, byelaws 30.1 and 30.3); no building, wall, fence or other structure on a municipal drain without permission (Jharkhand Municipal Act, 2011, s. 235); and public tanks and reservoirs, with their adjacent land not being private property, vest in the municipality (s. 203). These protect the waterbody and the drain, not a flood corridor; the whole recorded and monsoon extent is a waterbody for this chapter.
  • Wetlands and Udhwa. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); no Jharkhand wetland had been notified as of February 2025, and a draft notification of 44 wetlands was reported in 2023 (as reported). Udhwa Lake Bird Sanctuary (935.5 ha), the State's only Ramsar site, is protected to its sanctuary and Ramsar boundary.
  • The High Court's water-body orders. Around Ranchi's water bodies, including Bada Talab and the Kanke, Dhurwa and Getalsud dams, the Jharkhand High Court has ordered encroachments removed from the water bodies and their catchments and the surroundings made a "no-entry zone" with barbed-wire fencing (W.P.(PIL) No. 1463 of 2020 with W.P.(PIL) No. 1325 of 2011, order of 31 July 2025, as reported), and has set up a committee headed by the member secretary of the State legal services authority to monitor encroachment (August 2025, as reported). The Court's orders of 2025 and 2026, including that of 7 January 2026, were not read for this Manual, and any distance or FTL line they set governs.
  • WRD, DVC and mine lines. Works on or next to WRD rivers, dams and reservoirs, and DVC reservoirs, need the custodian's approval; works next to a mine void, pit lake or working need the lessee's and the DGMS's consent, and mine openings are kept at least 1.5 m above the highest flood level (Coal Mines Regulations, 2017, reg. 149, as reported).

This Manual sets 15 m as the floor because no width exists for talabs and nalas outside Ranchi, and the river line of byelaw 23.2 has never been tied to a list; because 15 m is the upper value that the State already applies to rivers; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the nalas need. The reasons for the corridor are the record: the CAG found the Harmu river at Ranchi narrowed by 18.70 m at Karma Chowk bridge by encroachment between 2009 and 2021, and the project to rejuvenate it designed for a 25-year flood, against the 100-year frequency of IS 12094 for works protecting towns (CAG Report No. 1 of 2023); the High Court heard that only four or five of Ranchi's 71 ponds remained visible, and that several acres near the Kanke and Dhurwa dams had been encroached (2024 and 2025, as reported); and the Jamshedpur master plan proposes about 94 ha less water area than exists. Until a statute, rule, notification, master plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory, master plan and court controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with Jharkhand's statutory and master plan limits (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 Statute and plans: JBBL 2016, byelaw 23; Ranchi Master Plan 2037, condition 2.9; Wetlands Rules 2017; JMA 2011, s. 203 Rivers other than the Ganga: 10–15 m from the outer boundary (byelaw 23.2); the State's list of rivers has never been notified. Ranchi: at least 10 m along rivers and natural nalas, 10–15 m as space allows (condition 2.9) Kanke, Dhurwa and Rukka dams, Ranchi: no construction within 20 m of the FTL, not counted as setback (Ranchi Master Plan 2037, condition 2.9) 50 m from the mean high flood level, notified wetlands only (r. 4(2)(vi)); none notified as of February 2025. Udhwa (Ramsar site): its own boundary ? talabs, bandhs and ahars, and nalas outside Ranchi: no line. Public tanks and their adjacent land vest in the municipality (JMA s. 203), but no strip around them; no floodplain zoning. This Manual measures from FTL, the monsoon water line or top of bank. The 15 m floor of Zone 1 is this Manual's proposal, not a statutory width; it never reduces a wider line. Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Setback measured from FTL (talabs, reservoirs) or top of bank (channels), whichever gives the wider zone. Wider lines govern: Kanke, Dhurwa and Rukka 20 m from FTL; the Ganga boundary (byelaw 23.1); a river list or distance once notified; notified wetlands; High Court orders; WRD, DVC and DGMS (mine) lines.