Draft v1.0 prepared by NEER. Not adopted by the Government of Jharkhand or any authority or local body, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Jharkhand. Jharkhand is landlocked: it has no coast, no tide and no Coastal Regulation Zone. A Bay of Bengal cyclone reaches the State only as rainfall, as cyclone Yaas did in May 2021, and that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Jharkhand: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Jharkhand the receiving water is one of three kinds: a river, reached directly, through a gate in a bank or embankment or through a pumping station, whose level is often set by the releases of a dam upstream, as on the Subarnarekha and the Kharkai at Jamshedpur and on the Damodar and the Barakar below Tenughat and the dams of DVC, or by the Ganga at Sahebganj; a reservoir, dam or talab held at its full level, such as the Getalsud, Kanke and Hatia (Dhurwa) reservoirs and Bada Talab at Ranchi, Dimna lake at Jamshedpur, the reservoirs of DVC and the ponds of Dhanbad; or, in the coalfields, a mine void or pit lake, which is not a design outfall at all unless its lessee and DGMS agree and its level and spill are surveyed; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river, a reservoir, dam or talab, a mine void or a receiving drain, with the river lock of Clause 5.8.5(a) and the closures of Clause 5.8.5(b), (d) and (f) in place of the tidal lock windows.

Commentary. The drains of Jharkhand's towns fail in places that site design does not see, and in three different ways. The first is the river below a dam. Jamshedpur stands at the confluence of the Subarnarekha, which comes down from Ranchi past the Getalsud and Chandil dams, and the Kharkai, which rises in Mayurbhanj in Odisha below dams that the State does not operate; in June 2008 both rivers rose above their danger marks after the gates of the Kharkai dam were opened and more than 500 houses were reported inundated (as reported). Bokaro, Chas and Bermo stand on the Damodar below the Tenughat and Konar dams, and Dhanbad between the Maithon and Panchet reservoirs of DVC, whose combined release peaked at about 2.5 lakh cusec on 17 September 2024 (as reported); on that day CWC gauges on the Damodar, the Barakar and the North Koel stood above their danger levels (CWC). Sahebganj and Rajmahal drain to the Ganga, which stood above its danger level at Sahebganj on readings reported between 9 and 31 August 2021 (CWC bulletins, seen as extracts). The second is the reservoir or talab. Ranchi's nalas end in the Subarnarekha below the Getalsud dam, in the Kanke and Hatia (Dhurwa) reservoirs that supply the city, or in Bada Talab, and Dhanbad's drainage project sends 19 of its 94 outfalls into ponds (JUIDCO, 2017); a reservoir or a pond at its full level holds every drain that ends in it. The third belongs to Jharkhand alone among the editions of this Manual: in the Jharia, Bokaro, Ramgarh and Karanpura coalfields a drain can end in a mine void, a pit lake or a subsidence hollow whose level, spill and stability no one has surveyed, or run towards a working mine. The outfalls also belong to one body while the drains above them belong to others: the rivers and the State's dams are held by WRD, the reservoirs of DVC by DVC, the drains by the municipal bodies, JUIDCO, RRDA, the civic body of Jamshedpur or Tata Steel UISL, and the voids and mine drains by the coal companies, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, reservoir or void outfall in the State. A detention basin that meets every release rate in Chapter 4 still fails if the river it drains to stands above its outfall for days, if the reservoir or talab is full, or if the void it ends in has no outlet. This chapter makes all three failure modes part of the design. Jharkhand has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Harmu, Jumar, Potpoto and Hinoo of Ranchi and the Argora nala and the other nalas that join them, the Harmu channel rebuilt by JUIDCO, the Katri, Jamunia and Khudia and the other natural drains of Dhanbad that run to the Damodar, the Garga at Bokaro, the nalas of Jamshedpur, Adityapur, Mango and Jugsalai that run to the Subarnarekha and the Kharkai, any drain built or held by JUIDCO, a Municipal Corporation, a Municipal Council, a Nagar Panchayat, RRDA, MADA, an Industrial Area Development Authority, the civic body of Jamshedpur or Tata Steel UISL with an internal width of 1.0 m or more, the garland drains and diversion channels of a mine, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, talab or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or talab under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, RMC, JSDMA or WRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next talab or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Jharkhand. In Ranchi, where the Harmu runs about 17.8 km from a catchment of 22.59 km², 10.4 km of it through the city, to the Subarnarekha (CAG, Report No. 1 of 2023), the Jumar, Potpoto and Hinoo also run to the Subarnarekha, and the outfalls above the Kanke and Hatia (Dhurwa) reservoirs end in the reservoir, and in Dhanbad, where the drains of the city's storm water project have 94 outfalls, 19 of them to ponds, 40 to culverts and 26 to rivers or drains, and the six major natural drains run through the coalfield to the Damodar and the Khudia (JUIDCO, 2017), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river towns of Jharkhand, whose outfalls lie below the levels of rivers held up by dam releases or by the Ganga: on 17 September 2024, while DVC's combined release from Maithon and Panchet