Chapter 7Waterbodies, Ponds (Pukurs) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (pukur) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, including the East Kolkata Wetlands and their bheris, the Sundarbans Wetland with its tidal creeks (khanris) and mangroves, the Hooghly estuary, the bils and baors of the Gangetic floodplain, and the pukurs, dighis and jhils of Kolkata and other towns;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the West Bengal Inland Fisheries Act, 1984 (section 17A), the West Bengal Town and Country (Planning and Development) Act, 1979, the Kolkata Municipal Corporation Act, 1980, the West Bengal Municipal (Building) Rules, 2007 (rule 8), the East Kolkata Wetlands (Conservation and Management) Act, 2006, the Coastal Regulation Zone Notification as applied through the CZMP in force, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. No West Bengal Act for the protection of tanks or lakes as such was found during research for this Manual. Ponds are protected instead by fisheries law, planning law, municipal law and the courts. Section 17A of the West Bengal Inland Fisheries Act, 1984 (Chapter IIIA, inserted in 1993 and operative from 16 June 1994) bars the use of a "water area", or of depressed land that holds water for at least six months in a year, for any purpose other than fishery, and bars its filling "with a view to converting the same to solid land"; filling for a development scheme needs the prior approval of the Fisheries Department, the owner may be made to restore the area at his own cost, and the offence carries up to two years' imprisonment, a fine of up to ₹2 lakh, or both. The 1993 text applied only to areas of 5 cottahs (0.035 ha) or more; those words were omitted by the West Bengal Inland Fisheries (Amendment) Act, 2008, so the bar now applies whatever the size (all as reported; the Gazette text of the 2008 amendment was not read). Rule 8(3) of the West Bengal Municipal (Building) Rules, 2007 bars the filling of any "canal, pond, water body, wetland, rivulets, jhora, water source, natural spring, streams", drain or culvert in the municipal areas without reasons recorded in writing and the prior approval of the State Government (as reported). In Kolkata, KMC acts through restoration notices under section 53 of the West Bengal Town and Country (Planning and Development) Act, 1979, notices of its Building Department under section 400(1) of the KMC Act, 1980, and police complaints, of which it had reportedly filed 870. The Calcutta High Court has held that the Corporation must first establish that a site is a "water area" before it acts under section 17A (Anuradha Sen v. Kolkata Municipal Corporation, 9 January 2024, as reported). The KMC Building Rules 2009 add an incentive: water bodies within a plot count in the plot area for FAR (Rule 2(27)), and setback, height and internal-road relaxations are available where a water body, a heritage building or both cover at least 25% of the land (Rules 65A, 74(4) and 81(9), in the copy of the Rules that appears to include later amendments). The East Kolkata Wetlands have their own Act of 2006 and the High Court's judgment of 1992 (Clause 7.12). Counts of Kolkata's ponds disagree: KMC listed 1,634 water bodies in 1996 and 3,874 in 2006, against about 8,731 estimated by NATMO and about 4,889 in a later satellite count, a loss of some 44% (as reported, on different bases). On the coast, the Coastal Zone Management Plan under the CRZ Notification, 2019 had not been approved by December 2025 (NGT filings). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the fisheries, planning, municipal, wetland and coastal procedures that record and protect waterbodies in law, or the directions of the High Court and the National Green Tribunal.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or tidal river (gang), stream, khal or nala, canal, lake or large tank (jhil, dighi, sayar), tank or pond (pukur, doba), floodplain wetland or marsh (bil, baor, jala), embanked fishery (bheri), tidal creek or estuary (khanri, mohana), mudflat or mangrove, abandoned brick-field pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (pukur) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (overflow, outlet or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the I&WD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (feeder channel, khal or nala) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice gate or outlet, including a sluice through a river or Sundarbans embankment (bandh)) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

West Bengal terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Water area The land that section 17A of the West Bengal Inland Fisheries Act, 1984 protects: a water area, with or without embankments, or naturally or artificially depressed land that retains water for at least six months in a year, of any size since the 2008 amendment (as reported). A water area is a tank or pond under Clause 7.2, whether or not it has a bund, an overflow or a sluice. Whether a particular site is a water area is for the competent authority to establish after inquiry (Anuradha Sen v. KMC, 2024, as reported); for design under this Manual, the boundary of Clause 7.13.1 applies.
