Draft v1.0 prepared by NEER. Not adopted by the Government of Jharkhand or any authority or local body, and has no legal force. About this draft

Chapter 4Site Runoff Control: Retention and Detention


4.1 Purpose and scope

4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:

  • (a) the order in which runoff-control measures are to be applied (Clause 4.3);
  • (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
  • (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
  • (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
  • (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
  • (f) regional detention and fee-in-lieu (Clause 4.13);
  • (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
  • (h) public safety (Clause 4.15).

4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rainwater harvesting on plots of 300 m² and more, with recharge pits or trenches of at least 6 m³ for every 100 m² of roof area, under bye-law 51.1 of the Jharkhand Building Byelaws 2016, and a recharge well as per the National Building Code for multi-storeyed buildings under bye-law 58.6.6; and the rainwater harvesting regulation reported to have been made by Ranchi Municipal Corporation in 2016, and the State regulation of 2017 reported in the press, whose texts were not found [TBC]; the rules are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.

4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.

Commentary. No Indian national rule or Jharkhand rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or "zero run-off". The building rules are the Jharkhand Building Byelaws 2016 (JBBL 2016), notified by UD&HD with Notification No. 7/न0वि0/अधि0/स0सो0/102/2013-2006 dated 5 April 2016 under section 434 of the Jharkhand Municipal Act 2011, "enforceable to all the Regional Development Authorities, Urban Local Bodies, Mineral Area Development Authority and all Industrial Area Development Authorities". They have been amended on 15 May 2017, on 17 August 2017 (IInd amendment), on 6 June 2019 (Vth amendment) and in 2019 (VIth amendment), all of which were read; the Xth amendment of March 2024 and the XIth of 27 April 2026 were seen only in summaries [TBC]. None of these amendments touches the river, basement or rainwater harvesting bye-laws, and the summaries of the later two mention none; the 2017 amendment cut the soft paving of bye-law 58.6.15 from 50% to 40%. The drainage provisions of JBBL 2016 protect the building, the drain and the river, not the catchment. No permission is given "In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan" (bye-law 30.1), over or under a municipal drain (30.3), or in areas that flood where the structural plans do not take that into account (30.5); land within the curtilage shall, if the Authority requires, "be effectively drained by surface water drains or other means", and connecting a surface-water drain to a sewer needs its written approval (31.3, 31.4); the plinth shall be "so located with respect to the surrounding ground level that adequate drainage of the site is assured", at least 450 mm above it, with no upper limit (42.1.1); rainwater harvesting is mandatory on plots of 300 m² and more (51.1; Commentary to Clause 4.11); and in multi-storeyed buildings at least 40% of the paving round the building shall be soft paving "to insure surface water percolation into the subsoil" (58.6.15, as amended). Along rivers other than the Ganga no building is allowed "within a strip of land of 10-15 metres", from the outer boundary of the river as prescribed by the Irrigation Department, and "The State Government shall notify a list of such rivers" (23.2), but no such list was found [TBC]; along the Ganga the line is the river boundary or a larger distance that the State prescribes (23.1); nothing may be built within the boundary of any river (23.3); and a planning authority may still develop riverfronts "on reclaimed lands" with the Government's approval (23.4), which this Manual reads as a risk to floodplain storage. The Jharkhand Municipal Act 2011 makes storm-water drains a municipal function (section 70) and requires the municipality to "construct and maintain drains and sewers, and provide a safe and efficient outfall … in such manner as may not cause any nuisance, whether by flooding any part of the municipal area" (section 219); public drains vest in the municipality (section 221); no premises may be erected or occupied until a drain is made "of such size, materials and description, at such level, and with such fall" as the Commissioner or Executive Officer thinks necessary, emptying into a municipal drain within thirty metres (section 227); and nothing may be built on a municipal drain without permission (section 235). None of these sets a design storm, a release rate, a storage volume or an overflow path. The lines that do exist are few. The approval of the Ranchi Master Plan 2037 of 30 November 2015 bars any building within 20 m of the full tank level of the Kanke, Dhurwa and Rukka (Getalsud) dams, a distance that does not count as setback, and within 10–15 m, and in every case at least 10 m, of rivers and natural nalas (condition 2.9; UD&HD notification No. 4371). Jharkhand has no floodplain zoning law and no notified flood zone; at Jamshedpur the NGT's Joint Committee fell back on the 10–15 m line of bye-law 23.2 because "the flood plain zoning of the Subarnarekha River has not been designated" (report of 14 March 2024 in O.A. 145/2023 (EZ), as quoted in an intervention). The hydraulic corridor of Chapter 7, with its Zone 1 floor of at least 15 m, and the setback zones of that chapter are this Manual's proposal; the lines of the Ranchi Master Plan 2037 and of bye-law 23 apply where they bind and are wider. The design norms in use are history, to be replaced. JUIDCO's World Bank-funded drainage project for Dhanbad was designed for "a flood frequency of once in a year", because "Return period of 2& 5 years was resulting in increase in land beyond the available RoW, which was leading to land acquisition" (draft ESIA, November 2017). The channel of the Harmu river in Ranchi was designed for a return period of 25 years, against the 100 years that IS 12094 sets for the protection of towns, and redesigned for 50 years after damage in July 2016 and July 2017; IIT Mumbai first advised a runoff coefficient of 0.95 "in a developed area", then cut it to 0.29 "based on the weighted average", which gave a 25-year flow of 64.11 m³/s at chainage 10,400 m against 177 m³/s by the figures that JUIDCO sent to NIT Jamshedpur, and the project used 8.49 km² of a catchment of 22.59 km² (CAG, Report No. 1 of 2023, Chapter 4). The lesson is the one that Clauses 3.5.2, 3.5.4 and 3.9.2 apply: an urban catchment shall not be averaged down with rural land, and its sealed surfaces shall be measured and modelled as such. Under the Ranchi sewerage and drainage project, 207 km of storm drains were to be built for ₹129.10 crore; the contractor submitted longitudinal sections for only 1.49 km, which were not approved, and the lengths built "were not connected to any bigger drain network" (CAG, Report No. 1 of 2023, Chapter 3). The environmental clearances of coal mines size garland drains with "at least 50% safety margin over and above the peak sudden rainfall and maximum discharge", which is not a return period (standard coal-sector conditions, as read). This Manual uses none of these. Basements are already restricted. Bye-law 48.1 provides that "Basements/cellars shall not be permitted in low lying area and without adequate drainage facilities" and that "Basement shall not be allowed in flood prone areas", and bye-law 48.6.4 that "Adequate arrangement shall be made, so that surface drainage does not enter the basement"; neither "low lying area" nor "flood prone areas" is defined, and no ramp or opening level is set. This Manual proposes that, for bye-law 48.1, the flood-sensitive catchments of Clause 4.5.3.2, any catchment notified under Clause 4.5.4 and land in Zone 1 or Zone 2 of Chapter 7 be treated as flood-prone, and that land whose surface lies below the 1% AEP level of the adjacent river, nala, talab, dam or mine void, with the river floodplains, the Ganga diara and the subsidence hollows of the coalfields, be treated as low-lying. It adds its own requirements for every basement that is permitted elsewhere: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). These definitions and requirements are the Manual's proposals, not rules of the Byelaws. Mine land is a drainage regime of its own. Mine drains are governed by the conditions of each environmental clearance and by DGMS, under whose Coal Mines Regulations 2017 the lowest point at which surface water could enter a mine is to stand at least 1.5 m above the highest flood level (regulation 149, as reported [TBC]); the Dhanbad drainage project left out the coal-bearing area and the fire zone (draft ESIA, 2017); and the effluent of CCL mines has carried 104 to 12,628 mg/l of suspended solids against a limit of 100 (CAG, Report No. 12 of 2019). For any development on or beside mine land this Manual therefore requires that: no development drain or overflow path discharges into an active mine; runoff from an overburden dump or other mine-disturbed ground passes through a sediment basin (Chapter 8) and a stable toe drain at the foot of the dump before it reaches any urban drain or outfall; overburden dumps and mine-disturbed ground are HSG D with no infiltration credit (Clause 3.7.2); and a mine void or pit lake is not used as an outfall or as storage unless the lessee and DGMS agree in writing and its water level, spill level and spill path are surveyed (Chapter 5). These are the Manual's requirements, not conditions of any clearance. In Jamshedpur the lease of 20 August 2005 between the State and Tata Steel binds the company to "continue to maintain the standard of municipal services and civic amenities" but does not mention drains or storm water, and the State's notification of 23 December 2023 forming an industrial town is under challenge in the High Court (PIL 2636/2024, as reported); this chapter applies through whichever body grants the building permission. Where a detention site, a nala widening or an outfall needs private land, the Chota Nagpur Tenancy Act 1908 and the Santhal Pargana Tenancy (Supplementary Provisions) Act 1949 restrict the transfer of raiyati land, so public land, road reserves, existing talabs and nala buffers are the practical sites. This chapter is written so that it can supply, as a technical companion to JBBL 2016 and to the Municipal Act, the design storm, release rates and storage volumes that section 227 and the Byelaws leave open; it has not been adopted for either purpose. In practice many city nalas in Jharkhand carry sewage: a CAG audit of nine urban local bodies found 567.12 km of their 939.55 km of drains uncovered, and that "all waste water generated from the HHs flow through open or covered drains that are also used as storm water drains" (CAG, Annual Technical Inspection Report on Local Bodies for 2015-16), and the Harmu receives sewage from 14 major and 56 minor inlets (CAG, Report No. 1 of 2023). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.


