Draft v1.0 prepared by NEER. Not adopted by the Government of West Bengal or the Andaman and Nicobar Administration, and has no legal force. About this draft

West Bengal · Draft v1.0

West Bengal Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the West Bengal Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for West Bengal.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of West Bengal or by any of its departments, local bodies or agencies, including the Kolkata Municipal Corporation (KMC), the Kolkata Metropolitan Development Authority (KMDA), the New Town Kolkata Development Authority (NKDA) and the other Municipal Corporations, Municipalities and development authorities of the State. Where it names a body, such as the Urban Development and Municipal Affairs Department (UD&MA), the Irrigation and Waterways Department (I&WD), WBSDMA, the West Bengal State Coastal Zone Management Authority, the East Kolkata Wetlands Management Authority, KMC, KMDA, NKDA, a Municipality or the Damodar Valley Corporation, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

Supplements. The Manual carries one supplement, for a place that lies outside the State's jurisdiction. Supplement S01 covers the Union Territory of the Andaman and Nicobar Islands, in the Bay of Bengal. The islands fall within the jurisdiction of the Calcutta High Court, whose Circuit Bench sits at Sri Vijaya Puram, and Bengali is widely spoken there. No West Bengal Act, rule or authority applies in the islands; the supplement works through the instruments of the Union Territory. It has not been adopted, notified or endorsed by the Andaman and Nicobar Administration or by any of its departments, local bodies, Tribal Councils or agencies. What this notice says of the Manual applies to the supplement.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.

Names. Older sources and some IMD and tide-gauge stations keep the old names Calcutta (Kolkata), Burdwan (Bardhaman), Midnapore (Medinipur), Contai (Kanthi) and Saugor (Sagar); this Manual uses the present names and keeps the old ones where a source or a station uses them. In the islands, Port Blair was renamed Sri Vijaya Puram in 2024, Havelock Island is Swaraj Dweep and Neil Island is Shaheed Dweep; the IMD station and the 1999 building bye-laws keep the name Port Blair. Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any Municipal Corporation, and names the Asansol Municipal Corporation in full;
  • CD is chart datum; the community development blocks of the islands are written in full;
  • SWD is a storm water drain, and SWF the storm-water flow of a combined system (Chapter 5); and
  • KMC is the Kolkata Municipal Corporation, and KMCBR its Building Rules, 2009.

The sense is clear from the context. Bengali terms used in the text, such as pukur (pond), dighi (large tank), khal (canal), bheri (embanked fishery) and bandh (embankment), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

West Bengal's cities and towns flood for three reasons. Kolkata showed the first on 23 September 2025, when its drains could not take a storm of the kind they were never designed for; the lower Damodar and Ghatal showed the second in September 2024, when dam releases and swollen rivers held the land under water; and the delta showed the third when Cyclones Aila and Amphan drove the sea over its embankments.

  1. Drains built for frequent storms, discharging against the tide. Kolkata drains away from its river. The city stands on the levee of the Hooghly and its land slopes east, so most of its storm water is pumped: the large Kolkata Municipal Corporation stations at Ballygunge (1,233 cusec) and Palmer Bazar (1,184 cusec) lift it into outfall channels that run about 27 km from Bantala to the Kultigang, a tidal arm of the Raimangal estuary, through the East Kolkata Wetlands. The core system is a combined one: the Kolkata Municipal Corporation Act, 1980 requires KMC to provide one outfall "for the effectual drainage and proper discharge of storm-water and sewage", and the pumping stations designed for KMC since 2015 still pump storm flow mixed with sewage to the canals. The system was sized for small storms. Kolkata's first brick sewer, commissioned in 1876, was designed to carry 6.35 mm of rain an hour, and an attempt in the 1970s to raise this to 12.7 mm/h is reported not to have succeeded. The drainage master plan of the metropolitan area was based on a storm that comes "once in two months (6 times in a year)", with 70% of the land impervious, and its intensity–frequency curve was adopted by KMDA and the local bodies. On the night of 22–23 September 2025 IMD's Alipore observatory recorded 251.4 mm in 24 hours, 185.6 mm of it in three hours and 98 mm in a single hour, fifteen times the design rate of the old sewers; a KMC gauge at Garia was reported to have recorded 332 mm. Kolkata went under water, and about ten people died, most of them by electrocution in flooded streets. A project report for the KMC pumping stations records that "discharge through the outfall is partially achieved due to high water levels in the canal, particularly during tidal period". Roofs, roads and paving now send more water to the drains, and faster.
  2. Rivers that rise from upstream. Much of south Bengal drains to rivers whose level is set by rain and dams far upstream. On 17 September 2024 the combined release from the Maithon and Panchet dams of the Damodar Valley Corporation, in Jharkhand, was stated to have peaked at 2.5 lakh cusec, about 7,080 m³/s; parts of Howrah, Hooghly, Paschim and Purba Medinipur, Bankura and Purulia flooded, and the Shilabati rose above its danger level at Ghatal, a low basin that drains slowly to the Rupnarayan and floods repeatedly. In July 2017 floods across the State affected 8.7 million people, killed 217 and caused damage of ₹17,727.94 crore, and the Comptroller and Auditor General (CAG) found that flood works had been "taken up at different locations depending on priority and availability of funds without being linked to a comprehensive plan". In the north, the Teesta flood of October 1968 and the outburst of South Lhonak lake in Sikkim on 4 October 2023, which left silt in the Teesta and in the Teesta–Mahananda link canal, show the same: a town drain is only as good as the river it empties into.
  3. The sea, the cyclones and sinking land. The Hooghly is tidal well above Kolkata, with a range of about 17 ft at its mouth; in the 1960s a tidal bore was reported on practically every spring tide. INCOIS puts the 100-year extreme sea level at Diamond Harbour at 3.79 m above mean sea level now, rising to 4.34–4.46 m by 2100. Cyclones bring the sea inland. Aila, on 25 May 2009, breached about 177 km of the 3,122 km of embankments that protect the Sundarbans and badly damaged another 601 km; Amphan, on 20 May 2020, brought "tidal waves of 15 feet height" into the 24 Parganas and Purba Medinipur, and 240 mm of rain at Alipore in 24 hours. Yaas (May 2021) and Remal (May 2024) followed. The land is also going down. Satellite measurements show parts of Kolkata subsiding by 2.8–5.5 mm a year, as fast as the sea is rising at Diamond Harbour (3.73 mm a year), and the two add: a gravity outfall built today loses both together.