Pukur; dighi; jhil A pond or tank; a large and deep tank; a very large pond (Annex 7E). KMC's records classify plots as "Pukur (Pond)". Each is a tank or pond under Clause 7.2. Most urban pukurs have no surplus weir: their FTL is the level at which they spill to the street drains or to the next pond, found by survey.
Water body (East Kolkata Wetlands) Under the East Kolkata Wetlands (Conservation and Management) Act, 2006, "water body" includes "any land holding water", and the East Kolkata Wetlands are the areas described in Schedule I of the Act and mapped in Schedule II (sections 2(c) and 2(k), as reported). Within that boundary, Clause 7.12 applies in addition to this chapter.
Bheri An embanked low land used as a fishery (Annex 7E). In the East Kolkata Wetlands, a fishery pond fed with the city's sewage for fish culture, which the 2006 Act calls "sewage-fed pisciculture" (section 4, as reported). A bheri is a tank or pond under Clause 7.2 and, within the East Kolkata Wetlands, part of a wetland under Clause 7.12; its storage is not counted as detention for any development (Clause 7.12.5).
Khal A canal or channel (Annex 7E), natural or cut, such as Tolly's Nullah, the Bagjola, Kestopur and Churial khals and the Circular Canal. A khal draining 8 ha or more is a natural channel under Clause 7.4.1(b), whether or not it was dug. In Kolkata a khal that receives storm-water flow pumped from a combined system is also a combined-system outfall channel (Clause 7.10.6 and Chapter 8).
Outfall channels (DWF and SWF channels) The "two parallel channels from Bantala to Kulti (17 miles / 27 kms) to carry storm water and dry weather flow of the city separately" of the Kulti Outfall Scheme (I&WD). For this Manual they are channels under Clause 7.10 and the downstream end of every Kolkata cascade under Clause 7.7.2; their tailwater is the tide in the Kultigang (Chapter 5).
River zone The zone "within 15 metres from river bank", and on the fronts of water bodies of more than 1,000 acres, in which rule 8(4) of the West Bengal Municipal (Building) Rules, 2007 limits a building to 5.00 m in height (6.50 m on stilts at least 3.00 m high and not walled in), 20 m in length and 200 m² in covered area, with clear gaps between buildings of 30 m, 20 m or 15 m for rivers more than 75 m, 50 to 75 m and less than 50 m wide (as reported). It limits buildings but does not keep the strip clear; Zone 1 of this Manual, not less than 15 m, excludes buildings, fill, paving and walls from the same strip (Clause 7.5.1).
Embankment (bandh) A river or Sundarbans flood embankment. The I&WD counts about 3,122 km of embankment in the Sundarbans (I&WD, Aila account). A sluice through an embankment is a controllable outlet under Clause 7.8 only where its gates can be operated to a written rule; a breach or cut in an embankment is governed by Clause 7.14.5.
Brick-field pit An abandoned brick-field pit, which rule 8(5) of the West Bengal Municipal (Building) Rules, 2007 requires to be kept as a water body (as reported). It is a tank or pond under Clause 7.2.