peaked at about 2.5 lakh cusec (as reported), the CWC gauges on the Damodar at Pupunki and Hendegir, the Barakar at Barkisuriya and Nandadih, the North Koel at Daltonganj and the Sone at Japla all stood above their danger levels (CWC, daily flood situation report); at Sahebganj readings of 27.81–28.08 m, above the Ganga's danger level of 27.25 m, were reported between 9 and 31 August 2021 (CWC bulletins, seen as extracts), and in August 2025 about 1,500 houses were reported flooded there (as reported); and in Jamshedpur the low colonies of Bagbera, Mango, Jugsalai and Sonari on the banks of the Subarnarekha and the Kharkai flooded in June 2008 and again in July and August 2025, with the dams above releasing (as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Jharkhand, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, RRDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Jharkhand has no coast, and the surge term does not arise in the State, which a Bay of Bengal cyclone reaches only as rainfall (Chapter 2).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Jharkhand, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Subarnarekha at Jamshedpur below the Getalsud and Chandil dams, with Mango, Jugsalai, Bagbera and Sonari, and on to Ghatsila, and the drains and nalas of the city that end in it (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Kharkai at Adityapur and Sonari to its confluence with the Subarnarekha at Domuhani, below the dams of Mayurbhanj in Odisha (Clauses 5.8.3 and 5.8.5(a) and (c));
  • the Subarnarekha at Ranchi below the Getalsud dam and at Muri, with the Harmu, the Jumar, the Potpoto, the Hinoo and the other rivers and nalas of Ranchi that join it (Clause 5.8.5(a));
  • the Damodar at Ramgarh, Bermo, Bokaro and Chas below the Tenughat dam and the Konar dam on its tributary, and past Dhanbad to the Panchet reservoir, and the Barakar below the Tilaiya dam at Barkisuriya and Nandadih to the Maithon reservoir (Clauses 5.8.3 and 5.8.5(a) to (c));
  • the North Koel at Daltonganj (Medininagar) and Mohammadganj, and the Sone at Japla (Clause 5.8.5(a));
  • the Ganga at Sahebganj and Rajmahal, with Udhwa lake and the low ground that drains to the river (Clause 5.8.5(a) and (b));
  • the Getalsud, Kanke and Hatia (Dhurwa) reservoirs and Bada Talab at Ranchi, Dimna lake at Jamshedpur, the Chandil and Tenughat reservoirs, the DVC reservoirs at Tilaiya, Konar, Maithon and Panchet, and the ponds of Dhanbad that receive its drains (Clause 5.8.5(b));
  • the mine voids, pit lakes and subsidence hollows of the Jharia, Bokaro, Ramgarh and Karanpura coalfields, and any working mine (Clause 5.8.5(d));
  • any irrigation canal of WRD, and any drain or channel of another body that receives storm water, including the Harmu channel of JUIDCO (Clause 5.8.5(f)); and
  • elsewhere: any river or WRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Getalsud and Chandil dams on the Subarnarekha, the Kharkai dam and the other dams of Mayurbhanj in Odisha above the Kharkai, the Tenughat dam on the Damodar, the DVC dams at Konar, Tilaiya, Maithon and Panchet, and the Kanke and Hatia (Dhurwa) dams at Ranchi), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 River-locked outfalls, reservoir, dam and talab outfalls, rivers below dams and the releases of DVC, mine voids and pit lakes, WRD and DVC consent, and discharges to canals and the drains of other bodies.

  • (a) River-locked outfalls. For an outfall to a river directly, through a gate in a bank or embankment or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain the sill of each gate, the crest of the bank or embankment, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or WRD gauge.
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 100-year level of a flood-frequency study or floodplain delineation that gives a level at the outfall, or a level from a hydraulic model under Clause 5.8.2(b), with the dam releases of item (c). No floodplain of any river in the State has been demarcated: WRD's demarcation of the Ganga floodplain was awaiting hydrology when research was done, and none was found for the Subarnarekha, the Kharkai or any other river [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), from copies of the CWC site lists of 2018 and 2022 published by SANDRP and extracts of CWC bulletins, none read in a CWC site sheet [TBC], are: the Subarnarekha at Jamshedpur 129.82 m (12 October 1973), at Muri 238.12 m (9 July 2008) and at Ghatsila 86.835 m (13 October 1973; removed from the list in 2022); the Kharkai at Adityapur 137.8 m (18 June 2008); the Ganga at Sahebganj 30.91 m (20 August 1998) and at Rajmahal 26.94 m (19 September 2003); the North Koel at Daltonganj 210.91 m (17 September 1976) and at Mohammadganj 146.66 m (19 August 2016); the Sone at Japla 128.04 m (15 August 1975); the Damodar at Hendegir 368.858 m and at Ramgarh 316.68 m (both 26 September 1978) and at Pupunki 160.05 m (21 August 1976); and the Barakar at Barkisuriya 292.32 m (17 September 2004; 291.54 m, of 25 September 2007, in the list of 2018) and at Nandadih 200.644 m (list of 2018, undated; 200.395 m, of 27 September 1995, in the list of 2022). Where two values are reported for the same gauge, or a level has been removed from the list, the higher, or the removed level, applies until CWC confirms the level (set by this Manual). Where a later flood has exceeded the listed level, the later level governs. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and WRD gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river, with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual).
