Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in West Bengal. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration multi-day south-west monsoon storms of June–September and the cyclonic storms of May and October–November, as well as for short-duration intensities;
- (d) to design outfalls for tidal tailwater on the Hooghly, in the outfall channels that carry Kolkata's storm water east to the Kulti, and in the creeks of the Sundarbans and the Medinipur coast, and river tailwater raised by Damodar Valley Corporation (DVC) releases on the Damodar and by floods on the Teesta and the Mahananda, including the case where the outfall is closed;
- (e) to protect tanks (pukurs), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building rules for Kolkata and for the municipal areas of the State (the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For West Bengal, the top layer has a particular meaning: much of the State's flood storage sits in its pukurs and dighis, in the khals and outfall channels of Kolkata, in the East Kolkata Wetlands (a Ramsar site of 12,500 ha since 2002), in the mangroves and tidal creeks of the Sundarbans (a Ramsar site of 423,000 ha since 2019), and in the beels and floodplains of the rivers. The ponds and wetlands have the strongest protection: section 17A of the West Bengal Inland Fisheries Act, 1984 bars the filling of a water area, with no minimum size since an amendment of 2008 (as reported); rule 8 of the West Bengal Municipal (Building) Rules 2007 bars the filling of any canal, pond, wetland or drain without the prior approval of the State Government (as reported); and the East Kolkata Wetlands (Conservation and Management) Act, 2006, and the Calcutta High Court's judgment of 1992 before it, restrict any change in the character of the wetlands (as reported). The khals and floodplains have no comparable protection: West Bengal has no flood lines and no flood plain zoning law (CAG, 2019). Losing that storage cannot be offset economically by pipes and pumps.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of West Bengal through:
- (a) an amendment to the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. West Bengal has no single building code. Kolkata has the KMC Building Rules 2009, in force from 15 September 2009 under the KMC Act 1980; the municipal areas, notified areas and industrial townships have the West Bengal Municipal (Building) Rules 2007 (Notification No. 67/MA/O/C-4/3R-8/2002 of 14 February 2007, amended by No. 446-MA of 22 June 2018, as reported), with a separate chapter for Salt Lake in Bidhannagar; and New Town has the New Town Kolkata (Building) Rules 2009 under the New Town Kolkata Development Authority Act, 2007, last amended by UD&MA Notification No. 2282-T&CP/C-2/2C-17/2020 of 8 September 2021. The building rules of the other Municipal Corporations were not read for this Manual [TBC]. The KMC copy read appears to include later amendments, whose notification numbers were not seen. None of these instruments sets a design storm, return period, runoff coefficient, release rate or detention volume. The KMC rules make rainwater harvesting part of the plan only "as per" the Environmental Impact Assessment guideline (rule 144), keep the plinth at least 60 cm (rule 105), allow a site in a waterlogging-prone area to be raised by up to 600 mm (rule 76(i)), require basements to keep out surface drainage (rule 118(6)(b)), and reward keeping a pond: water bodies count in the plot area for FAR, and setbacks, height and internal roads are relaxed where a water body or heritage building covers at least 25% of the plot (rules 2(27), 65A, 74(4) and 81(9)). They have no setback from a khal. Their one opening for a runoff condition is the Commissioner's power to sanction, "subject to such restrictions or conditions … as he may deem fit", a building that "will put additional burden on the existing … sewerage and drainage system". An amendment of the KMC rules and of the 2007 Rules by UD&MA, which makes both, is the natural route for a statewide condition of approval, which is why Clause 1.3.1(a) names them. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Municipal Commissioner of KMC under the KMC Building Rules 2009 in Kolkata; NKDA under the New Town Kolkata (Building) Rules 2009 in New Town; elsewhere in urban areas, the Municipality or Municipal Corporation concerned, under the West Bengal Municipal (Building) Rules 2007 or the building rules that apply to that Corporation; or a development authority under the West Bengal Town and Country (Planning and Development) Act, 1979 (such as KMDA, SJDA or ADDA) where it grants permission in its planning area, or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of the drainage pumping stations and outfalls of low-lying Kolkata and of the canals and outfall channels that carry its storm water to the Kulti, low-lying Howrah, the lower Damodar, Mundeswari, Rupnarayan and Shilabati below the DVC dams including the Ghatal basin, the embanked islands of the Sundarbans, and Siliguri on the Mahananda and the Teesta towns below the Gajoldoba barrage, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (pukur), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Kolkata Gazette. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within West Bengal, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply as set by rule 144(1) of the KMC Building Rules 2009 in Kolkata (rooftop rainwater harvesting, for direct use or recharge, in the plan of a new or expanded building or housing complex "as per" the Environmental Impact Assessment guideline of the State or Union government), by rule 28(4) of the New Town Kolkata (Building) Rules 2009, as amended in 2021, in New Town (every new building or housing complex, and every expansion), and by the West Bengal Municipal (Building) Rules 2007 in the municipal areas (whose threshold was not read for this Manual [TBC]), as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical West Bengal plots are small and the cumulative effect of many small plots is what fills Kolkata's drains. For small buildings, the KMC Building Rules 2009 set the plinth at not less than 60 cm and so located with respect to the crest of the road that "adequate drainage of the site is assured" (rule 105), and allow the whole site to be raised by up to 600 mm in an area prone to waterlogging, with the Commissioner's permission (rule 76(i)); the West Bengal Municipal (Building) Rules 2007 set the same 60 cm plinth (rule 57(1), as reported).