Filled-up tank Land declared in a KMC building application as a "solid/filled up tank or part tank" (KMC Building Rules 2009, application form). For this Manual, a filled tank is a waterbody under Clause 7.3.3, and its recorded extent governs, unless the competent authority has approved the filling in law.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the I&WD and the Land and Land Reforms Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the I&WD, KMC or another municipal corporation, a Municipality, NKDA, KMDA or another development authority, EKWMA, the Gram Panchayat, the Fisheries Department, the Land and Land Reforms Department (through the District Collector), the Forest Department, the private owner of a pond or bheri, or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) mouza maps and land records of the Land and Land Reforms Department, including land recorded as pukur (pond), doba, khal, bil or jala (KMC's notices cite the L.R. plot "classified as Pukur (Pond)"); the water-body lists of KMC and other ULBs and KMC's GIS mapping of ponds; land shown as a water body in a land-use map or notification of KMDA or another development authority under the West Bengal Town and Country (Planning and Development) Act, 1979; the map of the East Kolkata Wetlands in Schedule II of the 2006 Act; and, in the coastal districts, the High Tide Line and mangroves of the Coastal Zone Management Plan (CZMP) in force;
  • (b) I&WD and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where I&WD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. No 1% AEP flood map of any West Bengal city was found, and West Bengal has no system of statutory flood lines. The CAG recommended in 2019 that the State enact the Model Flood Plain Zoning Bill, and found that flood management projects were "taken up at different locations depending on priority and availability of funds without being linked to a comprehensive plan" (CAG, Report No. 2 of 2019). KMC has begun GIS mapping of its ponds, and its website was reported to show pond lists for 141 of its 144 wards (as reported); in the case at Behala that came before the National Green Tribunal, KMC detected the filling of a pond by comparing the site with the NRSA aerial map (NGT, OA 258/2024). KEIIP's third tranche of work was to include an early-warning system for flood risk and an update of KMC's land use maps "to incorporate climate change principles" (ADB, 2016); no published flood map from it was found. The National Green Tribunal directed in November 2021 that the boundary of the East Kolkata Wetlands be demarcated with pillars within six months (as reported); whether that was done was not established. On the coast, the CZMP under the CRZ Notification, 2019 was not approved by December 2025, and the State and the Technical Scrutiny Committee disagreed over whether to keep the High Tide Line of 2011, which the State's coastal authority says "no longer exists" on an eroding coast (NGT filings, 2025). Clause 7.3.4 lets the Authority adopt larger-scale flood maps once they are issued. Until then, the Applicant must produce the extent for larger and flood-sensitive sites, and because West Bengal has no flood lines, that extent governs wherever it has been mapped. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual (no West Bengal statute or building rule sets a general setback from khals, ponds or wetlands, and the 15 m river zone of rule 8(4) of the West Bengal Municipal (Building) Rules, 2007 limits the height and size of buildings in it rather than keeping it clear; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the I&WD's consent for a work on one of its rivers, embankments, khals or outfall channels, the Fisheries Department's permission under section 17A of the West Bengal Inland Fisheries Act, 1984, the sanction of EKWMA under the East Kolkata Wetlands (Conservation and Management) Act, 2006, a WBSCZMA recommendation or CRZ clearance, or a permission of the wetland authority sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, because the KMC Building Rules 2009, the West Bengal Municipal (Building) Rules, 2007 and the West Bengal Acts that protect waterbodies set no general setback from khals, ponds or wetlands. Rule 8(4) of the 2007 Rules limits buildings within 15 m of a river bank to 5 m in height (as reported), but does not keep the strip clear; this Manual uses the same 15 m as a corridor (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because West Bengal flood maps are mostly coarser than US maps, the Gangetic delta around Kolkata, Howrah and the 24 Parganas and the islands of the Sundarbans are very flat and low, and Kolkata's ground falls only gently eastward from the natural levee of the Hooghly (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

West Bengal's rules set almost no distances from waterbodies. No setback from khals, ponds or wetlands was found in the KMC Building Rules 2009; instead the Rules reward keeping a water body on a plot (Rules 2(27), 65A, 74(4) and 81(9)). The KMC Act, 1980 keeps any filth receptacle 15 m from a tank, well, water-course or reservoir (heading in Chapter XVIII, read from a poor scan), but sets no building line along a khal. Rule 8 of the West Bengal Municipal (Building) Rules, 2007, which applies in the municipal areas, notified areas and industrial townships, bars the filling of ponds, canals, wetlands, streams, drains and culverts without the State's approval, and in the river zone within 15 m of a river bank limits the height, length and covered area of buildings and the gaps between them (as reported); it does not keep the zone clear. The West Bengal Inland Fisheries Act, 1984 and the East Kolkata Wetlands (Conservation and Management) Act, 2006 protect the waterbody itself: the first bars filling a water area, and the second bars any change in the area or character of the wetlands without sanction and requires a water body of no less area to be created within the wetlands for any that is filled (sections 9 and 10, as reported). Neither sets a distance. No bank buffer for the I&WD's khals and outfall channels was found. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. West Bengal has no general statutory setback from khals, ponds or wetlands. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor. It is not found in the KMC Building Rules 2009, the West Bengal Municipal (Building) Rules, 2007, the New Town Kolkata (Building) Rules, 2009 or any West Bengal Act read for this Manual. Because West Bengal has no statutory flood lines, the 1% AEP extent of this Manual, where it has been mapped (Clause 7.3.4), is the only flood-based line, and it governs Zone 2. The setback is applied as the larger of the corridor and any statutory line, so the Manual is stricter than statute almost everywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • The river zone of rule 8(4) of the West Bengal Municipal (Building) Rules, 2007. Within 15 m of a river bank, and on the fronts of water bodies of more than 1,000 acres, a building may be no more than 5 m high, 20 m long and 200 m² in covered area (as reported). Zone 1 covers the same 15 m and excludes buildings from it altogether; where a river's floodway or the 1% AEP extent is wider, Zone 1 or Zone 2 extends to it.