    • The district gauges at Jamshedpur. The danger marks that the East Singhbhum district administration uses, 121.50 m for the Subarnarekha at the Mango bridge and 129 m for the Kharkai at the Adityapur bridge, and the readings reported against them, such as 123.36 m at Mango and 134.90 m at Adityapur on 26 July 2025 (as reported), belong to gauges whose location, zero and datum have not been reconciled with those of the CWC gauges at Jamshedpur and Adityapur [TBC]. They are alert levels for operations only. They shall not be used as a design level, compared with a CWC level or transferred to an outfall, and no level shall be carried from one set of gauges to the other, until the zeros of both are tied by levelling to a Survey of India benchmark and the tie is confirmed by CWC or WRD (set by this Manual).
    • Rivers with no gauge level. No CWC level was found for the Harmu, the Jumar, the Potpoto, the Hinoo or the other rivers and nalas of Ranchi (the CWC monitoring sites added in 2022 on the Jumar at the Kanke Road bridge, the Gara at the Dhurwa dam and the Kanchi at Paradih have no published level), for the Kharkai at the Saraikela road bridge, the Garga at Bokaro or the natural drains of Dhanbad [TBC]. On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of the Harmu in July 2016 and July 2017 and of Jamshedpur in June 2008 and July 2025, and from the records of WRD, JUIDCO, the local body or the Deputy Commissioner, with its source stated. A model of the Harmu shall take its whole catchment of 22.59 km², not the 8.49 km² on which its channel was designed (CAG, Report No. 1 of 2023), with the urban area modelled under Chapter 3. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest CWC gauge, transferred in the same way: 123.5 m at Jamshedpur (warning level 122.5 m), 27.25 m at Sahebganj (warning level 26.25 m; 26.50 m in a press report), 25.99 m at Rajmahal, 209 m at Daltonganj, 145.52 m at Mohammadganj, 125.09 m at Japla, 365.3 m at Hendegir, 307.51 m at Ramgarh, 153.5 m at Pupunki, 289.4 m at Barkisuriya and 194.21 m at Nandadih (CWC site list, as copied by SANDRP). The district danger marks at Mango and Adityapur are not used for this purpose. Where no CWC danger level has been found, as at Muri, Ghatsila and Adityapur and on the rivers of Ranchi, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (all set by this Manual). The datum of every level is to be confirmed for each gauge [TBC].
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate, bank or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment, solid waste and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
    • River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC or WRD gauge in the flood that set the highest recorded level or in a comparable flood, with the dam releases of item (c), and not less than: 7 days (168 hours) on the Ganga at Sahebganj and Rajmahal and on the low ground that drains to it; and elsewhere 72 hours, or, on a river below a dam, the time for which the largest recorded release of the dams above stayed above the flow at which the outfall is closed, from the operator's records, if that is longer (set by this Manual). Either lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6, including the releases of the dams above, shows it and the Authority approves it.
    • Gate failure and breach. Floor levels and pumped outfalls behind a gate, bank or embankment shall also be checked for the failure of the gate and for a breach of the bank or embankment, with the land and drains behind it filled to the river level beyond it. Below a dam they shall also be checked for the release that results from a gate failing open.
  • (b) Reservoir, dam and talab outfalls. For an outfall to a reservoir, dam, lake, talab or pond, directly or through a nala that ends in it, such as the Getalsud, Kanke and Hatia (Dhurwa) reservoirs and Bada Talab at Ranchi, Dimna lake at Jamshedpur, the Chandil and Tenughat reservoirs, the reservoirs of DVC at Tilaiya, Konar, Maithon and Panchet, and the ponds that receive the drains of Dhanbad:
    • Consent. Storm water shall not be discharged to a reservoir, dam, talab or pond without the written consent of its custodian, the body that holds and operates it: WRD for its reservoirs, DVC for its reservoirs, the municipality for a public tank vested in it under s.203 of the Jharkhand Municipal Act 2011, Tata Steel or the civic body of Jamshedpur for Dimna lake, or another custodian that the State names (the custodian of Bada Talab and of Dimna lake was not confirmed during research [TBC]). Where the waterbody is a Ramsar site (Udhwa lake) or a wetland notified under the Wetlands (Conservation and Management) Rules 2017, any permission that the Jharkhand State Wetlands Authority requires shall also be obtained, and the orders of the High Court on the water bodies of Ranchi shall be checked (Chapter 7). An outfall that carries dry-weather flow is dealt with under Clause 8.9.