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) the Kolkata Municipal Corporation (KMC);
- (b) every Approving Authority within the Kolkata Metropolitan Area (KMA), for which KMDA is the development authority, or within the planning area of the Siliguri Jalpaiguri Development Authority (SJDA) or the Asansol Durgapur Development Authority (ADDA), as those areas are notified from time to time, including the Howrah and Bidhannagar Municipal Corporations, NKDA in New Town, the Siliguri, Asansol and Durgapur Municipal Corporations, KMDA, SJDA and ADDA where they are the Approving Authority, and the Municipalities in those areas; and
- (c) every other Municipal Corporation constituted under any Act of the State, as constituted from time to time.
1.6.2 Tier B authorities. All other Municipalities and Notified Area Authorities are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with UD&MA regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Kolkata Metropolitan Area (KMA) or the planning area of the Siliguri Jalpaiguri or Asansol Durgapur Development Authority (SJDA, ADDA), or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Kolkata Municipal Corporation, with its own Sewerage and Drainage Department and drainage pumping stations, and a small Municipality with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Kolkata.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| RWH mandates (KMC Building Rules 2009, rule 144; New Town Kolkata (Building) Rules 2009, rule 28(4); West Bengal Municipal (Building) Rules 2007) | Continue unchanged. In Kolkata, rooftop rainwater harvesting is part of the plan of a new or expanded building or housing complex "as per" the State or Union EIA guideline, and tree cover of at least 15% of the land is required on projects of 6,000 m² of floor area or more (rule 144); in New Town it is required in every new building or housing complex and every expansion, with a 15% fee rebate for retrofits (rule 28(4), 2021); the 2007 Rules also require it, but their rule number and threshold were not read for this Manual [TBC]. None gives a storage volume per m² or an outlet rule. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge pits may count toward retention where they meet Chapters 4 and 8. |
| Plinth, site level, roof drainage and basements (KMC Building Rules 2009, rules 76(i), 105, 117 and 118; West Bengal Municipal (Building) Rules 2007, rules 57 and 59) | Continue. The plinth of at least 60 cm and the floor level of Clause 1.5.4(b) both apply; the higher governs. Raising a site by up to 600 mm in a waterlogging-prone area (rule 76(i)) is fill, and is assessed for its effect on storage and flow paths under Chapters 4 and 6. Where the Commissioner requires rain-water pipes to connect to a drain or sewer (rule 117(2)), the connection is made under Chapters 4 and 6, after the retention and detention of Chapter 4. Basements keep out surface drainage and are pumped (rule 118(6)(b)); their pumping is not counted as outlet capacity. |
| Drainage-capacity condition (KMC Building Rules 2009, procedure for sanction) | Continues. Where the Commissioner considers that a building "will put additional burden on the existing … sewerage and drainage system", sanction may be subject to conditions; Chapters 4 and 5 give the technical content of such a condition and apply to every development above the thresholds of Clause 1.5.2 whether or not it is invoked. |
| Kolkata Municipal Corporation Act, 1980 (West Bengal Act LIX of 1980), ss.277, 280, 292, 293, 296 and 400; West Bengal Municipal Act, 1993 | Drains vest in KMC (s.280), which must provide a safe and sufficient outfall for storm water and sewage together without flooding Kolkata or the country round the outfall (s.277). No premises may be built or occupied without a drain to the Commissioner's specification (s.293), and blocks within 30 m of a municipal drain may be drained in combination (s.296). The Commissioner may require separate drains for rain water and for sewage (s.292); this Manual's rules for sites that discharge to a combined sewer are in Chapters 5, 6 and 8. Section 400(1) notices are used against unauthorised work, including pond filling. The sections were read from a scanned copy, and quotations are as reconstructed. The drainage sections of the West Bengal Municipal Act, 1993 were not reviewed for this Manual [TBC]. |