  • Bars on filling. Section 17A of the West Bengal Inland Fisheries Act, 1984, rule 8(3) of the 2007 Rules and sections 9 and 10 of the East Kolkata Wetlands (Conservation and Management) Act, 2006 bar or control the filling of ponds, water areas, canals and wetlands. They protect the waterbody, not a strip around it.
  • CRZ Notification, through the CZMP in force. The State's CZMP under the CRZ Notification, 2019 had not been approved by December 2025: revised plans for Purba Medinipur and North 24 Parganas went to the Ministry in September and October 2025, and that for South 24 Parganas was promised for January 2026 (NGT filings). Until it is approved, the plan approved under the CRZ Notification, 2011, with its 2011 High Tide Line, is the one in use. Its widths along tidal rivers and creeks were not read for this Manual; the Applicant shall obtain the CRZ lines for the site from the WBSCZMA, and they govern wherever they lie outside Zone 1.
  • The East Kolkata Wetlands boundary. Within the area mapped in Schedule II of the 2006 Act, no change of use is permitted without the sanction of EKWMA (section 10, as reported). The whole of that area is a waterbody for this chapter.

This Manual sets 15 m as the floor because it is the distance that West Bengal law already uses beside water, in the river zone of the 2007 Rules and in the KMC Act's provision that keeps filth receptacles 15 m from a tank or water-course; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that Kolkata's khals need for regular desilting. The reasons for the corridor are the waterlogging of Kolkata on 23 September 2025, the floods of July 2017, in which the CAG recorded 217 deaths and damage of ₹17,727.94 crore, the CAG's finding that flood works in the State were not linked to any basin plan, and the loss of ponds and wetlands in and around Kolkata. Until a statute, rule, notification or land-use plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with West Bengal's statutory limits (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Setback measured from FTL (tanks, lakes) or top of bank (channels), whichever gives the wider zone. This Manual: Zone 1 and Zone 2 Statute: WBMBR 2007, r. 8; KMC Act 1980 15 m river zone: buildings ≤ 5 m high, ≤ 20 m long, ≤ 200 m² (WBMBR r. 8(4), as reported) 15 m: no filth receptacle near a tank or water-course (KMC Act, Ch. XVIII) No statutory setback from khals, pukurs or wetlands: filling is barred instead (Inland Fisheries Act s. 17A; WBMBR r. 8(3); East Kolkata Wetlands Act 2006). No statutory flood lines: the mapped 1% AEP extent sets Zone 2. The 15 m floor of Zone 1, for every waterbody, is set by this Manual and is stricter than statute. Wider statutory lines govern: the East Kolkata Wetlands boundary (2006 Act, Schedule II); water bodies in KMDA or other land-use maps and notifications; mangroves and CRZ lines of the CZMP in force.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the mandatory open space required by the KMC Building Rules 2009 and the West Bengal Municipal (Building) Rules 2007, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban West Bengal practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Gangetic delta around Kolkata and Howrah and the embanked islands of the Sundarbans are flat and low, and Kolkata's ground is subsiding by 2.8 to 5.5 mm a year (Thakur et al., 2026), so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

No West Bengal rule protecting the land between a pond's full level and its flood level was found. Section 17A of the Inland Fisheries Act protects land that holds water for at least six months in a year (as reported), so the margin of a pukur that floods only in a heavy storm is not protected by it on its text, and the burden of showing that a site is a water area rests on the authority (Anuradha Sen v. KMC, 2024, as reported). The East Kolkata Wetlands Act is wider: within the wetlands, "water body" includes "any land holding water" (section 2(k), as reported). Kolkata's pukurs are part of its flood path. Most have no surplus weir and spill to the street drains, so the land around them that floods in a storm stores water that would otherwise stand in the streets or reach the pumping stations. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the South Suburban catchment of Kolkata, which suffers "frequent and prolonged waterlogging" (KMC, 2015), Howrah, which lies lower than the Hooghly (CPHEEO appraisal note), and the Ghatal basin already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

