Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, talab and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Jharkhand's cities have drainage projects but no published city drainage master plan with a design standard fit for use. Ranchi's sewerage and drainage DPR, prepared by Meinhardt in 2006 and approved in December 2007 for four zones, reached construction only in Zone I, whose contract for 207 km of storm drains produced 1.49 km of disconnected drains before it was terminated in 2019; the consultancy of ₹16.04 crore "proved wasteful", the Cabinet sanctioned ₹31.17 crore for a consultant to update the DPR, and the Department decided to build drains only where waterlogging occurs (CAG Report No. 1 of 2023); the design basis of the 2006 DPR's storm drains was not found. Ranchi's storm drainage is carried out by RMC and JUIDCO, including small AMRUT drainage projects (as reported), and the Harmu river was rejuvenated by JUIDCO between 2014 and 2018 at ₹92.78 crore on a 25-year design, raised to 50 years after damage, against the 100-year norm the audit applied; the audit asked the State to "revise the estimation for storm water" and to recognise urban runoff as a source of water for the river (CAG). The Ranchi Master Plan 2037, approved on 30 November 2015 for 652.02 km² and 31.58 lakh people, keeps building 20 m back from the full tank level of the Kanke, Dhurwa and Rukka dams and at least 10 m back from rivers and natural nalas (condition 2.9), but its approval sets no drainage design standard. In Jamshedpur, JNAC and Tata Steel UISL serve the leased area, the Jamshedpur (UA) Master Plan 2027 was approved on 23 October 2017, and an integrated sewerage and storm drainage DPR for Dhanbad, Jamshedpur and Mango was commissioned in September 2014 (CAG, 2017), with no outcome found. In Dhanbad the World Bank-funded drainage of 153.95 km was designed for a 1-year storm to stay within the road right of way, left out the coal-bearing area and the fire zone, and took 10 major ponds into the system as storage (JUIDCO, draft ESIA, 2017), under the Dhanbad Master Plan 2041 approved on 24 October 2017. The rivers are planned elsewhere: DVC operates the Damodar–Barakar reservoirs with releases advised by the Damodar Valley Reservoir Regulation Committee, and WRD has appointed a consultant to demarcate the floodplain of the Ganga in Sahebganj district, waiting for hydrology from the National Hydrology Project that was due by March 2024 (State's report in NGT OA 200/2014). No published document sets a design return period, fit for use, for the storm drain network of any Jharkhand city; the only stated design storms are Dhanbad's 1-year storm and the Harmu's 25 and 50 years. This chapter supplies the design storm, levels of service, storage and buffer criteria that such a plan needs, with the design storms of Chapter 2 and the levels of service of Clause 11.6; it has not been adopted by UD&HD, JUIDCO, any Municipal Corporation, RRDA, MADA, JNAC, Tata Steel UISL, WRD, DVC or any other body. A site-level manual cannot fix basin-level problems: lost tank storage, city drains and urban rivers that reach the Subarnarekha, the Kharkai, the Damodar and the Ganga while releases from the dams above hold them high, nalas and urban rivers, the Harmu first among them, that carry sewage to their outfalls and into Ranchi's reservoirs, talabs encroached or filled, catchments changed by mine voids, overburden dumps and subsidence in the coalfield, single drains split between a Municipal Corporation, JUIDCO, RRDA, WRD, Tata Steel UISL and the coal companies, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to Jharkhand: to a plateau State whose city drains fall steeply to urban rivers and reservoirs, as in Ranchi, where the Harmu, the Jumar, the Subarnarekha and the Kanke, Dhurwa and Getalsud reservoirs receive the city's runoff and its sewage; to outfalls on the Subarnarekha and the Kharkai at Jamshedpur that releases from Chandil and from the dams on the Kharkai in Odisha can hold high, and on the Damodar and the Barakar, whose levels Tenughat and the DVC reservoirs set; to the Ganga front at Sahebganj and Rajmahal; to the coalfields of the Damodar valley, from Ramgarh and Karanpura to Bokaro, Bermo, Dhanbad and Jharia, where mine voids, pit lakes, overburden dumps, subsidence and mine fires change the catchments and their storage; to drains that carry sewage, as the Harmu and the drains of Jamshedpur that reach the Subarnarekha do; to drains vested in the Municipal Corporations, project drains of JUIDCO, the leased area served by Tata Steel UISL, the areas of RRDA and MADA, the rivers and dams of WRD and the reservoirs of DVC, without an order that divides the natural nalas from the municipal drains; to a State with no floodplain zoning law and no notified flood zone; to a State with no published design return period, fit for use, for the drains of any city; to hard-rock aquifers little used across the State but over-exploited under Jamshedpur and critical under Dhanbad and parts of Ranchi; and to a south-west monsoon and Bay of Bengal depressions whose recorded days far exceed the 50-year depths of the CWC plates, 601.4 mm at Taljhari on 25 September 1999 and 382.0 mm at Mandar near Ranchi on 11 July 1990 (IMD).