| Water bodies and rivers in the municipal areas (West Bengal Municipal (Building) Rules 2007, rule 8) | No canal, pond, water body, wetland, rivulet, jhora, spring, stream, drain or culvert may be filled except for reasons recorded in writing and with the prior approval of the State Government; within 15 m of a river bank, buildings are limited to 5.00 m in height, 20 m in length and 200 m² in covered area, with clear gaps of 15–30 m between them according to the width of the river (as reported). These limits are not a setback: building is not barred within 15 m of the bank. The setback of Chapter 7 (Clause 7.4.7) applies its no-fill zone to all development and is wider where the hydraulic corridor or the mapped 1% AEP extent requires; it is stricter than the statute and is set by this Manual. |
| West Bengal Town and Country (Planning and Development) Act, 1979 (West Bengal Act XIII of 1979) | Development authorities such as KMDA, SJDA and ADDA prepare land-use and development plans and grant permission in their areas; section 53 restoration notices, followed by police complaints, are KMC's working tool against the filling of ponds (as filed before the National Green Tribunal). Flood-sensitive catchments, drainage corridors and regional facility sites should be shown in the plans. This Manual does not decide zoning. The Act was read only in extracts [TBC]. |
| Ponds: West Bengal Inland Fisheries Act, 1984, s.17A | No person may fill a water area, or depressed land that holds water for six months of the year, to convert it to solid land, or put it to a non-fishery use, without the permission of the Fisheries Department; restoration is at the owner's cost, and the offence carries up to two years' imprisonment, a fine of up to ₹2 lakh, or both. The 1993 threshold of 5 cottahs (0.035 ha) was omitted by the amendment of 2008 (as reported). The Calcutta High Court has held that the authority must first establish that the site is a "water area" (Anuradha Sen v. Kolkata Municipal Corporation, 9 January 2024, as reported). Works under this Manual that drain to a pukur shall meet the water-quality rules of Chapter 8, and no work shall reduce its area or storage (Chapter 7). |
| East Kolkata Wetlands (Conservation and Management) Act, 2006 (West Bengal Act VII of 2006) | The wetlands (the Ramsar site of 12,500 ha) must keep their area and character; a change of use needs EKWMA's sanction and may be only for the improvement or upkeep of the local environment, and a water body filled must be replaced by one of no less area within the wetlands (ss.9 and 10, as reported). Kolkata's outfall channels pass through the wetlands to the Kulti. Works under this Manual that drain into or through them need EKWMA's consent, and no work shall reduce their storage. |
| West Bengal Ground Water Resources (Management, Control and Regulation) Act, 2005 (West Bengal Act XVIII of 2005) | New wells need a permit from the authorities under the Act, administered by SWID (as reported). No recharge or RWH obligation in the Act was found. Recharge wells and deep infiltration under Chapters 4 and 8 are subject to its permits and to the arsenic and salinity limits of Chapter 8. |
| Flood-prone land | West Bengal has no flood plain zoning law and no flood lines: the CAG recommended that I&WD adopt the model flood plain zoning Bill and found flood works "taken up at different locations … without being linked to a comprehensive plan" (CAG Report No. 2 of 2019). This Manual does not create flood lines. Where the 1% AEP extent of Chapter 7 is mapped, it governs the setback; where a plan zone is wider, the zone governs (Clause 1.3.3). |
| Wetlands (Conservation and Management) Rules, 2017 | Apply to notified wetlands and the Ramsar sites (the East Kolkata Wetlands, Ramsar site from 19 August 2002, 12,500 ha; and the Sunderbans Wetland, from 30 January 2019, 423,000 ha). Where their restrictions are wider than the setback of Chapter 7, they govern (Clause 1.3.3). A State Wetland Authority is reported to be active before the National Green Tribunal; its notification was not read [TBC]. |
