About this draft
Status. This is Draft v1.0 of the West Bengal Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for West Bengal.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of West Bengal or by any of its departments, local bodies or agencies, including the Kolkata Municipal Corporation (KMC), the Kolkata Metropolitan Development Authority (KMDA), the New Town Kolkata Development Authority (NKDA) and the other Municipal Corporations, Municipalities and development authorities of the State. Where it names a body, such as the Urban Development and Municipal Affairs Department (UD&MA), the Irrigation and Waterways Department (I&WD), WBSDMA, the West Bengal State Coastal Zone Management Authority, the East Kolkata Wetlands Management Authority, KMC, KMDA, NKDA, a Municipality or the Damodar Valley Corporation, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.
Supplements. The Manual carries one supplement, for a place that lies outside the State's jurisdiction. Supplement S01 covers the Union Territory of the Andaman and Nicobar Islands, in the Bay of Bengal. The islands fall within the jurisdiction of the Calcutta High Court, whose Circuit Bench sits at Sri Vijaya Puram, and Bengali is widely spoken there. No West Bengal Act, rule or authority applies in the islands; the supplement works through the instruments of the Union Territory. It has not been adopted, notified or endorsed by the Andaman and Nicobar Administration or by any of its departments, local bodies, Tribal Councils or agencies. What this notice says of the Manual applies to the supplement.
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.
Names. Older sources and some IMD and tide-gauge stations keep the old names Calcutta (Kolkata), Burdwan (Bardhaman), Midnapore (Medinipur), Contai (Kanthi) and Saugor (Sagar); this Manual uses the present names and keeps the old ones where a source or a station uses them. In the islands, Port Blair was renamed Sri Vijaya Puram in 2024, Havelock Island is Swaraj Dweep and Neil Island is Shaheed Dweep; the IMD station and the 1999 building bye-laws keep the name Port Blair. Some abbreviations have more than one meaning:
- AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any Municipal Corporation, and names the Asansol Municipal Corporation in full;
- CD is chart datum; the community development blocks of the islands are written in full;
- SWD is a storm water drain, and SWF the storm-water flow of a combined system (Chapter 5); and
- KMC is the Kolkata Municipal Corporation, and KMCBR its Building Rules, 2009.
The sense is clear from the context. Bengali terms used in the text, such as pukur (pond), dighi (large tank), khal (canal), bheri (embanked fishery) and bandh (embankment), are explained where they first appear.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
West Bengal's cities and towns flood for three reasons. Kolkata showed the first on 23 September 2025, when its drains could not take a storm of the kind they were never designed for; the lower Damodar and Ghatal showed the second in September 2024, when dam releases and swollen rivers held the land under water; and the delta showed the third when Cyclones Aila and Amphan drove the sea over its embankments.
- Drains built for frequent storms, discharging against the tide. Kolkata drains away from its river. The city stands on the levee of the Hooghly and its land slopes east, so most of its storm water is pumped: the large Kolkata Municipal Corporation stations at Ballygunge (1,233 cusec) and Palmer Bazar (1,184 cusec) lift it into outfall channels that run about 27 km from Bantala to the Kultigang, a tidal arm of the Raimangal estuary, through the East Kolkata Wetlands. The core system is a combined one: the Kolkata Municipal Corporation Act, 1980 requires KMC to provide one outfall "for the effectual drainage and proper discharge of storm-water and sewage", and the pumping stations designed for KMC since 2015 still pump storm flow mixed with sewage to the canals. The system was sized for small storms. Kolkata's first brick sewer, commissioned in 1876, was designed to carry 6.35 mm of rain an hour, and an attempt in the 1970s to raise this to 12.7 mm/h is reported not to have succeeded. The drainage master plan of the metropolitan area was based on a storm that comes "once in two months (6 times in a year)", with 70% of the land impervious, and its intensity–frequency curve was adopted by KMDA and the local bodies. On the night of 22–23 September 2025 IMD's Alipore observatory recorded 251.4 mm in 24 hours, 185.6 mm of it in three hours and 98 mm in a single hour, fifteen times the design rate of the old sewers; a KMC gauge at Garia was reported to have recorded 332 mm. Kolkata went under water, and about ten people died, most of them by electrocution in flooded streets. A project report for the KMC pumping stations records that "discharge through the outfall is partially achieved due to high water levels in the canal, particularly during tidal period". Roofs, roads and paving now send more water to the drains, and faster.