West Bengal has no tank Act and few impounded tanks of the classic type, with an earthen bund, a waste weir and irrigation sluices, in its towns. The storages that matter for urban drainage are of five kinds. The first is the urban pukur or dighi, often privately owned, usually with no outlet structure, and protected by section 17A of the Inland Fisheries Act: KMC listed 3,874 water bodies in 2006 (as reported). The second is the bheri of the East Kolkata Wetlands, an embanked fishery pond fed with the city's sewage, beside the outfall channels that carry Kolkata's storm and dry-weather flow to the Kulti (I&WD); the wetlands' storage role in a design storm, and any rule for operating the bheris, were not found (gap). The third is the floodplain wetland, the bil, baor or jala of the Gangetic plain. The fourth is the abandoned brick-field pit that rule 8(5) of the West Bengal Municipal (Building) Rules, 2007 requires to be kept as a water body. The fifth is the embanked island of the Sundarbans, which drains through sluices in its embankments when the tide outside is low, as a polder does (this Manual's reading). Clauses 7.7 and 7.8 apply to any of these whose storage is counted. In Kolkata, the chain of city drains, pumping stations, outfall channels, bheris and outfall works to the tidal Kulti is the cascade for Clause 7.7.2, and it is modelled as one system. DVC's reservoirs at Maithon and Panchet on the Damodar are not tanks for these clauses: their releases enter a design as inflow and tailwater (Chapter 5).

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. I&WD, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in Kolkata, every pumping station, outfall channel and bheri of the East Kolkata Wetlands through which the outflow passes to the tidal Kulti, as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than I&WD's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. West Bengal's largest floods have come late in the south-west monsoon, when ponds, wetlands and channels are already high and the soils wet. In September 1978, 369.6 mm fell at Alipore on 28 September and 409.3 mm at Uluberia on the 29th (IMD). On 17 September 2024, the combined release from Maithon and Panchet reached about 2.5 lakh cusec (as reported, from a government statement), and on 23 September 2025, 251.4 mm fell on Kolkata in 24 hours, 185.6 mm of it in three hours (IMD, 2025). At the KEIIP pumping station at Behala Flying Club, the basin stays flooded because discharge through the outfall "is partially achieved due to high water levels in the canal, particularly during tidal period" (KMC, 2015): storage downstream that is already full gives no relief. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

Kolkata's outfall chain: city drains to the tidal Kulti (plan) Kolkata's outfall chain: city drains to the tidal Kulti (plan, schematic, not to scale) River Hooghly (tidal) natural levee ground falls east, away from the river Kolkata (KMC) pukur combined drains and sewers: storm water and sewage together (KMC Act 1980, s. 277) new sites: retention, RWH, detention; foul and storm kept apart (Cl. 6.3.6) combined flow Pumping stations flows split at each station DWF pumps SWF pumps e.g. Ballygunge 1,233 cusec, Palmer Bazar 1,184, Dhapa Lock 480 (installed, I&WD list) SWF = storm water "mixed with sewage" Bidhannagar, New Town, South Dum Dum Bagjola khal (about 38 km) Zone 1 ≥ 15 m each bank (Cl. 7.4) dry-weather-flow (DWF) channel storm-water-flow (SWF) channel two parallel channels, Bantala to Kulti, about 27 km (Kulti Outfall Scheme) sewage to the bheris bheri bheri bheri East Kolkata Wetlands (Ramsar, 12,500 ha; Act of 2006) embanked fishery ponds: "sewage-fed pisciculture" inflows and outflows drawn schematically; storage not counted as detention for any development (Cl. 7.12.5) P Kulti pump house, 1,650 cusec; upgrade to 4,000 approved (as reported) outfall gates (schematic; sill levels not published) Kultigang (tidal), to the Raimangal estuary tide sets tailwater (Ch. 5) tidal river dry-weather flow (sewage) storm water (with sewage in a storm) Zone 1 (≥ 15 m, set by this Manual) Model the whole chain together, from the city's drains and pumping stations to the Kultigang (Clause 7.7.2); count no storage in the bheris (Clause 7.12.5). No levels shown: no design tailwater, sill or channel level for the outfall chain was published. Pumping capacities are installed values from the I&WD list. Every level in a design must be surveyed and stated on one datum (Clause 7.3.5). The Hooghly-side outfalls through locks and gates are not shown.