| CRZ Notification 2019, through the Coastal Zone Management Plan in force | The State's plan under CRZ 2019 had not been approved by December 2025: the draft went to the Union Ministry on 4 October 2024, revised plans for Purba Medinipur and North 24 Parganas were sent on 10 September and 29 October 2025, and the South 24 Parganas plan was promised for January 2026, with the 2011 High Tide Line still in dispute on an eroding coast (WBCZMA affidavits before the National Green Tribunal). Until it is approved, the plans prepared under CRZ 2011 apply [TBC]. WBCZMA recommends CRZ clearance for outfalls, drains, sluices and pumping stations in the CRZ. CRZ categories and lines are taken from the approved maps, and govern where wider than Chapter 7 (Clause 1.3.3). |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in West Bengal is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon depression or a May or October–November cyclone arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Kolkata is spending heavily on drainage. The Kolkata Environmental Improvement Investment Program (KEIIP), financed by ADB from 2013, built sewer-drains, pumping stations and pumping mains and a flood early-warning system, and its unfinished works passed in 2025 to the ADB-financed KMC Sustainability, Hygiene and Resilience project, which plans some 84 km of combined trunk and secondary sewers (ADB, 2016; as reported). These works are combined: each pumping station separates the dry-weather flow, but in a storm the storm-water flow, "mixed with sewage", is pumped to the outfall canals (KMC, 2015). That is the system the law describes. The KMC Act 1980 makes the Corporation provide "a safe and sufficient outfall … for the effectual drainage and proper discharge of storm-water and sewage" without flooding the city or the country round the outfall (s.277(1)), vests every public drain in the Corporation (s.280), and lets the Commissioner require "an entirely distinct drain for rain water and unpolluted sub-soil water" (s.292), a power and not a duty (as read from a scanned copy). Where a site discharges to a combined sewer, the requirements of this Manual apply as Chapters 5 and 6 set out. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
West Bengal's law already holds many of the tools. The KMC plan sanction asks whether the site is a "filled up tank or part tank" and requires the house drains and the "means of communication with any municipal drain" to be shown; KMC enforces against pond filling through notices under section 53 of the West Bengal Town and Country (Planning and Development) Act, 1979 and section 400(1) of the KMC Act, followed by police complaints (as filed before the National Green Tribunal); and the Calcutta High Court has held that KMC must first establish that a site is a "water area" before it acts under section 17A of the Inland Fisheries Act (Anuradha Sen v. Kolkata Municipal Corporation, 9 January 2024, as reported). Storm water from Kolkata, Bidhannagar and New Town also reaches the outfall through canals of I&WD; an outfall to such a canal is designed for the canal's own water level, as for a river (Clause 5.8), and needs the consent of I&WD. None of these instruments says how high a flood reaches or how much storage a filled pond removes; this Manual supplies that technical test.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Urban Development and Municipal Affairs Department (UD&MA) | Would own the Manual. Makes the building rules for Kolkata, for the municipal areas and for New Town, and would issue their amendment (Clause 1.3.1(a)). Would constitute and service the State Stormwater Technical Committee. Oversees KMDA and the other development authorities under the West Bengal Town and Country (Planning and Development) Act, 1979, whose land-use plans should show flood-sensitive catchments, drainage corridors and regional facility sites. Technical support to Tier B authorities, including through the Municipal Engineering Directorate. Maintains the empanelled reviewer list (Clause 10.7). |
| State Stormwater Technical Committee (Clause 1.3.2) | Adopts higher standards. Issues Annexes, tables and the compliance calculator. Concurs with Tier A alternatives. Decides variances referred to it. Reviews the Manual (Clause 1.12). |
| Kolkata Municipal Corporation (KMC) | Approving Authority under the KMC Building Rules 2009 in Kolkata. Owner of the public drains and sewage disposal works vested in it (KMC Act, s.280), with the duty to provide a safe and sufficient outfall for storm water and sewage (s.277); runs the combined sewer-drains and the drainage pumping stations through its Sewerage and Drainage Department, and protects ponds through its Environment and Heritage and Building Departments. Would apply this Manual to its own works, including those of KEIIP's successor projects, and decide where separate rain-water drains are required (s.292). Inspects and enforces (Clauses 10.12–10.15). |
