Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Jharkhand soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Jharkhand to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Jharkhand Department of Agriculture (soil survey) and Birsa Agricultural University [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Drinking Water and Sanitation Department, supplemented by piezometers in the floodplains of the Subarnarekha and the Kharkai at Jamshedpur and Adityapur, the Ganga front and diara at Sahebganj and Rajmahal and the Udhwa wetland, the lowland rice land (don) of the valley floors round Ranchi and the other plateau towns, the waterlogged mine-subsidence hollows of the Jharia coalfield, and the land round the Kanke, Dhurwa (Hatia) and Getalsud reservoirs and Bada Talab in Ranchi. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of June–September record | Highest June–September level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Jharkhand CN calibration and supplementary land covers (overburden dumps and mine-disturbed ground, laterite crust and rock outcrop, don rice land, hill forest and scrub, talab, bandh and dobha beds, Ganga diara)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Jharkhand catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the overburden dumps, backfilled and reclaimed mine land, compacted mine benches and haul roads, subsidence ground and coal-fire ground of the Damodar coalfields, Jharia, Bokaro, Ramgarh–Patratu and Karanpura, which shed water fast and carry heavy sediment; the bare laterite crust (murram) and the rock outcrop of the plateau, the Dalma volcanics and the Rajmahal traps; the terraced lowland rice land (don) of the valley floors when it is dry or cultivated at the start of a storm, and the upland fields on thin red soils; the sal forest, scrub and grassland of the hill flanks of Dalma, Parasnath, Netarhat and the Rajmahal hills; the beds of talabs, bandhs and dobhas that are dry or cultivated at the start of a storm; and the diara of the Ganga at Sahebganj and Rajmahal when it is above the river at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Overburden dump, backfilled or reclaimed mine land, compacted bench or haul road (Damodar coalfields) | ||||||
| Subsidence ground and coal-fire ground, Jharia coalfield | ||||||
| Bare laterite crust (murram) and rock outcrop of the plateau, the Dalma volcanics and the Rajmahal traps | ||||||
| Lowland rice land (don) of the valley floors, dry or cultivated at the start of the storm | ||||||
| Upland fields on thin red soils | ||||||
| Sal forest, scrub and grassland of the hill flanks (Dalma, Parasnath, Netarhat, Rajmahal hills) | ||||||
| Talab, bandh or dobha bed, dry or cultivated at the start of the storm | ||||||
| Diara of the Ganga at Sahebganj and Rajmahal, above the river level at the start of the storm | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Jharkhand. Jharkhand is landlocked and has no flat coastal plain, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). Most of the State is plateau and hill, where the response is fast, not slow: the subzone 1(g) worked example on the Saphi near Barkakana, with an equivalent slope of 9.37 m/km, gives a 50-yr peak of about 4.5 m³/s per km² (Annex 3E). The Ganga flats at Sahebganj and Rajmahal and the rice land of the valley floors are flat but are not coastal plain; their slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4), not by a lower peak rate factor. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzones 1(d), 1(g) and 3(d), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzones 1(d) (Sone), 1(g) (Lower Ganga Plains) and 3(d) (Mahanadi), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the three CWC Flood Estimation Reports that cover Jharkhand: the Lower Ganga Plains subzone 1(g) (revised, LG-1(g)/R-1/23/94, November 1994), whose hilly region, the Chota Nagpur plateau and its foothills, covers the Damodar–Barakar, Subarnarekha–Kharkai, Ajay–Mayurakshi and Ganga-front basins of the State, including Ranchi, Jamshedpur, Adityapur, Dhanbad, Jharia, Bokaro, Ramgarh, Hazaribagh, Giridih, Koderma, Deoghar, Dumka, Chaibasa, Sahebganj and Pakur; the Sone subzone 1(d) (Design Office Report No. S/15/1987, CWC Publication No. 33/88, August 1987), which covers the North Koel and the Sone frontage, including Daltonganj (Medininagar), Garhwa, Latehar and Chatra; and the