- Rivers that rise from upstream. Much of south Bengal drains to rivers whose level is set by rain and dams far upstream. On 17 September 2024 the combined release from the Maithon and Panchet dams of the Damodar Valley Corporation, in Jharkhand, was stated to have peaked at 2.5 lakh cusec, about 7,080 m³/s; parts of Howrah, Hooghly, Paschim and Purba Medinipur, Bankura and Purulia flooded, and the Shilabati rose above its danger level at Ghatal, a low basin that drains slowly to the Rupnarayan and floods repeatedly. In July 2017 floods across the State affected 8.7 million people, killed 217 and caused damage of ₹17,727.94 crore, and the Comptroller and Auditor General (CAG) found that flood works had been "taken up at different locations depending on priority and availability of funds without being linked to a comprehensive plan". In the north, the Teesta flood of October 1968 and the outburst of South Lhonak lake in Sikkim on 4 October 2023, which left silt in the Teesta and in the Teesta–Mahananda link canal, show the same: a town drain is only as good as the river it empties into.
- The sea, the cyclones and sinking land. The Hooghly is tidal well above Kolkata, with a range of about 17 ft at its mouth; in the 1960s a tidal bore was reported on practically every spring tide. INCOIS puts the 100-year extreme sea level at Diamond Harbour at 3.79 m above mean sea level now, rising to 4.34–4.46 m by 2100. Cyclones bring the sea inland. Aila, on 25 May 2009, breached about 177 km of the 3,122 km of embankments that protect the Sundarbans and badly damaged another 601 km; Amphan, on 20 May 2020, brought "tidal waves of 15 feet height" into the 24 Parganas and Purba Medinipur, and 240 mm of rain at Alipore in 24 hours. Yaas (May 2021) and Remal (May 2024) followed. The land is also going down. Satellite measurements show parts of Kolkata subsiding by 2.8–5.5 mm a year, as fast as the sea is rising at Diamond Harbour (3.73 mm a year), and the two add: a gravity outfall built today loses both together.
Behind all three lies lost storage. Kolkata's ponds, the pukurs and dighis, and the wetlands to its east once held much of its rain. An estimate by the National Atlas and Thematic Mapping Organisation (NATMO) put the city's water bodies at about 8,700; a later satellite count found about 4,900. Salt Lake and New Town stand on reclaimed wetland. The Calcutta High Court froze reclamation of the East Kolkata Wetlands in 1992, and the wetlands were listed under the Ramsar Convention in 2002, but ponds are still filled across the city; KMC has filed hundreds of police complaints over it.
Design for West Bengal therefore has to cover more than the monsoon. Four of the last five damaging cyclones struck in late May, near spring tides, and the all-time daily record at Diamond Harbour (290.7 mm, 27 May 1993) is a May storm; Dum Dum's largest pre-monsoon day, 220 mm on 8 May 1949, came from a nor'wester. October and November bring cyclones and depressions as well.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the tide, the khal or the river is high, or when the pumps that serve it are running at full capacity.
The Manual also sets how public drains, roads, khals, pukurs, pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to West Bengal's south-west monsoon and the nor'westers and cyclones that bracket it; the very wet sub-Himalayan north, where Jalpaiguri receives about 3,700 mm a year, and the delta, where the State average is about 1,850 mm; the deltaic clays and high water table of the south, the laterite of the western plateau and the sandy terai of the north; the pukurs, the East Kolkata Wetlands and the Sundarbans; combined sewers and pumped, tide-locked outfalls; rivers regulated by dams; and the macro-tidal Hooghly estuary.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. The CWC Flood Estimation Reports for the three subzones that cover West Bengal, 1(g) Lower Ganga Plains, 2(a) North Brahmaputra and 1(f) Middle Ganga Plains, as the interim source, and frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for climate-change ratios.