Behind all three lies lost storage. Kolkata's ponds, the pukurs and dighis, and the wetlands to its east once held much of its rain. An estimate by the National Atlas and Thematic Mapping Organisation (NATMO) put the city's water bodies at about 8,700; a later satellite count found about 4,900. Salt Lake and New Town stand on reclaimed wetland. The Calcutta High Court froze reclamation of the East Kolkata Wetlands in 1992, and the wetlands were listed under the Ramsar Convention in 2002, but ponds are still filled across the city; KMC has filed hundreds of police complaints over it.

Design for West Bengal therefore has to cover more than the monsoon. Four of the last five damaging cyclones struck in late May, near spring tides, and the all-time daily record at Diamond Harbour (290.7 mm, 27 May 1993) is a May storm; Dum Dum's largest pre-monsoon day, 220 mm on 8 May 1949, came from a nor'wester. October and November bring cyclones and depressions as well.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the tide, the khal or the river is high, or when the pumps that serve it are running at full capacity.

The Manual also sets how public drains, roads, khals, pukurs, pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to West Bengal's south-west monsoon and the nor'westers and cyclones that bracket it; the very wet sub-Himalayan north, where Jalpaiguri receives about 3,700 mm a year, and the delta, where the State average is about 1,850 mm; the deltaic clays and high water table of the south, the laterite of the western plateau and the sandy terai of the north; the pukurs, the East Kolkata Wetlands and the Sundarbans; combined sewers and pumped, tide-locked outfalls; rivers regulated by dams; and the macro-tidal Hooghly estuary.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Reports for the three subzones that cover West Bengal, 1(g) Lower Ganga Plains, 2(a) North Brahmaputra and 1(f) Middle Ganga Plains, as the interim source, and frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for climate-change ratios.
  4. Tropical and coastal practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites, drainage reserves and coastal platform levels. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Kolkata Municipal Corporation Act, 1980 and the KMC Building Rules, 2009; the West Bengal Municipal (Building) Rules, 2007; the New Town Kolkata (Building) Rules, 2009, as amended in 2021; the West Bengal Town and Country (Planning and Development) Act, 1979; the West Bengal Inland Fisheries Act, 1984 (s.17A) and the East Kolkata Wetlands (Conservation and Management) Act, 2006; the Calcutta High Court's judgment of 1992 on the East Kolkata Wetlands; and the CRZ Notification 2019 as it will be applied in West Bengal through its Coastal Zone Management Plan. This Manual follows them or, where disclosed, makes them stricter.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in West Bengal can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no curve for any West Bengal station. The reanalysis grids of NIH-DHAARA come close to the CWC values near Kolkata (50-year 24-hour depth 294 mm), but give two to three times the CWC values in the north and on the coast: 677 mm against about 320 mm at Siliguri, 790 mm against about 360–400 mm at Cooch Behar, and 631 mm against about 360 mm at Digha.