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 No basin delineation has been published for any Jharkhand city. For the urban areas where the evidence identifies them, the basins are at least the following:

  • Ranchi, Harmu: the catchment of the Harmu river, 22.59 km² in all, from its head to its confluence with the Subarnarekha, with the Argora nala and the other major and minor inlets in the 1D network, their sewage interceptions mapped (Clause 8.9.5), and the level of the Subarnarekha at the confluence as the boundary condition;
  • Ranchi, Kanke, Dhurwa and Bada Talab: the catchments of the Kanke and Dhurwa (Hatia) reservoirs, with the Jumar below Kanke and the Gara below Dhurwa, and of Bada Talab, with each reservoir's full tank level, spillway and sluices as storage and outfall, and the 20 m line of the Ranchi Master Plan 2037 shown;
  • Ranchi, Subarnarekha and Getalsud: the catchments of RMC and of the RRDA area that drain to the Subarnarekha above and below Getalsud, with the reservoir's level and releases as boundary conditions and the Bhusur and the other urban streams in the 1D network;
  • Jamshedpur and Adityapur: the catchments of the leased area, Mango, Jugsalai and Adityapur that drain to the Subarnarekha and the Kharkai above and below their meeting at Sonari, with the level at CWC's Jamshedpur site and, on the Kharkai, at Adityapur as boundary conditions, releases from Chandil and from the dams on the Kharkai in Odisha as inflows, and the outfall-closed case a design case;
  • Dhanbad and Jharia: the seven drainage zones of Dhanbad's World Bank project and the catchments of the six main natural drains to the Damodar and the Khudia, with the coal-bearing and fire areas that the project left out, the ponds taken into the system as storage, mine voids shown as storage only where the lessee and DGMS consent and their levels and spills are surveyed, subsidence in the DEM, and the levels of the Damodar below Panchet and of the Barakar below Maithon as boundary conditions;
  • Bokaro, Chas, Ramgarh and the other Damodar towns: the catchments that drain to the Damodar between Tenughat and Panchet, with the levels at CWC's Ramgarh and Pupunki sites and the releases from Tenughat and the DVC reservoirs as boundary conditions, and overburden dumps as sediment sources; and
  • Sahebganj and Rajmahal: the catchments that drain to the Ganga, with the level at CWC's Sahebganj gauge as the boundary condition, the outfall-closed case a design case, and Udhwa Lake, the State's only Ramsar site, shown.

Other Tier A bodies, among them Deoghar, Hazaribagh, Giridih and Medininagar, shall define their basins in the first BSMP that covers them. Where WRD, DVC, CWC, DGMS or a court has a high flood level, a full tank level, a floodplain demarcation, a line around a reservoir or water body, or an operating rule for a dam, a sluice or a pumping station, the BSMP shall take its boundary conditions from it and show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, river levels, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, river, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. In Jharkhand a single drain can pass through several hands on its way to a river. The Jharkhand Municipal Act 2011 vests in the municipality all public drains and all drains alongside or under any public street (s.221), and the public tanks with the adjacent land, not being private property, that appertains to them (s.203), and lets the municipality make a drain over to, or take one over from, another authority with the State's approval (s.222); JUIDCO builds the State's drainage projects, such as the Harmu works and Dhanbad's drains, and runs them until they are handed over; RRDA plans the area of the Ranchi Master Plan outside RMC, where the High Court has held that the Panchayati Raj Act prevails over the Regional Development Authority Act (November 2025, as reported); in Jamshedpur the leased area is served by Tata Steel UISL under a lease of 2005 that binds it to keep up "the standard of municipal services and civic amenities" but does not mention drains, while Mango, Jugsalai and Adityapur have their own municipal bodies; WRD holds the rivers, the river boundary of byelaw 23 and the dams; and the coal companies hold the drains, voids and dumps on their leases. No rule divides the natural nalas and urban rivers, such as the Harmu, the Jumar and the Bhusur in Ranchi, from the municipal drains (as this Manual reads the record). The drains carry sewage across these boundaries: of the Harmu's 14 major inlets only nine were connected to the sewers, and these overflowed to the river in the dry season, its sewer network was designed for 22.15 MLD against the 47.12 MLD the audit estimated, and the river narrowed by 18.70 m at Karma Chowk bridge between 2009 and 2021 (CAG Report No. 1 of 2023). This clause makes the basin the planning unit, so that one model carries each drain from its head to the river whoever owns each reach, and so that the interception works are tested against the capacity of the drains they tap (Chapter 8, Clause 8.9.5).