- Tropical and coastal practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites, drainage reserves and coastal platform levels. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. The Kolkata Municipal Corporation Act, 1980 and the KMC Building Rules, 2009; the West Bengal Municipal (Building) Rules, 2007; the New Town Kolkata (Building) Rules, 2009, as amended in 2021; the West Bengal Town and Country (Planning and Development) Act, 1979; the West Bengal Inland Fisheries Act, 1984 (s.17A) and the East Kolkata Wetlands (Conservation and Management) Act, 2006; the Calcutta High Court's judgment of 1992 on the East Kolkata Wetlands; and the CRZ Notification 2019 as it will be applied in West Bengal through its Coastal Zone Management Plan. This Manual follows them or, where disclosed, makes them stricter.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in West Bengal can cite 1, 2, 5 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no curve for any West Bengal station. The reanalysis grids of NIH-DHAARA come close to the CWC values near Kolkata (50-year 24-hour depth 294 mm), but give two to three times the CWC values in the north and on the coast: 677 mm against about 320 mm at Siliguri, 790 mm against about 360–400 mm at Cooch Behar, and 631 mm against about 360 mm at Digha.
West Bengal has no drainage design standard of its own. Research for this Manual found no West Bengal design standard, State IDF relationship or circular of UD&MA or I&WD that fixes return periods or design rainfall for urban drains, and no published IDF relationship for Kolkata or any other city in the State. In particular:
- current practice designs for very frequent storms. The metropolitan drainage master plan used a storm that comes six times a year, and the old sewers of central Kolkata carry 6.35 mm/h. The project reports for KMC's sewerage and drainage works since 2015 state no design rainfall intensity or return period;
- core Kolkata is a combined system by law. KMC must provide one outfall for storm water and sewage (KMC Act, s.277), all public drains vest in KMC (s.280), and the Commissioner may, but need not, require a separate drain for rain water (s.292). New works keep the combined system, separating the dry-weather flow at the pumping stations and pumping the combined storm flow to the outfall canals. This Manual states how its rules apply where the receiving system is combined;
- the building rules do not require on-site detention or limit peak runoff. The KMC Building Rules, 2009 make rainwater harvesting part of the plan only "as per Environmental Impact Assessment Guideline", require a plinth of at least 60 cm, and allow a site to be raised by up to 600 mm in areas prone to waterlogging; the Commissioner may impose conditions where a building would put an additional burden on the drainage system, but no rule says what they should be. The West Bengal Municipal (Building) Rules, 2007 are reported to mandate rainwater harvesting, though the threshold could not be read for this Manual; the New Town rules, since 2021, require it for every new building;
- there are almost no setbacks in metres from khals, ponds or rivers. The KMC Building Rules reward keeping a pond, counting it in plot area and relaxing setbacks where water bodies and heritage buildings cover a quarter of the plot, but set no distance from a khal. The West Bengal Municipal (Building) Rules, 2007 limit the height and length of buildings within 15 m of a river bank, and bar the filling of ponds, canals, wetlands and drains without the State's approval, as reported; they do not keep the bank clear;
- pond protection depends on the West Bengal Inland Fisheries Act, 1984 (s.17A), whose size threshold of 5 cottah was removed in 2008, as reported, on restoration notices under s.53 of the West Bengal Town and Country (Planning and Development) Act, 1979, and on police complaints. In Anuradha Sen v. Kolkata Municipal Corporation (January 2024) the Calcutta High Court held that KMC must first establish that a site is a "water area" before acting;
- there are no flood lines and no floodplain zoning law. The CAG asked I&WD in 2019 to enact the Model Flood Plain Zoning Bill; no Act has followed; and
- West Bengal's Coastal Zone Management Plan under the CRZ Notification 2019 had not been approved by December 2025. Revised plans were sent for Purba Medinipur in September 2025 and North 24 Parganas in October 2025, and the plan for South 24 Parganas, which covers the Sundarbans, was promised for January 2026. The State has told the National Green Tribunal that the High Tide Line of 2011 "no longer exists" on its eroding coast, while the Ministry's committee asked that it be kept. Until a plan under the 2019 Notification is approved, this Manual uses the plans prepared under the CRZ Notification 2011.