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Jharkhand Building Byelaws 2016, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Jharkhand practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The valley floors and lowland (don) paddy land of the plateau, the foreshores of Jharkhand's city reservoirs and talabs, and the Ganga floodplain at Sahebganj and Rajmahal are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Jharkhand the one reservoir line in force is measured from a high level, not from the dry-season water line: condition 2.9 of the Ranchi Master Plan 2037 measures its 20 m from the Full Tank Level of the Kanke, Dhurwa and Rukka dams, and the Wetlands Rules, 2017 measure their 50 m from the mean high flood level. The byelaw line of 23.2 is measured from "the outer boundary of the riverfront", which the Irrigation Department is to prescribe and has not, so it has no fixed starting point. The difference matters on the plateau, where a reservoir in a shallow valley spreads far at a small rise: the High Court has heard that the capacity of the Kanke and Dhurwa dams has been reduced and that several acres near them were encroached (as reported), and a line drawn from the dry-season edge would leave the foreshore that the reservoir floods in every heavy monsoon open to building. This Manual gives the same rule a level for every talab, bandh and reservoir: its monsoon water line, and its FTL, are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Ranchi, such as the colonies along the Harmu river, whose channel the CAG found narrowed by 18.70 m at Karma Chowk by encroachment, and the low colonies of Bahu Bazar and Kanke Road flooded in 2022 and 2025 (as reported), the riverside colonies of Jamshedpur, Mango, Bagbera and Jugsalai on the Subarnarekha and the Kharkai, flooded in June 2008 and again in 2025 (as reported), and the riverside wards of Sahebganj on the Ganga already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Jharkhand has no tank Act, and its storages range from dug dobhas a few metres across to river reservoirs held by gated dams. The storages that matter for urban drainage are of six kinds. The first is the urban and village talab or pokhar, usually with no outlet structure, recorded in the Revenue records or, inside a municipality, vested in it with its adjacent land (Jharkhand Municipal Act, 2011, s. 203); Bada Talab at Ranchi, built in 1842 (as reported), receives untreated sewage, and a treatment plant for it was reported "under process of its installation since September, 2021" (as reported before the High Court in 2022). The Dhanbad drainage project proposed to integrate ten major ponds, such as Pampu pond and Loco talab, with its storm drains, with inflow through silt traps and overflow over an outlet weir, so that 19 of its 94 outfalls discharge to ponds (JUIDCO, draft ESIA, 2017). The second is the bandh, a tank held by an earthen bund across a slope, and the ahar of the Palamu and Chatra plains. The third is the city reservoir held by a gated dam, which takes the city's nalas and supplies its water: Kanke (about 1955), Dhurwa or Hatia (1962–63) and Getalsud (1971, on the Subarnarekha, with a catchment of about 717 km² and an FRL of 590.06 m in the CWC's list) at Ranchi, and Dimna lake at Jamshedpur, built by Tata Steel in 1940–44 (all as reported, except the CWC level). These are the tanks for which Figure 7.3 and Clauses 7.7 and 7.8 matter most, and no operating rule for any of them was published. The fourth is the river reservoirs of the DVC (Tilaiya, Konar, Maithon and Panchet) and of the State (Tenughat and Chandil), whose releases drive the floods of the Damodar and the Subarnarekha; they are not tanks for these clauses, and their releases enter a design as inflow and tailwater (Chapter 5). The fifth is the dobha, the small farm pond of the State's programme, about 3 m each way (as reported), which silts and loses its steps within a few years (as reported); dobhas are modelled as existing features of a catchment, but their storage is not counted (definitions after Clause 7.2). The sixth is the mine void and pit lake of the coalfields: closure guidelines treat a retained void as a "Water Body" or "Water Reservoir near pit" (Ministry of Coal, guidelines of 29 May 2020), some abandoned pits are used by the surrounding community as reservoirs and for fish (BCCL clearance compliance reports, as seen in search extracts), and CCL has reported a quarry holding about 721 million gallons (as recorded before the appraisal committee); a pit lake is treated under the definitions after Clause 7.2. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any city reservoir, bandh or pit lake whose storage is to be counted is subject to Clause 7.7.1 in full, with the WRD, the municipality, the lessee or other custodian, and the custodian of each reservoir and talab shall be confirmed for the inventory (Annex 7A).