4.2 Definitions

Term Meaning in this Manual
Retention Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall.
Retention depth The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E).
Required retention volume (RRV) The runoff volume from the retention depth over the post-development site (Clause 4.4.2).
Detention Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5.
Retention credit The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume.
Permissible site discharge (PSD) The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha.
Site storage requirement (SSR) The detention storage required per hectare of site under the simplified method of Clause 4.14.
Multi-stage outlet An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2).
Drawdown time Time from the peak stored volume until the stated fraction of that volume has been released.
Emergency spillway A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment.
Freeboard Vertical distance between the maximum design water level and the embankment crest or other critical level.
Flood-sensitive catchment A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4.
Authority The approving authority under Chapter 1 (the Municipal Corporation, Nagar Parishad or Nagar Panchayat that grants building or layout permission under the Jharkhand Municipal Act 2011 and the Jharkhand Building Byelaws 2016; RRDA or another regional development authority, outside municipal limits; MADA in its area; an industrial area development authority in its industrial areas; or the body that grants building permission in Jamshedpur, the Jamshedpur Notified Area Committee or its successor under the industrial-town notification of 23 December 2023 [TBC], as applicable).
Tier A / Tier B Adoption tiers defined in Chapter 1. Tier A: Ranchi Municipal Corporation (RMC) and every other Municipal Corporation constituted under the Jharkhand Municipal Act 2011, among them those of Dhanbad, Deoghar, Chas, Hazaribagh, Giridih, Adityapur, Mango and Medininagar, with every other approving authority within their limits; RRDA within the area of the Ranchi Master Plan 2037; MADA; and the body that grants building permission in Jamshedpur (the Jamshedpur Notified Area Committee or its successor under the industrial-town notification of 23 December 2023, which is under challenge [TBC]). Tier B: Nagar Parishads and Nagar Panchayats.

4.3 Order of measures

4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:

  1. Preserve. Keep existing waterbodies, talabs, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
  2. Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
  3. Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
  4. Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).

4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.

Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.


4.4 Retention

4.4.1 Requirement

The site shall retain the RRV. Retention shall be achieved by one or more of the following:

  • infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
  • rainwater reuse that is drawn down by a demonstrated non-potable demand;
  • green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.

The limits of Clause 4.4.4 apply.

4.4.2 Computation of the RRV

RRV (m³) = 10 × Q_R × A

where:

  • Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
  • A (ha) is the area of the site that drains to the outfall.

Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.

The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.

Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.

4.4.3 Verification

Retention by infiltration shall be supported by:

  • (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
  • (b) a design infiltration rate of no more than half of the measured rate; and
  • (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).

Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.

Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.

4.4.4 Limits on retention

4.4.4.1 Infiltration practices shall not be used:

  • where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
  • on contaminated land;
  • within the setbacks from foundations, wells and septic systems set in Chapter 8; or
  • on fill, unless tested after placement.

4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.

4.4.5 Drawdown of retention

Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.

4.4.6 Retention credit: definition and computation

4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.

4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:

  • (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
  • (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
  • (c) once it is full, route its overflow to the detention facility; and
  • (d) size the detention for the residual hydrograph.

The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.

4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:

V_credit = C_R × RRV_provided

where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.

4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.

Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Jharkhand, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.

The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).

This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).

4.4.7 Preservation credit

Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:

  • they are protected by a registered covenant or dedication; and
  • their runoff is not concentrated onto impervious surfaces.

This lowers both the RRV and the detention required. No other preservation credit applies.


4.5 Release-rate criteria

4.5.1 General

4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.

4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.