    • Design level. The tailwater for the major-system and storage cases shall be the waterbody's maximum water level (MWL) as WRD, DVC or the custodian publishes it, or, where only the full tank or reservoir level (FTL) is published, FTL plus the surcharge in its design flood, computed from the rating of its spillway, weir and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FTL, the tailwater is FTL + 0.5 m (set by this Manual) [TBC]. For a talab or pond with no published level, the tailwater is the level at which it spills to the next drain or onto land, from its overflow sill or, where it has none, the lowest point of its rim, plus the head over that point needed to pass the 1% AEP inflow (set by this Manual). In every case it shall be not less than the highest level recorded at the waterbody. The minor-system tailwater is the FTL or the spill level, or the level at which the custodian's rule opens the gates if that is higher. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
    • The named reservoirs. The levels found during research, from the CWC inflow-forecast site lists of 2018 and 2022 (as copied by SANDRP) and extracts of DVC's own table, none read in a CWC or DVC document [TBC], give the following tailwaters until WRD or DVC confirms the levels and their datum (set by this Manual): Getalsud, FRL 590.06 m and no MWL, 590.56 m; a secondary source gives the FRL as about 1,954 ft (about 595.6 m), so no outfall with its invert below 596.1 m shall be designed without the FRL in writing from WRD [TBC]; Chandil, FRL 189 m in the list of 2022 and 192.0 m in that of 2018, MWL 192 m, 192 m; Tenughat, FRL 268.834 m with an MWL of 268.83 m, which is not above the FRL, 269.33 m (a press report gives a "danger level" of 854 ft [TBC]); and the reservoirs of DVC at the higher of DVC's maximum flood-management level and the highest recorded level: Tilaiya 372.47 m (highest recorded 372.28 m, 6 July 1986), Konar 427.94 m (427.91 m, 1 October 1961), Maithon 151.79 m (the highest recorded level of 1 October 1959 and CWC's MWL; flood-management level 150.88 m) and Panchet 132.893 m (the highest recorded level of 2 October 1959; flood-management level 132.59 m). The level that CWC lists as the "FRL" of Maithon and Panchet is DVC's maximum flood-management level, not its conservation level; the designer shall state which level is used. No FTL on a stated datum was found for the Kanke and Hatia (Dhurwa) reservoirs, Bada Talab, Dimna lake or any pond of Dhanbad [TBC]; no outfall to the Kanke or Hatia reservoir shall be designed without the FTL and the spillway rating in writing from WRD, or, until WRD gives them, a survey of the spillway crest tied to a Survey of India benchmark, taken as the FTL (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the waterbody below the invert at the start of comparable storms and the Authority accepts it. Every reservoir, dam, talab and pond starts every design storm at its FTL or spill level (Clause 7.7.3). No lowering of a reservoir or pond before a storm and no early or additional gate opening shall be assumed unless the custodian's written operating rule and records show it, and no storage shall be credited in a pond that a drainage scheme uses as storage, such as the ponds integrated into the Dhanbad drains, below its spill level unless the custodian's records show that storage available at the start of comparable storms.
  • (c) Rivers below dams, and the releases of DVC. For an outfall to a river below a dam, such as the Subarnarekha below the Getalsud and Chandil dams, the Kharkai below the dams of Mayurbhanj in Odisha, the Damodar below the Tenughat and Konar dams and the Barakar below the Tilaiya dam, or to the shore of a reservoir whose level the dam sets, such as Maithon and Panchet:
    • in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dams above, routed to the outfall, with the flow of the catchment below them as it occurred in the same event, and a reservoir shore outfall with the reservoir at the level of item (b) (set by this Manual), until WRD or DVC publishes an operating rule that bounds the release [TBC]. As reported, the combined release of Maithon and Panchet peaked at about 2.5 lakh cusec (about 7,080 m³/s) on 17 September 2024, with a peak inflow reported as 4,23,163 cusec, and the press reported more than 3 lakh cusec; Tenughat released about 85,000 cusec in the same event; and Chandil opened 13 of its 18 gates on 17 August 2016, and is reported to have passed 708.3 m³/s through nine gates on another occasion. The largest recorded release of each dam and its duration shall be obtained from WRD or DVC and stated [TBC];
    • a release, or a release rule, alone shall not be taken to bound the river level: the level shall also be checked for the largest recorded event at the nearest gauge, with the local inflows as they occurred;
    • the river level shall not be reduced on the ground that the flood comes from rain that falls outside the town or outside the State, as on the Kharkai, whose dams lie in Odisha, or that the site storm is small, and the release shall be placed before, during and after the site storm;
    • no dam gate shall be assumed to open earlier or wider than the operator's records show; the release rules and records of the dams above the Kharkai shall be obtained through WRD from the Government of Odisha [TBC], and until they are, an outfall to the Kharkai shall take the level of item (a), not less than 137.8 m at Adityapur transferred to the outfall; and
    • an outfall in Jamshedpur to the Subarnarekha or the Kharkai, or to a nala or drain that ends in either, shall be designed with the releases of Getalsud and Chandil and of the dams above the Kharkai placed together with the site storm.