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, on the plateau, every dobha and talab on the slope above the site and the talab or city reservoir it drains to, with its FTL, MWL and sluice, the reservoir level being the tailwater of the inflowing nalas, and, in the coalfield, every mine pit lake and overburden dump in the catchment, the pit lake being modelled as an existing feature but not counted as storage or used as an outfall except under the definitions after Clause 7.2, as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Jharkhand's worst urban floods have come when reservoirs were full and releasing. At Jamshedpur in June 2008, more than 250 mm fell in 48 hours, the Met office recorded 338.1 mm (the period of the reading is not clear), the Kharkai and the Subarnarekha rose above their danger levels after the gates of the Kharkai dam in Odisha were opened, and more than 500 houses were flooded; SANDRP attributes the flood partly to the operation of the Chandil reservoir (all as reported). On 17 August 2016 Chandil opened 13 of its 18 gates (as reported), and in August 2025 it was releasing through eleven gates with its level at 181.22 m (as reported), against an FRL listed by the CWC as 189 m in 2022 and 192 m in 2018. On the Damodar, the DVC reservoirs released a combined peak of about 2.5 lakh cusecs on 17 September 2024, with Panchet at 425.22 ft, while the State's Tenughat dam released about 85,000 cusecs (as reported). No hydrograph showing how long Ranchi's reservoirs stay at or above FTL in a wet spell was obtained for this Manual, and the FTLs of Kanke and Dhurwa were found only in the press, in feet and to no stated datum. While a city reservoir or talab is full, it stores nothing more below FTL, its inflowing nalas discharge against a high water level, and every release adds to the flow in the nala or river below the dam. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A plateau talab or city reservoir with a dobha cascade and a mine pit lake: dobhas stepping down a laterite slope to a talab or reservoir with FTL, MWL and sluice; a fenced pit lake and an overburden dump with a toe drain and sediment basin (schematic) A plateau talab or reservoir with a dobha cascade, and a mine pit lake (schematic, not to scale) A. Plateau: dobhas step down the laterite slope to a talab or city reservoir with its FTL, MWL and sluice laterite upland (tanr) roof water to a filter, then a recharge bore through the crust into the weathered zone laterite crust weathered zone (recharge) fractured granite-gneiss dobhas: each full and spilling to the next at the peak storm; modelled, not counted colony nali and inflow nala setback from FTL and monsoon water line: Zone 1 at least 15 m (this Manual); 20 m around Kanke, Dhurwa and Rukka (Ranchi Master Plan 2037) MWL FTL foreshore (FTL to MWL) = flood storage; reservoir level = tailwater of the nalas talab or city reservoir dam or bund (bandh) sluice / gates nala or river below the dam storage counted only under Clause 7.7.1; releases to a written rule with warning downstream (Clause 7.8) B. Coalfield: a fenced pit lake in a mine void, and an overburden dump with its toe drain and sediment basin coal seam (Gondwana) pit lake (level surveyed?) no recharge within 50 m of the void edge colony drains to the nala, never to the pit lake or an active working overburden dump (HSG D) sediment basin then to the nala toe (garland) drain garland drain to the same basin, never into the void mine void with pit lake: fenced, kept by the lessee not a design outfall and not counted as storage unless the lessee and the DGMS consent and its water level, spill level and spill path are surveyed no development drains into an active working; mine openings at least 1.5 m above the highest flood level (reg. 149, as reported); no recharge in mine-disturbed ground or a dewatering zone; benches and highwall checked for stability before any storage is counted talab, dobha and storm water pit lake turbid runoff (settling) laterite crust overburden (mine-disturbed ground) setback (Clause 7.4) MWL FTL recharge bore (filtered roof water only) fence The cascade, pit-lake and dump rules and the 15 m minimum are this Manual's proposals; condition 2.9 of the Ranchi Master Plan 2037, the mine's environmental clearance and the DGMS govern where they say more. Original drawing for this Manual.