4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.

4.5.2 Standard catchments

For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

Q_post(T, d) ≤ 0.9 × Q_pre(T, d)

4.5.3 Flood-sensitive catchments

4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:

Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).

Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).

4.5.3.2 The flood-sensitive catchments are:

  • (a) Ranchi on the Harmu river and its low colonies: the catchment of the Harmu river down to its confluence with the Subarnarekha, with the Argora nala and the other nalas and drains that join it, and the low-lying colonies of Ranchi that drain to the Harmu, the Jumar, the Potpoto and the Hinoo and flood in heavy rain;
  • (b) Jamshedpur on the Subarnarekha–Kharkai banks: the land of Jamshedpur, Adityapur, Mango, Jugsalai and Bagbera that drains to the Subarnarekha and the Kharkai, whose outfalls are held up when the rivers are high;
  • (c) the Dhanbad–Jharia subsidence belt: the land of Dhanbad, Jharia, Katras and Sindri within the Jharia coalfield that drains to subsidence hollows, mine voids or the Katri, the Jamunia and the Khudia, including the low-lying wards 25, 26, 28 and 29 of the Dhanbad drainage project;
  • (d) Sahebganj on the Ganga front: the land of Sahebganj and Rajmahal that drains to the Ganga, including the diara, whose outfalls are held up when the Ganga is high;
  • (e) Deoghar: the catchments of the drains of the Deoghar Municipal Corporation area; and
  • (f) any catchment notified under Clause 4.5.4.

The boundaries shall be those mapped in Annex 4A.

4.5.4 Notification of further flood-sensitive catchments

4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:

  • (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
  • (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
  • (c) an outfall that is held up by a river in flood or by a reservoir at or above its full level, such as the Subarnarekha and the Kharkai at Jamshedpur and Adityapur when Chandil or the dams upstream on the Kharkai release, the Ganga at Sahebganj and Rajmahal, the Damodar and the Barakar below Tenughat and the DVC reservoirs, or the Kanke, Dhurwa and Getalsud reservoirs at Ranchi, or that is closed by a sluice or flap gate when the receiving water is high, for part of the SW monsoon (Chapter 5);
  • (d) loss of more than a quarter of the mapped tank and talab storage in the catchment since the earliest available survey; or
  • (e) a basin master plan that relies on limiting site discharge.

4.5.4.2 The procedure shall be:

  1. The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
  2. The State-level technical committee constituted under Chapter 1 reviews the note.
  3. The draft notification and map are published for public comment for at least 60 days.
  4. The Government notifies the catchment and the map is added to Annex 4A.
  5. The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.

4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.

Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Ranchi entry follows the Harmu and the city's record. The Harmu is a tributary of the Subarnarekha with a catchment of about 22.59 km², 10.4 km of it urban; its channel was rebuilt for a 25-year flood, damaged in July 2016 and July 2017, and redesigned for a 50-year flood, against the 100-year frequency that IS 12094 sets for the protection of towns (CAG, Report No. 1 of 2023). Satellite images of 2009–2021 show the river 18.70 m narrower at Karma Chowk bridge, and of its 14 major inlets 9 discharge sewage even in the dry season and 5 discharge it directly, with 56 minor inlets besides (same report). The Argora nala, which joins it, carries 0.47 MLD of sewage from 0.64 km² and is encroached by cattle sheds (same report). The city has flooded repeatedly: about 205 mm fell in 24 hours on 26 July 2017; about 180 mm fell in July 2021 and flooded Kathal More and Argora; knee-deep water stood on Kanke Road and houses flooded in Bahu Bazar in August 2022; and the district had about 459 mm in 1–23 June 2025, more than three times its normal, with Bahu Bazar again under water (all as reported). The High Court has recorded that only four or five of about 71 ponds once in the city remain visible and has ordered encroachment removed round the Kanke and Dhurwa dams (W.P.(PIL) 1463/2020, orders of 2024 and 31 July 2025, as reported; the orders of 2025–26 were not read [TBC]). The Jamshedpur entry follows the two rivers. In June 2008, after 338.1 mm in 24 hours at Jamshedpur (A) on 18 June (IMD), the Kharkai and the Subarnarekha rose above their danger marks after the gates of the Kharkai dam in Odisha were opened, and more than 500 houses were flooded in Jugsalai, Bagbera, Shastrinagar, Sonari and Adarshnagar (as reported). In Cyclone Yaas the Kharkai at Adityapur reached 132.40–132.87 m against its danger mark of 129 m, while the Subarnarekha at Mango stayed below its mark (27 May 2021, as reported), and on 26 July 2025 the Subarnarekha stood at 123.36 m at Mango bridge and the Kharkai at 134.90 m at Adityapur, and about 159 houses were flooded in Bagbera (as reported). The Subarnarekha floodplain has never been designated, and the NGT's Joint Committee fell back on the 10–15 m line of bye-law 23.2 (report of 14 March 2024 in O.A. 145/2023 (EZ), as quoted in an intervention). The Dhanbad–Jharia entry follows the coalfield. The ground there is sinking, by about 4 cm a year on average and up to about 12 cm a year over some underground mines, with a high-risk zone of almost 18 km² (abstracts to the EGU General Assembly 2020 and 2021, as reported), so drain gradients change over a design life and water collects in the hollows; the Dhanbad drainage project of JUIDCO left out the coal-bearing area and the fire zone, found drains on only about 16.5% of the road length, and named wards 25, 26, 28 and 29 as flood-prone and low-lying (draft ESIA, November 2017). It designed its new drains for a 1-year storm, because 2- and 5-year drains "was resulting in increase in land beyond the available RoW" (same document). In August 2024 the Jhilia river flooded colonies at Maithon after about 45 hours of rain (as reported). The Sahebganj entry follows the Ganga, whose highest level at the CWC gauge is 30.91 m (20 August 1998) against a danger level of 27.25 m (CWC); the river reached 28.61 m on 11 August 2025, when about 1,500 houses and 11 of the town's 28 wards were flooded, and 28.72 m on 11 September 2026 (as reported), and in 2019 the diara areas were flooded from 28 September (as reported). WRD has appointed a consultant to demarcate the Ganga floodplain in the State, awaiting hydrology from the National Hydrology Project (State of Jharkhand, quarterly progress report in NGT O.A. 200/2014). The Deoghar entry is set by this Manual as an interim choice. Deoghar lies in the band of the State's heaviest recorded falls, with 520.0 mm at Kairo, 454.4 mm at Sarawan and 350.0 mm at Madhupur in Deoghar district on 21 September 2000 (IMD, Climate of Jharkhand), and near the "280" cell of the 50-year plate of subzone 1(g) over Madhupur (Annex 3E), but no record of urban flooding in the town was found [TBC]; it is listed pending that record, and the listing should be reviewed when a basin study is made. Bokaro and Chas on the Garga and the Damodar, Hazaribagh, Giridih, Ramgarh, Medininagar on the North Koel, Dumka and Chaibasa are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.