Mahanadi subzone 3(d) (revised, M-3(d)/R-3/25/1996, February 1997), which covers the South Koel, the Sankh and the other Brahmani headwaters, including Lohardaga, Gumla and Simdega (see the References of Chapter 3); with the 1(d) loss rate, read as 2.5 mm/h but as 4.5 mm/h in one passage, the exponent of the 1(d) time-to-peak relationship, the 3(d) loss-rate curve, read only by eye, the areal reduction and time-distribution tables of all three, and the subzone boundaries within Jharkhand, including the 3(d)/1(g) line just west of Ranchi and the 1(d)/1(g) line north-west of Hazaribagh, still to be confirmed on the reports' page images and index maps [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 1(d) relationship | Subzone 1(g), hilly region | Subzone 1(g), plain region | Subzone 3(d) relationship |
|---|---|---|---|---|---|---|
| Peak discharge per unit area | qp | m³/s per km² | qp = 1.664 tp^−0.965 | qp = 2.0972 tp^−0.927 | qp = 0.6617 (L/√S)^−0.515 | qp = 1.260 tp^−0.725 |
| Time from centre of unit rainfall to peak | tp | h | tp = 0.314 (L/√S)^1.012 (the exponent is printed 1.102 in the relationship table and 1.012 in the worked example and the design-storm formula; see the note) [TBC] | tp = 1.1808 (L·Lc/√S)^0.285 | tp = 1.8833 qp^−0.940 | tp = 1.757 (L·Lc/√S)^0.261 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.534 qp^−0.976 | W50 = 1.2622 tp^0.828 | W50 = 1.7897 qp^−1.006 | W50 = 1.974 qp^−1.104 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.478 qp^−0.860 | W75 = 0.7896 tp^0.711 | W75 = 0.8955 qp^−1.061 | W75 = 0.961 qp^−1.125 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 1.091 qp^−0.750 | WR50 = 0.5357 tp^0.745 | WR50 = 0.5524 qp^−1.012 | WR50 = 1.150 qp^−0.829 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.672 qp^−0.719 | WR75 = 0.3825 tp^0.647 | WR75 = 0.2984 qp^−1.012, as printed (the same exponent as WR50) [TBC] | WR75 = 0.527 qp^−0.932 |
| Base width of UH | TB | h | TB = 5.526 tp^0.866 | TB = 5.5830 tp^0.824 | TB = 12.4755 tp^0.721 | TB = 5.411 tp^0.826 |
| Unit duration | tr | h | 1 | 1 | 1 | 1 |
| Design storm duration | TD | h | TD = 1.1 tp = 0.345 (L/√S)^1.012, rounded to the nearest hour; the report found that TD = 1.1 tp gave the higher peak than TD = TB in "60 to 75% of the cases" | TD = 1.1 tp | TD = 1.1 tp | TD = 1.1 tp (it gave a higher 50-yr peak than TD = TB on all 16 catchments of the report) |
| Design loss rate | — | mm/h | 2.5 (printed "modal loss rate of 0.25 cm/hr"; one passage reads "0.45cm/hr" by optical character recognition, to be checked against the page image [TBC]) | 2.7 (printed "0.27 cm/hr"; modal value of 46 events on 11 catchments; used in the worked example) | 2.7 (the subzone value) | Falls with the duration of the storm (Fig. 13 of the report): about 3.5 for a 3-hour storm, falling to 1.5 for storms of about 13 hours or more, read by eye from the curve [TBC] |
| Design base flow | — | m³/s per km² | Not located in the copy read; the worked example's 15.33 m³/s on 340.64 km² implies about 0.045 [TBC] | 0.05 | 0.05 | 0.10 |
| Ratio of t-hour to 24-hour rainfall | — | — | 50-yr: 1 h 0.37; 3 h 0.58; 6 h 0.70; 9 h 0.80; 12 h 0.89; 15 h 0.94; 18 h 0.98 (read by optical character recognition only [TBC]); 24 h 1.00 (from 14 IMD self-recording gauges) | 10-yr, from 21 self-recording gauges, "comparable" for return periods above 5 years: 1 h 0.350; 3 h 0.515; 6 h 0.640; 9 h 0.735; 12 h 0.800; 15 h 0.860; 18 h 0.915; 24 h 1.000 | as hilly region | 10-yr, from 6 self-recording gauges: 1 h 0.390; 3 h 0.610; 6 h 0.760; 9 h 0.820; 12 h 0.860; 15 h 0.880; 18 h 0.920; 24 h 1.000 |
| Time distribution of 24-hour rainfall | — | cumulative fraction | Average curves of Fig. 12(a)–(e) for storms of 2–3, 4–6, 7–12, 13–18 and 19–24 hours and coefficients of Table A-2; not transcribed [TBC] | For a 6-hour storm, 0.57, 0.74, 0.86, 0.93, 0.97 and 1.00 at the end of hours 1 to 6 (Table 5.1 of the worked example); the curves for other durations (Annex 4.1 and Fig. 11 of the report) not transcribed [TBC] | as hilly region [TBC] | [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 | 1.15 | 1.15 |
| Areal reduction factor | ARF | — | Table 6 and Figs 11(a) and 11(b), from 8 bridge catchments with data "only upto 800 sq.km", to be used "with caution for areas more than 800 sq.km"; values not transcribed [TBC] | Annex 4.2 and Fig. 12(a) of the report, read by optical character recognition only; the worked example uses 0.846 for a 6-hour storm on 389.76 km² [TBC] | as hilly region [TBC] | [TBC] |