Figure 7.3 — A plateau talab or city reservoir with a dobha cascade and a mine pit lake (schematic, not to scale; no particular waterbody is shown). A: in section, rain on the laterite upland (tanr) runs down the slope through a cascade of dobhas, each full and spilling to the next by the time of the peak storm, and through the colony drains (nali) and nalas to a talab or city reservoir, which holds water up to its FTL, floods its foreshore up to MWL, and releases through a sluice or gates to the nala or river below; the dobhas are modelled as existing features of the catchment but their storage is not counted, the reservoir's storage is counted only under Clause 7.7.1, and the reservoir level is the tailwater of the inflowing nalas (Chapter 5). A recharge bore passes through the laterite crust into the weathered zone below it, for filtered roof water only (Clause 8.8.1). B: in the coalfield, a pit lake in a mine void is fenced and kept by its lessee; it is not a design outfall and its storage is not counted unless the lessee and the DGMS consent and its water level, spill level and spill path are surveyed, no development drains into an active working, and no recharge is made within 50 m of the void edge or in the dewatering zone; runoff from the overburden dump beside it, high in sediment, passes through its toe (garland) drain and a sediment basin before it reaches any urban drain or nala (definitions after Clause 7.2; Clause 8.12). The cascade, pit-lake and dump rules, the monsoon water line and the 15 m minimum are this Manual's proposals; the 20 m line of condition 2.9 of the Ranchi Master Plan 2037 around the Kanke, Dhurwa and Rukka dams, a mine's environmental clearance and the DGMS's requirements govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, JSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.

Commentary. No operating rule for a Jharkhand talab or city reservoir that keeps a flood cushion was found, and most talabs and all dobhas have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the cities are the releases of the gated reservoirs. Ranchi's Kanke, Dhurwa and Getalsud reservoirs supply the city's water and are held as full as the monsoon allows; no gate rule, MWL or design release for any of them was published, and no record of their gate openings was found. On the Subarnarekha, the releases of Chandil, and of the Kharkai dam and other dams upstream in Odisha, set the river at Jamshedpur (Clause 7.7, Commentary), and SANDRP argued that the Chandil release of August 2016 was avoidable (as reported); on the Damodar, releases from Maithon and Panchet are advised by the Damodar Valley Reservoir Regulation Committee, on which the Governments of Jharkhand and West Bengal, the CWC and the DVC are represented, while Konar and Tilaiya are released by the DVC and Tenughat, which the State operates, lies outside the Committee (as reported). Without an agreed rule with dates, levels, release rates and a named operator, storage in a reservoir cannot be relied on, and a release made without warning to the colonies downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression or the remnant of a Bay of Bengal cyclone. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

Many talabs, bandhs and reservoirs have other users. Ranchi's reservoirs are its water supply, ahars and bandhs irrigate the fields below them, talabs and pit lakes are used for fish (as reported), and dobhas are the farmers' own. Drawing a reservoir or talab down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Jharkhand State Pollution Control Board (JSPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).