West Bengal has no drainage design standard of its own. Research for this Manual found no West Bengal design standard, State IDF relationship or circular of UD&MA or I&WD that fixes return periods or design rainfall for urban drains, and no published IDF relationship for Kolkata or any other city in the State. In particular:

  • current practice designs for very frequent storms. The metropolitan drainage master plan used a storm that comes six times a year, and the old sewers of central Kolkata carry 6.35 mm/h. The project reports for KMC's sewerage and drainage works since 2015 state no design rainfall intensity or return period;
  • core Kolkata is a combined system by law. KMC must provide one outfall for storm water and sewage (KMC Act, s.277), all public drains vest in KMC (s.280), and the Commissioner may, but need not, require a separate drain for rain water (s.292). New works keep the combined system, separating the dry-weather flow at the pumping stations and pumping the combined storm flow to the outfall canals. This Manual states how its rules apply where the receiving system is combined;
  • the building rules do not require on-site detention or limit peak runoff. The KMC Building Rules, 2009 make rainwater harvesting part of the plan only "as per Environmental Impact Assessment Guideline", require a plinth of at least 60 cm, and allow a site to be raised by up to 600 mm in areas prone to waterlogging; the Commissioner may impose conditions where a building would put an additional burden on the drainage system, but no rule says what they should be. The West Bengal Municipal (Building) Rules, 2007 are reported to mandate rainwater harvesting, though the threshold could not be read for this Manual; the New Town rules, since 2021, require it for every new building;
  • there are almost no setbacks in metres from khals, ponds or rivers. The KMC Building Rules reward keeping a pond, counting it in plot area and relaxing setbacks where water bodies and heritage buildings cover a quarter of the plot, but set no distance from a khal. The West Bengal Municipal (Building) Rules, 2007 limit the height and length of buildings within 15 m of a river bank, and bar the filling of ponds, canals, wetlands and drains without the State's approval, as reported; they do not keep the bank clear;
  • pond protection depends on the West Bengal Inland Fisheries Act, 1984 (s.17A), whose size threshold of 5 cottah was removed in 2008, as reported, on restoration notices under s.53 of the West Bengal Town and Country (Planning and Development) Act, 1979, and on police complaints. In Anuradha Sen v. Kolkata Municipal Corporation (January 2024) the Calcutta High Court held that KMC must first establish that a site is a "water area" before acting;
  • there are no flood lines and no floodplain zoning law. The CAG asked I&WD in 2019 to enact the Model Flood Plain Zoning Bill; no Act has followed; and
  • West Bengal's Coastal Zone Management Plan under the CRZ Notification 2019 had not been approved by December 2025. Revised plans were sent for Purba Medinipur in September 2025 and North 24 Parganas in October 2025, and the plan for South 24 Parganas, which covers the Sundarbans, was promised for January 2026. The State has told the National Green Tribunal that the High Tide Line of 2011 "no longer exists" on its eroding coast, while the Ministry's committee asked that it be kept. Until a plan under the 2019 Notification is approved, this Manual uses the plans prepared under the CRZ Notification 2011.

So each region and each local body interprets the central manual its own way. KMC, the other Municipal Corporations, the Municipalities, KMDA, NKDA, the development authorities, I&WD, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A KMC drain can discharge into an I&WD canal designed to another standard, with no agreed level at which the canal is full or the tide shuts the outfall. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater and pumped-outfall check (Chapter 5); and
  • basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a Municipality or a development authority can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines; MoHUA Model Building Bye-Laws (2016); Kolkata Municipal Corporation Act, 1980, ss.277, 280 and 292; KMC Building Rules, 2009, rr.2(27), 65A, 76, 105, 117 and 144; West Bengal Municipal (Building) Rules, 2007, r.8 (as reported); New Town Kolkata (Building) Rules, 2009, as amended by UD&MA notification No. 2282-T&CP/C-2/2C-17/2020 of 8 September 2021, r.28(4); West Bengal Inland Fisheries Act, 1984, s.17A, and its amendments of 1993 and 2008 (as reported); Calcutta High Court, Anuradha Sen v. Kolkata Municipal Corporation (9 January 2024) and People United for Better Living in Calcutta v. State of West Bengal (24 September 1992), as reported; NGT, OA 258/2024 (compliance report of the District Magistrate, South 24 Parganas) and MA 03/2024/EZ in OA 06/2021/EZ (affidavits of the West Bengal State Coastal Zone Management Authority, March and December 2025); CAG, Report No. 2 of 2019 (Government of West Bengal), Implementation of Flood Control Measures, Chapter 6; Gupta, K. (2005), Waterlines 23(4); CPHEEO, appraisal note on drainage of Howrah city under JNNURM; KMC/ADB, Initial Environmental Examination, KEIIP Tranche 1, Sewerage and Drainage (2015), and Periodic Financing Request Report, Tranche 2 (2016); I&WD, Kolkata Metropolis Drainage and AILA pages (archived 1 May 2026); IMD, press release on extremely heavy rainfall over Kolkata (23 September 2025); IMD, report on Super Cyclonic Storm Amphan (14 June 2020); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Observed Rainfall Variability and Changes over West Bengal State (2020); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC, Flood Estimation Reports for Subzones 1(g), 2(a) and 1(f); INCOIS (2025), extreme sea levels (TR-04); PSMSL, relative sea-level trends (January 2026); Gole and Vaidyaraman, Salinity distribution and effect of fresh water flows in the Hooghly River (CWPRS, ICCE); Thakur et al. (2026), ISPRS Annals XI-3-2026; Ray, M., on Kolkata's missing water bodies (India Water Portal); government statement on DVC releases, 17–19 September 2024, and reports of the September 2025 Kolkata floods (press).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Supplements. The supplement follows the annexes. It applies the Manual to the Union Territory of the Andaman and Nicobar Islands, and states where its rules differ.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Ponds (Pukurs) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