| 50-yr 24-hour point rainfall at Jharkhand towns (Plate 9, read by eye, about ±1 contour) | — | mm | Daltonganj (Medininagar) about 280–320; Latehar and Chatra about 320; Garhwa about 240–280 | Ranchi, Jamshedpur, Dhanbad and Bokaro about 240; Hazaribagh about 240–280; Giridih and Deoghar about 280; Dumka about 240–280; Chaibasa below 200; the Saphi catchment of the worked example 240 | Sahebganj and Rajmahal about 240–280 [TBC] | Lohardaga below 200; Gumla about 200–240; Simdega about 240 |
| Catchment area for which the relationships apply | A | km² | Recommended for 25–1,500, usable to 5,000 with judgement; derived from 15 catchments of 27.51–5,815 km² | 25–1,000; up to 5,000 with judgement; derived from 11 railway-bridge catchments of the hilly region; 24 of the 29 gauged catchments of the subzone have slopes of 2.0–9.37 m/km | 25–1,000; up to 5,000 with judgement | 25–1,000; up to 5,000 with judgement |
| Report reference | — | — | Relationship table (p. 40), worked example (pp. 15–23), design storm (p. 49), rainfall ratios (p. 50), loss rate (pp. 84–88) | Hilly region (p. 9), Tables 3.1 and 3.2 (pp. 13–14), §3.5 and §3.6 (pp. 15–16), worked example (pp. 25–29), Annexes 3.1, 4.3 and 4.4 | Tables 3.1 and 3.2 (pp. 13–14), §3.5 and §3.6 (pp. 15–16) | Table 3.3 (p. 13), §3.5 (p. 14), §3.6 (p. 15), Annex 5.2 and Fig. 13 |
Note: relationships as printed in the three CWC reports that cover Jharkhand (References of Chapter 3), read from scanned copies and checked against the page images except where marked as read by optical character recognition only or by eye. L is the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km, S the equivalent slope in m/km and A the catchment area in km². The reports were written when "Bihar" included the districts that are now in Jharkhand. The 1(g) worked example is a Jharkhand catchment: Railway Bridge No. 110 on the Saphi, Garwa Road–Barkakana section, near Barkakana in Ramgarh district (85°02′30″ E, 23°39′45″ N), a fan-shaped, steep catchment of the Damodar basin with A = 389.76 km², L = 38.29 km, Lc = 18.50 km and S = 9.37 m/km. The report gives tp = 5.5 h, qp = 0.432 m³/s per km², W50 = 5.18 h, W75 = 2.65 h, WR50 = 1.91 h, WR75 = 1.15 h, TB = 23 h and a unit-graph peak of 168.38 m³/s; with TD = 6 h, a 50-yr 24-hour point rainfall of 24.0 cm read from Plate 9, the factor 0.640 for 6 hours (15.36 cm), an ARF of 0.846 (12.99 cm), the 1-hour increments 7.40, 2.21, 1.56, 0.91, 0.52 and 0.39 cm less the design loss rate of 0.27 cm/h (7.13, 1.94, 1.29, 0.64, 0.25 and 0.12 cm) and a base flow of 0.05 × 389.76 = 19.49 m³/s, it gives a 50-yr peak of 1,770.94 m³/s (read by optical character recognition from p. 29 and consistent with these steps), about 4.5 m³/s per km². The relationships of Table 3E.1 reproduce the unit hydrograph: tp = 1.1808 × (38.29 × 18.50 / √9.37)^0.285 = 5.57 h, which the report rounds to 5.5 h, and qp = 2.0972 × 5.5^−0.927 = 0.432 m³/s per km² (by NEER's arithmetic). The report's simplified formula for the hilly region, Q50 = 1.320 A^0.871 L^−0.359 S^0.106 R50^0.968 with R50 in cm, gives about 1,770 m³/s for the same catchment (by NEER's arithmetic); it is for preliminary design only and shall not be used under Clause 3.11.4. Fifty-seven per cent of the 6-hour storm falls in its first hour: plateau storms are front-loaded, and the steep catchments of the plateau peak early and high. The 1(d) worked example (Railway Bridge No. 1198 on the Itarsi–Allahabad line, the Simrawal Nadi, 340.64 km², S = 3.70 m/km) lies outside Jharkhand; the report gives a 50-yr peak of 1,157.06 m³/s. The 1(d) time-to-peak exponent is to be confirmed before use [TBC]. The relationship table of the 1(d) report prints tp = 0.314 (L/√S)^1.102, but its worked example computes "0.314 (34.94/√3.70)^1.012 = 5.90 hrs", and its design-storm formula is TD = 0.345 (L/√S)^1.012; this Manual uses 1.012 and treats 1.102 as a misprint until the report is checked. The 3(d) worked example (railway bridge 385 near Sondur, 194 km²) also lies outside Jharkhand; the report gives a 50-yr peak of 1,086.5 m³/s. The 3(d) report of 1997 kept the loss curve of its 1982 edition, although 28 new events it examined lie considerably outside the curve [TBC]. The 1(g) plain-region relationships were derived from 22 catchments of subzone 1(f) in Bihar and