Commentary. No statewide order of the Urban Development and Housing Department for the pre-monsoon desilting of drains, nalas or talabs was found. Ranchi's drains are reported to be cleaned "by early June" and to a "June 5" deadline in one year (as reported), and Tata Steel UISL runs the pre-monsoon desilting of the leased area at Jamshedpur (as reported). The Jharkhand High Court has directed the Ranchi Municipal Corporation to clean and de-encroach the city's dams (July 2024, as reported), and desilting of the Kanke, Hatia and Getalsud dams has long been called for (as reported). Dobhas silt up and lose their steps within a few years of being dug (as reported), and their silt is farm soil that should go back to the fields, not into a nala. The date of 31 May in this Manual is set by this Manual, before the monsoon's normal onset in the State (13 June at Jamshedpur and Bokaro, 14 June at Ranchi and 17 June at Daltonganj; IMD, new normal dates, 2020; 12 June for the State, IMD Meteorological Centre, Ranchi). Excavation to "increase capacity" is governed by Clause 7.9.3, and in the coalfield no excavation shall cut into a mine void, a subsidence hollow or a fire area. Silt from a talab or nala that drains a mine, a washery or an overburden dump is tested before disposal (Clause 7.9.1(c)), because mine runoff carries a heavy load of suspended solids (Clause 8.12, Commentary). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Jharkhand precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Jharkhand the public drains vest in the municipality, but the split between natural nalas and municipal drains has not been written down. The Jharkhand Municipal Act, 2011 vests in the municipality "all public drains, all drains alongside or under any public street, and all sewage disposal works, constructed or acquired out of the Municipal Fund or otherwise … within or outside the municipal area", which are "municipal drains" (s. 221), lets it make over a drain to, or take one over from, another authority with the State's prior approval (s. 222), and bars any building, wall, fence or other structure on a municipal drain without permission (s. 235); public drains and watercourses in or under a street are municipal property (s. 126). No rule or order dividing natural nalas from municipal drains, or the municipalities' drains from the WRD's rivers, was found for this Manual. In practice the rivers, dams and reservoirs lie with the WRD (the ownership of Ranchi's urban rivers, such as the Harmu, the Jumar and the Bhusur, was not confirmed); the nalas and drains within a town with the municipality; the trunk drains and river works built under State projects, such as the Harmu river works and the Dhanbad storm drains, with JUIDCO until they are handed over; the drains of a layout outside municipal limits with the RRDA, MADA or industrial area development authority that approved it; the leased area of Jamshedpur with the civic body under the industrial-town notification of 2023, which is under challenge, Tata Steel UISL serving as provider (the 2005 lease does not mention drains or storm water); the garland drains and settling ponds of a mine with its lessee; and the village tanks and nalas with the Revenue Department and the Gram Panchayat. This Manual uses that division as its working assignment, not as a statement of law, and each city should publish a register of its drains and nalas with the owner of each reach. The record shows what is lost. The CAG found the Harmu narrowed by 18.70 m at Karma Chowk bridge, its riverfront encroached, the Argora nala that joins it encroached by cattle sheds, and the project's hydrology based on 8.49 km² of a 22.59 km² catchment (CAG Report No. 1 of 2023); of Ranchi's 207 km storm-drain contract, 1.49 km was built, "not connected to any drain network" and "found filled with the wastewater of septic tanks" (same report, Ch. 3); in nine test-checked ULBs, 567.12 km of 939.55 km of drains were uncovered (CAG, Annual Technical Inspection Report for 2015-16); and at Dhanbad, drains run along only about 16.5% of the road length (40 km of 243 km), outside the coal-bearing and fire areas, which the drainage project left out (JUIDCO, draft ESIA, 2017). Byelaw 30.1 of JBBL 2016 refuses permission in the natural waterways and drains of a Development Plan, but no byelaw keeps a nala at its recorded width once it has been piped, narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored talab or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Jharkhand no shared form of storage is required by the building rules: the rainwater harvesting of JBBL 2016 is plot-level (byelaw 51.1), and JBBL 2016 has no