| Kolkata Metropolitan Development Authority (KMDA) | Development authority for the Kolkata Metropolitan Area under the 1979 Act. Its land-use notifications bar a change in the use of land, including ponds, without permission (as cited in KMC's notices). Should reserve drainage corridors and regional facility sites in its plans; applies this Manual to the drains and canals it builds. Member of EKWMA. |
| Howrah Municipal Corporation and Bidhannagar Municipal Corporation | Approving Authorities in their areas (Bidhannagar under the Salt Lake chapter of the 2007 Rules; Howrah under the rules that apply to it [TBC]). Owners of the municipal drains and pumping in their areas. Would provide outfall levels and pump operating rules for tailwater (Chapter 5). Receive handed-over assets (Clause 10.14). Inspect and enforce (Clauses 10.12–10.15). |
| New Town Kolkata Development Authority (NKDA) and West Bengal Housing Infrastructure Development Corporation (WBHIDCO) | NKDA is the Approving Authority in New Town under the New Town Kolkata (Building) Rules 2009, and would apply this Manual to its drains. WBHIDCO develops New Town and its infrastructure, and would apply this Manual to its works and hand drains over to NKDA (Clause 10.14). |
| Siliguri Jalpaiguri Development Authority (SJDA) and Siliguri Municipal Corporation | SJDA plans its area; Siliguri Municipal Corporation approves buildings and owns the drains within the city, for which it sought a drainage master plan covering all 47 wards in 2022 (as reported). Their roles were not researched further for this Manual [TBC]. |
| Asansol Durgapur Development Authority (ADDA) and Asansol Municipal Corporation | ADDA plans its area; Asansol Municipal Corporation approves buildings and owns the drains within the city. Their roles were not researched for this Manual [TBC]. |
| Municipalities and Notified Area Authorities | Approving Authorities under the West Bengal Municipal (Building) Rules 2007, through the Board of Councillors (as reported). Owners of the public drains vested in them. Inspect and enforce (Clauses 10.12–10.15). |
| Irrigation and Waterways Department (I&WD) | Rivers, embankments (about 3,122 km in the Sundarbans), sluices, the outfall channels and canals of the Kolkata area and the pumping at Kulti and on the I&WD channels; flood schemes such as the Ghatal Master Plan. Provides design water levels and tailwater (Chapters 5 and 7). Consents to outfalls into its canals and drainage works. Holds rain-gauge and river-gauge records (Annex 2A). |
| Damodar Valley Corporation (DVC) | A statutory body of the Union, not of the State. Operates the dams at Maithon and Panchet, whose releases set the tailwater on the lower Damodar, the Mundeswari and the Rupnarayan. Would be asked for release scenarios for Chapter 5; this Manual places no duty on it. |
| West Bengal State Disaster Management Authority (WBSDMA), the Department of Disaster Management and Civil Defence and the District Disaster Management Authorities | Hazard and flood mapping. Notify or recommend flood-sensitive catchments. Pre-monsoon preparedness. Lead the post-event review (Clause 10.16), using their flood records. |
| State Water Investigation Directorate (SWID) | Administers the West Bengal Ground Water Resources (Management, Control and Regulation) Act, 2005. Advises on groundwater levels, recharge, infiltration, arsenic and coastal salinity (Chapters 3, 4 and 8). |
| West Bengal Pollution Control Board (WBPCB) | Consents to establish and operate for local-authority drainage and sewerage works. Regulates discharges of sewage into canals, rivers and storm drains. Supports the removal of sewage connections to storm drains and the treatment of combined flows (Chapter 8). |
| Syama Prasad Mookerjee Port, Kolkata | A major port of the Union. Holds land and docks on the Hooghly front; the Hooghly tide tables are published for the port (as reported). Would be consulted where an outfall, river-front work or tide gate lies within port limits; its role at urban outfalls was not researched for this Manual [TBC]. |