So each region and each local body interprets the central manual its own way. KMC, the other Municipal Corporations, the Municipalities, KMDA, NKDA, the development authorities, I&WD, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A KMC drain can discharge into an I&WD canal designed to another standard, with no agreed level at which the canal is full or the tide shuts the outfall. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites (Chapter 4);
- a required tailwater and pumped-outfall check (Chapter 5); and
- basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a Municipality or a development authority can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines; MoHUA Model Building Bye-Laws (2016); Kolkata Municipal Corporation Act, 1980, ss.277, 280 and 292; KMC Building Rules, 2009, rr.2(27), 65A, 76, 105, 117 and 144; West Bengal Municipal (Building) Rules, 2007, r.8 (as reported); New Town Kolkata (Building) Rules, 2009, as amended by UD&MA notification No. 2282-T&CP/C-2/2C-17/2020 of 8 September 2021, r.28(4); West Bengal Inland Fisheries Act, 1984, s.17A, and its amendments of 1993 and 2008 (as reported); Calcutta High Court, Anuradha Sen v. Kolkata Municipal Corporation (9 January 2024) and People United for Better Living in Calcutta v. State of West Bengal (24 September 1992), as reported; NGT, OA 258/2024 (compliance report of the District Magistrate, South 24 Parganas) and MA 03/2024/EZ in OA 06/2021/EZ (affidavits of the West Bengal State Coastal Zone Management Authority, March and December 2025); CAG, Report No. 2 of 2019 (Government of West Bengal), Implementation of Flood Control Measures, Chapter 6; Gupta, K. (2005), Waterlines 23(4); CPHEEO, appraisal note on drainage of Howrah city under JNNURM; KMC/ADB, Initial Environmental Examination, KEIIP Tranche 1, Sewerage and Drainage (2015), and Periodic Financing Request Report, Tranche 2 (2016); I&WD, Kolkata Metropolis Drainage and AILA pages (archived 1 May 2026); IMD, press release on extremely heavy rainfall over Kolkata (23 September 2025); IMD, report on Super Cyclonic Storm Amphan (14 June 2020); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Observed Rainfall Variability and Changes over West Bengal State (2020); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC, Flood Estimation Reports for Subzones 1(g), 2(a) and 1(f); INCOIS (2025), extreme sea levels (TR-04); PSMSL, relative sea-level trends (January 2026); Gole and Vaidyaraman, Salinity distribution and effect of fresh water flows in the Hooghly River (CWPRS, ICCE); Thakur et al. (2026), ISPRS Annals XI-3-2026; Ray, M., on Kolkata's missing water bodies (India Water Portal); government statement on DVC releases, 17–19 September 2024, and reports of the September 2025 Kolkata floods (press).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Supplements. The supplement follows the annexes. It applies the Manual to the Union Territory of the Andaman and Nicobar Islands, and states where its rules differ.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
Supplements
| No. | Title | Status |
|---|---|---|
| S01 | Andaman and Nicobar Islands (Union Territory) | Not adopted by the Andaman and Nicobar Administration |
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| A&N | Andaman and Nicobar Islands |
| ADB | Asian Development Bank |
| AEP | Annual exceedance probability |
| AMC | Antecedent moisture condition |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APWA | American Public Works Association |
| APWD | Andaman Public Works Department |
| ARF | Areal reduction factor |