detention, peak-flow or "zero runoff" rule. The ponds that the Dhanbad drainage project proposed to integrate with its storm drains, "to reduce the direct discharge of runoff to the river system and the flood risk downstream" (JUIDCO, draft ESIA, 2017), and Ranchi's talabs under the High Court's supervision, are the nearest existing forms of shared storage. None of these sets a technical standard for counting storage. Land for a regional pond in the Chota Nagpur and Santhal Pargana tenancy areas is subject to the restrictions on the transfer of raiyati land (Chota Nagpur Tenancy Act, 1908 and Santhal Pargana Tenancy (Supplementary Provisions) Act, 1949), which is a further reason to restore public talabs before buying new land. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Jharkhand State Wetlands Authority;
  • (b) Udhwa Lake Bird Sanctuary in Sahebganj district, the State's only Ramsar site (the Barhel and Pataura lakes and the Udhwa nala that links them to the Ganga; 935.5 ha; designated on 8 January 2024 according to the Ramsar Information Sheet), to its sanctuary and Ramsar boundary, and any wetland notified under the 2017 Rules, or proposed in the draft notification of 2023 until it is found not to be a wetland;
  • (c) the marshy low land and depressions of the floodplain of the Ganga at Sahebganj and Rajmahal, and of the other rivers, within the 1% AEP extent of Clause 7.3.4 or the Ganga floodplain zone once the WRD demarcates it, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
  • (d) any other marsh, wetland, reservoir, talab or pit lake that the Authority notifies, that the wetland authority lists, or that the Jharkhand High Court or the National Green Tribunal directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Jharkhand's wetlands are the concern of the Jharkhand State Wetlands Authority, constituted under the 2017 Rules (notification No. 1079 of 10 March 2017, reconstituted on 22 May 2018) and chaired by the Minister for Forest, Environment and Climate Change, with the Chief Secretary as vice-chair and the secretaries of the Urban Development and Housing, Water Resources, Revenue and other departments, and the member secretary of the JSPCB, as members. No Jharkhand wetland had been notified under the 2017 Rules (Rajya Sabha reply of 13 February 2025, as seen in an extract); a draft notification of 44 wetlands was reported in March 2023 (as reported), and it does not appear to have been finalised. The State's only Ramsar site is Udhwa Lake Bird Sanctuary in Sahebganj district (Ramsar Site No. 2559; 935.5 ha), "The largest natural Gangetic floodplain wetland of Jharkhand", declared a sanctuary in 1991 under the Wild Life (Protection) Act, 1972, and made up of two connected wetlands, the Barhel lake (410 ha) and the Pataura lake (155 ha), fed by the Udhwa nala, which "connects the wetland to the Ganges near the Farakka Barrage" (Ramsar Information Sheet). Its date of designation is 8 January 2024 in the Ramsar Information Sheet; the designation was announced in February 2025 (as reported). No eco-sensitive zone for it was found. A drain outfall, desilting, diversion or work on the Udhwa nala in or near the sanctuary therefore needs the permission of the wildlife authorities and compliance with this chapter; the city reservoirs, talabs and floodplain depressions that are not notified are protected only by this chapter, the municipal and revenue law, the master plan lines and the High Court's orders. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Jharkhand's talabs, reservoirs and rivers through the nalas (Clause 8.9, Commentary). Bada Talab at Ranchi receives untreated sewage, and its treatment plant was reported to the High Court in 2022 as still being installed (as reported); the CAG found 14 major and 56 minor inlets carrying sewage to the Harmu river (CAG Report No. 1 of 2023); and the Subarnarekha at Jamshedpur is alleged to receive polluted water from nine drains (NGT O.A. 129 of 2026 (EZ), an application). In the coalfield, mine water and runoff carry suspended solids far above the limit (Clause 8.12, Commentary). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Jharkhand they apply in full to every new outfall, and every existing outfall to a talab, reservoir, wetland or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed; an outfall to a drinking-water reservoir, such as Kanke, Dhurwa or Getalsud, comes first in the programme of Clause 8.10.4.