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For the basins of a city with a Municipal Corporation: the Municipal Corporation (in Ranchi, RMC; elsewhere the Corporations of Dhanbad, Deoghar, Chas, Hazaribagh, Giridih, Adityapur, Mango and Medininagar), in which the public drains and street drains vest (Jharkhand Municipal Act 2011, s.221) and which must provide a safe and efficient outfall (s.219), with JUIDCO as the executing agency for the State's drainage projects in it; either may prepare the plan as UD&HD directs, and UD&HD carries it into the master plan (Clause 11.9). In the Jamshedpur leased area the Lead Authority is the body that holds the area under the industrial-town notification of 23 December 2023, or JNAC while that notification is under challenge, with Tata Steel UISL as the service provider; in the area of the Ranchi Master Plan outside RMC it is RRDA; and in the Dhanbad mining area it is MADA, until its functions pass to Dhanbad Municipal Corporation (s.615(4)). Where a basin extends beyond the Corporation, the other local bodies and the authority in the basin are partners, and one BSMP covers the whole basin (Clause 11.3.1).
  • No order dividing the natural nalas from the municipal drains, or the drains of the local bodies from the rivers and reservoirs of WRD and DVC, was found; until one is made, this Manual assigns the reaches within each BSMP as follows, each body being Lead Authority for the reaches and works it owns or runs and for the parts of the CIP on them: WRD for the rivers, the river boundary of byelaw 23 of the JBBL 2016, the State's dams and reservoirs and their spillways, sluices and releases, among them Kanke, Dhurwa, Getalsud, Chandil and Tenughat, and the demarcation of the Ganga floodplain; DVC for the Tilaiya, Konar, Maithon and Panchet reservoirs and their releases; the coal company or other lessee, with DGMS, for the mine voids, pit lakes, overburden dumps, garland drains and sediment basins within its lease; the Municipal Corporation, Nagar Parishad or Nagar Panchayat for the drains and public tanks vested in it (ss.203 and 221) and for the natural nalas within its limits that no other body holds; JUIDCO for project drains until they are handed over; RRDA and MADA for the drains of their schemes in their areas; Tata Steel UISL for the drains it runs in the Jamshedpur leased area, until the responsibility for them is settled; the Industrial Area Development Authorities for the drains of their estates; the Jharkhand State Wetlands Authority, with the Forest Department, for any notified wetland and for Udhwa Lake; and the Road Construction Department and NHAI for the drains of their roads.
  • In Tier B bodies: the Lead Authority is named by UD&HD. Basins draining to a common river reach or reservoir may be grouped into one district-level plan.

The Jharkhand State Wetlands Authority shall be consulted on every BSMP whose basin drains to a notified wetland or to Udhwa Lake; JSDMA and the district administration on every BSMP; the Jharkhand State Pollution Control Board on every BSMP that proposes works on a drain that carries sewage to a river or reservoir, or that receives runoff from a mine; DVC on every BSMP in the Damodar–Barakar basin; and, for a basin whose outfall lies on a river shared with Odisha or West Bengal, such as the Subarnarekha, the Kharkai or the Damodar, the water resources departments of those States, through WRD.