| West Bengal State Coastal Zone Management Authority (WBCZMA) | Recommends CRZ clearance for outfalls, drains, sluices and pumping stations in the CRZ of Purba Medinipur and the two 24 Parganas. Advises on CRZ categories and the HTL from the Coastal Zone Management Plan in force. |
| East Kolkata Wetlands Management Authority (EKWMA) | Manages the East Kolkata Wetlands under the 2006 Act. Its sanction is needed for any change of use in the wetlands. Consulted on any outfall or channel work that passes through them (Chapters 5 and 7). |
| Land and Land Reforms Department, the Fisheries Department and the District Magistrates | Maintain the land records of ponds, khals and government land used for setbacks and storage, which are the starting point for the waterbody inventory of Chapter 7. The Fisheries Department grants the permission needed under section 17A of the Inland Fisheries Act before a water area is filled or converted. |
Commentary. Ownership of West Bengal's drainage is split. Inside Kolkata the drains vest in KMC, but the outfall channels and canals that carry the city's storm water to the Kulti, and the pumps at their tail, belong to I&WD, and the exact boundary between the two on the khals was not found in research for this Manual. The channels pass through the East Kolkata Wetlands, which EKWMA manages. On the lower Damodar the river that receives the drains is set by the releases of DVC, a Union body, from dams in Jharkhand, and in September 2024 the State publicly disputed those releases (as reported). Sundarbans towns drain through sluices in embankments maintained by I&WD. Recent reports indicate a change of State government after the 2026 Assembly election; this Manual names departments and authorities as the statutes and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. A site that drains to the Hooghly or to the outfall channels east of Kolkata through a lock gate or sluice, as at Chitpur and Dhapa, or to a Sundarbans creek through a sluice in an embankment, does not discharge to a tidal reach for this clause, because the gate is closed whenever the water outside is higher than the water behind it; nor does a site whose drainage reaches the outfall only by pumping.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Kolkata a count from satellite imagery found about 4,889 ponds where an earlier NATMO survey had found some 8,731, a loss of about 44% (as reported), although section 17A of the West Bengal Inland Fisheries Act, 1984 has barred the filling of water areas since 1994.
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Urban Development and Municipal Affairs Department, Government of West Bengal (2009). Kolkata Municipal Corporation Building Rules, 2009, The Kolkata Gazette, Extraordinary, 9 Sep 2009 (KMC-hosted copy, apparently with later amendments; notification number not seen), rules 2(27), 65A, 74(4), 76, 81(9), 105, 117, 118, 144 and 145. https://www.kmcgov.in/KMCPortal/downloads/Building_%20Rules2009.pdf ; consolidated copy: https://www.kmcgov.in/KMCPortal/downloads/KMC_Building_Rule.pdf
- West Bengal Municipal (Building) Rules, 2007, Notification No. 67/MA/O/C-4/3R-8/2002 of 14 Feb 2007, as amended by No. 446-MA of 22 Jun 2018 (rules 8, 57 and 59 read in a legal-database text; salient features on the Department of Municipal Affairs page). https://www.legitquest.com/act/west-bengal-municipal-building-rules-2007/CE73 ; https://sudawb.org/wbdma_oldversion_old/HTM/MUNI_Legislation_WB_BuildingRules_2007.htm
- Urban Development and Municipal Affairs Department (2021). New Town Kolkata (Building) Rules, 2009, amendment, Notification No. 2282-T&CP/C-2/2C-17/2020 of 8 Sep 2021, Kolkata Gazette Extraordinary. https://nkdamar.org/storage/files/sar-365-urban-devp-municipal-departmentnkda-no-2282-tcp_1.pdf
- Kolkata Municipal Corporation Act, 1980 (West Bengal Act LIX of 1980), ss.277–296 and 400, PRS compilation with amendments to 2023 (scanned). https://prsindia.org/files/bills_acts/acts_states/west-bengal/1980/ActNo.59of1980WB.pdf
- West Bengal Inland Fisheries Act, 1984, s.17A, as inserted by West Bengal Act XIX of 1993 and amended by the West Bengal Inland Fisheries (Amendment) Act, 2008 (read in extracts). https://wbxpress.com/west-bengal-inland-fisheries-amendment-act-1993/
- East Kolkata Wetlands (Conservation and Management) Act, 2006 (West Bengal Act VII of 2006) (read in a third-party text). https://wbxpress.com/east-kolkata-wetlands-conservation-management-act-2006/