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Jharkhand's main controls on filling and building in tanks and nalas are municipal law, the public land law and the courts. Public tanks and reservoirs, with their adjacent non-private land, vest in the municipality (Jharkhand Municipal Act, 2011, s. 203), no structure may be built on a municipal drain without permission and an unauthorised one may be removed (s. 235), and no one may put rubbish, cinders or quarry refuse into a watercourse so as to interfere with its flow (s. 340). Encroachments on public land are removed under the Public Land Encroachment Act, 1956 (Bihar Act XV of 1956, as applied in Jharkhand), under which the Circle Officers of Jamshedpur and Mango are reported to have ordered the demolition of 56 structures within 15 m of the Subarnarekha in May 2025 (as reported). The courts have been more active than the agencies. In 2013 the High Court found that on the encroachment and pollution of the Subarnarekha and the Kharkai "nothing has been done … except some paper orders", and directed the Chief Secretary to report on the removal of encroachment and the "reclamation of the area of the rivers which may have been damaged" (W.P.(PIL) No. 1325 of 2011, order of 16 April 2013). In W.P.(PIL) No. 1463 of 2020, on Ranchi's water bodies, it has sought the number and condition of the water bodies, a report on encroachment of the Bhusur river, the cleaning and de-encroachment of three dams and the details of all water bodies with historical data (2022 and 2024, as reported); on 31 July 2025 it ordered encroachments removed from the water bodies and their catchment areas and the surroundings made a "no-entry zone" with barbed-wire fencing, after hearing that "several acres" had been encroached near the Kanke and Dhurwa dams (as reported); and the Ranchi Municipal Corporation is reported to have issued notices to 90 buildings near Kanke dam and Bada Talab (date not confirmed). The orders of 2025–26, including that of 7 January 2026, were not read for this Manual. At Jamshedpur the National Green Tribunal took up suo motu the "rampant and indiscriminate construction of high-rise building on the river-bed of pristine Subernarekha river" (O.A. 145 of 2023 (EZ)), and notices and demolitions followed its order of 8 July 2024 (as reported). Against these, section 341 of the Municipal Act still lets an owner be required to "fill up" a private tank; this Manual treats a recorded talab as drainage infrastructure (definitions after Clause 7.2). Byelaw 23.4 of JBBL 2016, which allows riverfront development "on reclaimed lands" with the Government's approval, and the Jharkhand Regularization of Unauthorizedly Constructed Buildings Rules, 2026, which were not checked for any exclusion of buildings in river setbacks or water bodies, can each undo a setback once encroached; a design under this Manual does not count reclaimed or regularised land in a waterbody as anything but lost storage (Clause 7.13.2). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most talabs and the walls of dobhas are low and are not expected to make them specified dams, but each bund shall be screened under Clause 7.14.1. The dams of the city reservoirs, such as Kanke, Dhurwa and Getalsud at Ranchi and Dimna at Jamshedpur, and the bunds of the larger bandhs, are of heights that were not found for this Manual; each shall be screened, and the larger of them may be specified dams. Where the storage of a talab, bandh, city reservoir or pit lake is counted under Clause 7.7, its bund, dam or retaining bench is a tank bund for Clause 7.14.2 unless the Act applies; the highwall and benches of a pit lake are checked for stability as well (definitions after Clause 7.2). Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Jharkhand the dams that matter to the cities are the gated city reservoirs and the river reservoirs above Jamshedpur and the Damodar towns. In June 2008, after the gates of the Kharkai dam in Odisha were opened, the Kharkai and the Subarnarekha rose above their danger levels at Jamshedpur and the army was called in (as reported); in May 2021, during Cyclone Yaas, the Kharkai at Adityapur reached about 132.4–132.9 m against a danger level of 129 m and about 14,000 people were evacuated in Kolhan (as reported); and in September 2024 the DVC and Tenughat releases flooded the Damodar valley (as reported). No breach map or emergency action plan for a city reservoir, a talab bund, a bandh or a pit lake was found, and the State Disaster Management Authority's urban flood plan was not found either. A failed or overtopped bund floods the colonies below it, a pit lake that breaches into a working or a nala carries sediment with its water, and an unannounced release floods the colonies too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Hindi and Urdu waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)