4.5.5 Minimum outlet and short-duration 2-yr checks

4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.

4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:

  • size the low-flow orifice as the smallest opening that meets Clause 4.7; and
  • report the resulting 2-yr exceedance for those durations.

The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.

Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next SW monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).

4.5.6 Constrained redevelopment sites

4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:

  • (a) the existing site is at least 60% impervious, as surveyed before demolition;
  • (b) the site is 1 ha or less; and
  • (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.

New development on undeveloped land is never eligible.

4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:

  • (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
  • (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
  • (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).

4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:

  • (a) paid into the ring-fenced account of the basin in which the site lies;
  • (b) spent only on regional detention or on restoring talab or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
  • (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.

Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with WRD agreement.

4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.

Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as the old town of Jharia, the old core of Ranchi, or the old bazaars of Dhanbad, Hazaribagh and Deoghar, there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.


4.6 Detention sizing procedure

4.6.1 Method

Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.

4.6.2 Steps

  1. Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
  2. Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
  3. Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
  4. Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 July to 30 September in sub-areas JH-C, JH-D and JH-E and on river floodplains, and in July–August in JH-A, JH-B, JH-F and JH-G, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
  5. Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
  6. Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
  7. Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
  8. Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
  9. Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
  10. Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
  11. Size the emergency spillway and set freeboard (Clause 4.9).
  12. Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).

4.6.3 Storms to be routed

Every facility shall be routed for the full matrix:

Table 4.1 — Design storms to be routed for detention sizing

AEP Durations (h) AMC
50% (2-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
10% (10-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
1% (100-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h

The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.

4.6.4 Initial conditions

Each run shall start with:

  • detention storage empty, down to the invert of the lowest outlet;
  • any permanent pool full;
  • retention practices empty, except as limited by Clause 4.11; and
  • RWH storage full (Clause 4.11).

The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.

4.6.5 Multi-stage outlet design

4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:

  • Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
  • Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
  • Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
  • Emergency spillway: separate from the primary outlet (Clause 4.9).

Stages may be combined where routing shows that every cap is met.

4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).

4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.

4.6.6 Tailwater on the outlet

The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:

  • for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
  • for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).

Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.

4.6.7 Illustrative example

Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a colony on the Harmu river in Ranchi. They are not NIH-DHAARA values and must not be used for design.

Inputs:

  • Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
  • Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
  • Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
  • 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
  • Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
  • Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
  • Storage: vertical-walled, 2,500 m² plan area.
  • Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
    • Stage 1: 170 mm orifice at the invert.
    • Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
    • Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.

Results (discharges in L/s; storage in m³):

Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)

Duration (h) 2-yr pre 2-yr post, detained 10-yr pre 10-yr post, detained 100-yr post, uncontrolled 100-yr post, detained 100-yr storage used 10-yr drawdown, 50% blocked (h)
1 4 15 51 28 922 42 1,426 31.3
2 14 20 84 34 961 79 1,911 32.1
3 19 22 104 37 981 139 1,999 32.8
6 32 25 150 41 1,010 194 2,154 34.2
12 127 30 302 46 1,074 276 2,512 39.0
24 149 32 327 49 1,081 320 2,766 45.3
48 173 34 349 82 1,087 343 2,913 44.8
72 180 34 356 84 1,089 343 2,911 44.7

How to read it:

  • 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
  • 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
  • Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
  • Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
  • Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.

The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.

2026-11-01T10:14:56.974241 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 5 10 15 20 25 30 35 40 Time from start of 24 h design storm (h) 0 200 400 600 800 1000 1200 Discharge (L/s) Release cap = max pre-development 10-yr peak over all durations (356 L/s) Uncontrolled peak 1081 L/s Detained: peak later and flatter, recession prolonged (volume unchanged) Illustrative — not design values. 2 ha site, 24 h storm, AMC III, mixed-frequency rule Post-development 1% AEP (100-yr), uncontrolled Post-development 1% AEP (100-yr), detained Pre-development 10% AEP (10-yr)

Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).

Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).


4.7 Drawdown

4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.

4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).

4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).

4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.

Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Jharkhand storage must hold multi-day volumes. It is still short enough that a basin filled by one SW monsoon depression will have most of its volume back before the next, which in June 2025 at Ranchi (about 459 mm in the district in 1–23 June against a normal of 125.7 mm, with more than 150 mm in 24 hours on 18–19 June, as reported) followed within days.


4.8 Outlet structures

4.8.1 General. Primary outlets shall be:

  • unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
  • accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
  • built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).

4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.

4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:

  • have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
  • have a clear open area at least 10 times the area of the opening it protects;
  • be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
  • be removable or hinged for cleaning; and
  • for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.

4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).

4.8.5 Outlet barrels. Outlet barrels through embankments shall:

  • be at least 300 mm in diameter (Chapter 6);
  • have watertight joints;
  • have a filter diaphragm or seepage collars over the length within the embankment; and
  • have an energy-dissipating outfall (Chapter 9).

4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.

Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.

Figure 4.2 — Detention storage stack and multi-stage outlet (schematic) Schematic cross-section of a detention basin showing stacked storage zones (permanent pool, water quality volume, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and a multi-stage riser outlet with trash rack, anti-vortex plate, outlet barrel and emergency spillway. Not to scale. Storage stack and multi-stage outlet — schematic section, not to scale Embankment crest Max level, spillway flowing (outlet blocked) Emergency spillway crest 1% AEP (100-yr) max water level 10% AEP (10-yr) max water level 50% AEP (2-yr) max water level Top of water quality volume (WQv) Permanent pool (wet basin only) Basin floor / pool bottom Spillway surcharge (Clause 4.9) 100-yr detention zone 10-yr detention zone 2-yr / channel-protection zone WQv — 24–48 h release (Ch 8) Permanent pool / retention Freeboard ≥ 0.3 m Spillway crest (offset in plan) 1 2 3 4 5 6 7 Key 1 Stage 1 low-flow orifice (≥ 50 mm, Clause 4.8.2) — releases WQv over 24–48 h 2 Stage 1 second orifice — with 1, controls 50% AEP (2-yr) release 3 Stage 2 orifice or weir slot — controls 10% AEP (10-yr) release 4 Stage 3 riser crest / overflow grate with anti-vortex plate — controls 1% AEP (100-yr) release 5 Trash rack enclosing all openings (Clause 4.8.3) 6 Seepage collar or filter diaphragm on outlet barrel 7 Outlet barrel, energy dissipation and outfall apron Levels and zone thicknesses are diagrammatic only.

Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).


4.9 Emergency spillway, freeboard and embankment safety

4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:

  • with the primary outlet assumed fully blocked;
  • with the facility full to the spillway crest at the start of the storm; and
  • with at least 0.3 m freeboard from the maximum water level to the embankment crest.

4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:

  • endanger life;
  • flood a habitable building or critical facility; or
  • close an arterial road.

High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.

4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.

4.9.4 Spillway location. The spillway shall be:

  • on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
  • discharging to the 1% AEP overland flow path of Chapter 6; and
  • placed so that its flow does not reach a building.

4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.

4.9.6 Embankments.

  • (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
  • (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
  • (c) Embankments shall have:
    • a crest width of at least 3 m;
    • compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
    • no trees or large shrubs.
  • (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.

4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.

Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.


4.10 Facility types

4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.

4.10.2 Underground tanks and vaults.

  • (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
  • (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
  • (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
  • (d) The tank shall be ventilated.
  • (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
  • (f) Flotation and groundwater ingress shall be checked under Clause 4.12.

4.10.3 Rooftop detention.

  • (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
  • (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
  • (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.

4.10.4 Podium and landscape-deck detention.

  • (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
  • (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.

4.10.5 Parking-lot detention.

  • (a) It is permitted only on surface parking. Ponding depth shall not exceed:
    • 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
    • zero on accessible routes, ramps and pedestrian crossings; and
    • zero in the 10% AEP storm on fire-tender access routes.
  • (b) Signs shall warn that the area floods.
  • (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).

4.10.6 Multi-use detention (parks, playfields, open space reservation).

  • (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
  • (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
  • (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
  • (d) The depth and slope limits of Clause 4.15 apply.
  • (e) Play equipment and seating shall be placed above the 10% AEP level.

4.10.7 Ponds and wet basins.

  • (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
  • (b) Only storage above the permanent pool counts as detention.

Commentary.

  • The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
  • The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
  • Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
  • Using open space for multi-use detention fits JBBL 2016, under which at least 10% of the land of a layout is kept as parks and open spaces and relinquished to the Authority (bye-law 72.1), though not on residential layouts of 0.30 ha or less (74.3), and at least 40% of the paving round a multi-storeyed building is to be soft paving "to insure surface water percolation into the subsoil" (58.6.15, as amended in 2017); the Municipal Act lets the municipality promote rainwater harvesting in its parks, gardens and open spaces (Jharkhand Municipal Act 2011, section 378(3)). A detention area graded into the open space below the level of the road keeps it pervious and usable, which is what 4.10.6 requires. Four kinds of land are not open space for this purpose. A talab, bandh or dobha on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its full level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; public tanks and the adjacent land that is not private property vest in the municipality (section 203 of the Act). The 20 m strip round the full tank level of the Kanke, Dhurwa and Rukka dams and the strip of at least 10 m along every river and natural nala in Ranchi (condition 2.9 of the approval of the Ranchi Master Plan 2037), the 10–15 m strip along the rivers of bye-law 23.2, the surroundings of the Ranchi water bodies that the High Court has ordered kept as no-entry zones (W.P.(PIL) 1463/2020, order of 31 July 2025, as reported), the Udhwa Lake Ramsar site, and land in the hydraulic corridor of a river, nala or talab under Chapter 7 are corridor or flood land already: water reaches them first, so they are not counted as detention for the development beside them (Chapter 7). And a mine void, pit lake or subsidence hollow on or beside the land is not open space or storage for the site unless the lessee and DGMS agree and its levels are surveyed (Commentary to Clause 4.1).

4.11 Rainwater harvesting versus detention accounting

4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.

4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.

4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:

  • (a) the detention zone lies wholly above the RWH overflow level;
  • (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
  • (c) no pump, valve or user action can hold water in the detention zone; and
  • (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.

Only the volume between the RWH overflow level and the detention overflow level counts as detention.

4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the SW monsoon season.

4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of bye-laws 51 and 58.6.6 of the Jharkhand Building Byelaws 2016, the rainwater harvesting regulations reported for Ranchi Municipal Corporation (2016) and for the State (2017) once their texts are confirmed [TBC], any condition of a building plan, completion certificate or occupancy certificate, or any rainwater harvesting rule of an approving authority.

Commentary. RWH in Jharkhand is required by bye-law 51 of JBBL 2016, which sets a recharge volume but no storage volume. Bye-law 51.1 reads: "Provision of rainwater harvesting shall be mandatory for 300 sqm. and above size of plots-The dimension of recharging pits/trenches shall be at least 6 cubic meters for every 100 Sqm. of roof area." The threshold is on plot area and the volume on roof area. The pits are to be filled with small pebbles, brick jali or river sand under perforated concrete slabs; terrace collection to a sump or well through a filtering tank, with a valve to discharge the first, dirty rain, and the replacement of topsoil by river sand on open ground are optional (51.1.1, 51.1.2). Multi-storeyed buildings shall also provide a recharge well "as per NBC norms" (58.6.6) and at least 40% of their paving as soft paving (58.6.15, as amended in 2017). A pit of 6 m³ per 100 m² of roof is about 60 mm over the roof, of the same order as the retention depth of Clause 4.4; but it is a volume of filled pit, not of water that infiltrates, and the bye-law sets no infiltration test and no depth to the water table. Ranchi Municipal Corporation is reported to have made a rainwater harvesting regulation in 2016 for land holdings of 300 m² and more, with a penalty of 1.5 times the annual holding tax, and a "Jharkhand Rain Water Harvesting Regulation, 2017" with the same threshold is referred to in the press; neither text was found [TBC]. The Jharkhand Urban Water Conservation and Drinking Water Regulatory Authority Act 2016 (Act 04 of 2017) names rainwater harvesting and recharge among its objects, but whether the Authority has been constituted was not found [TBC], and the text of a State groundwater Act of 2019 seen in an unofficial copy commences only on notification, which was not confirmed [TBC]. None of these rules requires a tank to be empty before a storm, and none restricts recharge where the water table is shallow, the ground is mined or the aquifer is contaminated. This Manual credits these structures against its own retention requirement (Clause 4.4) as follows:

  • An RWH storage tank or sump, including the terrace sump of bye-law 51.1.1, is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because after the July rains it is full. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
  • An RWH tank counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing, demonstrated under Clause 4.4.3; it is then modelled under Clause 4.4.6 like any other retention practice.
  • The recharge pits and trenches of bye-law 51.1 and the recharge wells of bye-law 58.6.6 count as retention only where they meet Clause 4.11.4: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
  • The soft paving of bye-law 58.6.15, the open ground of bye-law 51.1.2 and the parks and open spaces of a layout are pervious area. They enter the post-development run as pervious land under Clause 3.9.2 and get no further credit as retention or detention unless they are built and tested as an infiltration practice, such as permeable pavement on an infiltration base.
  • Recharge first where the aquifer is stressed. Groundwater use is low statewide, at a stage of extraction of 32.89% in 2025 (CGWB, Lok Sabha reply of 18 December 2025), but the industrial towns draw down their aquifers: in the 2023 assessment Jamshedpur Urban, Golmuri-cum-Jugsalai, Baliapur and Bermo were over-exploited, Dhanbad Urban and Topchanchi critical, and 501.6 km² of Ranchi district critical (CGWB annexures reproduced in the State's status report in NGT O.A. 694/2023), and the depth to water before the monsoon reached 33 m in Ranchi district in May 2022 (same report). In these units, and in the critical area round Ranchi, retention shall be provided by recharge before reuse or detention wherever site tests allow. About 85% of the State is hard rock, which takes water through its weathered zone, 10–25 m thick over granite and gneiss and 30–60 m under laterite, and through fractures, first met at 50–70 m at Ranchi (CGWB, Ranchi district booklet, 2013). A pit that ends in laterite crust or hardpan drains little; recharge there shall be by a bore or shaft taken through the crust into the weathered zone, with a silt trap, a filter and a first-flush diverter ahead of it, and it earns credit only on a test at its own depth and after a hydrogeologist's check of the target zone.
  • No recharge credit on wet or disturbed ground. On the river floodplains, the Ganga diara, the lowland rice land (don) and the other land of Clause 4.12.1, and wherever the seasonal high water table is within the 1.0 m separation of Clause 4.4.3, no recharge or infiltration practice earns retention credit; detention, conveyance and reuse govern there. No recharge or infiltration practice shall be built in mine-disturbed ground (overburden dumps, backfilled or reclaimed mine land, subsidence ground and fire areas) or within the dewatering zone of a working mine, where the water would be pumped out again or would wet unstable ground, and none within 50 m of the edge of a mine void without a geotechnical check.
  • Fluoride and arsenic. Fluoride is found in the groundwater of parts of Palamu, Garhwa, Koderma and Pakur districts, and arsenic in parts of Sahebganj district (CGWB, Ground Water Year Book Jharkhand 2019-20); another CGWB list gives fluoride above 1.5 mg/l in Bokaro, Giridih, Godda, Gumla, Palamu, Ramgarh and Ranchi, and the two lists conflict [TBC]; in Ranchi district fluoride is 0.5–2.3 mg/l, with "Sporadic fluoride contamination in Ormanjhi, Ranchi sadar and Silli blocks" (CGWB, 2013); and the tube wells of Sahebganj, Rajmahal and Udhwa are badly affected by arsenic (published surveys, as reported). In these districts the hydrogeologist's check shall report the fluoride, or the arsenic, of the target aquifer before a recharge bore or shaft is credited, and untreated runoff shall not be put into a bore or shaft there; retention is then provided by surface infiltration through a soil or filter layer, or by detention and reuse (Chapter 8).
  • Everywhere, road and parking runoff shall be recharged only through a surface infiltration practice with a filter, such as a vegetated basin or trench, never directly into a bore or well, and runoff from a drain that carries sewage, such as the Harmu and its inlets, shall not be recharged at all.

On the floodplains, the diara and the don land, a recharge pit drains slowly or not at all in the SW monsoon, and on the plateau a sump is full after the first heavy rain. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH sumps are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The recharge-first rule for the stressed units, the bore through the laterite, the ban on recharge in mine-disturbed ground and dewatering zones, the 50 m distance from a mine void, the fluoride and arsenic checks and the pre-treatment and road-runoff rules are set by this Manual; no Jharkhand rule on where recharge may or may not be credited was found.


4.12 High-groundwater and sandy coastal sites

4.12.1 Design groundwater level. Each site in the floodplains of the Subarnarekha, the Kharkai, the Damodar, the North Koel and the other rivers, the Ganga front and diara at Sahebganj and Rajmahal with the Udhwa wetland, the lowland rice land (don) of the valley floors, where the water table rises close to the surface in the monsoon, the waterlogged mine-subsidence hollows of the coalfields, and the beds and foreshores of talabs, bandhs and dams, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the SW monsoon, from:

  • (a) site piezometer readings over at least one full June–November season; or
  • (b) where (a) is not available, the higher of the CGWB or Drinking Water and Sanitation Department record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, nala, talab, dam or mine void.

For the flotation check of 4.12.3 at sites in the river floodplains, the Ganga front at Sahebganj and the waterlogged mine-subsidence hollows, where (a) is not available, the DGWL shall be taken as existing ground level.

4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:

  • (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
  • (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.

4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:

  • with the facility empty;
  • with groundwater at the DGWL; and
  • for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.

The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.

4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.

4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.

4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.

Commentary. Jharkhand is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3, do not apply in the State, and saline groundwater was not reported, so the exposure provisions of 4.12.5 apply only where a test at the site shows it, or where the facility is in contact with mine water whose chemistry has not been tested. Most of the State is hard rock with a water table several metres down before the monsoon, but it rises fast: across the State 63% of wells were at 5–10 m below ground in May 2022 and 62% at 2–5 m in November 2022, with the shallowest levels, 0.45 m and 0.4 m, in Gumla district (CGWB data in the State's status report in NGT O.A. 694/2023). The floodplains of the Subarnarekha, the Kharkai, the Damodar and the North Koel, the Ganga front and diara at Sahebganj and Rajmahal, the lowland rice land (don) and the subsidence hollows of the coalfields are the wet cases. There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river in flood, a reservoir at its full level or a flooded mine void raises the water table beside it. On laterite and thin soil over rock, water can also perch above the rock after heavy rain in a site where the regional water table is deep. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, nala, talab, dam or mine void where that is higher than the well record, and in the river floodplains, on the Ganga front at Sahebganj and in the waterlogged mine-subsidence hollows it is taken as existing ground level for the flotation check unless piezometers show otherwise. Groundwater is plentiful statewide but stressed in Jamshedpur, Dhanbad, Bermo and round Ranchi, where recharge is worth most (Commentary to Clause 4.11). The June–November monitoring season of 4.12.1(a) is set by this Manual to cover the SW monsoon and the post-monsoon high that the CGWB measures in November: a reading taken in May or June, when most wells are at 5–10 m, understates the design level. No monsoon water-table depths for individual town sites in Ranchi, Jamshedpur, Dhanbad or Sahebganj were obtained [TBC]. The factor of 1.2, the 0.5 m allowance and the "ground level" default for the floodplains, the Ganga front and the subsidence hollows have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Jharkhand were found during research.