Figure 7.3 — Kolkata's outfall chain, in plan (schematic, not to scale): the city on the natural levee of the Hooghly, with ground falling east; combined drains and sewers carrying storm water and sewage together (KMC Act, 1980, section 277), with on-site retention, RWH and detention on new sites; pumping stations with separate dry-weather-flow and storm-water-flow pumps, of which three of KMC's main stations are named with their installed capacity from the I&WD list; the two parallel outfall channels from Bantala to Kulti, about 27 km, that carry the dry-weather flow and the storm-water flow "separately"; the bheris of the East Kolkata Wetlands, fed from the channels for sewage-fed fisheries; the outfall works where the channels and the Bagjola khal meet the tidal Kultigang, which joins the Raimangal estuary; and the 15 m minimum Zone 1 of this Manual along the khals and around the ponds. The bheri inflows and outflows and the gates at the outfall are drawn schematically: no plan of the wetlands' connections, and no sill or tailwater level at the outfall, was published. Original drawing for this Manual; concept from the I&WD's account of the Kolkata Metropolis Drainage and the Kulti Outfall Scheme, the KEIIP environmental examination (KMC, 2015) and the East Kolkata Wetlands (Conservation and Management) Act, 2006.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, WBSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under I&WD control, the operating rule shall be I&WD's rule. This Manual does not authorise any other body to operate a I&WD tank.

Commentary. No operating rule for a West Bengal pukur, bheri or floodplain wetland that keeps a flood cushion was found, and most pukurs have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter are elsewhere. Kolkata's drainage runs through locks, gates and pumps: the Chitpur lock on the Circular Canal dates from 1833, the main KMC pumping stations at Ballygunge, Palmer Bazar and Dhapa Lock lift the city's flow into the outfall channels, and the Bagjola khal ends in a pump house at Kulti of 1,650 cusec that is reported to be inadequate, with an upgrade to 4,000 cusec approved by the Central Water Commission (I&WD; as reported; the upgrade's status is not known). Lock-gate operators have warned of damage at full-moon high tides, and KMC has planned lifting stations so that drainage can continue while lock gates are shut (as reported). Upstream, the Damodar's floods are regulated by DVC's dams. In September 2024, the combined release from Maithon and Panchet reached about 2.5 lakh cusec on 17 September, and the State Government and the Union Ministry then disagreed in public over how the releases had been made (as reported; release figures from different sources also disagree). Without an agreed rule with dates, levels and a named operator, storage behind a gate cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression or a May or October–November cyclone. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

Fish culture remains the purpose for which section 17A of the Inland Fisheries Act protects ponds, and the bheris of the East Kolkata Wetlands are working fisheries. Drawing a pond or bheri down before a storm has a cost to those who fish it, which is why Clause 7.8.2(d) requires the custodian, and for a private pond its owner, to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the West Bengal Pollution Control Board directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 15 May each year (Chapter 10).