Uttar Pradesh; in Jharkhand they could apply only to the Ganga flats at Sahebganj and Rajmahal, if the report's index map places them in the plain region [TBC], and there both sets shall be computed. In the 1(g) plain region the WR75 exponent is printed the same as the WR50 exponent, which may be a misprint [TBC]. The design loss rates, 2.5 mm/h in 1(d), 2.7 mm/h in 1(g) and the 3(d) curve, are φ-indices fitted to the floods of whole rural catchments; they are not soil infiltration capacities and are not used to assign HSG (Clause 3.7) or to size infiltration practices (Chapter 4). The 1(g) value is about a tenth of the infiltration rates measured on the upland soils near Ranchi (Commentary to Clause 3.7), because in the monsoon the thin soils over rock are already full. The reports were derived from gauged rural catchments at railway and road bridges, none of them urban. In Jharkhand they apply to the rural nalas and rivers that enter city limits, such as the Subarnarekha above Getalsud and the Jumar and the Potpoto at Ranchi, the Kharkai above Adityapur and the streams of the Dalma flank at Jamshedpur, the Katri and the Jamunia at Dhanbad and Jharia, and the Garga at Bokaro; they are not a model of city catchments. The Harmu, whose whole catchment is about 22.59 km² (CAG, Report No. 1 of 2023), is below the 25 km² limit and is designed by the methods of Clause 3.4 alone. Where a city catchment lies within 25–5,000 km², the SUH is computed only as the benchmark of its natural condition (Clause 3.11.4), and the catchment itself is designed by the methods of Clause 3.4 with the design rainfall of Chapter 2. The Ganga, the Damodar and the lower Barakar are far larger than the catchments of any report, and the Subarnarekha, the Kharkai and the North Koel at the cities may be near or above 5,000 km² [TBC]; reaches above 5,000 km² are outside Clause 3.11.4 (Clause 3.4.5). The ratios are not to be used to derive intensities for durations shorter than the TD of the SUH (Chapter 2): with the 1(g) ratios the 50-yr 1-hour and 3-hour depths at Ranchi are about 84 mm and 124 mm, below the 99 mm in 1 hour and 171 mm in 3 hours recorded by the self-recording gauge at Mandar on 6 August 1971 and the 184 mm in 3 hours at Jamshedpur (A) on 5 August 1977, both in the report's own Annex 4.4 (Chapter 2 sets the short-duration floors). Several gauges also exceed the plates at 24 hours, among them Kanke 332.6 mm (1998), Giridih 403.0 mm (1980) and Taljhari 601.4 mm (1999) (IMD), so the plate values are a floor under Clause 2.3.3, not a ceiling. The stations listed in the reports' rainfall annexes are regional context, not subzone membership: the 3(d) annex lists Hunterganj and Chatra, which drain to the Phalgu in 1(d). Subzone boundaries, read from the plates by eye and to be confirmed on the index maps of the reports [TBC]: 1(g) covers the Damodar–Barakar, the Subarnarekha–Kharkai, the Ajay–Mayurakshi and the Ganga front, with its northern boundary on the Ganga, so that Sahebganj, Rajmahal and Pakur are inside it; the 3(d)/1(g) boundary, the divide between the Subarnarekha and the South Koel, passes about 0.15–0.3° west of Ranchi city, near 85.05° E at Ranchi's latitude, so that the city is in 1(g) and its western edge at Hatia–Dhurwa and Nagri lies at the line; the 1(d)/1(g) boundary runs from about 85.0–85.1° E at 24° N north-east towards the Ganga near the Kiul, about 0.3° north-west of Hazaribagh, which is in 1(g), while Chatra and Hunterganj are in 1(d) and Koderma–Jhumri Telaiya, on the Barakar side, in 1(g); and the 1(d)/3(d) boundary crosses the Netarhat–Lohardaga plateau, with Latehar in 1(d) and Lohardaga just inside 3(d). The subzone is chosen by the catchment's outfall, not by its district. Where a catchment drains across the boundary between two subzones, or lies near it, as do the south-western wards of Ranchi that drain to the South Koel, this Manual requires the SUH to be computed with the parameters of each subzone and the higher 1% AEP peak to be adopted, unless calibration under Clause 3.15 supports the other.
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Jharkhand Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Jharkhand Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Jharkhand Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Jharkhand Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Jharkhand Stormwater Design Manual, Draft v1.0.