Supplements

No. Title Status
S01 Andaman and Nicobar Islands (Union Territory) Not adopted by the Andaman and Nicobar Administration

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in West Bengal
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for West Bengal locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and land
7E.2Channels, drains and parts of the system
7E.3Floods, tides and statutory terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published
S1.1Modifications to the Manual for the Andaman and Nicobar Islands
S1.2Roles in the Union Territory
S1.3Annual maximum rainfall depths at Port Blair, 1969–2000 (mm)

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Kolkata's outfall chain: city drains to the tidal Kulti
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
A&N Andaman and Nicobar Islands
ADB Asian Development Bank
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
APWD Andaman Public Works Department
ARF Areal reduction factor
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CD Chart datum
CGWB Central Ground Water Board
CMPO Calcutta Metropolitan Planning Organisation
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ / CZMP Coastal Regulation Zone / Coastal Zone Management Plan
CSE Centre for Science and Environment
CWC Central Water Commission
CWPRS Central Water and Power Research Station
DDMA District Disaster Management Authority
DVC Damodar Valley Corporation
DWF Dry-weather flow (of a combined system)
EIA Environmental impact assessment
EKW / EKWMA East Kolkata Wetlands / East Kolkata Wetlands Management Authority
ESC Erosion and sediment control
ESL Extreme sea level
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL Full reservoir level
FTL / MWL Full tank level / maximum water level
GLOF Glacial lake outburst flood
HAT / MHWS Highest astronomical tide / mean high water springs
HFL High flood level
HGL Hydraulic grade line
HMC Howrah Municipal Corporation
HSG Hydrologic soil group
HTL High tide line
I&WD Irrigation and Waterways Department, West Bengal
ICRZ / IIMP Island Coastal Regulation Zone / Integrated Island Management Plan (Andaman and Nicobar Islands)
IDF Intensity–duration–frequency
IMD India Meteorological Department
INCOIS Indian National Centre for Ocean Information Services
IRC Indian Roads Congress
KEIIP Kolkata Environmental Improvement Investment Program (ADB-assisted)
KMC Kolkata Municipal Corporation
KMCBR Kolkata Municipal Corporation Building Rules, 2009
KMDA Kolkata Metropolitan Development Authority
KOD Kidderpore Old Datum
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
MSL Mean sea level
NCSCM National Centre for Sustainable Coastal Management
NDMA National Disaster Management Authority
NDZ No Development Zone (CRZ and ICRZ Notifications)
NGT National Green Tribunal
NHO National Hydrographic Office
NIH National Institute of Hydrology, Roorkee
NKDA New Town Kolkata Development Authority
PAT Regulation Andaman and Nicobar Islands (Protection of Aboriginal Tribes) Regulation, 1956
PSD Permissible site discharge
PSMSL Permanent Service for Mean Sea Level
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance
SoI Survey of India
SUH Synthetic unit hydrograph (CWC)
SVPMC Sri Vijaya Puram Municipal Council (formerly Port Blair Municipal Council)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
SWF Storm-water flow (of a combined system)
SWID State Water Investigation Directorate, West Bengal
T&CP Act West Bengal Town and Country (Planning and Development) Act, 1979
TCP Regulation Andaman and Nicobar Islands Town and Country Planning Regulation, 1994
UD&MA Urban Development and Municipal Affairs Department, West Bengal
ULB Urban local body (a Municipal Corporation, a Municipality or a Notified Area Authority)
UT Union Territory
UTM Universal Transverse Mercator
WBMBR West Bengal Municipal (Building) Rules, 2007
WBPCB West Bengal Pollution Control Board
WBSCZMA West Bengal State Coastal Zone Management Authority
WBSDMA West Bengal State Disaster Management Authority
WQv Water quality volume