  • (d) Mine voids, pit lakes and working mines. For a site in or near a coalfield, such as the Jharia, Bokaro, Ramgarh and Karanpura coalfields, whose drainage could reach a mine void, a pit lake, a subsidence hollow or a working mine:
    • Not a design outfall. A mine void or pit lake, working or abandoned, is not a design outfall or storage unless the lessee and DGMS consent in writing and its water level, spill level and spill path are surveyed and tied to a Survey of India benchmark; it is never assumed to have free storage (set by this Manual). Where the lease has ended, the body that holds the land shall consent in place of the lessee [TBC].
    • No drainage into a working mine. No development shall drain, directly or through a drain, nala or overland flow path, into a working mine, its workings, its pit or the area inside its garland drain. The Coal Mines Regulations 2017 require the lowest point at which surface water could enter a mine to stand at least 1.5 m above the highest flood level at that point (reg. 149, as reported; the Gazette text was not read [TBC]), and a drain that raises the flood level at a mine opening works against that.
    • Where consent is given. The tailwater is the surveyed spill level plus the head over the spill needed to pass the 1% AEP inflow from all the land that drains to the void, and not less than the highest level recorded in it, from the lessee's records; the void starts every design storm full to its spill level; an outfall below that level is treated as closed for the whole storm (Clause 5.9.4); and the downstream analysis continues along the surveyed spill path to the next end point of Clause 5.3.1. The consent shall state the stability of the void's sides and benches with the design inflow, as assessed for the lessee, and the water-quality conditions (Chapter 8).
    • Mine-disturbed ground. Mine-disturbed ground is overburden dumps, backfilled or reclaimed mine land, compacted mine benches and haul roads, subsidence ground and the fire areas of the Jharia coalfield. Runoff from it is treated as high in volume and in sediment (Chapter 3), and runoff from an overburden dump shall pass a sediment basin and stable toe (garland) drains before it reaches any town drain or outfall (Chapter 8). No outfall, drain or storage shall be placed in a fire area or in ground declared unstable, and drains shall be routed around them, as the Dhanbad drainage project was (JUIDCO, 2017). On subsiding ground the levels of every outfall, drain and floor shall come from a level survey made for the design, and the design shall state the subsidence allowed for over the life of the works [TBC].
  • (e) WRD and DVC consent; plan and court lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank, boundary or floodplain of a river, or in a reservoir, dam, embankment or canal of WRD, without the consent of WRD, or at a reservoir of DVC without the consent of DVC; the procedure for that consent was not found during research [TBC]. The designer shall also check the outfall against the lines that the byelaws, plans and courts have set, as they stand at the time of design (Chapter 7): the river boundary and the river-front strips of JBBL 2016 byelaw 23 (the river boundary or more along the Ganga; 10–15 m along other rivers, whose list under byelaw 23.2 has not been notified [TBC]); the 20 m from the full tank level of the Kanke, Dhurwa and Rukka dams and the 10 m along rivers and natural nalas of the Ranchi Master Plan 2037 (condition 2.9); the no-entry zones that the High Court has directed around the water bodies of Ranchi (W.P.(PIL) 1463/2020, order of 31 July 2025, as reported; later orders not read [TBC]); the 15 m line used along the Subarnarekha at Jamshedpur in 2025 after the proceedings of the NGT (as reported); and Udhwa lake, a Ramsar site. Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].
  • (f) WRD channels, irrigation canals and the drains of other bodies. Storm water shall not be discharged to a drain or canal of WRD, or to another irrigation canal, without the consent of WRD or the canal's owner, or to a drain of another body, such as a trunk drain or channel of JUIDCO, a drain of a municipal body, RRDA, MADA or an Industrial Area Development Authority, or a drain of the leased area of Jamshedpur, without the written consent of that body. Where consent is given:
    • the discharge shall not exceed the rate the consent allows;
    • the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other bodies, and with its downstream boundary at the river or reservoir level of items (a) and (b); until a design water level is published for a channel, the computed level governs [TBC];
    • the channel shall be taken in its present condition, net of silt, encroachment, solid waste and obstruction by crossing services and culverts, and with its narrowest section as surveyed, such as the reaches of the Harmu narrowed by encroachment; a widening, lining, remodelling or diversion that has been proposed but not completed shall not be counted, and a channel designed for a stated return period shall not be taken to carry more than its surveyed section carries; and
    • the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.