WRD, or DVC for its reservoirs on the Damodar and the Barakar, shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, talab, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls, rivers, reservoirs and mine voids The datum of every level named, with levels published in feet converted; outfall invert levels against the warning, danger and high flood levels of the receiving river at the nearest CWC gauge and its recorded peaks (on the Subarnarekha at Jamshedpur a danger level of 123.5 m and a high flood level of 129.82 m, 12 October 1973; on the Ganga at Sahebganj 27.25 m and 30.91 m, 20 August 1998; CWC site lists, as reported), with the district marks at Mango and Adityapur bridges kept as a separate series; for outfalls to reservoirs and talabs, the full tank level, maximum water level and spillway and sluice data from WRD or the custodian, with any conflict between published values (for Getalsud, 590.06 m in CWC's list against about 1,954 ft in another source), and, for the DVC reservoirs, the conservation and maximum flood levels from DVC, naming which is used; the release records of Getalsud, Chandil, Tenughat and the DVC reservoirs, and of the dams on the Kharkai in Odisha; for any mine void proposed as storage, the lessee's survey of its level, spill and highwall stability, with the consent of DGMS; the lines of condition 2.9 of the Ranchi Master Plan 2037 and of byelaw 23 of the JBBL 2016 where they bind; and the sluices, flap gates, interception structures, check dams, pond outlet weirs and pumping stations on the outfalls, with their capacities and operating rules
Rainfall and levels All available rain gauges (IMD, including its observatories at Ranchi (A), Jamshedpur (A), Jamshedpur, Dhanbad, Hazaribagh, Daltonganj, Dumka and Chaibasa, the automatic weather station at Birsa Agricultural University, Kanke, and the other automatic weather stations and rain gauges reported by the Meteorological Centre Ranchi; the district and block rain gauges of the State, such as those at Kanke, Mandar and Namkum; the rain and river gauges of CWC, including its level-monitoring sites on the Jumar, on the Gara at Dhurwa dam and on the Kanchi in Ranchi district; the reservoir and rain gauges of DVC and of WRD; and any gauges kept by the Municipal Corporations, Tata Steel UISL and the Smart City companies) and water-level records, including those for the June 2008 (Jamshedpur), May 2021 (Cyclone Yaas, Jamshedpur and the Kharkai), August 2022 (Ranchi), September 2024 (the DVC releases on the Damodar) and June 2025 (Ranchi and Jamshedpur) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the Ganga floodplain at Sahebganj and Rajmahal, on the floodplains of the Subarnarekha and the Kharkai at Jamshedpur and Adityapur, across the valley-floor don lands of the plateau and the subsidence hollows of the coalfield, and around the margins of Ranchi's reservoirs and talabs, where the line of the full tank level decides what may be built, a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The June 2008 (Jamshedpur), May 2021 (Cyclone Yaas, Jamshedpur and the Kharkai), August 2022 (Ranchi), September 2024 (the DVC releases on the Damodar) and June 2025 (Ranchi and Jamshedpur) events are the best calibration data Jharkhand has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and talab storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been counted but not measured. In law the State's tanks are protected only in part: the public tanks of a municipality and the adjacent land appertaining to them, not being private property, vest in it (Jharkhand Municipal Act 2011, s.203), but the same Act lets the Commissioner require a private tank or depression to be filled up as well as re-excavated (s.341); no pond or tank statute exists; and no wetland had been notified under the Wetlands Rules 2017 by February 2025 (Rajya Sabha reply), though a draft list of 44 wetlands was reported in 2023 (as reported). Udhwa Lake in Sahebganj, 935.5 ha of Ganga floodplain wetland, is the State's only Ramsar site (designation date 8 January 2024 in the Ramsar information sheet; announced in February 2025, as reported). The losses are visible all the same: the High Court was told that of 71 ponds once in Ranchi only four or five remain visible, and noted the reduced capacity of the Kanke and Dhurwa dams and the encroachment of the Harmu and Jumar rivers (2024, as reported); the Jamshedpur master plan proposes 1,186.31 ha of water area against 1,280 ha existing (UD&HD, 2017); and Dhanbad's planning area holds 2,283.53 ha of water bodies (UD&HD, 2017), of which 10 major ponds have been taken into the drainage as storage (JUIDCO, 2017). Beyond the cities lie the talabs, bandhs, ahars and dobhas of the villages, the dobhas dug in large numbers as farm ponds, 1,74,654 of them by September 2017 (as reported). No survey of the storage of any talab or reservoir inside a Municipal Corporation was found, and no reliable capacity for Kanke or Dhurwa has been published.


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8, used unchanged: no projection of heavy rainfall for Jharkhand with a design factor was found; the State Action Plan on Climate Change (2014) projects at least 10 more rainy days, or about 20% more rainfall, by the end of the century under two scenarios, while the observed monsoon rainfall over the State has fallen by about 13 mm a decade since 1901 (Sharma and Kotal, 2022); and the station records set after the CWC plates were drawn, 332.6 mm at Kanke on 5 July 1998 and 338.1 mm at Jamshedpur (A) on 18 June 2008, exceed the 50-year 24-hour depths of those plates (IMD; this Manual's reading), which is a reason to keep the factors, not to reduce them.