Commentary. Desilting of the khals is a main pre-monsoon work in Kolkata. The dredging of the Kestopur and Bagjola canals, about 80 km together, began in 2022 after a gap of five years, and 28 to 31 canals were listed for desilting in a later season (as reported). Bengali has a word for the work on ponds: pukur jhalano, "to dredge a tank" (Samsad). In the north, the Teesta flood of October 2023 left silt in the Teesta–Mahananda link canal, which then had to be dredged (as reported). In the Ghatal basin, seven river stretches totalling 115.80 km were re-excavated in 2018–21 at a cost of ₹341.49 crore from the State budget (as reported). No published KMC deadline for desilting was found. The 15 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no West Bengal precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. Kolkata's khals are its outfall system, and most of them were dug. Tolly's Nullah was opened in 1777 and runs 27.2 km to the Bidyadhari at Samukpota; the Circular Canal followed in 1820, the Chitpur lock in 1833, the Bhangor Khal in 1897–98 and the Keshtapur Khal in 1910; the Bidyadhari, the city's old outfall river, silted and "was finally abandoned by the Govt. in 1928", and the Kulti Outfall Scheme replaced it (I&WD). The Bagjola khal, about 38 km long, is reported to be the main outlet for South Dum Dum, New Town and Bidhannagar. The KMC Act vests every public drain in the Corporation (section 280), but the main canals and outfalls are the I&WD's (as reported), and where one ends and the other begins was not established. Where the outfall "deteriorates by the decay of existing river channels or otherwise", the State may require KMC to act at the cost of the Municipal Fund (section 277(2)). Rule 8(3) of the West Bengal Municipal (Building) Rules, 2007 bars the filling of a canal, drain or culvert without the State's approval (as reported). The CAG found that the I&WD's Kandi Master Plan raised and strengthened embankments but "failed to create the additional waterways by reconstructing/renovating bridges and culverts" (CAG, Report No. 2 of 2019), which is the failure Clause 7.10.3 is written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored pukur or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In West Bengal the nearest existing forms of shared storage are the KMC Building Rules' reward for keeping a water body on a plot, which lets it count in the plot area for FAR and earns relaxations where it covers at least 25% of the land (Rules 2(27) and 65A), and the East Kolkata Wetlands Act's requirement that a water body filled with sanction be replaced by one of no less area within the wetlands (section 10, as reported). Bidhannagar was reported in 2024 to have identified more than 150 water bodies for restoration. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the West Bengal State Wetland Authority;
  • (b) the Ramsar sites of West Bengal: the East Kolkata Wetlands (listed as the East Calcutta Wetlands, designated on 19 August 2002, 12,500 ha) and the Sundarbans Wetland (listed as the Sunderbans Wetland, designated on 30 January 2019, 423,000 ha);
  • (c) the East Kolkata Wetlands as described in Schedule I and mapped in Schedule II of the East Kolkata Wetlands (Conservation and Management) Act, 2006, including their bheris, the dry-weather-flow and storm-water-flow channels from Bantala to Kulti, and the tidal Kultigang;
  • (d) the tidal creeks (khanris), rivers, mudflats and mangroves of the Sundarbans, the Hooghly estuary and the Purba Medinipur coast;
  • (e) the bils, baors and jalas of the Gangetic floodplain; and
  • (f) any other marsh, wetland or creek that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. West Bengal has two Ramsar sites, both large and both next to cities: the East Kolkata Wetlands (12,500 ha, designated on 19 August 2002) and the Sundarbans Wetland (423,000 ha, designated on 30 January 2019) (MoEF&CC, 2024). The East Kolkata Wetlands lie east of the city, between it and its outfall. The Calcutta High Court restrained their further reclamation in People United for Better Living in Calcutta v. State of West Bengal (24 September 1992, AIR 1993 Cal 215), and directed the State to maintain their character (as reported). The East Kolkata Wetlands (Conservation and Management) Act, 2006, deemed in force from 16 November 2005, set up the East Kolkata Wetlands Management Authority (EKWMA), chaired by the Chief Secretary, with the Secretaries of the Environment, Urban Development, Irrigation and Waterways, Fisheries and Municipal Affairs Departments, the Chief Executive Officer of KMDA, the Commissioner of KMC and the District Magistrates of North and South 24 Parganas among its members. Its powers extend to demarcation, stopping unauthorised development, pollution abatement and "sewage-fed pisciculture" (section 4). Landholders must keep the area and character of the wetlands intact (section 9); a change of use is allowed only with sanction and only for "improvement or upkeep of the local environment", and a water body that is filled must be replaced by one of no less area within the wetlands (section 10); offences carry up to three years' imprisonment, a fine of up to ₹1 lakh, or both (section 18) (all as reported; the Gazette text was not read). Salt Lake and New Town were built on reclaimed wetland (as reported). The National Green Tribunal made orders on encroachment in the wetlands from 2019 to 