- West Bengal Ground Water Resources (Management, Control and Regulation) Act, 2005 (West Bengal Act XVIII of 2005) (seen only in summaries). https://wbxpress.com/west-bengal-ground-water-resources-management-control-regulation-act-2005/
- National Green Tribunal (Principal Bench). Banibrata Mukherjee v. State of West Bengal, MA 122/2024 in OA 258/2024, compliance report of the District Magistrate, South 24 Parganas, with KMC action-taken reports and notices under s.53 of the West Bengal Town and Country (Planning and Development) Act, 1979 and s.400(1) of the KMC Act. https://www.greentribunal.gov.in/sites/default/files/news_updates/Compliance%20Report%20by%20DISTRICT%20MAGISTRATE%20%26%20COLLECTOR%2C%20SOUTH%2024%20PARGANAS%20DISTRICT%20in%20MA%20NO%20122%20of%202024%20IN%20OA%20NO%20258%20of%202024%20(Banibrata%20Mukherjee%20Vs.%20State%20of%20WB).pdf
- National Green Tribunal (Eastern Zone). Subhas Datta v. State of West Bengal, MA 03/2024/EZ in OA 06/2021/EZ: WBCZMA affidavit of 20–21 Mar 2025 and status report of 5 Dec 2025. https://www.greentribunal.gov.in/sites/default/files/news_updates/Affidavit%20by%20WBCZMA%20in%20OA%2006-2021-EZ_Pg-122-127.pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/1765166729_pagenumber.pdf
- Calcutta High Court. Anuradha Sen v. Kolkata Municipal Corporation, 2024 SCC OnLine Cal 185, order of 9 Jan 2024 (secondary report). https://www.scconline.com/blog/post/2024/01/12/calcutta-high-court-quashes-kmcs-action-under-section-17a-of-west-bengal-inland-fisheries-act-scc-blog/
- Calcutta High Court. People United for Better Living in Calcutta v. State of West Bengal, AIR 1993 Cal 215, decided 24 Sep 1992 (seen only in summaries).
- Comptroller and Auditor General of India (2019). Report No. 2 of 2019, Government of West Bengal, Performance Audit of Implementation of Flood Control Measures in West Bengal, Chapter 6. https://cag.gov.in/webroot/uploads/download_audit_report/2019/7.%20Chapter%206-0624302347a92f2.77846330.pdf
- Ministry of Environment, Forest and Climate Change (2019). Coastal Regulation Zone Notification, G.S.R. 37(E), 18 Jan 2019. https://czmp.ncscm.res.in/2019-notification.pdf
- Ministry of Environment, Forest and Climate Change (2024). 80 Ramsar Sites of India, 31 Jan 2024. https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- Irrigation and Waterways Department, Government of West Bengal. Kolkata Metropolis Drainage; AILA (web pages, Wayback Machine captures of 1 May 2026). https://web.archive.org/web/20260501071330/https://wbiwd.gov.in/index.php/applications/kolkata_drainage ; https://web.archive.org/web/20260501071547/https://wbiwd.gov.in/index.php/applications/aila
- Kolkata Municipal Corporation for ADB (2015). Initial Environmental Examination, KEIIP Tranche 1, Sewerage and Drainage, updated and revised final report, Oct 2015. https://ewsdata.rightsindevelopment.org/files/documents/23/ADB-42266-023_TfN9hJv.pdf
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- Gupta, K. (2005). The drainage systems of India's cities. Waterlines 23(4), 22–24. https://web.archive.org/web/20241111031826/https://www.ircwash.org/sites/default/files/Gupta-2005-Drainage.pdf
- MoHUA / CPHEEO. Appraisal Note for Consideration of Projects under JNNURM (Storm Water Drainage): Improvement of drainage in Howrah city and its vicinity, No. Q-12045/28/10/NURM/2006-CPHEEO. https://sudawb.org/wbdma_oldversion_old/PDF/URBAN_GROVER/Improvement%20of%20drainage%20in%20Howrah%20city%20and%20its%20vici.pdf
- India Meteorological Department (2025). Press release: Extremely heavy rainfall over Kolkata, 23 Sep 2025. https://internal.imd.gov.in/press_release/20250923_pr_4321.pdf
- India Meteorological Department (2020). Super Cyclonic Storm "AMPHAN" over the southeast Bay of Bengal (16th–21st May, 2020): A Report, 14 Jun 2020. https://internal.imd.gov.in/press_release/20200614_pr_840.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Down To Earth (2025). Unexpected interaction of atmospheric conditions, not cloudburst, caused Kolkata's intense rainfall, Sep 2025 (secondary source). https://www.downtoearth.org.in/climate-change/unexpected-interaction-of-atmospheric-conditions-not-cloudburst-caused-kolkatas-intense-180mm-rainfall-in-3-hours-says-imd
- Press reports of the DVC releases of 16–19 Sep 2024, citing a Government of India statement (ThePrint, Devdiscourse; secondary sources).