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the June 2008 (Jamshedpur), May 2021 (Cyclone Yaas, Jamshedpur and the Kharkai), August 2022 (Ranchi), September 2024 (the DVC releases on the Damodar) and June 2025 (Ranchi and Jamshedpur) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two tanks in cascade with surplus course; a 1D drain network linked to a 2D surface grid; a river or canal reach with an inter-basin link; an outfall with a flap gate and pumps; and a river or lake level boundary. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) River / receiving water 1 S1 S2 S3 2 Upper tank Lower tank start level start level 3 2D surface 5 4 River / canal (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Tanks and ponds Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Rivers and canals (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Sluices, flap gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary River (CWC or WRD gauge) or lake level (MWL or FTL + surcharge), per Ch. 5 Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and talabs with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: talabs, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: sluices and flap gates on the outfalls to the Subarnarekha, the Kharkai, the Damodar and the Ganga, pumping stations and the storage behind them where an outfall can be closed, as at Jamshedpur, Adityapur and Sahebganj, interception works that keep sewage out of the Harmu and the other urban rivers without taking their storm capacity, sediment basins and toe drains below overburden dumps and mine sites, and the operating rules of the spillways and sluices of Kanke, Dhurwa, Getalsud and Chandil and of the releases from Tenughat and the DVC reservoirs that set the receiving levels, agreed with WRD and DVC;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example IMD district rainfall warnings and nowcasts issued by the Meteorological Centre Ranchi, CWC flood forecasts and river stages at its sites on the Subarnarekha, the Damodar, the Barakar, the North Koel and the Ganga against their warning and danger levels, notice of releases from Getalsud, Chandil, Tenughat and the DVC reservoirs, and, through the Odisha authorities, from the dams on the Kharkai, to the towns downstream, and the district flood control rooms), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on groundwater recharge in the over-exploited and critical units of Jamshedpur, Dhanbad, Bermo and Ranchi, where water reaches the hard-rock aquifer only through the weathered zone below the laterite, the shallow post-monsoon water table of the valley floors, mine dewatering and the stability of mine-disturbed ground, and the quality of the groundwater, with fluoride in parts of the State and arsenic in the Sahebganj alluvium, and of the rivers and reservoirs that the runoff reaches (Chapter 8);
  • effect on downstream basins and the receiving river or reservoir; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring storage comes first because many of Jharkhand's city outfalls are closed or limited in the wettest weeks, and because conveyance on its own has failed. The Subarnarekha and the Kharkai can stand above Jamshedpur's outfalls for the length of a release from Chandil or from the dams in Odisha; the Ganga stayed above its danger level at Sahebganj from 9 to 31 August 2021 (CWC, as reported); and the outfalls to Ranchi's reservoirs are closed while the reservoirs are full. Ranchi once held its runoff in its talabs and dams, and of 71 ponds reported in the city only four or five are visible (as reported). Conveyance built without a basin plan has not served: in Ranchi 1.49 km of storm drains were built in pieces that connect to nothing, and the Harmu channel, sized on 8.49 km² of its 22.59 km² catchment with a runoff coefficient of 0.29, was damaged in two successive monsoons (CAG Report No. 1 of 2023); and Dhanbad's drains were held to a 1-year storm because larger drains needed land (JUIDCO, 2017), so the storage of its ponds is what stands between the town and the larger storms. The storms are large for drains with no stated design basis: IMD has recorded 601.4 mm in a day at Taljhari (25 September 1999), 382.0 mm at Mandar (11 July 1990) and 338.1 mm at Jamshedpur (A) (18 June 2008), above the 50-year 24-hour depths of the CWC plates there (IMD; this Manual's reading). Conveyance upgrades on their own move water faster to an outfall that the Subarnarekha, the Kharkai, the Damodar or the Ganga in flood, or a reservoir held at its full tank level, may close, or that is limited by the capacity of its sluice, interception structure or pumping station. Groundwater in Jharkhand calls for recharge in its industrial towns and is little used elsewhere. The State's stage of extraction was 32.89% in 2025 (CGWB, via PIB), and of its 263 assessment units in 2023, 241 were safe, but Jamshedpur Urban, Golmuri-cum-Jugsalai, Baliapur and Bermo were over-exploited and Dhanbad Urban and Topchanchi critical, with 501.6 km² of Ranchi district critical (CGWB, 2023); the pre-monsoon water level fell to 33 m below ground in Ranchi district in May 2022 (CGWB). About 85% of the State is hard rock, where water reaches the aquifer through a weathered zone generally 10–25 m thick, 30–60 m under laterite, and through fractures at about 50–70 m and 100–120 m at Ranchi; in lateritic terrain many dug wells dry up in summer (CGWB), so recharge must reach the weathered zone below the crust. But the post-monsoon water table stands 2–5 m below ground in most wells (CGWB, 2022), so recharge on the valley floors adds to waterlogging. Quality and mining limit recharge too: fluoride is reported in parts of Palamu, Garhwa, Koderma and Pakur and in the Ormanjhi, Ranchi Sadar and Silli blocks of Ranchi, and arsenic in the alluvium of Sahebganj, Rajmahal and Udhwa (CGWB); and in the coalfields mine dewatering draws the water table down while subsidence and fires make the ground unstable. The Building Byelaws ask for recharge pits on every plot of 300 m² and more without regard to the depth of the water table or the ground (byelaw 51.1). This is why recharge, waterlogging, mine-disturbed ground and groundwater quality are all assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the master plans approved by UD&HD, among them the Ranchi Master Plan 2037 under s.24 of the Jharkhand Regional Development Authority Act 1981 (as adopted), and the Jamshedpur (UA) Master Plan 2027 and the Dhanbad Master Plan 2041 under s.33 of the Jharkhand Town Planning and Improvement Trust Act 2002 (as adopted); the development plans and drainage plans to which byelaw 30.1 of the JBBL 2016 refers; the plans of RRDA, MADA and the Industrial Area Development Authorities; and the layouts approved under Chapter VIII of the byelaws. In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. Jharkhand draws its water lines in its byelaws and in one master plan. Byelaw 23 of the JBBL 2016 bars building within the boundary of a river, from the outer boundary of the Ganga up to the river boundary or a larger distance the State prescribes (23.1), and within 10–15 m of the outer boundary of other rivers (23.2), but the State has never notified the list of rivers to which 23.2 applies, and 23.4 lets a Planning Authority develop a riverfront on reclaimed land with the Government's approval; byelaw 30.1 refuses permission in natural waterways or drains shown in the development plan or drainage plan. The Ranchi Master Plan 2037 keeps building 20 m back from the full tank level of the Kanke, Dhurwa and Rukka dams, a distance not counted as setback, and at least 10 m back from every river and natural nala, 10–15 m where space allows (condition 2.9 of its approval of 30 November 2015); no such clause was found in the approvals of the Jamshedpur and Dhanbad plans. There is no floodplain zoning law and no notified flood zone: WRD's demarcation of the Ganga floodplain awaits hydrology, and at Jamshedpur the National Green Tribunal's Joint Committee fell back on the byelaw's 10–15 m because the Subarnarekha floodplain had never been designated (2024). The High Court has ordered no-entry zones around Ranchi's water bodies without a stated distance (2025, as reported), and no wetland has been notified, so the 50 m line of the Wetlands Rules 2017 binds nowhere. Land for drainage reserves is hard to secure in the Scheduled Areas, where the Chota Nagpur Tenancy Act 1908 and the Santhal Pargana Tenancy Act 1949 restrict the transfer of raiyati land (as reported; the texts were not read), so a BSMP looks first to public land, existing tanks, road reserves and the buffers above, and the Transferable Development Rights Rules 2017 allow development rights for land surrendered for drainage. These are river, reservoir and nala lines, not drainage-flood lines; the hydraulic corridor and setback zones of Chapter 7 are this Manual's proposal, and where the lines of the Master Plan 2037 or the byelaw's 10–15 m bind and are wider, they apply. A BSMP gives the master plans the 1% AEP drainage-flood map, and the buffer widths of Chapter 7, that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the Jharkhand Building Byelaws 2016 already require at least 10% of the land of a layout to be kept as parks and open spaces and relinquished to the Authority (byelaw 72.1, not insisted on for residential layouts of 0.30 ha or less, byelaw 74.3), rainwater harvesting on plots of 300 m² and more, with recharge pits or trenches of at least 6 m³ per 100 m² of roof and topsoil in open ground replaced by river sand so that rain water percolates slowly (byelaw 51), and soft paving over at least 40% of the paving around multi-storied buildings (byelaw 58.6.15, as amended in 2017), but set no detention or peak-runoff rule; storage placed in a layout's open space builds on these duties, and because that land still serves as open space, the storage must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 31 May). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for Jharkhand building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report