No pump, gate, sluice or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a reservoir or talab before a storm, closing a gate late or opening dam gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the waterbody or the river (Clause 5.12.3). Pumping shall not be used to move water into a mine void, a working mine or another catchment.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Jharkhand's rivers break that assumption, because the monsoon depressions and the remnants of Bay of Bengal cyclones that fill them fall on the plateau towns at the same time. The Subarnarekha set its highest recorded level at Jamshedpur, 129.82 m, on 12 October 1973, and at Ghatsila on 13 October 1973 (CWC site list, as copied by SANDRP), when Ranchi recorded 175.8 mm in a day, its highest daily fall of the October–December season (IMD); the Kharkai set its highest recorded level at Adityapur on 18 June 2008 (CWC site list, as copied by SANDRP), the day Jamshedpur (A) recorded 338.1 mm, its highest daily rainfall (IMD); and on 17 September 2024, while DVC's combined release from Maithon and Panchet peaked at about 2.5 lakh cusec (as reported), the Damodar, the Barakar, the North Koel and the Sone stood above their danger levels at the same time (CWC). In May 2021 the rain of cyclone Yaas fell on Jamshedpur and on the Kharkai's catchment in Odisha together, with the dams there releasing (as reported). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the dams above the State's towns. On the Damodar and the Barakar, DVC holds the Tilaiya, Konar, Maithon and Panchet reservoirs, whose maximum flood-management levels are reported as 372.47, 427.94, 150.88 and 132.59 m (DVC, as extracted [TBC]); releases from Maithon and Panchet are advised by the Damodar Valley Reservoir Regulation Committee and those from Konar and Tilaiya are issued by DVC (Ministry of Water Resources, 2018, as seen in an extract), and the State's own Tenughat dam is reported to lie outside the Committee's regulation (as reported). In September 2024 a warning that the releases of Maithon and Panchet could exceed 1.5 lakh cusec was issued at 04:30 on 17 September and a red flood warning at 05:25; the combined release peaked at about 2.5 lakh cusec between 08:00 and 18:00 that day and was brought down to 80,000 cusec by 06:50 on 19 September, and Panchet rose to RL 425.22 ft (PIB, as reported); Tenughat released about 85,000 cusec in the same event (as reported). On the Subarnarekha, Ranchi's Getalsud dam and the Chandil dam above Jamshedpur are held by WRD; Chandil opened 13 of its 18 gates on 17 August 2016, a release that SANDRP argued was avoidable, and its full reservoir level is listed by CWC as 189 m in 2022 and 192.0 m in 2018 (as copied by SANDRP). The Kharkai comes down from Mayurbhanj in Odisha, and the releases of the Kharkai dam in June 2008 and of the Bankabal and Silaipath dams in May 2021 are reported to have raised it at Jamshedpur (as reported). No operating rule or release record for any of these dams was obtained during research, and no hourly stage record for any gauge in the State was obtained [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(c)). The levels used in this Manual come from copies of the CWC site lists, extracts of CWC bulletins and extracts of DVC's table, which could not be downloaded during research, and their datum and gauge zero are to be confirmed from CWC and DVC [TBC].

Clause 5.8.5 is set by this Manual. In Jharkhand the tailwater at a town outfall is set not by the tide but by a river held high by the releases of the dams above it, by a reservoir, dam or talab at its full level, or, in the coalfields, by a mine void whose level no one has surveyed, and no document found during research gives a design level for any of them. The Jharkhand Municipal Act 2011 requires the municipality to provide "a safe and efficient outfall, in or outside the municipal area" for storm water, in such manner as may not cause any nuisance "by flooding any part of the municipal area, or of the areas surrounding the outfall" (s.219), and requires the drain of new premises to empty into a municipal drain within thirty metres, or else into a cesspool (s.227), but it does not say against which level. The State has no floodplain zoning law and no notified flood zone (Chapter 7).