- Press reports of the South Lhonak glacial lake outburst of 4 Oct 2023 and its effects on the Teesta in North Bengal (secondary sources).
- India Water Portal. The curious case of Kolkata's missing water bodies (secondary source). https://www.indiawaterportal.org/agriculture/farm/curious-case-kolkatas-missing-water-bodies
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Asian Development Bank (2016). Periodic Financing Request Report, Kolkata Environmental Improvement Investment Program, Tranche 2 (Project 42266-025), Aug 2016. https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42266-025_dnsshKo.pdf
- Asian Development Bank (2025). ADB approves $200 million loan to expand urban services in Kolkata, India (news release, Feb 2025; secondary for project details). https://www.adb.org/news/adb-approves-200-million-loan-expand-urban-services-kolkata-india
- The Telegraph (2022). Siliguri sewerage plan: Siliguri Municipal Corporation seeks experts for a drainage master plan (secondary source). https://obeta.ttef.in/west-bengal/siliguri-sewerage-plan/cid/1862912
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Kolkata Metropolitan Area and of the Siliguri Jalpaiguri and Asansol Durgapur planning areas |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model KMCBR/WBMBR amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. West Bengal's floods come from four mechanisms, often together. The first is the short, intense storm on a city whose drains were never built for it. Kolkata's first brick sewer, commissioned in 1876, was designed for 6.35 mm of rain an hour with full runoff, and an attempt in the 1970s to raise the capacity to 12.7 mm an hour was not achieved (Gupta, 2005); the later metropolitan drainage master plan was based on a storm of "once in two months" with 70% imperviousness (CPHEEO). On 22–23 September 2025 the IMD gauge at Alipore recorded 251.4 mm in 24 hours, 185.6 mm of it in three hours and 98 mm in the peak hour (IMD, 2025), and some ten people died, most of them by electrocution in flooded streets (as reported). The second is the long monsoon depression: on 26–29 September 1978, 369.6 mm fell at Alipore in a day, 409.3 mm at Uluberia, 400.0 mm at Suri and 387.7 mm at Durgapur (IMD). The third is the river below a dam. In September 2024 the combined release from the DVC dams at Maithon and Panchet peaked at about 2.5 lakh cusecs (about 7,080 m³/s), and Howrah, Hooghly, the two Medinipurs, Bankura and Purulia were flooded, with the Shilabati above danger level at Ghatal (as reported); in July 2017 floods across the State affected 8.7 million people, killed 217 and caused damage of ₹17,727.94 crore (CAG, 2019, citing CWC). In the north, the Teesta flooded in October 1968, when Kalimpong recorded 419.2 mm and Bagdogra 345.2 mm in a day (IMD), and again after the South Lhonak glacial lake burst on 4 October 2023 and sent silt down the Teesta and into the Teesta–Mahananda link canal (as reported). The fourth is the cyclone on a macro-tidal coast: Aila on 25 May 2009 breached about 177 km of the Sundarbans embankments and badly damaged a further 601 km (I&WD), and Amphan on 20 May 2020 brought 24 cm of rain to Alipore in a day and tidal waves of 15 ft to the 24 Parganas and Purba Medinipur (IMD, 2020); Yaas (2021) and Remal (2024) also struck in late May.
Lost storage makes all four worse. Kolkata drains east, away from the Hooghly, through outfall channels that pass the East Kolkata Wetlands to the Kulti, and most of its storm water has to be pumped (I&WD). Its ponds are its de facto detention, and they are being filled: a satellite count found about 4,889 where an earlier survey had found some 8,731 (as reported). The CAG found that flood works in the State were "taken up at different locations depending on priority and availability of funds without being linked to a comprehensive plan", and asked I&WD to adopt the model flood plain zoning Bill (CAG, 2019). No city in the State has published a stormwater design storm in research for this Manual. Objectives (b) to (e) address the storage and tailwater failures, which a drain-sizing manual alone cannot fix.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.