4.13 Regional detention and fee-in-lieu

4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:

  • (a) a regional detention facility identified in the plan; or
  • (b) a fee-in-lieu paid toward restoration of talab or tank storage identified in the plan.

4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:

  • (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
  • (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
  • (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the SW monsoon. Storage below FTL that is held for irrigation or supply through June to September shall not be credited.
  • (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
  • (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
  • (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.

4.13.3 Fee. The fee-in-lieu shall be computed as:

Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)

The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.

4.13.4 Ledger. The Authority shall keep a public ledger of:

  • detention volume credited to each regional facility;
  • volume delivered; and
  • fees received and spent.

Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.

Jharkhand has no tank or lake Act, and no talab, bandh or reservoir in its cities was found to be operated for flood control under a documented rule [TBC]. Public tanks, reservoirs and wells, with any adjacent land that is not private property, vest in the municipality (Jharkhand Municipal Act 2011, section 203); but the same Act lets the Commissioner require the owner of a private tank or pool to "cleanse, repair, cover, re-excavate, fill up or drain off" it (section 341), so a private talab can be lost by order, and this Manual prefers desilting and inlet screening to filling. The High Court has been supervising Ranchi's water bodies, the Kanke, Dhurwa and Getalsud dams, Bada Talab and the city's ponds, since 2020, and has recorded that only four or five of about 71 ponds once in the city remain visible (W.P.(PIL) 1463/2020 with W.P.(PIL) 1325/2011, as reported; the orders of 2025–26 were not read [TBC]). Dhanbad's drainage design leads 19 of its 94 outfalls into ponds and integrates 10 major ponds, among them Loco talab, as storage that "will reduce the direct discharge of runoff to the river system and the flood risk downstream" (JUIDCO, draft ESIA, 2017). No wetland has been notified under the Wetlands (Conservation and Management) Rules 2017; the State's only Ramsar site is Udhwa Lake, 935.5 ha, on the Ganga floodplain in Sahebganj district, designated on 8 January 2024 according to the Ramsar Information Sheet and announced in February 2025 (as reported). The State's regional storage is of five kinds: the talabs and bandhs of the towns, such as Bada Talab in Ranchi; the reservoirs of WRD, among them Kanke, Dhurwa (Hatia), Getalsud and Chandil, Tenughat on the Damodar, which the State operates, and the DVC reservoirs at Tilaiya, Konar, Maithon and Panchet; the dobhas, ahars and village tanks; the voids and pit lakes of the coalfields; and the river floodplains. Four points follow:

  • A talab on the record may not be a working talab. No inventory of the talabs within RMC or the other Municipal Corporations was found [TBC]. A talab is credited only after a survey shows its bed, bund and outlet, and only for the storage above its full level.
  • The reservoirs are not spare capacity for a site. Kanke, Dhurwa and Getalsud hold Ranchi's water supply, so their storage below full level is held through the monsoon and is not credited (Clause 4.13.2(c)); the full levels of Kanke and Dhurwa on a stated datum were not found [TBC]; and the releases of Maithon and Panchet are advised for the whole Damodar valley by the Damodar Valley Reservoir Regulation Committee, on which the governments of Jharkhand and West Bengal, CWC and DVC sit (as reported). Storm water spilled to a reservoir, or to a river below one, uses capacity that is operated for the whole basin; it can be relied on only with the written agreement of WRD, or of DVC for its dams, for a stated flow and level.
  • A mine void or pit lake is not regional storage. Some abandoned pits are used by villagers as reservoirs and for fish (BCCL compliance reports, as reported), and a void can attenuate runoff, but water raised against an unstable high wall or into old workings is a hazard, and the lessee and DGMS control it. It is used only with the written consent of the lessee and DGMS and with its water level, spill level and spill path surveyed, and it is never assumed to have free storage.
  • No rule dividing natural nalas from municipal drains was found [TBC]. Until one is made, this Manual treats rivers, reservoirs, dams and their gates as WRD's, or DVC's for its dams; the nalas, drains and public tanks within the limits of an urban local body as that body's (sections 203 and 221 of the Act), including the trunk drains and river works that JUIDCO builds for it; the drains of the leased area of Jamshedpur as served by Tata Steel UISL, whose legal ownership is to be confirmed [TBC]; mine drains, garland drains, voids and pit lakes as the lessee's, under its environmental clearance and DGMS; and Udhwa Lake and any notified wetland as within the remit of the State Wetland Authority. This is the Manual's working assignment, not a statutory one.

The first point is the basis of condition 4.13.2(c) in Jharkhand. A talab gives flood storage only above its full level, unless a notified operating rule commits it to be lowered before the SW monsoon. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.


4.14 Simplified methods for small sites

4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.

4.14.2 Method.

  1. Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
  2. Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
  3. Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
  4. Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
  5. Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
  6. Complete Form 4-2 (Tier B site sheet).

Table 4.3 — Tier B permissible site discharge and site storage requirement (template)

Zone (Annex 2A) HSG Imperviousness PSD 2-yr (L/s/ha) PSD 100-yr (L/s/ha), standard PSD 100-yr (L/s/ha), flood-sensitive SSR (m³/ha), standard SSR (m³/ha), flood-sensitive
JH-Z1 Chota Nagpur plateau: JH-A Ranchi plateau (Subarnarekha headwaters) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z1 Chota Nagpur plateau: JH-B Hazaribagh–Koderma–Giridih plateau and Parasnath B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z1 Chota Nagpur plateau: JH-G South-west plateau (Brahmani headwaters) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z2 Lowlands and the coalfield: JH-C Damodar coalfield belt B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z2 Lowlands and the coalfield: JH-D Subarnarekha–Kharkai lowland and Kolhan B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z2 Lowlands and the coalfield: JH-E Santhal Parganas and Ganga front B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
JH-Z3 Palamu–Latehar–Garhwa: JH-F Palamu–Latehar–Garhwa (North Koel–Sone) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]

Worked example (illustrative — not design values).