The first is the river. The plateau rivers rise and fall fast: the worked example of the CWC Flood Estimation Report for subzone 1(g), the Saphi near Barkakana in Ramgarh district, has a time to peak of 5.5 hours and a time base of 23 hours for a catchment of 390 km², and puts 57% of its 6-hour storm in the first hour (CWC, FER 1(g)). On their own they would lock an outfall for hours, not days. But most of the State's towns stand below dams, and a dam spills when it is full and goes on spilling while the inflow lasts. The single lock of at least 72 hours therefore covers the whole of the longest design storm of Clause 2.5.2, so that the site does not rely on the river falling during the storm, and below a dam it is lengthened to the duration of the largest recorded release, which the operator's records show and research did not find [TBC]. The Ganga is different: it stands high for weeks, with readings above its danger level at Sahebganj reported between 9 and 31 August 2021 and a severe flood situation reported there by CWC in late September and early October 2019 (CWC, as seen in extracts), so it takes the lock of at least 7 days that the Bihar edition of this Manual sets on the same river. The CWC levels listed in item (a) come from SANDRP's copies of the CWC site lists and from extracts of CWC bulletins, which could not be downloaded; their datum and gauge zero are to be confirmed [TBC]. Where the lists of 2018 and 2022 disagree, as at Barkisuriya and Nandadih, or a level has been removed, as at Ghatsila, item (a) keeps the higher value until CWC explains the change, because a level that the river reached is not made lower by being revised. The danger level is used as the floor of the 10% AEP level because the rivers have crossed it in recent floods: on 17 September 2024 the gauges at Pupunki and Hendegir on the Damodar, Barkisuriya and Nandadih on the Barakar, Daltonganj on the North Koel and Japla on the Sone all stood at or above it (CWC), and the Ganga at Sahebganj passed it in 2021, 2024 and 2025 (CWC; as reported), so a level reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the CWC record [TBC]. Item (a) counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump.

At Jamshedpur there are two sets of gauges. CWC's gauge on the Subarnarekha has a warning level of 122.5 m, a danger level of 123.5 m and a highest level of 129.82 m, set on 12 October 1973 (CWC site list and bulletins, as copied and seen in extracts). The district administration's danger mark for the Subarnarekha at the Mango bridge is 121.50 m and for the Kharkai at the Adityapur bridge 129 m (as reported, consistently from 2011 to 2025), while CWC's highest level for the Kharkai at Adityapur is 137.8 m, of 18 June 2008. The two sets have never been reconciled in any source found: their gauge locations, zeros and datums may all differ. The district readings are what the press reports, so the Kharkai was "above danger" during cyclone Yaas in May 2021 at 132.40–132.87 m while the Subarnarekha at Mango stood at 119.20 m, below its mark (as reported). Item (a) keeps the two sets apart, because a design level built from one and a reading from the other could be wrong by metres in either direction.

The second is the reservoir and the talab. Ranchi's reservoirs supply the city and are held as full as the monsoon allows; a reservoir at its full level does not fall for the rest of the season, but passes its inflow over its spillway, and its level rises above FTL by whatever head the flood needs. Item (b) therefore takes the MWL, or FTL plus the design-flood surcharge, as the tailwater, and treats an outfall below it as closed for the whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. No MWL and no surcharge was found for Getalsud, and none of the levels of Kanke and Hatia (Dhurwa) reported in the press has a stated datum, so FTL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge, which depends on the spillway and the flood [TBC]. The FRL of Getalsud is itself uncertain: CWC's list gives 590.06 m, while a secondary source gives about 1,954 ft, more than 5 m higher, so item (b) does not let an outfall be designed in that band without WRD's written level. The tailwaters of the DVC reservoirs take the higher of DVC's maximum flood-management level and the highest recorded level because both were exceeded or approached in recorded floods: in September 2024 Panchet reached RL 425.22 ft, which was described as beyond its land-acquisition level (PIB, as reported). The talabs and ponds have no published level at all, so item (b) uses their spill level and the head over it. The custodian's consent is required because a storm drain added to a reservoir raises its level for every other outfall, and because the reservoirs and talabs also carry the city's sewage, which is the subject of Clause 8.9: the High Court has heard that of the 71 ponds once in Ranchi only four or five can be seen, and that encroachment has reduced the capacity of the Kanke and Dhurwa dams (as reported).

The third is the coincidence of the release and the storm. Item (c) runs the design storm on the town with the river at the largest recorded release because the rain that fills a reservoir and the rain on the town below come from the same monsoon spell or the same Bay system (see the Commentary to Clause 5.8.4). The releases of Maithon and Panchet pass into West Bengal, but the same storms raise the Damodar and the Barakar above them in Jharkhand, and the reservoir levels that the releases are made to control set the tailwater of every outfall on their shores. The Kharkai's dams lie in Odisha, so their releases are decided outside the State, and in June 2008 and May 2021 those releases are reported to have raised the Kharkai at Jamshedpur (as reported); item (c) asks WRD to obtain their rules and records and, until then, uses the river's highest recorded level.