2021, directed an integrated management plan in December 2020 and boundary pillars in November 2021, and in May 2026 the State Wetland Authority told it that KMC had not cleared encroachments at Ukil Bheri (as reported). In the Sundarbans, the I&WD's embankments are the line between the islands and the tide: Cyclone Aila (25 May 2009) washed out or breached about 177 km of them and severely damaged a further 601 km (I&WD), and the stretches rebuilt after Aila, only about 84 km, were reported to have held in Amphan and Yaas while mud embankments breached at many points. On the coast, the State's coastal authority told the Tribunal that the 2011 High Tide Line "no longer exists due to erosion of the soft unconsolidated alluvial coast and ingress of sea" (NGT filing, March 2025). A drain outfall, khal widening, sluice or pumping station in a mangrove belt or on a tidal creek therefore needs CRZ clearance through the WBSCZMA as well as compliance with this chapter, and any work within the East Kolkata Wetlands needs EKWMA's sanction. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. In Kolkata, sewage reaches the khals and the wetlands by design. The KMC Act, 1980 makes the Corporation provide "a safe and sufficient outfall … for the effectual drainage and proper discharge of storm-water and sewage" without flooding the city or the country round the outfall (section 277(1)); the Commissioner may require a separate drain "for rain water and unpolluted sub-soil water" (section 292), but the system the Act describes is combined (Clause 6.3.6). KEIIP's pumping stations have separate dry-weather-flow and storm-water-flow pumps, and in a storm the storm-water flow, "mixed with sewage", is pumped to the canals (KMC, 2015). The Kulti Outfall Scheme carries the city's storm water and dry-weather flow to the Kulti in separate channels (I&WD), and the bheris of the East Kolkata Wetlands are fed with the sewage for fish culture. Clauses 7.10.6(d) and 7.12.3 therefore cannot be met by the existing outfalls of a combined system. In West Bengal they apply in full to every new separate storm outfall; an outfall from a combined system is a sewage overflow, which Clause 8.9.6 permits only where the sewerage agency shows that no alternative exists, with screening and with the overflow frequency stated.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. West Bengal's main controls on filling and building in waterbodies are the Inland Fisheries Act, the planning Act, the municipal Acts and the orders of the Calcutta High Court and the National Green Tribunal. A case at Behala shows how they are used. KMC's Environment and Heritage Department found part of an 875.64 m² pond, recorded as "Pukur (Pond)", filled, by comparison with the NRSA aerial map; it issued a notice under section 53 of the West Bengal Town and Country (Planning and Development) Act, 1979 in September 2021, giving seven days to restore, and lodged a police complaint; after the High Court's order in Sumitra Mondal v. KMC (28 November 2023) it issued a fresh notice and a second complaint followed in March 2024, while its Building Department issued a notice under section 400(1) of the KMC Act (NGT, OA 258/2024). KMC had reportedly filed 870 such complaints. The High Court quashed one KMC action under section 17A in January 2024 because the Corporation had not first shown that the Act applied to the site, and ordered a proper inquiry with notice (Anuradha Sen v. KMC, as reported). The National Green Tribunal has made orders on the filling of water bodies in Howrah (2016) and of two ponds in Purba Bardhaman (2021), and on encroachment in the East Kolkata Wetlands (2019 to 2026) (as reported). KMC's building application asks whether the land is a "solid/filled up tank or part tank" (KMC Building Rules 2009). No statewide count of encroached waterbodies was found; Kolkata's counts are in the Commentary to Clause 7.1. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 15 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most pukurs and the embankments of most bheris are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The river and Sundarbans embankments of the I&WD are flood embankments, which the Act excludes. DVC's dams at Maithon and Panchet on the Damodar enter this Manual only as sources of inflow and tailwater (Chapter 5). Where the storage of a pukur, bheri or other pond is counted under Clause 7.7, its bank or embankment is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Dam releases and embankment failures have flooded West Bengal's towns. In September 2024 the combined release from Maithon and Panchet reached about 2.5 lakh cusec on 17 September, and parts of Howrah, Hooghly, the two Medinipurs, Bankura and Purulia were flooded, with the Shilabati above its danger level at Ghatal (as reported; other reports give higher figures). In October 2023 the outburst of South Lhonak lake in Sikkim washed away the Teesta-III dam and sent a flood down the Teesta through Kalimpong, Darjeeling, Jalpaiguri and Cooch Behar districts, with more than 8,000 m³/s reported released from the Teesta barrage (as reported). Cyclone Aila breached about 177 km of Sundarbans embankment in May 2009 (I&WD). No release protocol for the DVC dams, and no emergency action plan for an embankment, was read for this Manual. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Bengali waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)