A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:

  • PSD 100-yr = 356 / 2.0 = 178 L/s/ha
  • SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
  • PSD 2-yr ≈ 17 L/s/ha

Then:

  • Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
  • 100-yr release: 178 × 0.4 = 71 L/s.
  • 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
  • Layout options:
    • a 400 m² underground tank 1.5 m deep; or
    • 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
    • Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
  • RWH sumps are additional, and are assumed full (Clause 4.11).

Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.

4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:

  • (a) the site counts tank or waterbody storage in its design (Chapter 7);
  • (b) any part of the site lies within a waterbody setback (Chapter 7); or
  • (c) the site drains to a tank cascade whose storage is counted in a downstream design.

The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.

4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:

Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A

where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.

Table 4.3A — Fixed release coefficients (provisional)

Hydrologic soil group C_10 C_2
A (sandy, well drained) 0.05 0.02
B 0.08 0.03
C 0.15 0.08
D (clay, poorly drained) 0.25 0.15

Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).

4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):

V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]

V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]

where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).

4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.

4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.

Figure 4.3 — Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic) Schematic. Left: cumulative inflow volume against storm duration for the 1% and 50% AEP storms, with straight release lines 1.8 x Q_cap x d; the storage is the largest vertical gap. Right: two-stage outlet. Not to scale. Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3–4.14.7) — schematic, not to scale 0 12 24 36 48 60 72 Storm duration d (h) Volume (m³) V_100 = largest gap V_2 = largest gap 1% AEP inflow 10·C_v·P_100(d)·A Release line 1.8·Q_cap,10·d 50% AEP inflow 10·C_v·P_2(d)·A Release line 1.8·Q_cap,2·d Dots: durations of Clause 2.5.2 (1, 2, 3, 6, 12, 24, 48, 72 h). Pervious C ≥ 0.50 for d ≥ 12 h. Two-stage outlet (Clause 4.14.6) Top of V Top of V_2 Overflow / spillway (Clause 4.9) Upper orifice or weir: total release ≤ Q_cap,10 at top of V Low-flow orifice (≥ 50 mm): passes Q_cap,2 at top of V_2 Retention (Clause 4.4) is provided in addition; no retention credit (Clause 4.14.7) Q_cap,10 = 2.78 × C_10 × i_10 × A ; Q_cap,2 = 2.78 × C_2 × i_2 × A ; (L/s; A in ha; i in mm/h) C_10, C_2 from Table 4.3A by soil group; i_10, i_2 for a 15-minute duration with the climate factor (Clause 2.8) V = max(V_100, V_2); V_T = max over d of [ 10 × C_v × P_T(d) × A − 1.8 × Q_cap × d ] (m³) ; 1.8 = 3.6 × 0.5 (average release of half the cap)

Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).

Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Ranchi plateau, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.

The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.


4.15 Safety, fencing and multi-use

4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):

  • (a) maximum depth in the 10% AEP storm: 0.45 m;
  • (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
  • (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
  • (d) no vertical drop greater than 0.3 m within the storage area or at its edge.

4.15.2 Wet basins. Permanent pools shall have:

  • a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
  • an emergent planting fringe that deters entry.

4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:

  • has a vertical wall or headwall drop greater than 0.6 m;
  • exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
  • contains an outlet structure with an opening larger than 300 mm that is not grated.

4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.

4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Hindi and English stating that the area floods during rain, and a depth marker at the deepest point.

4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.

4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.

Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.


4.16 Basis: why peak matching alone fails

Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.

  1. Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
  2. Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
  3. Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
  4. Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
  5. Closed outfalls. In Jharkhand, the governing failure is volume with no outlet when a river or reservoir downstream is high, and on the plateau it comes fast. Jamshedpur drains to the Subarnarekha and the Kharkai, whose levels are set by releases from dams upstream: in June 2008 the gates of the Kharkai dam in Odisha were opened as 338.1 mm fell in 24 hours at Jamshedpur (A) (IMD), both rivers rose above their danger marks and more than 500 houses were flooded (as reported); in Cyclone Yaas the Kharkai at Adityapur reached 132.40–132.87 m against its mark of 129 m, partly from releases in Mayurbhanj (27 May 2021, as reported); and on 26 July 2025 the Subarnarekha stood at 123.36 m at Mango bridge, 1.86 m above its mark, and the Kharkai at 134.90 m at Adityapur, 5.90 m above its mark (as reported). These marks are the district's; the CWC site at Jamshedpur has a danger level of 123.5 m and a highest level of 129.82 m (12 October 1973), and the two have not been reconciled. Sahebganj and Rajmahal drain to the Ganga, which can stay high for weeks: at Sahebganj it read 27.81–28.08 m, above its danger level of 27.25 m, on days between 9 and 31 August 2021 (CWC bulletins, seen in search snippets), against a highest level of 30.91 m (20 August 1998). The Damodar towns drain to a river regulated by the DVC dams and Tenughat: on 17 September 2024 Maithon and Panchet released a combined peak of about 2.5 lakh cusecs, and Tenughat about 85,000 cusecs (as reported). Ranchi drains to the Subarnarekha below Getalsud and to the Kanke and Dhurwa reservoirs, whose levels govern the outfalls of the city's lake catchments and whose operating rules were not found [TBC]. On the plateau the failure is also one of capacity: the Harmu channel, built for a 25-year flood, was damaged in two successive monsoons, July 2016 and July 2017 (CAG, Report No. 1 of 2023). No hourly record of how long a river or reservoir in Jharkhand stays above a city's outfalls was obtained [TBC], and no document was found that sets a design river level for an outfall; Chapter 5 sets the design level and the closure to be assumed. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.

The response in this Manual is layered:

  • release below pre-development (Clause 4.5);
  • retain the frequent storms (Clause 4.4);
  • route long SW monsoon storms (Clause 4.6.3);
  • prefer regional storage in the talab system (Clause 4.13); and
  • check downstream and at the outfall (Chapter 5).

Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.


4.17 Submittal requirements

Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:

  1. the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
  2. the evidence for the order of measures under Clause 4.3.1;
  3. the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
  4. the retention credit computation (Clause 4.4.6);
  5. the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
  6. a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
  7. stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
  8. the drawdown calculation (Clause 4.7);
  9. outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
  10. the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
  11. the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
  12. the design groundwater level and flotation check (Clause 4.12);
  13. the downstream and tailwater report (Chapter 5, Form 5-1); and
  14. the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).

Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.


References (chapter)

Annexes and forms

Annex / Form Content
4A Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map
4B Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A)
4C Worked example (Tier A) with full routing tables
Form 4-1 Site Runoff Control Report
Form 4-2 Tier B Site Sheet
Form 4-3 Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7)