| BSMP | Basin Stormwater Master Plan |
| CAG | Comptroller and Auditor General of India |
| CD | Chart datum |
| CGWB | Central Ground Water Board |
| CMPO | Calcutta Metropolitan Planning Organisation |
| CN | Curve number (SCS/NRCS method) |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CRZ / CZMP | Coastal Regulation Zone / Coastal Zone Management Plan |
| CSE | Centre for Science and Environment |
| CWC | Central Water Commission |
| CWPRS | Central Water and Power Research Station |
| DDMA | District Disaster Management Authority |
| DVC | Damodar Valley Corporation |
| DWF | Dry-weather flow (of a combined system) |
| EIA | Environmental impact assessment |
| EKW / EKWMA | East Kolkata Wetlands / East Kolkata Wetlands Management Authority |
| ESC | Erosion and sediment control |
| ESL | Extreme sea level |
| FAR | Floor area ratio |
| FER | Flood Estimation Report (CWC) |
| FRL | Full reservoir level |
| FTL / MWL | Full tank level / maximum water level |
| GLOF | Glacial lake outburst flood |
| HAT / MHWS | Highest astronomical tide / mean high water springs |
| HFL | High flood level |
| HGL | Hydraulic grade line |
| HMC | Howrah Municipal Corporation |
| HSG | Hydrologic soil group |
| HTL | High tide line |
| I&WD | Irrigation and Waterways Department, West Bengal |
| ICRZ / IIMP | Island Coastal Regulation Zone / Integrated Island Management Plan (Andaman and Nicobar Islands) |
| IDF | Intensity–duration–frequency |
| IMD | India Meteorological Department |
| INCOIS | Indian National Centre for Ocean Information Services |
| IRC | Indian Roads Congress |
| KEIIP | Kolkata Environmental Improvement Investment Program (ADB-assisted) |
| KMC | Kolkata Municipal Corporation |
| KMCBR | Kolkata Municipal Corporation Building Rules, 2009 |
| KMDA | Kolkata Metropolitan Development Authority |
| KOD | Kidderpore Old Datum |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| MSL | Mean sea level |
| NCSCM | National Centre for Sustainable Coastal Management |
| NDMA | National Disaster Management Authority |
| NDZ | No Development Zone (CRZ and ICRZ Notifications) |
| NGT | National Green Tribunal |
| NHO | National Hydrographic Office |
| NIH | National Institute of Hydrology, Roorkee |
| NKDA | New Town Kolkata Development Authority |
| PAT Regulation | Andaman and Nicobar Islands (Protection of Aboriginal Tribes) Regulation, 1956 |
| PSD | Permissible site discharge |
| PSMSL | Permanent Service for Mean Sea Level |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SLA | Sea-level allowance |
| SoI | Survey of India |
| SUH | Synthetic unit hydrograph (CWC) |
| SVPMC | Sri Vijaya Puram Municipal Council (formerly Port Blair Municipal Council) |
| SW monsoon / JJAS | South-west monsoon, June–September |
| SWD | Storm water drain |
| SWF | Storm-water flow (of a combined system) |
| SWID | State Water Investigation Directorate, West Bengal |
| T&CP Act | West Bengal Town and Country (Planning and Development) Act, 1979 |
| TCP Regulation | Andaman and Nicobar Islands Town and Country Planning Regulation, 1994 |
| UD&MA | Urban Development and Municipal Affairs Department, West Bengal |
| ULB | Urban local body (a Municipal Corporation, a Municipality or a Notified Area Authority) |
| UT | Union Territory |
| UTM | Universal Transverse Mercator |
| WBMBR | West Bengal Municipal (Building) Rules, 2007 |
| WBPCB | West Bengal Pollution Control Board |
| WBSCZMA | West Bengal State Coastal Zone Management Authority |
| WBSDMA | West Bengal State Disaster Management Authority |
| WQv | Water quality volume |