The fourth is the mine void. A void or pit lake looks like free storage, and in the Olidih watershed of the Jharia coalfield abandoned pits modelled as potholes cut surface runoff by about half (Shinde et al., 2017, as summarised). But a void's level, spill point and spill path are not surveyed for drainage, its sides can fail, it may be connected to workings, and its water may be acid or laden with sediment; the coal companies' mine drains are sized "keeping at least 50% safety margin over and above the peak sudden rainfall" (standard condition of the environmental clearances for coal mines), which is not a return period, and the Coal Mines Regulations 2017 require mine openings to stand at least 1.5 m above the highest flood level (reg. 149, as reported). Item (d) therefore treats a void as an outfall only with the lessee's and DGMS's written consent and a survey, and never lets a town drain into a working mine. Subsidence in the Jharia coalfield has been measured by satellite at rates from a few centimetres to several tens of centimetres a year (Borah et al., 2017; Garg et al., 2021; as summarised), enough to reverse the fall of a drain within its design life, which is why item (d) requires levels from a survey made for the design.

The fifth is the body that owns the receiving water. The rivers and the State's dams are WRD's; the reservoirs of DVC are DVC's, whose releases from Maithon and Panchet are advised by the Damodar Valley Reservoir Regulation Committee, with members from West Bengal, Jharkhand, CWC and DVC, and from Konar and Tilaiya by DVC itself (Ministry of Water Resources, 2018, as seen in an extract), while Tenughat, operated by the State, is reported to be outside the Committee's regulation (as reported); the public drains and tanks vest in the municipality (Jharkhand Municipal Act 2011, ss.203 and 221); and no rule dividing the natural nalas from the municipal drains was found (Chapter 6, Clause 6.9). Items (b), (e) and (f) ask for the owner's consent and design level because a design that discharges to a channel, a reservoir or a void cannot be checked without them. The lines of item (e) decide where an outfall can be built, not its level; their status is set out in Chapter 7.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Jharkhand requirement in this Manual. In Jharkhand it applies where an outfall is shut not by the tide but by a river held high by the releases of a dam or by the Ganga, by a reservoir, dam or talab at its full level, or by a mine void with no outlet. In June 2008 the Kharkai and the Subarnarekha rose above their danger marks at Jamshedpur after the gates of the Kharkai dam were opened, and more than 500 houses in Jugsalai, Bagbera, Sonari and the other low colonies were reported inundated (as reported). In September 2024 the releases of Maithon and Panchet stayed above 80,000 cusec from the night of 16 September to the morning of 19 September (as reported), and readings above the Ganga's danger level at Sahebganj were reported between 9 and 31 August 2021 (CWC bulletins, seen as extracts). A river below a spilling dam stays high for as long as the dam spills, the Ganga stays high for weeks, a reservoir or talab at its full level stays there for the rest of the monsoon, and a void with no outlet does not drain at all, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 72 hours, or 7 days on the Ganga, and a closure for the whole storm at a reservoir, talab or void outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 10 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Jharkhand the outfalls do not cross a beach, but many of them end in a river whose level is set by the gates of a dam upstream, or in a reservoir, dam or talab held at its full level. In June 2008 the Kharkai and the Subarnarekha rose above their danger marks at Jamshedpur after the gates of the Kharkai dam in Mayurbhanj, Odisha, were opened, more than 500 houses were reported inundated, and the operation of the Chandil reservoir was also questioned (as reported; SANDRP, 2008); in May 2021, during cyclone Yaas, the Kharkai at Adityapur rose above the district's danger mark after releases from the Bankabal and Silaipath dams in Mayurbhanj (as reported). A gate opened in a hurry raises the river below; a gate held shut raises the reservoir and every outfall that drains to it. The dams and their gates are held by WRD, by DVC or, above the Kharkai, by the Government of Odisha [TBC], while the drains that reach the rivers belong to the Municipal Corporations, JUIDCO, the civic body of Jamshedpur or Tata Steel UISL, and no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 10 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 10 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Jharkhand: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless WRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Jharkhand has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the sediment and waste that its rivers and drains leave at an outfall. The coalfields send sediment-laden water to the streams: CAG found suspended solids of 104 to 12,628 mg/l in the effluent of four mines of CCL, against a limit of 100 mg/l, and washery rejects reaching the Damodar (CAG, Report No. 12 of 2019); at Jamshedpur WRD asked CWC to examine the "disturbance of hydrology" of the Subarnarekha and the Kharkai by slag dumping on their banks (High Court order of 16 April 2013); and the storm drains along the Harmu were found "blocked with silt, mud and solid deposits" (CAG, Report No. 1 of 2023). A flap gate held open or shut by silt, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No written gate-operation rule for the gates of any dam, reservoir or talab outlet in the State was found during research [TBC]. Clause 5.8.5 deals with both by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on the Harmu river in Ranchi
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)